Hoshin Kanri And the X-‐Matrix
What is Hoshin Kanri?
Hoshin: Direc6on needle Kanri: Control logic Hoshin Kanri is a method for controlling the direc6on in which a company or project goes.
Why?
The cogs on the gears all need to be in synch
All Levels of the Organiza6on
Plan Do
Check Act
Plan Do
Check Act
Plan Do
Check Act
Plan Do
Check Act
Plan Do
Check Act
Plan Do
Check Act
Plan Do
Check Act
Corporate Objec6ves / Ini6a6ves
Site Objec6ves / Ini6a6ves
Func6onal Objec6ves / Ini6a6ves
Team Objec6ves / Ini6a6ves
Specific Tasks
How it will be done
What must be done
Monthly Reviews to monitor progress and
implement countermeasures as
required
Ver6cal A
lignm
ent
Cross Func6onal Alignment
Goals, Objec6ves (1 day) 1
Objec6ves, metrics 2
Objec6ves, metrics, projects, ac6vi6es, tasks
3
Deploy, measure, manage, integrate
4
Data collec6on, problem solving, “Catchball” nego6a6ons. Process mapping
Root Cause Analysis, problem solving, “Catchball” nego6a6ons, project planning
Rapid Improvement Events, project planning and management, metrics integra6on
The X-‐matrix
• Tool to be used in Hoshin Kanri • Ties everything together in one place • Allows everyone to manage together • Insures alignment of ini6a6ves