Hutchinson River and Westchester Creek CSO Long Term Control Plan Public Meeting #3 Final LTCP Plan Review PS 71 Rose E Scala September 16, 2015

Upload: others

Post on 05-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

Hutchinson River and Westchester Creek

CSO Long Term Control Plan

Public Meeting #3

Final LTCP Plan Review

PS 71 Rose E Scala

September 16, 2015

Page 2: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

2

Welcome & Introductions

Eric Landau

Associate Commissioner

DEP

Page 3: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

3

Agenda

Topic Speaker

1 Welcome & Introductions Eric Landau

2 Hutchinson River LTCP

• Summary of Previous Public Meetings Eric Landau

• LTCP Proposed Final Recommendations Jim Mueller

3 Westchester Creek LTCP

• Summary of Previous Public Meetings Eric Landau

• LTCP Proposed Final Recommendations Jim Mueller

4 Green Infrastructure Angela Licata

5 Discussion and Q&A Session All

Page 4: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

4

What is a Combined Sewer Overflow?

NYC’s sewer system is approximately 60% combined, which means it

is used to convey both sanitary and storm flows.

When the sewer system is at full capacity, a diluted mixture of rain water and

sewage may be released into local waterways. This is called a combined sewer

overflow (CSO).

65% to 90% of combined sanitary & storm flow is captured at treatment plants.

Down

Spout

Catch Basin

Combined

Sewer Outfall

Sewer

Regulator

Dry Weather

Conditions

City Sewer Main

Building Sewer

Connection

Down

Spout

Catch Basin

Stormy Weather Conditions

Combined

Sewer Outfall

Sewer

Regulator

City Sewer Main

Building Sewer

Connection

Page 5: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

5

What is a LTCP and CSO Consent Order?

Long Term Control Plan (LTCP)

identifies appropriate CSO controls to achieve applicable

water quality standards

consistent with the Federal CSO Policy and Clean Water Act

CSO Consent Order

an agreement that settles past legal disputes without

prolonged litigation

requires DEP to develop LTCPs and mitigate CSOs

Page 6: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

6

Hutchinson River (HR) LTCP

Page 7: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

7

Summary of Previous

HR Public Meetings

Eric Landau

Associate Commissioner

DEP

Page 8: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

8

HR LTCP Process and Public Involvement

ONGOING PUBLIC/STAKEHOLDER INPUT

Existing Information

Review

Data Collection &

AnalysisModeling

Alternatives Development & Evaluation

LTCP DEC Review

Kickoff

Meeting3/26/2014

Alternatives

Review Meeting9/9/2014

Final Plan

Review Meeting

TODAY

Submitted

LTCP 9/30/2014*

Riverbay’s Legislative

Committee Meeting

on LTCP Process

4/24/2014

*DEP submitted supplemental documentation to DEC on 4/14/2015 and 8/7/2015 in response to their comments.

Page 9: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

9

HR Public Meeting #1 – Summary

Presented on:

Waterbody/Watershed Characteristics

Current Uses

Water Quality Sampling Results

Green Infrastructure Projects• Edenwald Houses

• Neighborhood Demonstration Area

• Area-Wide Contracts with DDC

Date: March 26, 2014

Location: Harry S. Truman High School

# Attendees: 15

BacteriaDry Weather

(GM, #/100 mL)

Wet Weather(GM, #/100 mL)

Fecal Coliform 53 – 670 95 – 773

Enterococci 17 – 38 26 – 207

Page 10: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

10

HR Public Meeting #2 – Summary

Date: September 9, 2014

Location: Co-Op City Community Center

# Attendees: 15

Presented on:

Brief Recap of Meeting #1

Water Quality Attainment• Current Class SB: Non-attainment

• Future Entero: Non-attainment

Modeling• Minimal improvement with 100% CSO Control

• Significant bacteria loading contribution from

Westchester County

Comparison of Key Alternatives

Page 11: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

11

HR LTCP Proposed

Final Recommendations

Jim Mueller, P.E.

