WELCOME

The Od Group is London’s leading fit-out and refurbishment company in commercial, residential and leisure.

We provide the very best specialist construction skills from project initiation to completion, and we can cope with any scale project including new builds.

We’re experts in organising people and materials within tight timescales.

A dedicated team with over 50 years’ collective experience as London and the South East’s leading high-quality contractor.

Within this document you will find a selection of our recently completed projects.

TURNOVER

182 8 10 12 14 164 60

(Turnover £m April-April)

20 2422 26

2012/2013

2013/2014

SECURED2014/2015 (Projected)

28 30 34 3632 38 40 5048 5842 52 6044 5446 56

2015/2016 (Projected) SECURED

HISTORY

• Od Projects client list includes Arsenal FC, Scott Brownrigg, AYH, and Price & Myers

• Recruitment of Commercial Director, Greg Pinchin (Managing Surveyor of top fit out company)

• Recruitment of Construction Director, Steve Cherry (BCO & FX Quality Award Winner)

• AIB framework contractor

• Achieve British Council for offices corporate member status

• Sign five year lease and fit out Moorgate HQ

• Jon Kearney finalist for G4_ New Generation Awards – Entrepreneurship Award

• Rolls Royce framework contractor

• Green Apple Award for Digitas Saatchi & Saatchi

• Instutute of Chartered Accountants Framework contractor

• Awarded Vogue/Condenast HQ fitout

• Education sector expansion with successful fitout projects for Partnerships For Schools and North Herts College

• Savills approved contractor

• High end residential team acknowledged as leading contractor within sector

• Awarded refurbishment for Royal Albert Hall

• In January Jon Kearney founds Od

• Client base expanded to include Royal & Sun Alliance, O2, AIB, Morley Fund, and GIS Interpublic

• Consultants include Gensler, Cushman & Wakefield, Barr Gazetas, and Leslie Clark

• Royal & Sun Alliance approved contractor status

• Od complete £4 million, 107 Leadenhall, fit out

• Od achieve ISO9001 status

• Forecast record turnover of circa £20m in with Business Plan

• Official launch of aftercare team ‘ZEROdEFECTS’

• Successful completion of first Irish project for Marcus Evans HQ in Dublin

• Notable project wins for clients such as Finchatton, BMB Property, United Continental Airlines, Safestay and Royal London Asset Management

• Commitment to sustainability – BREEAM ‘Excellent’ achieved on refurbishment of RLAM property in Crawley, LEED silver certification achieved for Harris Williams fit out in Mayfair, SKA silver certificate achieved for Paradigm Housing in High Wycombe

• Rebrand of Od which defines our focus and disciplined approach to achieving quality

• Od appointed on Savills Estate Agency office fitout framework

• Repeat business levels at 70% of turnover and growing

• Notable project wins for Dow Jones, Royal London Asset Management, Fendi,National Australia Group and Berkeley Group Marketing Suites

• Od completes its first hotel refurbishment for launch of exciting new venture for Safestay in London

• Od working on over 50000sqft of Londons super prime residential projects in Knightsbridge, Kensington and Hampstead

• Od expand office space to take another floor at Sun St HQ

• Od Group formed, divisions focused on commercial fit out, super prime Residential and commercial design & build

• Od Group launch Od Solutions to cater for direct end user clients requiring a ‘one stop shop’ turnkey, design & build solution

• Andrew Wright joins as Director to head up Od Solutions

• Successful completion of first laboratory project for BTG

• Successful completion of Kia Motors UK Headquarters in Walton Upon Thames

• Od Solutions secure preferred partner status for Royal London Asset Management’ own nationwide corporate workspace refurbishment programme

• Od Interiors successfully complete 25,000 sqft fit out for Bridgepoint Advisors at 95 Wigmore St

• Od Solutions secure fitout for Hedge Fund Muzinich & Co, our 3rd floor within 8 Hanover St

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

• Od Group celebrates ten years of delivering successful projects

• Od Interiors successfully complete 25,000sqft two stage Cat B fit out across two floors for First State Investments in 13 weeks

• Od Solutions successfully deliver 60,000sqft Cat B office refurbishment across floors 6 – 11 for Howard Kennedy at Number One London Bridge

• Od Interiors continue to work with long term clients, Royal London, AIB and ICA on a range of projects across the UK

• Od Interiors secure project for global media company delivering studio and office fit out

• Od Projects secure prestigious 40,000sqft development in Knightsbridge working with project manager Finchatton at 38-62 Yeomans Row

• Notable wins across the group for clients including; AGC, Leni Gas & Oil, Numis, Viridis Properties, BTG and Acadian Asset Management

• Od Interiors appointed to deliver 26,000sqft fit out across four floors at 99 Bishops Gate for Latham & Watkins

• Od’s commitment to sustainability continues as they work towards ISO14001

Specialising in interior fit out and construction to the professional construction industry.

