harding perkins corson south dakota …sddot.com/business/contractors/bid/regdocs/i4h5_plans.pdf ·...

15
STATE OF SHEET NO. TOTAL SHEETS PROJECT S.D. N PIERRE, SOUTH DAKOTA GREGORY MIX CHARLES BUFFALO KINGSBURY BROOKINGS JERAULD SANBORN MINER LAKE MOODY MINNEHAHA McCOOK HANSON DAVISON AURORA BRULE DOUGLAS LINCOLN TURNER HUTCHINSON BON HOMME YANKTON CLAY UNION LAWRENCE BUTTE HARDING PERKINS CORSON MEADE PENNINGTON CUSTER FALL RIVER CAMPBELL McPHERSON BROWN MARSHALL ROBERTS ZIEBACH DEWEY WALWORTH POTTER SULLY EDMUNDS FAULK HYDE HAND SPINK DAY GRANT CODINGTON CLARK DEUEL HAMLIN BENNETT JACKSON HAAKON STANLEY TODD MELLETTE BEADLE JONES TRIPP LYMAN OGLALA LAKOTA PROJECT STORM WATER PERMIT None Required Department of Transportation State of South Dakota Plans Prepared By 15 1 SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION AUGUST 2016 HUGHES DM&E R. R. DM & E R. R. DM&E R. R. DM&E R. R. DM & E R. R. DM&E R. R. DM&E R. R. DM & E R. R. DM&E R. R. DM&E R. R. DM & E R. R. DM&E R. R. DM&E R. R. DM & E R. R. DM&E R. R. DM&E R. R. DM & E R. R. DM&E R. R. DM&E R. R. DM & E R. R. DM&E R. R. M I SS OU R I MI SS OU R I M I SS OU R I MI SS OU R I M I SS OU R I MI SS OU R I M I SS OU R I MI SS OU R I M I SS OU R I MI SS OU R I LN. I S L AND CENTER PARK LABARGE FI ELD CAPITOL MANSION RIGGS HIGH SCHOOL PARK CULTURAL HERITAGE POOL BOAT RAMP BUCHANAN SCHOOL BALL PLANT TREATMENT SEWAGE INDIAN GOLF COURSE CITY HEALTH STATE LAB BLDG. DEER PARK PL. CRESTED AVE. PATRON PKWY. R I V E R R I V E R R I V E R R I V E R R I V E R R I V E R R I V E R R I V E R R I V E R R I V E R RI VERSI DE DR. RIVERVIEW DR. COUNTY DR. EAGLE DR. HYDE DR. LEE HILL RD. NELTOM DR. LAKESI DE LN. RI VER RD. EDGEWATER DR. TERRI LN. LAKEWOOD DR. WESTWOOD DR. CAPI TOL AVE. BRI DGEVI EW AVE. HATHAWAY AVE. ELIZABETH 4TH ST. PLACE SIBERT BRI DGEVI EW ST. CEDAR PLACE MAPLE AVE. MELLETTE MAPLE AVE. HARNEY COURT WI LLOW AVE. LA BARGE COURT AVE. 8TH ST. 7TH ST. 7TH ST. 5TH ST. 6TH ST. 5TH ST. 4TH ST. 3RD ST. 2ND ST. ST. SENECA ST. OAK ST. OAK ST. WYNOKA ST. POPLAR AVE. AVE. ONI EDA AVE. AVE. AVE. AVE. CENTRAL HURON GRAND EUCLI D AVE. ONI EDA AVE. HI GHLAND EVANS AVE. ASH ST. MAPLE AVE. WI LLOW AVE. POPLAR AVE. ONI EDA AVE. YANKTON AVE. PROSPECT AVE. CAPI TOL AVE. SEBREE PL. AVE. CENTRAL HURON AVE. AVE. PLEASANT EUCLI D AVE. AVE. NI COLLET AVE. ANTON MARY LN. BROADWAY AVE. JAMES ST. CHARLES ST. POPLAR AVE. ROBERTS ST. HENRY ST. SI OUX DAKOTA MI SSOURI FORT ST. PI ERRE ST. COTEAU ST. HI GHLAND CHAPELLE ST. AVE. AVE. AVE. PAWNEE ST. ST. ST. ST. BRULE REE CROW LN. COURT PLACE GOVERNORS DR. CAPITOL HILL DR. CHURCH SUMMIT ROBINSON BROADWAY CABOT AVE. AVE. CAPITOL MADI SON WASHI NGTON ADAMS JEFFERSON ERSKINE FRANKLIN WELLS AVE. SI OUX DAKOTA WASHI NGTON AVE. ADAMS AVE. JEFFERSON AVE. PARK MARI NA ST. MADI SON AVE. MONROE AVE. ST. MADI SON AVE. MONROE AVE. ST. ST. SUNSET DR. ST. AVE. AV E . AVE. AVE. AVE. AVE. AVE. ST. MONROE HARRI SON VAN BUREN ST. ST. JACKSON JACKSON AVE. AVE. AVE. HARRI SON VAN BUREN BLUEBELL DR. I RI S CT. HI LLTOP DR. TYLER AVE. AVE. TYLER POLK AVE. HUM BOLDT TAYLOR AVE. WELLS AVE. AVE. DAKOTA AVE. TYLER AVE. POLK AVE. TAYLOR AVE. FI LMORE AVE. AVE. PI ERCE AVE. FI LMORE AVE. AVE. AVE. PI ERCE BUCHANAN ST. LI NCOLN AVE. HI LGERS DR. HERI TAGE DR. CAMBRI DGE DR. WOODRI DGE DR. WINCHESTER DR. HAMPTON DR. PLC. PRESTON MANCHESTER DR. HARRI SON AVE. CURRENT DR. PLUM DR. CHERRY DR. CI RCLE DR. KENNEDY DR. FLAG MOUNTAI N DR. PASQUE DR. FLAG MOUNTAI N DRI VE COYOTE ST. ANTELOPE ST. YUCCA DR. TAYLOR BUFFALO ST. BAJA DR. SKYLI NE DR. BROADWAY AVE. AVE. BUCHANAN SPRUCE AVE. HEMLOCK AVE. AVE. PINE ST. AVE. FI R LAKEVI EW DR. JOHNSON PI ERCE CAPITOL BUSHFIELD DR. HERSETH DR. BULOW DR. NORBECK DR. DR. CASE ELIZABETH ST. GRANT IRWIN AVE. HAYES AVE. ST. ARTHUR ST. IRWIN ST. KAY ST. GREEN ST. CLEVELA ND AVE. ROOSEVELT AVE. BUCHANAN LI NCOLN AVE. GRANT AVE. AVE. HAYES PAWN AVE. PARK AVE. AVE. SULLY MEMORY LN. LN. REEN LAURELL PR I MROSE GARFI ELD AVE. ARTHUR AVE. AVE. ST. AVE. REEN ST. McKI NLEY TRUMAN AVE. CLEVELAND CLEVELAND AVE. LOWELL AV E. LANDFI LLRD. VISTA LOOP STATFORD PLACE BRI STOL PLACE ABBEY ROAD CAMDEN CT. 4TH ST. N. AI RPORT RD. AIRPORT RD. S. AI RPORT RD. NORTHSTAR AVE. POLARI S AVE. MERCURY ST. VENUS ST. ARI ES AVE. SANDWEDGE DRI VE JANE LN. FAI RWAY DR. UPS RD. 1804 83 14 34 14B L a F R A M B O I S E I S L AND DU M P RIVER CENTRE’ CONVENTION S.D. DISCOVERY STEAMBOAT PARK BOAT RAMP BALL FIELD JEFFERSON SCHOOL PARK POND BRANDTS HOUSE COURT FEDERAL BLDG. CI TY HALL STATE CAPI TOL ANDERSON BLDG. FOOTBALL J OE FOSS BLDG. HYDE STADI UM LAKE DOT BLDG. GOVERNOR’S FIELD BALL BLDG. KNEIP HILGER’S GULCH CENTER Mc KI NLEY SCHOOL SWI MMI NG ST. MARYS HOSPI TAL GRIFFIN PARK BALL FIELD PARK DEVINE SCHOOL TON WASHING- FIELD SHOP HIGHWAY STATE COMPLEX OAHE SOFTBALL COMPLEX OAHE SOFTBALL PIERRE HI L L SVI EWMUNI CI PAL ARMORY GUARD NATIONAL CEMETERY RIVERSIDE LANDFILL MUN I C I P A LA I RP O RT PIERRE PIERRE - FT. PIERRE BECKER/HANSON CALLAWAYCT. LANCASTER PL. LANCASTER LOOP BRI GHTON CT. A ST. PI PER ST. MAC SI OUX AVE. I NDUSTRI ALAVE. WOMENSPRI SON SOUTHDAKOTA POL I CE STATI ON LI NCOLN AVE. DRY CREEK ST. ABBEY RD. RIDGEWAY PL. KENNEDY LOOP 2014 MI DDLE GEORGI A MORSE SCHOOL SUNRI SEDR. GRANDVIEW ST. PLATEAU ST. TABLE ST. SAUNDERS AVE. SAUNDERS CT. RI VERPLACE DR. RI VER RI M DR. EASTGATE AVE. SOUTHGATE AVE. MICKELSON ST. MARS CENTER VI LLAGE DRI VE OAK ST. SHELIA DR. ARTHUR AVE. SANDSTONE PL. MACKAY BLDG. AVERA LEARNING CENTER NW 1/4 SW 1/4 SEC 36 T111N R79W Pierre Regional Airport State Hangar PROJECT SITE 24 1 9 33 32 36 3 35 36 2 3 1 9 20 29 30 2 20 29 28 2 22 27 28 22 23 26 27 23 24 25 26 30 25 25 30 3 36 26 25 36 35 27 26 35 34 28 27 34 33 29 28 6 2 34 35 33 34 3 4 32 5 4 2 1 1 1 2 3 2 1 1 1 0 SOUTH DAKOTA HUGHES - STANLEY COUNTY AC 6001(HNG) INDEX OF SHEETS Standard Plates State Hangar Repairs Access and Staging Locations Plan Notes Environmental Commitments Estimate of Quantities Layout Map & Index of Sheets 13 - 15 Sheets 7 - 12 Sheets 6 Sheet Sheets 4-5 3 Sheet 2 Sheet 1 Sheet STATE HANGAR PAVEMENT REPAIRS PIERRE REGIONAL AIRPORT PCN i4H5 PROJECT AC 6001(HNG)

