grants awarded by fygrants awarded by fy . faa - office of airports . report date 02/23/2006 . fy...

98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006 FY 2005 Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of Work Level Number Funds AL AAL AK Adak GA 002 770,569 Acquire Aircraft Rescue & Fire Fighting Vehicle Aniak P 007 3,302,222 Construct Snow Removal Equipment Building Bethel P 013 1,686,972 Construct Sand and Chemical Storage Building 014 16,100,000 Construct Runway - Plan-1, Construct Runway Safety Area - 18/36 Chevak 001 3,468,450 Construct New Airport [Phase 2 (Surfacing)], Construct Snow Removal Equipment Building Chignik Regional (Proposed GA) 002 169,399 Conduct Airport Master Plan Study [Phase 2 (EA & ALP)] Cold Bay CS 008 200,000 Conduct Airport Master Plan Study [(Terminal Plan)] Deadhorse P 008 8,733,083 Expand Apron, Extend Runway Safety Area [(Phase 2)] - 04/22 English Bay CS 001 95,000 Update Airport Master Plan Study False Pass GA 004 308,390 Conduct Environmental Study [Specialty marine studies] Hoonah GA 001 2,076,714 Construct Seaplane Base Hooper Bay CS 005 1,803,100 Rehabilitate Access Road, Rehabilitate Runway [(Maintenance)] - 13/31 Juneau International P 043 1,491,528 Construct Apron 045 25,953 Security Enhancements [(Security Vehicle)] 046 750,000 Construct Runway Safety Area [(Environmental)] - 08/26 Kenai Municipal P 034 2,094,233 Extend Taxiway [(Multi-Year, Year 2)], Extend Taxiway [Extend Twy P] King Cove CS 003 7,155,400 Construct Snow Removal Equipment Building, Rehabilitate Apron, Rehabilitate Kodiak P 009 1,000,000 Runway [(RSA)] - 07/25, Rehabilitate Runway - 07/25 Extend Runway Safety Area [(EIS)] - 07/25, Extend Runway Safety Area [(EIS)] - 18/36 Kokhanok GA 002 5,713,000 Construct Snow Removal Equipment Building, Expand Apron, Extend Runway [(RSA Development)] - 06/24, Extend Runway - 06/24 Merle K (Mudhole) Smith P 009 7,500,000 Construct Runway Safety Area [(Purchase EMAS, Phase 1)] - 09/27, Repair Utilities [(Power)] Merrill Field P 036 3,752,500 Acquire Equipment [(RSAT Recommendations)], Extend Taxiway [(RSAT Recommendation)], Rehabilitate Runway - 06/24 Nenana Municipal GA 011 194,684 Acquire Snow Removal Equipment Nome P 013 10,300,000 Construct Aircraft Rescue & Fire Fighting Building [(Phase 1)], Construct Snow Palmer Municipal GA 012 437,990 Removal Equipment Building [(Phase 1)] Acquire Land For Approaches, Acquire Snow Removal Equipment [(Motor grader)], Rehabilitate Runway [Phase 1 (Design)] - 09/27, Rehabilitate Runway Lighting [(Design)] - 16/34 Selection Criteria Year: 2005 Page 1 of 98

Upload: others

Post on 24-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

AL AAL AK Adak GA 002 770,569 Acquire Aircraft Rescue & Fire Fighting Vehicle

Aniak P 007 3,302,222 Construct Snow Removal Equipment Building

Bethel P 013 1,686,972 Construct Sand and Chemical Storage Building

014 16,100,000 Construct Runway - Plan-1, Construct Runway Safety Area - 18/36

Chevak 001 3,468,450 Construct New Airport [Phase 2 (Surfacing)], Construct Snow Removal Equipment Building

Chignik Regional (Proposed GA) 002 169,399 Conduct Airport Master Plan Study [Phase 2 (EA & ALP)]

Cold Bay CS 008 200,000 Conduct Airport Master Plan Study [(Terminal Plan)]

Deadhorse P 008 8,733,083 Expand Apron, Extend Runway Safety Area [(Phase 2)] - 04/22

English Bay CS 001 95,000 Update Airport Master Plan Study

False Pass GA 004 308,390 Conduct Environmental Study [Specialty marine studies]

Hoonah GA 001 2,076,714 Construct Seaplane Base

Hooper Bay CS 005 1,803,100 Rehabilitate Access Road, Rehabilitate Runway [(Maintenance)] - 13/31

Juneau International P 043 1,491,528 Construct Apron

045 25,953 Security Enhancements [(Security Vehicle)]

046 750,000 Construct Runway Safety Area [(Environmental)] - 08/26

Kenai Municipal P 034 2,094,233 Extend Taxiway [(Multi-Year, Year 2)], Extend Taxiway [Extend Twy P]

King Cove CS 003 7,155,400 Construct Snow Removal Equipment Building, Rehabilitate Apron, Rehabilitate

Kodiak P 009 1,000,000Runway [(RSA)] - 07/25, Rehabilitate Runway - 07/25 Extend Runway Safety Area [(EIS)] - 07/25, Extend Runway Safety Area [(EIS)] ­18/36

Kokhanok GA 002 5,713,000 Construct Snow Removal Equipment Building, Expand Apron, Extend Runway [(RSA Development)] - 06/24, Extend Runway - 06/24

Merle K (Mudhole) Smith P 009 7,500,000 Construct Runway Safety Area [(Purchase EMAS, Phase 1)] - 09/27, Repair Utilities [(Power)]

Merrill Field P 036 3,752,500 Acquire Equipment [(RSAT Recommendations)], Extend Taxiway [(RSAT Recommendation)], Rehabilitate Runway - 06/24

Nenana Municipal GA 011 194,684 Acquire Snow Removal Equipment

Nome P 013 10,300,000 Construct Aircraft Rescue & Fire Fighting Building [(Phase 1)], Construct Snow

Palmer Municipal GA 012 437,990 Removal Equipment Building [(Phase 1)] Acquire Land For Approaches, Acquire Snow Removal Equipment [(Motor grader)], Rehabilitate Runway [Phase 1 (Design)] - 09/27, Rehabilitate Runway Lighting [(Design)] - 16/34

Selection Criteria Year: 2005

Page 1 of 98

Page 2: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

AL AAL AK Perryville GA 001 6,604,400 Construct Apron, Construct Runway [(Replacement RWY)] - Plan-1, Construct Snow Removal Equipment Building, Modify Access Road

Port Alsworth Proposed 003 276,212 Conduct Airport Master Plan Study [Phase 2 (EA)]

Ralph Wien Memorial P 010 525,000 Update Airport Master Plan Study [(Relocation Study) Stg 1]

011 7,200,000 Construct Runway Safety Area - 08/26

Red Devil GA 001 2,386,400 Construct Snow Removal Equipment Building, Remove Obstructions

Sand Point CS 010 6,125,600 Extend Runway Safety Area [(Phase 3)] - 13/31

Sitka Rocky Gutierrez P 020 1,500,000 Conduct Environmental Study

Soldotna GA 005 375,250 Construct Runway [(Phae 1 design and EA)] - Turf

St George GA 006 10,669,205 Construct Snow Removal Equipment Building, Modify Access Road, Strengthen

State of Alaska 004 1,645,533Runway [Phase 2 (Construction)] - 11/29 Update State System Plan Study

Stevens Village

Ted Stevens Anchorage International P

002

082

7,009,850

7,443,000

Construct New Airport [Phase 2 (Surfacing)], Construct Snow Removal Equipment Building Construct Taxiway [LOI #2-01(grant 3): Construct twy Y (pymt 3)], Rehabilitate

083 5,500,000Taxiway [LOI #2-01 [grant 3]; DG6 Upgrade Twy K(J - Y) [pymt1]] Noise Mitigation Measures for Residences within 65 - 69 DNL [RSIP (phase 5), 150

084 1,162,661homes (est.)] Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire ARFF vehicle 1]

085 6,250,665 Construct Taxiway

086 4,918,750 Construct Apron [LOI #98-1 (grant 7): Postmark RRA (pymt 1)]

087 1,890,000 Rehabilitate Taxiway [Construct run-up pad (twy K)]

088 10,058,619 Modify Terminal Building [(Phase 1 [MYr 1])], Modify Terminal Building [(Phase 1

089 12,235,000[MYr 2])], Modify Terminal Building [(Phase 1 [MYr 3])] Rehabilitate Taxiway [Reconstr K from C-A (non-LOI), phase 1], Rehabilitate

Tenakee GA 001 1,209,995Taxiway [Reconstr K from C-A (non-LOI), phase 1; MY funds] Rehabilitate Seaplane Base

Trident Basin GA 001 356,804 Improve Seaplane Base [(Preliminary Design & Environmental)]

Unalakleet P 002 12,354,247 Strengthen Runway [(Phase 1)] - 08/26, Strengthen Runway [(Phase 1)] - 14/32

Unalaska P 011 500,000 Conduct Airport Master Plan Study [(Terminal Study)]

Various Locations in Alaska 049 2,600,000 Acquire Aircraft Rescue & Fire Fighting Vehicle (Merle K (Mudhole) Smith; Ralph Wien Memorial; Wiley Post-Will Rogers Memorial)

050 2,920,386 Acquire Friction Measuring Equipment (Adak), Acquire Snow Removal Equipment

Selection Criteria Year: 2005

Page 2 of 98

Page 3: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

AL AAL AK

Wasilla

Wrangell

Report Total:

Region Total:

ADO Total:

State Total:

CE ACE IA Albia Municipal

Algona Municipal

Ames Municipal

Arthur N Neu

Atlantic Municipal

Selection Criteria Year: 2005

FY 2005

Service Grant Seq Level Number

050

051

052

GA 011

CS 011

53 Grants

53 Grants

53 Grants

2099 Grants

GA 002

003

GA 003

GA 015

GA 007

GA 005

AIP Federal Funds

1,568,498

3,032,426

250,000

5,731,984

203,429,672

203,429,672

203,429,672

3,549,617,470

153,619

93,699

228,950

355,288

1,482,000

2,581,385

Report Date 02/23/2006

Brief Description Of Work

(Adak; Bethel; Chenega Bay; Clarks Point; Newtok; Port Graham; St George;Talkeetna)Acquire Snow Removal Equipment (Deering; Golovin; Gulkana; Huslia; Merle K(Mudhole) Smith; Tetlin; Wiley Post-Will Rogers Memorial)Rehabilitate Runway (Akhiok - 04/22; Bethel - 11/29; Bethel - 18/36; Chignik Lake ­08/26; Clear - 01/19; Dillingham - 01/19; False Pass - 13/31; Gambell - 16/34;Goodnews - 05/23; Gustavus - 02/20; Gustavus - 11/29; Haines - 08/26; Homer ­03/21; Iliamna - 07/25; Iliamna - 17/35; Kake - 10/28; Kaltag - 03/21; Karluk - 10/28;Ketchikan International - 11/29; King Salmon - 11/29; King Salmon - 18/36; Kodiak ­07/25; Kodiak - 11/29; Kodiak - 18/36; Larsen Bay - 04/22; Manokotak - 01/19;Minchumina - 02/20; Napakiak - 16/34; Napaskiak - 02/20; Nelson Lagoon - 08/26;Newtok - 15/33; Nondalton - 02/20; Nulato - 02/20; Pedro Bay - 09/27; Port Graham- 12/30; Port Lions - 06/24; Seldovia - 16/34; Seward - 12/30; Seward - 15/33;Sheldon Point - 01/19; Shungnak - 09/27; Sitka Rocky Gutierrez - 11/29; Skagway ­02/20; Sleetmute - 14/32; Teller - 07/25; Togiak - 03/21; Togiak - 10/28; Willow ­13/31)Construct Apron [(Design)]