Working closely with architects, project managers, quantity surveyors and direct for end user clients.

Covering all sectors including commercial, retail and leisure

Specialist high end residential refurbishment and construction company working closely with high net worth clients, developers and architects to deliver unique boutique interiors

Specialist company working directly with end user clients and their consulting teams delivering a ‘one stop shop’ turnkey solution. Working with interior design and architecture companies Od Solutions are procurement specialist that take a client from concept to completion under one roof.

ANDY TORLOTDIRECTOR

STEvE ChERRYDIRECTOR

JON KEARNEYDIRECTOR

ANDREW WRIGhTDIRECTOR

JON KEARNEYMANAGING DIRECTOR

STEvE ChERRYCONSTRUCTION DIRECTOR

GREG PINChINCOMMERCIAL DIRECTOR

COMPANY STRUCTURE

MANAGEMENT STRUCTURE

MANAGING SURVEYORS

GREG PINCHINCOMMERCIAL DIRECTOR

GAVIN HAWKINSPRE CONSTRUCTION DIRECTOR

JON KEARNEYMANAGING DIRECTOR

OD PROJECTSJON KEARNEY

DIRECTOR

OD INTERIORSANDY TORLOT

DIRECTOR

OD INTERIORSSTEVE CHERRY

DIRECTOR

STEVE CHERRYCONSTRUCTION DIRECTOR

CONTRACTS MANAGERS

CONSTRUCTION MANAGERS

ASSISTANT CONSTRUCTION MANAGERS

CONTRACTS MANAGERSCONTRACTS MANAGERS

CONSTRUCTION MANAGERSCONSTRUCTION MANAGERS

ASSISTANT CONSTRUCTION MANAGERS

ASSISTANT CONSTRUCTION MANAGERS

ADMINISTRATION SUPPORT

OD SOLUTIONSANDREW WRIGHT

DIRECTOR

HEAD OF CONSTRUCTION

CONSTRUCTION MANAGERS

PRE CONSTRUCTION MANAGERS

ACCOUNTS MANAGER PRE CONSTRUCTION MANAGER

SENIOR ESTIMATOR

ESTIMATOR

ESTIMATOR

PRE CONSTRUCTION COORDINATOR

bID MANAGER PLANNER

PLANNER

ASSISTANT PLANNER

bID COORDINATORACCOUNTS ASSISTANT COMMERCIAL MANAGERS

›OD INTERIORS

Specialising in interior fit out and refurbishment to the professional construction industry. Working closely with architects, project managers,

quantity surveyors and direct for end user clients. Covering all sectors including commercial, retail and leisure

CORPORATE, LONDON

25,000 sq ft, £3,200,000

Two stage Cat A to Cat B fit out of the 7th & 8th floors.

FIRST STATE INvESTMENTS10 SOUTH PLACE, LONDON

The details:Architect: Gensler

Project Manager: Mace

Quantity Surveyor: Mace Cost Consultancy

Duration: 13 weeks

Works included:

• New client meeting suite

• Data centre

• Catering kitchen

• New toilets

• Trading areas

• Reception and collaboration hub area

• Library

• Full AV installation integrated into existing services

• Sprinklers

CORPORATE, LONDON

30,000 sq ft, £2,000,000

Phased refurbishment of office floor whilst the building remained in full occupation.

DOW JONESGRAYS INN ROAD, LONDON

The details:Architect: Edge

Quantity Surveyor: Arcadis

Services Consultant: Arcadis

Duration: 12 weeks & 9 weeks

Phase 1 works included:

• Strip out

• Installation of new electrical & mechanical services

• Glass partitions

• Fit Out of new toilets

• Tea points

• High specification restaurant

• Floor coverings

Phase 2 works included:

• Strip out

• Installation of new electrical & mechanical services

• Glass partitions

• Fit out of new toilets

Phase 3 works included:

• Reception refurbishment

CORPORATE, LONDON

28,000 sq ft, £2,400,000

Cat B office fit out across 5th, 6th and 7th floors at 95 Wigmore Street.

