group brochure march 2015
DESCRIPTION
ÂTRANSCRIPT
WELCOME
The Od Group is London’s leading fit-out and refurbishment company in commercial, residential and leisure.
We provide the very best specialist construction skills from project initiation to completion, and we can cope with any scale project including new builds.
We’re experts in organising people and materials within tight timescales.
A dedicated team with over 50 years’ collective experience as London and the South East’s leading high-quality contractor.
Within this document you will find a selection of our recently completed projects.
TURNOVER
182 8 10 12 14 164 60
(Turnover £m April-April)
20 2422 26
2012/2013
2013/2014
SECURED2014/2015 (Projected)
28 30 34 3632 38 40 5048 5842 52 6044 5446 56
2015/2016 (Projected) SECURED
HISTORY
• Od Projects client list includes Arsenal FC, Scott Brownrigg, AYH, and Price & Myers
• Recruitment of Commercial Director, Greg Pinchin (Managing Surveyor of top fit out company)
• Recruitment of Construction Director, Steve Cherry (BCO & FX Quality Award Winner)
• AIB framework contractor
• Achieve British Council for offices corporate member status
• Sign five year lease and fit out Moorgate HQ
• Jon Kearney finalist for G4_ New Generation Awards – Entrepreneurship Award
• Rolls Royce framework contractor
• Green Apple Award for Digitas Saatchi & Saatchi
• Instutute of Chartered Accountants Framework contractor
• Awarded Vogue/Condenast HQ fitout
• Education sector expansion with successful fitout projects for Partnerships For Schools and North Herts College
• Savills approved contractor
• High end residential team acknowledged as leading contractor within sector
• Awarded refurbishment for Royal Albert Hall
• In January Jon Kearney founds Od
• Client base expanded to include Royal & Sun Alliance, O2, AIB, Morley Fund, and GIS Interpublic
• Consultants include Gensler, Cushman & Wakefield, Barr Gazetas, and Leslie Clark
• Royal & Sun Alliance approved contractor status
• Od complete £4 million, 107 Leadenhall, fit out
• Od achieve ISO9001 status
• Forecast record turnover of circa £20m in with Business Plan
• Official launch of aftercare team ‘ZEROdEFECTS’
• Successful completion of first Irish project for Marcus Evans HQ in Dublin
• Notable project wins for clients such as Finchatton, BMB Property, United Continental Airlines, Safestay and Royal London Asset Management
• Commitment to sustainability – BREEAM ‘Excellent’ achieved on refurbishment of RLAM property in Crawley, LEED silver certification achieved for Harris Williams fit out in Mayfair, SKA silver certificate achieved for Paradigm Housing in High Wycombe
• Rebrand of Od which defines our focus and disciplined approach to achieving quality
• Od appointed on Savills Estate Agency office fitout framework
• Repeat business levels at 70% of turnover and growing
• Notable project wins for Dow Jones, Royal London Asset Management, Fendi,National Australia Group and Berkeley Group Marketing Suites
• Od completes its first hotel refurbishment for launch of exciting new venture for Safestay in London
• Od working on over 50000sqft of Londons super prime residential projects in Knightsbridge, Kensington and Hampstead
• Od expand office space to take another floor at Sun St HQ
• Od Group formed, divisions focused on commercial fit out, super prime Residential and commercial design & build
• Od Group launch Od Solutions to cater for direct end user clients requiring a ‘one stop shop’ turnkey, design & build solution
• Andrew Wright joins as Director to head up Od Solutions
• Successful completion of first laboratory project for BTG
• Successful completion of Kia Motors UK Headquarters in Walton Upon Thames
• Od Solutions secure preferred partner status for Royal London Asset Management’ own nationwide corporate workspace refurbishment programme
• Od Interiors successfully complete 25,000 sqft fit out for Bridgepoint Advisors at 95 Wigmore St
• Od Solutions secure fitout for Hedge Fund Muzinich & Co, our 3rd floor within 8 Hanover St
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
• Od Group celebrates ten years of delivering successful projects
• Od Interiors successfully complete 25,000sqft two stage Cat B fit out across two floors for First State Investments in 13 weeks
• Od Solutions successfully deliver 60,000sqft Cat B office refurbishment across floors 6 – 11 for Howard Kennedy at Number One London Bridge
• Od Interiors continue to work with long term clients, Royal London, AIB and ICA on a range of projects across the UK
• Od Interiors secure project for global media company delivering studio and office fit out
• Od Projects secure prestigious 40,000sqft development in Knightsbridge working with project manager Finchatton at 38-62 Yeomans Row
• Notable wins across the group for clients including; AGC, Leni Gas & Oil, Numis, Viridis Properties, BTG and Acadian Asset Management
• Od Interiors appointed to deliver 26,000sqft fit out across four floors at 99 Bishops Gate for Latham & Watkins
• Od’s commitment to sustainability continues as they work towards ISO14001
Specialising in interior fit out and construction to the professional construction industry.