Upload: phungque

Post on 07-Apr-2018

216 views

Category:

Documents


3 download

TRANSCRIPT

STATE

OF

SHEET

NO.

TOTAL

SHEETS

PROJECT

S.D.

N

PIERRE, SOUTH DAKOTA

GREGORY

MIX

CHARLES

BUFFALO

KINGSBURYBROOKINGS

JERAULD SANBORN MINER LAKE MOODY

MINNEHAHAMcCOOKHANSONDAVISON

AURORABRULE

DOUGLAS LINCOLNTURNERHUTCHINSON

BON

HOMME

YANKTONCLAY UNION

LAWRENCE

BUTTE

HARDINGPERKINS CORSON

MEADE

PENNINGTON

CUSTER

FALL RIVER

CAMPBELL McPHERSON BROWN MARSHALL ROBERTS

ZIEBACH DEWEY

WALWORTH

POTTER

SULLY

EDMUNDS

FAULK

HYDE HAND

SPINK

DAY

GRANT

CODINGTONCLARK

DEUEL

HAMLIN

BENNETT

JACKSON

HAAKON

STANLEY

TODD

MELLETTE

BEADLE

JONES

TRIPP

LYMAN

OGLALA LAKOTA

PROJECT

STORM WATER PERMIT

None Required

Department of Transportation

State of South Dakota

Plans Prepared By

151

SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION

AUGUST 2016

HUGHES

DM & E R.R.

DM

& E R.R.

DM & E R.R.

DM & E R.R.

DM

& E R.R.

DM & E R.R.

DM & E R.R.

DM

& E R.R.

DM & E R.R.

DM & E R.R.

DM

& E R.R.

DM & E R.R.

DM & E R.R.

DM

& E R.R.

DM & E R.R.

DM & E R.R.

DM

& E R.R.

DM & E R.R.

DM & E R.R.

DM

& E R.R.

DM & E R.R.

MISSOURI

MISSO

URI

MISSOURI

MISSO

URI

MISSOURI

MISSO

URI

MISSOURI

MISSO

URI

MISSOURI

MISSO

URI

LN.

ISLAND

CENTER

PARK

LABARGE

FIE

LD

CAPITOL

MANSION

RIGGS HIGH SCHOOL

PARK

CULTURAL

HERITAGE

POOL

BOATRAMP

BUCHANAN

SCHOOL

BALL

PLANT

TREATMENT

SEWAGE

INDIAN

GOLF COURSE

CITY

HEALTH

STATE

LAB

BLDG.

DEER PARK PL.

CR

ES

TE

D

AV

E.

PATRO

N PK

WY.

RIVER

RIV

ER

RIVER

RIV

ER

RIVER

RIV

ER

RIVER

RIV

ER

RIVER

RIV

ER

RIV

ERSID

E

DR.

RIVERVIEW DR.

COUNTY

DR.

EA

GL

E

DR.

HYDE DR.

LEE HILL RD.

NE

LT

OM

DR.

LA

KESID

E

LN.

RIV

ER

RD.

ED

GE

WA

TE

R

DR.

TERRI

LN.

LA

KE

WO

OD

DR.

WE

ST

WO

OD

DR.

CAPIT

OL

AVE.

BRID

GEVIE

W

AVE.

HATHA

WAY

AVE.

ELIZABETH

4TH ST.

PLACESIBERT

BRIDGEVIEW

ST.

CE

DA

R

PL

AC

E

MA

PL

EA

VE.

ME

LL

ET

TE

MA

PL

E

AV

E.

HA

RN

EY

CO

UR

T

WIL

LO

WA

VE.

LA

BA

RG

E

CO

UR

T

AV

E.

8TH ST.

7TH ST.7TH ST.

5TH ST.

6TH ST.

5TH ST.

4TH ST.

3RD ST.

2ND ST.

ST.

SENECA ST.

OAK ST.

OAK ST.

WYNOKA ST.

PO

PL

AR

AV

E.

AV

E.

ONIE

DA

AV

E.

AV

E.

AV

E.

AV

E.

CE

NT

RA

L

HU

RO

N

GR

AN

D

EU

CLID

AV

E.

ONIE

DA

AV

E.

HIG

HL

AN

D

EV

AN

SA

VE.

AS

H ST.

MAPLE

AVE.

WIL

LO

W

AVE.

POPLAR

AVE.

