ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
2
GT13E2 MXL
M blading
GT13E2 M/MXL
Agenda
GT13E2 M
References
New Blade 5 M
Compressor Upgrade
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
3
Different positioning possible
GT13E2 Turbine Upgrades
Hot gas pathC insp. interval
(EOH)
24,000 32,000 36,000
Baseline, GT13E2ISO conditions, NG
GT Power outputand efficiency(ISO conditions)
GT13E2
XL & MXL Upgrades: extend C-inspection intervals
M U
pg
rad
e: in
crea
se in
G
T p
ower
ou
tpu
t / e
ffic
ien
cy
GT13E2 Upgrades:
Enhanced GT power output and efficiency versus extended inspection intervals
GT13E2 XL
GT13E2 MXL
GT13E2 M
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
4
GT13E2 MXL
M blading
GT13E2 M/MXL
Agenda
GT13E2 M
References
New Blade 5 M
Compressor Upgrade
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
5
M Blading
Customized solutions
GT13E2 MXL
Lower temperature
Extended inspection intervals
SC performance slightly
increased
GT13E2 M
Unchanged firing temperature
Clear performance increase
Inspection intervals unchanged
Perform
ance Lifetime
Whatever suits best
MBlading
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
6
Module 3New stages 4,5
Module 2New stages 2,3
Module 1Modified stage 1
TBC at Vane 1, 2 & Blade 1
M Blading Concept
# blades: 63 (all rows)# vanes: 40/48/48/60/50SHS-A,B,C new heat shieldsShroud-less blade 1,2,3,4Cooled vane 3Blade 4 hollow designShrouded blade 5 (w/o damping bolt)Blade 5 cast solid bladeAll blades & vanes in CC-IN738LC
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
12
TIT changed– M TIT increased– MXL TIT decreased
Re-Commissioning Procedure– Heat Balance– NOx mapping in the upper load range (70 % - 100%)
• incl. pulsation measurementadd. equipment / measurements:– Tk2, exhaust pressure, ∆p air inlet
implementation of new ODC delivering more detailed information regarding operating mode of GT (e.g. frequency response, peak mode)EOH formula modified
approx. 4 - 5 days re-commissioning time required
M Upgrades Commissioning & Operational Requirements
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
13
Summary
Simplified design of M-blading componentsThorough validation of new components under real operation conditionsDesign benefits from 10 years of operating experience with GT13E2– > 1,300,000 OH
Increased operation flexibility with M-technologyM-blading technology is now standard for all new GT13E2 units since mid 2003
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
14
GT13E2 MXL
M blading
GT13E2 M/MXL
Agenda
GT13E2 M
References
New Blade 5 M
Compressor Upgrade
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
15
GT13E2
GT13E2 MXL
Power output&
efficiency(ISO conditions)
Hot gas path insp. interval(EOH)24’000 32’000
GT13E2 XL
36’000
GT13E2 MXL
Extended inspection intervals (36 kEOH)Slightly increased SC performance (power output & efficiency)
GT13E2 M
+/- 0 MW / +/- 0 %
+ 6.1 MW / + 0.4 %
+ 1.0 MW / + 0.2 %
Extended Lifetime Improved AvailabilityReduced maintenance costs
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
16
GT13E2 MXL - Scope of Work
Improved stage 1 version A with TBC and optimized coolingNew Vanes, Blades & Heat-Shields at Stage 2-5
Modification of TurbineVane Carrier on-site
Zone 2 inner and outer shell with TBC
Operation ConceptHot gas path C-inspection each 36’000 EOHSlightly increased SC performance
Enlarged Axial Thrust Bearing
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
17
GT13E2 M / MXL -Modifications of Turbine Vane Carrier
New:Vane row 2 direct cooling air feed from Plenum24 add. cool. holes in TVCOld cooling holes plugged
