high-grade gold production development in · pdf file3.5m3 scoops, jumbo drills) ... 3.5 m3...
TRANSCRIPT
High-grade Gold Production
Development in ColombiaPDAC, March 2016
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
DISCLAIMER
This presentation may contain forward-looking
statements concerning the Company’s plans for
its properties, operations and other matters.
These statements refer to analyses and other
information that are based on forecasts of future
results, estimates of amounts not yet
determinable and assumptions of management.
Statements concerning reserves and mineral
resource estimates may also be deemed to be
forward-looking statements to the extent that
they involve estimates of the mineralization that
will be encountered if the property is developed
and in the case of mineral reserves, such
statements reflect the conclusion based on
certain assumptions that the mineral deposit can
be economically exploited. Any statements that
express or involve discussions with respect to
predictions, expectations, beliefs, plans,
projections, objectives, assumptions or future
events or performance are not statements of
historical fact and may be “forward-looking
statements”. Should one or more of these risks
and uncertainties materialize, or should
underlying assumptions prove incorrect, actual
results may vary materially from those described
in forward-looking statements. Forward-looking
statements are made based on management’s
beliefs, estimates and opinions on the date the
statements are made and the Company
undertakes no obligation to update forward-
looking statements if these beliefs, estimates
and opinions or other circumstances change.
Investors are cautioned against attributing undue
certainty to forward-looking statements. Some
information provided is of a confidential nature
and cannot be divulged or used for gain until it is
made public.13
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Cisneros location
• Paved highway, <2 hours from Medellin
• Good infrastructure including power, water and gas
• Proximity to other notable gold projects
Santa RosaRed Eagle Cisneros
Antioquia GoldGramalote
Anglo/B2Gold
Medellin
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Board of Directors
Felipe Ferraro
Director and Chairman of the Board
• B.Sc in agricultural engineering and MA in business administration from the University ESAN-Stanford University
• Experience in industries including mining, enterprise, metal-working and heavy equipment
• General manager for Cori Puno that operates the 30,000 oz/y Au Untuca open-pit and underground mine in Peru (owned by the principals of Consorcio Minero Horizonte)
• Director of another TSXV-listed issuer
James (Jim) Decker, P. Eng.
Director and Vice President Investor Relations
• B.Sc. in Mining Engineering from Queen's University
• More than 40 years in the mining business
• President and principal partner of mining consulting firm Jim Decker & Associates with clients including Barrick, Kinross, Teckand Xstrata
• Director of two other TSXV listed issuers
Clever Schrader
Director
• Seasoned professional with forty years of experience in underground gold mine exploration and operations in Peru
• Currently Corporate Operations Manager for ConsorcioMinero Horizonte.
Ernesto Bendezu Flores
Director
• Lawyer in Peru with more than 20 years of mining experience
• Legal manager for Consorcio Minero Horizonte
Michael Cannock
Director
• Businessman with expertise in the hospitality and marketing sectors
• Director of hospitality at PI Fine Art in Toronto, Ontario
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Management Team
Felipe Ferraro
President and CEO, Director
• B.Sc in agricultural engineering and MA in business administration from the University ESAN-Stanford University
• Experience in industries including mining, enterprise, metal-working and heavy equipment
• General manager for Cori Puno that operates the 30,000 oz/y Au Untuca open-pit and underground mine in Peru (owned by the principals of ConsorcioMinero Horizonte)
• Director of another TSXV-listed issuer
Rodger Roden
Chief Financial Officer
• Chartered Accountant with more than 25 years of industry experience
• Former VP Finance/CFO with public and private companies in a broad range of industries
• Currently CFO to several public companies
Alvaro Espinoza
Executive Vice President
• Strong background in mining finance
• Manager of Administration & Finance at Cori Puno, a CMH subsidiary
James (Jim) Decker, P. Eng.
