Timescales Document should describe the period from LS1 – LS2 - Estimates of evolving resource needs In order to prepare for 2015, a good draft needs to be available in time for the Autumn 2013 RRB, so needs to be discussed at the LHCC in September:  Solid draft by end of summer 2013 (!) Work has started - Informed by all of the existing work from the last 2 years (Technical Evolution groups, Concurrency forum, Technology review of 2012) March 6, 2013

TRANSCRIPT

Page 1: Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013

[email protected] 1

Update of Computing & Software Models

Ian BirdOverview Board; CERN, 8th March 2013

March 6, 2013

Page 2: Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013

[email protected] 2

Background• Requested by the LHCC in December: need to see

updated computing models before Run 2 starts• A single document to:

- Describe changes since the original TDRs (2005) in• Assumptions, models, technology, etc.

- Emphasise what is being done to adapt to new technologies, to improve efficiency, to be able to adapt to new architectures, etc.

- Describe work that still needs to be done- Use common formats, tables, assumptions, etc

• 1 document rather than 5

March 6, 2013

Page 3: Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013

[email protected] 3

Timescales• Document should describe the period from LS1 –

LS2- Estimates of evolving resource needs

• In order to prepare for 2015, a good draft needs to be available in time for the Autumn 2013 RRB, so needs to be discussed at the LHCC in September: Solid draft by end of summer 2013 (!)

• Work has started- Informed by all of the existing work from the last 2

years (Technical Evolution groups, Concurrency forum, Technology review of 2012)

March 6, 2013

Page 4: Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013

[email protected] 4

Opportunities• This document gives a framework to:

- Describe significant changes and improvements already made- Stress commonalities between experiments – and drive

strongly in that direction• Significant willingness to do this• Describe the models in a common way – calling out differences

- Make a statement about the needs of WLCG in the next 5 years (technical, infrastructure, resources)

- Potentially review the organisational structure of the collaboration

- Review the implementation: scale, quality of service of sites/Tiers; archiving vs processing vs analysis activities

- Raise concerns:• E.g. staffing issues; missing skills;

March 6, 2013

Page 5: Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013

[email protected] 5

Draft ToC• Preamble/introduction • Experiment computing models• Technology review and outlook• Challenges – the problem being addressed• Distributed computing• Computing services• Software activities and strategies• Resource needs and expected evolution• Collaboration organisation and management

March 6, 2013

Page 6: Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013

[email protected] 6

Experiment computing models• Data models – types of data, event sizes,

relationships, etc• Anticipated event rates and data streams• Data flows• Differences for Pb-Pb or p-Pb• Non-event data

March 6, 2013

Page 7: Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013

[email protected] 7

Technology review• Use (update) report from 2012• What are likely technologies in next 5 years?

- CPU: e.g. Intel vs ARM vs GPU vs ??- Storage- Clouds/virtualisation- Likely evolution of networks

• Etc.

March 6, 2013

Page 8: Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013

[email protected] 8

Challenges• What problem are we addressing?

- Need to make the best use possible of available resources

- Major investment in software needed • But missing skills, people, tools, infrastructure?

- Need for flexibility in adapting the models to changing technologies

- …

March 6, 2013

Page 9: Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013

[email protected] 9

Distributed computing• Use Cases

- Calibration, reconstruction, re-processing, stripping, analysis use cases & strategies for prompt vs delayed analysis, simulation

• Functions implemented at Tier 0,1,2, HLT- Include how we would use opportunistic resources- Review functions: perhaps distinguish between

archive needs and data distribution needs, QoS• Networking

- What will our needs be? - What topologies to interconnect tiers?

March 6, 2013

Page 10: Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013

[email protected] 10

Computing services• Emphasise commonalities between experiments (and

justify differences)- Workflow management – use of pilots, implementations, needs

at sites- Data management – strategies for use of tapes, disks, other

storage; services such as FTS, data popularity, data federation• Use of HEP vs standard protocols

- Distributed computing services (aka “grid mw”)• Describe the services required, central vs distributed deployments;

where do experiment needs diverge?• Federated identity management?• Infrastructure services: operations, monitoring, accounting, security,

etc• Other new technologies

March 6, 2013

Page 11: Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013

[email protected] 11

Application Software• Current and recent activities – gains already achieved• Strategies for the future• How to address the use of new architectures etc• Common tools and libraries (ROOT, GEANT, etc)• Possibility for common frameworks between

experiments, prerequisite for:• Setting up consultancy/optimisation team (inc. testing

infrastructure) to guide efforts in optimisation (memory use, I/O, parallel code, etc)

• What is the coordination and management needed for this?

March 6, 2013

Page 12: Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013

[email protected] 12

Resource Needs & Evolution• Assumptions on running conditions• Event parameters• Summary tables of resource requirements

- Tape, disk, cpu, bandwidths- 2015-2018/19

March 6, 2013

Page 13: Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013

[email protected] 13

Collaboration Organisation & Management

• Opportunity to review the WLCG organisational structure and associated bodies

• Stress the need for building collaborative activities – in order to find the effort for needed developments, operations, etc.

• Describe the anticipated interactions with e-infrastructures (EGI/Horizon 2020, OSG, etc)

• Interaction with other HEP experiments – i.e. should the scope of WLCG broaden to support HEP more widely?