horizon 2020 programme transport calls -...
TRANSCRIPT
TÜBİTAK
Muhammet Hakan HorzumNational Contact Point
Transport Configuration
Horizon 2020 ProgrammeTransport Calls
25.5.16Okan University, Istanbul
TÜBİTAK
Content
EU Framework Programmes
2017 Transport Calls
Logistics
Automated Driving
Mobility
Electromobility
TUBITAK Supports
Miscellaneous
2
TÜBİTAK
EU Framework Programmes
TÜBİTAK
Framework Programmes
2002-2006(5 years)
19.1 Billion €
FP 6
2007-2013(7 years)
53.2 Billion €
FP 7
2014-2020(7 years)
80 Billion €
H2020
Horizon 2020 is the continuation of Framework Programmes
4
TÜBİTAK
Horizon 2020: 3 Main Pillars
5
MSCAERCFET
Research Infrastructures
Excellent Science
ICTNMP
SME InstrumentSpace
Industrial LeadershipTransport
EnvironmentEnergyHealth
Food, AgricultureSecurity
Inclusive Societies
Societal Challenges25.3 M €
30.8 M €17.4 M €
3 Main Pillars: 72.7 Billion €
Total Budget: 80 Billion €
Science with and for SocietyWidening Participation
TÜBİTAK
Rules for Participation
3 entities from separate MS/AC
ERC, MSCA, SME Instrument different
Associated Countries:
Turkey, Israel, Switzerland, Norway, Bosnia and
Herzegovina, etc.
6
TÜBİTAK
Funding: RIA, CSA or IA
• RIA - Research and Innovation Actions
• CSA - Coordination and Support Actions
Total Direct Costs
(100%)
• IA - Innovation Actions
70% of Direct Costs
(100% for Non-profits)
7
TÜBİTAK
Preparation, Proposal Submission, Execution
8
TÜBİTAK
So
ciet
al C
hal
len
ges
Smart, Green, and Integrated Transport
Subcategories:1. Mobility for Growth-MG2. Automated Road Transport-ART3. Green Vehicles-GV
Note: Safety, urban mobility, logistics, intelligent transport systems, infrastructure topics are investigated under Mobility for Growth subcategory
9
TÜBİTAK
2017 WP Calls
LogisticsConnected and Automated Driving
MobilityElectromobility
TÜBİTAK
Mobility for Growth Calls - MG(Logistics Working Group)
TÜBİTAK
Mobility for Growth I: MG-5.2-2017
MG-5.2-2017: Innovative ICT solutions for futurelogistics operations
Expected Impacts:• Integration of ICT Solutions
• Linkage btw. digital and physical transport
• Seamless freight transport
• Reducing transit times
• 10% higher load factor and shorter delivery routes
Budget: 3-5 M€, 1 or 2 projects
Type of Action: RIA-%100
Dates: Two-Stage (26 Jan 17 – 19 Oct 17)
12
TÜBİTAK
Mobility for Growth II: MG-5.4-2017
MG-5.4-2017: Potential of the Physical InternetScope:I. RIA• Case study for position, size, and number of hubs• Mapping the influence of hubs• Developing simulation and modelling tools
Budget: 2-3 M€ ~2 projects (total:6)
Type of Action: RIA - %100
Dates: Two-Stage (26 Jan 17 – 19 Oct 17)
II. CSA• Roadmapping towards the Physical Internet• Monitoring previous and on-going logistics projects• Exploring legal issues
Budget: 0.5-1 M€ ~2 projects (total:1)
Type of Action: CSA - %100
Dates: Two-Stage (26 Jan 17 – 19 Oct 17)
13
TÜBİTAK
Mobility for Growth III: MG-7.2-2017
MG-7.2-2017: Optimisation of transport infrastructureincluding terminals
Expected Impact• Using of the multimodal transport system optimally
• Avoidance of over-dimensioning of the physical network
• Reducing congestion
• Accessibility
Budget: 2-6 M€ ~3 projects (total:37, MG-7.1,7.2,7.3)
Type of Action: RIA - %100
Dates: Two-Stage (26 Jan 17 – 19 Oct 17)
14
TÜBİTAK
Mobility for Growth IV: MG-7.3-2017
MG-7.3-2017: The Port of the future
Scope:• Reduction of environmental impact
• Reduction operational and infrastructural costs
• Improvement of logistics efficiency
• Integration of the port to the surroundings
Budget, RIA: 3-5 M € ~3 projects
Budget, CSA: 1 M € ~1 projects (total:37 w/ MG-7.1, 7.2, 7.3)
Type of Action: RIA and CSA – both %100
Dates: Two-Stage (26 Jan 17 – 19 Oct 17)
15
TÜBİTAK
Mobility for Growth V: MG-8.2-2017
MG-8.2-2017: Big data in Transport: Researchopportunities, challenges and limitations
Scope:• ICT and exploitation of big data implementation (case studies etc.)
