houston area constraint mitigation: phase ii and tnp- bell county project

21
HOUSTON AREA CONSTRAINT MITIGATION: PHASE II and TNP- BELL COUNTY PROJECT Robert Lona, P.E. & Don Le ERCOT System Planning

Upload: bradley-terry

Post on 31-Dec-2015

28 views

Category:

Documents


1 download

DESCRIPTION

HOUSTON AREA CONSTRAINT MITIGATION: PHASE II and TNP- BELL COUNTY PROJECT. Robert Lona, P.E. & Don Le ERCOT System Planning. CNP PROJECT JUSTIFICATION. CONCERNS ABOUT FUTURE NORTH – HOUSTON IMPORT CONSTRAINTS AFTER HACM PHASE 1(HILLJE SUB) - PowerPoint PPT Presentation

TRANSCRIPT

HOUSTON AREA CONSTRAINT MITIGATION: PHASE II and

TNP- BELL COUNTY PROJECT

Robert Lona, P.E.&

Don Le ERCOT System Planning

RPG 04/13/2007 Houston Area Constraint Phase II

CNP PROJECT JUSTIFICATION

• CONCERNS ABOUT FUTURE NORTH – HOUSTON IMPORT CONSTRAINTS AFTER HACM PHASE 1(HILLJE SUB)

• CONCERNS ON ADDITIONAL CONGESTION ON TOMBAL 345KV AUTOS

RPG 04/13/2007 Houston Area Constraint Phase II

CNP PROPOSED OPTIONS

• INCREASE N – H IMPORTS - SINGLETON OPTIONS 1-4 - SINGLETON OPTION 5(SUB)• RELIEVE TOMBALL 345KV AUTO CONGESTION - OPTION A(HARDIN SUB) - OPTION B1(ROTHWOOD SUB) - OPTION B2 (ROTHWOOD SUB) - OPTION C (HUMBLE SUB)

NOTE: AFTER INITIAL STUDIES, SINGLETON OPTIONS #1 - #3 WERE NOT EVALUATED FURTHER, DUE TO LACK OF INCREASED IMPORT CAPABILITY FOR NORTH TO HOUSTON

POWER TRANSFERS

RPG 04/13/2007 Houston Area Constraint Phase II

RPG 04/13/2007 Houston Area Constraint Phase II

RPG 04/13/2007 Houston Area Constraint Phase II

SO4 vs SO5 PRODUCTION COST SAVING COMPARISONS

-$4.00

-$3.00

-$2.00

-$1.00

$0.00

$1.00

$2.00

$3.00

$4.00

$5.00

$6.00

$7.00

$8.00

$9.00

$10.00

$11.00

$12.00

$13.00

$14.00

$15.00

$16.00

2009 2010 2011 2009 2010 2011

PR

OD

UC

TIO

N C

OS

T S

AV

ING

S -

$M

S S_SC S_OG S_SC_OG

SO4 SO5

$0.24 M

$ 3.28 M

S=Sandow 5SC=Sandy Creek 1OG=Oak Grove 1&2

RPG 04/13/2007 Houston Area Constraint Phase II

EFFECT OF SINGLETON PROJECTS ON TOMBAL 345KV AUTO CONGESTION

$0

$1,000,000

$2,000,000

$3,000,000

$4,000,000

$5,000,000

$6,000,000

$7,000,000

$8,000,000

$9,000,000

$10,000,000

$11,000,000

$12,000,000

2010 2011 2010 2011 2010 2011 2010 2011 2010 2011 2010 2011 2010 2011 2010 2011

MA

RG

INA

L C

ON

GE

STI

ON

CO

ST

NOTE: NO CONGESTION IN BASE CASE ACROSS ALL GEN SCENARIOS

SO4 CONFIGURATION SO5 CONFIGURATION

S_GEN S_SC_GEN S_OG_GEN S_SC_OG_GEN S_GEN S_SC_GEN S_OG_GEN

S_SC_OG_GEN

S=Sandow 5SC=Sandy Creek 1OG=Oak Grove 1&2

PROPOSED EAST BELL COUNTY – TNP ONE 345KV DOUBLE CKT.

RPG 04/13/2007 Houston Area Constraint Phase II

East Bell County – TNP One 345KV DB CKTUPGRADE RATTLESNAKE – LAKE CRK 345KV

UPGRADE TEMPLE – SALADO 345KV TO 3200A UPGRADE TNP ONE – TWIN

OAK 345KV DOUBLE CKT.

