GT 5 7630
Rev No. 00
Page 1 of 3 C
OPY
RIG
HT
AN
D C
ON
FID
EN
TIA
L
The inform
ation on this document is the property of BHARAT HEAVY ELECTRIC
ALS LIM
ITED,
It m
ust not be used directly or indirectly in any way detrim
ental to the interest of the company.
Ref. Doc
Revisions : Prepared :
Approved :
Date :
Refer to record of revisions : CHM K.S 17.05.13
HYDERABAD
TECHNICAL SPECIFICATION FOR SET OF VARIABLE SPRING HANGER ASSEMBLIES
1.0 Scope This specification covers the design, manufacture, inspection; testing and supply of variable
load spring hanger assemblies.
2.0 Material of Construction:
2.1 Springs : 50 Cr V4 to DIN 17221 / 735 A 50 or En 47 to BS 970 Part V of 1972 or its equivalent, duly shot peened.
2.2 Spring casing : IS 2062 Gr A,R&W
2.3 Plates / Flats : Carbon Steel to IS-2062 Gr. A/B 2.4 Hanger rods/Screw rod : Carbon Steel to IS-2062 Gr. A/B 2.5 Beam attachment : Carbon Steel to IS-2062 Gr. A/B 2.6 Turn buckle/ Threaded Bush : Carbon steel to IS 1875 Gr.II (Forged) upto M-30 Carbon steel to IS 2062 Gr.A/B (Machined) above M-30
2.7 Bushes / Low friction pads : Graphite 2.8 Pipe clamp / U-bolt / Saddle : Alloy steel to 1.25% Cr,0.5% Mo (ASTM A182 F11)(or) Alloy steel to 2.25% Cr,1.0% Mo (ASTM A182F22) (or)
Carbon steel to IS 2062 Gr.A/B (As mentioned in Hanger schedule of specific project indent enclosed with the indent)
2.9 Bolt/stud nuts : Alloy steel to A193 Gr.B7/A194 Gr.2H for F11/CSclamps Alloy steel to A193 Gr.B16/A194 Gr.4 for F22 clamps 2.10 Name Plates, Scales : Aluminum Anodised 2.11 Pointers : Carbon steel / Stainless steel
Arrangement of hangers shall be generally inline with the support sketches attached with
the indent(PEMC document of specific project enclosed with the indent). Any other component not mentioned above, but required for completion of manufacture shall conform to MSS SP 58 & 69 and ANSI B31.1. Total assembly length is the height between centerline of pipe and interface with supporting civil structure. Supplier shall maintain the specified length either by adding or trimming the rod length suitably and assembly lengths shall be exactly as per the hanger schedule. For load, movements, length of hanger assembly etc., refer hanger schedule(PEMC document of specific project enclosed with the indent).The typical arrangement of variable load spring hanger assemblies shall be generally as per sh 3 of 5 of this specification.
3.0 Painting & Punch Marking Springs shall be given a rust preventive coating of “ Black phosphating “ after shot blasting. Unless noted otherwise, the Spring Housings & other components shall be applied with an epoxy based Primer & then final coating (total DFT- 150 microns- approx.). Colour – “ Sea Green” – IS 5- shade 217. The assemblies shall be stenciled with Tag nos.as well as punched on the name plate , so that they can be correctly identifiable at site.
`
Form
No.
PRODUCT STANDARD HYDERABAD
PROJECT ENGINEERING DEPARTMENT
GT 5 7630
Rev No. 00
Page 2 of 3 C
OPY
RIG
HT
AN
D C
ON
FID
EN
TIA
L
The inform
ation on this document is the property of BHARAT HEAVY ELECTRIC
ALS LIM
ITED .
It m
ust not be used directly or indirectly in any way detrimental to the interest of the company.
Ref. Doc
HYDERABAD
4.0 Inspection & Testing
Inspection & Testing as per approved Quality Assurance (QA) Plan. At least one piece per lot of similar assemblies shall be load tested to 3 times the rated load for 5 minutes. In case of
spring housings, the sliding plate shall be locked in position before testing. The tests are to be conducted in the presence of BHEL / persons authorized by BHEL.
5.0 Assembly & Dispatch
Preferably total assembly shall be fabricated and dispatched in single despatchable units only. Where the length of the assembly is not convenient for transportation, the assemblies can be dis-assembled in 2 or 3 segments at the threaded joints (like at Turn Buckles) & dispatched.