• Examination of methodological issues for data mining
• Analysis of the barriers and limitations of the transportationsystems
• Examination of institutional and governmental issues and barriers
Budget: 0.5-1.5 M € ~ 2 projects
Type of Action: CSA – %100
Dates: Single-Stage (1 Feb 17)
16
TÜBİTAK
Automated Road Transport Calls -ART
(Connected and Automated Driving WorkingGroup)
TÜBİTAK
Automated Road Transport Calls I: ART-01-2017
ART-01-2017: ICT infrastructure to enable the transition towardsroad transport automation
Scope:• Development, testing and real-life validation of ICT infrastructure
architectures
• Integrating state-of-the-art ICT technologies
• Enable the transition towards road vehicle automation
• Actors from automotive, IT and telecommunication
Budget: 5-15 M€, up to 3 projects
Type of Action: IA-%70
Dates: Two-Stage (26 Jan 17 – 19 Oct 17)
18
TÜBİTAK
Automated Road Transport Calls II: ART-03-2017
ART-03-2017: Multi-Brand platooning in real traffic conditions
Expected Impact
• Impacts of platooning on traffic
• Behaviour of other road users
• Requirements with regard to infrastructure
• Impact on driving time of operators
Budget: 15-20 M€, 1 Project (probably)
Type of Action: IA - %70
Dates: Two-Stage (26 Jan 17 – 19 Oct 17)
19
TÜBİTAK
Automated Road Transport Calls III: ART-07-2017
ART-07-2017: Full-scale demonstration of urban roadtransport automation
Expected Impact• Urban areas!
• Aim: Reliability, safety and robustness
in fully automated transport systems
• Integration of automated vehicles to existing transport systems
Budget: 10-15 M€ ~1 Project (probably)
Type of Action: IA - %70 (100% for non-profits)
Dates: Two-Stage (26 Jan 17 – 19 Oct 17)
20
TÜBİTAK
Mobility for Growth Calls-MG
(Mobility Working Group)
TÜBİTAK
Mobility for Growth VI: MG-4.1-2017
MG-4.1-2017: Increasing the take up and scale-up ofinnovative solutions to achieve sustainable mobility inurban areas
Expected Impact• Traffic avoidance
• Optimizing the use of existing infrastructure and vehicles
• Optimizing design and use of multi-modals hubs and terminals
• Increased walking and cycling
Budget: 2-5 M€, ~3 project
Type of Action: IA - %70 (100% for non-profits)
Dates: Two-Stage (26 Jan 17 – 19 Oct 17)
22
TÜBİTAK
Mobility for Growth VII: MG-4.2-2017
MG-4.2-2017: Supporting 'smart electric mobility' in cities
Expected Impact:• Production and distribution of electricity for electric vehicle fleet
• Public and Private recharging stations
• Energy production from infrastructure itself
• Billing systems
• Integrated approaches to business models
Budget: 4-5 M€ ~2 projects
Type of Action: IA - %70
Dates: Two-Stage (26 Jan 17 – 19 Oct 17)
23
TÜBİTAK
Mobility for Growth VIII: MG-4.3-2017
MG-4.3-2017: Innovative approaches for integrating urbannodes in the TEN-T core network corridors
Expected Impact• Integration of urban nodes into TEN-T corridors
• Wide scale deployment of R&I solutions
• Take into account socio-economic aspects
• Define funding and instruments
Budget: 1-2 M€ ~ 1 or 2 projects
Type of Action: CSA- %100
Dates: Single-Stage (01 Feb 17)
24
TÜBİTAK
Mobility for Growth IX: MG-8.5-2017
MG-8.5-2017: Shifting paradigms: Exploring the dynamics of individual preferences, behaviors and lifestyles influencing travel and mobility choices
Scope:• Shifting from car ownership to sharing (trends)
• Impact on foreseen sales
• Travel time perceptions (human factor)
• New preferences
• Urban congestion, emission and noise reductions
Budget: 1-2 M € ~ 2 projects
Type of Action: RIA– %100
Dates: Single-Stage (01 Feb 17)
26
TÜBİTAK
Green Vehicles Calls-GV(Electromobility Working Group)
TÜBİTAK
Green Vehicles Calls I: GV-04-2017