UPGRADE TEMPLE – BOGGY CREEK 138KV TO 1146A

SANDY CREEK GEN

OAK GROVE GEN

SANDOW GEN

TWIN OAK 3 GEN

RPG 04/13/2007 Houston Area Constraint Phase II

PROPOSED EAST BELL COUNTY – TNP ONE PROJECT

• PROPOSED IN-SERVICE PEAK 2011

PROPOSED UPGRADE COST

NEW TNP ONE-BELL COUNTY 40 MILE 345 kV DBCKT - 2700A $ 48,580,000

EAST BELL COUNTY 345 kV SUB $ 1,048,000

THREE 345 kV BREAKERS @ TNP ONE SUB $ 3,205,000

RECONDUCTOR TEMPLE - SALADO 345 kV DBCKT TO 3200A $ 6,713,000

UPGRADE TEMPLE - BOGGY CREEK 138 kV CKT TO 1146A $ 350,000

TOTAL COST $ 69,337,000

RPG 04/13/2007 Houston Area Constraint Phase II

PRODUCTION COST SAVINGS (PCS) OF EAST BELL COUNTY - TNP ONE PROJECT WITHOUT SINGLETON SUBSTATION IN BASECASE

6.06

13.74 13.36

33.54

6.78

11.93

27.35

52.48

0.00

10.00

20.00

30.00

40.00

50.00

60.00

BASECASE TWIN OAKS 3 OAK GROVE 1 OAK GROVE1&2

SANDY CREEK SANDY CREEK+ TWIN OAKS 3

SANDY CREEK+ OAK GROVE

1&2

SANDY CREEK+ OAK GROVE

1&2 + TWINOAKS 3

GENERATION SCENARIO

PC

S (

$M)

MIN PCS NEEDED: $11.56 M2011

RPG 04/13/2007 Houston Area Constraint Phase II

PRODUCTION COST SAVINGS (PCS) OF EAST BELL COUNTY-TNP ONE 345 Kv LINE WITH SINGLETON SUBSTATION IN BASE CASE

11.29

14.27

22.89

6.00

10.04

21.61

34.04

-5.00

-10.00

-5.00

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

BASE CASE TWIN OAKS 3 OAK GROVE 1 OAK GROVE1&2

SANDY CREEK SANDY CREEK+ TWIN OAKS

3

SANDY CREEK+ OAK GROVE

1&2

SANDY CREEK+ OAK GROVE

1&2 + TWINOAKS 3

GENERATION SCENARIO

PC

S (

$M)

MIN PCS NEEDED: $10.38 M

2011

RPG 04/13/2007 Houston Area Constraint Phase II

PRODUCTION COST SAVINGS (PCS) OF EAST BELL COUNTY-TNP ONE PROJECT WITH SINGLETON SUBSTATION IN BASE CASE

-5.12

11.73

14.45

22.99

5.43

9.92

23.58

38.98

-10.00

0.00

10.00

20.00

30.00

40.00

50.00

BASECASE TWIN OAKS 3 OAK GROVE 1 OAK GROVE1&2

SANDY CREEK SANDY CREEK+ TWIN OAKS

3

SANDY CREEK+ OAK GROVE

1&2

SANDY CREEK+ OAK GROVE

1&2 + TWINOAKS 3

GENERATION SCENARIO

PC

S (

$M)

MIN PCS NEEDED: $11.56 M

2011

RPG 04/13/2007 Houston Area Constraint Phase II

PROPOSED OPTIONS TO REDUCE TOMBALL 345KV AUTO

CONGESTION

RPG 04/13/2007 Houston Area Constraint Phase II

RPG 04/13/2007 Houston Area Constraint Phase II

RPG 04/13/2007 Houston Area Constraint Phase II

RPG 04/13/2007 Houston Area Constraint Phase II

2011 TNPBC_SO5S_SC_OG PROPOSED OPTIONS

-$6.00

-$5.00

-$4.00

-$3.00

-$2.00

-$1.00

$0.00

$1.00

$2.00

$3.00

$4.00

$5.00

$6.00

ROTHWOOD B1 ROTHWOOD B2 HARDIN A HUMBLE C

PR

OD

UC

TIO

N C

OS

T S

AV

ING

S -

$M

$3.04 M $3.16 M

$4.34 M

$ 2.63 MMIN PC SAVINGSMIN PC SAVINGS

MIN PC SAVINGS

MIN PC SAVINGS

RPG 04/13/2007 Houston Area Constraint Phase II

SUMMARY

• MINIMUM ECONOMIC JUSTIFICATION FOR SINGLETON SO4 or SO5 OPTION REQUIRES SANDOW GENERATION

• MINIMUM ECONOMIC JUSTIFICATION FOR TNPBC PROJECT REQUIRES EITHER ONE OAKGROVE UNIT OR ONE TWIN OAK UNIT

• MINIMUM ECONOMIC JUSTIFICATION FOR TNPBC WITH SINGLETON ALSO REQUIRES ONE OAK GROVE UNIT OR ONE TWIN OAK UNIT

•ADDITIONAL ANALYSIS OF NEW SUB IN NORTH HOUSTON NEEDED BEFORE RECOMMENDATION

RPG 04/13/2007 Houston Area Constraint Phase II

Questions?