Facilities Design and PlanningRecap to date

Hans van Wees

Page 2: Htm 3230 recap oct 2010

Purpose

• Basic design principles used to develop lodging and resort properties

• Principles of facilities management that will help in protecting the valuable assets of property owners and stockholders.

Page 3: Htm 3230 recap oct 2010

Objectives

• Learn tools and techniques of resort and hotel facility management and design

• Work in a team to create a design for a lodging facility

• Interact with professionals in the industry• Make a formal presentation

Page 4: Htm 3230 recap oct 2010

Class Format

• First half of each class: – Interactive discussion of topic based on readings

from book and articles, web research, actual experiences

– Industry developments of the past week: students will be asked to research web for articles on latest design and facilities management topics and share with class

Page 5: Htm 3230 recap oct 2010

It all starts with a vision…

Page 6: Htm 3230 recap oct 2010

Types of facilities

• Impact on design and construction costs• Scale and complexity of operations• Need for updating: renovations and

modernizations

• Let’s look at a few….

Page 7: Htm 3230 recap oct 2010

City Hotels

Page 8: Htm 3230 recap oct 2010

Sub-Urban Hotels

Page 10: Htm 3230 recap oct 2010

Convention Hotels

Page 11: Htm 3230 recap oct 2010

Resort Hotels - Ski

Page 12: Htm 3230 recap oct 2010

Resort Hotels - Islands

Page 13: Htm 3230 recap oct 2010

Resort Hotels – City!

Page 14: Htm 3230 recap oct 2010

And small…Remote Resorts

Page 15: Htm 3230 recap oct 2010

ECO Resorts

Page 16: Htm 3230 recap oct 2010

Far away…

Page 17: Htm 3230 recap oct 2010

… and close by

Page 18: Htm 3230 recap oct 2010

We will also look at the inside..

Page 19: Htm 3230 recap oct 2010

Environmental and Sustainability Management (week 3)

– Corporate Social Responsibility mission (PPP)– Waste Management– Energy Conservation and Management

(alternatives)– Fresh water resources– Land use planning– Engaging staff, guests and community

Page 20: Htm 3230 recap oct 2010

Killing “The Golden Goose”

• Example: Candi Dasa, Bali, Indonesia

Page 21: Htm 3230 recap oct 2010
Page 22: Htm 3230 recap oct 2010

Candi Dasa

In the 1970s and 1980s, the area received a large amount of investment in tourism and a construction boom. To fuel the construction of beach bungalows, new homes and restaurants, the offshore reef was mined for lime to make cement and other construction materials.

This removed the coastal barrier that had protected the beach which was undermined and washed away. Local hotel owners constructed a series of T-shape groins jutting out into the water in an attempt to preserve the beach, with mixed results

Page 23: Htm 3230 recap oct 2010
Page 24: Htm 3230 recap oct 2010

Versus a different kind of sustainable

Page 25: Htm 3230 recap oct 2010
Page 26: Htm 3230 recap oct 2010
Page 27: Htm 3230 recap oct 2010

Not just to feel good, but also good for the pocket

• reduction in energy use, savings• solid waste reduction• water usage

Page 28: Htm 3230 recap oct 2010

Water savings example

• Per room we sue about 50,000 gallons of water!

• At a cost of $2 per 1000 gallons that is $100 per room per year

• Add about $100 for waste water cost. • For a 400 room hotel $80,000 – if you could

save 25%, that is $20,000

Page 29: Htm 3230 recap oct 2010

What does the consumer say?

• Another important reason are market conditions, what does the consumer want, what do tour operators say?

Page 30: Htm 3230 recap oct 2010

PROJECT

Page 31: Htm 3230 recap oct 2010

Location

Page 32: Htm 3230 recap oct 2010

APPROACH

Page 33: Htm 3230 recap oct 2010

DESIGN TEAM COMMITTEES

Page 34: Htm 3230 recap oct 2010

DESIGN TEAM COMMITTEES

Page 35: Htm 3230 recap oct 2010

DESIGN TEAM COMMITTEES

Page 36: Htm 3230 recap oct 2010

DESIGN TEAM COMMITTEES

Page 37: Htm 3230 recap oct 2010

Weekly

2n

d

half

of class

Page 38: Htm 3230 recap oct 2010

Client

• Redstone Development• Meet 9/14 (to be confirmed) – check

blackboard and email• Final presentation: December 14th

(tentatively)• Use blackboard to provide updates on

progress to other committees

Page 39: Htm 3230 recap oct 2010

Building Structure, Finishes and Site (week 4)