Rehabilitate Runway [(Resurfacing)] - 10/28, Rehabilitate Runway [(RunwaySafety Area, Phase 1)] - 10/28

Construct Snow Removal Equipment Building, Improve Access Road [/Apron],Install Miscellaneous NAVAIDS [Beacon & Lit Wind Cones], Remove Obstructions[Bury OH Power]Acquire Snow Removal Equipment [Truck]

Construct Snow Removal Equipment Building, Install Miscellaneous NAVAIDS[Beacon]Rehabilitate Taxiway [(01/19)]

Construct Runway [PH 2 PAVE/MK/LT] - 03/21, Construct Runway - 03/21

Construct Runway [2-20 (PH 4) Grade & Pave Rd] - Plan-1

Page 3 of 98

Page 4: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

CE ACE IA Audubon County

Cherokee Municipal

Clarion Municipal

Council Bluffs Municipal

Davenport Municipal

Decorah Municipal

Des Moines International

Dubuque Regional

Emmetsburg Municipal

Estherville Municipal

Fairfield Municipal

Forest City Municipal

Fort Dodge Regional

Fort Madison Municipal

Grinnell Regional

Guthrie County Regional

Harlan Municipal

Independence Municipal

Iowa City Municipal

James G. Whiting Memorial Field

Jefferson Municipal

Keokuk Municipal

FY 2005

Service Grant SeqLevel Number

GA 001

GA 005

GA 002

GA 011

GA 012

GA 002

P 039

040

041

P 038

039

GA 001

GA 005

GA 008

GA 006

CS 021

GA 002

GA 004

005

GA 002

GA 004

GA 003

GA 011

GA 002

GA 004

GA 013

AIP FederalFunds

102,236

25,304

325,941

2,701,118

405,650

26,600

3,110,485

1,295,351

4,458,632

636,280

46,550

742,378

63,998

3,512,670

103,550

1,000,937

99,173

128,250

133,000

142,255

460,750

182,400

150,000

106,606

413,891

271,335

Report Date 02/23/2006

Brief Description Of Work

Construct Taxiway [(Phase 1 - Design)], Expand Apron [(Phase 1 - Design)]

Install Miscellaneous NAVAIDS [Beacon]

Construct Taxiway [Conn], Improve Access Road [Pave], Rehabilitate Apron,Rehabilitate Taxiway [T-Hgrs], Remove ObstructionsConstruct Runway [18/36 (PH 5) Pave/Mk/Lt] - Plan-1

Rehabilitate Taxiway

Extend Runway [Phase 1 - Design] - 11/29, Update Airport Master Plan Study[Phase 1 - Update ALP Runway 11/29 Extension]Rehabilitate Runway [13L/31R (PH 2)] - 13/31, Rehabilitate Runway [RSA 31R­relocate localizer] - 13/31Construct Runway [13R/31L (PH 1)] - Plan-1

Construct Runway [13R/31L (PH 2)] - Plan-1

Improve Snow Removal Equipment Building [Expand/Terminal Security Access]

Conduct Miscellaneous Study [Drainage]

Rehabilitate Runway [13/31 Widen/OL] - 13/31

Rehabilitate Taxiway [Taxilanes Hgrs. 6&7]

Construct Runway [18-36 (PH 5) (PAVE)] - 18/36

Rehabilitate Access Road

Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Snow Removal Equipment[Replace Snow Plow]Acquire Snow Removal Equipment [single axle truck]

Construct Taxiway [T-Hgr Access]

Install Weather Reporting Equipment [AWOS]

Construct Runway - 18/36

Construct Taxiway [Partial Par. R15]

Improve Access Road [Pave], Rehabilitate Runway [Phase 1 - Conduct RunwayPavement Study] - 17/35Extend Runway [7/25 (PH 3-Design for Grade & Obst. Removal)] - 07/25

Rehabilitate Apron, Rehabilitate Runway [crack seal & repair] - 02/20, RehabilitateTaxiway [crack seal & repair]Rehabilitate Access Road, Rehabilitate Apron [/TWY]

Rehabilitate Taxiway [T-Hgr Taxilanes]

Selection Criteria Year: 2005

Page 4 of 98

Page 5: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

CE ACE IA Knoxville Municipal GA 008 81,476 Acquire Snow Removal Equipment

Maquoketa Municipal GA 001 218,464 Rehabilitate Apron, Rehabilitate Taxiway [T-Hgrs.]

Marshalltown Municipal GA 008 902,500 Rehabilitate Runway [12/30] - 12/30

Mason City Municipal P 024 4,763,627 Improve Runway Safety Area - 17/35, Rehabilitate Runway [17/35] - 17/35

025 2,082,542 Improve Runway Safety Area - 12/30, Rehabilitate Runway [12/30] - 12/30

Monticello Regional GA 002 163,305 Acquire Land For Approaches [RPZ 33 - Prull & Franzenburg], Expand Apron

Mount Pleasant Municipal GA 005 177,650 Rehabilitate Taxiway

Orange City Municipal GA 001 133,000 Conduct Airport Master Plan Study, Conduct Environmental Study [EA], Conduct

002 76,000Miscellaneous Study [BCA] Construct Fuel Farm

Osceola Municipal GA 003 153,900 Construct Snow Removal Equipment Building, Improve Access Road

004 77,254 Acquire Snow Removal Equipment

Oskaloosa Municipal GA 004 300,000 Construct Taxiway [Grade/Pave/Light Partial Parallel to R31]

Ottumwa Industrial GA 011 220,305 Install Miscellaneous NAVAIDS [SWC's - Runways 13/31 & 4/22], Rehabilitate

Pella Municipal GA 003 27,377

Runway [13/31 Crack Cleaning & Sealing] - 13/31, Rehabilitate Runway Lighting [13/31] - 13/31 Install Perimeter Fencing [PH 1 - WHA/WHMP]

Red Oak Municipal GA 005 300,504 Extend Runway [5/23 PH 2 Grade] - 05/23

Schenck Field GA 002 68,565 Construct Fuel Farm [Self Serve Fuel Dispenser]

Sioux Gateway/Col. Bud Day Field P 032 4,363,510 Extend Runway Safety Area [Grade ditch 17, remove arresting gear 17/35] - 17/35, Extend Taxiway [C]

Southeast Iowa Regional CS 023 4,458,090 Rehabilitate Runway [18/36] - 18/36, Rehabilitate Runway [Improve RSA 18/36] ­18/36, Rehabilitate Taxiway [C (PH 2)]

Spencer Municipal GA 014 134,710 Acquire Snow Removal Equipment [Loader/Blower]

015 131,260 Construct Taxiway, Expand Building

State of Iowa 007 415,495 Update Airport Master Plan Study (Denison Municipal; Knoxville Municipal; Monticello Regional; Ottumwa Industrial; Spencer Municipal; Vinton Veterans Memorial

008 69,569Airpark) Conduct Miscellaneous Study

The Eastern Iowa P 031 4,344,189 Install Miscellaneous NAVAIDS [Replace Primary Wind Cone], Install Runway Sensors - 09/27, Rehabilitate Taxiway [PH 2 Construction]

032 271,814 Rehabilitate Runway [PH 1 Design] - 09/27

Selection Criteria Year: 2005

Page 5 of 98

Page 6: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

CE ACE IA Vinton Veterans Memorial Airpark

Waterloo Municipal

State Total:

Waverly Municipal

Winterset-Madison County

CE ACE KS Allen County

Amelia Earhart

Anthony Municipal

Atkinson Municipal

Atwood-Rawlins County City-County

Belleville Municipal

Blosser Municipal

Captain Jack Thomas/El Dorado

Cheyenne County Municipal

Clay Center Municipal

Coffeyville Municipal

Dodge City Regional

Elkhart-Morton County

Forbes Field

Fort Scott Municipal

Garden City Regional

Gardner Municipal

Great Bend Municipal

FY 2005

Service Grant Seq Level Number

GA 002

P 025

026

027

028

GA 001

GA 002

63 Grants

GA 005

GA 003

GA 001

GA 009

GA 003

GA 004

GA 004

GA 004

GA 002

003

GA 004

GA 009

CS 017

GA 002

P 019

020

GA 006

CS 022

GA 002

GA 014

AIP Federal Funds

19,237

627,000

285,000

972,701

1,110,970

150,000

367,648

53,007,943

55,446

38,200

137,053

898,354

1,162,894

635,829

437,289

165,067

35,055

30,020

47,500

63,887

116,253

114,000

683,574

41,272

73,363

2,566,567

216,007

450,000

Report Date 02/23/2006

Brief Description Of Work

Install Miscellaneous NAVAIDS [Rotating Beacon]

Acquire Aircraft Rescue & Fire Fighting Vehicle

Install Guidance Signs [(PH 2)]

Security Enhancements [Wildlife Fence]

Rehabilitate Apron [(PH 2)]

Extend Runway [PH 1-Planning, Environmental, and Land] - 11/29

Rehabilitate Runway [14/32 Repair & Resurface] - 14/32

Construct Taxiway [Parallel Taxiway]

Rehabilitate Apron [phase 1 (design)]

Improve Airport Drainage, Rehabilitate Terminal Building

Rehabilitate Runway [PH3 OVERLAY RWY 3-21] - 03/21

Rehabilitate Runway - 16/34, Rehabilitate Taxiway [Phase 2]

Rehabilitate Runway - 18/36

Rehabilitate Runway - 17/35

Rehabilitate Runway - 04/22

Rehabilitate Runway [Environmental Assessment] - 13R/31L

Construct Apron [Design engineering for apron]

Rehabilitate Runway [Design Only (repair/ crack seal) runway, taxiways, apron] ­17/35Acquire Land For Approaches

Rehabilitate Taxiway [Design Phase]

Rehabilitate Apron

Acquire Aircraft Rescue & Fire Fighting Vehicle

Rehabilitate Taxiway

Acquire Snow Removal Equipment

Rehabilitate Taxiway [PH2 TWY A]

Acquire Land For Approaches

Install Miscellaneous NAVAIDS, Rehabilitate Taxiway [parallel txy phase 1],

Selection Criteria Year: 2005

Page 6 of 98

Page 7: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

CE ACE KS 014 Rehabilitate Taxiway Lighting

Herington Regional GA 002 608,073 Rehabilitate Runway - 17/35

Hill City Municipal GA 005 360,358 Rehabilitate Apron

Hutchinson Municipal GA 014 125,685 Update Airport Master Plan Study

Kingman Airport - Clyde Cessna Field GA 007 22,145 Install Weather Reporting Equipment [Install AWOS]

Larned-Pawnee County GA 007 19,952 Improve Utilities [Replace existing septic system], Install Weather Reporting

Lawrence Municipal GA 012 256,538Equipment [Install AWOS] Construct Taxiway [Construct Partial Parallel Taxiway], Rehabilitate Runway

Manhattan Regional P 024 327,346

Lighting [Rehab RWY lts] - 15/33, Rehabilitate Taxiway Lighting [Rehab Taxiway A Lighting] Conduct Environmental Study, Update Airport Master Plan Study

026 1,166,821 Rehabilitate Runway Lighting - 03/21, Rehabilitate Taxiway Lighting

027 489,204 Construct Building

McPherson GA 009 503,138 Construct Taxiway [Construct new connecting taxiway], Rehabilitate Taxiway [Phase 2 Apron to A-3.]

