ii · 2020. 9. 24. · ‐ ii 40 o 59 lje predvideti prostore za edukaciju, kabinete i...

59
Ǧ Ǧ ǡ ǣ Ǥ ǣ ȀǦǦ Ȁ Ǧ Ǥ Ǥ

Upload: others

Post on 29-Jan-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • ‐ 

    ‐  II 1 o  59 

    , email: [email protected] 

    :  032/515‐00‐47 8/2014 

    ‐  II 

    31 31 

    .  .

  • ‐ 

    ‐  II 2 o  59 

    :  4‐404‐151/1  30.05.2014.  , 

    ‐  II 

    I  4‐6 II  6‐12 III  13‐16 

    17 18

    19

    20 21 22222425 26‐27 28 29‐35 

    3  3637 38‐59 59

  • ‐ 

    ‐  II 3 o  59

  • ‐ 

    ‐  II 4 o  59 

    1. 

    1.  ,32300 

    2. 3.  8/2014 4. 5. 

    II 6.  ‐00‐47, Email: [email protected] 

    2. 1. 

    II 2. 

    5114 3. 71242000 

    3. 1.  . 2.

    3. 

    4. 

    5. 

    8/2014

  • ‐ 

    ‐  II 5 o  59 

    II. 

    2, 3 

    2,00 

    6. 

    12,10 , 

    7. 

    8. 20 

    a

  • ‐ 

    ‐  II 6 o  59 

    II 

    1. 

    2. 

    3. 

    .

  • ‐ 

    ‐  II 7 o  59 

    4. 

    5. 

    6. 

    7. 

    1) 

    2) 

    3) 

    4) 

    5) 

    6) 

    8.

  • ‐ 

    ‐  II 8 o  59 

    ‐ 

    40 % *  50  % 

    10  % 

    9. 

    ‐ 

    ‐ 

    ‐ 

    ‐ ; 

    10.

  • ‐ 

    ‐  II 9 o  59 

    11. 

    60 ( 

    12. 

    13. 

    1) 2) 3) 4) 5) 

    6)

  • ‐ 

    ‐  II 10 o  59 

    1) 2) 

    3) 4) 

    5) 

    6)

    7) 

    14. 

    ‐742221843‐ ‐

  • ‐ 

    ‐  II 11 o  59 

    15.

    16. 

    ‐ 

    8/2014  ‐ II. 

    17.

    18.

  • ‐ 

    ‐  II 12 o  59 

    19. 

    20. 

    21.

    22. 

    23. 

    III 

    1.

  • ‐ 

    ‐  II 13 o  59 

    15 

    1.2.2.  2 , 

    . . 

    1.2.4 .  3  (  2011, 2012, 2013) ,

  • ‐ 

    ‐  II 14 o  59 

    1.4.1. 

    1) 

  • ‐ 

    ‐  II 15 o  59 

    2)   

     

     

    3)   

    4)   

    5)    .

  • ‐ 

    ‐  II 16 o  59 

    3. 

    3.1. , 2012  3. 

    3.2.  : * 

    3.3.

  • ‐ 

    ‐  II 17 o  59 

    _____________________________________________________________________________ 

    _____________________________________________________________________________ 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ‐mail): ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    _____________________

  • ‐ 

    ‐  II 18 o  59 

    ‐ 

    II,  /2014, 

    _____________________

  • ‐ 

    ‐  II 19 o  59 

    ‐ ‐  II, 

    ______________ 

    _______________ 

    ________________ 

    _____________________

  • ‐ 

    ‐  II 20 o  59 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ‐mail): ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    _____________________

  • ‐ 

    ‐  II 21 o  59 

    _________________________         ____________________________ _________________________ 

    _________________________         ____________________________ _________________________ 

    ‐  II , 

    _______________________ 

    _______________________ 

    _______________________ 

    _______________________

  • ‐ 

    ‐  II 22 o  59 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ‐mail): ______________________________________________________________________________ 

    _____________________________________________________________________________ 

    _____________________________________________________________________________ 

    _____________________________________________________________________________

  • ‐ 

    ‐  II 23 o  59 

    (  2011,  2012,  2013) 15.000.000,00 

    ‐ 

    ______________________________

  • ‐ 

    ‐  II 24 o  59 

    _________________________________________________ 

    _________________________________________________ 

    ________________________________________________________________________ 

    : 1. 

    ________________________________ ‐ 

    ‐ 

    ________________________________________ 

    ______________________ 

    ‐ 

  • ‐ 

    ‐  II 25 o  59 

    II, 

    _____________________

  • ‐ 

    ‐  II 26 o  59 

    II 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ‐mail): ______________________________________________________________________________ 

    ______________________________________________________________________________ 

    ______________________________________________________________________________

  • ‐ 

    ‐  II 27 o  59 

    1. ______________________________________________________________________________ 2. ______________________________________________________________________________ 3. ______________________________________________________________________________ 

    1. ______________________________________________________________________________ 2. ______________________________________________________________________________ 3. ______________________________________________________________________________ 

    ‐  ‐ 

    __________________ 5) 

    40 % *  50  % 

    10  % 

    . 6  60 

    ____________________

  • ‐ 

    ‐  II 28 o  59 

    ‐  ‐ 

    1  ‐ 

    _____________________

  • ‐ 

    ‐  II 29 o  59 

    2. 

    1. 

    2  .  _________________________________________, 

    : : 

    ‐  ‐  . 

    II 

    _____ 

    1.  ‐ 2.

  • ‐ 

    ‐  II 30 o  59 

    2. _____ 

    2. ____________ 

    ‐ ‐ 

  • ‐ 

    ‐  II 31 o  59 

    40 % *  50  % 

    10  % 

    ‐ ‐ 

    ‐ ‐ 

    .

  • ‐ 

    ‐  II 32 o  59 

    7. 

    9. 

     

    .

  • ‐ 

    ‐  II 33 o  59 

    .

  • ‐ 

    ‐  II 34 o  59 

    _________________________________________________ 

    _________________________________________________ 

    16. (  ) 

    18. 

    , . 

    1. 2.  . 

    _____________________  __________________________

  • ‐ 

    ‐  II 35 o  59

  • ‐ 

    ‐  II 36 o  59 

    3. 

    ______________________

  • ‐ 

    ‐  II 37 o  59 

    4. 

    ‐ II, 

    ______________________

  • ‐ 

    ‐  II 38 o  59 

    PROJEKTNI ZADATAK 

    Za izradu Glavnog ARHITEKTONSKO  projekta Doma kulture Gornji Milanovac 

    Izradom  glavnog  i objeka dogradnjo opreme,  i  u  skladu  sa  standardima  za  ovu  vrstu  objekata.  Osnova  za  izradu  glavnog 

    Gornjem  Milanovcu  (  KP  432  KO  Gornji  Milanovac).  Glavni  ulaz  u  objekat  je  iz  ulice Vojvode Milana Obrenovi  a. 

    Koris  m 2 

     i restoranom, spratnosti Po+Su+P+3+Pk. 

    Glavni  projekat  rekonstrukcije  i  dogradnje  objekta  javne  namene 

    ispravka, br.  64  od  10.09.2010US,  br.  24  od  04.04.2011.  godine)  a  u  potpunosti  u  skladu  sa 

    m propisima i standardima za objekte navedene namene.

  • ‐ 

    ‐  II 39 o  59 

    Objekat  je  izveden  u  sistemu  kombinovanom  od  armiranobetonskog  skeleta  i  punih  

    armiranobe punom  opekom  debljine  d=25 vertikalnim  i  horizontalnim  armirano   

    rebraste, tipa Avramenko. 

    FAZA II: 

    2 )  BRGP (m 2 ) PODRUM  106,10  139,89 SUTEREN  303,37  396,18 PRIZEMLJE  272,01  324,46 1. SPRAT  362,23  390,06 2. SPRAT  197,28  243,68 3. SPRAT  200,07  247,93 POTKROVLJE  197,80  247,93 

    UKUPNO  1638,86  1990,13 

    PROGRAMSKI KONCEPT: 

    Objekat   podrumski deo     suterenski  deo  , 

    snabdevanja iz servisne komunikacije i nezavi 

      prizemlje 

    kafeu  i  baru  takodje  povezanim  sa  prostorima  publike  velike  dvorane  uz 

      prvi  sprat 

    male  sale  namenjen  galerijskom  programu  i  manjim  scensko izvodjenjima  funkcionalno  povezan  sa  prostorima  publike  velike  dvorane  kao  i

  • ‐ 

    ‐  II 40 o  59 

      lje  predvideti  prostore  za  edukaciju,  kabinete  i 

    novoprojektovanog lifta. 

    Kompletan  prostor  u  prizemlju  i  na  spratu  druge  faze prostora  namenjenog  publici  velike  dvorane  i  kao  multifunkcionalna  celina  sa 

    publike. 

    Spratni deolovi druge faze postojeceg objekta namenjeni su potrebama Kulturnog centra u  smis 

    multifunkcionalni  prostor  upotrebljiv  za  medija  centar,  seminare,  prijeme  i  sastanke,  i 

    kanalizacija,  scenska  tehnologija)  povezani  su  sa  delovima  istih  sistema  u  okviru  prve 

    ETAPE PROJEKTOVANJA: 

    namenjena glavnom projektu druge faze. 

    tako i u vertikalnom planu. U grubim crtama p 

    1.  faza I (nije predmet ovog projekta) 

    Ova  faza obuhvata  i deo suterenskog prostora u kome  treba  formirati  toalete za korisnike svih sad 

    2. objekta. U podrumskom i delu suterenskog prostora predvideti malu scenu. Spratni

  • ‐ 

    ‐  II 41 o  59 

    deo  namenjen  je  potrebama  Kulturnog  centra  u  smislu  kancelarijskog  prostora, 

    kabinete

  • ‐ 

    ‐  II 42 o  59 

    OKVIRNI PREGLED POVR  B  FAZA II: 

    2 ) 1.330,00 

    Podrum i suteren Prizemlje Spratni deo NOVOPROJEKTOVANO  320,00 

    UKUPNO  1.650,00 

    KONSTRUKCIJA I MATERIJALIZACIJA: 

    Obz 

    Elaboratu  geomehanike  i  proceni nosivosti pojedinih konstruktivnih elemenata objekta. 

    i suterenske prostorije u cilju sanacije vlage, koja je evidentna u ovim delovima objekta. 

    malu salu 

    krovovi, sa kompletnom limarijom. 

    a)  SPOLJA Fasadu objekta obraditi u duhu arhitekt

  • ‐ 

    ‐  II 43 o  59 

    predvideti brisoleje ili sl. 

    svim  pripa 

    svim  potrebnim  sloje 

    b)  UNUTRA 

    daglas ili Armstrong i sl). U elementima u kontekstu rasvete. 

    Sve primenjene materijale izabrati sa ciljem ostvarivanja estetskih zahteva prema nameni objekta  i  pojedinih  prostora,  uz  izvesnu  trajnost 

    Idejni ema 

    Kompletan projekat predaje se investitoru u 4 primerka i u elektronskoj formi. 

    INVESTITOR

  • ‐ 

    ‐  II 44 o  59 

    PROJEKTNI ZADATAK 

    Za izradu Glavnog projekta Doma kulture Gornji Milanovac 

    Faza II 

    Izradom glavnog  i objekat savremenim potrebama korisnika r 

    u skladu sa standardima za ovu vrstu objekata. 

    a u Gornjem Milanovcu ( KP 432 KO Gornji Milanovac). Glavni ulaz u objekat je iz ulice Vojvode Milana Obrenovica. 

    0m2, funkcionalno i gradjevinski rasporedjena u dve celine:  deo spratnosti Po+ P+1 a  deo  edukacioni i restoranom spratnosti Po+Su+P+3+Pk. 

    Rekonstr 

    ispravka, br. 64 od 10.09.2010 

    je obezbedjeno 24 

     modulima, 

      kontrolu stanja centrale za dojavu gasa u kotlarnici,

  • ‐ 

    ‐  II 45 o  59 

       

    (klimatizacija, ventilacija i izbacivanje dim 

    mirnom stanju i 30min u alarmnom stanju. 

    kablove tipa NHXHX 

    S obzirom na faznost izgradnje, predv 

    povezivanju. 

    Kompletan projekat predaje se investitoru u 4 primerka i u elektronskoj formi, sa 

    INVESTITOR

  • ‐ 

    ‐  II 46 o  59 

    PROJEKTNI ZADATAK 

    Za izradu Glavnog projekta NERGETSKIH INSTALACIJA 

    Doma kulture Gornji Milanovac, Faza II 

    objekat  savremenim  potrebama  koris 

    opreme, i u skladu sa standardima za ovu vrstu objekata. 

    Gornjem  Milanovcu  (  KP  432  KO  Gornji  Milanovac).  Glavni  ulaz  u  objekat  je  iz  ulice Vojvode Milana Obrenovi  a. 

    reko  2100m 2 

     i restoranom, spratnosti Po+Su+P+3+Pk. 

    Glavni dnji 

    ispravka, br. 64  od 10.09.2010 

    Projeka 

          

    startom  

    Instalacija  elektromotornog  pogona

  • ‐ 

    ‐  II 47 o  59 

    posebnih projekata. Instalacija  enterijerskog  osvetljenja  je  predmet  posebnog  projekta.  Ovim  projektom predvideti dovoljan kapacitet u razvodnim ormanima, kao i u energetskom bilansu, za tu namenu. 

    Za potrebe n 

    je u trafostanici. 

    n na fasadi, na delu objekta koji pripada 1. Fazi izgradnje. 

    Projektom I faze predvidjena  je nabavku dizel el. agregata, kontejnerskog tipa, dovoljne . 

    ranim startom. 

    FeZn  25x4mm,  u  rovu  oko  objekta.  U  novoformiranim  delovima  objekta,  predvideti 

    ovu vrstu instalacija. 

    INVESTITOR

  • ‐ 

    ‐  II 48 o  59

  • ‐ 

    ‐  II 49 o  59

  • ‐ 

    ‐  II 50 o  59

  • ‐ 

    ‐  II 51 o  59

  • ‐ 

    ‐  II 52 o  59

  • ‐ 

    ‐  II 53 o  59

  • ‐ 

    ‐  II 54 o  59

  • ‐ 

    ‐  II 55 o  59

  • ‐ 

    ‐  II 56 o  59

  • ‐ 

    ‐  II 57 o  59

  • ‐ 

    ‐  II 58 o  59

  • ‐ 

    ‐  II 59 o  59