– Exterior Building Structure– Building Interiors– Exterior Facilities (garage/parking)– Landscaping and Grounds

Page 40: Htm 3230 recap oct 2010

Overview

• Building functions:– Provide usable space:

• Suitable to the functions of the business• Fits with company image and style intended

– Provide shelter:• People• Equipment and fixtures/furnishings

Page 41: Htm 3230 recap oct 2010

Exterior Building Structure

• Foundation: carry live and dead load. Drainage and water proofing very important

• Structural Frame• Exterior Walls (protection against weather

and providing structural strength to building)• Windows and Doors (sealants, casement vs

vertically hung, multiple glazing for insulation)

Page 42: Htm 3230 recap oct 2010

Building Exterior

• Roof – costly. Built up versus single-ply roof systems. Give example of single ply roofing and advantages– Thermal imaging: used at TFL when we wanted to

discover where cold air was infiltrating building. Next is a sample of thermal imaging, the red parts being where most heat escapes from building. So, where do we see most heat loss?

Page 43: Htm 3230 recap oct 2010
Page 44: Htm 3230 recap oct 2010

Building Interiors

• Ceilings and wall coverings – acoustics, looks, insulation. Explain advantages of paint versus vinyl versus wallpaper. – Mildew! Especially in humid climates. Example of

hotel I worked at in Bermuda where wrong glue was used for vinyl wall covering and mildew grew behind it -> similar issues with “sick building” syndrome.

Page 45: Htm 3230 recap oct 2010

Exterior and Site

• Parking• Service and delivery entrance!• Storm Water drainage• Water, electric, sewer, gas, oil (deliveries)• Landscaping

• For the project we will study these in detail. Mistakes are costly and not easily changed

Page 46: Htm 3230 recap oct 2010

“Curb Appeal”

Page 47: Htm 3230 recap oct 2010

“Curb Appeal” ??

Page 48: Htm 3230 recap oct 2010

For Vermont consider:

Heated driveway:advantages and disadvantages

Parking: maximize, access, maintenance and costs. Free to guests or charge? Optional: valet parking (think of our project what may work best)

Next a picture of heated driveway at Trapp Family Lodge in midst of a snowstorm

Page 49: Htm 3230 recap oct 2010
Page 50: Htm 3230 recap oct 2010

The importance of landscaping

• Landscaping requires work (labor cost) and particularly in 4 season resorts

• But it is critical for creating an appealing atmosphere, even in city hotels where we see more gardens or terrace gardens being created

• Some area with milder climates get luckier…

Page 51: Htm 3230 recap oct 2010

Landscaping (Bermuda)

Page 52: Htm 3230 recap oct 2010

Lodging Planning and Design (week 5)

– Development process (owner/manager/architect)• Feasibility study (students will do a mini study),

Operational and construction criteria, Budget, Preliminary Schedule

– Planning and Design process• Site planning, Hotel, Rooms (floors, lay outs), Public

Areas incl. Lobby, Restaurants, Meeting Rooms, Recreation, Offices, Kitchens, Restrooms, BOH!

Page 53: Htm 3230 recap oct 2010

Overview

• Process of development, design and construction can take up to four years!

• Hotel and Resort Design requires skills from:– Owners– Managers– Architects – Builders

Page 54: Htm 3230 recap oct 2010

Development Process

Page 55: Htm 3230 recap oct 2010

Development Process

Page 56: Htm 3230 recap oct 2010

Space Allocation

• What do you need to look at before you allocate space:– Feasibility study that shows:

• Type of guest, type of hotel, location, what functions

– Understand differences between a resort hotel and a downtown hotel, luxury or limited service

Then do a schematic, rough lay-out of the site (all teams to do in second half of class)

Page 57: Htm 3230 recap oct 2010
Page 58: Htm 3230 recap oct 2010

Space Allocation

• Let’s look at the Burlington project:– List all areas we need to include in our design