GT13E2
GT13E2 M / MXL
New:Cooled vane row 382 add. cooling holes in expansion bends
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
18
GT13E2 M / MXL -Modifications of Turbine Vane Carrier
Stage 1:SHSS A: no modification required for Power Plants equipped with 1st stage version A
Stage 2:Vane 2: (48 vanes instead of 60)
— new fixation of vanes— new cooling feed
SHSS B: new design of stator heat shield require intermediate rings
Stage 3:Vane 3: (48 vanes instead of 60)
— new fixation of vanesSHSS C: new design of stator heat shield require intermediate ringsAll rework can be done on site
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
19
GT13E2 MXL - Summary
GT13E2
GT13E2 MXL
C24’000
36’000 C
4321Years
C24’000 C24’000 C24’000
36’000 C 36’000 C
8765 1211109
Save 1 out of 3 C-inspections in a span of 9 years
GT13E2 MXL with 36’000 EOH C-inspection intervalsSlightly increased SC performance (ISO / Baseload)– + 1.0 MW / + 0.2%
Boost your plant availability with 36’000 EOH C-inspection intervals
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
20
Additional advantages of MXL
Peak load application up to 16°C increased TIT allowed for continuous operation and counted with only factor 1.5A-, B-inspection cycle 9,000 EOH (+ 3,000 EOH)Lower TIT compared to GT13E2 and GT13E2 XL– less thermal stress– reduced reconditioning efforts– direct positive impact on lifetime
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
21
GT13E2 MXL
M blading
GT13E2 M/MXL
Agenda
GT13E2 M
References
New Blade 5 M
Compressor Upgrade
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
22
GT13E2
GT13E2 M
Power output&
efficiency(ISO conditions)
Hot gas path insp. interval(EOH)24’000 32’000
GT13E2 XL
36’000
GT13E2 MXL
Unchanged inspection intervals compared to GT13E2
GT13E2 M
+/- 0 MW / +/- 0 %
+ 6.1 MW / + 0.4 %
+ 1.0 MW / + 0.2 %
Improved performanceIncreased Power OutputIncreased Efficiency
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
23
GT13E2 M - Scope of Work
Modification of TurbineVane Carrier on-site Enlarged Axial
Thrust Bearing
Zone 2 inner and outer shell with TBC
Site specific checks (e.g. Generator & Transformer capacity, etc.) necessary
Operation ConceptHot gas path C- inspection each 24’000 EOHIncreased performance
Improved stage 1 version A with TBC and optimized coolingNew Vanes, Blades & Heat-Shields at Stage 2-5
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
24
Performance compared to GT13E2
Increase power output and efficiency
PlantLifetime
Performance[Power & Efficiency]
StandardC-inspection
MaintenanceInterval
24’000 EOH 24’000 EOH24’000 EOH
StandardC-inspectionUpgrade
+ 6.1 MW /+ 0.4%
Performance recoveryduring a standard
C-inspection
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
25
GT13E2 M - Summary
Increase performance while keeping insp. intervals unchanged
GT13E2 M with 24’000 EOH C-inspection intervalsIncreased performance (ISO / Baseload)
– + 6.1 MW / + 0.4 %
Reduced costs per MWh due to increased power output and efficiency
GT13E2 C24’000 C24’000 C24’000 C24’000 C
GT13E2 M C24’000 C24’000 C24’000 C24’000 C
4321Years 8765 1211109
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
26
GT13E2 MXL
M blading
GT13E2 M/MXL
Agenda
GT13E2 M
References
New Blade 5 M
Compressor Upgrade
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
27
0
5
10
15
20
25
30
35
40
45
1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q
2002 2003 2004 2005 2006 2007 2008 2009
GT13E2 M/MXL – higher performance at increased availability
Status: January 2006
GT13E2 upgrade packages
Customized solutions for competitive markets.