ONIE

DA

AVE.

YA

NKT

ON

AVE.

PROSPECT

AVE.

CAPIT

OL

AVE.

SE

BR

EE

PL.

AVE.

CENTR

AL

HUR

ON

AVE.

AVE.

PLEASANT

EUCLID

AVE.

AVE.

NIC

OLLET

AVE.

ANTON

MA

RY

LN.

BROAD

WAY

AVE.

JA

MES

ST.

CHARLES

ST.

POPLAR

AVE.

ROBERTS

ST.

HENR

Y

ST.

SIO

UX

DAKOTA

MIS

SOURI

FO

RT

ST.

PIE

RRE

ST.

COTEA

U

ST.

HIG

HLA

ND

CH

APELLE

ST.

AVE.

AVE.

AVE.

PA

WNEE

ST.

ST.

ST.

ST.B

RULE

REE

CRO

W LN.

CO

UR

T

PL

AC

E

GO

VE

RN

OR’S

DR.

CAPITOL HILL

DR.

CHURCH

SUMMIT

ROBINSON

BROADWAY

CABOT

AV

E.

AV

E.

CAPITOL MA

DIS

ON

WA

SHIN

GT

ON

AD

AM

S

JEFF

ER

SO

N

ERSKINE

FRANKLIN

WELLS

AVE.

SIOUX

DAKOTA

WA

SHIN

GT

ON

AV

E.

AD

AM

SA

VE.

JEFF

ER

SO

N

AV

E.

PARK

MARINAST.

MA

DIS

ON

AV

E.

MO

NR

OE

AV

E.

ST.

MA

DIS

ON

AV

E.

MO

NR

OE

AV

E.

ST.

ST.

SUNSET

DR.

ST.

AV

E.

AV

E.

AV

E.

AV

E.

AV

E.

AV

E.

AVE.

ST.

MO

NR

OE

HA

RRIS

ON

VA

N

BU

RE

N

ST.

ST.JA

CKS

ON

JA

CKS

ON

AV

E.

AV

E.

AV

E.

HA

RRIS

ON

VA

N

BU

RE

N

BLUEBELL

DR.

IRIS

CT.

HILLTOP DR.

TY

LE

R

AV

E.

AV

E.

TY

LE

R

PO

LK

AV

E.

HUM BOLDT

TA

YL

OR

AV

E.

WELLS

AVE.

AVE.

DAKOTA

AVE.

TY

LE

RA

VE.

PO

LK

AV

E.

TA

YL

OR

AV

E.

FIL

MO

RE

AV

E.

AV

E.

PIE

RC

E

AV

E.

FIL

MO

RE

AV

E.

AV

E.

AV

E.

PIE

RC

E

BU

CH

AN

AN

ST.

LIN

CO

LN

AV

E.

HIL

GE

R’S

DR.

HERITAGE

DR.

CA

MBRID

GE

DR.

WOODRIDGEDR.

WINCHESTER DR.

HAMPTON DR.

PL

C.

PR

ES

TO

N

MA

NC

HES

TE

R

DR.

HARRISON

AVE.

CU

RR

EN

T

DR.

PL

UM

DR.

CHE

RR

Y

DR.

CIRCLE

DR.

KENNEDY DR.

FLAG

MOUNTAIN

DR.

PA

SQ

UE

DR.

FL

AG

MO

UN

TAIN

DRIV

E

COYOTE ST.

ANTELOPE ST.

YU

CC

A

DR.

TA

YL

OR

BUFFALO ST.

BAJ

A

DR.

SK

YLIN

E

DR.

BROADWAY

AVE.

AV

E.

BU

CH

AN

AN

SPRUCE

AVE.

HE

ML

OC

K

AV

E.

AV

E.

PINE ST.

AVE.

FIR

LAKEVIEW

DR.

JO

HN

SO

N

PIE

RC

E

CAPITOL

BUSHFIELD

DR.

HE

RS

ET

H

DR.

BU

LO

WD

R.

NO

RB

EC

KD

R.

DR.

CA

SE

ELIZABETH ST.

GR

AN

T

IRWIN

AV

E.

HA

YES

AV

E.

ST.

AR

TH

UR

ST.

IRWIN ST.

KAY ST.

GREEN ST.

CL

EV

EL

A

ND

AV

E.

RO

OS

EV

EL

TA

VE.

BU

CH

AN

AN

LIN

CO

LN

AV

E.

GR

AN

T

AV

E.

AV

E.

HA

YES

PAWN

AVE.

PARK AVE.

AVE.SULLY

MEMORY

LN.L

N.

REEN

LA

UR

EL

L PR I

MR

OS

E

GA

RFIE

LD

AV

E.

AR

TH

UR

AV

E.

AV

E.

ST.

AV

E.

REEN ST.

Mc

KIN

LE

Y

TR

UM

AN

AV

E.

CL

EV

EL

AN

D

CLEVELAND

AVE.

LO

WE

LL

AV

E.

LANDFILL RD.

VISTA LOOP

STATFORD PLACE

BRIS

TO

LP

LA

CE

AB

BE

Y

RO

AD

CA

MD

EN

CT.

4TH ST.

N.

AIR

PO

RT

RD.

AIRPORT RD.

S.

AIR

PORT

RD.

NO

RT

HS

TA

R

AV

E.

PO

LA

RIS

AV

E.

MERCURY ST.

VENUS ST.

ARIES

AV

E.

SANDWEDGE

DRIV

E

JANE LN.

FAIR

WA

YD

R.

UP

SR

D.

1804

83

14

34

14B

LaFRAMBOISE ISLANDDUMP

RIVER

CENTRE’

CONVENTION

S.D.

DISCOVERY

STE

AMBOAT PAR

K

BOAT

RAMP

BALL FIELD

JEFFERSON

SCHOOL

PARK

POND

BRANDTS

HOU

SE

COURT

FE

DE

RAL

BLD

G.

CITYH

ALL

STAT

ECAP

ITOL

ANDERSON

BLD

G.

FOOT

BALL

JOE F

OSS

BLD

G.

HYD

ESTADIU

M

LAKE

DOT

BLD

G.

GOVERNOR’S

FIELD

BALL

BLDG.

KNEIP

HILGER’S GULCH

CENTER

McKINLEYSCHOOL

SWIMMING

ST. MARY’SHOSPITAL

GRIFFIN

PARK

BALL

FIELD

PARK

DEVINE

SCHOOL

TON

WASHING-FIELD

SHOP

HIGHWAY

STATE

COMPLEX

OAHE SOFTBALL

COMPLEX

OAHE SOFTBALL

PIERRE

HILLSVIEW MUNICIPAL

ARMORY

GUARD

NATIONAL

CEMETERY

RIVERSIDE

LANDFILL

MUNICIPAL AIRPORT

PIERRE

PIERRE - FT. PIERRE

BECK

ER/H

ANSON

CALLAWAY CT.

LANCASTER

PL.

LANCASTER

LOOP

BRIG

HT

ON

CT.

A ST.

PIP

ER

ST.

MA

C

SIOUX

AVE.

INDUSTRIAL AVE.

WOMEN’S PRISON

SOUTH DAKOTA

POLICE STATION

LIN

CO

LN

AV

E.

DRY CREEK ST.

AB

BE

Y

RD.

RIDGEWAY PL.

KE

NN

ED

Y

LO

OP

2014

MID

DLE

GEOR

GIA

MOR

SES

CHOOL

SUNRISE D

R.