Medicine Lodge GA 001 93,812 Conduct Airport Master Plan Study

Miami County GA 006 70,157 Acquire Easement For Approaches [REIMBURSE EASEMENTFOR RPZ]

Moritz Memorial GA 003 150,000 Expand Apron

New Century Aircenter R 019 2,145,160 Rehabilitate Runway [PH2 REHAB RWY 17-35] - 17/35

Newton-City-County R 019 1,210,254 Rehabilitate Apron [APRON REHAB DESIGN ONLY], Rehabilitate Taxiway [REHAB TWY C], Rehabilitate Taxiway Lighting [REHAB MITL TWY'S A,B,C,D]

Oswego Municipal GA 002 46,370 Update Airport Master Plan Study [Update ALP and revalidate EA]

003 22,934 Remove Obstructions

Ottawa Municipal GA 007 103,630 Install Miscellaneous NAVAIDS [INSTALL PAPI'S RWY 17-35], Rehabilitate Apron [Design Apron Rehab]

Philip Billard Municipal GA 011 1,312,195 Rehabilitate Runway [Rehab RWY 13-31 and narrow to 100'] - 13/31

Phillipsburg Municipal GA 005 41,610 Update Airport Master Plan Study [UPDATE ALP]

Pratt Industrial GA 008 2,457,042 Rehabilitate Runway [PH3 Rehab runway 17-35.] - 17/35

Renner Field /Goodland Municipal/ GA 011 278,862 Construct Runway [reimb for EA (for RSA rwy 12 fill)], Improve Runway Safety

012 28,500Area - 12/30 Acquire Miscellaneous Land

Russell Municipal GA 004 1,240,410 Rehabilitate Runway [PH2 Rehab Runway 17-35] - 16/34

Selection Criteria Year: 2005

Page 7 of 98

Page 8: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

FAA - Office Of Airports

Region ADO State Worksite

CE ACE KS Salina Municipal

State Total:

Scott City Municipal

Shalz Field

Strother Field

Syracuse-Hamilton County Municipal

Wichita Mid-Continent

CE ACE MO Charles B. Wheeler Downtown

Joplin Regional

Kansas City International

Lambert-St Louis International

Missouri State Block Grant Program

Springfield-Branson Regional

State Total:

CE ACE NE Albion Municipal

Selection Criteria Year: 2005

Grants Awarded by FY

FY 2005

Service Level

Grant Seq Number

CS 025

GA

GA

GA

GA

P

006

006

011

003

049

50 Grants

R

P

P

015

016

023

046

047

P 088

091

092

093

094

095

P

097

026

029

030

15 Grants

GA 005

AIP Federal Funds

4,039,731

156,832

270,123

218,177

202,544

5,944,578

31,879,811

5,415,000

1,100,000

3,501,523

4,634,255

7,464,005

386,687

7,028,210

19,909,600

4,790,400

2,251,054

6,137,729

176,172

15,603,594

5,381,109

4,000,000

87,779,338

93,850

Report Date 02/23/2006

Brief Description Of Work

Install Airport Beacons [Replace old beacon with new beacon], Install GuidanceSigns [Replace damaged and faded sign panels], Rehabilitate Runway [PH2 Rehabrwy 12-30 with drains] - 12/30, Rehabilitate Taxiway [Rehab TWY B & E with underdrains.]Extend Taxiway [construct T-Hanger Taxiway]

Rehabilitate Apron, Rehabilitate Taxiway [T-hangar taxiway]

Rehabilitate Taxiway Lighting [Rehab Partial Par TWY Lts]

Construct Runway [Project Design (grading & paving) and fencing] - Plan-1

Construct Taxiway [Taxiway H], Construct Taxiway [Taxiway L]

Rehabilitate Runway [phase 2] - 01/19

Rehabilitate Runway Lighting - 01/19

Construct Terminal Building [Construct new terminal building (phase 2)]

Rehabilitate Apron

Construct Deicing Containment Facility [Expand Glycol recovery system (phase 2)],Rehabilitate Runway Lighting [Airfield lightng control] - 01L/19RAcquire Aircraft Rescue & Fire Fighting Vehicle

Construct Runway - Plan-1

Acquire Land for Noise Compatibility within 70 - 74 DNL [Expansion noise land]

Noise Mitigation Measures for Residences within 65 - 69 DNL

Rehabilitate Taxiway [rehab txy Delta (6/24 to Charlie)]

Rehabilitate Apron [rehab NW aircarrier apron], Rehabilitate Apron [rehabconcourse C apron], Rehabilitate Taxiway [rehab txy Golf (Papa to 12R)]Acquire Aircraft Rescue & Fire Fighting Vehicle

Non primary development projects in state block grant program

Rehabilitate Runway [Phase 5 (final)]

Construct Terminal Building [phase 2]

Acquire Snow Removal Equipment

Page 8 of 98

Page 9: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

CE ACE NE Alliance Municipal GA 010 1,025,000 Install Airfield Guidance Signs, Install Perimeter Fencing [Preliminary Phase work for the fence construction in FY 06 including the wildlife study by USDA], Rehabilitate

Antelope County GA 002 513,501Apron, Rehabilitate Taxiway Construct Taxiway [look back], Construct Taxiway, Expand Apron

Aurora Municipal - Al Potter Field GA 005 265,068 Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate Taxiway

Beatrice Municipal GA 009 183,872 Construct Snow Removal Equipment Building, Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS

Blair Municipal GA 006 939,051 Construct Apron, Construct Runway [Phase 4] - 13/31, Construct Taxiway, Install Miscellaneous NAVAIDS, Update Airport Master Plan Study

Brenner Field GA 004 11,000 Update Airport Master Plan Study

005 94,002 Acquire Snow Removal Equipment

Brewster Field GA 004 273,797 Expand Apron, Improve Fuel Farm

Broken Bow Municipal GA 003 121,021 Acquire Snow Removal Equipment

Central Nebraska Regional CS 026 219,863 Security Enhancements

027 2,863,676 Rehabilitate Apron

Chadron Municipal GA 007 111,944 Acquire Snow Removal Equipment

Columbus Municipal GA 005 693,880 Acquire Land For Approaches, Acquire Land For Approaches, Acquire Land For

Cozad Municipal GA 002 139,650Approaches Extend Runway [Land for Runway RPZ and BRL (Phase 1)] - 13/31

Creighton Municipal GA 002 104,500 Rehabilitate Runway - 12/30, Rehabilitate Taxiway

Crete Municipal GA 005 226,670 Construct Snow Removal Equipment Building

Eppley Airfield P 041 1,988,187 Construct Apron

042 1,932,371 Extend Runway

043 11,651,250 Extend Runway [Extend Runway 14L/32R by 1500 feet] - 14L/32R, Extend Runway - 14L/32R, Extend Runway - 14L/32R

Garden County GA 002 450,000 Construct Taxiway

Hartington Municipal GA 003 589,181 Construct Taxiway

Hastings Municipal GA 007 66,500 Update Airport Master Plan Study

008 137,602 Install Perimeter Fencing

Hebron Municipal GA 003 180,500 Construct Snow Removal Equipment Building

Jim Kelly Field GA 005 93,945 Acquire Snow Removal Equipment

006 15,000 Update Airport Master Plan Study

Selection Criteria Year: 2005

Page 9 of 98

Page 10: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

CE ACE NE 007 380,721 Construct Terminal Building [Design Terminal area (Phase 1)]

Karl Stefan Memorial GA 012 97,324 Acquire Snow Removal Equipment

013 90,725 Acquire Snow Removal Equipment, Acquire Snow Removal Equipment

Kearney Municipal CS 015 949,050 Install Miscellaneous NAVAIDS, Rehabilitate Apron

016 802,471 Construct Snow Removal Equipment Building

Kimball Municipal/Robert E Arraj Field GA 004 602,547 Construct Taxiway

Lincoln Municipal P 033 902,500 Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS [Install ODALS on Runway 35 End], Install Miscellaneous NAVAIDS [Relocate windcones out of the RSA], Rehabilitate Runway - 17/35, Rehabilitate Service Road, Rehabilitate Taxiway, Security Enhancements

Miller Field GA 004 243,244 Extend Runway [Phase 3] - 03/21

Nebraska City Municipal GA 009 191,000 Construct Snow Removal Equipment Building

North Platte Regional Airport Lee Bird Field CS 020 103,550 Install Guidance Signs

Pender Municipal GA 003 49,400 Update Airport Master Plan Study

004 91,618 Acquire Snow Removal Equipment

Plattsmouth Municipal GA 008 104,500 Install Weather Reporting Equipment

Red Cloud Municipal GA 001 52,250 Update Airport Master Plan Study

Rock County GA 004 218,500 Construct Parking Lot, Improve Access Road, Rehabilitate Taxiway

Searle Field GA 003 393,300 Acquire Land For Approaches

004 1,525,374 Rehabilitate Runway [Phase 1] - 13/31

Seward Municipal GA 004 866,317 Extend Taxiway, Widen Taxiway

State of Nebraska 006 242,250 Update State System Plan Study

007 144,486 Conduct State System Plan Study, Update State System Plan Study

Stuart-Atkinson Municipal GA 002 306,000 Rehabilitate Apron, Rehabilitate Taxiway

Superior Municipal GA 001 420,000 Rehabilitate Apron, Rehabilitate Taxiway

Tecumseh Municipal GA 004 95,000 Acquire Miscellaneous Land

Tekamah Municipal GA 003 800,000 Construct Taxiway [Reimbursement for Taxiway constructed in FY-05], Construct Taxiway [Reimbursement for Taxiway constructed in FY-05], Construct Taxiway [The airport will finish construction in FY-05 and get reimbursement in FY-06 and

