Page 1: Guidelines for Solar Grid Power Projects - NVVN Ltdnvvn.co.in/Solar Conclave 11.01.2010 NVVN Presentation.pdf · Guidelines for Solar Grid Power Projects ... Govt. of India for allocation

Guidelines for

Solar Grid Power Projects

NTPC Vidyut Vyapar Nigam Ltd.NTPC Ltd.

Page 2: Guidelines for Solar Grid Power Projects - NVVN Ltdnvvn.co.in/Solar Conclave 11.01.2010 NVVN Presentation.pdf · Guidelines for Solar Grid Power Projects ... Govt. of India for allocation

NTPC / NVVN at a glance

Broad Guidelines for Selection of Solar Power Developers

Elements of PPA

AGENDA AGENDA

1

2

3

Page 3: Guidelines for Solar Grid Power Projects - NVVN Ltdnvvn.co.in/Solar Conclave 11.01.2010 NVVN Presentation.pdf · Guidelines for Solar Grid Power Projects ... Govt. of India for allocation

NTPC Limited – At a glance

� One of the three largest Indian

companies with market cap of nearly

Rs.1,75,000 Crore.

� Net worth of over Rs. 57,000 Crore

� Total assets of over Rs. 1,05,000 Crore

� One of the three largest Indian

companies with market cap of nearly

Rs.1,75,000 Crore.

� Net worth of over Rs. 57,000 Crore

� Total assets of over Rs. 1,05,000 Crore

� Ranked # 1 independent power producer in Asia in 2009 (by Platts, a division of McGraw-Hill companies)

� No.1 globally in capacity utilisation

� 317th Largest company in the world

(FORBES ranking – 2009)

� The largest generator in India with a share of nearly 30%

� Ranked # 1 independent power producer in Asia in 2009 (by Platts, a division of McGraw-Hill companies)

� No.1 globally in capacity utilisation

� 317th Largest company in the world

(FORBES ranking – 2009)

� The largest generator in India with a share of nearly 30%

Page 4: Guidelines for Solar Grid Power Projects - NVVN Ltdnvvn.co.in/Solar Conclave 11.01.2010 NVVN Presentation.pdf · Guidelines for Solar Grid Power Projects ... Govt. of India for allocation

NTPC VIDYUT VYAPAR NIGAM LTD.

Power Trading market share ~ 20%

Presence in ash business

National Power Exchange Limited (NPX)

Cu

rren

t B

usin

ess

Cross Border Trading

Green Power Trading & Emission Trading

Fu

ture

po

ten

tial

Captive Power Trading

Long Term Power Trading

Trading of Fuel

Strong Promoter – NTPC Limited

Excellent Asset Back-up

Co

re S

tren

gth

s

Formidable Network

Government Support

Professional Manpower

Incorporated on 26th Nov 2002

Wholly owned subsidiary of NTPC Ltd

Highest rated Trading Licensee Category “I”

Backg

rou

nd

Page 5: Guidelines for Solar Grid Power Projects - NVVN Ltdnvvn.co.in/Solar Conclave 11.01.2010 NVVN Presentation.pdf · Guidelines for Solar Grid Power Projects ... Govt. of India for allocation

Operational Performance of NVVN

MUs Traded

Year 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09

Units traded (MU)

962 2616 1643 2664 3324 4832

Turnover

(Rs. Million) 2240 5870 4346 8613 7598 18996

Page 6: Guidelines for Solar Grid Power Projects - NVVN Ltdnvvn.co.in/Solar Conclave 11.01.2010 NVVN Presentation.pdf · Guidelines for Solar Grid Power Projects ... Govt. of India for allocation

National Solar Mission (NSM)

Targets set for development of Solar Power under NSM:

Installed Capacity (MW)

Phase -I

Phase -II

Phase -III

(up to 2013) 1100 MW

(up to 2017) 4000 MW

(up to 2022) 20000 MW

Page 7: Guidelines for Solar Grid Power Projects - NVVN Ltdnvvn.co.in/Solar Conclave 11.01.2010 NVVN Presentation.pdf · Guidelines for Solar Grid Power Projects ... Govt. of India for allocation

• NVVN appointed the Nodal Agency for sale and purchase of 33 kV and above Grid connected Solar Power under Phase -I of the NSM by Ministry of Power

• Cumulative capacity to be limited to 1000 MW under phase-I

• Tariff shall be as fixed by the CERC

• MOP to allocate the equivalent megawatt capacity from the central unallocated power of NTPC coal based stations to NVVN, for bundling together with the solar power

• NVVN will undertake the sale of the bundled power to Power Utilities at regulated tariff plus facilitation charges.