Assistant Commissioner

DEP

Page 12: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

12

Hutchinson River NYC Drainage AreaLehmann

High

School

Bruckner Expressway

Whitestone

Bridge Tolls

Begins in Westchester County, flows

through the Bronx into Eastchester Bay

Tributary to East River

Total NYC watershed drainage area is

approximately 2,795 acres

53% served by combined sewer

Classified by New York State DEC for

primary contact recreation:

Class SB – Bathing and Fishing

Land Use (breakdown for NYC):

43 % Residential

30 % Open Space

10 % Public Facilities

DEP wet weather discharges include:

5 CSO Outfalls

18 Stormwater Outfalls

Page 13: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

13

Hutchinson River CSO Mitigation Options

System

OptimizationFixed Weir

Parallel

Interceptor /

Sewer

Inflatable Dams

Bending Weirs

Control Gates

Pump Station

Expansion

CSO

Relocation

Gravity Flow

Tipping to Other

Watersheds

Pumping Station

Modification

Flow Tipping with

Conduit/Tunnel and Pumping

Water Quality

/ Ecological

Enhancement

Floatables

ControlDredging

Dissolved Oxygen

ImprovementFlushing Tunnel

Treatment

Satellite:

Centralized:

Outfall

Disinfection

Retention Treatment Basin (RTB)

with Disinfection

High Rate

Clarification (HRC)

WWTP Expansion

Storage In-System Shaft Tank Tunnel

INCREASING COMPLEXITY

INC

RE

AS

ING

CO

ST

Preferred Alternative

= Floatables Control & Outfall Disinfection (See Next Slide)

Page 14: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

14

Hutchinson River Preferred Alternative

*Recreational Season is from May 1st through October 31st

Divert flow to Outfall HP-024 Extension,

Provide Floatables Control, and

Disinfect 50 MGD in Recreational Season*

Benefits:

Reduces bacteria load to river from seasonal

disinfection

Provides floatables control

Utilizes gravity, no effluent pumping

No construction of costly retention tank

Challenges:

Solids deposition in outfall

Permitting of new outfall

Impact on MTA bus facilities during construction

Site acquisition for disinfection facility and soil

contamination

Est. Construction Cost / Annual O&M

$90 Million / $1.25 Million

Page 15: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

15

Hutchinson River Sampling Locations

Freshwater

Section

Tidal

Section

Page 16: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

16

Projected Annual Fecal Coliform Attainment

0 0 0

67

70

83 8385

100

0 0 0

67 67

83 83 83

100

0 00

75

83 83 83

92

100

-20

0

20

40

60

80

100

120

0 1 2 3 4 5 6 7 8 9 10

Att

ain

me

nt

%

LTCP Recommended Plan

Baseline

100% CSO Control

Tidal

HR9 HR8 HR7 HR6 HR5 HR4 HR3 HR2 HR1

Compliance

= Attainment ≥ 95%

for GM ≤ 200 #/100 mL

Sampling Locations

*Projections based on 2008 average rainfall year

We

stc

he

ste

r C

ou

nty

–N

ew

Yo

rk C

ity B

ou

nd

ary

Freshwater

HP-024

CSO Outfall

Extension

HP-024

CSO Outfall

Page 17: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

17

Projected Annual Enterococcus Attainment

0 0 0

44

53

63

71

85

100

0 0 0

42

49

60

69

83

100

-20

0

20

40

60

80

100

120

0 1 2 3 4 5 6 7 8 9 10

Att

ain

me

nt

%

LTCP Recommended Plan

Baseline

HR9 HR8 HR7 HR6 HR5 HR4 HR3 HR2 HR1

Compliance

= Attainment ≥ 95%

for GM ≤ 30 #/100 mL

Sampling Locations

*Projections based on 2008 average rainfall year

TidalFreshwater

We

stc

he

ste

r C

ou

nty

–N

ew

Yo

rk C

ity B

ou

nd

ary

HP-024

CSO Outfall

Extension

HP-024

CSO Outfall

Page 18: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

18

Projected Annual Dissolved Oxygen Attainment

100 100 100

9597

99 100 100 100

100 100 100

9597 98

100 100 100

0

20

40

60

80

100

120

0 1 2 3 4 5 6 7 8 9 10

Att

ain

me

nt

%

LTCP Recommended Plan - Hourly

Baseline - Hourly

HR9 HR8 HR7 HR6 HR5 HR4 HR3 HR2 HR1

Compliance

= Attainment ≥ 95%

for DO ≥ 3.0 mg/L

Sampling Locations

*Projections based on 2008 average rainfall year

TidalFreshwater

We

stc

he

ste

r C

ou

nty

–N

ew

Yo

rk C

ity B

ou

nd

ary

HP-024

CSO Outfall

Extension

HP-024

CSO Outfall

Page 19: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

19

Projected Annual Dissolved Oxygen Attainment

100 10098

73

78

90

97 98 98

100 10098

69

75

88

9698 98

0

20

40

60

80

100

120

0 1 2 3 4 5 6 7 8 9 10

Att

ain

me

nt

%

LTCP Recommended Plan - Daily

Baseline - Daily

HR9 HR8 HR7 HR6 HR5 HR4 HR3 HR2 HR1

Compliance

= Attainment ≥ 95%

for DO ≥ 4.8 mg/L

Sampling Locations

*Projections based on 2008 average rainfall year

TidalFreshwater

We

stc

he

ste

r C

ou

nty

–N

ew

Yo

rk C

ity B

ou

nd

ary

HP-024

CSO Outfall

Extension

HP-024

CSO Outfall

Page 20: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

20

HR Resulting Water Quality Improvements

CSO Volume Reduction: 11% annual volume reduction through planned

Green Infrastructure implementation

CSO Bacteria Reduction: 14% additional annual bacteria reduction through

disinfection of Outfall HP-024 Extension during

recreational season (May 1st to Oct. 31st)

BEFORE

(362 MG/yr)AFTER

(323 MG/yr)11%

CSO Volume

Reduction

Post LTCP Recommendations

105

6514%

Additional

Bacteria

Reduction (Through disinfection of

65 MG/Yr at HP-024.

This results in 24%

bacterial reduction in

Recreational Season)

Page 21: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

21

HR Tentative Implementation Schedule

Per constructability reviews and recent DEC Technical Meeting

on Sept. 3rd, 2015:

Page 22: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

22

HR LTCP Proposed Final Recommendations

Continue to implement Green Infrastructure Program

Implement Preferred Alternative

• Outfall Disinfection & Floatables Control

Initiate post-construction compliance monitoring

Perform a Use Attainability Analysis (UAA) addressing

non-compliance

Establish a wet-weather advisory during the recreational

season (May 1st – Oct 31st)

Page 23: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

23

Westchester Creek (WC) LTCP

Page 24: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

24

Summary of Previous

WC Public Meetings

Eric Landau

Associate Commissioner

DEP

Page 25: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

25

WC LTCP Process and Public Involvement

ONGOING PUBLIC/STAKEHOLDER INPUT

Existing Information

Review

Data Collection &

AnalysisModeling

Alternatives Development & Evaluation

LTCP DEC Review

Kickoff

Meeting2/26/2014

Alternatives

Review Meeting5/7/2014

Final Plan

Review Meeting

TODAY

Submitted

LTCP 6/30/2014*

Bronx Borough

Cabinet Meeting

on Public

Outreach

2/5/2014

Bronx Community

Board 9 Land Use

Committee

Meeting

2/10/2014

Bronx Borough

Board with Borough

Services Cabinet

Meeting

3/5/2014

Bronx Community

Board 10

Municipal Service

Committee

3/11/2014

*DEP submitted supplemental documentation to DEC on 4/14/2015 in response to their comments.