BRIDGEPOINT ADvISORS95 WIGMORE STREET, LONDON

The details:Architect: KKS

Project Manager: Savills

Quantity Surveyor: Fanshawe

Duration: 15 Weeks

Works included:

• Formation of the main reception and five meeting suites on 7th floor

• Completion and early handover of the comms room on 5th and 7th floor

• Offices and open plan areas to 5th and 6th floors

CORPORATE, LONDON

20,000 sq ft, £2,100,000

Extension and fit out of ground and mezzanine floor at Britannia House to create an iconic space for entrepreneurs and creative businesses.

BRITANNIA hOUSEHANBURY STREET, LONDON

The details:Architect: Selgas Cano

Project Manager: Jackson Coles LLP

Quantity Surveyor: Jackson Coles LLP

Duration: 16 Weeks

Works included:

• Curved acrylic domed screen

• Flying table

• Cafe area/Bar

• Open interactive workspaces

• Toilets and showers

• Additional steel works

PHARMACEUTICAL, SURREY

30,000 sq ft, £Confidential

Multi-phased lab fit out project - Phase 1 lab and office fit out was from an unoccupied building that was already fitted out to CAT A. Phase 2 lab and office fit out was completed during occupation.

BIOCOMPATIBLES UK LTDWATCHMOOR PARK, CAMBERLEY

The details:Architect: Moxon Architects

Services Consultant: Hi-Tek Consultants

Duration: 52 weeks

Works to the office space included:

• Internal structural modifications• Revision of MEP basebuild services• Dedicated comms room with UPS backup• Formation of new glazed offices• General fit out of office space over two floors• New reception• Five new kitchens and breakout station• Board room with integral AV installation• Third project in UK to achieve Silver SKA Rating

for Sustainability

Works to the laboratory units included:

• Specialist Medical gas/air installations including; Helium, Nitrogen, CO2, O2 and compressed air systems

• Compressed air systems• Bespoke lab furniture• Incoming utilities• Fume cupboards• Specialist lighting• Clean room conditions• Bespoke joinery

CORPORATE, LONDON

8,000 sq ft, £720,000

CAT B fit out of the first floor newly refurbished occupied building to provide a high quality office.

hARRIS WILLIAMSLEVEL 2, 63 BROOK STREET, MAYFAIR, W1

The details:Project Manager: Gensler

Architect: Gensler

Duration: 14 weeks

Works included:

• High quality bespoke joinery

• Mechanical and electrical modifications

• Double glazed BENE partitions and doors

• Handmade carpet flooring

• Audio visual installations

CORPORATE, LONDON

3,000 sq ft, £600,000

Strip out and new fit out of existing occupied offices in two separate phases.

SAPINDALEVEL 5, 25 PARK LANE, W1

The details:Architect: Gensler

Project Manager: Gensler

Quantity Surveyor: Montie

Duration: 11 Weeks

Works included:

• New cellularised offices

• New meeting and board rooms

• High spec stone reception

• Stone flooring

• Specialist joinery

• New lighting inclusive of feature lighting installed throughout

CORPORATE, SURREY

31,000 sq ft, £1,800,000

The project works comprises of the fit out of an existing office building and construction of a new extension to house a new main entrance and reception room.

KIA MOTORS (UK) LTDWALTON ON THAMES

The details:Architect:: Pringle Brandon Perkins + Will

Project Manager: Savills

Quantity Surveyor: Heasmans

Duration: 18 weeks

Works included:

• Ground floor consists of new reception area, main entrance, meeting rooms, showroom area, post room, UPS server room, and kitchen and staff facilities

• The new layout on levels 1 and 2 consist of offices, meeting rooms, copy point areas, server rooms, tea points, commercial kitchen/cafe and break out areas

• The roof level consists of an internal plant room and an external flat roof plant area

HOSPITALITY, LONDON

3,700 sq ft, £1,000,000

This project comprised the demolition of an existing basement workshop and fit-out of new dining/kitchen facilities within a Grade I listed building.

