Page 1: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

to the

Heritage Heights

Transportation Master Plan Study

Public Information Centre #3

Welcome

June 4, 20144:00 PM to 8:00 PM

10675 Mississauga Road, Brampton(Peel Regional Police Association)

Page 2: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

2

Heritage Heights Transportation Master Plan

Secondary Planning ProgramThe City of Brampton has initiated a Secondary Plan work program for Area 52 (Huttonville North) and Area 53 (Mount Pleasant West), collectively referred to as “Heritage Heights”, in accordance with the timeline and polices of ROPA 15, OPA 93-245 and Council direction in December 2009.

The work program includes the following studies:• Subwatershed & Landscape Scale Analysis

o Open House held on October 22, 2013• Servicing and Infrastructure• Employment Implementation• Shale Resources Review Update• Community Visioning

o Preliminary Concept Plan – Endorsed by Council April 2013• Transportation Master Plan (subject of tonight’s Open House)

• Commercial Institutional Study• Cultural Heritage Study• Community Design and Open Space Study

For further information and status updates regarding the Secondary Plan Program for Heritage Heights, please visit:

www.brampton.ca/en/Business/planning-development/projects-studies/Pages/HeritageHeightsCommunity.aspx

Mt PleasantSPA 51

Mt PleasantSPA 51

Mt PleasantSPA 51

Heritage Heightsstudy area

Page 3: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

3

Heritage Heights Transportation Master Plan

Transportation Study Process This study is being conducted as a Transportation Master Plan in accordance with Phases 1 and 2 of the Municipal Class Environmental Assessment (2000, as amended 2011).

The study will assess environmental, social, economic and technical criteria and will address the interests of area residents, stakeholders and local businesses in selecting the preferred solution.

Notice of Commencement 

September 16, 2011

#3

June 2014

Notice of Completion Fall 2014

• Present the study purpose and process• Background  information• Existing conditions• Preliminary Problem and Opportunity Statement

• Confirm the problem and opportunity statement

• Present alternative solutions • Present alignment concepts for the NSTC• Provide a preliminary assessment of the alternatives

Final Transportation Master Plan 

• Present final results and recommended draft plan

• Phasing strategy for transportation improvements

• Strategies for transit, active transportation and travel demand management and concept for corridor protection area 

#2

November 2012

we are HERE in the EA

Process

Page 4: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

4

Heritage Heights Transportation Master Plan

Study Area and Purpose

The key objectives of the Transportation Master Plan include: • Identifying opportunities for a transportation corridor crossing of the

Credit River valley, and refining the North-South Corridor Protection Area in northwest Brampton.

• Planning for road and transit projects as part of a preferred transportation network and strategy that are innovative, pedestrian/cycling-friendly, and transit-oriented to support the development of Heritage Heights and the northwest Brampton area as a “complete community.”

The City of Brampton is undertaking a Transportation Master Plan as a supporting study to the Secondary Plan for the Heritage Heights Community (Secondary Plan Areas 52 and 53). This study will identify the Transportation needs of the new community and consider options to satisfy future travel demands.

The study area includes the Secondary Plan Areas of Huttonville North (SP 52) and Mount Pleasant West (SP 53). The study area is bounded by Mayfield Road to the north, Mississauga Road to the east, Winston Churchill Boulevard to the west and the Credit River Valley to the south.

Page 5: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

5

Heritage Heights Transportation Master Plan

Problem and Opportunity StatementThe City of Brampton is forecasted to achieve a population of 837,000 and 292,800 jobs by 2031*.

The City has designated an urban expansion area in North West Brampton to accommodate a portion of future growth. The area known as Heritage Heights (Secondary Plan Areas 52 and 53) is planned to accommodate 43,000 residents and 20,000 jobs by 2031.

The Secondary Planning Areas are subject to corridor protection and future environmental assessment (EA) studies for a North-South Transportation Corridor of provincial and municipal planning interest.

The existing transportation system of roads, transit, pedestrian linkages, and pathways will not adequately accommodate the mobility needs of future residents and workers.

The City of Brampton has an opportunity to plan and implement a transportation solution that supports the development of Heritage Heights as a “complete community.”

* Source: Preliminary updated forecasts prepared for the City of Brampton (March 2014).