Higher power outputIncreased efficiencyIncreased availabilityExtended inspection intervals
ALSTOM’s implementation success:
36 MXL configuration sold5 M configurations sold
GT13E2 M/MXL - Fleet Growths
Un
its tod
ay
13 units in operation43 units sold
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
29
Zawia GT12 2Q/00 MXL 2006 - V96Zawia GT16 3Q/05 MXL Aug 2005 - MXLBenghazi GT14 2Q/02 MXL 2006 - VAKeppel GT11 1Q/07 MXL Jan 2007 - MXLKeppel GT12 1Q/07 MXL Jan 2007 - MXLBraemar GT11 3Q/06 MXL July 2006 - MXLBraemar GT12 3Q/06 MXL July 2006 - MXLBraemar GT13 3Q/06 MXL July 2006 - MXLAluar GT11 4Q/07 MXL Nov 2007 - MXLAluar GT12 4Q/07 MXL Nov 2007 - MXLDiemen 33 GT1 2Q/95 MXL Oct 2008 - V96Lageweide GT7 4Q/94 MXL Mar 2009 - V96Wagerup GT11 4Q/07 MXL Oct 2007 - MXLWagerup GT12 4Q/07 MXL Oct 2007 - MXLSohar GT11 3Q/08 MXL June 2008 - MXLSohar GT12 3Q/08 MXL June 2008 - MXLSohar GT13 3Q/08 MXL June 2008 - MXLSohar GT14 3Q/08 MXL June 2008 - MXL
…GT13E2 Upgrade List (2)
Plant Unit In Op Current Set-up Since Last Set-up Original Set-up
Status: February 2006
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
30
Afam GT11 2008 MXL 2008 - MXL Afam GT12 2008 MXL 2008 - MXL Afam GT13 2008 MXL 2008 - MXLDubal GT1 1Q/07 MXL March 2007 - MXLDubal GT2 3Q/07 MXL Sept 2007 - MXLKwinana GT1 4Q/08 MXL Nov 2008 - MXLDeeside GT1 2Q/94 MXL Oct 2006 - V96Dunkerque GT1 MXL - VADunkerque GT2 MXL - VA
…GT13E2 Upgrade List (3)
Plant Unit In Op Current Set-up Since Last Set-up Original Set-up
Status: February 2006
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
31
GT13E2 M - Reference Kuala Langat
First unit (GT#14) in Kuala Langat completed 1st C-cycle
Operation dataCommercial base load operation, primarily on natural gas22,103 OH, 45 starts, 26,795 EOH by March 31, 2005
Operation experience100% reliability of M-bladingGood conditions allowed stretched C-cycle!
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
32
GT13E2 M/MXL - Fleet Key Data
43 units sold of which 13 units in commercial operation
5 M and 38 MXL (5 M and 8 MXL in operation)Total Fleet Data
First unit in operation since June 2002> 130’000 Equivalent Operating Hours> 120’000 Operating Hours> 580 Starts
Fleet Leader completed C-cycleMore than 22,103 OH on gas– More than 26,795 EOH
Status: May 2006
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
33
GT13E2 MXL
M blading
GT13E2 M/MXL
Agenda
GT13E2 M
References
New Blade 5 M
Compressor Upgrade
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
34
New Blade 5 M for GT13E2 M & MXL
New
Tip
Mid
Hub
Original
New
New
Original
Original
Extensive testing showed potential for improvementFurther Improvement of the existing Blade 5 Version MAchieves an even further improved turbine exit profile shape and exhaust diffusor characteristicImproves both power and efficiency of the GT13E2 M & MXL
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
35
New Blade 5 M for GT13E2 M & MXL
New Blade 5 M NOT mixable with old Blade 5 M
No influence on duration of C-inspection
No other new hardware required Only new Blade 5 M
Hardware available within standard delivery time
Unchanged Operation Concept
Unchanged EOH formula
Already implemented and validated in 2 unitsStatus May 2006
– GT#14: S = 38; OH = 7’482; EOH = 9’813– GT#15: S = 17; OH = 7’628; EOH = 8’190
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
36
Benefits of New Blade 5 M
Simple Cycle – Power + 1.1 MW compared to GT13E2 M/MXL– Efficiency + 0.2% (additive) compared to GT13E2 M/MXL– At ISO, Base Load, Gas Operation
Combined Cycle– Expected Power ~+ 0.5 MW compared to GT13E2 M/MXL– Expected Efficiency ~+ 0.1% (additive) compared to GT13E2 M/MXL– To be determined case per case
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
37
Benefits of New Blade 5 M
PlantLifetime
Performance[Power & Efficiency]
StandardC-inspection
MaintenanceInterval
24’000 EOH M 24’000 EOH(MXL 36’000 EOH)
24’000 EOH
StandardC-inspectionUpgrade
M SC + 7.2 MW/
+ 0.6%MXL
(SC +2.1 MW/ +0.4%) Performance recovery
during a standardC-inspection
GT13E2 M/MXL performance compared to GT13E2
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
38
Benefits of GT13E2 M/MXL & New Blade 5 M
Continuous improvement keeps your plant competitive
Power output&
efficiency (ISO/Base Load/
New & Clean)
Hot gas path insp. interval(EOH)
24’000 36’000
GT13E2 MXL(2003)GT13E2
