home inspection summary for 276 redpath avenue, toronto

2
Interested parties shoud be advised that; without this general review our obligation and liability can only remain with the seller. $325.00 + HST. This general review inspection is essential to compare your expectations; intended use and special needs with the realities of the house. available to inspect the house to provide any prospective buyer general orientation; helpful maintenance tips and improvement consulting for a fee of general information about this property. The inspector is available by telephone to any interested party to answer questions about the house. We are also This report should not be considered as a complete home and property inspection. The Baker Street report is prepared for the owner to provide SUMMARY Work/repairs was in progress at time of inspection. Inquire to seller about how/when work is to be completed. ADDITIONAL INFORMATION REQUIRED A camera inspection of the main building drain is recommended. OTHER RECOMMENDATIONS Budget $ years Time frame Budget $ years Time frame $500.00+ Budget $ years 0-1 Time frame GFCI breaker for whilpool tub not functioning correctly Budget $ years Time frame Budget $ years Time frame 500.00+ Budget $ years 0-1 Time frame Required short term roofing repairs 1000.00+ Budget $ years 0-2 Time frame Deck/porch repairs/replacement 2,000.00+ Budget $ years 0-3 Time frame Miscellaneous interior repairs 2000.00+ Budget $ years 0-3 Time frame Miscellaneous exterior repairs REQUIRED REPAIRS/MAJOR SYSTEMS AND COMPONENTS APPROACHING END OF EXPECTED LIFE SPAN None Identified HOMEOWNER INSURANCE CONCERNS good overall functional condition Interior (general): copper Predominant water lines 3/4 inch copper line Main supply: Plumbing System 2 tons Approx. tons: years 8? Age of cooling equipment: central A/C-low velocity System type: Cooling System high-efficiency forced air furnace System type: years 8 Age of central heating appliance: natural gas Fuel type: Heating System romex/copper Predominant branch wiring: circuit breakers amp 100 Main service size Electrical Systems Wood casements Windows(general): wood siding aluminum siding Secondary wall siding: brick veneer Exterior wall systems: rolled roofing Secondary roofing system: asphalt shingles Roofing systems: MAJOR SYSTEMS - GENERAL DESCRIPTION AND CONDITIONS: years. 0-3 (minimum) to address the functional concerns listed in the the report over the next $6,000.00+ You will require for annual general repairs and on-going maintenance. $3500-$4500 On average; a house of similar age/size and quality will cost you functional condition in comparison to other similar age and size homes in the neighbourhood. well above average This house is in brick veneer row house 3 storey Construction Type: years. Age of House Blair Wallhouse; RHI Inspector: General Information: Sept, 10, 2015 Inspection Date: Toronto Municipality: 276 Redpath Ave Address: PROPERTY INSPECTION SUMMARY Email: [email protected] Website: www.bakerstreet-hi.ca Fax: 416-483-9756 Telephone: 416-483-3535 Toronto Ontario M4N 2M1 3335 Yonge Street Suite 402 BAKER STREET HOME INSPECTION SERVICES INC.

Upload: marian-neal

Post on 10-Dec-2015

26 views

Category:

Documents


3 download

DESCRIPTION

For more information on this Freehold Townhome at Yonge & Eglinton, please contact Marian Neal & Carver Fraser, Sales Representatives, RE/MAX Hallmark Realty Ltd, Brokerage at 416-486-5588 [email protected]

TRANSCRIPT

Page 1: Home Inspection Summary for 276 Redpath Avenue, Toronto

Interested parties shoud be advised that; without this general review our obligation and liability can only remain with the seller.

$325.00 + HST. This general review inspection is essential to compare your expectations; intended use and special needs with the realities of the house.

available to inspect the house to provide any prospective buyer general orientation; helpful maintenance tips and improvement consulting for a fee of

general information about this property. The inspector is available by telephone to any interested party to answer questions about the house. We are also

This report should not be considered as a complete home and property inspection. The Baker Street report is prepared for the owner to provide

SUMMARY

Work/repairs was in progress at time of inspection. Inquire to seller about how/when work is to be completed.

ADDITIONAL INFORMATION REQUIRED

A camera inspection of the main building drain is recommended.

OTHER RECOMMENDATIONS

Budget $ years Time frame

Budget $ years Time frame

$500.00+Budget $ years 0-1 Time frame GFCI breaker for whilpool tub not functioning correctly

Budget $ years Time frame

Budget $ years Time frame

500.00+Budget $ years 0-1 Time frame Required short term roofing repairs

1000.00+Budget $ years 0-2Time frame Deck/porch repairs/replacement

2,000.00+Budget $ years 0-3Time frame Miscellaneous interior repairs

2000.00+Budget $ years 0-3Time frame Miscellaneous exterior repairs

REQUIRED REPAIRS/MAJOR SYSTEMS AND COMPONENTS APPROACHING END OF EXPECTED LIFE SPAN

None Identified

HOMEOWNER INSURANCE CONCERNS

good overall functional conditionInterior (general):

copperPredominant water lines 3/4 inch copper lineMain supply:

Plumbing System

2 tonsApprox. tons: years 8?Age of cooling equipment: central A/C-low velocitySystem type:

Cooling System

high-efficiency forced air furnaceSystem type: years 8Age of central heating appliance: natural gasFuel type:

Heating System

romex/copperPredominant branch wiring: circuit breakersamp 100Main service size

Electrical Systems

Wood casementsWindows(general):

wood sidingaluminum sidingSecondary wall siding: brick veneerExterior wall systems:

rolled roofingSecondary roofing system: asphalt shinglesRoofing systems:

MAJOR SYSTEMS - GENERAL DESCRIPTION AND CONDITIONS:

years. 0-3(minimum) to address the functional concerns listed in the the report over the next $6,000.00+You will require

for annual general repairs and on-going maintenance. $3500-$4500On average; a house of similar age/size and quality will cost you

functional condition in comparison to other similar age and size homes in the neighbourhood. well above averageThis house is in

brick veneerrow house3 storeyConstruction Type: years. Age of House

Blair Wallhouse; RHIInspector: General Information:

Sept, 10, 2015Inspection Date: TorontoMunicipality:276 Redpath AveAddress:

PROPERTY INSPECTION SUMMARY

Email: [email protected] Website: www.bakerstreet-hi.ca Fax: 416-483-9756 Telephone: 416-483-3535

Toronto Ontario M4N 2M1 3335 Yonge Street Suite 402

BAKER STREET HOME INSPECTION SERVICES INC.

Page 2: Home Inspection Summary for 276 Redpath Avenue, Toronto

Copyright C

BC

G 2014

E-mail:

Other Current Address

(Res.) (Bus.) M. NealName of Client

evidence of new water leaks and/or items not previously inspected due to seasonal limitations for an additional fee.

conditions and is not an insurance policy of any kind. I am aware that I can retain the inspector to re-evaluate the property prior to closing for

the conditions as stated herein. I am aware that the fee paid for this inspection is for professional time and is not a guarantee of present or future

I have read this contract and report and am aware of the limitations of the inspection process. I accept this report and supplements according to

extra expense in the event of an unforseen and/or unreported problem or upon receiving a conflicting opinion and prior to any corrective work.

The client hereby acknowledges they are contractually obliged to contact the inspector immediately to arrange a site visit at no 12)

The purchaser is advised to revisit the property before closing to verify that functional conditions remain unchanged or retain the inspector for this task.

The purchaser is advised to ask the property owner if they are aware of any defects that would not normally be detected by a visual inspection. 11)

in a real estate transaction. We do not overstate or under value any issue to benefit any party.

The preliminary inspection process is conducted in a fair and impartial manner. Accordingly this report is not provided as an aid for negotiation 10)

The preliminary inspection does not take into account manufacturer’s recalls and eligibility for mortgage insurance building or home owners insurance. 9)

The preliminary inspection does not cover code compliance issues set by governments or other regulatory authorities. 8)

most cost effective solution to address the problem and will not include betterment. Obtain accurate cost estimates from contractors immediately.

Cost estimates if provided in this report are minimums and are intended to be a rough guideline only. Estimates are based on the 7)

report are not carried out in a timely manner. This is especially the case in matters concerning uncontrolled water/vapour.

The client is warned that resultant damages may occur to the building systems or components if the recommended repairs in this 6)

The client is advised to annually budget at least 1% of the building’s value for general maintenance and unforseen repairs. 5)

The inspector/inspection firm will not assume any of your risk in buying an older property. Further inspections by specialists are required.

The preliminary inspection is partially designed to reduce your risk of buying an older home. However we cannot eliminate this risk. 4)

The inspector’s role is principally educational; to provide you with a better understanding of the building. We will not detect all problems. 3)

be revealed; not 100%. Determining the presence of mold fungi and other indoor air quality contaminants are specifically not included.

of the visual inspection. The client is hereby warned that not all deficiencies will be discovered. At best 80% of the first year repairs should

The required repairs to the building include but are not limited to what is reported herein due to the limitations and restrictive nature 2)

not include the verbal information imparted by the inspector which is vital to fully understand the service and contract.

evidence that was visually accessible at the time of the inspection. This report is not transferable to anyone other than the client as this report does

The preliminary inspection report issued by the inspector is prepared with reasonable skill and care. This consulting service is limited to the physical 1)

Comments:

Plumbing Maintenance

Heat/Cool Interiors

Electrical Exteriors

Structure Roofing

REPAIRS REPAIRS REPAIRS REPAIRS

MAJOR MINOR MAJOR MINOR

Please be advised that failure to address concerns promptly may result in additional problems and/or consequential damages.

It is suggested that the highlighted concerns be considered priorities.

Recommended improvements or repairs to the building/dwelling have been addressed in the report.

well above average.In comparison to other homes of similar vintage in the vicinity the functional condition of this building/dwelling is;

SUMMARY (GENERAL COMMENTS)

Blair Wallhouse; RHIInspector 10am - 1pmTime Sept, 10, 2015Inspection Date

TorontoMunicipality 276 Redpath AveProperty Inspected

PRELIMINARY BUILDING INSPECTION REPORT

Email: [email protected] Website: www.bakerstreet-hi.ca Fax: 416-483-9756 Telephone: 416-483-3535

Toronto Ontario M4N 2M1 3335 Yonge Street Suite 402

BAKER STREET HOME INSPECTION SERVICES INC.