GV-04-2017: Next generation electric drivetrains forfully electric vehicles, focusing on high efficiency and low cost
Expected Impact• Reduction in total motor and power electronics system costs
• 30% increase in specific torque and specific power of electricmotors
• 50% increase in maximum operating speed
• 50% increase in the power density of motor power electronics
Budget: 5-10 M€, 2 projects
Type of Action: RIA-%100
Dates: Single-Stage (01 Feb 17)
28
TÜBİTAK
Green Vehicles Calls II: GV-05-2017
GV-05-2017: Electric vehicle user-centric design for optimised energy efficiency
Expected ImpactOne single impact is expected:
• Increase the electric drive range of EVs by 25%
Budget: 7-10 M€ ~ 1 or 2 projects
Type of Action: RIA- %100
Dates: Single-Stage (01 Feb 17)
29
TÜBİTAK
Green Vehicles Calls III: GV-06-2017
GV-06-2017: Physical integration of hybrid and electric vehicle batteries at pack level aiming at increased energy density and efficiency
Expected Impact2 impacts:
• Energy density improvement of battery packs in the order of 15-20%
• Battery integration costs (excluding cell cost) reduced by 20 to 30%
Budget: 5-7 M€ ~2 projects
Type of Action: IA- %70
Dates: Single-Stage (01 Feb 17)
30
TÜBİTAK
Green Vehicles Calls IV: GV-07-2017
GV-07-2017: Multi-level modelling and testing of electricvehicles and their components
Expected Impact• Reduction of development and testing efforts for e-drivetrains by
40%
• Improved efficiency of e-drivetrains under real driving conditions by20%
• Improved powertrain safety by a factor of 10
Budget: 4-10 M € ~2 projects
Type of Action: RIA - %100
Dates: Single-Stage (01 Feb 17)
31
TÜBİTAK
Green Vehicles Calls V: GV-08-2017
GV-08-2017: Electrified urban commercial vehiclesintegration with fast charging infrastructure
Scope:
For electrified medium duty trucks and high capacity buses:• Energy efficiency improvements up to 70%
• Low noise operation (<72 dB)
• Polluting emissions below Euro VI
For fast charging infrastructure:• Power transfer capability above 100kW
• Transfer efficiencies above 90% for static contactless systems
Budget: 5-15 M € ~ 1 project
Type of Action: IA – %70
Dates: Single-Stage (01 Feb 17)
32
TÜBİTAK
Green Vehicles Calls VI: GV-10-2017
GV-10-2017: Demonstration (pilots) for integration ofelectrified L-category vehicles in the urban transportsystem
Scope:• Attracting general public interest including mind shift
• Potential market penetration in different European cities
• Two cities as beneficiaries
• Demonstration can help
Budget: 7-10 M € ~ 1 projects
Type of Action: IA – %70
Dates: Single-Stage (01 Feb 17)
33
TÜBİTAK
Green Vehicles Calls VII: GV-13-2017
GV-13-2017: Production of next generation battery cellsin Europe for automotive applications
Scope:• Develop technologies for modular battery cell production lines
• Decrease cost of battery cells
• Reducing scrap directly or recycling measures
Budget: 3-5 M € ~ 1 projects
Type of Action: RIA – %100
Dates: Single-Stage (01 Feb 17)
34
TÜBİTAK
TUBITAK Supports&
Miscellaneous
TÜBİTAK
TUBITAK Supports and Awards
Supports
Travel Support
Coordinator Candidate
Support
Awards
Above-Threshold Award
Success Award (in-progress)
COST AwardMSCA Pre-
Evaluation
36
TÜBİTAK
Miscellaneous
37
National Coordination Office @ TUBITAK
www.ufuk2020.org.tr
For former projects:TRIP: www.transport-research.info
ETNA+: www.transport-ncps.net
Upcoming Events:27.9.16-Info Day by EC for all calls @ Brussels
30.9.16-Brokerage Event for GV by TUBITAK @ Istanbul
14.10.16-Info Day by EC and EGVIA for GV @ Brussels
TÜBİTAK
Thanks for your attentionTel: +90 312 298 94 53
e-mail: [email protected]
webpage: www.ufuk2020.org.tr