The O'Neill Municipal-John L Baker Field GA 002 123,323 07] Rehabilitate Runway - 13/31

Selection Criteria Year: 2005

Page 10 of 98

Page 11: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

CE ACE NE Wahoo Municipal GA 003 300,515 Acquire Land for Development

Wayne Municipal GA 006 95,000 Install Weather Reporting Equipment

Western Nebraska Regional/William B. Heilig Field

CS 024 1,000,000 Construct Terminal Building

State Total: 55 Grants 36,175,846

ADO Total: 183 Grants 208,842,938

Region Total: 236 Grants 208,842,938

Report Total: 2099 Grants 3,549,617,470

EA BEC WV Braxton County GA 010 252,807 Install Perimeter Fencing, Rehabilitate Runway [Crack & Joint Repair] - 01/19

Eastern WV Regional/Shepherd Field R 020 200,000 Construct Terminal Building

021 1,513,021 Construct Taxiway

Elkins-Randolph County-Jennings Randolph Field

GA 011 215,131 Construct Runway Safety Area - 14/32, Install Airfield Guidance Signs

Fairmont Municipal-Frankman Field GA 005 505,400 Acquire Land For Approaches, Remove Obstructions

Grant County GA 015 780,772 Construct Taxiway [(TW "A")]

Greenbrier Valley

Harrison/Marion Regional

P

P

022

028

1,108,750

3,019,789

Expand Apron [phase 3], Improve Runway Safety Area [Environmental Assessment] - 04/22, Security Enhancements [Fencing & Terminal Modifications] Acquire Friction Measuring Equipment, Construct Aircraft Rescue & Fire Fighting

Jackson County GA 012 76,010

Building, Improve Runway Safety Area [Grading] - 03/21, Rehabilitate Emergency Generator, Security Enhancements [(Camera System)] Construct Taxiway, Install Emergency Generator

013 129,580 Rehabilitate Building [(Hangar)]

Kee Field GA 009 491,283 Improve Runway Safety Area - 8-26

Marshall County GA 013 187,482 Construct Snow Removal Equipment Building

Mason County GA 013 68,238 Remove Obstructions [Primary Surface]

Mercer County GA 017 555,998 Construct Fuel Farm [design], Improve Terminal Building, Remove Obstructions [RW

Mid-Ohio Valley Regional P 029 4,800,00023 Approach and Primary Surface] Improve Runway Safety Area [Grading] - 03/21, Rehabilitate Taxiway

Morgantown Municipal-Walter L. Bill Hart Field P 024 1,018,589 Construct Deicing Containment Facility, Rehabilitate Apron

Selection Criteria Year: 2005

Page 11 of 98

Page 12: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

FAA - Office Of Airports

Region ADO State Worksite

EA BEC WV

Philippi/Barbour County Regional

Raleigh County Memorial

Tri-State/Milton J. Ferguson Field

Upshur County Regional

Wheeling Ohio County

Yeager

EA HAR DE

ADO Total:

State Total:

Delaware Airpark

New Castle

New Castle County

State of Delaware

Summit

State Total:

Sussex County

EA HAR PA Allegheny County

Selection Criteria Year: 2005

Grants Awarded by FY

FY 2005

Service Level

Grant Seq Number

GA

CS

P

025

026

006

019

033

GA

GA

016

021

P 035

24 Grants

24 Grants

GA

GA

GA

006

023

022

R

GA

003

007

008

019

7 Grants

R 013

AIP FederalFunds

97,119

4,750,000

175,816

299,917

910,288

567,362

400,000

7,075,861

29,199,213

29,199,213

1,800,000

114,670

3,631,943

152,000

52,098

236,540

566,846

6,554,097

237,500

Report Date 02/23/2006

Brief Description Of Work

Improve Snow Removal Equipment Building [Sewer Connection], Install TaxiwayLightingImprove Runway Safety Area - 18/36

Install Miscellaneous NAVAIDS [PAPIs & REILs]

Construct Taxiway [Design], Rehabilitate Terminal Building [Rehab RoofOverhangs], Security EnhancementsAcquire Snow Removal Equipment, Improve Runway Safety Area [EnvironmentalAssessment] - 12/30, Improve Terminal Building, Install Perimeter Fencing,Rehabilitate Access RoadInstall Apron Lighting [South Apron], Install Perimeter Fencing

Install Runway Vertical/Visual Guidance System [Phase 2 of 2] - 16/34, RehabilitateRunway [Crack Seal And Remark] - 03/21, Rehabilitate Runway [Crack Seal AndRemark] - 16/34Expand Terminal Building, Improve Runway Safety Area [RW 5 END] - 05/23,Improve Terminal Building, Rehabilitate Apron, Remove Obstructions [EnvironmentalAssessment]

Construct Runway [Land Acquisition and Wetlands, Phase II] - 09/27

Acquire Snow Removal Equipment [Six Wheel Dump Truck]

Construct Taxiway [Taxiway K-4 (including rehabilitation of Taxiway K], ExpandApron [Holding Area for Taxiway E at Runway 1 (including blast wall insulation)],Rehabilitate Taxiway [Old Taxiway M], Update Miscellaneous Study [PavementManagement System]Update State System Plan Study

Rehabilitate Runway [Remarking] - 17/35, Rehabilitate Runway Lighting - 11/29

Construct Taxiway [Parallel Taxiway (Environmental), Phase I], Extend Runway[Environmental, Phase I] - 17/35, Remove Obstructions [Environmental, Phase I]Construct Snow Removal Equipment Building [Design & Snow Plan], RehabilitateRunway [Land easements, Ph II] - Plan-1

Update Airport Master Plan Study

Page 12 of 98

Page 13: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

EA HAR PA 014 248,875 Rehabilitate Runway Lighting

015 1,666,175 Improve Airport Drainage, Rehabilitate Taxiway [Convert Runway 5/23 to a

Allentown Queen City Municipal GA 008 150,000Taxiway], Rehabilitate Taxiway Construct Taxiway [(Taxilanes), Phase III]

Altoona-Blair County CS 030 2,643,810 Expand Apron [South Hangar Apron, Phase II], Improve Runway Safety Area [Runways 3/21 and 30, Phase II] - 03/21

031 178,484 Acquire Land For Approaches [Runway 2/20 and 12/30]

Arnold Palmer Regional P 028 260,680 Improve Airport Drainage [Sewer Extension], Improve Runway Safety Area [Obstruction removal, Phase III] - 05/23

030 739,250 Acquire Land for Development [One Acre - Tomasic Property], Acquire Snow Removal Equipment [Broom]

031 1,810,700 Construct Taxiway [T-hangar taxiway, Phase II]

Bradford Regional CS 029 396,000 Improve Runway Safety Area [(construct), Phase II] - 14/32

030 1,129,550 Acquire Miscellaneous Land [Mineral Rights], Rehabilitate Apron [Terminal Apron], Rehabilitate Runway Lighting [HIRL] - 14/32

Capital City R 014 1,799,930 Improve Runway Safety Area [Easements, land, construction replace ALS for Runway 8, Ph III] - 08/26, Improve Runway Safety Area [Runway 12 End] - 12/30

Commonwealth of Pennsylvania 003 330,000 Update State System Plan Study

Delaware Valley Region 005 325,000 Conduct Miscellaneous Study [Conduct Air Service Demand Study, Phase II]

006 281,000 Conduct Metropolitan System Plan Study [CASP XXIII]

Du Bois-Jefferson County CS 027 1,680,550 Construct Access Road [Access Road and Parking Lot, Phase II], Construct

Erie International/Tom Ridge Field P 041 432,250Taxiway [T-Hangar Taxiway], Improve Terminal Building [utilities-water] Rehabilitate Apron [Terminal Apron, Phase II]

Franklin County Regional GA 005 613,927 Rehabilitate Apron, Rehabilitate Runway - 06/24, Rehabilitate Taxiway

Harrisburg International P 041 6,660,000 Construct Apron [Phase IV], Construct Taxiway [Phase III], Install Runway Lighting [Phase II] - 13/31

042 3,830,105 Construct Apron [Cargo Apron, Phase II], Construct Terminal Building [Phase III]

John Murtha Johnstown-Cambria County CS 033 1,083,000 Improve Runway Safety Area - 05/23, Rehabilitate Runway [cracksealing] - 05/23, Rehabilitate Runway Lighting [internal electrical components, Phase II] - 15/33, Rehabilitate Taxiway [Taxiways B, C, D, F, F2 and G], Remove Obstructions

Lancaster GA 027 1,000,000[Runway Approaches] Extend Runway [Phase IX] - 08/26, Rehabilitate Taxiway [Design of Taxiways E, F,

Lehigh Valley International P 061 2,000,000 and M] Noise Mitigation Measures for Residences within 65 - 69 DNL

Selection Criteria Year: 2005

Page 13 of 98

Page 14: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

EA HAR PA

Northeast Philadelphia

Pennsylvania State Block Grant Program

Philadelphia International

Pittsburgh International

Reading Regional/Carl A Spaatz Field

Rostraver

University Park

Wilkes-Barre/Scranton International

Williamsport Regional

State Total:

Selection Criteria Year: 2005

Report Date 02/23/2006

FY 2005

Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

062 3,591,522 Acquire Interactive Training System, Acquire Land for Development, Construct Snow Removal Equipment Building, Improve Runway Safety Area [Phase II] - 13/31, Security Enhancements [Install Security Fencing]

063 5,344,625 Rehabilitate Taxiway [Taxiway B, Phase III]

064 2,000,000 Acquire Land For Approaches [Runway 13 RPZ]

012R 3,252,222 Construct Taxiway [Taxiway C, Phase V]

022 6,300,000 Non primary development projects in state block grant program - GA/RL

023 4,961,076 Non primary development projects in state block grant program - GA/RL

024 628,000 Non primary development projects in state block grant program - GA/RL

025 1,326,928 Non primary development projects in state block grant program - GA/RL

026 1,907,000 Non primary development projects in state block grant program - GA/RL

027 1,499,500 Non primary development projects in state block grant program - GA/RL

072P 2,400,000 Noise Mitigation Measures for Residences within 65 - 69 DNL [Phase III]

073 6,000,054 Construct Runway [Environmental Impact Statement, Phase III] - 17/35

074 5,450,000 Rehabilitate Apron [D and E Apron including Taxiway J, Phase IV]

075 12,779,619 Extend Runway - 17/35

085P 5,323,879 Improve Runway Safety Area [10L Safety Area, Phase III] - 10L/28R, Improve Runway Safety Area [28R Safety Area] - 10L/28R, Security Enhancements [Police Vehicles]

