ICRA Panel Installation Steps

ICRA Panel SystemInstallation Instructions

ICRA Panel Installation Steps

1. Layout corners, angles, obstacles so that the panel sizes will fit together nicely and not create a gap at any point of the installation.

Determine Starting Point

NOTE: If the first panel comes off the wall, place the track at 24” from the wall.

ICRA Panel Installation Steps

2 & 3. Establish the starting point on one of the walls. Run 3” Blue Tape from ceiling to floor as the center point of the ICRA wall.

Install 3” Blue Tape to protect the Facility

ICRA Panel Installation Steps

Clip track to center beam of ceiling grid.Double sided foam tape to ceiling

grid or Hard Lid.

4. Install the Ceiling Frame

ICRA Panel Installation Steps

5. Determine the location of the Floor Angle Metal Strip.Drop the “String Line” from the Ceiling Track as a level to establish the placement of the Floor Angle Metal Strip.

ICRA Panel Installation Steps

7. Starting next to the wall, insert the first ICRA Panel by sliding it into the Ceiling Track & placing it against the Floor Angle then sliding it over to meet the wall.

ICRA Panel Installation Steps

Place a 12” strip of White tape on the metal strip on the back of the panel slider.

Once the panel is set to the desired height, press the tape onto the coroplast. It will stick and hold the panel slider in place.

Installation Tips:

Manometer: Hold back tape, then release when meter is level.

ICRA Panel Installation Steps

Assembly of Additional Slider to reach 13’ wall height

Insert 2nd slider on the bottom of the

panel.

Remember that the top slider will be the final fit: Measure and identify desired placement of the

bottom slider.

ICRA Panel Installation Steps

Assembly of Additional Slider to reach 13’ wall heightPlace ONE screw on back side on each side

of slide to maintain desired position.

ICRA Panel Installation Steps

Re-assemble the top slide if it was removed earlier.

The Preferred method of securing the top slide is with tape on the back supporting rail. (Ref. Slide #7)

Assembly of Additional Slider to reach 13’ wall height

ICRA Panel Installation Steps

12. Once a large section of the wall is installed, run 3” White tape along the top and bottom of the panel wall sealing it to the Blue tape on the ceiling and floor to make a complete air tight seal.

Sealing the Seams

ICRA Panel Installation Steps

Door Installation• ** For best results: Mount the door in between 2 ICRA Panels

for stability and strength.

• NOTE: The Door and Frame are held square by 3 screws and 1/8” spacers placed through the wood frame into the door. KEEP THESE SCREWS INTACT during the installation to insure square-ness of the installation.

ICRA Panel Installation Steps

• 11.

NOTE: There is a 1” frame on the door panel . Add 1” from the last ICRA Panel installed before making the cut on the Floor Angle.

Measure the exterior dimension of the WOODEN Door Frame (37-1/4”)

Door Installation

ICRA Panel Installation Steps

16. Insert the door in the same fashion as an ICRA Panel.20. Measure, cut and install the coroplast on the top of the door.

Door Installation

ICRA Panel Installation Steps

21. Remove the 3 screws and 1/8” spacers from the door and frame.

ICRA Panel Installation Steps

23. Double check for proper function and level. 24. Run 3” Tape over the threshold of the door covering all of the exposed metal.

Door Installation

ICRA Panel Installation Steps

25. Resume installing the next ICRA Panel.

ICRA Panel Installation Steps

26. Wipe the entire wall down with a Disinfectant Spray or wipe.

Disinfecting the ICRA Wall

ICRA Panel Installation Steps

PROPER Panel System Storage

ICRA Panel Installation Steps

IMPROPER Panel Storage

ICRA Panel Installation Steps