Page 1: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Virtual Design + Construction

Panel Talk and DiscussionASCE Alabama Section Meeting Presentation

Page 2: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Huntsville UtilitiesOldest Water System West of Appalachian Mountains

1836First cast iron pipe

1843City of Huntsville purchase water

works

1954Huntsville Utilities

formed

1964South Parkway

WTP constructed (12 MGD)

1966South Parkway WTP expanded

(24 MGD)

1978South Parkway WTP expanded

(36 MGD)

1988Southwest WTP

constructed(24 MGD)

1992Lincoln Dallas

WTP constructed (9 MGD)

1996Hampton Cove

WTP constructed (2 MGD)

2001Southwest WTP

expanded (48 MGD)

2008 South Parkway WTP expanded

(4 MGD)

2015Southeast WTP

construction begins (24 MGD)

Page 3: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Southeast Water Treatment Plant

■Average daily pumpage is approximately 35 MGD or about 24,300 GPM (Gallons per Minute)

■Maximum day pumpage was 75 million gallons

■Total storage capacity – 52 MGD

■Over 1,000 miles of water mains

Page 4: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Project Background

■ Current construction project began Spring 2015

■ New 24 MGD raw water intake on Lake Guntersville just upstream of Guntersville Dam

■ Approximately 3 miles of 42-inch DIP raw water main to plant

■ New 24 MGD conventional water treatment plant at the intersection of Highway 431 and TVA Guntersville Dam RD

■ Flocculation/Sedimentation/Dual Media Filtration/Granular Activated Carbon Filtration/Chlorination

■ Approximately 8 miles of 48-inch DIP finished water main from plant to existing distribution system

■ Expected construction completion Summer 2017

Page 5: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Design

Page 6: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Journey from 2D to 3D

■Why move into 3D?

■Choosing a 3D modeling software

■What hurdles to overcome?

■Benefits to working in 3D

Page 7: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Why Move to 3D?

■ Industry future

■Superior product

■Coordination

■Efficiency

■Accuracy

Page 8: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Which 3D Modeling Program to Use?

■Client requirements?

■Do we have disciplines or design centers already working in 3D?

■Compatibility issues

■Out-of-the-box library of content

■Ease of use and training available

Page 9: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Challenges to Overcome

■Learning and teaching the new program

■Create project workflows

■Creating existing company CAD standards in Revit format

■Create cohesive plan set

■Create custom content library

Page 10: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Benefits to 3D Modeling

■Accurate quantities and estimates

■Smart labeling and schedules

Page 11: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Benefits to 3D Modeling

■Phasing capabilities

■Photorealistic renderings

Page 12: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Benefits to 3D Modeling

■Easily add 3D “perspective” views to the construction planset

Page 13: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Construction Coordination

Page 14: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Preconstruction Information and Planning

Architect

Civil

EngineerConsultant

Project

Manager

Owner

MEP

EngineersEstimator

Structural

Engineer

Collaborative Process

Page 15: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Preconstruction Information and Planning

Insert Image Here

Page 16: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Construction Communication & Coordination

■Model Info Delivered to Field Personnel During Construction

Page 17: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Construction Communication & Coordination

■Learn the Job Quickly

■Safety Planning

— Tie Off points

— Hazard Forecasting

— Onsite Training

Page 18: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Field Implementation/End Product

Page 19: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Construction Communication & Coordination

■Current drawings to field

■Punch lists

■Drawing markups

Page 20: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

Live iPad Demo

Page 21: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

The Next Steps

Page 22: Huntsville Utilities New Water Treatment Facility

ASCE Alabama Section Meeting3D Modeling Presentation & Panel Discussion

What’s Next…

Model Driven Layout

Model Communication and Tracking Tools

Facility Management

UAVs and Photogrammetry