Group May0914 Project Plan Date: October 9, 2008 To: Dr. Gregory Smith From: Group May0914 Subject: Project Plan for Green De-icier Introduction The project plan memo presents group May0914 project plan. It includes referenced justification for the project, an overview of the project operations, the project requirements, and the overall project direction. In addition, the project plan seeks authorization and confirmation to proceed with the development and construction of the Green De-icier. System Purpose The client contracted our senior design group to help design a system that melts winter snow and ice from steps of a deck using green energy. Potential exists for the client to file a patent and market the product if satisfied with the outcome of the project research, the final system design, and the operational prototype. System Description The basic operation of the de-icing system begins with a wind generator with either a vertical turbine design or a standard turbine design. The electric current produced from the generator runs though a diode or rectifier circuit for transformation from alternating current (AC) to direct current (DC). Incorporated into the system, at the generator is line protection, which protects the line from a short circuit or overload. In addition, located at the generator is a line disconnect. The line disconnect separates the generator from the line for maintenance or other reasons. In addition, a voltage regulator regulates energy flowing through the line to maintain a constant voltage at

Upload: others

Post on 29-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Green Deicer Project Plan Draft - Iowa State Universityseniord.ece.iastate.edu/projects/archive/may0914/Senior_Design/De-i… · We follow a schedule set out by the Iowa State University

Group May0914

Project Plan Date: October 9, 2008

To: Dr. Gregory Smith

From: Group May0914

Subject: Project Plan for Green De-icier

Introduction

The project plan memo presents group May0914 project plan. It includes

referenced justification for the project, an overview of the project operations, the

project requirements, and the overall project direction. In addition, the project plan

seeks authorization and confirmation to proceed with the development and

construction of the Green De-icier.

System Purpose

The client contracted our senior design group to help design a system that melts

winter snow and ice from steps of a deck using green energy. Potential exists for the

client to file a patent and market the product if satisfied with the outcome of the project

research, the final system design, and the operational prototype.

System Description The basic operation of the de-icing system begins with a wind generator with either a

vertical turbine design or a standard turbine design. The electric current produced

from the generator runs though a diode or rectifier circuit for transformation from

alternating current (AC) to direct current (DC). Incorporated into the system, at the

generator is line protection, which protects the line from a short circuit or overload. In

addition, located at the generator is a line disconnect. The line disconnect separates

the generator from the line for maintenance or other reasons. In addition, a voltage

regulator regulates energy flowing through the line to maintain a constant voltage at

Page 2: Green Deicer Project Plan Draft - Iowa State Universityseniord.ece.iastate.edu/projects/archive/may0914/Senior_Design/De-i… · We follow a schedule set out by the Iowa State University

the storage device (battery bank). The rate the generator spins is not easily to

control, therefore voltage on the line is tough to control without a voltage regulator.

The voltage regulator allows proper voltage for the battery and protects the battery

from overcharging conditions. The DC line also contains a line disconnect and line

protection. Next, in the system is the control panel, which acts as the brains of the

system, and provides a user interface for the customer to control the system. The

control panel receives information from a temperature senor, moisture sensor, and a

barometer sensor under an automatic setting. The automatic setting allows the

system to operate at the proper times, without human interaction. Furthermore, the

control panel includes an inverter that takes 12volt direct current and converts to

120volt alternating current for operation of the control system and the external

devices plugged into the outlet. The external portion of the control panel contains a

GFIC outlet, to plug in the de-icing heating coils or other AC devices. The line from

the control panel to the GFIC outlet is line protected by a fifteen-amp breaker. The

GFIC provides user protection from electric shock due to potentially wet conditions

found outside. In addition, the heating mats are surface mountable and water

resistant. They also contain internal protection for the user from electric shock.

System User Interface The user interface consists of a control panel that provides the user options other

than the automatic system function. First, the panel contains a main disconnect

breaker to shut the AC portion of the system off. When the breaker is in the on

position, a system operation light shines to let the user know the system is operable.

In the center of the panel is a hand/off/auto selector switch. The selector switch

allows the user to override the automatic functions when the switch is in the hand

mode position. Hand mode allows the user to control or influence when the system

operates. In order to turn on the outlet in hand mode the user must push the start

button. The outlet remains on until the user pushes the stop button, selects off on

the selector switch, or rotates the main disconnect breaker to the off position. The

customer may not want the system on at night or may leave on vacation, these

simple controls allows them to incorporate what they want rather than the system

operating according to the input of the sensors.

Page 3: Green Deicer Project Plan Draft - Iowa State Universityseniord.ece.iastate.edu/projects/archive/may0914/Senior_Design/De-i… · We follow a schedule set out by the Iowa State University

System Diagram

System Requirements

The system must function as a de-icing system for extreme winter elements of ice,

snow, and wind then during the summer provide an alternative source of electric

generation in the hot humid summer elements. This means the system must be

able to generate heat at a temperature high enough to melt ice and snow in the

freezing temperatures of winter. Furthermore, the system provides a cost effective

source of clean energy. The system must be safe for both the user and person(s)

standing near the system. Furthermore, the de-icing system and all the required

system components meet both state and national electric codes for electrical safety.

