GUP PLANNING FOR JULY- DECEMBER 2009 MONTH JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER ACTIVITIE S Sampling Lab Analysis Collection Of Data From PKD & Pejabat Daerah Compilation Of All Data 1. Sampling Around Sepang and Kuala Langat => 5 sampling points, 2X sampling for each place. 2. Lab Analysis a. Microbiological + Physicochemical Analysis July to Mid-August 2009 b. Heavy Metal + Pesticide Analysis Mid-August to September 2009 (Month of Ramadhan) 3. Collection of Data From PKD & Pejabat Daerah August to September 2009 4. Compilation of All Data collected October 2009 FIELD WORKS 15 July 2009 Sampling of Raw Water in Sepang (1st sampling) 20 July 2009 Kuala Langat Pre-Survey with PPKP from PKD Kuala Langat 30 July 2009 Kuala Langat Raw Water Pre-Survey 05 August 2009 Sampling at Kuala Langat (1st Sampling) 10 August 2009 Sampling at Sepang (2nd Sampling) 17 August 2009 Sampling at Sepang (loji) 19 August 2009 Sampling at Kuala Langat (2nd Sampling)

Upload: aizat-asyh

Post on 10-Apr-2016

216 views

Category:

Documents


0 download

DESCRIPTION

geran universiti pendidikan

TRANSCRIPT

Page 1: Gup Planning for July

GUP PLANNING FOR JULY- DECEMBER 2009

MONTH JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER

ACTIVITIES

Sampling

Lab Analysis

Collection Of Data From PKD & Pejabat Daerah

Compilation Of All Data

1. Sampling – Around Sepang and Kuala Langat => 5 sampling points, 2X sampling for each place.

2. Lab Analysis

a. Microbiological + Physicochemical Analysis – July to Mid-August 2009

b. Heavy Metal + Pesticide Analysis – Mid-August to September 2009 (Month of Ramadhan)

3. Collection of Data From PKD & Pejabat Daerah – August to September 2009

4. Compilation of All Data collected – October 2009

FIELD WORKS

15 July 2009 – Sampling of Raw Water in Sepang (1st sampling)

20 July 2009 – Kuala Langat Pre-Survey with PPKP from PKD Kuala Langat

30 July 2009 – Kuala Langat Raw Water Pre-Survey

05 August 2009 – Sampling at Kuala Langat (1st Sampling)

10 August 2009 – Sampling at Sepang (2nd Sampling)

17 August 2009 – Sampling at Sepang (loji)

19 August 2009 – Sampling at Kuala Langat (2nd Sampling)