086 5,578,206 Rehabilitate Taxiway [Taxiways T and V, Phase V]

087 1,843,647 Rehabilitate Taxiway [B2], Rehabilitate Taxiway [Taxiway R (design)]

040P 45,717 Acquire Snow Removal Equipment [Tow Vehicle], Rehabilitate Runway [Phase II] ­13/31, Rehabilitate Runway - 18/36

010R 441,750 Acquire Land For Approaches [20 Acres], Improve Airport Drainage [Phase II], Improve Runway Safety Area [Design on Runway 8 End] - 08/26, Install Perimeter Fencing [Phase II]

037P 469,896 Update Airport Master Plan Study [Airport Layout Plan Update, environmental and preliminary design of ATCT]

038P 5,990,170 Construct Apron [Phase II], Construct Terminal Building [Phase V], Improve Airport Drainage, Rehabilitate Runway [renumber and signage] - 04/22

029P 788,500 Construct Runway Safety Area [Phase II] - 09/27, Construct Snow Removal Equipment Building [Design, Phase I]

45 Grants 107,419,097

Page 14 of 98

Page 15: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

ADO Total:

EA NYC NJ Atlantic City International

Cape May County

Essex County

Greenwood Lake

Hammonton Municipal

Lakewood

Lincoln Park

Linden

Millville Municipal

Morristown Municipal

Newark Liberty International

FY 2005

Service Grant Seq AIP Federal Level Number Funds

52 Grants 113,973,194

P 060 366,469

061 3,458,358

GA 019 115,999

022 200,000

R 019 641,136

020 701,900

GA 001 25,000

GA 009 98,597

010 96,972

GA 006 51,775

R 005 142,500

006 1,076,484

R 009 94,927

GA 017 680,000

018 137,000

023 279,749

R 030 41,238

031 46,953

032 215,507

P 103 500,000

104 6,704,570

105 1,656,156

Report Date 02/23/2006

Brief Description Of Work

Environmental Mitigation [Phase II]

Security Enhancements [Security Enhancements - Phase III]

Conduct Airport Master Plan Study [Pavement Management Study], RemoveObstructions [Obstruction Study]Rehabilitate Taxiway ["B", "D", "G", and T-hangar taxiway]

Improve Runway Safety Area [Runways 4 & 9 Safety Areas, Phase I - PreliminaryEngineering & Environmental Only] - 04/22, Install Miscellaneous NAVAIDS [Acquire& Relocate Airport Beacon - Design & Installation], Rehabilitate Runway [Design] ­09/27, Rehabilitate Taxiway [Taxiway "P" - Phase I, Design & Construct]Construct Building [14,000 Square-Foot, 9-Bay T-hangar]

Install Perimeter Fencing [Replace Existing Fence - Design Only]

Conduct Environmental Study [Environmental Assessment for short term projects.]

Install Perimeter Fencing [Phase II]

Conduct Environmental Study [Environmental Assessment Phase II.]

Conduct Environmental Study [CONDUCT ENVIRONMENTAL ASSESSMENT FORMASTER PLAN PROJECT]Construct Apron [Includes Associated Taxiway-Phase II]

Conduct Airport Master Plan Study [:Obstruction Study On/Off Airport Property]

Rehabilitate Taxiway Lighting [Rehabilitate t/w 'A' Ligthing ,Signage]

Conduct Airport Master Plan Study [Pavement Management System Study], RemoveObstructions [Obstruction Study]Rehabilitate Taxiway ["B","G","J" and North Apron Intersection(Design)]

Install Weather Reporting Equipment [INSTALL WEATHER REPORTING EQUIPMENT{AWOS} - Design & Permitting]Install Runway Vertical/Visual Guidance System [Install PAPI at Runway 5Approach End - Design and Permitting Only] - 05/23Improve Airport Drainage [Preliminary Design (Runway 13 End) & EnvironmentalAssessment]Improve Runway Safety Area [Phase I] - 11/29

Noise Mitigation Measures for Public Buildings [Soundproofing McKinley School ­Phase VII $6,251,900(Fed. Share)]Install Runway Incursion Caution Bars [Upgrade Runway Hold Bar Lighting]

Selection Criteria Year: 2005

Page 15 of 98

Page 16: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

EA NYC NJ

Ocean City Municipal

Robert J. Miller Air Park

Somerset

106

007

008

009

013

014

005

GA

GA

R

8,217,000

103,071

28,761

17,978

285,000

525,000

622,328

Sussex 005R 198,271

Teterboro 026

028

029

030

031

R 3,166,993

4,150,000

500,000

6,030,027

500,000

Trenton Mercer

032

030

031

P

5,723,132

729,097

262,432

Trenton-Robbinsville

Woodbine Municipal

005

006

007

011

012

R

GA

268,579

262,182

37,525

28,500

188,503

State Total: 43 Grants 49,175,669

EA NYC NY Adirondack Regional 033

034

035

GA 467,685

1,044,405

276,500

Report Date 02/23/2006

Brief Description Of Work

Extend Taxiway ["P"]

Rehabilitate Runway [Sink hole repair (r/w rehabilitation)] - 06/24

Construct Snow Removal Equipment Building [Design and Permits]

Construct Fuel Farm [Design and Permits]

Construct Runway [14-32(new crosswind runway) design and permitting] - Plan-1

Rehabilitate Apron [Rehabilitation and Extension - Construction- Phase I]

Rehabilitate Apron [REHABILITATE TRANSIENT APRON (NORTH OF RUNWAY 12­30) 33,000 SF]Remove Obstructions [Obstruction Removal at Runway 3 End Bury Power Lines(800 ft).]Construct Taxiway [Phase II]

Construct Taxiway [Construct Taxiway N (between Taxiways G and L)]

Improve Runway Safety Area [Prelim. Eng. & Env.] - 06/24

Noise Mitigation Measures for Public Buildings

Noise Mitigation Measures for Public Buildings [Soundproofing of H. P. BectonRegional School - Phase II $500,000]Construct Taxiway [Relocate Taxiway P - Phase IV]

Acquire Snow Removal Equipment [Acquire Snow Removal Equipment - Phase II]

Rehabilitate Taxiway [Rehabilitate Taxiways "A","C" and "J" - Phase I$285,000(Fed. Share)]Rehabilitate Apron [Rehabilitate Mid-Field Aircraft Parking Apron - Phase II]

Install Airfield Guidance Signs [Airfield Signage Improvements]

Acquire Land for Development [Property Transfer to Airport]

Install Weather Reporting Equipment [Design and Permits]

Acquire Land for Development [Phase I, Condemnation Proceedings], UpdateAirport Master Plan Study [Update Airport Layout Plan]

Construct Apron [Apron Expansion - Phase I (Construction)]

Construct Taxiway

Rehabilitate Runway [Runway 9-27 Rehabilitation (Design Only)] - 09/27,Rehabilitate Taxiway [Taxiways C, D & E and Ramp Rehabilitation (Design Only)]

Selection Criteria Year: 2005

Page 16 of 98

Page 17: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

EA NYC NY 037 140,296 Acquire Snow Removal Equipment [Plow Truck], Conduct Airport Master Plan Study [Wildlife Hazard Assessment]

Akron R 011 313,797 Acquire Easement For Approaches [ACQUIRE EASEMENTS/OBSTRUCTION REMOVAL FOR RWYS. 25 AND 29 RPZ'S]

012 304,611 Construct Building [PURCHASE 2 10-BAY T-HANGARS (REIMBURSEMENT)]

Albany International P 080 834,058 Security Enhancements [Airfield Security/Service Access Road Improvements]

081 2,680,591 Security Enhancements [Terminal Concourse D Security Checkpoint Improvements]

082 1,330,773 Rehabilitate Apron [Southern Terminal Ramp Improvements - Phase 2]

083 1,130,181 Expand Apron [Northeast Quadrant Air Cargo Ramp Expansion]

085 503,500 Remove Obstructions [Runway 01/10 Obstruction (Tree) Removal]

Bayport Aerodrome GA

086

007

400,422

187,231

VALE Vehicle [VALE Program - Clean Fuel/American Fuel Fleet Conversion - Phase 1] Construct Snow Removal Equipment Building [Construct Snow Removal and

008 260,633Maintenance Equipment Building] Improve Access Road [Improve Airport Access Road - North End]

Buffalo Airfield R 013 82,431 Update Airport Master Plan Study [AIRPORT MASTER PLAN UPDATE]

014 86,724 Install Miscellaneous NAVAIDS [Replace Rotating Beacon, Lighted Wind Indicator

Buffalo Niagara International P 060 11,250,242and Regulator] Rehabilitate Runway [REHABILITATE AND EXTEND RUNWAY 5/23 AND PARALLEL TAXIWAY A, INCLUDING RELOCATION OF NAVIGATIONAL AIDS (PHASE 3)] ­05/23

Canandaigua R 017

018

93,542

439,850

Construct Snow Removal Equipment Building [Phase I-Design], Remove Obstructions [Phase I-Study] Extend Runway [Acquire Land For Runway End 13 Extension and Runway

Chautauqua County/Dunkirk GA 032 133,752Protection Zone] - 13/31 Acquire Snow Removal Equipment [PURCHASE SNOW REMOVAL EQUIPMENT]

Chautauqua County/Jamestown CS 032 356,250 Acquire Snow Removal Equipment, Expand Apron [Design]

Corning-Painted Post GA 005 149,971 Acquire Snow Removal Equipment [PURCHASE SNOW REMOVAL EQUIPMENT]

006 2,522,019 Construct Runway [Pave and light runway, including associated obstruction removal] - 13/31

Cortland County-Chase Field GA 012 201,400 Install Weather Reporting Equipment [INSTALL AWOS-3]

Dansville Municipal GA 014 798,000 Construct Building [CONSTRUCT 8-BAY T-HANGAR], Construct Taxiway

Dutchess County GA 026 76,000 [CONSTRUCT T-HANGAR TAXILANE] Improve Airport Drainage [Improve Drainage For SRE Building]

Selection Criteria Year: 2005

Page 17 of 98

Page 18: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

EA

Region

NYC NY

ADO State

Elmira/Corning Regional

Finger Lakes Regional

Floyd Bennett Memorial

Francis S Gabreski

Fulton County

Genesee County

Greater Binghamton/Edwin A Link Field

Greater Rochester International

Griffiss Airpark

Worksite

Hamilton Municipal

Ithaca Tompkins Regional

Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

P 042

043

4,512,888

988,924

Extend Runway [EXTEND RUNWAY END 6 BY 600'] - 06/24, Extend Taxiway [EXTEND TAXIWAY A BY 600'] Expand Terminal Building [Install Passenger Boarding Bridge]

GA

GA

015

032

286,900

159,600

Install Weather Reporting Equipment [INSTALL AN AUTOMATED WEATHER OBSERVING SYSTEM (AWOS-3)] Improve Runway Safety Area [RW 1-Design] - 01/19

