huw rhys lewis mriba, mrics, mapm managing director€¦ · huw rhys lewis mriba, mrics, mapm...
TRANSCRIPT
Huw Rhys Lewis MRIBA, MRICS, MAPM
Managing Director
West Midlands Forum for Growth September 6th 2017
Hybrid Bill proposal
Hybrid Bill proposals
Our Vision
Illustrative Masterplan
• Airport option• Passive provision for
2036 terminal
2016 Masterplan &
LOD Overlay
Phase 1 (2018-2022)
De
velo
pm
en
t
Infr
astr
uct
ure
Phase 2 (2023-2027)
De
velo
pm
en
t
Infr
astr
uct
ure
Phase 3 (2028-2030)
De
velo
pm
en
t
Infr
astr
uct
ure
Phase 4 (2032- Beyond)
De
velo
pm
en
t
Infr
astr
uct
ure
DeliveryDevolution Agreement
Value Capture Framework tool kit
WMCA SEP
HS2 Growth Strategy
Investment Prospectus
Investments underpinned by
new or improved infrastructure
VALUE CAPTURE needs to be a
core part of this approach
• Framework developed for selecting from 21 tools
• New and existing development / activities
• Commercial, planning, voluntary business contribution and fiscal tools
• Existing or new / amended mechanisms
• UKC Hub: tested value capture using a combination of 12 mechanisms
• Up to £2 billion (2017 prices) in value could potentially be captured over the period to 2045
• UKC Hub: tested value capture using existing (non-specifically designated) mechanism
• Up to £0.97 billion captured (2017 prices) to 2045