i-mining.co.id guidelines
TRANSCRIPT
-
7/25/2019 i-mining.co.id Guidelines
1/13
> Engineering tools
> Calculator
> No rocket science
> Get to solution
> Decision making
http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.
> WYSIWYG
> Minerals
> Maps application
> Public report based> Under construction
> Consulting services
> Online fee estimator
> Transparent parameter> Under construction
-
7/25/2019 i-mining.co.id Guidelines
2/13
> 7 modules ready to run
> 3 modules under construction
> another 3 modules to come,
include mineral pricing and cut of grade
http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.
-
7/25/2019 i-mining.co.id Guidelines
3/13
Input
Result
Enter klik
> Coal dilution results
> Higher ash content
> Weighted RD
> Preston-Sanders
Coal dilution
approach input
Module A
http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.
-
7/25/2019 i-mining.co.id Guidelines
4/13
Module A
HBA
Drop down list -basis of reporting
Calculation
result
Enhanced feature;
> Save
> Print to pdf
> Sent to user's email
> Load
http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.
-
7/25/2019 i-mining.co.id Guidelines
5/13
Module B > 8 combination available> Guideline for pit optimisation
> Elaborate geotechnical in mine design
Allowance for
IPBFFlexibility in combination
of swamp, soil, soft and
hard material bench spec.
http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.
-
7/25/2019 i-mining.co.id Guidelines
6/13
Module C
Calculate the yearly
effective working hour
based on planned working shift
> Predict the best solution,
over truck and under truck
> Suggest the fleet allocation
http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.
-
7/25/2019 i-mining.co.id Guidelines
7/13
Module C > Production = ewh x productivity> 8 coal fleets option
> 14 OB fleets option
http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.
-
7/25/2019 i-mining.co.id Guidelines
8/13
Module D
> Mining intensity in bcm/m2/year
> Include motor grader operation
> Working area marked and
calculated in the end of
each stage plan,
exclude road and bench
http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.
-
7/25/2019 i-mining.co.id Guidelines
9/13
Module E
> Use typical proven costs
> Allign to pit optimisation
> Flexibility of material type,
mining method and
supply chain characteristichttp://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.
-
7/25/2019 i-mining.co.id Guidelines
10/13
Module F
http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.
-
7/25/2019 i-mining.co.id Guidelines
11/13
Module F
> Bunch of practical use
> Options in drop down list
> Flexibility of trial and gethttp://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.
-
7/25/2019 i-mining.co.id Guidelines
12/13
Module G
> Decision making tool
> Up to 7 seams calculation
> Targeted certain value
> Product vs consolidated price
http://i-Mining.co.id PT. Mahameru Arka Nusantara 2015. All rights reserved.
-
7/25/2019 i-mining.co.id Guidelines
13/13
Next modules - to be continued
TERIMA KASIH
http://i-Mining co id PT Mahameru Arka Nusantara 2015 All rights reserved