GA

GA

012

013

314,441

210,720

Acquire Snow Removal Equipment [Acquire One Broom and One Snow Plow $432,250(Fed. Share)] Install Perimeter Fencing [Install Perimeter Fencing]

014 124,995 Acquire Snow Removal Equipment

R 018

019

285,000

1,630,789

Acquire Land For Approaches [ACQUIRE LAND AND EASEMENTS FOR THE RUNWAY END 10 RPZ (PHASE 3)], Rehabilitate Runway [REHABILITATE RUNWAY END 28 AND TAXIWAYS C AND D - PHASE 1 (DESIGN)] - 10/28 Rehabilitate Runway Lighting [Phase 1] - 10/28

P 045 5,436,510 Rehabilitate Runway [Runway 16-34 Rehabilitation (Construction)] - 16/34

P 054 13,613,405 Improve Runway Safety Area [Runway End 28 Safety Area-Phase 4] - 10/28

055 3,312,707 Improve Runway Safety Area [Phase 5] - 10/28

GA 008

009

010

011

270,750

3,676,500

636,500

750,000

Conduct Airport Master Plan Study [Pavement Management Study], Conduct Miscellaneous Study [Tenant Relocation Plan], Install Instrument Approach Aid [Feasibility Study/EA for Navaids Installation] - 15/33 Construct Building [30-Bay T-Hangar Building], Construct Fuel Farm [MAP] [Fuel Farm Upgrades], Improve Aircraft Rescue & Fire Fighting Building [Rehabilitate ARFF Building (Bldg. 45)], Rehabilitate Building [Rehabilitate Aircraft Storage Hangar (Bldg. 221)], Rehabilitate Building [Rehabilitate Fuel truck Storage Building (Bldg. 47)] Rehabilitate Apron [Phase I (Design)], Rehabilitate Building [Control Tower (Bldg. 504) Study & Design], Rehabilitate Building [Hangar/Offices - Phase I (Bldg. 100) Design], Rehabilitate Snow Removal Equipment Building [(Bldg. 220) Design] Acquire Snow Removal Equipment [Purchase Two Snowplows]

GA

P

009

043

044

150,468

2,420,450

405,793

Rehabilitate Runway [Runway 17-35 Reconstruction & Extension (Design Only)] ­17/35 Extend Taxiway [EXTEND PARALLEL TAXIWAY A BETWEEN TAXIWAYS C AND E (CONSTRUCTION) Phase II] Acquire Friction Measuring Equipment [PURCHASE TOW-BEHIND RUNWAY FRICTION METER], Extend Taxiway [EXTEND PARALLEL TAXIWAY A BETWEEN TAXIWAY E AND RUNWAY END 32 (DESIGN)], Remove Obstructions

Selection Criteria Year: 2005

Page 18 of 98

Page 19: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

EA NYC NY

Region ADO State

John F Kennedy International

Worksite

Joseph Y Resnick

Kingston-Ulster

La Guardia

Lake Placid

Le Roy

Long Island MacArthur

Lt Warren Eaton

Malone-Dufort

FY 2005

Service Grant Seq Level Number

044

046

P 137

138

139

140

141

142

143

GA 018

R 013

P 109

111

112

113

GA 021

023

R 013

014

P 063

064

065

068

GA 021

GA 017

AIP Federal Funds

1,013,308

7,000,000

738,000

1,000,000

1,841,925

3,577,004

947,600

1,146,589

252,859

247,097

5,866,239

1,000,000

3,163,761

6,842,107

178,600

164,350

102,795

163,892

378,385

767,571

1,713,700

396,001

242,250

237,500

Report Date 02/23/2006

Brief Description Of Work

[OBSTRUCTION REMOVAL FOR RUNWAY 14/32 (ENVIRONMENTALASSESSMENT)]Extend Taxiway [Phase III]

Improve Runway Safety Area - 04R/22L

Install Runway Lighting [Runway Hold Bar Upgrades - Phase II] - 13L/31R

Improve Runway Safety Area [Improve Runways 4L-22R & 13L-31R Safety Areas(Preliminary Engineering & Environmental) - Phase I] - 04L/22RConstruct Aircraft Rescue & Fire Fighting Training Facility [Phase III]

Rehabilitate Taxiway ["B"]

Security Enhancements [Security Enhancements, Project#3 - Phase II]

Rehabilitate Taxiway [Taxiway ZA]

Install Perimeter Fencing [Inadvertent Entry Fence (Approx. 5,000L.F.)]

Acquire Land For Approaches [Land Acquisition/Obstruction Removal R/W 15]

Rehabilitate Runway [Runway 13 Deck-Phase IV] - 13/31, Rehabilitate Runway[Runway 22 Deck-Phase IV] - 04/22Improve Runway Safety Area [Prelim. Eng. & Env.] - 13/31

Improve Access Road [Central Terminal Building Access Road Bridges]

Improve Access Road [East End Roadway Improvements - Phase I]

Acquire Snow Removal Equipment [Snowblower]

Expand Building [T-hangar]

Update Airport Master Plan Study [MASTER PLAN UPDATE/OBSTRUCTION STUDY]

Install Airfield Guidance Signs [REPLACE AIRFIELD GUIDANCE SIGNS]

Acquire Snow Removal Equipment

Construct Access Road [1606L.F X 20Ft], Construct Service Road [700L.F X 24Ft]

Construct Snow Removal Equipment Building

Improve Terminal Building

Install Runway Lighting [DISPLACE RUNWAY 19 THRESHOLD] - 01/19, InstallWeather Reporting Equipment [REPLACE AUTOMATED WEATHER OBSERVINGSYSTEM (AWOS)], Rehabilitate Runway [PERFORM RUNWAY CRACK REPAIR] ­01/19Rehabilitate Runway [Runway 14-32 Rehabilitation (Construction)] - 14/32

Selection Criteria Year: 2005

Page 19 of 98

Page 20: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

EA NYC NY Massena International-Richards Field GA 032 376,200 Acquire Snow Removal Equipment [Snowblower]

Montauk R 008 42,900 Rehabilitate Runway - 06/24

New 002 1,590,117 Rehabilitate Runway [Reconstruct and Widen RW 15-33 (2,500ft X 60ft)] - Plan-1

003 584,323 Acquire Land for Development [Land Acquisition - Phase I]

Niagara Falls International R 025 103,723 Remove Obstructions [OBSTRUCTION STUDY]

Ogdensburg International GA 025 996,518 Construct Access Road [North Ramp, Access Road & Utility (Construction)]

026 74,100 Construct Terminal Building [(Design)]

Oneonta Municipal GA 010 2,280,217 Install Perimeter Fencing [Install Perimeter Fencing], Rehabilitate Runway

Orange County GA 031 237,500[Rehabilitate Runway 6-24 and Obstructions Removal] - 06/24 Conduct Environmental Study [R/W 3/21 Relocation Phase I]

Oswego County GA 027 28,500 Improve Runway Safety Area [Runways 6/24 and 15/33-Design Only] - 15/33

Penn Yan GA 019 423,314 Acquire Land for Development [ACQUIRE GOLF COURSE LAND AND ASSOCIATED

020 265,020DAMAGES] Install Perimeter Fencing [INSTALL PERIMETER/INADVERTENT ENTRY FENCING]

Perry-Warsaw GA 019 62,549 Remove Obstructions [Design]

Piseco GA 015 395,191 Construct Snow Removal Equipment Building

Plattsburgh International GA 013

015

5,182,500

3,239,540

Construct Terminal Building [Phase III], Rehabilitate Runway [Rehabilitate Runway 17-35 (Construction) - Phase I] - 17/35 Install Instrument Approach Aid [Runway 17-35 NAVAIDS - ILS, PAPI, MALSR

016 316,350(Construction)] Install Taxiway Lighting [Lighting & Markings]

Potsdam Municipal/Damon Field/ GA 016 1,018,400 Construct Apron [Apron & Taxilane - Phase I (Construction)], Construct Fuel Farm, Install Miscellaneous NAVAIDS [NAVAID & Weather Equipment (Construction)]

Randall R 020 36,631 Extend Taxiway [Extend Existing Taxilanes G and H, T/W F and Construct New Taxilane J - Design]

Saratoga County GA 021 559,693 Acquire Easement For Approaches [Acquire Land/Easements for Approaches]

Schenectady County R 033 91,014 Conduct Miscellaneous Study

034 339,276 Construct Runway Safety Area [Runway 28 (Final Design & Construction)] - 10/28

Sidney Municipal GA 012 693,500 Expand Apron [EXPAND TRANSIENT AIRCRAFT PARKING APRON], Remove

Spadaro R 007 150,000Obstructions [PERFORM OBSTRUCTION REMOVAL FOR RUNWAY 7/25] Construct Runway [Runway Relocation Phase I] - 18/36

State of New York 004 250,000 Conduct State System Plan Study

Selection Criteria Year: 2005

Page 20 of 98

Page 21: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

EA NYC NY 005 300,000 Conduct State System Plan Study

Stewart International P 043 1,245,000 Rehabilitate Runway Lighting [Rehabilitate Runway 9-27 Edge Lighting Design and

044 29,450Construction] - 09/27 Construct Sand and Chemical Storage Building [Construct Sand Storage Building

045 262,214Design Phase I $29,450(Fed.Share)] Security Enhancements [Security Project #1 Phase II]

046

047

747,750

4,180,000

Improve Runway Safety Area [Improve RSA for R/W 16-34 Phase I Design $1,700,000(Fed. Share)] - 16/34 Improve Terminal Building [Phase II and III]

Syracuse Hancock International P 071 5,169,900 Improve Airport Drainage [Rehabilitate Airfield Drainage - Phase II]

086 3,551,572 Noise Mitigation Measures for Public Buildings

087 299,250 Rehabilitate Apron [Rehabilitate GA Apron & Taxiways G, Y & N (Design Only)]

088 352,000 Improve Airport Miscellaneous Improvements [Safety Improvements to the General

Ticonderoga Municipal GA 013 85,501Aviation Area] Rehabilitate Runway [Design/Construct Runway 2-20 Crack Sealing & Emergency

Tri-Cities GA 011 573,018Repairs] - 02/20 Construct Fuel Farm

Watertown International GA 022 129,192 Acquire Snow Removal Equipment

023 317,105 Improve Airport Drainage

Wellsville Municipal Airport,Tarantine Field GA 017 538,586 Install Perimeter Fencing

Westchester County P 074 3,345,788 Security Enhancements [Install Security Perimeter Intrusion Detection System

075 396,887$3,667,000 (Fed Share)] Improve Utilities [Replace the Existing HIgh Voltage Cable]

Whitfords R 007 665,000 Construct Building [10-unit T-hangar and associated taxilane], Remove Obstructions [Bury utility line (Runway End 28)]