Page 6: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

6

Heritage Heights Transportation Master Plan

Study Context – BackgroundCorridor Protection

This is the depiction from the HPBATS Study Report, dated May 2010, and is superseded by the GTA West as developed by MTO in the GTA West EA (see next board).

Subject to Town of Halton Hills - GTA West Transportation Corridor Protection / Halton Hills Employment Lands Phasing Study –Halton Region Draft OPA 43 and Halton Hills Draft OPA 21.

www.haltonhills.ca/initiatives/GTA-West-Corridor.php

Halton Peel Boundary Area Transportation Study (HPBATS)HPBATS identified a future long-term transportation network (2021 and 2031) required to support provincial and inter-municipal planning goals for Halton and Peel Regions, and to satisfy future transportation demand.• July 2010: A Notice of Information was issued advising that HPBATS was adopted

by the Councils of participating municipalities in April and May 2010 as a Transportation Master Plan in accordance with Phases 1 and 2 of the Municipal Class EA process.

• April 2012: A Memorandum of Understanding amongst the municipal partners –Peel Region, Halton Region, Halton Hills, Town of Caledon and City of Brampton –set out a framework for the timely implementation of the HPBATS cross-jurisdictional transportation improvements and acknowledged municipal partners proceeding with planning and transportation studies as input to future EA studies.

• November 2012: GTA West Corridor Environmental Assessment Stage 1 completion and release of the Transportation Development Strategy and Preliminary Route Planning Study Area.

• June 2013: HPBATS Review of Implementation Strategies recommended that environmental assessments for the cross-jurisdictional improvements – Halton Peel Freeway (as superseded by GTA West EA) and East-West Connection – no longer be advanced as municipal studies. See next board

Subject to City of Brampton OP Policy –Interim Control By-law 306-2003 for the protection of North-South Transportation Corridor and Peel Region OPA 26 (ROPA 26).

Heritage Heights study area

Page 7: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

7

Heritage Heights Transportation Master Plan

Heritage Heights study area

Study ContextGTA West Corridor Environmental Assessment• The proposed North South Transportation Corridor largely coincides with the

Ministry of Transportation’s (MTO) GTA West study area as subject to Official Plan corridor protection policies of provincial and municipal interest.

• The MTO’s Preliminary Route Planning Study Area includes the Heritage Heights Community.

• The Preliminary Route Planning Study Area provides for the consideration of a range of Credit River crossing locations to serve the north-south transportation needs as well as the potential to serve the east-west transportation needs.

• The final alignment of the GTA West, including the location of the Credit River crossing will be determined by the MTO in the subsequent route planning Environmental Assessment. The findings of Heritage Heights Transportation Master Plan Study will be considered, along with other content and analysis, as input to the MTO’s GTA West EA.

• The MTO has finalized the GTA West Transportation Development Strategy Report (November 16, 2012). The completion of the Transportation Development Strategy represents the conclusion of the first stage of the EA study.

• Stage 2 of the GTA West project is actively underway. Route alternatives will be generated within the Route Planning Study Area.

For further information or status updates, please visit: www.gta-west.com

Subject to Town of Halton Hills - GTA West Transportation Corridor Protection / Halton Hills Employment Lands Phasing Study –Halton Region Draft OPA 43 and Halton Hills Draft OPA 21.

www.haltonhills.ca/initiatives/GTA-West-Corridor.php

Subject to City of Brampton OP Policy –Interim Control By-law 306-2003 for the protection of North-South Transportation Corridor and Peel Region OPA 26 (ROPA 26).

Source: MTO’s GTA West EA (November 2012)

Page 8: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

8

Heritage Heights Transportation Master Plan

Study ContextStatus of West / Northwest Brampton

Environmental Assessments

See previous board

Page 9: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

9

Heritage Heights Transportation Master Plan

Credit River Valley Crossing • A crossing opportunity has been identified which allows for

suitable flexibility to reasonably address the transportation corridor, interchange configuration options, and protection for a hydro corridor through future Environmental Assessment processes.

• The crossing opportunity was defined by identifying constraints as they relate to the natural environment, existing socio-economic conditions (i.e. settlement areas) and planned context as the basis of establishing criteria upon which to evaluate concepts for the corridor protection area.

Page 10: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

16

Heritage Heights Transportation Master Plan

Alternative Corridors

East of Heritage Road• This corridor option crosses the Credit River west of

Heritage Road, crosses Heritage Road and generally follows a northerly alignment midblock between Heritage Road and Mississauga Road.