Page 59: Htm 3230 recap oct 2010

Space Allocation - task

– Task for teams: • Schematic design of the project site: roughly draw and

allocate spaces. All teams to submit at next week’s class

• Let’s find out what Hilton Garden Inn brand requirements are (Team 1 to contact Larry Williams at Redstone and learn about Hilton’s guidelines)

Page 60: Htm 3230 recap oct 2010

“Space” list Burlington project

• Parking• Landscaping• Driveway/entrance/Porte Cochere• Lobby area, front desk, luggage area, seating• Restaurant• Kitchen• Bar• Recreational: Fitness, Spa? Indoor pool

Page 61: Htm 3230 recap oct 2010

“Space” list Burlington Project

• Public Bathrooms• Meeting rooms• Shops?• Guestrooms (125-140)• Corridors: what type is best here? service

areas?• Back of House: areas do we need to think of??• Offices

Page 62: Htm 3230 recap oct 2010

Development Process

Page 63: Htm 3230 recap oct 2010
Page 64: Htm 3230 recap oct 2010

Development Process

Page 65: Htm 3230 recap oct 2010

Like this…. Or like this….

Page 66: Htm 3230 recap oct 2010

Before we kick off ask yourself:

• ALL teams to work on the following questions:

– What are the challenges with our project site?• How can we best overcome these challenges?

– What are the advantages of the project site?• How can we best make use of these?

Page 67: Htm 3230 recap oct 2010

Development Process

Page 68: Htm 3230 recap oct 2010

Budget

• What is the budget for our project?• Team 4: prepare a rough budget, by category,

for the project (use the same lay out as exhibit 6, page 430 plus include any other information that you find helpful)

• Questions: what is the cost: – per square foot based on 98,000 sq ft building– per room based on 140 rooms?

Page 69: Htm 3230 recap oct 2010

Development Process

Page 70: Htm 3230 recap oct 2010

Schedule

• If we were to start today with our project, how would it take before we can open the doors?

Page 71: Htm 3230 recap oct 2010

And then…

• The actual planning design process, finally….

Page 72: Htm 3230 recap oct 2010

Planning & Design Process

Page 73: Htm 3230 recap oct 2010

Initial Concept

• The “rough draft” of the project even before any detailed research is done

• It’s the start of putting the idea on paper

• Thinking back about or visit, what is the initial concept that was presented back in 2001?

• How many times did it change? And why?• What can we learn from this?

Page 74: Htm 3230 recap oct 2010

Our project hotel

• What would the initial concept look like? In other words: describe the concept behind this hotel?

Page 75: Htm 3230 recap oct 2010

Site Planning

• How do guests arrive at the site?• What is the sense of arrival you want to

create, also called “Curb appeal”?• What is the parking situation like? Unique

challenge but how do we fix it? • Do you it will be a high rise structure? How

high can we go?• Where will the entrance be?

Page 76: Htm 3230 recap oct 2010

Hotel Planning

• This is where we will spend most of our time for the project

• Some things to consider: – Anything that is added to one room needs to be

copied and paid for for 125-140 rooms– How luxurious a hotel should our hotel be? (what

is the nightly rate? When you look at the Hilton Garden Inn concept, what do they charge at other Hilton Garden Inns? What do other HGI’s look like? Team 3 to research all three questions)

Page 77: Htm 3230 recap oct 2010

Hotel Planning – Areas

Page 78: Htm 3230 recap oct 2010

This week’s focus

Page 79: Htm 3230 recap oct 2010

Guestroom Corridors

• Types of corridors:– Which type is the most efficient and gives you

most space for guestrooms?– Which type should we use for the project?– Other than entrance doors to rooms, what other

areas are there in a corridor?

Page 80: Htm 3230 recap oct 2010
Page 81: Htm 3230 recap oct 2010
Page 82: Htm 3230 recap oct 2010

Guestrooms and Suites

• Level of luxury• Who will the user be (family, business person,

couples, young/old, foreign or domestic)• Mix of bed types

– Team 2: given the type of guests our project hotel will have, how many rooms should have two beds and how many one king or queen bed; and how many suites should there be (based on 140 rooms)? What/who would the suites be used for?