But in that case, the linking identification marks shall be stenciled clearly in all the segments – as sub- parts of the main unit. Vendor shall do the packing & dispatching of the assemblies appropriately, so that they are not damaged during transportation & storing at site.In case of
any problem at site while identifying assemblies (in case supplied loose based on transportable restrictions),vendor to sort out the problem to the satisfaction of erection agency.
6.0 Documentation Along with offer: One copy each of the following documents shall be submitted along with offer, without which offers will not be scrutinised:
a) G.A. Drawing of assembly / leaflets / catalogues for the offered item binding dimensions, bill of materials with material specification details, tests, weight etc. b) Any deviation to this standard, separately under a heading of Technical Deviations
After placement of order: Four copies each of the following documents for approval:
a) G.A. Drawings with binding dimensions, bill of materials with material specification details, details of tests, weight, cross-sectional & constructional details and materials of construction Quality plan adopted by the supplier during manufacture and inspection / testing b) Installation Guidelines Five copies of the following test certificates shall be furnished to BHEL along with each consignment attested by authorized inspector: a) Chemical and Mechanical Test Certificates b) Test Certificates
Ten copies of Operation & Maintenance manuals to BHEL (Hyderabad) Approval / Review of the documents submitted to BHEL shall not relieve the vendor from its
responsibilities of supplying the assemblies as per applicable standard
TD-106-3
Rev No.
Form
No.
PRODUCT STANDARD
HYDERABAD PROJECT ENGINEERING DEPARTMENT
GT 5 7630
Rev No. 00
Page 3 of 3
CO
PY
RIG
HT
AN
D C
ON
FID
EN
TIA
L
The inform
ation on this document is the property of BHARAT HEAVY ELECTRIC
ALS LIM
ITED,
It m
ust not be used directly or indirectly in any way detrimental to the interest of the company.
RECORD OF REVISIONS
Rev. No. Date Revision Details Revised By Approved By
00 17.05.13 FIRST ISSUE CHM KS
Ref. Doc.
HYDERABAD
Hanger Schedule for Neepco Monarchak PEMC-03900-R01 Dated:23.04.14
Sl. Tag Piping Node No. of Pipe Design Vertical Hot Theoretical Actual Spring Horizontal Load Assembly Clamp Refer
No: No: Service No: Hangers Size Temperature Movement Load Installed Load Load Rate Movement Variation Length With 3 Bolts Sketch
MM Centigrade MM N N N N/MM MM MM
1 HPS-001 HP STEAM 1 273.1 547 -13.043 5700 ** CONSTANT EFFORT SUPPORT 35 - 2000 AS-P22 HGR-01
2 HPS-002 HP STEAM 2 273.1 547 1 8200 ** CONSTANT EFFORT SUPPORT 38 - 2000 AS-P22 HGR-03
3 HPS-003 HP STEAM 2 273.1 547 -44 9750 ** CONSTANT EFFORT SUPPORT 12 - 1500 AS-P22 HGR-03
