hale parkway community goals - denvergov.orgthe park is home to tennis courts, basketball courts, a...

2
HALE PARKWAY COMMUNITY GOALS 100 YR FLOW TODAY CONCEPT DESIGN HYBRID APPROACH 100 YEAR DESIGN STORM WATER QUALITY PRIORITIES MULTIPLE COMMUNITY BENEFITS NEIGHBORHOOD GREEN SPACE UPPER MONTCLAIR CONCEPT DESIGN CONCEPT 12.5 ACRES TODAY 7.5 ACRES WHAT YOU SAID Current Pipe Current Pipe New Pipe Greenway Channel Remaining Flooding In a 100-year storm event, stormwater flows in this area reach 2300 cubic feet per second (cfs). In Concept Design, these flows will be handled by a gray / green hybrid approach. I-70 I-25 Sand Creek Cherry Creek UPPER MONTCLAIR BASIN RECREATIONAL BENEFITS HEALTH SAVINGS ENVIRONMENTAL BENEFITS AVOIDED FLOOD DAMAGE S Platte WATER QUALITY PRIORITY HIGH MEDIUM-HIGH MEDIUM MEDIUM-LOW LOW “For over thirty years, storms have caused cars to float down the street in my neighborhood, taking landscaping and trees with it.” “Flooding is a real problem in this area.” “We are all here to try and stop the flooding.” “I’ve lost three cars due to flooding in the neighborhood. We need to do something now.” “Best water management policy is water quality.” “Need to improve water quality throughout the city.” “Create an amenity -- not just a detention pond.” “Need to increase neighborhood amenities and leverage improvements” “Any interventions must make the neighborhood look better.” “Beautify the parkway and improve recreation.” “Greenway on north side of the parkway would feel like an exten- sion of Lindsley Park.” “We need less impermeable surface throughout the neighborhood.” “Reclaim the waterway - can we create a greenway or sliver parks?” COMMUNITY GOAL Alleviate flooding Improve water quality Seek solutions with multiple community benefits Improve and preserve neighborhood green space CONCEPT DESIGN Hale Parkway open channel system is designed to manage stormwater flows in an 100- year event. e above-ground open channel, and the below ground new pipe (appx. 10 foot diameter) work together to meet this design goal. e graph on the leſt illustrates the gap in today’s infrastructure (remaining flooding) and how the concept plans to meet this goal. Denver’s lakes and streams receive runoff from City streets, yards, parks, and other discharges. Pollutants in these runoff waters can be detrimental and the Montclair Basin is one of Denver’s five high priority water quality basins. In concept design, run-off from neighborhood streets and rainwater will be funneled to the open channel where pollutants and other harmful materials are absorbed by native vegetation. e Hale Parkway design features many ecosystem services that provide the local neighborhood with increased community benefits. In addition to avoided flood damage, the Hale Parkway concept design will enhance recreation and environmental benefits as well as account for significant health savings. Earth Economics estimates total benefits generated by the project over 50 years could exceed $60M. Today, the neighborhood is anchored by Lindsley Park. e concept design adds an additional appx. 5 acres of usable green space for trails, playgrounds, community gatherings and other uses.

Upload: others

Post on 01-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • HALE PARKWAY COMMUNITY GOALS

    100 YR FLOW

    TODAY

    CONCEPT DESIGNHYBRID APPROACH

    100 YEAR DESIGN STORM

    WATER QUALITY PRIORITIES

    MULTIPLE COMMUNITY BENEFITS

    NEIGHBORHOOD GREEN SPACE

    UPPER MONTCLAIR CONCEPT DESIGN

    CONCEPT 12.5 ACRES

    TODAY7.5 ACRES

    WHAT YOU SAID

    Current Pipe

    Current Pipe

    New Pipe

    Greenway Channel

    Remaining Flooding

    In a 100-year storm event, stormwater flows in this area reach 2300 cubic feet per second (cfs). In Concept Design,

    these flows will be handled by a gray / green hybrid approach.

    I-70

    I-25

    Sand Creek

    CherryCreek

    UPPER MONTCLAIR BASIN

    RECREATIONAL BENEFITS

    HEALTH SAVINGS

    ENVIRONMENTAL BENEFITS

    AVOIDED FLOOD DAMAGE

    S Pl

    atte

    WATER QUALITYPRIORITYHIGH

    MEDIUM-HIGH

    MEDIUM

    MEDIUM-LOW

    LOW

    “For over thirty years, storms have caused cars to float down the street in my neighborhood, taking landscaping and trees with it.”

    “Flooding is a real problem in this area.”

    “We are all here to try and stop the flooding.”

    “I’ve lost three cars due to flooding in the neighborhood. We need to do something now.”

    “Best water management policy is water quality.”

    “Need to improve water quality throughout the city.”

    “Create an amenity -- not just a detention pond.”

    “Need to increase neighborhood amenities and leverage improvements”

    “Any interventions must make the neighborhood look better.”

    “Beautify the parkway and improve recreation.”

    “Greenway on north side of the parkway would feel like an exten-sion of Lindsley Park.”

    “We need less impermeable surface throughout the neighborhood.”

    “Reclaim the waterway - can we create a greenway or sliver parks?”