Working closely with architects, project managers, quantity surveyors and direct for end user clients.
Covering all sectors including commercial, retail and leisure
Specialist high end residential refurbishment and construction company working closely with high net worth clients, developers and architects to deliver unique boutique interiors
Specialist company working directly with end user clients and their consulting teams delivering a ‘one stop shop’ turnkey solution. Working with interior design and architecture companies Od Solutions are procurement specialist that take a client from concept to completion under one roof.
ANDY TORLOTDIRECTOR
STEvE ChERRYDIRECTOR
JON KEARNEYDIRECTOR
ANDREW WRIGhTDIRECTOR
JON KEARNEYMANAGING DIRECTOR
STEvE ChERRYCONSTRUCTION DIRECTOR
GREG PINChINCOMMERCIAL DIRECTOR
COMPANY STRUCTURE
MANAGEMENT STRUCTURE
MANAGING SURVEYORS
GREG PINCHINCOMMERCIAL DIRECTOR
GAVIN HAWKINSPRE CONSTRUCTION DIRECTOR
JON KEARNEYMANAGING DIRECTOR
OD PROJECTSJON KEARNEY
DIRECTOR
OD INTERIORSANDY TORLOT
DIRECTOR
OD INTERIORSSTEVE CHERRY
DIRECTOR
STEVE CHERRYCONSTRUCTION DIRECTOR
CONTRACTS MANAGERS
CONSTRUCTION MANAGERS
ASSISTANT CONSTRUCTION MANAGERS
CONTRACTS MANAGERSCONTRACTS MANAGERS
CONSTRUCTION MANAGERSCONSTRUCTION MANAGERS
ASSISTANT CONSTRUCTION MANAGERS
ASSISTANT CONSTRUCTION MANAGERS
ADMINISTRATION SUPPORT
OD SOLUTIONSANDREW WRIGHT
DIRECTOR
HEAD OF CONSTRUCTION
CONSTRUCTION MANAGERS
PRE CONSTRUCTION MANAGERS
ACCOUNTS MANAGER PRE CONSTRUCTION MANAGER
SENIOR ESTIMATOR
ESTIMATOR
ESTIMATOR
PRE CONSTRUCTION COORDINATOR
bID MANAGER PLANNER
PLANNER
ASSISTANT PLANNER
bID COORDINATORACCOUNTS ASSISTANT COMMERCIAL MANAGERS
›OD INTERIORS
Specialising in interior fit out and refurbishment to the professional construction industry. Working closely with architects, project managers,
quantity surveyors and direct for end user clients. Covering all sectors including commercial, retail and leisure
CORPORATE, LONDON
25,000 sq ft, £3,200,000
Two stage Cat A to Cat B fit out of the 7th & 8th floors.
FIRST STATE INvESTMENTS10 SOUTH PLACE, LONDON
The details:Architect: Gensler
Project Manager: Mace
Quantity Surveyor: Mace Cost Consultancy
Duration: 13 weeks
Works included:
• New client meeting suite
• Data centre
• Catering kitchen
• New toilets
• Trading areas
• Reception and collaboration hub area
• Library
• Full AV installation integrated into existing services
• Sprinklers
CORPORATE, LONDON
30,000 sq ft, £2,000,000
Phased refurbishment of office floor whilst the building remained in full occupation.
DOW JONESGRAYS INN ROAD, LONDON
The details:Architect: Edge
Quantity Surveyor: Arcadis
Services Consultant: Arcadis
Duration: 12 weeks & 9 weeks
Phase 1 works included:
• Strip out
• Installation of new electrical & mechanical services
• Glass partitions
• Fit Out of new toilets
• Tea points
• High specification restaurant
• Floor coverings
Phase 2 works included:
• Strip out
• Installation of new electrical & mechanical services
• Glass partitions
• Fit out of new toilets
Phase 3 works included:
• Reception refurbishment
CORPORATE, LONDON
28,000 sq ft, £2,400,000
Cat B office fit out across 5th, 6th and 7th floors at 95 Wigmore Street.