4 HPS-005 HP STEAM 1 273.1 547 -76 9000 ** CONSTANT EFFORT SUPPORT 4 - 1500 AS-P22 HGR-01
5 HPS-006 HP STEAM 1 273.1 547 -67 15000 ** CONSTANT EFFORT SUPPORT 44 - 1500 AS-P22 HGR-01
6 HPS-008 HP STEAM 1 273.1 547 9.526 7873 9016 0 120 63 15 2000 AS-P22 HGR-01
7 HPS-022 HP STEAM 1 273.1 547 -2.809 19432 18637 0 283 62 4 2000 AS-P22 HGR-01
8 HPS-026 HP STEAM 1 273.1 547 -21.76 35494 29782 0 263 85 16 2000 AS-P22 HGR-01
9 HPS-027 HP STEAM 1 273.1 547 -18.7 19322 16684 0 141 72.8 14 2000 AS-P22 HGR-01
10 HPS-029 HP STEAM 1 273.1 547 -3.6 15700 14936 0 213 51 5 2000 AS-P22 HGR-01
11 HPS-030 HP STEAM 1 273.1 547 -12.6 14750 12071 0 213 32 18 2000 AS-P22 HGR-01
12 HPS-031 HP STEAM 1 273.1 547 -22 16550 ** CONSTANT EFFORT SUPPORT 30 - 2000 AS-P22 HGR-01
13 HPS-032 HP STEAM 1 273.1 547 -32 16200 ** CONSTANT EFFORT SUPPORT 15 - 2000 AS-P22 HGR-01
14 DS-HP-01 HP STEAM 1 273.1 547 0.5 26681 26853 0 384 16 1 2000 AS-P22 HGR-01
15 DS-HP-02 HP STEAM 1 273.1 547 -2.303 8200 7924 0 120 44 3 2000 AS-P22 HGR-01
16 DS-HP-04 HP STEAM 1 273.1 547 -15.5 15088 11788 0 213 34 22 2000 AS-P22 HGR-01
17 DS-HP-08 HP STEAM 1 508.00 210 0.758 10922 11043 0 160 2 1 2000 AS P22 HGR-01
18 DS-HP-09 HP STEAM 1 323.00 210 1.227 8300 8447 0 120 2 2 2000 AS P22 HGR-01
19 DS-HP-10 HP STEAM 1 323.00 547 -3 4011 3864 0 53.3 5 4 2000 AS P22 HGR-01
20 WV-HP-02 HPSTEAM 1 60.00 547 -7.5 2100 1881 0 29.4 27 10 2000 AS P22 HGR-01
21 WV-HP-04 HPSTEAM 1 168.00 547 -3.7 7751 7317 0 120 37 6 2000 AS P22 HGR-01
22 HPS-008a HP STEAM 1 273.1 547 9.526 7873 9016 0 120 63 15 2000 AS-P22 HGR-01
23 HPS-022a HP STEAM 1 273.1 547 -2.809 19432 18637 0 283 62 4 2000 AS-P22 HGR-01
24 HPS-026a HP STEAM 1 273.1 547 -21.76 35494 29782 0 263 85 16 2000 AS-P22 HGR-01
25 HPS-027a HP STEAM 1 273.1 547 -18.7 19322 16684 0 141 72.8 14 2000 AS-P22 HGR-01
26 HPS-029a HP STEAM 1 273.1 547 -3.6 15700 14936 0 213 51 5 2000 AS-P22 HGR-01
27 HPS-030a HP STEAM 1 273.1 547 -12.6 14750 12071 0 213 32 18 2000 AS-P22 HGR-01
28 DB-69-01 AUX. STEAM 1 114.30 270 -8.711 1689 1399 0 333 3.881 17 3000 CS Galv. HGR-01
29 DB-69-01 AUX. STEAM 1 168.30 270 -7.928 3358 2830 0 666 3.215 16 3000 CS Galv. HGR-01
30 DB-68-02 AUX. STEAM 1 168.30 270 -23.466 10019 8456 0 666 11.632 16 1000 CS Galv. HGR-01
31 PR-AU-01 AUX. STEAM 1 168.30 270 17.423 1797 2087 0 166 24.869 16 2000 CS Galv. HGR-01
32 AUX-2 AUX. STEAM 1 88.90 270 3.252 472 499 0 83 12.567 6 1500 CS Galv. HGR-01
33 AUX-1115 AUX. STEAM 1 48.30 270 10.789 398 487 0 83 4.367 22 1000 CS Galv. HGR-01
34 AUX-1117 AUX. STEAM 1 48.30 270 3.652 252 282 0 83 5.615 12 1000 CS Galv. HGR-01
35 IPS-001 IP STEAM 1 114.30 270 6.5 2401 2657 0 40.7 11 11 2000 CS Galv. HGR-01
36 IPS-005 IP STEAM 1 114.30 270 -23 1956 1619 0 14.7 17 17 2000 CS Galv. HGR-01
