htm 3230 week 5 class notes
TRANSCRIPT
![Page 1: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/1.jpg)
Hospitality Facilities Design and Planning
Week 5 Lodging Planning and Design
![Page 2: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/2.jpg)
Overview
• Process of development, design and construction can take up to four years!
• Hotel and Resort Design requires skills from:– Owners– Managers– Architects – Builders
![Page 3: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/3.jpg)
Site Visit last week
• What did we learn:– What does the owner envision?– How long has the process taken?– How is the market for hotels in Burlington? Why?– Describe future guest for this hotel– What is biggest challenge:• Financing• The site itself, what limitations?
![Page 4: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/4.jpg)
Development Process
• Let’s look at the process that is involved with development and design and let’s apply this to our project:
![Page 5: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/5.jpg)
Development Process
![Page 6: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/6.jpg)
Our project
• What development phase is our project in?
![Page 7: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/7.jpg)
Development Process
![Page 8: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/8.jpg)
Space Allocation
• What do you need to look at before you allocate space:– Feasibility study that shows:• Type of guest, type of hotel, location, what functions
– Understand differences between a resort hotel and a downtown hotel, luxury or limited service
Then do a schematic, rough lay-out of the site (all teams to do in second half of class)
![Page 9: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/9.jpg)
![Page 10: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/10.jpg)
Space Allocation
• Let’s look at the Burlington project:– List all areas we need to include in our design
![Page 11: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/11.jpg)
Space Allocation - task
– Task for teams: • Schematic design of the project site: roughly draw and
allocate spaces. All teams to submit at next week’s class• Let’s find out what Hilton Garden Inn brand
requirements are (Team 1 to contact Larry Williams at Redstone and learn about Hilton’s guidelines)
![Page 12: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/12.jpg)
“Space” list Burlington project
• Parking• Landscaping• Driveway/entrance/Porte Cochere• Lobby area, front desk, luggage area, seating• Restaurant• Kitchen• Bar• Recreational: Fitness, Spa? Indoor pool
![Page 13: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/13.jpg)
“Space” list Burlington Project
• Public Bathrooms• Meeting rooms• Shops?• Guestrooms (125-140)• Corridors: what type is best here? service
areas?• Back of House: areas do we need to think of??• Offices
![Page 14: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/14.jpg)
Development Process
![Page 15: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/15.jpg)
![Page 16: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/16.jpg)
Development Process
![Page 17: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/17.jpg)
Like this…. Or like this….
![Page 18: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/18.jpg)
Before we kick off ask yourself:
• ALL teams to work on the following questions:
– What are the challenges with our project site?• How can we best overcome these challenges?
– What are the advantages of the project site?• How can we best make use of these?
![Page 19: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/19.jpg)
Development Process
![Page 20: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/20.jpg)
Budget
• What is the budget for our project?• Team 4: prepare a rough budget, by category,
for the project (use the same lay out as exhibit 6, page 430 plus include any other information that you find helpful)
• Questions: what is the cost: – per square foot based on 98,000 sq ft building– per room based on 140 rooms?
![Page 21: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/21.jpg)
Development Process
![Page 22: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/22.jpg)
Schedule
• If we were to start today with our project, how would it take before we can open the doors?
![Page 23: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/23.jpg)
And then…
• The actual planning design process, finally….
![Page 24: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/24.jpg)
Planning & Design Process
![Page 25: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/25.jpg)
Initial Concept
• The “rough draft” of the project even before any detailed research is done
• It’s the start of putting the idea on paper
• Thinking back about or visit, what is the initial concept that was presented back in 2001?• How many times did it change? And why?• What can we learn from this?
![Page 26: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/26.jpg)
Our project hotel
• What would the initial concept look like? In other words: describe the concept behind this hotel?
![Page 27: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/27.jpg)
Site Planning
• How do guests arrive at the site?• What is the sense of arrival you want to
create, also called “Curb appeal”?• What is the parking situation like? Unique
challenge but how do we fix it? • Do you it will be a high rise structure? How
high can we go?• Where will the entrance be?
![Page 28: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/28.jpg)
Hotel Planning
• This is where we will spend most of our time for the project
• Some things to consider: – Anything that is added to one room needs to be
copied and paid for for 125-140 rooms– How luxurious a hotel should our hotel be? (what is
the nightly rate? When you look at the Hilton Garden Inn concept, what do they charge at other Hilton Garden Inns? What do other HGI’s look like? Team 3 to research all three questions)
![Page 29: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/29.jpg)
Hotel Planning – Areas
![Page 30: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/30.jpg)
This week’s focus
![Page 31: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/31.jpg)
Guestroom Corridors
• Types of corridors:– Which type is the most efficient and gives you
most space for guestrooms?– Which type should we use for the project?– Other than entrance doors to rooms, what other
areas are there in a corridor?
![Page 32: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/32.jpg)
![Page 33: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/33.jpg)
![Page 34: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/34.jpg)
Guestrooms and Suites
• Level of luxury• Who will the user be (family, business person,
couples, young/old, foreign or domestic)• Mix of bed types– Team 2: given the type of guests our project hotel
will have, how many rooms should have two beds and how many one king or queen bed; and how many suites should there be (based on 140 rooms)? What/who would the suites be used for?
![Page 35: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/35.jpg)
Jay Peak - King Room
![Page 36: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/36.jpg)
Jay Peak – “Double Double”
![Page 37: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/37.jpg)
Tasks for second half of class
ALL TEAMS:
Make a schematic design of the project site: roughly draw and allocate spaces on the site in general and inside the armory building (see hand outs)
Use the information from the form we used in class today that lists Feasibility and Space Allocation
![Page 38: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/38.jpg)
Team 1
• What are Hilton Garden Inn design requirements?– Contact Larry Williams at Redstone to find out if they
have these requirements in a document to review– How do you think these requirements can fit in
Burlington setting– What do other Hilton Garden Inns look like? Give 2
examples, one in an urban setting, one in a setting outside of a city (sub-urban or country side?) Describe and provide pictures. What do you like, not like?
![Page 39: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/39.jpg)
Team 2
• Given the type of guests our project hotel will have, how many rooms should have two beds and how many one king or queen bed; and how many suites should there be (based on 140 rooms)?
• What/who would the suites be used for?• Would you use tower, double loaded, single
loaded or atrium corridors? And why?
![Page 40: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/40.jpg)
Team 3
• Research Hilton Garden Inn: what sense of level of service do you get? (luxurious, middle of the road, amenities)?
• What is the nightly rate? • When you look at the Hilton Garden Inn concept,
what do they charge at other Hilton Garden Inns?
![Page 41: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/41.jpg)
Team 4
• Prepare a rough budget, by category, for the project (use the same lay out as exhibit 6, page 430 plus include any other information that you find helpful)
• Questions: what is the cost: – per square foot based on 98,000 sq ft building– per room based on 140 rooms?
![Page 42: Htm 3230 week 5 class notes](https://reader035.vdocuments.site/reader035/viewer/2022062307/55626602d8b42aab1a8b4cb7/html5/thumbnails/42.jpg)
Next class
Food Service Design - Chapter 13 from book
Hotel Planning and Design project:Review of team assignments from 9/14Discuss and agree on design concept and rough concept and lay-out of propertyReview each team’s tasks to be clear