us installation guide · 2020. 4. 28. · fixing instalation guide line instalation guide line...

12
INSTALLATION GUIDE www.vistagreen.com Copyright © 2019, Vistagreen Limited, All rights reserved.

Upload: others

Post on 22-Aug-2020

27 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: US Installation Guide · 2020. 4. 28. · Fixing Instalation Guide Line Instalation Guide Line PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL

INSTALLATION GUIDE

www.vistagreen.comCopyright © 2019, Vistagreen Limited, All rights reserved.

Page 2: US Installation Guide · 2020. 4. 28. · Fixing Instalation Guide Line Instalation Guide Line PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL

22 21

QUICK & EASYINSTALLATIONUse our Vistagreen Fixings for a neat and reliable installation. Use 4 fixings per panel.

The Vistagreen Fixing System has been specifically designed to securely hold Signature Panels in the optimum position and to give the best result in a wide variety of applications.

43

65

6 EASY STEPS TO FOLLOW

Measure & mark Drill the holes

Plug & screw the fixing Attach the panel

Secure the fixing Ruffle & bend the foliage

2 | Installation guide

www.vistagreen.com

COPYRIGHT. ALL RIGHTS RESERVED

Page 3: US Installation Guide · 2020. 4. 28. · Fixing Instalation Guide Line Instalation Guide Line PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL

The fixings can be attached to the vertical or horizontal wires or placed at the joins.

31.5

31.5″

2″ to 2.75″GridFixingsPlanting overlap

SIGNATURE PANEL & FIXINGS

The Vistagreen Signature Panel was designed with a small allocation of ’planting overlap’ to allow for seamless installation of multiple panels. The top overlap is slightly greater than the bottom one whereas the side overlaps are the same. The overlap also serves to disguise the grid that holds the plants.

3 | Installation guide

@vistagreenltdwww.vistagreen.com

COPYRIGHT. ALL RIGHTS RESERVED

Page 4: US Installation Guide · 2020. 4. 28. · Fixing Instalation Guide Line Instalation Guide Line PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL

GREEN WALL INSTALLATION

PANEL PREPARATION

VISTAGREEN INSTALLATION

VIDEOS

This video shows a practical example of how

to install Vistagreen Signature Panels.

This video shows how to increase the

volume and depth of foliage.

4 | Installation guide

www.vistagreen.com

COPYRIGHT. ALL RIGHTS RESERVED

https://vimeo.com/297468370

https://vimeo.com/297468370

https://vimeo.com/297468370

https://vimeo.com/297468370https://vimeo.com/297468370

https://vimeo.com/297466353

https://vimeo.com/297466353

https://vimeo.com/297466353

https://vimeo.com/297466353

https://vimeo.com/297466353

Page 5: US Installation Guide · 2020. 4. 28. · Fixing Instalation Guide Line Instalation Guide Line PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL

Spirit level

DrillTape measure

Ladders or mobile tower

Safety goggles

Pencil

Safety gloves

Screws

Drywall fixings

INSTALLATION TOOLS

These are the tools that you need to install Signature Panels.

5 | Installation guide

@vistagreenltdwww.vistagreen.com

COPYRIGHT. ALL RIGHTS RESERVED

Page 6: US Installation Guide · 2020. 4. 28. · Fixing Instalation Guide Line Instalation Guide Line PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL

@vistagreenltdwww.vistagreen.com

COPYRIGHT. ALL RIGHTS RESERVED

Page 7: US Installation Guide · 2020. 4. 28. · Fixing Instalation Guide Line Instalation Guide Line PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL

Fixing InstallationGuide Line

InstallationGuide Line

PANEL PANELPANEL PANEL PANEL

PANEL PANELPANEL PANEL PANEL

PANEL PANELPANEL PANEL PANEL

InstallationGuide Line

InstallationGuide Line

Grid

Grid

Fixing InstallationGuide Line

InstallationGuide Line

PANEL PANELPANEL

PANEL

PANEL

1Important Note: See panel preparation video first before starting the installation. Measure and mark the holes in the wall.

We recommend to leave a gap between panels to allow for easier installation and to reduce bunching of foliage or joins.

Maximum gap between 2 panels can be : 0.8″

PANEL

7 | Installation guide

A detailed Fixing Layout and the steps to follow are shown on next page.

@vistagreenltdwww.vistagreen.com

COPYRIGHT. ALL RIGHTS RESERVED

Page 8: US Installation Guide · 2020. 4. 28. · Fixing Instalation Guide Line Instalation Guide Line PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL

Fixing InstallationGuide Line

InstallationGuide Line

PANEL PANELPANEL PANEL PANEL

PANEL PANELPANEL PANEL PANEL

PANEL PANELPANEL PANEL PANEL

InstallationGuide Line

InstallationGuide Line

Grid

Grid

Fixing InstallationGuide Line

InstallationGuide Line

PANEL PANELPANEL

PANEL

PANEL

FIXING LAYOUT

STEP 1

STEP 2

STEP 4

STEP 5

STEP 3The fixing should ideally be installed on the cross joint of the grid as shown on the diagram above; however, it is possible to secure the Signature Panels with fixings on the horizontal or vertical bars, with the latter being the least recommended option.

At top left of the panel, measure 3.9″ down and mark this as first point.

Measure 23.6″ across horizontally from first marked point and mark as second point.

Measure 23.6″ down vertically from first marked point and mark as third point.

Measure 23.6″ across from third point and mark as fourth point.

Measure 8.4″ from point 2 and 4, which become points 1 and 3 of the second panel. This process can be continued throughout installation.

8 | Installation guide

@vistagreenltdwww.vistagreen.com

COPYRIGHT. ALL RIGHTS RESERVED

Gap left in the drawing: 0.6″ (optimum)

Page 9: US Installation Guide · 2020. 4. 28. · Fixing Instalation Guide Line Instalation Guide Line PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL

2 When all the holes from the fixing layout have been marked, drill them. Then, insert drywall fixings in each hole.

3 Plug in the fixings and screw the fixings in (not too tight). Use 4 fixings per panel, one in each corner.

9 | Installation guide

@vistagreenltdwww.vistagreen.com

COPYRIGHT. ALL RIGHTS RESERVED

Page 10: US Installation Guide · 2020. 4. 28. · Fixing Instalation Guide Line Instalation Guide Line PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL

4 Attach the panel to the fixings.

5 Plug in the fixing and secure the top cap of the fixing, turning clockwise until tight.

10 | Installation guide

@vistagreenltdwww.vistagreen.com

COPYRIGHT. ALL RIGHTS RESERVED

Page 11: US Installation Guide · 2020. 4. 28. · Fixing Instalation Guide Line Instalation Guide Line PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL

6 Place panels side by side. Spend some time ruffling and bending the foliage for a natural look.

11 | Installation guide

@vistagreenltdwww.vistagreen.com

COPYRIGHT. ALL RIGHTS RESERVED

Page 12: US Installation Guide · 2020. 4. 28. · Fixing Instalation Guide Line Instalation Guide Line PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL PANEL

HEAD OFFICE / R&D FACILITY:

Follow us:

Vistagreen Ltd.

Unit 6 Trade City, Lyon Way,Frimley, Camberley, SurreyGU16 7AL United Kingdom

Tel: +44 (0)20 7385 1020

Tel: +1 727-325-2901

Email: [email protected]

www.vistagreen.com

Copyright © 2019, Vistagreen Limited, All rights reserved.

US SALES OFFICE