GRANDVIEW ST.

PLATEAU

ST.

TA

BL

E S

T.

SA

UN

DE

RS

AV

E.

SAUNDERS CT.

RIV

ER

PL

AC

E

DR.

RIV

ER

RI

M

DR.

EA

ST

GA

TE

AV

E.

SOUTHGATE

AVE.

MICKELSON

ST.MARS

CENTER

VIL

LA

GE

DRIV

E

OAK ST.

SHELIA

DR.

AR

TH

UR

AV

E.

SANDSTONE PL.

MACKAY

BLDG.

AVERA

LEARNING

CENTER

NW 1/4 SW 1/4 SEC 36 T111N R79W

Pierre Regional Airport

State Hangar

PROJECT SITE

24 1 9

3332

36 3

35 3623

1 9 20

2930220

29 282 22

272822 23

2627

23 24

2526

3025

25 30

336

26 25

3635

27 26

3534

28 27

3433

29 28

6

2

34 35

33 34

34

32

5 4

2

1 1 1 2

3 2

1 11 0

SOUTH DAKOTA

HUGHES - STANLEY COUNTY

AC 6001(HNG)

INDEX OF SHEETS

Standard Plates

State Hangar Repairs

Access and Staging Locations

Plan Notes

Environmental Commitments

Estimate of Quantities

Layout Map & Index of Sheets

13 - 15Sheets

7 - 12Sheets

6Sheet

Sheets 4-5

3 Sheet

2Sheet

1Sheet

STATE HANGAR PAVEMENT REPAIRS

PIERRE REGIONAL AIRPORT

PCN i4H5

PROJECT AC 6001(HNG)

ESTIMATE OF QUANTITIES

PROJECT STATE OF

S.D. AC 6001(HNG)

SHEET NO.

2 15

TOTAL SHEETS

SPECIFICATIONS Standard Specifications for Roads and Bridges, 2015 Edition and Required Provisions, Supplemental Specifications, and Special Provisions as included in the Proposal.

PROJECT STATE OF

S.D. AC 6001(HNG)

SHEET NO.

3 15

TOTAL SHEETS

ENVIRONMENTAL COMMITMENTS An Environmental Commitment is a measure that SDDOT commits to implement in order to avoid, minimize, and/or mitigate a real or potential environmental impact. Environmental commitments to various agencies and the public have been made to secure approval of this project. An agency mentioned below with permitting authority can influence a project if perceived environmental impacts have not been adequately addressed. Unless otherwise designated, the Contractor’s primary contact regarding matters associated with these commitments will be the Project Engineer. These environmental commitments are not subject to change without prior written approval from the SDDOT Environmental Office. The environmental commitments associated with this project are as follows: COMMITMENT B: FEDERALLY THREATENED, ENDANGERED, AND PROTECTED SPECIES COMMITMENT B2: WHOOPING CRANE The Whooping Crane is a spring and fall migratory bird in South Dakota that is about 5 feet tall and typically stops on wetlands, rivers, and agricultural lands along their migration route. An adult Whooping Crane is white with a red crown and a long, dark, pointed bill. Immature Whooping Cranes are cinnamon brown. While in flight, their long necks are kept straight and their long dark legs trail behind. Adult Whooping Cranes' black wing tips are visible during flight. Action Taken/Required: Harassment or other measures to cause the Whooping Crane to leave the site is a violation of the Endangered Species Act. If a Whooping Crane is sighted roosting in the vicinity of the project, borrow pit, or staging site associated with the project, cease construction activities in the affected area until the Whooping Crane departs and contact the Project Engineer. The Project Engineer will contact the Environmental Office so that the sighting can be reported to USFWS. COMMITMENT C: WATER SOURCE The Contractor shall not withdraw water with equipment previously used outside the State of South Dakota without prior approval from the SDDOT Environmental Office. Thoroughly wash all construction equipment before entering South Dakota to reduce the risk of invasive species introduction into the project vicinity. Action Taken/Required: The Contractor shall obtain the necessary permits from the regulatory agencies such as the Department of Environment and Natural Resources (DENR) and the United States Army Corps of Engineers (COE) prior to executing water extraction activities. COMMITMENT E: STORM WATER Construction activities constitute less than 1 acre of disturbance.

Action Taken/Required: At a minimum and regardless of project size, appropriate erosion and sediment control measures must be installed to control the discharge of pollutants from the construction site. COMMITMENT H: WASTE DISPOSAL SITE The Contractor shall furnish a site(s) for the disposal of construction and/or demolition debris generated by this project. Action Taken/Required: Construction and/or demolition debris may not be disposed of within the Public ROW. The waste disposal site(s) shall be managed and reclaimed in accordance with the following from the General Permit for Construction/Demolition Debris Disposal Under the South Dakota Waste Management Program issued by the Department of Environment and Natural Resources. The waste disposal site(s) shall not be located in a wetland, within 200 feet of surface water, or in an area that adversely affects wildlife, recreation, aesthetic value of an area, or any threatened or endangered species, as approved by the Project Engineer. If the waste disposal site(s) is located such that it is within view of any ROW, the following additional requirements shall apply: 1. Construction and/or demolition debris consisting of concrete, asphalt concrete, or other similar materials shall be buried in a trench completely separate from wood debris. The final cover over the construction and/or demolition debris shall consist of a minimum of 1 foot of soil capable of supporting vegetation. Waste disposal sites provided outside of the Public ROW shall be seeded in accordance with Natural Resources Conservation Service recommendations. The seeding recommendations may be obtained through the appropriate County NRCS Office. The Contractor shall control the access to waste disposal sites not within the Public ROW through the use of fences, gates, and placement of a sign or signs at the entrance to the site stating “No Dumping Allowed”. 2. Concrete and asphalt concrete debris may be stockpiled within view of the ROW for a period of time not to exceed the duration of the project. Prior to project completion, the waste shall be removed from view of the ROW or buried and the waste disposal site reclaimed as noted above. The above requirements will not apply to waste disposal sites that are covered by an individual solid waste permit as specified in SDCL 34A-6-58, SDCL 34A-6-1.13, and ARSD 74:27:10:06. Failure to comply with the requirements stated above may result in civil penalties in accordance with South Dakota Solid Waste Law, SDCL 34A-6-1.31. All costs associated with furnishing waste disposal site(s), disposing of waste, maintaining control of access (fence, gates, and signs), and reclamation of the waste disposal site(s) shall be incidental to the various contract items.