Page 26: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

26

WC Public Meeting #1 – Summary

Presented on:

Waterbody/Watershed Characteristics

Current Uses

Water Quality Sampling Results

Current WQ Improvement Projects

• Weir Modification to Regulators CSO 29A/29

• Pugsley Parallel Sewer

• Green Infrastructure

Date: February 26, 2014

Location: JHS 125 Henry Hudson School

# Attendees: 10

BacteriaDry Weather

(GM, #/100 mL)

All Weather(GM, #/100 mL)

Fecal Coliform 5 – 97 23 – 559

Enterococci 4 – 74 12 – 460

Page 27: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

27

WC Public Meeting #2 – Summary

Date: May 7, 2014

Location: Herbert Lehman High School

# Attendees: 10

Presented on:

Brief Recap of Meeting #1

Water Quality Attainment• Current Class I: Full Fecal attainment

• Primary Contact: Full Fecal attainment during

Recreational Season* and

high-level of Annual Fecal

attainment

Modeling• Minimal improvement with 100% CSO Control

• East River and stormwater inputs limit reaching

full Class SB attainment

Comparison of Key Alternatives

*Recreational Season is from May 1st through October 31st

Page 28: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

28

WC LTCP Proposed

Final Recommendations

Jim Mueller, P.E.

Assistant Commissioner

DEP

Page 29: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

29

Westchester Creek Drainage Area

Majority of CSO discharges at

head end near Lehmann HS

(HP-014)

Drainage area: 4,952 acres

70% impervious

85% served by combined sewers

Classified by New York State

DEC for secondary contact

recreation and fishing (Class I)

Land Use 55% Residential

18% Mixed Use

15% Open Space

Wet weather discharges

6 CSO Outfalls

12 Stormwater Outfalls

Page 30: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

30

Westchester Creek CSO Mitigation Options

System

OptimizationFixed Weir

Parallel

Interceptor /

Sewer

Inflatable Dams

Bending Weirs

Control Gates

Pump Station

Expansion

CSO

Relocation

Gravity Flow

Tipping to Other

Watersheds

Pumping Station

Modification

Flow Tipping with

Conduit/Tunnel and Pumping

Water Quality

/ Ecological

Enhancement

Floatables

ControlDredging

Dissolved Oxygen

ImprovementFlushing Tunnel

Treatment

Satellite:

Centralized:

Outfall

Disinfection

Retention Treatment Basin (RTB)

with Disinfection

High Rate

Clarification (HRC)

WWTP Expansion

Storage In-System Shaft Tank Tunnel

INCREASING COMPLEXITY

INC

RE

AS

ING

CO

ST

Preferred Alternative = Continue to Implement Waterbody/Watershed

Facility Plan (WWFP) Work (See Next Slide)

Page 31: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

31

WC Recommendation: Continue Ongoing WWFP Work

Weir Modifications to

Regulators

CSO-29A and CSO-29

(Directs more flow to WWTP)

Cost = $15 Million

Parallel Relief Sewer to

Divert CSO Away from

Pugsley Creek

Cost = $66 Million

Floatables Control at HP-011 (Incorporated under Bronx River LTCP)

Cost = $9 Million

Page 32: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

32

Westchester Creek Sampling Locations

Page 33: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

33

Projected Annual Fecal Coliform Attainment

92

100 100 100

92

100 100 100

0

20

40

60

80

100

120

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5

Att

ain

me

nt

%

LTCP Recommended Plan

Baseline

WC2 WC1 WC3 E13

Compliance

= Attainment ≥ 95%

for GM ≤ 200 #/100 mL

Sampling Locations

*Projections based on 2008 average rainfall year

HP-013

CSO OutfallHP-014

CSO Outfall

Page 34: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

34

Projected Annual Enterococcus Attainment

64

72

80

99

64

72

80

99

0

20

40

60

80

100

120

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5

Att

ain

me

nt

%

LTCP Recommended Plan

Baseline

Compliance

= Attainment ≥ 95%

for GM ≤ 30 #/100 mL

*Projections based on 2008 average rainfall year

WC2 WC1 WC3 E13

HP-013

CSO Outfall

Sampling Locations

HP-014

CSO Outfall

Page 35: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

35

Projected Annual Dissolved Oxygen Attainment

80

9799 99

80

9799 99

0

20

40

60

80

100

120

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5

Att

ain

me

nt

%

LTCP Recommended Plan

Baseline

Compliance

= Attainment ≥ 95%

for DO ≥ 4.0 mg/L

*Projections based on 2008 average rainfall year

WC2 WC1 WC3 E13

HP-014

CSO Outfall

HP-013

CSO Outfall

Sampling Locations

Page 36: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

36

WC Resulting Water Quality Improvements

Implementation of planned GI and WWFP Recommendations will reduce

CSO volume by 64%

High level of attainment of primary contact criterion (Fecal Coliform GM <200 cfu/100 mL)