Page 83: Htm 3230 recap oct 2010

Jay Peak - King Room

Page 84: Htm 3230 recap oct 2010

Jay Peak – “Double Double”

Page 85: Htm 3230 recap oct 2010

Tasks for second half of class

ALL TEAMS:

Make a schematic design of the project site: roughly draw and allocate spaces on the site in general and inside the armory building (see hand outs)

Use the information from the form we used in class today that lists Feasibility and Space Allocation

Page 86: Htm 3230 recap oct 2010

Team 1

• What are Hilton Garden Inn design requirements?– Contact Larry Williams at Redstone to find out if they

have these requirements in a document to review– How do you think these requirements can fit in

Burlington setting– What do other Hilton Garden Inns look like? Give 2

examples, one in an urban setting, one in a setting outside of a city (sub-urban or country side?) Describe and provide pictures. What do you like, not like?

Page 87: Htm 3230 recap oct 2010

Team 2

• Given the type of guests our project hotel will have, how many rooms should have two beds and how many one king or queen bed; and how many suites should there be (based on 140 rooms)?

• What/who would the suites be used for?• Would you use tower, double loaded, single

loaded or atrium corridors? And why?

Page 88: Htm 3230 recap oct 2010

Team 3

• Research Hilton Garden Inn: what sense of level of service do you get? (luxurious, middle of the road, amenities)?

• What is the nightly rate? • When you look at the Hilton Garden Inn concept,

what do they charge at other Hilton Garden Inns?

Page 89: Htm 3230 recap oct 2010

Team 4

• Prepare a rough budget, by category, for the project (use the same lay out as exhibit 6, page 430 plus include any other information that you find helpful)

• Questions: what is the cost: – per square foot based on 98,000 sq ft building– per room based on 140 rooms?

Page 90: Htm 3230 recap oct 2010

Next class

Food Service Design - Chapter 13 from book

Hotel Planning and Design project:Review of team assignments from 9/14Discuss and agree on design concept and rough concept and lay-out of propertyReview each team’s tasks to be clear

Page 91: Htm 3230 recap oct 2010

Food and Beverage Facilities (Week 6)

– Concept Development (ideas, theme, menu)– Feasibility, regulations– Project Planning Team (planning lay out,

objectives)– Design (receiving area, storage, kitchen)– Dining area– Employee facilities, office space

Page 92: Htm 3230 recap oct 2010

Hotel Planning – Areas

Page 93: Htm 3230 recap oct 2010

This week’s focus

Page 94: Htm 3230 recap oct 2010

Development Process

Page 95: Htm 3230 recap oct 2010

Why is it so important to have a restaurant manager involved in the design?

Page 96: Htm 3230 recap oct 2010

Concept Discussion

Page 97: Htm 3230 recap oct 2010

Initial Concept

• Market study:– Location– Type of service– Type of menu?– Profile of potential guests

Menu?Type of food service?

Page 98: Htm 3230 recap oct 2010

Food Service Concepts

Page 99: Htm 3230 recap oct 2010

Food Service Concepts

Page 100: Htm 3230 recap oct 2010

Food Service Concepts

Page 101: Htm 3230 recap oct 2010

Our project hotel

• What is the food service offering at our hotel?• What are the advantages?• What are the disadvantages?

Page 102: Htm 3230 recap oct 2010

Development Team

Who should be on the development team for a

restaurant?

Page 103: Htm 3230 recap oct 2010

Once you do the concept, then…

• Feasibility study• And then???

Page 104: Htm 3230 recap oct 2010

Development Process

Page 105: Htm 3230 recap oct 2010

Space Allocation

• Dining area• Kitchen• Storage rooms• Other (bathrooms, entrance, coat room, etc.)

Page 106: Htm 3230 recap oct 2010

Lay out

• “Smooth flow of resources”

• Cross tracking and back tracking

Page 107: Htm 3230 recap oct 2010

Kitchen design and planning

• Where should kitchen be located?• Temperature, humidity, lighting, noise, aisles,

equipment• http://www.hellskitchendesign.com/

Page 108: Htm 3230 recap oct 2010

Kitchen design

• Kitchen work areas:– Pre-preparation– Cold Food preparation– Hot Food production

Latest designs for Jay Peak Hotel II:

Page 109: Htm 3230 recap oct 2010

Dining Room Design

• Location? Where and why?• Number of seats and table sizes, turns?• Service stations? Why?• Noise levels, what does the size of tables have

to do with this?• What type of chair would you have in fine

dining? Fast casual dining?