As shown at PIC #2 in

November 2012.

Page 11: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

11

Heritage Heights Transportation Master Plan

Preliminary Concept Plan

Source: City of Brampton Council endorsed Preliminary Concept Plan, April 2013

Page 12: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

12

Heritage Heights Transportation Master Plan

Natural Features Mapping

DRAFT – subject to ongoing Heritage Heights Subwatershed Study

Page 13: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

13

Heritage Heights Transportation Master Plan

Mayfield Road

Wanless Drive

Sandalwood Parkway

Bovaird Drive

Williams Parkway

Queen Street

Embleton Road

He ritage Road

Winston C

hurchill Boulevard

Guelph Street

10 Sideroad

Credit River

Mississauga R

oad

CN Rail

5th Side Road

Winston Churchill B

oulevard

Ninth Line

Mount Pleasant

GO Station

4

4

6

6

6

4

4

66

6

4

44

4

66

4

4

24

4

4

4

4

2

44

6

4

4

4

6

Mayfield Road

Wanless Drive

Sandalwood Parkway

Bovaird Drive

Williams Parkway

Queen Street

Embleton Road

He ritage Road

Winston C

hurchill Boulevard

Guelph Street

10 Sideroad

Credit River

Mississauga R

oad

CN Rail

5th Side Road

Winston Churchill Boulevard

Ninth Line

Mount Pleasant

GO Station

2

2

22

2

2

2

2

2

4

4

4

2

2

2

2

2

2

22

2

2

2

22

6

Network AlternativesAlternative 1 – Do NothingHeritage Heights road network as it exists today with no new road network improvements within the study area.

Alternative 2A base case with planned improvements: • Widening of Mayfield Road• Widening of Wanless Drive • Sandalwood Parkway extension to

Winston Churchill Boulevard• Widening of Bovaird Drive• Williams Parkway extension to

Heritage Road• Widening of Mississauga Road

Roads shown are conceptual and are subject to future Environmental Assessment studies.

Heritage Heights Area

Legend

Major ArterialMinor ArterialMajor Collector Minor Collector NSTC*

NSTC Interchange*

Lanesx

Heritage Heights Area

Legend

Major ArterialMinor ArterialMajor Collector Minor Collector NSTC*

NSTC Interchange*

Lanesx

* Final route and interchanges to be determined by the Province as subject to GTA West Stage 2 Environmental Assessment.

* Final route and interchanges to be determined by the Province as subject to GTA West Stage 2 Environmental Assessment.

Page 14: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

14

Heritage Heights Transportation Master Plan

Mayfield Road

Wanless Drive

Sandalwood Parkway

Bovaird Drive

Williams Parkway

Queen Street

Embleton Road

He ritage Road

Winston C

hurchill Boulevard

Guelph Street

10 Sideroad

Credit River

Mississauga R

oad

CN Rail

5th Side Road

Winston Churchill Boulevard

Ninth Line

Mount Pleasant

GO Station

46

4

6

6

44

64

4

2

4

4

2

4

44

6

4

4

6

4

4

4

6

4

4

4

4

4

66 4

6

4

4

Mayfield Road

Wanless Drive

Sandalwood Parkway

Bovaird Drive

Williams Parkway

Queen Street

Embleton Road

He ritage Road

Winston C

hurchill Boulevard

Guelph Street

10 Sideroad

Credit River

Mississauga R

oad

CN Rail

5th Side Road

Winston Churchill Boulevard

Ninth Line

Mount Pleasant

GO Station

4

46

4

6

6

44

64

4

2

4

4

4

2

4

4

4

4

44

6

4

4

4

4

4

4

6

4

4

4

6

66 4

6

4

Network AlternativesAlternative 3In addition to improvements in the Alternative 2 network:• Lagerfeld Drive extension to

Winston Churchill Boulevard • A new north-south arterial road

between Winston Churchill Boulevard and Heritage Road provides a connection from Mayfield Road to Bovaird Drive

Roads shown are conceptual and are subject to future Environmental Assessment studies.

Alternative 4Building upon the improvements in the Alternative 2 network:• Sandalwood Parkway extension to

Heritage Road, then parallel to the CN Rail line before terminating at new north-south arterial road

• Lagerfeld Drive extension to Winston Churchill Boulevard

• New north-south arterial road provides a connection from Mayfield Road to Bovaird Drive

Roads shown are conceptual and are subject to future Environmental Assessment studies.