Vice President Investor Relation, Director
• B.Sc. in Mining Engineering from Queen's University
• More than 40 years in the mining business
• President and principal partner of mining consulting firm Jim Decker & Associates with clients including Barrick, Kinross, Teck and Xstrata
• Director of two other TSXV listed issuers
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Key Players
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Background
• History• 2007 – Private investor group acquired core Guayabito property
• 2008 – Formed Antioquia Gold Inc. via reverse takeover
• 2009 to present – project advancement
• Acquisitions• Guayabito
• La Manuela
• Pacho Luis
• Santo Domingo
• Guayabito Sur
• Exploration• Mapping/Sampling/Geochemistry/Geophysics
• 45,000 m diamond drilling
• NI 43-101 Resource Report
• Development• Internal feasibility studies
• Production decision for initial annual operation of 30,000 oz Au
• Currently in underground development stage
• Production• Scheduled for year end 2016 or Q1 2017
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Acquisitions
8
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Initial Mining Areas
9
Guayabito
Guaico
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Community Relations
• Highlights
• Communication Network
• Employment of Locals
• Reclamation
• Input for EIA permitting
• Financial Support for Community Projects
• Census of Land Owners/Residents
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Resource Estimate
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Exploration Potential
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Mine Development
• Mechanized underground mining with trackless equipment (30t trucks, 3.5m3 scoops, jumbo drills)
• 500 tpd mine and process plant; 250 tpd first 2 years, 500 tpd thereafter
• 15,000 oz Au for first 2 years, increase to 30,000 oz Au/yr thereafter
• Processing circuit with gravity, flotation and dry tailings filtration process
• Dry tailings disposal/rock
• Initial 5-7 year mine life
Guaico Portal
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Mining Method
% Production
Cost US$/t
Cut-off *(g Au/t)
Equipment Backfill
MechanizedCut and Fill
67% 13.87 2.55 Jumbo & 3.5 m3 Scoop
70% Waste Backfill30% Hydraulic Backfill
Cut and Fill with SpecialEquipment
15% 21.31 2.84 Jackleg &1 m3 Scoop
100% Hydraulic Backfill
Shrinkage Stoping
18% 25.07 3.34 Jackleg 100% Waste Backfill
Total 100% 2.70
Mine Plan
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
3.5 m3 Cat Scoop
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Single Jumbo
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Explosives Magazine
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Guaico Tunnel – February 21,
2016
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Guaico/Guayabito Tunnel Section View
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Guaico Portal Area
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Guaico Long Section
GCO Structure
GCFW5 Structure
Key
+1.0 g/t Au
0.1-1.0 g/t Au
43.7 g/t Au
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Guaico Vein – 1.5m
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Guayabito Long Section
BB’C C’Key
+1.0 g/t Au
0.1-1.0 g/t Au
GYB2
Structure
El Bolo Structure
31.3 g/t Au
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Guayabito Plant & Infrastructure Layout
Plant Site
Guayabito Portal
Hydraulic BackfillPlant
Shop
Office/Dry Complex
Warehouse
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Guayabito Plant & Portal
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Mine Development Renders
Guaico Guayabito
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Cisneros Metallurgy/Flotation Testing
Metallurgical tests indicate >95% gold recovery
Unit Guaico Guayabito
Mineral weight g 1,000 1,000
Au head grade analyzed
g/t 5.3 6.7
Au head grade calculated
g/t 5.7 6.6
Granulometry -200 mesh
% 60 60
Density Kg/L 1.3 1.3
Conditioning time Min 5 5
Initial pH of flotation 8.8 8.4
Final pH of flotation 8.4 8.1
Flotation time Min 16 16
Xanthate Z-6consumption
g/t 60.0 60.1
ER-350 consumption g/t 22.4 22.4
MIBC consumption 15.2 15.2
0
20
40
60
80
100
0 2 4 6 8 10 12 14 16 18
% R
eco
very
Time, minutes
Flotation Without Gravimetrics, Guaico
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Project Financing in Place
• Capex US$18M
• Infinita unsecured US$15M loan
• ~8% loan interest
• Two-year grace period
• US$6M drawn to date
• US$12M to draw down in 2016
• US$3M from cash flow from 1Q17
+ = Value creationReduced risk
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Mine Development Timeline
Infrastructure & Mine
DevelopmentGuayabito
Guaico
2016 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2017
PlantDetailed
Engineering
Mine
Development
Ongoing
Ore
Production
OreProduction
Env’l & Mining Permit
Construction
Testing &
Commissioning
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Current Status – Full Steam Ahead
• Permits in hand for Guaico
• Guaico Tunnel & Infrastructure close to completion
• Guayabito Tunnel & Infrastructure awaiting permit
• Plant detailed engineering ongoing
• Contractors working well
• Other
• Guaico underground diamond drilling
• Guayabito South Exploration
• Exploration tunnel
• Drilling
TSX-V: AGD OTCQX: AGDFX www.antioquiagoldinc.com March 2016
Conclusion
Thank You