Page 110: Htm 3230 recap oct 2010

From: "Mark Montminy" <[email protected]> Date: November 16, 2009 12:11:58 PM EST To: "'Hans van Wees'" <[email protected]>, "'\"Hemmelgarn, John\"'" <[email protected]>, "'Jerry Davis'" <[email protected]>, "'Marjorie Dickstein'" <[email protected]>, "'Steve Wright'" <[email protected]>, "'Jake Webster'" <[email protected]> Cc: "'bstenger'" <[email protected]> Subject: RE: JAYH2 - Plan Changes Hans - I'll try and answer as much as I can now. I'll ask Marjorie here to please verify the counts you came up with and add anything I missed. Re:#1 - Studio units are the only types in which we've made provisions for two Queen-size beds within the same room (or a King and a queen-sized pull-out sofa, these are the Studio "Group" and Studio "Retail" types, respectively). One Bedroom units are to have a King-size bed in the bedroom, and (1) Queen-size pull-out sofa in the Living Room. Some of the 1-Bedroom units (non-corner units) will have a Queen-size Murphy bed in the Living Room as well. Lock-offs (i.e., in a 3-Bedroom unit type) have a King-size bed only such that they are like a higher-end hotel guest suite. In all instances, per direction given to us by Bill Stenger quite a while back, the "Master Bedroom" in any unit configuration, is to have a King-size bed. In

Page 111: Htm 3230 recap oct 2010

ALL TEAMS:

Make a schematic design of the project site: roughly draw and allocate spaces on the site in general and inside the armory building (see hand outs)

Use the information from the form we used in class today that lists Feasibility and Space Allocation

Page 112: Htm 3230 recap oct 2010

Team 1

• What are Hilton Garden Inn design requirements?– Contact Larry Williams at Redstone to find out if they

have these requirements in a document to review– How do you think these requirements can fit in

Burlington setting– What do other Hilton Garden Inns look like? Give 2

examples, one in an urban setting, one in a setting outside of a city (sub-urban or country side?) Describe and provide pictures. What do you like, not like?

Page 113: Htm 3230 recap oct 2010

Team 2

• Given the type of guests our project hotel will have, how many rooms should have two beds and how many one king or queen bed; and how many suites should there be (based on 140 rooms)?

• What/who would the suites be used for?• Would you use tower, double loaded, single

loaded or atrium corridors? And why?

Page 114: Htm 3230 recap oct 2010

Team 3

• Research Hilton Garden Inn: what sense of level of service do you get? (luxurious, middle of the road, amenities)?

• What is the nightly rate? • When you look at the Hilton Garden Inn concept,

what do they charge at other Hilton Garden Inns?

Page 115: Htm 3230 recap oct 2010

Team 4

• Prepare a rough budget, by category, for the project (use the same lay out as exhibit 6, page 430 plus include any other information that you find helpful)

• Questions: what is the cost: – per square foot based on 98,000 sq ft building– per room based on 140 rooms?

Page 116: Htm 3230 recap oct 2010

NEXT 7 WEEKS• Today: Renovation and Capital Projects• 10/19: Project work• 10/22: site visit Jay Peak Resort 9AM-12• 10/26: Safety and Security Systems and guest

speaker Rolf Kielman (Architect)• 11/2: Water and Wastewater Systems and

basic HVAC knowledge• 11/9: Organization of the Maintenance Department.

Project work. Guest speaker• 11/16: Electrical Systems• 11/23: Lighting Systems

Page 117: Htm 3230 recap oct 2010

Course Schedule

• Week 16: Project Work finalization, prepare for presentation

• Week 17: Project presentation to client

• Final Exam

Page 118: Htm 3230 recap oct 2010

COURSE GRADING

• Grading will be based on:– Level of participation in class discussion– Contribution to team activities (team peer review)– Ability to prepare and present design project

(team score)– Ability to work professionally– Completion of assigned reading and writing

assignments

Page 119: Htm 3230 recap oct 2010

RENOVATION AND CAPITAL PROJECTS

– Hotel renovation (reasons, life cycle, types of renovation)

– Creating of Renovation Plan– Implementation (design phase, construction