hiradmat collimator jaws hrmt23 03/07/2014en/mme - e. berthomé1
TRANSCRIPT
EN/MME - E. Berthomé 1
HiRadMat Collimator JawsHRMT23
03/07/2014
EN/MME - E. Berthomé 215/05/2014
EN/MME - E. Berthomé 3
GENERAL OVERVIEW
15/05/2014
Beam
EN/MME - E. Berthomé 415/05/2014
EN/MME - E. Berthomé 515/05/2014
JAW WORKING ZONE
EN/MME - E. Berthomé 615/05/2014
Nominal travel between jaws= 118mm(Total range available= 284mm)
VERTICAL ACTUATION
EN/MME - E. Berthomé 7
Z=0mm 2
Lower switch
Meca end stop
24 142 260
Meca end stop
Upper switch
284mm282
Z value
Position range on upper jaws (+/-
20mm from middle of the jaws)
Position range on central jaws (+/-
20mm from middle of the jaws)
Position range on lower jaws (+/-
20mm from middle of the jaws)
4 44 122 162 240 280
15/05/2014
EN/MME - E. Berthomé 8
3x Sferax ø40/ø60
LAM Technologies motor Nema 34
15/05/2014
EN/MME - E. Berthomé 9
LAM Technologies motor Nema 34
Nozag Rotating jack 25kN
15/05/2014
EN/MME - E. Berthomé 10
Vertical LVDT(s)Recycling of HRM14 ones
End stop switches (range of adjustment +/-5mm)
15/05/2014
EN/MME - E. Berthomé 11
LATERAL ACTUATIONSLateral actuations make moving all purple parts
15/05/2014
EN/MME - E. Berthomé 12
Collimator stepper motor
Collimator LVDT
4x Sferax 2032 XA-GO (idem collimator)
Same screw/bearing and spring as collimator
15/05/2014
EN/MME - E. Berthomé 1315/05/2014
-15mm -14
Lower switch
Mecha. end stop (adjustable)
Y=0mm
Mecha. end stop (adjustable)
Upper switch
15mm14
Position with beam 14mm inside the jaw(switch adjustable +/-
5mm)
Position with beam tangent to jaw
surface Position with beam 14mm from the jaw
(switch adjustable +/- 5mm)
EN/MME - E. Berthomé 1415/05/2014
Adjustable mechanic end stop
EN/MME - E. Berthomé 1515/05/2014
Separating aluminum sheets= protection between each jaws
Protection windows for material projection
2 independent frames, each one composed of 3 protection glasses
3 vacuum windows
EN/MME - E. Berthomé 1615/05/2014
Mobil glasses protection system
Glass clamp
Duralit slider
EN/MME - E. Berthomé 1715/05/2014
Pneumatic actuation for glasses frame
Duralit bearing
Pneumatic alimentation is needed in the tunnel!
EN/MME - E. Berthomé 1815/05/2014
Front view Back view
OPTICAL POINT OF VIEW
EN/MME - E. Berthomé 1915/05/2014
93.1°
All windows shouldn’t be at 90° with optical measurements to avoid parasite reflexion.
Front view windows
Back view windows
EN/MME - E. Berthomé 2015/05/2014
Disposal for optical measurement
Translating mirror equipment have to be design in details
3 points of view: front / lateral / back
Back view
Front view
Lateral view
EN/MME - E. Berthomé 2115/05/2014
MANUFACTUREGeneral materials needed to build HRMT23:- Aluminium (6082 T6 principally) in sheet (maximum thickness : 40mm) and block- Stainless steel: sheet/bar of 304L and 304L vacuum
Only 2 standard CF flanges 1xCF63 and 1xCF16All others flanges in 304L vacuum (EPDM “o-ring” seal everywhere)
Machining quality needed:- All seal interfaces should have a good quality of machining (flatness, roughness, size)
- Vacuum tank 2.2m long (around 200Kg)
EN/MME - E. Berthomé 2215/05/2014
PLANNING1) Set of drawings of HRMT23 (as presented) available -> Beginning of Sept.2014
The first 50 drawings already done. Total set estimated around 100 drawings
2) Set of drawings of accessories for HRMT23 -> End of Oct. 2014(mirrors support, all electronic/electric integration, …)
3) Start to assemble HRMT23 -> End of nov. 2014
4) All parts received and end of assembly -> End of Jan. 2014