64%

Volume

Reduction

BEFORE

(792 MG/yr)

AFTER

(289 MG/yr)WWFP+GI

Post LTCP Recommendations

Page 37: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

37

WC Overview of Implementation Schedule

LTCP Recommendation Phase Schedule

Continue Ongoing

Waterbody /

Watershed

Facility Plant

(WWFP) Projects

Weir Modifications to

Regulators

CSO-29A and CSO-29

Design Completed

Construction Dec 2015 – Dec 2019

Pugsley Creek

Parallel Relief Sewer

Design In Progress

Construction Jun 2016 – Dec 2019

Part of Larger

CSO Control

Project under

Bronx River LTCP

Floatables Control at

HP-011*

Estimated Construction Completion

= 9 Years from Bronx River LTCP Approval(See Next Slide)

Page 38: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

38

Tentative Floatables Control Implementation Schedule

Per constructability reviews for Bronx River LTCP and recent

DEC Technical Meeting on Sept. 3rd, 2015:

Page 39: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

39

WC LTCP Proposed Final Recommendations

Continue to implement 2011 Waterbody / Watershed Facility

Plan (WWFP) Recommendations

Continue to implement Green Infrastructure Program

Initiate post-construction compliance monitoring

Incorporate floatables control at Outfall HP-011

• As part of a larger CSO control project under the Bronx River LTCP

Perform Use Attainability Analysis (UAA) addressing non-

compliance

Establish a wet-weather advisory during the recreational

season (May 1st to Oct 31st)

Page 40: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

40

Green Infrastructure

Mikelle Adgate

Program Manager

DEP

Page 41: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

41

Green Infrastructure in New York City

Green Infrastructure (GI) collects stormwater

runoff from impervious surfaces

Budget $1.5 billion for GI Citywide to manage

1” of stormwater runoff from 10% of

impervious combined sewered areas by 2030

Meet this goal through:

• ROW Bioswale Area-Wide Projects

• Public Property Retrofits

• Grant Program for Private Property

Owners

Existing Priority CSO Tributary Areas

New Priority CSO Tributary Areas

Other CSO Areas

Currently in-construction on

approx. 2700 GI Assets in

Brooklyn, Queens and the Bronx

Page 42: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

42

Ongoing GI in Hutchinson River and Westchester Creek

Status:

• 22 Bioswales Constructed

• 100 GI Assets in Construction or final design

• Porous Concrete Pilot

• Edenwald Retrofit – NTP issued

Status:

• 2 Green Roofs Constructed

• Geotechnical Investigations Underway

Hutchinson River Westchester Creek

Page 43: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

43

Next Steps

Public Comments will be accepted through October

30, 2015

DEP/DEC to review public comments

DEC to approve LTCPs

Comments can be submitted to:

• New York City DEP at: [email protected]

Page 44: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

44

Additional Information & Resources

Visit the informational tables tonight for handouts and

poster boards with detailed information

Go to www.nyc.gov/dep/ltcp to access:

LTCP Public Participation Plan

Presentation, handouts and poster boards from this meeting

Links to Waterbody/Watershed Facility Plans

CSO Order including LTCP Goal Statement

NYC’s Green Infrastructure Plan

Green Infrastructure Pilots 2011 and 2012 Monitoring Results

NYC Waterbody Advisory Program

Upcoming meeting announcements

Other LTCP updates

Page 45: Hutchinson River and Westchester Creek CSO Long Term ... › assets › dep › downloads › pdf › ...TODAY Submitted LTCP 9/30/2014* Riverbay’s Legislative Committee Meeting

45

Discussion and

Q&A Session