National Solar Mission - Features

Page 8: Guidelines for Solar Grid Power Projects - NVVN Ltdnvvn.co.in/Solar Conclave 11.01.2010 NVVN Presentation.pdf · Guidelines for Solar Grid Power Projects ... Govt. of India for allocation

Selection of Solar Power Developers

Migration Scheme

NewProjects

• Solar Power Developers (SPD)

who have already initiated definite

process of setting up solar power

plants and have made

arrangements for sale of power to

State Utilities

• SPDs approaching with new

proposals for setting up solar

power projects

The ratio of Solar PV to Solar Thermal is proposed to be in the ratio of 40 : 60

Page 9: Guidelines for Solar Grid Power Projects - NVVN Ltdnvvn.co.in/Solar Conclave 11.01.2010 NVVN Presentation.pdf · Guidelines for Solar Grid Power Projects ... Govt. of India for allocation

MIGRATION SCHEME

PROPOSED SELECTION CRITERIA FOR WILLING DEVELOPERSPROPOSED SELECTION CRITERIA FOR WILLING DEVELOPERS

Clear title and possession of land (say @ approx. two hectares/MW)

Approval from concerned State Transmission Utility (STU) for evacuating power from

their solar power plant to the grid at 33 kV and above

Confirmation from concerned State/Discoms for purchase of all the power from the

solar power plant through NVVN

Necessary water linkage from the concerned State Authorities (for solar thermal power plants)

Letters of comfort for funding the project

Bank Guarantee @ Rs. 50 Lac per MW to NVVN, out of which Rs. 25 Lac per MW at the

time of signing of MOU and balance Rs. 25 Lac per MW at the time of signing of PPA.

1

2

3

4

5

6

No change in equity holding permitted from MOU signing till PPA execution7

Page 10: Guidelines for Solar Grid Power Projects - NVVN Ltdnvvn.co.in/Solar Conclave 11.01.2010 NVVN Presentation.pdf · Guidelines for Solar Grid Power Projects ... Govt. of India for allocation

KEY TIMELINESKEY TIMELINES

Draft MOU, to be signed with the migrating SPDs and Discoms, would be circulated during 1st week of February 2010

Signing of MOU during the meeting between MNRE, MOP, NVVN, SPDs and Discoms (24-26, Feb 2010)

States have been requested (by MNRE) for providing information about the potential SPDs interested to migrate to NSM

MIGRATION SCHEME

READINESS OF PPAs & PSAs BY 31ST MARCH 2010

Page 11: Guidelines for Solar Grid Power Projects - NVVN Ltdnvvn.co.in/Solar Conclave 11.01.2010 NVVN Presentation.pdf · Guidelines for Solar Grid Power Projects ... Govt. of India for allocation

Invitation of Expression of Interest (EOI)

By 10th March 2010

Last date of submission of Applications and Registration

By 30th April 2010

Submission of documents by SPDsrequired for MOU

By 30th June 2010

Forwarding of details to States for validation / recommendation

By 15th July 2010

Confirmation of preparedness of SPDsand recommendations by State

By August 2010

Selection of Developers by the Central Empowered Committee

By September 2010

Signing of MOU with SPD

By 30th September 2010

Readiness for signing of PPA & PSA

By 31st October 2010

NEW PROJECTSNEW PROJECTS

PROPOSED TIME FRAME AND PROCESSPROPOSED TIME FRAME AND PROCESS

Page 12: Guidelines for Solar Grid Power Projects - NVVN Ltdnvvn.co.in/Solar Conclave 11.01.2010 NVVN Presentation.pdf · Guidelines for Solar Grid Power Projects ... Govt. of India for allocation

BROAD GUIDELINES FOR SELECTION BROAD GUIDELINES FOR SELECTION

OF SOLAR POWER DEVELOPERSOF SOLAR POWER DEVELOPERS……

Page 13: Guidelines for Solar Grid Power Projects - NVVN Ltdnvvn.co.in/Solar Conclave 11.01.2010 NVVN Presentation.pdf · Guidelines for Solar Grid Power Projects ... Govt. of India for allocation

Expression of Interest

� Invitation of EoI for Registration

of the new Solar Power Developers (SPDs) with NVVN.