COMMITMENT I: HISTORICAL PRESERVATION OFFICE CLEARANCES The SDDOT has obtained concurrence with the State Historical Preservation Office (SHPO or THPO) for all work included within the project limits and all department designated sources and designated option material sources, stockpile sites, storage areas, and waste sites provided within the plans. Action Taken/Required: All earth disturbing activities not designated within the plans require review of cultural resources impacts. This work includes, but is not limited to: Contractor furnished material sources, material processing sites, stockpile sites, storage areas, plant sites, and waste areas. The Contractor shall arrange and pay for a cultural resource survey and/or records search. The Contractor has the option to contact the state Archaeological Research Center (ARC) at 605-394-1936 or another qualified archaeologist, to obtain either a records search or a cultural resources survey. A record search might be sufficient for review; however, a cultural resources survey may need to be conducted by a qualified archaeologist. The Contractor shall provide ARC with the following: a topographical map or aerial view on which the site is clearly outlined, site dimensions, project number, and PCN. If applicable, provide evidence that the site has been previously disturbed by farming, mining, or construction activities with a landowner statement that artifacts have not been found on the site. The Contractor shall submit the records search or cultural resources survey report and if the location of the site is within the current geographical or historic boundaries of any South Dakota reservation to SDDOT Environmental Engineer, 700 East Broadway Avenue, Pierre, SD 57501-2586 (605-773-3180). SDDOT will submit the information to the appropriate SHPO/THPO. Allow 30 Days from the date this information is submitted to the Environmental Engineer for SHPO/THPO review. If evidence for cultural resources is uncovered during project construction activities, then such activities shall cease and the Project Engineer shall be immediately notified. The Project Engineer will contact the SDDOT Environmental Engineer in order to determine an appropriate course of action. SHPO/THPO review does not relieve the Contractor of the responsibility for obtaining any additional permits and clearances for Contractor furnished material sources, material processing sites, stockpile sites, storage areas, plant sites, and waste areas that affect wetlands, threatened and endangered species, or waterways. The Contractor shall provide the required permits and clearances to the Project Engineer at the preconstruction meeting.

PROJECT STATE OF

S.D. AC 6001(HNG)

SHEET NO.

4 15

TOTAL SHEETS

SCOPE OF WORK The work required for this project includes, but is not limited to, the following items, not listed in order of execution. 1. Remove Existing Concrete/Asphalt Pavement 2. Unclassified Excavation for Digouts & Backfill Operations 3. Base Course Placement Operations 4. Remove and Reset Aluminum Post 5. Asphalt Concrete Paving Operations 6. Install Dowel Bars 7. 6” Reinforced PCC Driveway Paving Operations 8. Type A Joint and Spall Repairs 9. Cleaning and Re-Sealing of Apron Joint to State Hangar 10. Cleanout Slotted Drain 11. Move Rain Downspout Gutter The Contractor is encouraged to inspect the project site prior to bidding to evaluate the extent of work that will be required for construction. SEQUENCE OF OPERATIONS The Contractor shall submit a proposed sequence of operations for the Engineer’s review and approval at least two weeks prior to the preconstruction meeting. Once work starts to inconvenience the state hanger, work shall be pursued in a near continuous, expeditious manner to its completion. Any work that restricts the employees of the state hanger from accessing, storing, or causes a potentially unsafe condition due to Contractor operations such as frequent movement of equipment or materials on or through the project, is considered to be an inconvenience to the airport. The Contractor will not be allowed to store equipment within the working area. Two areas have been designated as storage areas determined by airport personnel. These two staging areas can be seen on the plan sheet “Access and Staging Locations”. The Contractor shall notify the airport two weeks prior to work beginning so airport personnel can arrange and make available FHWA and FAA approved barrier to be installed 25’ away from the existing slotted drain. The Contractor will install the barrier with an airport employee. Also the Contractor shall notify airport personnel (Michael Isaacs at 605-773-7447) 48 hours in advance so the airport can issue a “Notice to Airman” warning. Once equipment is through the gate, the Contractor shall make sure the gate closes behind them and remains closed. At no time shall the Contractor be allowed to leave the gate open for extended periods of time. Work areas need to be kept clean and no trash shall be allowed to blow beyond the work area. In the event debris/trash gets onto the runway, the Contractor shall immediately contact airport personnel (Cory Hoffrogge 605-773-7447 or 605-280-4416) so they are able to remove the debris/trash.

UTILITIES The Contractor shall contact the involved utility companies through South Dakota One Call (1-800-781-7474) prior to starting work. It shall be the responsibility of the Contractor to coordinate work with the utility owners to avoid damage to existing facilities. Utilities are not planned to be affected on this project. If utilities are identified near the improvement area through the SD One Call Process as required by South Dakota Codified Law 49 7A and Administrative Rule Article 20:25, the Contractor shall contact the Engineer to determine modifications that will be necessary to avoid utility impacts. WATER FOR GRANULAR MATERIAL The moisture content for compaction of the Base Course material shall be approximately optimum moisture for the material or as directed by the Engineer. All costs for furnishing and placing the water shall be incidental to the contract unit price per ton for the corresponding Base Course material. EXCAVATION OF UNSTABLE MATERIAL The locations and extent of digout areas will be determined in the field by the Engineer. The backfilling material for the digouts shall be Base Course paid for at the contract unit price per ton. Included in the Estimate of Quantities are 10 cubic yards of Unclassified Excavation – Digouts for the removal of unstable material throughout the project. UNCLASSIFED EXCAVATION Unclassified Excavation will occur throughout the Remove Pavement areas as detailed in the plans. For Information only, a table has been provided to show estimated removal from the project. Unclassified Excavation material shall become the property of the Contractor for their disposal.

Table of Unclassified Excavation

Item Quantity (CuYd)

Pavement & Granular Base Material 100 Total Unclassified Excavation 100

BASE COURSE Base Course shall be utilized for 6” Reinforced PCC Driveway Pavement reconstruction, formwork reconstruction, and digout areas as detailed in the plans. 6” Reinforced PCC Driveway Pavement reconstruction, formwork reconstruction, and digout areas of excess moisture shall be dried, loose material shall be removed, and disturbed areas shall be leveled and compacted to the satisfaction of the Engineer prior to placing Base Course. Compaction shall be to the satisfaction of the Engineer. 19 tons of base course material has been included for backfilling Digouts and 14 tons of base course material has been include for backfilling formwork

reconstruction. All costs associated with the aforementioned work shall be incidental to the contract unit price per ton for “Base Course”. INCIDENTAL WORK Three objectives shall be completed under this bid item. First, the Contractor will be required to remove all debris from the existing slotted drain. Second, the Contractor will be required to move an existing rain downspout located on the Northeast corner of the building. The new downspout shall be routed to the south of the existing door. It is estimated that 2-B Style Elbows and a 20’ of aluminum downspout will be required to perform the work. If the existing aluminum downspout is not damaged when performing the cuts, the Contractor shall be allowed to use the salvaged material. A detail of the downspout work can be seen in this set of plans. Third, the Contractor will be required to remove and reset the aluminum pole that is located in the Northwest corner of the hanger. The Contractor shall make sure that the gate closes properly. All work to complete the debris removal from the slotted drain and re-routing the downspout shall be incidental to the contract lump sum price for “Incidental Work”. PCC PAVEMENT REPAIR - GENERAL Locations and size (length or width) of concrete repair areas are subject to change in the field, at the discretion of the Engineer, at no additional cost to the state. Payment will be based on actual area replaced. Existing concrete pavement shall be sawed full depth at the beginning and end of the repair areas. When either the beginning or end of a repair area falls close to an existing joint or crack, the repair area shall be extended to eliminate the existing joint or crack. Saw cuts for repairs will be allowed 18” beyond the final PCCP limits and full depth to allow for formwork. Once the 6” Reinforced PCC Driveway Pavement has been placed, the formwork shall be removed and 12” of Base Course, 8” (2-3” and 1-2”) Asphalt Concrete Composite shall be placed. If saw cuts extend beyond the formwork, the cuts filled with a non-shrinkage mortar mix at the Contractor’s expense. Any existing dowel bar assemblies/steel bars shall be sawed off and removed. Existing asphalt concrete (AC) pavement and PCCP shown in the plans for removal shall be removed by the lift out method or by means that minimize damage to the existing building foundation, existing slotted drain, and base and sides of remaining in place concrete. All removed material shall become the Contractor’s property and shall be removed from within the airport property by the end of the workday. Damage to the existing building, existing slotted drain, and adjacent concrete caused by the Contractor’s operations shall be removed and replaced at the Contractor’s expense. Compact of the subgrade shall be to the satisfaction of the Engineer. The Contractor will then place 5” Base Course in all concrete repair areas. AC and PCCP pavement removal, including saw cuts, sawing and removing existing steel bars, excavation to grade for Base Course, scarifying and compacting subgrade shall be incidental to the contract lump sum price for “Unclassified Excavation”. Asphalt concrete adjacent to concrete pavement replacements will be repaired by the Contractor with new Asphalt Concrete Composite.