BRIDGEPOINT ADvISORS95 WIGMORE STREET, LONDON
The details:Architect: KKS
Project Manager: Savills
Quantity Surveyor: Fanshawe
Duration: 15 Weeks
Works included:
• Formation of the main reception and five meeting suites on 7th floor
• Completion and early handover of the comms room on 5th and 7th floor
• Offices and open plan areas to 5th and 6th floors
CORPORATE, LONDON
20,000 sq ft, £2,100,000
Extension and fit out of ground and mezzanine floor at Britannia House to create an iconic space for entrepreneurs and creative businesses.
BRITANNIA hOUSEHANBURY STREET, LONDON
The details:Architect: Selgas Cano
Project Manager: Jackson Coles LLP
Quantity Surveyor: Jackson Coles LLP
Duration: 16 Weeks
Works included:
• Curved acrylic domed screen
• Flying table
• Cafe area/Bar
• Open interactive workspaces
• Toilets and showers
• Additional steel works
PHARMACEUTICAL, SURREY
30,000 sq ft, £Confidential
Multi-phased lab fit out project - Phase 1 lab and office fit out was from an unoccupied building that was already fitted out to CAT A. Phase 2 lab and office fit out was completed during occupation.
BIOCOMPATIBLES UK LTDWATCHMOOR PARK, CAMBERLEY
The details:Architect: Moxon Architects
Services Consultant: Hi-Tek Consultants
Duration: 52 weeks
Works to the office space included:
• Internal structural modifications• Revision of MEP basebuild services• Dedicated comms room with UPS backup• Formation of new glazed offices• General fit out of office space over two floors• New reception• Five new kitchens and breakout station• Board room with integral AV installation• Third project in UK to achieve Silver SKA Rating
for Sustainability
Works to the laboratory units included:
• Specialist Medical gas/air installations including; Helium, Nitrogen, CO2, O2 and compressed air systems
• Compressed air systems• Bespoke lab furniture• Incoming utilities• Fume cupboards• Specialist lighting• Clean room conditions• Bespoke joinery
CORPORATE, LONDON
8,000 sq ft, £720,000
CAT B fit out of the first floor newly refurbished occupied building to provide a high quality office.
hARRIS WILLIAMSLEVEL 2, 63 BROOK STREET, MAYFAIR, W1
The details:Project Manager: Gensler
Architect: Gensler
Duration: 14 weeks
Works included:
• High quality bespoke joinery
• Mechanical and electrical modifications
• Double glazed BENE partitions and doors
• Handmade carpet flooring
• Audio visual installations
CORPORATE, LONDON
3,000 sq ft, £600,000
Strip out and new fit out of existing occupied offices in two separate phases.
SAPINDALEVEL 5, 25 PARK LANE, W1
The details:Architect: Gensler
Project Manager: Gensler
Quantity Surveyor: Montie
Duration: 11 Weeks
Works included:
• New cellularised offices
• New meeting and board rooms
• High spec stone reception
• Stone flooring
• Specialist joinery
• New lighting inclusive of feature lighting installed throughout
CORPORATE, SURREY
31,000 sq ft, £1,800,000
The project works comprises of the fit out of an existing office building and construction of a new extension to house a new main entrance and reception room.
KIA MOTORS (UK) LTDWALTON ON THAMES
The details:Architect:: Pringle Brandon Perkins + Will
Project Manager: Savills
Quantity Surveyor: Heasmans
Duration: 18 weeks
Works included:
• Ground floor consists of new reception area, main entrance, meeting rooms, showroom area, post room, UPS server room, and kitchen and staff facilities
• The new layout on levels 1 and 2 consist of offices, meeting rooms, copy point areas, server rooms, tea points, commercial kitchen/cafe and break out areas
• The roof level consists of an internal plant room and an external flat roof plant area
HOSPITALITY, LONDON
3,700 sq ft, £1,000,000
This project comprised the demolition of an existing basement workshop and fit-out of new dining/kitchen facilities within a Grade I listed building.