Furthermore, the de-icing system and all the required system components meet

Underwriters Laboratory standards for safety. Next, the system has to have a

friendly and easily operable user interface for a wide range of customers. Likewise,

the system needs to be small, attractive, and adaptable to attract buyers.

Page 4: Green Deicer Project Plan Draft - Iowa State Universityseniord.ece.iastate.edu/projects/archive/may0914/Senior_Design/De-i… · We follow a schedule set out by the Iowa State University

System Operating Environment

Environmental operating conditions focus on outdoor conditions located in central

Iowa. During the winter conditions, temperatures are well below zero and during the

summer, conditions are hot and humid. Other environmental elements, such as

wind, rain, snow, ice, sleet, hail, and sunlight impact the system. The system is

outdoors, exposed to small animals or other sources of nature.

System Advantage The system provides an environmentally clean way of de-icing steps without

hazardous or corrosive products or manual labor. In addition, the system operates as

a dual-purpose system that can provide energy to power miscellaneous items such

as lawn lights, pond pumps, or any other AC powered device within the technical

specifications of the generator design and battery storage capacity.

System Initial Design Change The initial de-icier project design idea required the use of solar generation. At that

point in time, the client and the senior design committee overlooked the initial

feasibility factor of a solar powered de-icing system in the Midwest. Deficiencies

became apparent. The first deficiency of the initial project is the overall cost and

effectiveness of solar panels. The initial design idea had a cost factor beyond what

the client anticipated and beyond the marketing price range of most consumers. In

addition, Iowa and the Midwest lack an efficient source of sunlight particularly during

the winter months. The days are shorter and overcast most of the winter period.

Average climate trends during the winter rarely allow for half a day of sunlight thus

limiting a user to approximately 40% efficiency. Taking into account a solar panel has

an efficiency of approximately 20%. The overall efficiency of the system powered by

sunlight is too low to justify the expense in designing the system. On the other hand,

research proves wind to be an abundant and efficient source of energy that is local to

the Midwest. The two figures below display the overall efficiency of the United States,

in both solar and wind energy generating capabilities.

Page 5: Green Deicer Project Plan Draft - Iowa State Universityseniord.ece.iastate.edu/projects/archive/may0914/Senior_Design/De-i… · We follow a schedule set out by the Iowa State University

Resource Requirements Gen parts- materials for base , blades, misc parts, gen Gen lines Control panel parts Inverter parts Batt and volt regulator Line protection-fuses ,disconnects Outlets Enclosure Wire Sensors Mats

Page 6: Green Deicer Project Plan Draft - Iowa State Universityseniord.ece.iastate.edu/projects/archive/may0914/Senior_Design/De-i… · We follow a schedule set out by the Iowa State University

Market

The two main products are similar to our design. They are shown in figures #1 and

2 below. The main difference is our snow melting mats will be using alternative

power. They will be “green” and better for the environment. It would not be feasible

for us to build our own mats as the cost of doing so would be more than the cost of

what is already available on the market. Even though there is a de-icing mat

available. There is nothing on the market similar to our overall system. The system

includes the mat as well as the power system for the mat. This is the area where

our design is new and unlike anything else.

Our original design involved using solar cell panels for the power system. This

however turned out not to be feasible for our client. Instead we are focusing on

using a different alternative power system, wind energy to power the deicing mat.

Once the client has paid for the initial system, the costs of using the deicer would

be very minimal. The advantage of this design is minimal future costs, a green

system, and a power system that may be used to pay other device during the

summer.

Figure #1: Clear-Step Snow Melting Mats Figure #2: WarmTrax

stair treads

http://www.warmzone.com/snow-melting-mats.asp

http://www.calorique.com/Products22.asp

As for potential customers (mainly the affluent or the elderly in climates

with harsh winters), they seem to be looking for the following:

1- Saftey for people and pets

Page 7: Green Deicer Project Plan Draft - Iowa State Universityseniord.ece.iastate.edu/projects/archive/may0914/Senior_Design/De-i… · We follow a schedule set out by the Iowa State University

2- Little operation required (turn on and forget)

3- Automatic switches

4- Fast melting

5- Easy to install

6- Little maintanance

7- Long Lasting

8- Warranties

9- Customization

10- Low Cost

11- Little increase in utilies

12- No unique electrical connections needed (ex: GFI switch)

13- The mats have traction

14- Weight limits (ex: for driveways)

Project Risks The project idea is not marketable. The project is not cost effective enough to

consider buying over shoveling snow using manual labor. Lack of financing may lead

to an incomplete project design and prototype.