37 IPS-035 IP STEAM 1 114.30 270 -12.3 3385 2730 0 53.3 7 19 PEDESTAL CS Galv. HGR-02
38 DS-IP-00 IP STEAM 1 220.00 270 2.5 1210 1251 0 17 10 3 PEDESTAL CS Galv. HGR-02
39 DS-IP-01 IP STEAM 1 220.00 270 6.5 1549 1698 0 23 7.5 10 PEDESTAL CS Galv. HGR-02
40 IPS-035 IP STEAM 1 114.30 270 -12.3 3385 2730 0 53.3 7 19 PEDESTAL CS Galv. HGR-02
41 DS-IP-00 IP STEAM 1 220.00 270 2.5 1210 1251 0 17 10 3 PEDESTAL CS Galv. HGR-02
42 DS-IP-01 IP STEAM 1 220.00 270 6.5 1549 1698 0 23 7.5 10 2000 CS Galv. HGR-01
43 IP-7 IP STEAM 1 114.30 270 -0.653 1757 1735 0 333 15.757 1 2000 CS Galv. HGR-01
44 IP-8 IP STEAM 1 168.30 270 -19.178 2048 1730 0 166 26.928 16 2000 CS Galv. HGR-01
45 IP-9 IP STEAM 1 168.30 270 -12.556 1757 1339 0 333 5.181 24 3000 CS Galv. HGR-01
46 IDS-2 IP STEAM 1 219.10 270 7.896 1907 2170 0 333 16.046 14 3000 CS Galv. HGR-01
47 IDS-5 IP STEAM 1 219.10 270 6.218 2848 3262 0 666 14.309 15 PEDESTAL CS Galv. HGR-02
48 LP-04 LP STEAM 1 219.1 220 -33.123 3111 2561 0 166 15.678 18 PEDESTAL CS Galv. HGR-02
49 LP-08 LP STEAM 1 219.1 220 -16.225 2083 1813 0 166 10.589 13 2000 CS Galv. HGR-01
50 LP-02 LP STEAM 1 168.3 220 12.925 2986 3417 0 333 21.515 14 2000 CS Galv. HGR-01
51 LP-03 LP STEAM 1 168.3 220 14.551 901 1022 0 83 23.238 13 2000 CS Galv. HGR-01
52 LP-06 LP STEAM 1 168.3 220 -7.031 1511 1277 0 333 12.642 15 2000 CS Galv. HGR-01
53 LP-07 LP STEAM 1 168.3 220 -6.582 951 842 0 166 3.729 11 2000 CS Galv. HGR-01
54 DB-70A LP STEAM 1 219.1 220 -10.596 4851 4145 0 666 7.441 15 PEDESTAL CS Galv. HGR-02
55 DB-71 LP STEAM 1 273.1 220 -28.006 2208 1743 0 166 14.03 21 PEDESTAL CS Galv. HGR-02
56 DB-70B LP STEAM 1 273.1 220 -29.081 4629 3661 0 333 20.665 21 PEDESTAL CS Galv. HGR-02
57 DB-181 LP STEAM 1 273.1 220 3.877 9870 10903 0 2666 12.979 10 PEDESTAL CS Galv. HGR-02
58 DB-180 LP STEAM 1 457.2 220 -6.111 20577 17318 0 5333 9.136 16 PEDESTAL CS Galv. HGR-02
59 DB-121A LP STEAM 1 114.3 220 -0.822 566 552 0 166 9.716 2 3000 CS Galv. HGR-01
60 DB-184B LP STEAM 1 114.3 220 -1.828 2529 2407 0 666 2.088 5 PEDESTAL CS Galv. HGR-02
61 LP-08 LP STEAM 1 219.1 220 9.623 3325 3966 0 666 23.167 19 2000 CS Galv. HGR-01
62 LP-10 LP STEAM 1 219.1 220 16.457 3822 4370 0 333 16.881 14 1000 CS Galv. HGR-01
63 PS-02 LP STEAM 1 219.1 220 9.536 4527 5195 0 700 10.281 15 1000 CS Galv. HGR-01
64 ROD-1 General - 3 60.3 - - 10000 - - - - - 2000 AS-P22 HGR-04
65 ROD-2 General - 3 114.3 - - 10000 - - - - - 2000 CS Galv. HGR-04
66 ROD-3 General - 3 168.3 - - 20000 - - - - - 2000 CS Galv. HGR-04
67 ROD-4 General - 3 219.1 - - 20000 - - - - - 2000 CS Galv. HGR-04
68 ROD-5 General - 3 273.1 - - 20000 - - - - - 2000 AS-P22 HGR-04
69 ROD-6 General - 10 323 - - 50000 - - - - - 2000 AS-P22 HGR-04
70 ROD-7 General - 10 323 - - 30000 - - - - - 2000 AS-P22 HGR-04
71 EX-H-1600/200 General - 3 273.1 - - 15000 - - - - - 2000 AS-P22 HGR-01
