i-mining.co.id guidelines

Upload: marianus-antimus-buku

Post on 26-Feb-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/25/2019 i-mining.co.id Guidelines

    1/13

    > Engineering tools

    > Calculator

    > No rocket science

    > Get to solution

    > Decision making

    http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.

    > WYSIWYG

    > Minerals

    > Maps application

    > Public report based> Under construction

    > Consulting services

    > Online fee estimator

    > Transparent parameter> Under construction

  • 7/25/2019 i-mining.co.id Guidelines

    2/13

    > 7 modules ready to run

    > 3 modules under construction

    > another 3 modules to come,

    include mineral pricing and cut of grade

    http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.

  • 7/25/2019 i-mining.co.id Guidelines

    3/13

    Input

    Result

    Enter klik

    > Coal dilution results

    > Higher ash content

    > Weighted RD

    > Preston-Sanders

    Coal dilution

    approach input

    Module A

    http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.

  • 7/25/2019 i-mining.co.id Guidelines

    4/13

    Module A

    HBA

    Drop down list -basis of reporting

    Calculation

    result

    Enhanced feature;

    > Save

    > Print to pdf

    > Sent to user's email

    > Load

    http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.

  • 7/25/2019 i-mining.co.id Guidelines

    5/13

    Module B > 8 combination available> Guideline for pit optimisation

    > Elaborate geotechnical in mine design

    Allowance for

    IPBFFlexibility in combination

    of swamp, soil, soft and

    hard material bench spec.

    http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.

  • 7/25/2019 i-mining.co.id Guidelines

    6/13

    Module C

    Calculate the yearly

    effective working hour

    based on planned working shift

    > Predict the best solution,

    over truck and under truck

    > Suggest the fleet allocation

    http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.

  • 7/25/2019 i-mining.co.id Guidelines

    7/13

    Module C > Production = ewh x productivity> 8 coal fleets option

    > 14 OB fleets option

    http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.

  • 7/25/2019 i-mining.co.id Guidelines

    8/13

    Module D

    > Mining intensity in bcm/m2/year

    > Include motor grader operation

    > Working area marked and

    calculated in the end of

    each stage plan,

    exclude road and bench

    http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.

  • 7/25/2019 i-mining.co.id Guidelines

    9/13

    Module E

    > Use typical proven costs

    > Allign to pit optimisation

    > Flexibility of material type,

    mining method and

    supply chain characteristichttp://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.

  • 7/25/2019 i-mining.co.id Guidelines

    10/13

    Module F

    http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.

  • 7/25/2019 i-mining.co.id Guidelines

    11/13

    Module F

    > Bunch of practical use

    > Options in drop down list

    > Flexibility of trial and gethttp://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.

  • 7/25/2019 i-mining.co.id Guidelines

    12/13

    Module G

    > Decision making tool

    > Up to 7 seams calculation

    > Targeted certain value

    > Product vs consolidated price

    http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.

  • 7/25/2019 i-mining.co.id Guidelines

    13/13

    Next modules - to be continued

    TERIMA KASIH

    http://i-Mining co id PT Mahameru Arka Nusantara 2015 All rights reserved