Heritage Heights Area

Legend

Major ArterialMinor ArterialMajor Collector Minor Collector NSTC*

NSTC Interchange*

Lanesx

Heritage Heights Area

Legend

Major ArterialMinor ArterialMajor Collector Minor Collector NSTC*

NSTC Interchange*

Lanesx

* Final route and interchanges to be determined by the Province as subject to GTA West Stage 2 Environmental Assessment.

* Final route and interchanges to be determined by the Province as subject to GTA West Stage 2 Environmental Assessment.

Page 15: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

15

Heritage Heights Transportation Master Plan

Mayfield Road

Wanless Drive

Sandalwood Parkway

Bovaird Drive

Williams Parkway

Queen Street

Embleton Road

He ritage Road

Winston C

hurchill Boulevard

Guelph Street

10 Sideroad

Credit River

Mississauga R

oad

CN Rail

5th Side Road

Winston Churchill Boulevard

Ninth Line

Mount Pleasant

GO Station

4

46

4

6

6

44

4

2

4

4

2

4

4

44

6

4

6

4

4

4

6

4

4

4

4

66 4

6

44

6

4

4

4

Mayfield Road

Wanless Drive

Sandalwood Parkway

Bovaird Drive

Williams Parkway

Queen Street

Embleton Road

He ritage Road

Winston C

hurchill Boulevard

Guelph Street

10 Sideroad

Credit River

Mississauga R

oad

CN Rail

5th Side Road

Winston Churchill B

oulevard

Ninth Line

Mount Pleasant

GO Station

46

4

6

6

44

64

4

2

4

4

2

4

44

6

4

4

6

4

4

4

6

4

4

4

4

4

66 4

6

4

4

Network AlternativesAlternative 5Building upon the improvements in the Alternative 2 network:• Sandalwood Parkway extension to

Heritage Road, then parallel to CN Rail line and north to Mayfield Road

• A new north-south arterial road connects Sandalwood Parkway to Bovaird Drive

• Lagerfeld Drive extension to new north-south arterial

• A new arterial connects north-south arterial to Winston Churchill Boulevard

Roads shown are conceptual and are subject to future Environmental Assessment studies.

Alternative 6Building upon the improvements in the Alternative 2 network:• Sandalwood Parkway extends to

Heritage Road, then parallel to CN Rail line and north to Mayfield Road

• Lagerfeld Drive extends to Winston Churchill Boulevard

• Active transportation and transit only crossing of CN Rail line

Roads shown are conceptual and are subject to future Environmental Assessment studies.

Heritage Heights Area

Legend

Major ArterialMinor ArterialMajor Collector Minor Collector NSTC*

NSTC Interchange*

Lanesx

Heritage Heights Area

Legend

Major ArterialMinor ArterialMajor Collector Minor Collector NSTC*

NSTC Interchange*

Lanesx

Active Transportation and Transit only connection

* Final route and interchanges to be determined by the Province as subject to GTA West Stage 2 Environmental Assessment.

* Final route and interchanges to be determined by the Province as subject to GTA West Stage 2 Environmental Assessment.

Page 16: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

16

Heritage Heights Transportation Master Plan

Future Transportation Conditions (PM Peak Hour)

Alternative 1 “Do Nothing” Conditions

Alternative 2 Planned Improvements Conditions

Alternative 6 Conditions

Page 17: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

17

Heritage Heights Transportation Master Plan

Criteria and Measures Alternative1 2 3 4 5 6

TRANSPORTATION SERVICE• Network configuration and

intersection spacing• Network connectivity• Mobility and accessibility• Capacity and level of