ROYAL ALBERT hALLKENSINGTON GORE

The details:Architect: BDP

Services Engineer: Logi-Tek

Quantity Surveyors: Wheelers

Duration: 26 weeks

Works included:

• New storage facilities were located on a new mezzanine

• Existing kitchen facility located at basement level 1 was stripped out and high quality dressing rooms constructed in the vacated spaces

CORPORATE, WEST SUSSEX

25,000 sq ft, £2,500,000

Built in 1998, the Portland building was comprehensively refurbished over three floors to achieve a BREEAM Excellent classification.

ROYAL LONDON - PORTLAND BUILDINGPORTLAND, CRAWLEY

The details:Architect: Orbit Architects

Quantity Surveyor: Cyril Leonard

Services Consultant: Lamorbey Associates

Structural Engineer: Connisbee

Duration: 18 weeks

Works included:

• BREEAM ‘Excellent’ rated

• Full Design & Build

• Complete replacement of main plant and all on floor services

• New entrance canopy and internal reception

• External landscaping

• Refurbishment of multi-storey car park

CORPORATE, LONDON

27,000 sq ft, £2,000,000

Refurbishment of the existing offices to a CAT A fit out across three floors with one floor remaining occupied by the tenant.

ROYAL LONDON - DRAGON COURTCOVENT GARDEN, LONDON

The details:Architect: Orbit Architects

Quantity Surveyor: Quantem Consulting

Project Manager: APS Chartered Surveyors

Services Consultant: The Anslow Partnership

Duration: 24 weeks

Works included:

• Heavy strip out

• Structural modifications

• Complete mechanical plant renewal

• Toilets/reception fit out

• New suspended ceilings

• New raised floors

• Curtain walling

CORPORATE, LONDON

40,000 sq ft, £4,000,000

Extensive structural works to this 1960s building included opening up the façade, enclosing light wells and creating a 50m lift tower.

ShIATZU hOLDINGS LTD LEADENHALL STREET, LONDON

The details:Architect: Barr Gazetas

Quantity Surveyor: Quantem Consulting

Services Consultant: The Engineering Practice

Duration: 40 weeks

Works included:

• Cat A refurb on ground, mezzanine, 3rd – 7th floors

• Cat B client possession on ground, mezzanine, 6th & 7th floors

• Light well infills on three floors

• Link bridge and lift shaft from ground – 5th & 6th floors

• Phased common part refurbishment to WC’s and lobbies on 3rd – 7th floors

• Central plant replacement to basement incoming and roof mounted AHU’s and chillers

• Refurbishment of Crittall windows

›OD SOLUTIONS

Specialist company working directly with end user clients and their consulting teams delivering a ‘one stop shop’ turnkey solution. Working with interior design and architecture companies Od Solutions are procurement specialists that take

a client from concept to completion under one roof

TURNKEY, LONDON

8,000 sq ft, £CONFIDENTIAL

Full design & build CAT B fit out of levels 5 & 6.

TEMASEK hOLDINGS (UK) LIMITED LEADENHALL STREET, LONDON

The details:Designer: Od Solutions

Project Manager: Savills

Client facing front of house works included:

• High specification meeting rooms

• Lime-washed oak floor

• White marble cladding

• Presentation suites with full audio visual capacity

Back of house works included:

• Main board directors executive suite

• Central focal hub clad in a black lacquered finish with inset joinery

• Administration support area

• General working office and ancillary areas

TURNKEY, LONDON

9,000 sq ft, £CONFIDENTIAL

Full design and build of the UK headquarters.

ROYAL LONDONGRACECHURCH STREET

The details:Architect: Blue Bottle

Quantity Surveyor: Quantem Consulting LLP

Services Consultant: Lamorbey Associates

Duration: 16 weeks

Client facing front of house works included:

• Meeting rooms

• Lounges

• Catering facilities

• Presentation suites with full audio visual capacity

Back of house works included:

• Main board directors executive suite

• Administration support area

• General working office and ancillary areas

TURNKEY, LONDON

10,000 sq ft, £1,200,000

The design and fit out of a high quality office environment commensurate with a legal institution of this calibre.