    COMMUNITY GOAL

    Alleviate flooding

    Improve water quality

    Seek solutions with multiple community benefits

    Improve and preserve neighborhood green space

    CONCEPT DESIGN

    Hale Parkway open channel system is designed to manage stormwater flows in an 100-year event. The above-ground open channel, and the below ground new pipe (appx. 10 foot diameter) work together to meet this design goal. The graph on the left illustrates the gap in today’s infrastructure (remaining flooding) and how the concept plans to meet this goal.

    Denver’s lakes and streams receive runoff from City streets, yards, parks, and other discharges. Pollutants in these runoff waters can be detrimental and the Montclair Basin is one of Denver’s five high priority water quality basins. In concept design, run-off from neighborhood streets and rainwater will be funneled to the open channel where pollutants and other harmful materials are absorbed by native vegetation.

    The Hale Parkway design features many ecosystem services that provide the local neighborhood with increased community benefits. In addition to avoided flood damage, the Hale Parkway concept design will enhance recreation and environmental benefits as well as account for significant health savings. Earth Economics estimates total benefits generated by the project over 50 years could exceed $60M.

    Today, the neighborhood is anchored by Lindsley Park. The concept design adds an additional appx. 5 acres of usable green space for trails, playgrounds, community gatherings and other uses.

  • ANTICIPATED TRAFFIC GROWTH & CAPACITY

    HALE PARKWAY COMMUNITY GOALS

    LINDSLEY PARK

    NEIGHBORHOOD CONNECTIVITY

    TREE CANOPY PLANNING

    UPPER MONTCLAIR CONCEPT DESIGN

    PEDESTRIAN ENHANCEMENT

    PRELIMINARY TREE ANALYSIS ZONES

    CANOPY PRESERVATION

    EXISTING CROSSINGS

    12TH AVE

    HU

    DS

    ON

    CLE

    RM

    ON

    T S

    T

    CANOPY ENHANCEMENT

    NEW PEDESTRIAN CROSSING

    CANOPY REPLACEMENT

    KEY PEDESTRIAN & BIKE CONNECTION

    AS

    H S

    T

    AS

    H S

    T

    HO

    LLY

    ST

    HO

    LLY

    ST

    CLE

    RM

    ON

    T S

    T

    TODAY

    2 LANE CAPACITY

    4 LANE CAPACITY

    2035

    6,050

    10,100

    18,300

    36,800

    168appx.

    WHAT YOU SAID

    “We do not want you to make Lindsley Park a big detention pond.”

    “Please keep all the activity at Lindsley - tennis, fetch, basketball, trees, tag, soccer, and more!”

    “If necessary, use Lindsley Park to address flood, but maintain ten-nis court, playground, and hills.”

    “Traffic lanes on both side of the parkway act as a barrier into the north and south sides of the neighborhood.”

    “Connections to the hospital are critical.”

    “I would like comfortable, clear pedestrian access across Hale Parkway”

    “Neighborhood connectivity to future development and activities at 9th & Colorado development.”

    “Preserve the trees!”

    “Add new trees. Shade matters!”

    “Don’t replace mature trees with spindly trees”

    “Design for our grandkids and future generations.”

    “I’m concerned about the vehicular capacity of Hale Parkway during rush hour.”

    “Pedestrian access, connectivity and safety will be a priority for the Bellevue-Hale neighborhood.”

    “I think a divided roadway is more describable for vehicular capacity and neighborhood access.”

    “We want a quiet, safe street. Limit cut-through traffic.”

    COMMUNITY GOAL

    Trees in this zone are designed to remain in place

    Existing trees remain, and new trees planted in this area to enhance the existing canopy

    Trees may be removed in this area; new trees are planned to replace today’s canopy. All efforts should be made to keep mature and legacy trees where possible.

    New connections, supported by NPI East Planning efforts, are designed to better connect residents to amenities at 9+CO, Lindlsey Park, and additional local places.

    Preserve Lindsley Park and its recreational uses

    Increase pedestrian and bicycle connectivity

    Maintain tree canopy along Hale Parkway

    Manage traffic on Hale Parkway and neighborhood streets

    CONCEPT DESIGN

    Lindsley Park is a beloved resource for all ages and types of users. The park is home to tennis courts, basketball courts, a softball diamond, and open fields for relaxing, playing fetch or sledding on a snowy day. No portion of the park or its activities will be changed with this design concept.

    In addition to a new shared-use path created along Hale Parkway, the concept design creates five additional pedestrian crossings. This re-imagined Hale Parkway connects more residents to Lindsley Park, new amenities at 9CO, and strengthens the connection to Rose Hospital.

    From Ash St to Clermont St, all existing trees are designed to remain in place. Where the open channel begins at Clermont Street, old trees will be preserved where possible and new trees will be planted to replace the tree canopy. Additional trees will be planted to enhance the existing tree lawns today. Concept design anticipates a net tree gain of 62 trees. Final design will include a comprehensive tree inventory and assessment.

    As part of this process, a traffic impact study was conducted to better understand the area. After taking into account planned and future area development (including 9CO), Hale Parkway is anticipated to grow 65% by 2035 to roughly 10,000 average daily trips, and be below the standard threshold capacity for 2 lane roadways. Remaining turn lanes at the intersections, as well as improvements at 8th & Hale Pkwy will help manage future traffic while providing natural traffic calming.