service• Transit operations• Active Transportation

NATURAL ENVIRONMENT• Potential for impact to

natural heritage• Potential for impact to

surface water, groundwater

• Potential for impact to terrestrial features and habitat

SOCIO-ECONOMIC ENVIRONMENT• Development objectives

and economic growth• Land use / Community

IMPLEMENTATION• Capital cost –

construction, structures• Staging

OVERALL RANKPreliminary Preferred

Evaluation Summary

Least preferred Most preferred

Legend

Page 18: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

18

Heritage Heights Transportation Master Plan

Mayfield Road

Wanless Drive

Sandalwood Parkway

Bovaird Drive

Williams Parkway

Queen Street

Embleton Road

He ritage Road

Winston C

hurchill Boulevard

Guelph Street

10 Sideroad

Credit River

Mississauga R

oad

CN Rail

5th Side Road

Winston Churchill Boulevard

Ninth Line

Mount Pleasant

GO Station

4

46

4

6

6

44

4

2

4

4

2

4

4

44

6

4

6

4

4

4

6

4

4

4

4

66 4

6

44

6

4

4

4

Preliminary Preferred Network

Heritage Heights Area

Legend

Major ArterialMinor ArterialMajor Collector Minor Collector NSTC*

NSTC Interchange*

Lanesx

Active Transportation and Transit only connection

* Final route and interchanges to be determined by the Province as subject to GTA West Stage 2 Environmental Assessment.

Preferred Network roads are conceptual and subject to future Environmental Assessment studies.

Page 19: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

19

Heritage Heights Transportation Master Plan

Mayfield Road

Wanless Drive

Sandalwood Parkway

Bovaird Drive

Queen Street

Embleton Road

He ritage Road

Guelph Street

10 Sideroad

Credit River

Mississauga R

oad

CN Rail

5th Side Road

Winston Churchill Boulevard

Ninth Line

GO Kitchner Line

Winston C

hurchill Boulevard

Future Transitway

BRT

Mount Pleasant

GO Station

BRT

Williams Parkway

Transit Strategy• Efficient transit service throughout Heritage Heights• Transit connections to Mt. Pleasant GO Station • Transit connections to bus rapid transit routes

* Final route and interchanges to be determined by the Province as subject to GTA West Stage 2 Environmental Assessment.

Heritage Heights Area

Legend

Bus Service

GO Rail Kitchener LinePotential Transitway*

Mount Pleasant GOBus Rapid Transit Service

Page 20: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

20

Heritage Heights Transportation Master Plan

Active Transportation Strategy• Provide a combination of sidewalks, bicycle facilities

and pathways that provide connectivity and permeability for pedestrians and cyclists within Heritage Heights and across barriers such as the CN Rail line.

Mayfield Road

Wanless Drive

Sandalwood Parkway

Bovaird Drive

Queen Street

Embleton Road

He ritage Road

Guelph Street

10 Sideroad

Credit River

Mississauga R

oad

CN Rail

5th Side Road

Winston Churchill Boulevard

Ninth Line

GO Kitchner Line

Winston C

hurchill Boulevard

4

Williams Parkway

Pathways Classes: Class 1: Off RoadClass 2: Bike Lane on RoadClass 3: Signed Routes on Road

Heritage Heights Area

LegendPathway, Class 1Pathway, Class 1,2 or 3

Mount Pleasant GOTrail Gateway

Page 21: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

21

Heritage Heights Transportation Master Plan

Next StepsThe Heritage Heights Transportation Master Plan is a long range plan which integrates transportation infrastructure requirements in support of growth in Heritage Heights.• Recommendations will provide input and basis of

transportation network, strategies and initiatives in support of Heritage Heights secondary planning and the GTA West Transportation Corridor EA Study process.

• Address Phases 1 and 2 of the Municipal Class Environmental Assessment process for the City’s transportation improvement needs as part of the preferred network alternatives and broader planning solution.

The next steps for the study are:• Consider all comments and suggestions received from the

public and agencies following PIC #3• Complete Heritage Heights Phase 1 component transportation

study / finalize the Transportation Master Plan and provide notice of information advising of completion in Fall 2014.

Page 22: HHTMP PIC3 Boards v7a - Brampton...Heritage Heights Transportation Master Plan Secondary Planning Program The City of Brampton has initiated a Secondary Plan work program for Area

22

Heritage Heights Transportation Master Plan

Your Input is Important!We invite you to fill out a comment sheet with your input and suggestions by June 18, 2014.

If you require further information, or wish to provide any further input to the study, please contact the project team:

Suzette Shiu, P.Eng.Consultant Project ManagerCole Engineering Group Limited70 Valleywood DriveMarkham, ON L3R 4T5 Tel: 905-940-6161 Ext. 436 Fax: 905-940-2064E-mail: [email protected]

Marta Roias, MCIP, RPPTransportation Project Manager, Planning and Infrastructure Services2 Wellington Street West, Brampton, ON L6Y 4R2Tel: 905-874-2088Fax: 905-874-2099E-mail: [email protected]

Thank you!