72 EX-H-1000/200 General - 3 273.1 - - 9000 - - - - - 2000 AS-P22 HGR-01
73 EX-H-630/200 General - 3 273.1 - - 6000 - - - - - 2000 AS-P22 HGR-01
74 EX-H-400/200 General - 3 273.1 - - 3500 - - - - - 2000 AS-P22 HGR-01
75 CLAMPS-3 BOLTS General - 3 60.3 - - - - - - - - - AS-P22 -
76 CLAMPS-3 BOLTS General - 3 88.9 - - - - - - - - - AS-P22 -
77 CLAMPS-3 BOLTS General - 3 114.3 - - - - - - - - - AS-P22 -
78 CLAMPS-3 BOLTS General - 3 168.3 - - - - - - - - - AS-P22 -
79 CLAMPS-3 BOLTS General - 3 219.1 - - - - - - - - - AS-P22 -
80 CLAMPS-3 BOLTS General - 3 273.1 - - - - - - - - - AS-P22 -
81 1/2"-U BOLT General - 50 21.4 - - - - - - - - - - -
82 3/4"-U BOLT General - 50 26.7 - - - - - - - - - - -
83 1" -U BOLT General - 100 33.4 - - - - - - - - - - -
84 1.5" -U BOLT General - 4 48.3 - - - - - - - - - - -
85 2"-U BOLT General - 75 60.3 - - - - - - - - - - -
86 3"-U BOLT General - 40 88.9 - - - - - - - - - - -
87 4"-U BOLT General - 20 114.3 - - - - - - - - - - -
88 6"-U BOLT General - 20 168.3 - - - - - - - - - - -
Hanger Schedule for Neepco Monarchak PEMC-03900-R01 Dated:23.04.14
Sl. Tag Piping Node No. of Pipe Design Vertical Hot Theoretical Actual Spring Horizontal Load Assembly Clamp Refer
No: No: Service No: Hangers Size Temperature Movement Load Installed Load Load Rate Movement Variation Length With 3 Bolts Sketch
MM Centigrade MM N N N N/MM MM MM
89 8" -U BOLT General - 20 219.1 - - - - - - - - - - -
90 10"-U BOLT General - 10 273.1 - - - - - - - - - - -
91 12"-U BOLT General - 5 323.9 - - - - - - - - - - -
92 Fork General - 3 M12 - - - - - - - - - - -
93 Fork General - 3 M16 - - - - - - - - - - -
94 Fork General - 3 M20 - - - - - - - - - - -
95 Fork General - 3 M24 - - - - - - - - - - -
96 LH eye rod General - 3 M12 - - - - - - - - - - -
97 LH eye rod General - 3 M16 - - - - - - - - - - -
98 LH eye rod General - Z M20 - - - - - - - - - - -
99 LH eye rod General - 3 M24 - - - - - - - - - - -
100 RH eye rod General - 3 M12 - - - - - - - - - - -
101 RH eye rod General - 3 M16 - - - - - - - - - - -
102 RH eye rod General - 3 M20 - - - - - - - - - - -
103 RH eye rod General - 3 M24 - - - - - - - - - - -
104 TURN BUCKLE General - 3 M12 - - - - - - - - - - -
105 TURN BUCKLE General - 3 M16 - - - - - - - - - - -
106 TURN BUCKLE General - 3 M20 - - - - - - - - - - -
107 TURN BUCKLE General - 3 M24 - - - - - - - - - - -
108 FORK attach General - 3 M12 - - - - - - - - - - -
109 FORK attach General - 3 M16 - - - - - - - - - - -
110 FORK attach General - 3 M20 - - - - - - - - - - -
111 FORK attach General - 3 M24 - - - - - - - - - - -
Note :
1) Pipe design temperature is 547 deg.C wherever AS clamps mentioned
2) The spring hanger schedule prepared based on preliminary piping layout. This may be revised in any change in piping layout.
