icade emgp bâtiment 270 - finance · pdf fileicade emgp bâtiment 270 - 45 avenue...

19
ICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural engineering Mechanical engineering SCYNA 4 INGENI Window design Green building consultant Van Santen THOR ingénierie Colours and lighting Grandeur Nature

Upload: dinhkhanh

Post on 09-Feb-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural

ICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building

investorArchitect

ICADE EMGPBrenac & Gonzalez

Structural engineeringMechanical engineering

SCYNA 4INGENI

Window designGreen building consultant

Van SantenTHOR ingénierie

Colours and lighting Grandeur Nature

Page 2: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural

Land : 76,5 ha410 000 m² gross letting area

1- Parc Pont de Flandre2- Parc du Millénaire3- Parc des Portes de Paris (Saint Denis)4- Parc des Portes de Paris (Aubervilliers)5- Quartier du Canal – offices area6- Quartier du Canal – shopping center7- Parc du Mauvin

1

2

3 45

6 7

Auto

rout

e A1

Périphérique

Stade de france

Page 3: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural

TARGETS

Indoor users health:

Building materials: checking of chemical emissions

Indoor air quality control

Prevention of sick building syndrome

Energy efficiency

CO2 emission reduction

Users comfort

Individual control possible also in open plan offices

Air conditioning

Coloured natural light

Light with dimmer control

Window blinds

Communication

Internal

External

End Users

Shareholders

Financial outcome and return on investment control

Page 4: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural

Management

Facilities in use

Feed back on measures and benchmarking

Statements of requirements

Measurements AdjustmentsMinor repairs

Asset management

Initiate project

Design

Validation of theoretical statements

Keep / dispose of

PROGRAMMINGCLIENT BRIEFINGPROGRAMMING

CLIENT BRIEFING

DESIGNDESIGN

CONSTRUCTIONCOMMISSIONINGCONSTRUCTIONCOMMISSIONING

OPERATION ANDMAINTENANCE

OPERATION ANDMAINTENANCE

USERSSATISFACTION

LIFE CYCLEECONOMY

Page 5: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural

Project kick off in september 2003Opening in september 2005

View from Paris of the building 270

Opposite view

Page 6: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural

2 basement floors for 126 carpark spacesGround floor for commercial activities, main entrance and services access7 floors for offices 8 500 m²

Page 7: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural

Triple glazed windows withintegrated blinds : -Efficient daylighting-Efficient noise reduction fromthe street

Lobby entrance

The northorientation of the entrance allows a totallyglazed sidewithout air conditionning

Page 8: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural

Floor lobbies with chilled beam air conditionning

Lavatories with light controllers

Page 9: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural

PROGRAMMINGCLIENT BRIEFINGPROGRAMMING

CLIENT BRIEFING

DESIGNDESIGN

CONSTRUCTIONCOMMISSIONINGCONSTRUCTIONCOMMISSIONING

OPERATION ANDMAINTENANCE

OPERATION ANDMAINTENANCE

Analysis of adaptable office space

BUILDING OWNER:

Satisfied, long-term customers

Energy efficient solution and sustainable building scheme: LightingCooling and heatingairflow

Areas which fulfil the specific needs of different end-users over the years

Increase cycle life of technical systems

END-USER OF BUILDING:

Comfortable and healthy indoor environment

Individual control possible also in open plan offices

Areas which fulfil the specific needs of different user groups over the years

Reduce non-operating time for maintenance

Page 10: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural

Core vertical ciculation

Each floor 1200 m²

Partitioning flexibiliy

Work space withdirect daylightaccess

WORKING SPACE

Page 11: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural

Office Environment• Typical customer

needs andrequirements

• Satisfied users• Energy efficiency• Cost efficiency• Flexibility• Ease of use• Total solutions

• Solutions:• Adaptable air diffusers:

one product, several operations

• Adaptable, energy efficient system design

• Individually adjustable indoor conditions

• Light with dimmer• In-built flexibility for fast

and cost efficient changes

Page 12: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural

Office Chilled Beams

Chilled beams CBC 1250-1100 equipped with- asymetric nozzles- Changeable nozzles- HVC system- Temperature sensor

Single Office : Meeting room : Nozzle B-C 50m3/h/uHVC OFF

Nozzle D-D 100m3/h/uHVC ON

FACADE

1,35m 1,35m

CBC CBC CBC

1,25m 1,35m 5,4m

CBC CBC CBC

1,35m

LIGHTS CORRIDOR

B

C

C

B D

D

Meeting roomOffice

Page 13: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural

Built in Solutions:

External wall insulation

Motorised controlled blinds(automatic shutdown at 120 W solar heat/m²/ facade )

Page 14: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural
Page 15: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural

Building Management System

Page 16: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural

Cooling - heatingTechnical roof plant with :

2 air/air heat pumps of 20 000 m³/houreach

One the north side and the second one for the south east/west side– Air recirculation with on-line air

quality control– Electrical air heating in each diffuser

for individual space comfort– Hydrometric control for a 40% to 60%

indoor air humidity range– Free cooling

Page 17: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural

ICADE EMGP obtains the French sustainable building labelthrough evaluation of 14 main items

6 items High level :

lightingChemicalemissions of building materialsBuilding materialsqualityAir qualityWater qualitySite construction management

6 items Very high level :

EnergyperformanceWater savingsWaste policyIndoor Air climateMaintenanceBuilding environmentalimpact

2 items basic :

Building materials life cycleAccoustic

Page 18: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural

What’s next?

• 95 000 m² of project under process of evaluation to achieve the targets of the French « green building »

Page 19: ICADE EMGP Bâtiment 270 - Finance · PDF fileICADE EMGP Bâtiment 270 - 45 avenue Victor Hugo – AUBERVILLIERS Office building investor Architect ICADE EMGP Brenac & Gonzalez Structural

Parc du millenaire 3• 50 % cut-off of energy consumption for the

next building « PDM 3 » to compare to building 270 :

• 270 : 120 kwh/m²year(final energy use)

CO2 emission :15 kg/m²/year

• PDM 3: 60 kwh/m²/year(final energy use)