PROJECT STATE OF

S.D. AC 6001(HNG)

SHEET NO.

5 15

TOTAL SHEETS

6” REINFORCED PCC DRIVEWAY PAVEMENT The aggregate may require screening as determined by the Engineer. The concrete used in the Portland Cement Concrete Pavement shall conform to section 462 Class M, and shall contain ledge rock as coarse aggregate. The surface of the concrete shall be a carpet drag finish. The Contractor shall place the #4 rebar mid-depth of 6” Reinforced PCC Driveway Pavement slabs. To accomplish this, the Contractor may need to use chairs. Contraction joints in the 6” Reinforced PCC Driveway Pavement shall be 1½ inches deep if formed in the fresh concrete using a suitable grooving tool. If a saw is used to cut the contraction joints, then the depth of the joint shall be at least ¼ the thickness of the approach pavement. All costs for furnishing and placing the 6” Reinforced PCC Driveway Pavement and constructing the expansion and contraction joints including labor, equipment and materials shall be incidental to the contract unit price per square yard for “6” Reinforced PCC Driveway Pavement” accordingly. All costs for furnishing and placing the granular material shall be incidental to the contract unit price per ton for “Base Course”. SAW AND SEAL JOINTS All longitudinal and transverse joints shall be sawed and sealed. Longitudinal and transverse joints in the 6” Reinforced PCC Driveway Pavement area shall be sealed with Hot Poured Elastic Joint Sealer. Joint sealing shall conform to Section 380.3 P. The existing open joint between the existing building floor slab and the existing building approach slab on the north side of the building shall be cleaned full depth, saw a ¼” wide by 1’ deep where the slabs are tight. The gap shall then be filled with Hour Pour Elastic Joint Sealer to flush along the entire hangar apron. Expansion joint material shall be used between the existing building foundation and the new concrete, and between the existing building approach slabs and the new concrete/spall repairs areas. These joints shall be sealed with Low Modulus Silicone Joint Sealant. Acceptance of the Low Modulus Silicone Sealant and Hot Poured Elastic Joint Sealer will be based on visual inspection by the Engineer. Only use Cost for sawing joints, expansion joint material, Hot Poured Elastic Joint Sealer, Low Modulus Silicone Sealant, and sealing of all longitudinal and transverse joints shall be incidental to the contract unit price per square yard for “6” Reinforced PCC Driveway Pavement”. Cost for sawing joints, expansion joint material, Hot Poured Elastic Joint Sealer, and sealing of joint located between the hangar and apron shall be incidental to the contract unit price per foot for “Reseal PCC Pavement Joint – Hot Pour”. TYPE A JOINT AND SPALL REPAIR Do not do B Spalls Concrete Patch Material shall Type III conforming to Section 390.2 B.3.

If strength requirement has not been met by 36 hours after placement, the patches shall be removed and replaced at no cost to the State. The Engineer will determine the locations and limits for Type A Spall Repair on construction. Spalls which are repaired according to plans and specifications and exhibit partial respalling or cracking, shall be repaired to the satisfaction of the Engineer at no additional cost to the State. STEEL BAR INSERTION Steel bars shall conform to Section 1010. Locations and quantities of concrete repair are subject to change in the field at the discretion of the Engineer. The Contractor will be responsible for ordering the actual quantity of steel bars necessary to complete the work. The Contractor shall insert the steel bars (1" x 18" epoxy coated plain round dowel bars and ½” x 18” epoxy coated plain round dowel bars at the locations shown in the plans) into drilled holes in the existing concrete pavement. An epoxy resin adhesive must be used to anchor the steel bar in the drilled hole. Steel bars shall be inserted in the joints on 24" centers as shown in the plans. The first steel bar in the joint shall be placed at a distance ½ of the remaining distance from the layout of 5 bars spaced at 24”. It will be necessary to laterally adjust the location of some of the inserted steel bars when the dimensions above interfere with existing steel bar locations. A rigid frame or mechanical device will be required to guide the drill to ensure proper horizontal and vertical alignment of the steel bars in the drilled holes. Epoxy resin adhesive shall be of the type intended for horizontal applications, and shall conform to section 380.2 L. Epoxy coated plain round steel bars shall be inserted on 12 inch centers in the transverse joint. The first steel bar shall be placed a minimum of 3 inches and a maximum of 6 inches from the outside edge of the slab. TABLE OF STEEL BAR INSERTION

LOCATION QUANTITY OF BARS 1/2” 1” Insert Steel Bar -- 10 Dowel Bars 5 10

Totals: 5 20

STATE

OF

SHEET

NO.

TOTAL

SHEETS

PROJECT

N

ACCESS AND STAGING LOCATIONS

Staging Areas (All Equipment shall be stored in these areas prior to leaving work site)

AIRPORT PERSONNEL ONLY

Beyond this point

Access Location (Key Card)

Access Location (Key)

Barrier Install Line

No equipment beyond this point

25 F

EET

AC 6001(HNG)6 15S.D.

STATE HANGAR REPAIRS 08/25/2016Plotting Date:

trpr25584

1:30

1

Plotted

Fro

m -

Plot

Scale -

File - ...\

State

Hanger\

Design.dgn

Plot

Na

me -

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

STATE PLANE HANGAR DOOR

STATE PLANE HANGAR DOOR

PARKING LOT

THIS SET OF PLANSREPAIR AS DETAILED IN TYPE A JOINT & SPALL

TO AIR

PO

RT

RO

AD

EXISTING MANHOLE

EXISTING CHAINLINK FENCE

EXISTING CHAINLINK FENCE

AS DETAILED IN THIS SET OF PLANSSTATE FORCES TO REPAIR HEAVED AREAS

AS DETAILED IN THIS SET OF PLANSPLACE NEW 6" REINFORCED PCC DRIVEWAY PAVEMENTREMOVE EXISTING PAVEMENT AND

ACCESS LOCATION (KEY)

AC 6001(HNG) 7 15

REMOVE EXISTING CONCRETE LANDING

’22.0

0

BEGIN SAWCUT AT CORNER OF BUILDING

18"

SAWCUT

EXISTING OVERHEAD DOOR

EXISTING PCC DRIVEWAY

EXISTING MAIN DOOR

BUILDING EXTERIOR WALL

HANGAR DOOR

EXISTING BUILDING APPROACH SLAB

CONCRETE AT EXISTING JOINT

BEGIN REMOVE AND REPLACE

HANGAR SLAB REPAIR PLANSEE SLOTTED DRAIN AND TYPE A JOINT AND SPALL REPAIR

’11.5

4

Legend

EXIS

TIN

G S

LO

TT

ED D

RAIN

’7.5

0

’24.92

SAWCUT

STATE HANGAR REPAIRS08/25/2016Plotting Date:

trpr25584

1:8.38442

2

Plotted

Fro

m -

Plot

Scale -

File - ...\

State

Hanger\

Design.dgn

Plot

Na

me -

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

DEMOLITION PLAN

PCCP AND AC REMOVAL

WORKNO

FINAL LIMITS OF 6" REINFORCED PCC DRIVEWAY PAVEMENT

ALLOWANCE FOR FORMWORK

BY STATE FORCES)

(WORK DONE

REPAIR PLAN SHEET

SEE ASPHALT CONCRETE

8 15AC 6001(HNG)

END SAW CUT

(ESTIMATED 20 TOTAL)1" SMOOTH DOWELS 18" LENGTH 24" O.C.