3) The followin specifications are to be referred for hanger components:
(a) Clamps with 3-bolts-HY9603141
(b) U-bolt Galvanised-HY9603148
(c) Fork HY9603108
(d) LH eye rod-HY9603109-With LH threading
(e) RH eye rod-HY9603114-With RH threading
(f) Fork Attach-HY9603124
(g) Turn Buckle-HY9603118
HY9603148 REV. NO. 04
PLANT STANDARD HYDERABAD
PAGE 1 OF 2 Revisions: Var. Nos. 16 to 21 added, var. no. 14 corrected. Brought upto date.
Issued :
STANDARDS ENGINEERING DEPARTMENT Rev. No. 04 Amd. No. Reaffirmed:
Dt. DEC. 07 Dt. Year:
Prepared: KMS
Approved: M (TS)
Date of 1st issue: APR., 1981
Cop
yrig
ht a
nd C
onfid
entia
l Th
e in
form
atio
n on
this
doc
umen
t is t
he p
rope
rty o
f BH
AR
AT
HEA
VY
ELE
CTRI
CALS
LIM
ITED
.
It m
ust n
ot b
e us
ed d
irect
ly o
r ind
irect
ly in
any
way
det
rimen
tal t
o th
e in
tere
st o
f the
com
pany
.
U – BOLT GALVANIZED (FOR ASTM PIPE SIZES)
Designation : U – BOLT GALVZD VAR. NO. XX HY9603148 Orderring details : HY9603148 Material : IS 226 (AA10108) supply shall be in galvanized condition along with 4
nuts as per AA0673608. Size : Var. no. XX Nuts : As per IS 1364 Pt. 6 & IS 4218 – 6H Thread tolerances applicable after galvanization. Thread run outs and ends as per standard practice. Punch or paint 12 digit component code (e.g. for var no. 01 punch HY9603148016) Only the latest version of this standard shall be used for all commercial transactions. To obtain 12 digit component code suffix sub-code to plant standard no. Components shall be stored in fully covered shed. Old reference : 4C – 47 – 9689 (CPS061)
HY9603148 REV. NO. 04
PAGE 2 OF 2
PLANT STANDARD HYDERABAD
FOR INTERNAL REFERENCE ONLY
ALL DIMENSIONS IN mm UNLESS OTHERWISE STATED
Var. No.
Nd Inch D1 A B C D2
M-6g &Nut
6H
Wt./Set kg.
Dev. Length
Raw mat. Size dia
Sub code
01 ¾ 32 90 38 60 6 M6 0.056 196 6 016 02 1 38 95 50 55 12 M12 0.215 207 12 024 03 1 ½ 52 110 64 56 12 M12 0.292 245 12 032 04 2 64 130 76 70 12 M12 0.332 291 12 040 05 3 94 160 106 70 12 M12 0.400 369 12 059 06 4 120 190 136 80 16 M16 0.838 442 16 067 07 6 176 240 192 80 16 M16 1.04 574 16 075 08 8 228 305 248 90 20 M20 2.07 732 20 083 09 10 282 355 302 90 20 M20 2.39 862 20 091 10 12 332 405 352 90 20 M20 2.71 991 20 105 11 14 365 445 390 90 25 M24 4.65 1088 25 113 12 16 428 510 452 90 25 M24 5.28 1254 25 121 13 20 525 610 554 90 25 M24 6.26 1509 25 130 14 5 148 216 160 76 16 M16 0.95 530 16 148 15 ½ 25 85 30 60 6 M6 0.05 175 6 156 16 ¼ 15 70 20 54 6 M6 0.04 145 6 164 17 18 470 587 495 108 25 M24 5.97 1430 25 172 18 24 625 685 650 120 25 M24 7.69 1840 25 180 19 28 730 815 755 120 25 M24 8.78 2100 25 199 20 30 781 898 806 120 25 M24 9.27 2220 25 202 21 32 833 950 858 120 25 M24 9.82 2350 25 210
Note: If sub-contracted or manufactured internally raw material is to be issued as per plant
rationalized sizes as given.
Cop
yrig
ht a
nd C
onfid
entia
l Th
e in
form
atio
n on
this
doc
umen
t is t
he p
rope
rty o
f BH
AR
AT
HEA
VY
ELE
CTR
ICA
LS L
IMIT
ED.
It
mus
t not
be
used
dire
ctly
or i
ndire
ctly
in a
ny w
ay d
etrim
enta
l to
the
inte
rest
of t
he c
ompa
ny.