HYDRO ELECTRIC POWER PLANTS
Technical Information
ATB SEVER Your Partner in Building SHPP
ATB SEVER factory was founded in 1923. It is one of the oldest
manufacturers of electric machines in Southeast Europe. Production
and service of synchronous and asynchronous generators is one of the
main programs of ATB SEVER for decades. As a company with a great
experience ATB SEVER offers asynchronous generators within power
range from 132 kW up to 2000 kW and synchronous generators from 132
kW up to 10 MW! Beside the generators, ATB SEVER and ATB FOD offer
you turbines and equipment for turbines in cooperation with world
recognized producers. ATB SEVER, along with its own Engineering,
procures and installs control equipment in SHPP projects.
ATB SEVER is the manufacturer with a development of its own and that is
why it is able to satisfy all your demands!
ASHPP Energetic Potential as a Source of Opportunity
Systematic research of energetic potential of small watercourse in
Serbia started in 1987. has identified about 900 potential locations for
building SHPP with power between 100 kW and 10 MW. These data
unambiguously show that in Serbia energetic potential exists and creates
real, considerably large investment possibilities in building SHPP.
Hydro-electric power plants up to 10 MW are small hydro power plants
according to Law of Energetic of the Republic of Serbia.
ASYNCHRONOUS SYNCHRONOUS
GENERATORS GENERATORS
Rotor squirrel cage without brushes with brushes
Size 180 - 710 180 - 900 355 - 900
Voltage / Frequency 400 - 690 V / 50 Hz, 60 Hz 400 - 690 V / 50 Hz, 60 Hz 3 - 11 kV / 50 Hz, 60 Hz
Power 132 - 2000 kW 132 - 1500 kW 200 - 5000 kW
Speed 4 - 20 polova 4 - 24 pola 4 - 24 pola
Insulation class F F F
Mechanical protect. IP 23, IP 55 IP 23, IP 55 IP 23, IP 55
Cooling IC 01, IC 411 IC 01, IC 411 IC 01, IC 511, IC 611
Mounting shape IM B3, IM V1 IM B3, IM V1 IM B3, IM V1
On demand, we can offer generators different from those given in the table.
SYNCHRONOUS
Small Hydro-electric Power Plants (SHPP)
Become a Reality in Serbia!
HYDRO ELECTRIC POWER PLANTS
HYDRO ELECTRIC POWER PLANTS
Small Hydro-electric Power Plants (SHPP)
Become a Reality in Serbia!
ATB FOD Your Partner in Building SHPP
ATB FOD was founded by creation of the central maintenance service in
RTB BOR in 1954. It has significant experience in design, production and
assembly of mechanical and electrical equipment, spare parts,
assemblies and sub-assemblies for mining, metallurgy, inorganic
chemistry.
During last years of business and technical cooperation with worldwide
known manufacturers ATB FOD has gained large experience in a
production of equipment for turbines for SHPP. Housings, transportation
devices, covers, water traps and other equipment which are to be built in
front of and behind the turbine are produced in workshops. The equipment
is made for different turbine types and different power: FRANSIS turbine
for power 200 – 12500 kW, KAPLAN turbine for power 350 – 5500 kW, TUBE
turbine for power 300 – 4000 kW, PELTON turbine for power 1000 – 3000
kW.
Beside production of turbines, in cooperation with ATB SEVER and its
partners from other countries, ATB FOD offers design and assembly of
mechanical and electrical equipment for SHPP
.
Investment in SHPP surely returns
The analyses done for 29 potential locations have shown that technical
and economic parameters of SHPP depend on power, produced energy,
level of investment costs, price of electric energy and existence of
stimulating mechanisms, like Carbon Credits and Green Certificates. The
time of return on investments is 5 to 15 years for the majority of analyzed
locations.
Confirmation of national interest is expected in approving stimulating
measures as Green Certificate ('green kWh') which will speed up the
return of the invested capital and increase the interest of potential
investors!
TURBINE:
FRANSIS power 200 - 12500 kW
KAPLAN power 350 - 5500 kW
TUBE power 300 - 4000 kW
PELTON power 1000 - 3000 kW
Small Hydro-electric Power Plants (SHPP)
Become a Reality in Serbia!
Water intake and water chamber
- water level measurement
- communication with SHPP object: optical or copper cable, wireless by radio
connection or GMS, SMS
- object power supply by the means of energetic cable or photovoltaic device
Mechanical room of SHPP building consists of space for the turbine with its hydro-
mechanical equipment and space for electric unit.
Electrical installation of the mechanical room
- electrical installation for lightning and earthing and lightning arresters
- fire-fighting protection and protection against breaking in
- telecommunication
- equipment for electric power measurement
Low voltage unit
- the compensation field
- turbine and generator control system
- the own consumption
- the system for continuous supply
- the system for generator protection
Transformers
- the main energetic transformer 0,4/10(20) kV for asynchronous generator
- the main energetic transformer 6,3/10(20) kV for synchronous generator
- the house transformer 10(20)/0,4 kV for own consumption
Middle voltage unit
Sf6 gas-insulated or air-insulated.
- the generator unit
- the unit for measurement and protection
- the transformer unit for the main transformer and house transformer
- the network connecting unit
Control, SCADA system and technical documentation
Control equipment is made on PLC basis. Gathered data about mechanical and
electrical parameters of the generator are processed by the network analyst and
displayed on operator panel and SCADA system.
The complete system enables easy and simple control of the production of electric
energy in small hydro-electric power plant.
Delivery of the technical documentation
Test protocols, certificates and documentation of realized condition.
ATB SEVER a.d.
Magnetna polja 6
24 000 Subotica
Serbia
Tel. +381 24 665-124
Fax +381 24 665-125
www.atb-motors.com
ATB FOD d.o.o.
Djordja Vajferta 16,
19210 Bor
Tel. +381 30 423 147, 424 677
Fax +381 30 458 611
www.fod.co.rs
Serbia