Find project information and sign up to receive email updates at: mndot.gov/d8/projects/hwy15downtownhutch Highway 15 Hutchinson Project Project Schedule Project Goals & Benefits Summary of Work Complete reconstruction of Main Street/ Highway 15 through downtown Pavement resurfacing of Highway 15 between 5th Ave S and just south of Denver Ave Update sidewalk and pedestrian crossings along project area to meet Americans with Disabilities (ADA) standards • Smoother road surface Modernize sanitary sewer, water main and storm sewer Help ensure city and state infrastructure serves their purpose for many years The City of Hutchinson views this project as an opportunity to enhance downtown and improve livibility in the central district 2017 2018 2019 2020 July - Sept Oct - Dec Jan - Mar April - June July - Sept Oct - Dec Jan - Mar April - June July - Sept Oct - Dec Jan - Mar April - June July - Sept Oct - Dec Community Involvement Preliminary Design Final Design & Streetscape/Landscape Bid Le ng & Contractor Selec on Construc on November 22, 2019 Project booth at Dairy Days event. Project booth at Dairy Days event.

Upload: others

Post on 21-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Highway 15 Hutchinson Project - MnDOT · Hutchinson Project Project Schedule Project Goals & Benefi ts Summary of Work • Complete reconstruction of Main Street/ Highway 15 through

Find project information and sign up to receive email updates at:

mndot.gov/d8/projects/hwy15downtownhutch

Highway 15Hutchinson Project

Project Schedule

Project Goals & Benefi ts Summary of Work• Complete reconstruction of Main Street/

Highway 15 through downtown

• Pavement resurfacing of Highway 15 between 5th Ave S and just south of Denver Ave

• Update sidewalk and pedestrian crossings along project area to meet Americans with Disabilities (ADA) standards

• Smoother road surface

• Modernize sanitary sewer, water main and storm sewer

• Help ensure city and state infrastructure serves their purpose for many years

• The City of Hutchinson views this project as an opportunity to enhance downtown and improve livibility in the central district

2017 2018 2019 2020July

- SeptOct

- DecJan

- MarApril

- JuneJuly

- SeptOct

- DecJan

- MarApril

- JuneJuly

- SeptOct

- DecJan

- MarApril

- JuneJuly

- SeptOct

- Dec

Community Involvement

Preliminary Design

Final Design & Streetscape/Landscape

Bid Le ng & Contractor Selec on

Construc on

November 22, 2019

Project booth at Dairy Days event.Project booth at Dairy Days event.

Page 2: Highway 15 Hutchinson Project - MnDOT · Hutchinson Project Project Schedule Project Goals & Benefi ts Summary of Work • Complete reconstruction of Main Street/ Highway 15 through

Find project information and sign up to receive email updates at:

mndot.gov/d8/projects/hwy15downtownhutch

Highway 15Hutchinson Project

Approved Items:

STREETSCAPE DESIGN ELEMENTS AND THEMES

wrought iron benchwrought iron bench

• existing light poles to be reused - poles will be sandblasted, painted, and converted to LED fi xtures

• fl ag pole banners• benches• trash receptacles• portable potted plants• wider color concrete band• bike racks

existing lightingexisting lighting units + bannerunits + banner

existing trashexisting trash receptaclereceptacle

existing color bandexisting color band detaildetail

existing light-existing light-ing uniting unit

HUTCHINSON

PPARKING

HUTCHINSON

STATE THEATERCITY CENTER

EHEIM PARKGIRL SCOUT PARK

DOWNTOWN HUTCHINSON

.6 mi

.2 mi

1.8 mi

.8 mi

.6 mi

STATE THEATERCITY CENTER

EHEIM PARKGIRL SCOUT PARK

DOWNTOWN HUTCHINSON

.6 mi

.2 mi

1.8 mi

.8 mi

.6 mi

INDIANA LIMESTONE C

PRINTED STEEL SIGN PLACARD

PRINTED STEEL SIGN PLACARD

PAINTED STEEL SQUARE TUBING

FIELDSTONE POSTFFIIELDS NETONE POST

H

DO

HUTCHINSON HUUTCTCTTCTCTCTCTCTTCTCTCCTCTCTCTCTCTCTCTCCCCTCTCTCTCTCTCTTTCCTCT

QQQQQQQ

H

lighting unit withlighting unit with parking signparking sign

Page 3: Highway 15 Hutchinson Project - MnDOT · Hutchinson Project Project Schedule Project Goals & Benefi ts Summary of Work • Complete reconstruction of Main Street/ Highway 15 through

Find project information and sign up to receive email updates at:

mndot.gov/d8/projects/hwy15downtownhutch

Highway 15Hutchinson Project

STREETSCAPE DESIGN ELEMENTS AND THEMES

Explanation and Plan:• This project provides an opportunity for the

City of Hutchinson to enhance downtown and improve livability in the central district.

• Reuse quality products such as light poles and benches.

arches themearches theme arches themearches theme

existing benchexisting bencharches themearches theme arches themearches theme

arches themearches theme

existing potsexisting pots existing potsexisting pots existing benchesexisting benches

• Build upon existing themes such as arch designs through the city and utilizing the concept of portable planter pots.

Page 4: Highway 15 Hutchinson Project - MnDOT · Hutchinson Project Project Schedule Project Goals & Benefi ts Summary of Work • Complete reconstruction of Main Street/ Highway 15 through

Find project information and sign up to receive email updates at:

mndot.gov/d8/projects/hwy15downtownhutch

Highway 15Hutchinson Project

CORNER & STREETSCAPE DESIGN EXAMPLE

Design Intent:• Extended curb cuts aka “bump outs” will be

introduced at select intersections.- Improves safety for pedestrians crossing the

street.

• 32” wide color band (same as existing)- The color will remain consistent with existing

color in downtown area.- The texture will not be the same, a different

texture and jointing pattern will be introduced in these areas.

• Movable planter pots- These planter pots can be relocated in the winter

months to allow for snow removal.- Planter pot designs, shapes, and sizes will be

reviewed during future project development and presented this fall.

existing site conditionexisting site condition

proposed site conditionproposed site condition

Page 5: Highway 15 Hutchinson Project - MnDOT · Hutchinson Project Project Schedule Project Goals & Benefi ts Summary of Work • Complete reconstruction of Main Street/ Highway 15 through

Find project information and sign up to receive email updates at:

mndot.gov/d8/projects/hwy15downtownhutch

Highway 15Hutchinson Project

STOREFRONT & STREETSCAPE DESIGN EXAMPLE

Design Intent:• 32” wide concrete color band (same as existing)

- The color will remain consistent with existing color in downtown area.

- The texture will not be the same as existing. A different texture and jointing pattern will be

introduced in these areas.

• Movable planter pots- Rectangular planters are proposed, in addition to

the current type of planter pots, to be set along the back of the walk next to buildings at identifi ed locations

- Rectangular planters will be variable height to avoid blocking window fronts

- Rectangular planters and planter pots can be relocated in the winter months to allow for snow removal

- Rectangular planters and planter pot designs and sizes will be reviewed during future project development.

proposed site conditionproposed site condition