EXISTING BUILDING APPROACH SLAB

EXISTING BUILDING FLOOR SLAB

HANGAR DOOR

BUILDING EXTERIOR WALL

(ESTIMATED 5 TOTAL)1/2" SMOOTH DOWELS 18" LENGTH 24" O.C.

OVERHEAD DOOR

HANGAR SLAB REPAIR PLAN

SEE SLOTTED DRAIN AND

TYPE A JOINT AND SPALL REPAIR

Legend

2% S

LO

PE

1% SLOPE

0.4% SLOPE

ELEV. 1716.95MATCH EXITING

ELEV. 1716.90MATCH EXISTING

ELEV. 1716.47

MATCH EXISTING ELEV. 1716.59

MATCH EXISTING

ELEV. 1716.70

MATCH EXISTING

ELEV 1716.85

MATCH EXISTING

ELEV. 1716.81

MATCH EXISTING

ELEV. 1716.84

MATCH EXISTING

ELEV. 1717.12

MATCH EXISTING

ELEV. 1716.95

MATCH EXISTING

SAWCUT JOINT

SAWCUT JOINT

’ ’ ’ ’ ’ ’ ’ ’ ’11.00 11.00 11.00 11.00 11.00 11.00 11.00 12.45 12.45’7.15

EXIS

TIN

G S

LO

TT

ED D

RAIN

’32.64

MATERIALJOINT1" EXPANSION

’32.65 ’29.50

FORMED JOINTSAWCUT OR

11.0

011.0

0’

’6.0

0

’4.00

1" SMOOTH DOWELS

’1.50

’1.5

0

1" SMOOTH DOWELS

(12" Base Course & 8" (2 -3" Lifts & 1-2" Lift) of Asphalt Concrete Composite)18" Width Allowance for Formwork

BUILDING FOUNDATIONINSERTED INTO THE1/2" SMOOTH DOWELS

STATE HANGAR REPAIRS08/25/2016Plotting Date:

trpr25584

1:8.38442

3

Plotted

Fro

m -

Plot

Scale -

File - ...\

State

Hanger\

Design.dgn

Plot

Na

me -

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

6" CONCRETE/ASPHALT CONCRETE REPAIR PLAN

AC 6001(HNG) 9 15

#4 REBAR 2’ O.C. BOTH WAYS (REBAR SHALL BE PLACED MID DEPTH OF NEW SLAB)

6" REINFORCED PCC DRIVEWAY PAVEMENTBUILDING FOUNDATION AND NEW FULL LENGTH BETWEEN EXISTING 1/2" EXPANSION JOINT MATERIAL

BE TO THE TOP OF CASTING

DRAIN. CONCRETE DEPTH SHALL

REPLACE EXISTING SLOTTED

HANGAR DOOR

BUILDING EXTERIOR WALL

EXISTING SLOTTED DRAIN

HANGAR SLAB REPAIR PLANSLOTTED DRAIN AND

’6.00

’4.0

0

EXISTING BUILDING FLOOR SLAB

EXISTING BUILDING APPROACH SLAB

EXISTING JOINT WIDTH 1 1/2" EXISTING JOINT WIDTH 3/4"

BUILDING EXTERIOR WALL

STATE HANGAR REPAIRS08/25/2016Plotting Date:

trpr25584

1:8.38442

4

Plotted

Fro

m -

Plot

Scale -

File - ...\

State

Hanger\

Design.dgn

Plot

Na

me -

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

AS DIRECTED BY THE ENGINEERTYPE A JOINT AND SPALL REPAIR

SAWCUT

Legend

AS DIRECTED BY THE ENGINEER

TYPE A JOINT AND SPALL REPAIR

AS DIRECTED BY THE ENGINEERTYPE A JOINT AND SPALL REPAIR

’â��

AND EXISTING APPROACH SLAB WITH HOT POUR JOINT SEALANT.

�SEAL EXISTING OPEN JOINT BETWEEN EXISTING FLOOR

’18.00*

POUR JOINT SEALANT.

SLAB. SEAL JOINT WITH HOT

SLAB AND EXISTING APPROACH

BETWEEN EXISTING FLOOR

*SAWCUT 1/2" RELIEF JOINT

(NO WORK)

EXISTING ASPHALT

ACCESS LOCATION (KEY)

PLACE 2-3" & 1-2" LIFTS OF ASPHALT CONCRETE COMPOSITEPLACE 12" BASE COURSE

REMOVE & RESET ALUMINUM POSTREMOVE PCCP

SEE CONCRETE/ASPHALT REPAIR PLAN

1510AC 6001(HNG)

SEALED OVER WITH A SILICONE JOINT1/2" EXPANSION JOINT THAT IS

(WORK DONE BY STATE FORCES)

REPAIR PLAN SHEET

SEE ASPHALT CONCRETE

NEW SLOTTED DRAIN

NEW SLOTTED DRAIN

’50.00

’54.00

’71.46

A

A

SECTION A - A

SAWCUTSAWCUT

EXCAVATION LIMIT VARIES

12" BASE (MIN.)

8" APHALT CONCRETE COMPOSITE

STATE HANGAR REPAIRS08/25/2016Plotting Date:

trpr25584

1:8.38442

5

Plotted

Fro

m -

Plot

Scale -

File - ...\

State

Hanger\

Design.dgn

Plot

Na

me -

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

SAWCUT

CENTER OF SLOTTED DRAIN

Legend

A

A

ASPHALT CONCRETE REPAIR PLAN PERFORMED BY SDDOT

DEPTH VAIRIESEXISTING ASPHALT CONCRETE & PCCP SURFACING

SEE CONCRETE/ASPHALT CONCRETE REPAIR PLAN SHEET

PCCP AND ASPHALT CONCRETE REMOVAL

(FOR INFORMATION ONLY)

1511AC 6001(HNG)

5. RESURFACE WITH 2 - 3" LOWER LIFTS AND A TOP LIFT OF 2" OF ASPHALT CONCRETE COMPOSITE.

CONCRETE SURFACING TO MATCH THE EXISTING SURFACE.

4. BACKFILL THE REPAIR AREA WITH A MINIMUM OF 12" COMPACTED BASE COURSE TO THE DEPTH REQUIRED FOR ASPHALT

EXCAVATATION LIMITS WILL BE AS DIRECTED BY THE ENGINEER TO OBTAIN A LEVEL, STABLE, FIRM SURFACE.

