Find project information and sign up to receive email updates at:
mndot.gov/d8/projects/hwy15downtownhutch
Highway 15Hutchinson Project
Project Schedule
Project Goals & Benefi ts Summary of Work• Complete reconstruction of Main Street/
Highway 15 through downtown
• Pavement resurfacing of Highway 15 between 5th Ave S and just south of Denver Ave
• Update sidewalk and pedestrian crossings along project area to meet Americans with Disabilities (ADA) standards
• Smoother road surface
• Modernize sanitary sewer, water main and storm sewer
• Help ensure city and state infrastructure serves their purpose for many years
• The City of Hutchinson views this project as an opportunity to enhance downtown and improve livibility in the central district
2017 2018 2019 2020July
- SeptOct
- DecJan
- MarApril
- JuneJuly
- SeptOct
- DecJan
- MarApril
- JuneJuly
- SeptOct
- DecJan
- MarApril
- JuneJuly
- SeptOct
- Dec
Community Involvement
Preliminary Design
Final Design & Streetscape/Landscape
Bid Le ng & Contractor Selec on
Construc on
November 22, 2019
Project booth at Dairy Days event.Project booth at Dairy Days event.
Find project information and sign up to receive email updates at:
mndot.gov/d8/projects/hwy15downtownhutch
Highway 15Hutchinson Project
Approved Items:
STREETSCAPE DESIGN ELEMENTS AND THEMES
wrought iron benchwrought iron bench
• existing light poles to be reused - poles will be sandblasted, painted, and converted to LED fi xtures
• fl ag pole banners• benches• trash receptacles• portable potted plants• wider color concrete band• bike racks
existing lightingexisting lighting units + bannerunits + banner
existing trashexisting trash receptaclereceptacle
existing color bandexisting color band detaildetail
existing light-existing light-ing uniting unit
HUTCHINSON
PPARKING
HUTCHINSON
STATE THEATERCITY CENTER
EHEIM PARKGIRL SCOUT PARK
DOWNTOWN HUTCHINSON
.6 mi
.2 mi
1.8 mi
.8 mi
.6 mi
STATE THEATERCITY CENTER
EHEIM PARKGIRL SCOUT PARK
DOWNTOWN HUTCHINSON
.6 mi
.2 mi
1.8 mi
.8 mi
.6 mi
INDIANA LIMESTONE C
PRINTED STEEL SIGN PLACARD
PRINTED STEEL SIGN PLACARD
PAINTED STEEL SQUARE TUBING
FIELDSTONE POSTFFIIELDS NETONE POST
H
DO
HUTCHINSON HUUTCTCTTCTCTCTCTCTTCTCTCCTCTCTCTCTCTCTCTCCCCTCTCTCTCTCTCTTTCCTCT
QQQQQQQ
H
lighting unit withlighting unit with parking signparking sign
Find project information and sign up to receive email updates at:
mndot.gov/d8/projects/hwy15downtownhutch
Highway 15Hutchinson Project
STREETSCAPE DESIGN ELEMENTS AND THEMES
Explanation and Plan:• This project provides an opportunity for the
City of Hutchinson to enhance downtown and improve livability in the central district.
• Reuse quality products such as light poles and benches.
arches themearches theme arches themearches theme
existing benchexisting bencharches themearches theme arches themearches theme
arches themearches theme
existing potsexisting pots existing potsexisting pots existing benchesexisting benches
• Build upon existing themes such as arch designs through the city and utilizing the concept of portable planter pots.
Find project information and sign up to receive email updates at:
mndot.gov/d8/projects/hwy15downtownhutch
Highway 15Hutchinson Project
CORNER & STREETSCAPE DESIGN EXAMPLE
Design Intent:• Extended curb cuts aka “bump outs” will be
introduced at select intersections.- Improves safety for pedestrians crossing the
street.
• 32” wide color band (same as existing)- The color will remain consistent with existing
color in downtown area.- The texture will not be the same, a different
texture and jointing pattern will be introduced in these areas.
• Movable planter pots- These planter pots can be relocated in the winter
months to allow for snow removal.- Planter pot designs, shapes, and sizes will be
reviewed during future project development and presented this fall.
existing site conditionexisting site condition
proposed site conditionproposed site condition
Find project information and sign up to receive email updates at:
mndot.gov/d8/projects/hwy15downtownhutch
Highway 15Hutchinson Project
STOREFRONT & STREETSCAPE DESIGN EXAMPLE
Design Intent:• 32” wide concrete color band (same as existing)
- The color will remain consistent with existing color in downtown area.
- The texture will not be the same as existing. A different texture and jointing pattern will be
introduced in these areas.
• Movable planter pots- Rectangular planters are proposed, in addition to
the current type of planter pots, to be set along the back of the walk next to buildings at identifi ed locations
- Rectangular planters will be variable height to avoid blocking window fronts
- Rectangular planters and planter pots can be relocated in the winter months to allow for snow removal
- Rectangular planters and planter pot designs and sizes will be reviewed during future project development.
proposed site conditionproposed site condition