SChULTE ROTh & ZABEL LLPGRACECHURCH STREET

The details:Designer: Od Solutions

Project Manager: Savills

Duration: 13 weeks

Works included:

• Lime-washed oak floors

• Double-glazed fronted offices

• High-spec modern finishes

• Polished plaster walls

• Vertical timber shutters

• Noise-cancelling panels

TURNKEY, LONDON

60,000 sq ft, £CONFIDENTIAL

CAT B office refurbishment across floors 6 - 11.

hOWARD KENNEDY FSI LLPNUMBER ONE LONDON BRIDGE

The details:Architect MCM

Project Manager: APS

Quantity Surveyor: APS

Duration: 17 weeks

Works included:

• Client facing suites

• Meeting rooms

• Break-out spaces

• Catering facilities

• Administration support area

• General working office and ancillary areas

›OD PROJECTS

Specialist prime residential refurbishment and construction company working closely with high net worth clients, developers and architects to

deliver bespoke interiors

RESIDENTIAL, LONDON

13,500 sq ft, £6,000,000

The project comprises the design, construction and fit out to basement, lower ground and upper ground levels.

EATON SQUAREBELGRAVIA

The details:Development Manager Finchatton

Architect: Lifschutz Davidson Sandilands

Quantity Surveyor: Measur

Services Consultant: Tasc

Duration: 56 weeks

Works included:

• Basement swimming pool and leisure facility

• Rear mews extension

• High level residential finishes

• Installation of access lift to all floors

• High spec AV installation

• External rooftop inside outside facility

RESIDENTIAL, LONDON

6,500 sq ft, £6,000,000

The demolition of an existing two storey property to create one villa within this prime location in Knightsbridge, forming a 16m deep basement to the entire site.

RUTLAND GARDENSBELGRAVIA

The details:Development Manager Finchatton

Architect: Lifschutz Davidson Sandilands

Quantity Surveyor: Measur

Services Consultant: Tasc

Duration: 56 weeks

Works included:

• Complete demolition and soft strip

• Secant piling to the site boundaries

• A complicated temporary support system and 10m deep basement formation, carried out as CDP

• High quality stonework

• Whole house ventilation, air-conditioning, i-Light systems audio visual package

RESIDENTIAL, LONDON

7,500 sq ft, £5,000,000

The fit out of a penthouse apartment with three bedrooms - all en-suite - a reception room, bespoke kitchen, a dining/family room, a library/study, a large roof terrace and a private lift.

KENWOOD PLACEHAMPSTEAD

The details:Project Manager: Arcadis

Architect: Hamilton

Quantity Surveyor: Arcadis

Services Engineer: AWA

Interior Design: Keech Green

Duration: 48 weeks

Works included:

• New mechanical and electrical services

• Audio visual and IT networks

• Specialist joinery

• Extensive stonework

• High quality finishes

STAGE 1 – PLANNING FOR QUALITY•ZeroDefectsIntroductionMeeting•DetailedDesignReview•IdentifyQualityRisks•IdentifyWorkZones/Sequencing/Phasing•Sub-contractorTargetProgramme

STAGE 2 – INFORMATION RELEASE•Drawing/InformationReleaseSchedule•SampleSchedule•OffSiteInspectionSchedule

STAGE 3 – SETTING QUALITY STANDARDS•Benchmarking•SampleApproval•KeyInspections•ProtectionRegime

STAGE 4 – REvIEW & QUALITY CONTROL SIGN OFF•Review•Monitoring•Handover

STAGE 5 – SNAGGING & DEFECTS•DefectsProcess•IdentifyingDefects•SiteMarkUps•Sub-ContractorDefectManagement•DefectReporting

STAGE 6 – PROJECT CLOSE OUT•FinalisationPlan•CloseOutProgrammes•DefectReporting•RecordDocument•ClientFamiliarisation

Od operates a ‘zero defects’ plan. This is more commonly known as a quality plan. The plan is written at the commencement of the project and sets out to achieve as high a quality delivery as possible. This is not just in the finished product, it covers every stage of the project including management techniques as follows;

CERTIFICATION

Fit‐out Sustainability AssessmentThis is to certify that

Paradigm Housing GroupBuilding A1 Glory Park

High Wycombe Bucks HP10

has achieved the Ska rating of

Silver

Accredited Assessor 

Pringle Brandon LLP

On behalf of 

Paradigm Housing Group

Project Manager 

Savills Commercial Ltd

Architect 

Mansfield Monk

Contractor 

OD Projects

Building Services Engineer 

Capita Symonds

Certificate Reference 

Glory Park, High Wycombe

Date 

29/06/2010

This certificate has been produced using Ska Rating Offices version 1.0 

SUSTAINABLE CREDENTIALS

RECENT REFERENCES