Williamson-Sodus R 017 225,971 Expand Building [9-Unit T-hangar]

018 200,236 Install Perimeter Fencing

State Total: 114 Grants 146,185,233

ADO Total: 157 Grants 195,360,902

EA WAS DC Washington Dulles International P 033 4,720,042 Rehabilitate Taxiway

034 3,284,049 Expand Apron

Selection Criteria Year: 2005

Page 21 of 98

Page 22: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Level Number Funds

EA WAS DC Washington Metropolitan Area 004 293,889

State Total: 3 Grants 8,297,980

Report Date 02/23/2006

Brief Description Of Work

Conduct Metropolitan System Plan Study [Conduct Continous Airport Syst Planning]

Construct Apron

Update Airport Master Plan Study [phase 1 facility requirements]

Security Enhancements

Rehabilitate Apron [piers b & c construction phase 1]

Extend Taxiway [Acquire Land]

Extend Runway [Final Design] - 16/34

Extend Runway [Acquire Land] - 16/34

Construct Fuel Farm

Construct Apron [Southwest Apron]

Remove Obstructions [monocacy river]

Remove Obstructions [Gage parcel A1], Remove Obstructions [Toms Farm parcelA25]Extend Runway [construction phase 1] - 08/26

Construct Runway Safety Area [construction phase 3] - 09/27

Rehabilitate Apron [Phase 1-Design Only]

Construct Taxiway [Midfield Corporate]

Install Perimeter Fencing

Rehabilitate Runway - 14/32, Remove Obstructions [Design]

Rehabilitate Taxiway

Repair Utilities [MAP] [Convert utility from military base to commercial source]

Construct Taxiway [Design]

Expand Apron [Expand Apron, Conduct Environmental Assessment]

Rehabilitate Runway [Design Only] - 06/24

Construct Runway Safety Area [Construction, Overall PhaseIV]

Update Airport Master Plan Study

EA WAS MD Baltimore-Washington International P

Bay Bridge GA

Cambridge-Dorchester GA

Carroll County Regional/Jack B Poage Field R

Easton/Newnam Field GA

Frederick Municipal R

Garrett County GA

Hagerstown Regional-Richard A Henson Field P

Martin State R

Ocean City Municipal GA

Salisbury-Ocean City Wicomico Regional P

Tipton R

073

074

075

076

017

020

021

022

027

024

025

009

033

034

012

015

028

030

7,747,632

4,200,000

2,092,000

8,000,000

6,033,229

410,000

2,114,168

150,000

2,739,516

241,799

4,445,788

4,866,112

8,000,000

575,000

600,000

95,000

5,964,804

3,577,580

888,250012

State Total: 19 Grants 62,740,878

EA WAS VA Accomack County GA 010 76,000

Blue Ridge GA 014 270,000

Brookneal/Campbell County GA 001 77,540

Charlottesville-Albemarle P 035 3,353,840

Chesapeake Regional GA 010 142,500

Selection Criteria Year: 2005

Page 22 of 98

Page 23: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

EA WAS VA Chesterfield County R 017 1,970,593 Construct Apron

Commonwealth of Virginia 003 450,000 Conduct State System Plan Study

Culpeper Regional GA 016 629,850 Construct Apron

Danville Regional GA 020 118,750 Update Airport Master Plan Study

021 45,552 Acquire Land For Approaches [Runway 20 RPZ, Acquisition Services]

Dinwiddie County GA 015 574,750 Remove Obstructions [Remove Obstructions Rwy 23 Approach], Remove

Emporia-Greensville Regional GA 006 54,150Obstructions [Remove Obstructions Rwy 5 Approach] Construct Taxiway [Partial Parallel Twy (1000' North End) Design Only]

Farmville Regional GA 010 319,770 Conduct Environmental Study

Franklin Municipal-John Beverly Rose GA 009 668,800 Construct Taxiway [Construction], Install Runway Vertical/Visual Guidance System

Front Royal-Warren County GA 010 95,000[PAPI] - 09/27 Update Airport Master Plan Study [Update ALP]

011 1,385,665 Construct Taxiway [Partial Parallel Taxiway]

Lee County GA 001 614,688 Construct Taxiway [Partial Parallel Taxiway (Design/Construction)]

Leesburg Executive R 029 1,131,405 Improve Runway Safety Area - 17/35

030 50,000 Install Perimeter Fencing

Louisa County/Freeman Field GA 012 850,307 Rehabilitate Apron

Luray Caverns GA 007 154,850 Update Airport Master Plan Study

Lynchburg Regional/Preston Glenn Field P 028 522,687 Extend Runway [Design] - 04/22

Mecklenburg-Brunswick Regional GA 008 56,588 Construct Taxiway [Partial Parallel Twy (Design)]

Middle Peninsula Regional GA 003 377,594 Acquire Land For Approaches [John Hancock Lumber, ITI, Carter, Tracts]

Mountain Empire GA 017 156,750 Update Airport Master Plan Study [Update ALP]

New 008 3,135,427 Construct New Airport [Site Preparation, Access Road]

Newport News/Williamsburg International P 034 3,072,635 Construct Apron [Terminal Ramp Apron, Phase 2]

Norfolk International P 050 353,331 Update Airport Master Plan Study

Orange County GA 008 135,755 Rehabilitate Runway [, Phase 1] - 07/25

Richmond International P 047 340,855 Rehabilitate Taxiway [Taxiway 'L' (design only)]

Roanoke Regional/Woodrum Field P 038 2,374,688 Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire ARFF Vehicle with Snozzle], Acquire Equipment [Runway Sweeper for FOD Removal (Part 139 Recommendation)], Rehabilitate Taxiway [Rehab. Taxiway A&G (Design), Overall PHIII], Remove Obstructions [Remove Obstructions (Runway 15 Approach, 60AC)]

Selection Criteria Year: 2005

Page 23 of 98

Page 24: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

EA WAS VA

Shenandoah Valley Regional

Stafford Regional

Suffolk Municipal

Tangier Island

Tazewell County

Twin County

Virginia Highlands

Virginia Tech/Montgomery Executive

Warrenton-Fauquier

Winchester Regional

CS

R

GA

GA

GA

GA

GA

GA

R

GA

039

025

026

015

011

003

011

008

022

010

011

011

019

889,855

2,981,653

426,907

750,595

1,495,300

142,500

150,000

1,549,450

384,750

193,026

102,600

770,450

37,050

Update Airport Master Plan Study

Rehabilitate Taxiway [Design and Construction]

Acquire Snow Removal Equipment [Acquire Replacement Loader]

Construct Access Road

Improve Runway Safety Area [Design and Environmental Mitigation] - 04/22

Rehabilitate Runway [Design] - 02/20

Remove Obstructions [RW 25 Approach(Land Acquisition, Design)]

Rehabilitate Runway [Rehab/Widen Runway (Construction)] - 18/36

Extend Runway [Conduct Environmental Assessment] - 06/24

Update Airport Master Plan Study [Update ALP]

Expand Apron [Transient/Tiedown Apron (Design)]

Acquire Land For Approaches

Acquire Land For Approaches

State Total: 44 Grants 33,434,456

ADO Total: 66 Grants 104,473,314

Region Total: 535 Grants 443,006,623

Report Total: 2099 Grants 3,549,617,470

GL BIS ND Beach

Bismarck Municipal

Bottineau Municipal

Cando Municipal

Carrington Municipal

Casselton Robert Miller Regional

Cavalier Municipal

Cooperstown Municipal

GA

P

GA

GA

GA

GA

GA

GA

004

035

006

006

005

012

005

004

153,662

244,498

2,979,687

108,421

155,697

63,058

477,406

190,127

Construct Building, Construct Fuel Farm, Construct Taxiway, Improve Access Road, Rehabilitate Runway - 12/30 Rehabilitate Runway - 13/31

Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate Taxiway

Acquire Snow Removal Equipment, Install Perimeter Fencing, Rehabilitate Runway ­16/34 Improve Access Road, Rehabilitate Runway - 13/31

Rehabilitate Apron, Rehabilitate Taxiway, Update Airport Master Plan Study

Install Airport Beacons, Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate Taxiway Construct Building, Construct Snow Removal Equipment Building, Construct Taxiway, Rehabilitate Runway - 13/31

Selection Criteria Year: 2005

Page 24 of 98

Page 25: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

GL BIS ND Devils Lake Municipal GA 021 64,440 Rehabilitate Runway - 13/31, Remove Obstructions

Dickinson Municipal CS 018 190,182 Conduct Miscellaneous Study, Install Miscellaneous NAVAIDS, Rehabilitate Runway

019 962,171- 07/25, Rehabilitate Runway - 14/32 Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Perimeter Fencing

Ellendale Municipal GA 003 36,194 Conduct Airport Master Plan Study

Glen Ullin Regional GA 005 40,850 Construct Building, Rehabilitate Runway - 11/29

Grafton Municipal GA 004 89,191 Construct Fuel Farm, Rehabilitate Runway - 17/35

Grand Forks International P 029 881,246 Acquire Snow Removal Equipment, Environmental Mitigation [wildlife attractant],

Gwinner-Roger Melroe Field GA 004 287,850

Rehabilitate Runway - 17R/35L, Update Airport Master Plan Study [Phase 1 Airport facilities / needs] Construct Building

Hamry Field GA 006 161,607 Construct Building, Construct Snow Removal Equipment Building, Construct Taxiway

Harry Stern GA 009 150,261 Construct Access Road, Install Weather Reporting Equipment, Rehabilitate Apron

Hector International P 030 1,750,000 Construct Service Road [Service road recommended by RSAT.], Rehabilitate

Hettinger Municipal GA 007 216,448Runway - 18/36 Construct Fuel Farm, Rehabilitate Runway - 12/30, Update Airport Master Plan

Hillsboro Municipal GA 008 196,927Study Construct Building, Construct Fuel Farm

Jamestown Regional GA 024 5,703,182 Install Perimeter Fencing, Install Runway Lighting - 13/31, Rehabilitate Runway ­13/31

Kenmare Municipal GA 005 119,033 Acquire Snow Removal Equipment, Rehabilitate Runway - 08/26

Lakota Municipal GA 005 192,364 Construct Taxiway, Rehabilitate Runway - 15/33

Linton Municipal GA 004 226,148 Acquire Snow Removal Equipment, Construct Building, Rehabilitate Runway - 09/27

005 58,505 Acquire Land For Approaches

Lisbon Municipal GA 002 251,978 Conduct Airport Master Plan Study, Construct Apron, Construct Taxiway, Install Miscellaneous NAVAIDS, Install Miscellaneous NAVAIDS, Remove Obstructions

Mandan Municipal GA 009 76,000 Rehabilitate Apron [Plans and specs], Rehabilitate Runway - 13/31, Rehabilitate