ROYAL ALBERT hALLKENSINGTON GORE
The details:Architect: BDP
Services Engineer: Logi-Tek
Quantity Surveyors: Wheelers
Duration: 26 weeks
Works included:
• New storage facilities were located on a new mezzanine
• Existing kitchen facility located at basement level 1 was stripped out and high quality dressing rooms constructed in the vacated spaces
CORPORATE, WEST SUSSEX
25,000 sq ft, £2,500,000
Built in 1998, the Portland building was comprehensively refurbished over three floors to achieve a BREEAM Excellent classification.
ROYAL LONDON - PORTLAND BUILDINGPORTLAND, CRAWLEY
The details:Architect: Orbit Architects
Quantity Surveyor: Cyril Leonard
Services Consultant: Lamorbey Associates
Structural Engineer: Connisbee
Duration: 18 weeks
Works included:
• BREEAM ‘Excellent’ rated
• Full Design & Build
• Complete replacement of main plant and all on floor services
• New entrance canopy and internal reception
• External landscaping
• Refurbishment of multi-storey car park
CORPORATE, LONDON
27,000 sq ft, £2,000,000
Refurbishment of the existing offices to a CAT A fit out across three floors with one floor remaining occupied by the tenant.
ROYAL LONDON - DRAGON COURTCOVENT GARDEN, LONDON
The details:Architect: Orbit Architects
Quantity Surveyor: Quantem Consulting
Project Manager: APS Chartered Surveyors
Services Consultant: The Anslow Partnership
Duration: 24 weeks
Works included:
• Heavy strip out
• Structural modifications
• Complete mechanical plant renewal
• Toilets/reception fit out
• New suspended ceilings
• New raised floors
• Curtain walling
CORPORATE, LONDON
40,000 sq ft, £4,000,000
Extensive structural works to this 1960s building included opening up the façade, enclosing light wells and creating a 50m lift tower.
ShIATZU hOLDINGS LTD LEADENHALL STREET, LONDON
The details:Architect: Barr Gazetas
Quantity Surveyor: Quantem Consulting
Services Consultant: The Engineering Practice
Duration: 40 weeks
Works included:
• Cat A refurb on ground, mezzanine, 3rd – 7th floors
• Cat B client possession on ground, mezzanine, 6th & 7th floors
• Light well infills on three floors
• Link bridge and lift shaft from ground – 5th & 6th floors
• Phased common part refurbishment to WC’s and lobbies on 3rd – 7th floors
• Central plant replacement to basement incoming and roof mounted AHU’s and chillers
• Refurbishment of Crittall windows
›OD SOLUTIONS
Specialist company working directly with end user clients and their consulting teams delivering a ‘one stop shop’ turnkey solution. Working with interior design and architecture companies Od Solutions are procurement specialists that take
a client from concept to completion under one roof
TURNKEY, LONDON
8,000 sq ft, £CONFIDENTIAL
Full design & build CAT B fit out of levels 5 & 6.
TEMASEK hOLDINGS (UK) LIMITED LEADENHALL STREET, LONDON
The details:Designer: Od Solutions
Project Manager: Savills
Client facing front of house works included:
• High specification meeting rooms
• Lime-washed oak floor
• White marble cladding
• Presentation suites with full audio visual capacity
Back of house works included:
• Main board directors executive suite
• Central focal hub clad in a black lacquered finish with inset joinery
• Administration support area
• General working office and ancillary areas
TURNKEY, LONDON
9,000 sq ft, £CONFIDENTIAL
Full design and build of the UK headquarters.
ROYAL LONDONGRACECHURCH STREET
The details:Architect: Blue Bottle
Quantity Surveyor: Quantem Consulting LLP
Services Consultant: Lamorbey Associates
Duration: 16 weeks
Client facing front of house works included:
• Meeting rooms
• Lounges
• Catering facilities
• Presentation suites with full audio visual capacity
Back of house works included:
• Main board directors executive suite
• Administration support area
• General working office and ancillary areas
TURNKEY, LONDON
10,000 sq ft, £1,200,000
The design and fit out of a high quality office environment commensurate with a legal institution of this calibre.