(1993)
165.1 MW / 35.7 %
+ 6.1 MW / + 0.4 %
+ 1.0 MW / +0.2 %+ 2.1 MW / +0.4 %
+ 7.2 MW / + 0.6 %
GT13E2 M+ New Blade 5M
(2005)
GT13E2 MXL+ New Blade 5M
(2005)
GT13E2 M(2003)
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
39
Benefits of GT13E2 M
Increase performance while keeping inspection intervals unchangedGT13E2 M with 24’000 EOH C-inspection intervals and New Blade 5 M
Increased SC performance (ISO / Baseload)– + 7.2 MW / + 0.6 %
Reduced Costs of Electricity due to increased power output and efficiency
GT13E2 C24’000 C24’000 C24’000 C24’000 C
GT13E2 M C24’000 C24’000 C24’000 C24’000 C
4321Years 8765 1211109
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
40
Benefits of GT13E2 MXL
GT13E2
GT13E2 MXL
C24’000
36’000 C
4321Years
C24’000 C24’000 C24’000
36’000 C 36’000 C
8765 1211109
Save 1 out of 3 C-inspections in a span of 9 yearsGT13E2 MXL with 36’000 EOH C-inspection intervals and New Blade 5 M
Slightly increased SC performance (ISO / Baseload)– + 2.1 MW / + 0.4%
Boost your plant availability with 36’000 EOH C-inspection intervals
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
41
GT13E2 MXL
M blading
GT13E2 M/MXL
Agenda
GT13E2 M
References
New Blade 5 M
Compressor Upgrade
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
42
Product Information
Flow
VIGVVELA
VELE
GT13E2 MXL Compressor Upgrade
Restaggered Rows
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
43
Between 0.6° and 1.5°
OpenStages 1 to 5
Stagger angle change
Compressor row
Stagger angle adjustment
GT13E2 CompressorCompressor Upgrade
Increased mass flow by stagger angle
adjustment on leading compressor rows
Development with the proven tools and
methods already used for earlier compressor
upgrades
Output increase through approx. 4% mass flow increase
Engine Axis
StaggerAngle
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
44
Product Information
– Degree of re-stagger angle reduced at every row in flow direction– Material & coating unchanged i.e. ST12TNIE + Coating (VIGV, Blades 1-5 &
Vanes 1-4)– Upgrade released for GT13E2 MXL (combination with Maximum Continuous Load
(MCL) operation to be checked due to possible capacity limitations such as Geno, Transformer, etc.)
– Other upgrade applications (e.g. GT13E2, GT13E2 XL and GT13E2 M) are being investigated
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
45
Product Information
Compressor Upgrade results in:~3-4 % increased Air Mass flowIncreased power output of ~5 MW SC (CC details must be calculated case by case)+ 0.2% Efficiency (additive)No extension of C-insp durationAll casings & assembly material unchanged, only blades and vanes replaced with re-staggered ones
Compressor Upgrade settings are specific for each unitSite specific re-commissioning settings are requiredAdaptation of operation concept (e.g. VIGV)
Already implemented and validated in one unitGT#13 more than S = 18, OH = 5’746, EOH = 6’695
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
46
Benefits of Compressor Upgrade
Increase power output
PlantLifetime
SC Performance[Power & Efficiency]
StandardC-inspection
MaintenanceInterval
36’000 EOH 36’000 EOH36’000 EOH
StandardC-inspectionUpgrade
SC +5 MW /+0.2%
Performance recoveryduring a standard
C-inspection
Performance compared to GT13E2 MXL
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
47
Benefits of GT13E2 MXL Upgrade
Reduced Cost of Electricity due to increased power output
Power output&
efficiency (SC / ISO / Base
Load / New & Clean / Gas)
Hot gas path insp. interval(EOH)
24’000 36’000
GT13E2 MXL(2003)GT13E2
(1993)
165.1 MW / 35.7 %
+ 6.1 MW / + 0.4 %
+ 1.0 MW / +0.2 %
GT13E2 M(2003)
+ 6 MW / +0.4 %
New Blade 5 M+
Compressor Upgrade(2005)
+ 7,1 MW / +0.6 %
32’000
GT13E2 XL
ALSTOM (Switzerland)Ltd© 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
48
Benefits of GT13E2 MXL Upgrade withCompressor Upgrade
GT13E2
GT13E2 MXL
C24’000
36’000 C
4321Years
C24’000 C24’000 C24’000
36’000 C 36’000 C
8765 1211109
Save 1 out of 3 C-inspections in a span of 9 yearsGT13E2 MXL with 36’000 EOH C-inspection intervals and Compressor UpgradeIncreased SC performance (ISO / Baseload / Gas / New & Clean)
– + 6 – 7.1 MW / + 0.4 – 0.6% compared to GT13E2 (depending on B5 M version)
Boost your plant availability with 36’000 EOH C-inspection intervals
Extremely reduced Cost of Electricity due to increased power output