3. EXCAVATE THE REPAIR AREA TO MINIMUM DEPTH OF 20" BELOW THE SURROUNDING SURFACE.

2. PCCP AND AC REMOVAL LOCATIONS ARE APPROXIMATE, ACTUAL LIMITS WILL BE AS DIRECTED BY THE ENGINEER.

1. ALL WORK DETAILED ON THIS PAGE SHALL BE PERFORMED BY STATE FORCES.

NOTES:

’10.0

0

’10.0

0

STATE HANGAR REPAIRS08/25/2016Plotting Date:

trpr25584

1:8.38442

6

Plotted

Fro

m -

Plot

Scale -

File - ...\

State

Hanger\

Design.dgn

Plot

Na

me -

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

Existing Downspout

Existing Downspout

B-Style Elbow

’13.0

Existing Garage Door

Existing Garage Door

ADJUSTMENT OF RAIN DOWNSPOUT ON NE CORNER OF BUILDING

AC 6001(HNG) 1512

Existing 4"x3" Downspout

Existing 4"x3" Downspout

Electrical Box

’13.0

’7.2

WindowWindowWindow

Window Window Window

Electrical Box

ElbowB-Style

Existing Flood Light Bracket

Existing Flood Light Bracket

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

AC 6001(HNG)

08/25/2016Plotting Date:

trpr25584

1:200

1

Plotted

Fro

m -

Plot

Scale -

File - ...\

Standard

Plates.dgn

Plot

Na

me -

1513

REPAIR OF TYPE A SPALLS

to sound concrete

Remove and chip2" Min.

Type A Spall

REPAIR OF TYPE A SPALLS

sealant

existing

Remove Existing Slotted Drain

Type A SpallExisting Slotted Drain

PCC Patch

1/2" Expansion Joint Material

Existing Sawcut

SPALL REMOVALFULL WIDTH

SPALL PATCHFULL WIDTH

(PLAN VIEW)FULL WIDTH SPALL PATCHES

Asphalt

Remove existing

Sawcut Patch

PCC

Existing Slotted Drain

Joint Material

1/2" Expansion

Joint Material

1/2" Expansion

08/25/2016Plotting Date:

trpr25584

1:200

2

Plotted

Fro

m -

Plot

Scale -

File - ...\

Standard

Plates.dgn

Plot

Na

me -

14 15DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

REPAIR OF TYPE A SPALLS

to sound concrete

Remove and chip

Type A Spall

REPAIR OF TYPE A SPALLS

sealant

existing

Remove Existing Slotted Drain

Existing Slotted Drain

PCC Patch

1/2" Expansion Joint Material

Existing Sawcut

Asphalt

Remove existing

Sawcut

Existing Slotted Drain

removed by chipping)(Vertical face to be1 1/2" Min. Saw Cut

30”–

spalled area

Saw & chip beyond

SPALL REMOVALPARTIAL WIDTH

SPALL PATCHPARTIAL WIDTH

2" Min.

Sawcut

Edge of Spalled Area

Removal Limits

Patch

PCC

Patch

PCC

(PLAN VIEW)PARTIAL WIDTH SPALL PATCHES

AC 6001(HNG)

Joint Material

1/2" Expansion

Joint Material

1/2" Expansion

08/25/2016Plotting Date:

trpr25584

1:200

3

Plotted

Fro

m -

Plot

Scale -

File - ...\

Standard

Plates.dgn

Plot

Na

me -

15 15DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

6" REINFORCED PCC DRIVEWAY PAVEMENT REPAIR

Cost for furnishing and installing dowel bar assembly shall be included in the contract unit price per each for Dowel Bar.

price per each for Insert Steel Bar in PCC Pavement.

Cost for furnishing and inserting steel bars (deformed tie and plain round dowel) shall be included in the contract unit

Bar embedded to a minimum depth of 9 inches into the existing pavement by utilizing an epoxy resin adhesive.

T = New pavement thickness.

T = Existing pavement thickness.

N

Thickness

Pavement

Existing

Dowel Bar Size

Plain Round

Epoxy Coated

T >= 10.5" 1‰" x 18"

T < 10.5"

T >= 8.5" &1…" x 18"

T < 8.5" 1" x 18"

Tie Bar Size

Deformed

Epoxy Coated

No. 11 x 18"

No. 9 x 18"

No. 8 x 18"

N

of existing pavement)

shall be flush with top

(top of new pavement

T = T

T

Grease Grease

T/2

T/2

Drilled Hole Drilled Hole

T/2

T/2

9"

9"

9"

9"Pavement

Existing

Joint

Working

Joint

Working

Pavement

Existing

3/8" 3/8"

TYPE W - (TWO WORKING JOINTS)

PLAIN ROUND DOWEL BAR INSERTION

in Urban Section

Hot Poured Elastic Joint Sealer

Silicone Sealant in Rural Section,

Backer Rod and Low Modulus

Sawed joint to be filled with:

in Urban Section

Hot Poured Elastic Joint Sealer

Silicone Sealant in Rural Section,

Backer Rod and Low Modulus

Sawed joint to be filled with:

Repair Length

TN

(See Table)

Round Dowel Bar

Epoxy Coated Plain

3/8"

Drilled Hole

9"

9"

Grease

9"

Drilled Hole

9"

Joint

Working

5/8"

Joint

Tied

3/8"

T/2

T/2

T/2

T/2

TPavement

Existing

Pavement

Existing

TYPE B - (ONE TIED JOINT AND ONE WORKING JOINT)

DEFORMED TIE BAR AND PLAIN ROUND DOWEL BAR INSERTION

in Urban Section

Hot Poured Elastic Joint Sealer

Silicone Sealant in Rural Section,

Backer Rod and Low Modulus

Sawed joint to be filled with:

in Urban Section

Hot Poured Elastic Joint Sealer

in Rural Section,

Low Modulus Silicone Sealant

Sawed joint to be filled with:

Repair Length

TN

(See Table)

Deformed Tie Bar

Epoxy Coated

(See Table)

Round Dowel Bar

Epoxy Coated Plain

Drilled Hole Drilled Hole

3/8"

9"

9"

9"

9"

5/8"

Joint

Tied

Joint

Tied

5/8"

3/8"

T/2

T/2

T/2

T/2

TPavement

Existing

Pavement

Existing

TYPE T - (TWO TIED JOINTS)

DEFORMED TIE BAR INSERTION

in Urban Section

Hot Poured Elastic Joint Sealer

in Rural Section,

Low Modulus Silicone Sealant

Sawed joint to be filled with:

in Urban Section

Hot Poured Elastic Joint Sealer

in Rural Section,

Low Modulus Silicone Sealant

Sawed joint to be filled with:

Repair Length

TN

(See Table)

Epoxy Coated Deformed Tie Bar

Drilled Hole Drilled Hole

3/8"

9"

9"

9"

9"

5/8"

Joint

Tied

Joint

Tied

5/8"

3/8"Joint

Working

T/2

T/2

T/2

T/2

TPavement

Existing

Pavement

Existing

Assembly

Dowel Bar

TYPE R - (TWO TIED JOINTS AND ONE WORKING JOINT - ORIGINAL JOINT RESTORED)

DEFORMED TIE BAR INSERTION WITH DOWEL BAR ASSEMBLY

in Urban Section

Hot Poured Elastic Joint Sealer

in Rural Section,

Low Modulus Silicone Sealant

Sawed joint to be filled with:

in Urban Section

Hot Poured Elastic Joint Sealer

in Rural Section,

Low Modulus Silicone Sealant

Sawed joint to be filled with:

in Urban Section

Hot Poured Elastic Joint Sealer

Silicone Sealant in Rural Section,

Backer Road and Low Modulus

Sawed joint to be filled with:

Repair Length

TN

(See Table)

Epoxy Coated Deformed Tie Bar

AC 6001(HNG)