SChULTE ROTh & ZABEL LLPGRACECHURCH STREET
The details:Designer: Od Solutions
Project Manager: Savills
Duration: 13 weeks
Works included:
• Lime-washed oak floors
• Double-glazed fronted offices
• High-spec modern finishes
• Polished plaster walls
• Vertical timber shutters
• Noise-cancelling panels
TURNKEY, LONDON
60,000 sq ft, £CONFIDENTIAL
CAT B office refurbishment across floors 6 - 11.
hOWARD KENNEDY FSI LLPNUMBER ONE LONDON BRIDGE
The details:Architect MCM
Project Manager: APS
Quantity Surveyor: APS
Duration: 17 weeks
Works included:
• Client facing suites
• Meeting rooms
• Break-out spaces
• Catering facilities
• Administration support area
• General working office and ancillary areas
›OD PROJECTS
Specialist prime residential refurbishment and construction company working closely with high net worth clients, developers and architects to
deliver bespoke interiors
RESIDENTIAL, LONDON
13,500 sq ft, £6,000,000
The project comprises the design, construction and fit out to basement, lower ground and upper ground levels.
EATON SQUAREBELGRAVIA
The details:Development Manager Finchatton
Architect: Lifschutz Davidson Sandilands
Quantity Surveyor: Measur
Services Consultant: Tasc
Duration: 56 weeks
Works included:
• Basement swimming pool and leisure facility
• Rear mews extension
• High level residential finishes
• Installation of access lift to all floors
• High spec AV installation
• External rooftop inside outside facility
RESIDENTIAL, LONDON
6,500 sq ft, £6,000,000
The demolition of an existing two storey property to create one villa within this prime location in Knightsbridge, forming a 16m deep basement to the entire site.
RUTLAND GARDENSBELGRAVIA
The details:Development Manager Finchatton
Architect: Lifschutz Davidson Sandilands
Quantity Surveyor: Measur
Services Consultant: Tasc
Duration: 56 weeks
Works included:
• Complete demolition and soft strip
• Secant piling to the site boundaries
• A complicated temporary support system and 10m deep basement formation, carried out as CDP
• High quality stonework
• Whole house ventilation, air-conditioning, i-Light systems audio visual package
RESIDENTIAL, LONDON
7,500 sq ft, £5,000,000
The fit out of a penthouse apartment with three bedrooms - all en-suite - a reception room, bespoke kitchen, a dining/family room, a library/study, a large roof terrace and a private lift.
KENWOOD PLACEHAMPSTEAD
The details:Project Manager: Arcadis
Architect: Hamilton
Quantity Surveyor: Arcadis
Services Engineer: AWA
Interior Design: Keech Green
Duration: 48 weeks
Works included:
• New mechanical and electrical services
• Audio visual and IT networks
• Specialist joinery
• Extensive stonework
• High quality finishes
STAGE 1 – PLANNING FOR QUALITY•ZeroDefectsIntroductionMeeting•DetailedDesignReview•IdentifyQualityRisks•IdentifyWorkZones/Sequencing/Phasing•Sub-contractorTargetProgramme
STAGE 2 – INFORMATION RELEASE•Drawing/InformationReleaseSchedule•SampleSchedule•OffSiteInspectionSchedule
STAGE 3 – SETTING QUALITY STANDARDS•Benchmarking•SampleApproval•KeyInspections•ProtectionRegime
STAGE 4 – REvIEW & QUALITY CONTROL SIGN OFF•Review•Monitoring•Handover
STAGE 5 – SNAGGING & DEFECTS•DefectsProcess•IdentifyingDefects•SiteMarkUps•Sub-ContractorDefectManagement•DefectReporting
STAGE 6 – PROJECT CLOSE OUT•FinalisationPlan•CloseOutProgrammes•DefectReporting•RecordDocument•ClientFamiliarisation
Od operates a ‘zero defects’ plan. This is more commonly known as a quality plan. The plan is written at the commencement of the project and sets out to achieve as high a quality delivery as possible. This is not just in the finished product, it covers every stage of the project including management techniques as follows;
Fit‐out Sustainability AssessmentThis is to certify that
Paradigm Housing GroupBuilding A1 Glory Park
High Wycombe Bucks HP10
has achieved the Ska rating of
Silver
Accredited Assessor
Pringle Brandon LLP
On behalf of
Paradigm Housing Group
Project Manager
Savills Commercial Ltd
Architect
Mansfield Monk
Contractor
OD Projects
Building Services Engineer
Capita Symonds
Certificate Reference
Glory Park, High Wycombe
Date
29/06/2010
This certificate has been produced using Ska Rating Offices version 1.0
SUSTAINABLE CREDENTIALS