Minot International P 033 948,005Taxiway Rehabilitate Apron

Mohall Municipal GA 003 103,506 Construct Taxiway, Rehabilitate Runway - 13/31

Northwood Municipal-Vince Field GA 006 240,420 Construct Building, Rehabilitate Runway - 08/26

Oakes Municipal GA 006 88,471 Acquire Snow Removal Equipment, Rehabilitate Runway - 12/30

Selection Criteria Year: 2005

Page 25 of 98

Page 26: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

GL BIS ND Park River - W C Skjerven Field GA 003 156,358 Install Runway Lighting - 12/30

Pembina Municipal GA 004 99,470 Improve Fuel Farm, Install Runway Vertical/Visual Guidance System - 15/33,

Rugby Municipal GA 006 369,217Rehabilitate Runway - 15/33 Rehabilitate Runway - 12/30, Rehabilitate Taxiway

Sloulin Field International CS 024 1,425,868 Acquire Aircraft Rescue & Fire Fighting Vehicle, Conduct Miscellaneous Study, Construct Access Road, Construct Apron

State of North Dakota 004 122,036 Update State System Plan Study

Tioga Municipal GA 003 122,215 Conduct Environmental Study, Install Airport Beacons, Rehabilitate Runway - 12/30

Walhalla Municipal GA 003 135,200 Acquire Snow Removal Equipment, Improve Fuel Farm, Rehabilitate Runway - 15/33

Washburn Municipal GA 005 89,876 Construct Snow Removal Equipment Building, Rehabilitate Runway - 08/26

Watford City Municipal GA 006 288,593 Construct Building, Construct Fuel Farm, Install Runway Vertical/Visual Guidance System - 12/30

State Total: 41 Grants 20,216,368

GL BIS SD Aberdeen Regional P 025 142,500 Construct Snow Removal Equipment Building [plans and specifications], Construct

Belle Fourche Municipal GA 006 25,000Terminal Building [Remove existing terminal.], Update Airport Master Plan Study Construct Snow Removal Equipment Building

Black Hills-Clyde Ice Field GA 012 186,200 Extend Runway [plans and specifications] - 12/30

Bob Wiley Field GA 006 213,750 Construct Snow Removal Equipment Building

Britton Municipal GA 005 76,000 Install Weather Reporting Equipment

Brookings Municipal GA 017 950,000 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Aircraft Rescue & Fire

Chamberlain Municipal GA 003 171,000Fighting Building, Construct Taxiway Install Perimeter Fencing

Chan Gurney Municipal GA 016 358,500 Acquire Snow Removal Equipment, Construct Building, Update Airport Master Plan Study

Clark County GA 003 1,092,500 Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate Taxiway

Custer County GA 006 646,000 Conduct Environmental Study, Construct Snow Removal Equipment Building,

Faith Municipal GA 005 304,000Expand Apron Construct Building, Install Runway Lighting - 13/31

Gettysburg Municipal

Gregory Municipal

GA

GA

005

004

76,000

603,250

Construct Access Road, Construct Terminal Building, Install Perimeter Fencing [design] Construct Taxiway, Expand Apron, Rehabilitate Taxiway

Harold Davidson Field GA 004 378,100 Construct Snow Removal Equipment Building, Install Miscellaneous NAVAIDS, Install

Selection Criteria Year: 2005

Page 26 of 98

Page 27: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GL BIS SD 004 Runway Vertical/Visual Guidance System - 12/30, Rehabilitate Runway Lighting ­12/30

Highmore Municipal GA 002 1,235,000 Construct Runway [Construct Apron] - Plan-1, Construct Runway [Construct runway] - Plan-1, Construct Runway [Construct taxiway] - Plan-1

Hoven Municipal

Huron Regional

GA

GA

003

021

80,000

768,398

Construct Snow Removal Equipment Building, Install Miscellaneous NAVAIDS [design], Install Runway Lighting [Engineering Design] - 13/31 Acquire Aircraft Rescue & Fire Fighting Vehicle, Expand Terminal Building

Joe Foss Field P 034 2,783,500 Improve Airport Miscellaneous Improvements [ICAS], Rehabilitate Apron, Rehabilitate Taxiway, Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

Lemmon Municipal GA 006 25,000 Construct Runway - Plan-1

Madison Municipal GA 006 39,900 Update Airport Master Plan Study

Martin Municipal GA 004 57,000 Rehabilitate Runway [maintenance] - 14/32

Milbank Municipal GA 007 275,899 Construct Building [Hangar], Construct Snow Removal Equipment Building

Mission Sioux GA 005 95,000 Construct Snow Removal Equipment Building, Install Runway Vertical/Visual Guidance System - 11/29

Mobridge Municipal GA 006 63,650 Improve Airport Miscellaneous Improvements [Install windcone], Install Perimeter Fencing [Install Access gate], Update Airport Master Plan Study

Onida Municipal GA 005 39,045 Extend Runway [EA] - 13/31

Parkston Municipal GA 003 617,500 Construct Taxiway, Extend Runway - 15/33, Install Miscellaneous NAVAIDS, Install

Philip GA 003 61,750Runway Lighting - 15/33, Install Runway Vertical/Visual Guidance System - 15/33 Install Perimeter Fencing [Engineering design], Rehabilitate Apron

Pine Ridge GA 007 342,000 Install Perimeter Fencing, Rehabilitate Runway - 12/30

Platte Municipal GA 004 105,000 Extend Runway [Environmental Assessment] - 14/32

Rapid City Regional P 032 10,730,768 Rehabilitate Taxiway [A-Phase 2]

Redfield Municipal GA 003 15,688 Construct Fuel Farm

Springfield Municipal GA 004 926,250 Construct Taxiway, Improve Airport Miscellaneous Improvements [segmented circle], Install Runway Lighting - 15/33, Install Runway Vertical/Visual Guidance System - 15/33, Rehabilitate Apron, Rehabilitate Runway - 15/33

State of South Dakota 003 104,500 Update Miscellaneous Study

Various Locations in South Dakota 008 522,500 Rehabilitate Apron (Chan Gurney Municipal), Rehabilitate Runway (Canton Municipal - 17/35; Chan Gurney Municipal - 01/19; Edgemont Municipal - 12/30; Eureka Municipal - 12/30; Faith Municipal - 13/31; Martin Municipal - 14/32; Mobridge Municipal - 12/30; Murdo Municipal - 14/32; Philip - 12/30; Sturgis Municipal - 11/29; Wagner Municipal - 08/26), Rehabilitate Taxiway (Madison Municipal)

Selection Criteria Year: 2005

Page 27 of 98

Page 28: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

GL BIS SD

GL CHI

ADO Total:

State Total:

IL

Wagner Municipal

Watertown Municipal

Wilder

Capital

Central IL Regional Airport at Bloomington-Normal

Chicago Midway International

Chicago O'Hare International

FY 2005

Service Grant Seq AIP Federal Level Number Funds

009 422,750

GA 003 29,450

CS 017 97,850

GA 004 42,750

38 Grants 24,703,948

79 Grants 44,920,316

P 042 3,629,144

043 955,045

P 042 4,872,200

043 1,858,995

044 3,526,409

P 061 12,000,000

062 5,837,000

063 5,858,608

064 1,420,000

P 066 6,359,572

069 868,000

070 4,056,000

071 5,420,000

072 461,000

073 928,000

Report Date 02/23/2006

Brief Description Of Work

Acquire Snow Removal Equipment (Black Hills-Clyde Ice Field; Canton Municipal;Harold Davidson Field; Miller Municipal; Mission Sioux; Sisseton Municipal; WagnerMunicipal)Update Airport Master Plan Study

Improve Airport Miscellaneous Improvements [Wind cones], Rehabilitate Apron

Construct Snow Removal Equipment Building, Install Runway Lighting [Design MIRL]- 15/33

Improve Runway Safety Area [Runway 13/31 RSA] - 13/31, Install AirfieldGuidance Signs, Rehabilitate Airport Beacons, Rehabilitate Runway Lighting[Electrical Vault] - 04/22Acquire Land for Development [Parcels 9-1-S, 16-3-J, 17-2-D], Improve TerminalBuilding [Acquire Jet Bridge - Phase 2], Rehabilitate Apron [Phase 2 of the terminalapron]Widen Runway - 02/20

Acquire Miscellaneous Land [Acquire Land (100 Acres) Miller propoertyreimbursement], Acquire Snow Removal EquipmentWiden Runway - 02/20

Construct Apron [aircraft parking apron, taxiways and taxilanes]

Noise Mitigation Measures for Public Buildings [Design/Construct Hancock HighSchool]Construct Terminal Building [Terminal Concourse]

Noise Mitigation Measures for Public Buildings [Design/Construct - John DoreSchool]Conduct Environmental Study

Noise Mitigation Measures for Public Buildings

Noise Mitigation Measures for Public Buildings [Design/Construct - Rhodes School]

Rehabilitate Taxiway

Noise Mitigation Measures for Public Buildings [Design - East Leyden High School]

Noise Mitigation Measures for Public Buildings [Design/Construct - StevensonSchool (Des Plaines)]

Selection Criteria Year: 2005

Page 28 of 98

Page 29: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq Level Number

GL CHI IL 074

075

076

077

078

Decatur P 028

Greater Peoria Regional P 039

040

041

Greater Rockford P 041

042

043

044

Illinois State Block Grant Program 056

057

058

059

060

061

Quad City International P 052

053

054

Quincy Regional-Baldwin Field CS 034

AIP Federal Funds

Brief Description Of Work

192,000 Noise Mitigation Measures for Public Buildings [Design - St. Andrews Lutheran School]

2,551,000 Noise Mitigation Measures for Public Buildings [Design/Construct - Jane Addams School]

298,000 Noise Mitigation Measures for Public Buildings [Design - Stevenson School (Melrose Park)]

77,000 Noise Mitigation Measures for Public Buildings [Design - John Mills School]

700,000 Noise Mitigation Measures for Public Buildings [Construction - John Mills School]

2,640,447 Widen Taxiway [G, G1 and G2]

2,076,225 Extend Taxiway [Extend Taxiways A & D]

1,585,795 Acquire Miscellaneous Land [Land Reimbursement], Rehabilitate Terminal Building [Rehabilitate Terminal Building - Phase 3], Update Airport Master Plan Study

2,361,291 Rehabilitate Terminal Building

1,760,000 Expand Terminal Building [PHASE 1 TERMINAL IMPROVEMENTS (FIS FACILITY)], Expand Terminal Building [PHASE 2 TERMINAL IMPROVEMENTS (JET BRIDGE & BAGGAGE EQUIPMENT REPLACEMENT/EXPANSION).]

1,095,000 Acquire Aircraft Rescue & Fire Fighting Vehicle, Expand Aircraft Rescue & Fire Fighting Building

3,506,379 Improve Runway Safety Area [Construct Service Road (RIAT Improvement)] ­01/19, Improve Runway Safety Area [Relocate Falcon Road] - 01/19, