TRANSMISSION LINE & SUBSTATION PROJECTS COMPANY: ENTERGY SERVICES, INC. CUSTOMER: EAST TEXAS ELECTRIC COOPERATIVE (ETEC) FACILITIES STUDY EJO NO. F4PPTX0082 ICTT-2011-040 TRANSMISSION SERVICE FACILITIES STUDY OASIS 75821275 Revision: 0 Rev Issue Date Description of Revision Prepared By Approved By A 11/21/11 Submitted to PD IK ED B 11/21/11 TPD Approval Rick Bewley Brian Warwick C 11/23/11 Revised using Construction revised estimates IK ED 0 12/02/11 ICT Determines Upgrade Classification Sherri Maxey Ben Roubique

Upload: ngotuong

Post on 21-Aug-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

TRANSMISSION LINE & SUBSTATION PROJECTS

COMPANY: ENTERGY SERVICES, INC.

CUSTOMER: EAST TEXAS ELECTRIC COOPERATIVE (ETEC)

FACILITIES STUDY

EJO NO. F4PPTX0082

ICTT-2011-040

TRANSMISSION SERVICE FACILITIES STUDY OASIS 75821275

Revision: 0

Rev Issue Date

Description of Revision Prepared

By Approved

By

A 11/21/11 Submitted to PD IK ED

B 11/21/11 TPD Approval Rick

Bewley Brian

Warwick

C 11/23/11 Revised using Construction revised estimates

IK ED

0 12/02/11 ICT Determines Upgrade Classification Sherri Maxey

Ben Roubique

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

2

TABLE OF CONTENTS

1. PROJECT SUMMARY ....................................................................... 3

1.1. Background and Project Need............................................................................ 3

1.2. Scope Summary ................................................................................................. 3

1.3. Cost Summary .................................................................................................... 5

1.4. Schedule Summary ............................................................................................ 5

2. SAFETY REQUIREMENTS & GENERAL ASSUMPTIONS ............... 5

3. SCOPE OF WORK ............................................................................. 6

3.1. Cedar Hill to Plantation 138 kV line L886 ........................................................... 6

3.2. Plantation to Conroe 138 kV line ........................................................................ 9

4. COST ............................................................................................... 12

5. UPGRADE CLASSIFICATION ......................................................... 12

6. SCHEDULE ...................................................................................... 13

7. RISK ASSESSMENT ....................................................................... 14

8. CONFIRMED RESERVATIONS ....................................................... 15

9. PRE-888 TRANSACTIONS .............................................................. 20

10. STUDY QUEUE ................................................................................ 22

11. ATTACHMENTS .............................................................................. 23

11.1. Table of Acronyms ........................................................................................ 23

11.2. Excel sheet for schedule ............................................................................... 24

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

3

1. PROJECT SUMMARY 1.1. Background and Project Need

The purpose of this Facilities Study is to determine the availability of transfer capability across Entergy’s transmission system from Entergy (EES) to American Electric Power West (CSWS) to evaluate the ETEC request for 75MW of yearly network transmission service. The time period for this transfer is from 1/1/2015 until 1/1/2020. The direction of the transaction is EES to CSWS. The study was performed on the latest available 2014-2020 winter, 2014-2020 summer peak seasonal models using PSS/E and MUST software by PTI. The Facilities Study identifies any transmission constraints resulting from the requested power transfer. The Facilities Study also includes cost estimates to correct any transmission constraints.

1.2. Scope Summary

The Facilities Study has identified some transmission constraints. The constraints can be addressed in the following manner:

1.2.1 Upgrade the Cedar Hill-Plantation 138 kV transmission line

The Cedar Hill-Plantation 138 kV transmission line overloads for the loss of the Porter-Oak Ridge 138 kV transmission line. The Cedar Hill-Plantation 138 kV transmission line needs to have a capacity of 291 or greater on all components. The equipment at Plantation needs to be upgraded to increase the rating of the transmission line from 243 MVA to 250 MVA. The upgrade of the Plantation equipment (which increases the line rating to 250 MVA) is proposed in the 2011-2013 Entergy Construction Plan with a 2013 Expected ISD. It is required that the Cedar Hill-Plantation 138 kV transmission line and associated line equipment and bus be upgraded from a capacity of 250 MVA to at least 291 MVA. The proposed upgrade is 467 MVA. The amount of capacity created by this upgrade is 217 MW, and the customer’s use of the capacity created is 4 MW.

1.2.2 Upgrade the Conroe-Plantation 138 kV transmission line

The Conroe-Plantation 138 kV transmission line overloads for the loss of the Porter-Oak Ridge 138 kV transmission line. The Conroe-Plantation 138 kV transmission line needs to have a capacity of 278 MVA or greater on all components.

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

4

The equipment at Plantation needs to be upgraded to increase the rating of the transmission line from 243 MVA to 250 MVA. The upgrade of the Plantation equipment (which increases the line rating to 250 MVA) is proposed in the 2011-2013 Entergy Construction Plan with a 2013 Expected ISD.

It is required that the Conroe-Plantation 138 kV transmission line and associated line equipment and bus be upgraded from a capacity of 250 MVA to at least 278 MVA. The proposed upgrade is 291 MVA. The amount of capacity created by this upgrade is 41 MW, and the customer’s use of the capacity created is 4 MW.

1.2.3 CLECO Affected System Study

CLECO has been identified as an affected system. The customer will need to satisfy the requirements deemed necessary by CLECO.

1.2.4 2011-2013 Approved Entergy Construction Plan Projects

The following projects are approved in the 2011-2013 Entergy Construction Plan. These projects are required to be in-service prior to the start of NRIS.

Upgrade equipment at Conroe 138 kV substation – 2011 Expected ISD.

1.2.5 Confirmation of OASIS Request 75821264

In order to grant OASIS Request 75821275, an equivalent amount of the facility’s MW capacity must first be undesignated. The equivalent undesignation request (OASIS 75821264) must, therefore, be confirmed.

The ICT and Entergy agree that pursuant to FERC Order No. 890-A, the disposition of undesignation request OASIS 75821264 is not dependent upon the performance of a Facilities Study. Entergy currently is in the process of modifying its Business Practices. OASIS 75821264 undesignation request will be accepted. The ICT and Entergy are in discussions over the manner of studies that should be performed to assess the reliability impact of requests to undesignate Network Resources.

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

5

1.3. Cost Summary

The estimated total project cost is $6,979,570. This cost does not include Tax Gross Up, which may apply. Please note these are 2011 dollars and do not include tax gross-up if and where applicable (Tax Gross Up rate at this time is 25.09 %). Also, note that the estimates include AFUDC and will be removed should the agreement to undertake the project include a prepayment plan. The ICT has assigned $0 as Base Plan upgrades, and $6,979,570, as Supplemental Upgrade based on Attachment T of Entergy’s Open Access Transmission Tariff (“OATT”).

1.4. Schedule Summary The requested in-service date of January 1, 2015 can be met.

2. SAFETY REQUIREMENTS & GENERAL ASSUMPTIONS Safety Safety is a priority with Entergy. Safety will be designed into substations and lines. The designs will be done with the utmost safety for personnel in mind for construction, operation, and maintenance of the equipment. All employees working directly or indirectly for Entergy shall adhere to all rules and regulations outlined within the Entergy Safety manual. Entergy requires safety to be the highest priority for all projects. All Entergy and Contract employees must follow all applicable safe work procedures.

General Assumptions

Sufficient time will be allowed in approving the project, enabling Entergy to prepare a PEP, and be able to complete the project as per schedule, described below. Use of Facilities Study and estimates is not favored to commence an approved project.

Assumptions have been made in developing estimates without performing site visits, surveys, and soil borings. During PEP, these tasks will be completed and could have an impact on estimates and schedule.

All costs above represent good faith estimates in today’s dollars and are based on existing data, and could change considerably after development of detailed execution plan. Price escalation for work in future years has not been included.

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

6

3. SCOPE OF WORK 3.1. Cedar Hill to Plantation 138 kV line L886

General Upgrade the line rating from 250 to 291 MVA. Cedar Hill and Plantation Substation ends of the line are determined to be adequate to carry 291 MVA.

Line Data MVA

Required Line Rating (Minimum) 291 MVA

Proposed Line Rating (based on

1272 conductor with 1957A = 467

MVA) rating

467 MVA

Affected line length 2.38 mi.

Background

ETI proposes to eventually upgrade 138 kV L-886 to 230 kV between Tamina and Conroe Bulk Substations in Montgomery County, Texas. This project focuses on the portion between Cedar Hill GOAB to Plantation Substation. The project plan calls for rebuilding the existing single circuit structures with a double circuit structure, with one (1) circuit left vacant for a future circuit expansion. The project lies in Montgomery County (TX 339) – NAD 4203 Central Zone in the State Plane Coordinate system.

Project Description The proposed project will upgrade 2.38 miles of 138 kV Transmission Line 886, and will leave sufficient room on the double circuit structures to construct future 230 kV Transmission Line. Design criteria – LC-2A Zone: under extreme wind 110 mph, NESC medium, and .5” ice. Structures will be designed to accommodate two (2) circuits of 1272 ACSS “Bittern” conductor in a vertical configuration and two (2) three (3) foot shield wire davit arms, per Entergy 230 kV standards.

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

7

Install Steel structure – install new double circuit, direct embedded and self-supporting structures. Conductor - install single 1272 kcmil 45/7 ACSS code name “Bittern” conductor rated for 1957 amperes operating at 347°F maximum. Shield wires – two (2) shield wires will be planned for the length of the line. Install one (1) 48 fiber “AlumaCore” OPGW and one will be a future 7 #7 Alumoweld to installed at a later date. Insulators - Install 230 kV Braced Post, Polymer suspension, and dead-end insulator assemblies, with suspension and dead-end clamps that will be sized for single 1272 kcmil 45/7 ACSS code name “Bittern” conductor. An aerial LIDAR survey has been conducted and data has been received. Soil data has already been collected and borings reports have already been supplied for this project. Foundation - all new structures that do not require steel foundations will be embedded 20’. Other structures will utilize drilled piers. Material

(20) 230 kV steel structures 59,400 lbs. of 1272 kcmil 45/7 ACSS code name “Bittern” conductor 15,000’ OPGW Fiber “AlumaCore” 1,000’ 7 #7 alumoweld conductor (9) Dead-end insulators (57) Braced post Insulators (3) Jumper line post insulators

(57) Anodes One (1) drilled pier foundations

Removals

Remove all structures and all hardware that associated with Line 886, unless otherwise noted. (39) Wood poles Two (2) concrete poles (structure #296) 35,350 lbs. of 336 kcmil ACSR conductor 460 lbs. 1033 kcmil AA conductor 25,502’ of 5/16” EHS shield wire

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

8

(69) Insulators (21) Conductor crossarms (10) shield wire crossarms (20) X-braces

960’ guy wire (8) Anchors

Major/Long Lead Equipment & Estimated Lead Times

Quantity Material Description Lead Time,

weeks

20 Steel structures 20

1 Drilled piers 20

59,400’ 1272 kcmil 45/7 ACSS code name “Bittern” conductor 16

15,000’ DNO-8161 48 Fiber Optic – AlumaCore Cable 18

1,000’ 7 #7 Alumoweld 17

69 230 kV Insulators 2

● Assumption was made that all local permits will be filed 60 days before

start of construction.

● Assumption was made that all Environmental Permits will be approved 60 days before start of Construction.

● Assumption was made that the quantities of materials listed in this document are approximate and could change with completion of detail design.

Relay Settings Relay settings would be revised at Conroe and Tamina Substations to enable 291 MVA through Cedar Hill and Plantation section of line. Construction Outage of Cedar Hill to Plantation line will be required for eight (8) weeks starting September 2013, and since the load at Plantation could be served from Conroe, the probability of getting outage is good. However, due to lack of time in preparing this study, SOC has not been consulted to validate this assumption. Construction will be done using contractor selected through bidding process Wetland, storm water management and other permits will be secured prior to commencing the construction Matting would be used if the ground is wet.

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

9

3.2. Plantation to Conroe 138 kV line

General Upgrade line from 250 to 278 MVA. Conroe and Plantation Substation ends of the line are determined to be adequate to carry 278 MVA.

Line Data MVA

Required Line Rating (Minimum)

278 MVA

Proposed Line Rating (based on Cedar Hill to Plantation line rating, relay settings at substations to allow this amount and over load capability of switch 16321 at Plantation SS)

291 MVA

Affected line length 2.91 mi.

Background

ETI proposes to eventually upgrade 138 kV L-886 to 230 kV between Tamina and Conroe Bulk Substations in Montgomery County, Texas. This project focuses on the portion between Plantation to Conroe Bulk Substation. The project plan calls for rebuilding the existing single circuit structures with a double circuit structure, with one (1) circuit left vacant for a future circuit expansion. The project lies in Montgomery County (TX 339) – NAD 4203 Central Zone in the State Plane Coordinate system. Project Description The proposed project will upgrade 2.91 miles of 138 kV Transmission Line 886, and will leave sufficient room on the double circuit structure to construct future 230kV Transmission Line.

Design criteria – LC-2A Zone: under extreme wind 110 mph, NESC medium, and .5” ice. Structures will be designed to accommodate two (2) circuits of 1272 ACSS “Bittern” conductor in a vertical configuration and two (2) three (3) foot shield wire davit arms per Entergy 230kV standards.

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

10

Install

Steel structure – install new double circuit direct embedded and self-supporting structures. Conductor - install single 1272 kcmil 45/7 ACSS code name “Bittern” conductor rated for 1957 amperes operating at 347°F maximum. Shield wires – Two (2) shield wires will be planned for the length of the line. Install one (1) 48 fiber “AlumaCore” OPGW and one (1) will be a future 7 #7 Alumoweld to installed at a later date. Insulators - Install 230kV Braced Post, Polymer suspension, and Dead-end insulator assemblies with suspension and dead-end clamps that will be sized for single 1272 kcmil 45/7 ACSS code name “Bittern” conductor. An aerial LIDAR survey has been conducted and data has been received. Soil data has already been collected and borings reports have already been supplied for this project. Foundation - all new structures that do not require steel foundations will be embedded 20’ feet. Other structures will utilize drilled piers. Materials

(27) 230kV steel structures 72,620 lbs. of 1272 kcmil 45/7 ACSS code name “Bittern” conductor 18,000’ OPGW Fiber “AlumaCore” 1,000 ft. 7 #7 alumoweld conductor (18) dead-end insulators (72) Braced post Insulators (3) Jumper line post insulators (3) Heavy suspension insulators

(72) Anodes Four (4) drilled pier foundations

Removal

Remove all structures and all hardware that associated with Line 886, unless otherwise noted. (57) wood poles

42,977 lbs. of 336 kcmil ACSR conductor 308 lbs. 1033 kcmil AA conductor 30,994’ of 5/16” EHS shield wire (96) Insulators (30) Conductor crossarms

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

11

(2) shield wire crossarms (28) X-braces

1,680’ guy wire (14) Anchors

Major/Long Lead Equipment & Estimated Lead Times

Quantity Material Description Lead Time,

weeks

27 Steel structures 20

4 Drilled piers 20

72,620’ 1272 kcmil 45/7 ACSS code name “Bittern” conductor 16

18,000’ DNO-8161 48 Fiber Optic – AlumaCore Cable 18

1,000’ 7 #7 Alumoweld 17

96 230kV Insulators 12

● Assumption was made that all local permits will be filed 60 days before

start of construction. ● Assumption was made that all Environmental Permits will be approved

60 days before start of Construction. ● Assumption was made that the quantities of materials listed in this

document are approximate and could change with completion of detail design.

Relay Settings Relay settings would be revised at Conroe and Tamina Substations to enable 291 MVA through Cedar Hill and Plantation section of line. This would meet the requirement for 271 MVA flow through Conroe to Plantation section of line. Switch 16321 at Plantation is rated 1200A (287A) and should be able to withstand 4 MVA overload should the maximum 291 MVA be carried between Conroe and Cedar Hill substations. Construction Outage of Cedar Hill to Plantation line will be required for nine (9) weeks starting November 2013, and since the load at Plantation could be served from Cedar Hill, the probability of getting outage is good. However, due to lack of time in preparing this study, SOC has not been consulted to validate this assumption. Construction will be done using contractor selected through bidding process Wetland, storm water management, and other permits will be secured prior to commencing the construction. Matting would be used if the ground is wet.

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

12

4. COST

The ICT has reviewed and determined whether each required upgrade will be considered a Base Plan Upgrade or a Supplemental Upgrade. For more information on cost responsibility for Base Plan and Supplemental Upgrades, see Attachment T to Entergy’s OATT. The costs shown in the table include all applicable overheads but do not include tax gross up. Entergy incurs a tax liability proportional to the amount of customer contributions. AFUDC would be waived should the customer sign the agreement with prepayment plan.

Estimated Task Costs

2012 2013 2014 Total

3.1 Cedar Hill to Plantation line 162,349$ 2,335,521$ 608,023$ 3,105,892$

3.2 Plantation to Conroe line 165,829$ 3,035,339$ 672,510$ 3,873,678$

Total: 328,177$ 5,370,860$ 1,280,533$ 6,979,570$

5. UPGRADE CLASSIFICATION The ICT has reviewed and determined whether each required upgrade will be considered a Supplemental Upgrade. For more information on cost responsibility for Base Plan and Supplemental Upgrades, see Attachment T to Entergy’s OATT.

Task Total Cost Base Plan Supplemental FFRs Reference

Cedar Hill to Plantation line $ 3,105,892 $ 3,105,892 Section 3.1

Plantation to Conroe line $ 3,873,678 $ 3,873,678 Section 3.2

Total: $ 6,979,570 $ 6,979,570

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

13

6. SCHEDULE

A detailed schedule will be prepared subsequent to customer approval to proceed with the project. Based on the Task duration schedules listed below, the overall project in-service date is projected to be January, 2015. Based on an assumed customer approval date of April 2013, the following are approximate schedule dates:

Summary: Submit Facilities Study 11/1/2011 Customer + FP/WOs Approval Apr 13 Complete PEP Oct 13 Customer approval + Revised FP approval Nov 13 Commence design/ROW/environmental approvals Dec 13 Order material Feb 14 Issue design for construction & permits for construction Jun 14 Start Construction Sep 14 Complete construction Jan 15

Notes to Duration Schedules:

It is assumed that the outage of line between Cedar Hill to Plantation would be available between September 2013 to the end of October 2013, and the outage of line between Plantation and Conroe will be granted during November 2013 to January 2014.

Pre-existing scheduled line outages may prevent the commencement of work. Scheduled outages cannot be confirmed until a firm construction schedule is submitted.

All construction work requiring outages will be performed during off-peak load season. Line outages will be discussed with the SOC and TOC, and the assumption is made that line outages will be executed, as planned. However, last minute denial of outages by the SOC/TOC along with resulting schedule delay is possible.

Design and Construction resources are available when required.

Different resource is used for each design, so all designs start at same time.

This schedule does not account for adverse weather conditions.

Schedule durations are high level estimates at this time. A detailed schedule will be prepared upon project approval.

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

14

7. RISK ASSESSMENT

Risk Comment Impact

Material costs steel & Equipment Rising steel, copper, fuel and other market conditions could greatly affect estimated cost.

****

Storm-water plan implementation

Best guess on SWPPP creation, implementation and monitoring can vary greatly dependant on outcome of environmental study.

**

Weather & Equipment Lead Times (Poles)

Unexpected delays on material lead times, unusually inclement weather will impact schedule but might impact indirect and AFUDC costs.

**

Wetland mitigation Undetermined until environmental analysis is complete.

***

Outages may not be available

Preliminary schedule only considers general outage constraints. Specific project schedule may be delayed by days, weeks or months dependant on system conditions. Delays of months = increased project costs.

**

Rural road conditions/ County requirements

Depending on the condition of the dirt road, additional matting may be needed or mitigation of overhead obstructions. Possible permit requirement or repairing the road.

**

Scope based on design assumptions which may change

Varied impact on cost and schedule. ***

*-low impact to cost, ** - moderate impact to cost, ***- high impact to cost, **** - very high impact to cost.

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

15

8. CONFIRMED RESERVATIONS

OASIS PSE MW Begin End

569011 Entergy Services, Inc. (EMO) 242 3/1/2000 1/1/2014

759196 Entergy Services, Inc. (EMO) 143 1/1/2001 1/1/2021

759294 East Texas Electric Cooperative 31 1/1/2001 1/1/2018

1096986 Tennessee Valley Authority 73 9/1/2003 9/1/2013

1099991 (renewal) City Water & Light, Jonesboro 83 1/1/2010 1/1/2016

1099997 (renewal) City Water & Light, Jonesboro 168 1/1/2010 1/1/2016

1105665 Entergy Services, Inc. (EMO) 236 2/1/2003 2/1/2016

1105666 Entergy Services, Inc. (EMO) 91 2/1/2003 2/1/2027

1105668 Entergy Services, Inc. (EMO) 77 2/1/2003 2/1/2027

1126821 Entergy Services, Inc. (EMO) 101 5/1/2004 5/1/2029

1151106 Entergy Services, Inc. (EMO) 20 6/1/2010 6/1/2029

1168061 Entergy Services, Inc. (EMO) 80 8/1/2004 2/1/2028

1168408 Entergy Services, Inc. (EMO) 247 8/1/2004 2/1/2028

1289686 (undesignation) Entergy Services, Inc. (EMO) 1 6/1/2007 6/1/2030

1294132 Entergy Services, Inc. (EMO) 526 1/1/2006 1/1/2035

1309874 (renewal) East Texas Electric Cooperative 75 1/1/2009 1/1/2017

1309875 (renewal) East Texas Electric Cooperative 50 1/1/2009 1/1/2017

1309876 (renewal) East Texas Electric Cooperative 50 1/1/2009 1/1/2017

1356328 Muni Energy Agcy of Miss 40 6/1/2010 6/1/2040

1373643 City of Conway 25 3/1/2010 3/1/2040

1375299 Louisiana Generating LLC 11 3/1/2006 3/1/2013

1375559 CLECO Power LLC (Gen) 675 12/1/2006 12/1/2016

1380484 Osceola Light & Power 9 9/1/2009 9/1/2039

1381398 Constellation Energy Commodities Grp. 34 1/1/2006 1/1/2036

1381400 Constellation Energy Commodities Grp. 34 1/1/2006 1/1/2036

1381404 Constellation Energy Commodities Grp. 17 1/1/2006 1/1/2036

1381406 Constellation Energy Commodities Grp. 17 1/1/2006 1/1/2036

1383852 Arkansas Electric Cooperative Corp. 550 1/1/2007 1/1/2017

1385158 NRG Power Marketing 13 10/1/20070 10/1/2027

1387272 CLECO Power LLC (Gen) 11 4/1/2006 4/1/2016

1410022 Constellation Energy Commodities 60 3/1/2010 3/1/2040

1422708 (undesignation) Entergy Services, Inc. (EMO) 1 1/1/2007 1/1/2027

1425495 East Texas Electric Cooperative 50 3/1/2010 3/1/2045

1437089 Arkansas Electric Cooperative Corp. 349 1/1/2007 1/1/2012

1440189 Arkansas Electric Cooperative Corp. 84 1/1/2008 1/1/2012

1440190 Arkansas Electric Cooperative Corp. 104 1/1/2008 1/1/2012

1442453 NRG Power Marketing 320 6/1/2007 6/1/2026

1449495 Entergy Services, Inc. (EMO) 322 6/1/2009 6/1/2059

1456636 CLECO Power Marketing 10 10/1/2007 10/1/2012

1460876 Aquila Networks-MPS 75 3/1/2009 3/1/2029

1460878 Aquila Networks-MPS 75 3/1/2009 3/1/2029

1460879 Aquila Networks-MPS 75 3/1/2009 3/1/2029

1460881 Aquila Networks-MPS 75 3/1/2009 3/1/2029

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

16

OASIS PSE MW Begin End

1460898 Louisiana Energy & Power Authority 3 1/1/2009 1/1/2030

1460899 Louisiana Energy & Power Authority 5 1/1/2009 1/1/2030

1461442 Louisiana Energy & Power Authority 12 1/1/2009 1/1/2030

1464028 East Texas Electric Cooperative 168 1/1/2010 1/1/2040

1470484 City of West Memphis 20 1/1/2011 1/1/2041

1470811 East Texas Electric Cooperative 186 1/1/2010 1/1/2040

1477069 Entergy Services, Inc. (EMO) 10 11/1/2007 11/1/2037

1480164 Entergy Services, Inc. (EMO) 725 1/1/2005 9/1/2033

1495910 Southwestern Electric 78 5/1/2010 5/1/2013

1498122 Constellation Energy Commodities Grp. 30 4/1/2012 4/1/2042

1498129 City of Conway 50 4/1/2012 4/1/2042

1499610 Entergy Services, Inc. (EMO) 300 1/1/2008 1/1/2038

1500582 (undesignation) Entergy Services, Inc. (EMO) 1 1/1/2008 1/1/2038

1500584 (undesignation) Entergy Services, Inc. (EMO) 1 1/1/2008 1/1/2038

1502952 Arkansas Electric Cooperative Corp. 330 1/1/2008 1/1/2030

1514102 East Texas Electric Cooperative 29 1/1/2008 1/1/2017

1514104 East Texas Electric Cooperative 35 1/1/2008 1/1/2017

1514105 (undesignation) East Texas Electric Cooperative 1 1/1/2008 1/1/2017

1517005 (renewal) NRG Power Marketing 103 1/1/2011 1/1/2026

1525820 (renewal) NRG Power Marketing 3 7/1/2009 7/1/2014

1527816 Westar Energy 6 10/1/2007 10/1/2012

1530287 Empire District Electric 50 3/1/2010 3/1/2030

1530288 Empire District Electric 50 3/1/2010 3/1/2030

1546108 (undesignation) Entergy Services, Inc. (EMO) 1 1/1/2011 1/1/2051

1552148 (undesignation) Entergy Services, Inc. (EMO) 1 1/1/2009 1/1/2014

1555717 (undesignation) East Texas Electric Cooperative 1 1/1/2010 1/1/2015

1555718 Entergy Services, Inc. (EMO) 158 1/1/2010 1/1/2015

1557220 (undesignation) Entergy Services, Inc. (EMO) 1 7/1/2009 7/1/2018

1557221 Entergy Services, Inc. (EMO) 520 7/1/2009 7/1/2018

1557602 (undesignation) East Texas Electric Cooperative 1 1/1/2009 1/1/2017

1564001 (renewal) Louisiana Energy & Power Authority 6 4/1/2009 4/1/2014

1564356 (renewal) NRG Power Marketing 5 9/1/2009 9/1/2025

1566302 NRG Power Marketing 300 1/1/2008 1/1/2013

1585225 (renewal) City of Prescott 22 4/1/2009 4/1/2039

1585239 (undesignation) Entergy Services, Inc. (EMO) 1 1/1/2009 1/1/2013

1585240 (undesignation) Entergy Services, Inc. (EMO) 1 1/1/2009 1/1/2013

1598022 (renewal) NRG Power Marketing 103 7/1/2010 7/1/2015

1598291 Entergy Services, Inc. (EMO) 206 6/1/2012 6/1/2042

1598885 (renewal) Morgan Stanley Commodities Group 102 1/1/2009 1/1/2014

1598886 (renewal) Morgan Stanley Commodities Group 102 1/1/2009 1/1/2014

1601111 Constellation 5 1/1/2010 1/1/2015

1615102 (renewal) MidAmerican Energy, Inc. 50 1/1/2009 1/1/2014

1615103 MidAmerican Energy, Inc. 50 1/1/2009 1/1/2014

1615105 MidAmerican Energy, Inc. 50 1/1/2009 1/1/2014

1615108 MidAmerican Energy, Inc. 50 1/1/2009 1/1/2014

1629240 MidAmerican Energy, Inc. 7 3/1/2009 3/1/2014

1630065 NRG Power Marketing 40 1/1/2010 1/1/2015

1632265 (undesignation) Merrill Lynch Commodities 1 4/1/2009 4/1/2014

1632268 Merrill Lynch Commodities 25 4/1/2009 4/1/2014

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

17

OASIS PSE MW Begin End

1633701 NRG Power Marketing 20 1/1/2010 1/1/2019

1633702 NRG Power Marketing 20 1/1/2010 1/1/2016

1633703 NRG Power Marketing 20 1/1/2010 1/1/2016

1639337 Entergy Services, Inc. (EMO) 587 3/1/2009 1/1/2019

1639338 Entergy Services, Inc. (EMO) 103 3/1/2009 1/1/2019

1639339 Entergy Services, Inc. (EMO) 32 3/1/2009 1/1/2019

1639340 Entergy Services, Inc. (EMO) 122 3/1/2009 1/1/2019

1639341 Entergy Services, Inc. (EMO) 134 3/1/2009 1/1/2019

1640629 CLECO Power Marketing 58 5/1/2001 1/1/2021

1640630 CLECO Power Marketing 32 5/1/2001 1/1/2021

1643983 (renewal) NRG Power Marketing 300 1/1/2010 1/1/2015

1643984 (renewal) NRG Power Marketing 100 9/1/2010 9/1/2015

1644155 CLECO Power Marketing 9 4/1/2009 5/1/2016

1644215 NRG Power Marketing 83 1/1/2010 1/1/2025

1644908 CLECO Power Marketing 41 5/1/2009 5/1/2018

1648049 (undesignation) Entergy Services, Inc. (EMO) 1 6/1/2010 6/1/2013

1648050 Entergy Services, Inc. (EMO) 100 6/1/2010 6/1/2013

1648591 Entergy Services (SPO) 1 6/1/2010 6/1/2012

1648592 Entergy Services (SPO) 485 6/1/2010 6/1/2012

1655366 Missouri Joint Municipal 6 10/1/2009 10/1/2014

1658087 (undesignation) Entergy Services (SPO) 1 6/1/2012 6/1/2042

1658088 SMEPA 21 6/1/2012 6/1/2042

1659388 NRG Power Marketing 25 1/1/2011 1/1/2016

1665168 (renewal) Merrill Lynch Commodities 60 11/1/2009 11/1/2014

1665288 Merrill Lynch Commodities 15 1/1/2011 1/1/2017

1665492 (renewal) Merrill Lynch Commodities 16 11/1/2009 11/1/2014

1665493 (renewal) Merrill Lynch Commodities 4 11/1/2009 11/1/2014

1665899 Ameren Energy, Inc. 75 9/1/2009 9/1/2014

1668165 Entergy Services (SPO) 600 1/1/2013 1/1/2043

1669126 (renewal) Cargill Power Markets, LLC 103 1/1/2011 1/1/2016

1669127 (renewal) Cargill Power Markets, LLC 103 1/1/2011 1/1/2016

1676674 NRG Power Marketing 100 1/1/2011 1/1/2020

1676675 NRG Power Marketing 100 1/1/2011 1/1/2020

1677749 (undesignation) Entergy Services, Inc. (EMO) 1 1/1/2013 1/1/2015

1679179 (renewal) NRG Power Marketing 100 1/1/2011 1/1/2016

1679181 (renewal) NRG Power Marketing 100 1/1/2011 1/1/2016

1682716 (renewal) NRG Power Marketing 206 1/1/2011 1/1/2012

1685869 (renewal) Muni Energy Agcy of Miss 19 1/1/2010 1/1/2018

1689499 Missouri Joint Municipal 3 9/1/2009 9/1/2014

1690613 NRG Power Marketing 25 1/1/2011 1/1/2016

1694305 Entergy Services (SPO) 15 5/1/2010 5/1/2020

1694306 Entergy Services (SPO) 30 5/1/2010 5/1/2020

73454527 Hope Water & Light 10 10/1/2009 10/1/2032

73457918 South Miss Electric Power Assoc. 180 10/1/2009 10/1/2014

73573797 (renewal) American Electric Power 45 1/1/2011 1/1/2029

73586299 (renewal) American Electric Power 6 1/1/2011 1/1/2029

73595626 NRG Power Marketing 13 1/1/2012 1/1/2017

73723105 Arkansas Electric Cooperative Corp. 270 1/1/2010 1/1/2015

73724303 Arkansas Electric Cooperative Corp. 104 1/1/2010 1/1/2015

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

18

OASIS PSE MW Begin End

73741113 (renewal) Entergy Services, Inc. (EMO) 150 5/1/2010 5/1/2020

73741122 (renewal) Entergy Services, Inc. (EMO) 135 5/1/2010 5/1/2020

73774729 Arkansas Electric Cooperative Corp. 84 1/1/2010 1/1/2015

73820650 MOWR 5 3/1/2010 3/1/2040

73884547 MOWR 35 8/1/2010 8/1/2040

73884558 MOWR 40 8/1/2010 8/1/2040

73942862 (renewal) Muni Energy Agcy of Miss 13 6/1/2010 6/1/2015

73970673 Cargill Power Markets, LLC 40 1/1/2012 1/1/2016

73987480 South Miss Electric Power Assoc. 100 5/1/2010 5/1/2040

73987507 South Miss Electric Power Assoc. 180 6/1/2010 6/1/2015

73990804 South Miss Electric Power Assoc. 100 5/1/2010 5/1/2040

74001787 NRG Power Marketing 100 1/1/2011 1/1/2016

74001895 NRG Power Marketing 100 1/1/2011 1/1/2016

74001897 NRG Power Marketing 22 1/1/2011 1/1/2016

74001904 NRG Power Marketing 28 1/1/2011 1/1/2016

74001930 NRG Power Marketing 42 8/1/2006 8/1/2036

74001931 NRG Power Marketing 60 3/1/2010 3/1/2040

74001934 NRG Power Marketing 60 4/1/2012 4/1/2042

74233619 WRGS 15 4/1/2012 4/1/2017

74233670 (undesignation) Entergy Services, Inc. (EMO) 1 8/1/2012 1/1/2038

74236787 NRG Power Marketing 75 6/1/2012 6/1/2017

74236794 NRG Power Marketing 100 6/1/2012 6/1/2017

74236798 NRG Power Marketing 100 6/1/2012 6/1/2017

74305315 NRG Power Marketing 10 1/1/2014 1/1/2017

74305339 NRG Power Marketing 10 1/1/2013 1/1/2023

74356639 NRG Power Marketing 103 1/1/2011 1/1/2016

74356652 NRG Power Marketing 206 6/1/2012 6/1/2017

74356666 NRG Power Marketing 50 1/1/2013 1/1/2014

74370625 NRG Power Marketing 10 7/1/2010 7/1/2012

74408208 Louisiana Energy & Power Authority 13 9/1/2010 9/1/2015

74408225 Louisiana Energy & Power Authority 45 9/1/2010 9/1/2015

74514903 Entergy Services, Inc. (EMO) 20 6/1/2013 6/1/2029

74514911 Entergy Services, Inc. (EMO) 101 6/1/2013 6/1/2029

74691007 NRG Power Marketing 60 1/1/2013 1/1/2018

74728395 Brazos Electric Cooperative 100 1/1/2012 1/1/2017

74728415 Brazos Electric Cooperative 100 1/1/2012 1/1/2017

74728420 Brazos Electric Cooperative 100 1/1/2012 1/1/2017

74758974 Entergy Services, Inc. (EMO) 804 5/1/2013 5/1/2058

74777205 (renewal) NRG Power Marketing 300 1/1/2013 1/1/2033

74777208 (renewal) NRG Power Marketing 300 1/1/2015 1/1/2035

74789476 (undesignation) Entergy Services, Inc. (EMO) 1 1/1/2012 1/1/2016

74829975 (renewal) CLECO Power LLC (Gen) 35 1/1/2011 1/1/2016

74835023 AECI / APM 103 1/1/2012 1/1/2017

74881866 (renewal) NRG Power Marketing 8 3/1/2011 3/1/2021

74899933 Entergy Services (SPO) 322 2/1/2011 2/1/2041

74899954 (undesignation) Entergy Services, Inc. (EMO) 1 2/1/2012 2/1/2014

74899956 Entergy Services, Inc. (EMO) 100 2/1/2012 2/1/2014

74899968 (undesignation) Entergy Services, Inc. (EMO) 1 1/1/2013 1/1/2015

74899969 (undesignation) Entergy Services, Inc. (EMO) 1 1/1/2012 1/1/2015

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

19

OASIS PSE MW Begin End

74899972 (undesignation) Entergy Services (SPO) 1 1/1/2015 1/1/2045

74899974 (undesignation) Entergy Services (SPO) 1 1/1/2015 1/1/2045

74899976 (undesignation) Entergy Services (SPO) 1 1/1/2015 1/1/2045

74899980 Entergy Services (SPO) 584 1/1/2015 1/1/2045

74899988 (undesignation) Entergy Services (SPO) 1 6/1/2012 6/1/2042

74899989 Entergy Services (SPO) 485 6/1/2012 6/1/2042

74901827 (undesignation) Entergy Services, Inc. (EMO) 1 2/1/2011 2/1/2041

74958042 NRG Power Marketing 34 1/1/2006 1/1/2036

74958045 NRG Power Marketing 34 1/1/2006 1/1/2036

74958047 NRG Power Marketing 17 1/1/2006 1/1/2036

74958048 NRG Power Marketing 17 1/1/2006 1/1/2036

75031610 Arkansas Electric Cooperative Corp. 220 1/1/2011 1/1/2016

75031638 Arkansas Electric Cooperative Corp. 72 1/1/2011 1/1/2016

75207302 (renewal) Entergy Services, Inc. (EMO) 1 7/1/2011 7/1/2016

75265640 (renewal) South Miss Electric Power Assoc. 75 6/1/2011 6/1/2016

75299243 AECI 103 1/1/2012 1/1/2017

75342276 Cargill Power Markets 202 12/1/2012 12/1/2017

75342281 Cargill Power Markets 202 12/1/2012 12/1/2017

75495258 (renewal) NRG Power Marketing 13 1/1/2017 1/1/2019

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

20

9. PRE-888 TRANSACTIONS

OASIS

PSE MW Begin End

1332606

East Texas Electric Cooperative 55 1/1/2006 1/1/2017

1412155

Replaced by 76120479 Entergy Services, Inc. (EMO) 1718 1/1/2007 1/1/2038

1412156

Entergy Services, Inc. (EMO) 741 1/1/2007 1/1/2038

1412158

Entergy Services, Inc. (EMO) 1867 1/1/2007 1/1/2038

1412160

Entergy Services, Inc. (EMO) 1142 1/1/2007 1/1/2038

1412161

Entergy Services, Inc. (EMO) 59 1/1/2007 1/1/2038

1412162

Entergy Services, Inc. (EMO) 148 1/1/2007 1/1/2038

1412163

Replaced by 76292988 Entergy Services, Inc. (EMO) 194 1/1/2007 1/1/2038

1412164

Entergy Services, Inc. (EMO) 1157 1/1/2007 1/1/2038

1412165

Entergy Services, Inc. (EMO) 1219 1/1/2007 1/1/2038

1412166

Entergy Services, Inc. (EMO) 683 1/1/2007 1/1/2038

1412167

Entergy Services, Inc. (EMO) 140 1/1/2007 1/1/2038

1412168

Entergy Services, Inc. (EMO) 456 1/1/2007 1/1/2038

1412169

Entergy Services, Inc. (EMO) 739 1/1/2007 1/1/2038

1412170

Replaced by 76292992 Entergy Services, Inc. (EMO) 183 1/1/2007 1/1/2038

1412171

Entergy Services, Inc. (EMO) 64 1/1/2007 1/1/2038

1412172

Entergy Services, Inc. (EMO) 870 1/1/2007 1/1/2038

1412173

Entergy Services, Inc. (EMO) 129 1/1/2007 1/1/2038

1412174

Replaced by 76292990 Entergy Services, Inc. (EMO) 140 1/1/2007 1/1/2038

1412175

Entergy Services, Inc. (EMO) 130 1/1/2007 1/1/2038

1412176

Entergy Services, Inc. (EMO) 65 1/1/2007 1/1/2038

1412177 Replaced by

1528115 Entergy Services, Inc. (EMO) 947 1/1/2007 1/1/2038

1412178

Entergy Services, Inc. (EMO) 61 1/1/2007 1/1/2038

1412179

Entergy Services, Inc. (EMO) 304 1/1/2007 1/1/2038

1412180

Replaced by 76292993 Entergy Services, Inc. (EMO) 351 1/1/2007 1/1/2038

1412181

Entergy Services, Inc. (EMO) 692 1/1/2007 1/1/2038

1412182 Replaced by

1528116 Entergy Services, Inc. (EMO) 1641 1/1/2007 1/1/2038

1412183

Entergy Services, Inc. (EMO) 433 1/1/2007 1/1/2038

1412184

Entergy Services, Inc. (EMO) 1946 1/1/2007 1/1/2038

1412185

Entergy Services, Inc. (EMO) 946 1/1/2007 1/1/2038

1412186 Replaced by

1528114 Entergy Services, Inc. (EMO) 1233 1/1/2007 1/1/2028

1498278

Entergy Services, Inc. (EMO) 75 8/1/2007 1/1/2017

1498281

Entergy Services, Inc. (EMO) 86 8/1/2007 1/1/2017

1498283

Entergy Services, Inc. (EMO) 68 8/1/2007 1/1/2017

1498284

Entergy Services, Inc. (EMO) 78 8/1/2007 1/1/2017

1498285

Entergy Services, Inc. (EMO) 11 8/1/2007 1/1/2044

1498286

Entergy Services, Inc. (EMO) 69 8/1/2007 1/1/2044

1498287

Entergy Services, Inc. (EMO) 14 8/1/2007 1/1/2044

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

21

OASIS

PSE MW Begin End

1528114

Replaces 1412186 Entergy Services, Inc. (EMO) 1523 1/1/2008 1/1/2038

1528115

Replaces 1412177 Entergy Services, Inc. (EMO) 1039 1/1/2008 1/1/2038

1528116

Replaces 1412182 Entergy Services, Inc. (EMO) 1834 1/1/2008 1/1/2038

76120467 Renewal

for 1412178 Entergy Services, inc. (EMO) 61 1/1/2038 1/1/2045

76120472 Renewal

for 1412172 Entergy Services, inc. (EMO) 870 1/1/2038 1/1/2045

76120479 Replaces 1412155 Entergy Services, Inc. (EMO) 1738 1/1/2012 1/1/2045

76234797 Renewal

for 1412163 Entergy Services, Inc. (EMO) 194 1/1/2038 1/1/2043

76234817 Renewal

for 1412174 Entergy Services, Inc. (EMO) 140 1/1/2038 1/1/2043

76234827 Renewal

for 1412170 Entergy Services, Inc. (EMO) 183 1/1/2038 1/1/2043

76234836 Renewal

for 1412180 Entergy Services, Inc. (EMO) 351 1/1/2038 1/1/2043

76292988 Replaces 1412163 Entergy Services, Inc. (EMO) 190 1/1/2012 1/1/2043

76292990 Replaces 1412174 Entergy Services, Inc. (EMO) 144 1/1/2012 1/1/2043

76292992 Replaces 1412170 Entergy Services, Inc. (EMO) 210 1/1/2012 1/1/2043

76292993 Replaces 1412180 Entergy Services, Inc. (EMO) 324 1/1/2012 1/1/2043

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

22

10. STUDY QUEUE

OASIS PSE MW Begin End

74846159 AEPM 65 1/1/2015 1/1/2020

75206836 ETEC 125 1/1/2015 1/1/2020

75259845 SMEPA 2 1/1/2012 1/1/2020

75460486 MOWR 103 4/1/2012 4/1/2037

75564309 ETEC 50 5/1/2014 5/1/2044

75821264 ETEC 75 1/1/2015 1/1/2020

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

23

11. ATTACHMENTS

11.1. Table of Acronyms

ACSR Aluminum Conductor Steel Reinforced ACSS Aluminum Conductor Steel Supported ADEQ Arkansas Department of Environmental Quality AFUDC Allowance for Funds Used During Construction ATC Available Transfer Capability

EES Entergy Control Area EHS Extra High Strength EHV Extra-High Voltage ETI Entergy Texas, Inc. GOAB Gang-Operated Air Brake

ICT Independent Coordinator of Transmission KCMIL Equivalent cross-sectional in thousands in circular mills kV Kilo-Volt KVA Kilo-Volt Amps LIDAR Light Imaging Detecting and Ranging MCM (M) Thousand Circular Mils MVA Mega-Volt Amp MW Mega-Watt

NAD North American Datum NESC National Electric Safety Code NPDES National Pollution Discharge Elimination System NRIS Network Resource Interconnection Service NOI Notice of Intent OASIS Online Access and Same-time Information System OATT Open Access Transmission Tariff OPGW Optical Ground Wire cable PEP Project Execution Plan POD Point of Delivery POR Point of Receipt PTI Power Technologies Incorporated SES Steam Electric Station SOC System Operations Center

SHPO Arkansas State Historic Preservation Office SHV Super High Voltage SW Switch Station

SWEPCO Southwest Electric Power Company TOC Transmission Operations Center WMUC City of West Memphis Control Area

OASIS 75821275 East Texas Electric Cooperative (ETEC) Facilities Study

24

11.2. Excel sheet for schedule See Section 6.