Project Schedule

Page 8: Green Deicer Project Plan Draft - Iowa State Universityseniord.ece.iastate.edu/projects/archive/may0914/Senior_Design/De-i… · We follow a schedule set out by the Iowa State University

Asse

mb

le C

on

tro

l B

ox

De

sig

n t

he

Co

ntr

ol

Bo

x

Re

se

arc

h L

og

ic B

oa

rds a

nd

pri

cin

g

Re

se

arc

h S

witch

es a

nd

pri

cin

g

Re

se

arc

h C

on

tro

l ca

se

s a

nd

pri

cin

g

Pu

rch

ase

co

ntr

ol

bo

x c

om

po

ne

nts

Co

ntr

ol

Bo

x t

estin

g

Asse

mb

le I

nve

rte

r C

ircu

it

De

sig

n t

he

in

ve

rte

r cir

cu

it

Re

se

arc

h G

FIC

ou

tle

ts a

nd

pri

cin

g

Re

se

arc

h b

rea

ke

rs a

nd

pri

cin

g

Re

se

arc

h i

nve

rte

rs a

nd

pri

cin

g

Re

se

arc

h i

nve

rte

r ca

se

s a

nd

pri

cin

g

Re

se

arc

h c

on

tro

l se

nso

rs a

nd

pri

cin

g

Pu

rch

ase

in

ve

rte

r cir

cu

it c

om

po

ne

nts

Inve

rte

r cir

cu

it t

estin

g

Asse

mb

le W

ind

Ge

ne

rato

r

De

sig

n t

he

win

d g

en

era

tor

asse

mb

ly

Re

se

arc

h b

lad

es a

nd

pri

cin

g

Re

se

arc

h g

en

era

tors

an

d p

ricin

g

Re

se

arc

h r

ectifie

rs a

nd

pri

cin

g

Re

se

arc

h d

isco

nn

ects

an

d p

ricin

g

De

sig

n t

he

win

d g

en

era

tor

ca

se

Re

se

arc

h c

ase

pri

cin

g

Pu

rch

ase

Win

d G

en

era

tor

co

mp

on

en

ts

Win

d G

en

era

tor

testin

g

Re

se

arc

h r

eg

ula

tors

an

d p

ricin

g

Pu

rch

ase

re

gu

lato

r

Re

se

arc

h b

att

eri

es a

nd

pri

cin

g

Pu

rch

ase

ba

tte

rie

s

Rse

arc

h h

ea

tin

g m

ats

an

d p

ricin

g

Pu

rch

ase

he

atin

g m

ats

Fin

al

Asse

mb

ly

Fin

al T

estin

g

67

89

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

Red lines represent the inner and outer fences.

Gre

en

De

ice

rW

eek

The Green De-icier project team divides into lead positions as follows:

Director of Resource/Communications/Secretary: Louis Landphair

Director of Research and Design: Jamasen Parham

Page 9: Green Deicer Project Plan Draft - Iowa State Universityseniord.ece.iastate.edu/projects/archive/may0914/Senior_Design/De-i… · We follow a schedule set out by the Iowa State University

Director of Marketing and Project Resources: Michael Anderson

Director Testing/Data Collection: Jesse Erickson

Director of Group Organization and Presentation: Shawn Merselis

Director of Computing/Technical/Solar Decathlon Matthew Bray

Each member holds responsibility for their lead position and assisting with every step of the project until completion. We remain efficient and accurate by strategizing and dividing the workload.

We follow a schedule set out by the Iowa State University Senior Design Committee and mentors. The schedule is below:

DEADLINE

PROJECT

9.27.08 DRAFT PROJECT PLAN AND PROJECT PLAN PRESENTATION FILE

10.11.08 FINAL PROJECT PLAN AND PROJECT WEBSITE

11.1.08 PROJECT QUESTIONS

11.15.08 PROJECT DESIGN REPORT DRAFT AND PRESENTATION

11.29.08 FINAL DESIGN REPORT

12.13.08 DESIGN REVIEW

12.15.08 FINAL PROJECT REPORT AND PROJECT WEBSITE

We meet on a weekly basis every Thursday 8:00 am in Durham 114 to discuss upcoming deadlines and project direction, to prepare for presentations, and to learn about each other. Announcing and scheduling of additional meetings occurs when needed.

With this information, we seek authorization to proceed with the design of our Green De-icier. We encourage input and suggestions relating to project design and construction techniques. Please contact the group at [email protected] or any of the team members listed below with questions or comments.

Page 10: Green Deicer Project Plan Draft - Iowa State Universityseniord.ece.iastate.edu/projects/archive/may0914/Senior_Design/De-i… · We follow a schedule set out by the Iowa State University

Mike Anderson Matt Bray Jesse Erickson

[email protected] [email protected] [email protected]

Shawn Merselis Louis Landphair Jamasen Parham

[email protected] [email protected] [email protected]