Proposed Guidelines for Registration

Minimum Requirement

� Confirmation that Capacity proposed shall be commissioned on or before 31st March 2013.

� Net worth of the SPD for the past three years.

� Turn-over of last three years

� Technical requirement

�Letter of Registration would be issued by NVVN to those Developers who meet the Registration Criteria.

�The Registration Letter shall contain the conditions precedent for signing of MOU with them.

Page 14: Guidelines for Solar Grid Power Projects - NVVN Ltdnvvn.co.in/Solar Conclave 11.01.2010 NVVN Presentation.pdf · Guidelines for Solar Grid Power Projects ... Govt. of India for allocation

�Confirmation from STU regarding evacuation of power at 33 kV or above

�Statutory and other clearances as applicable

�Complete Detailed Project Report (DPR)

� Letter of comfort for Equity/Debt from Promoter(s) /Financial Institute(s)

�Time-Frame for major activities pertaining to Solar Power Plant

� Letter of confirmation from the State Authority regarding identification / notification/allotment of land for setting up of the solar power plant

�Necessary water linkage from the concerned State Authorities, incase of solar thermal

�Submission of Bank Guarantee

�No change in equity holding permitted from MOU signing till PPA execution

Conditions Precedents for signing of MOU

Solar Power Developers who are meeting the set conditions will be called

for signing of MOU with NVVN

Page 15: Guidelines for Solar Grid Power Projects - NVVN Ltdnvvn.co.in/Solar Conclave 11.01.2010 NVVN Presentation.pdf · Guidelines for Solar Grid Power Projects ... Govt. of India for allocation

� NVVN shall approach Distribution Utilities for signing of Power Sale Agreement (PSA) for purchase of solar

power along with equivalent NTPC power.

� Based on the above MOUs, NVVN would be approaching MOP, Govt. of India for allocation of NTPC

power from its unallocated quota of coal based station to NVVN for bundling it with solar power.

� After signing of PSAs with Distribution Utility, NVVN will sign PPAs with Solar Power Developers.

Signing of PPA / PSA

Page 16: Guidelines for Solar Grid Power Projects - NVVN Ltdnvvn.co.in/Solar Conclave 11.01.2010 NVVN Presentation.pdf · Guidelines for Solar Grid Power Projects ... Govt. of India for allocation

ELEMENTS OF PPAELEMENTS OF PPA……

Page 17: Guidelines for Solar Grid Power Projects - NVVN Ltdnvvn.co.in/Solar Conclave 11.01.2010 NVVN Presentation.pdf · Guidelines for Solar Grid Power Projects ... Govt. of India for allocation

� PPA to remain valid for 25 years (in line with CERC regulations) duration from the date of commencement of supply from the Solar Power Project.

� The Solar power tariff shall be as determined by the CERC including taxes & duties, as applicable.

� Power shall be delivered by SPD at 33 KV or above sub-station of Discom / STU

� Transmission charges, losses, RLDC/SLDC charges, scheduling charges or any other charges for supply of solar power beyond delivery point to be borne by the respective Distribution Utility.

� Billing & Payment cycle shall be as per Energy Accounts issued by RPC / SLDC.

Elements of PPA – 1/2

Page 18: Guidelines for Solar Grid Power Projects - NVVN Ltdnvvn.co.in/Solar Conclave 11.01.2010 NVVN Presentation.pdf · Guidelines for Solar Grid Power Projects ... Govt. of India for allocation

� Scheduling of power shall be as per Indian Electricity Grid Code (IEGC).

� NVVN shall establish irrevocable revolving Letter of Credit (LCs) in favour of the Solar Power Developers prior to commencement of electricity supply from the proposed Solar Power Plant.

� Distribution Utilities shall ensure Payment Security Mechanism as per Tri Partite Agreement and open irrevocable revolving Letter of Credit.

� Aggregate share holding of Promoter shall not go below 51% for 3 years after COD. Any reduction thereafter shall necessarily require the approval of NVVN.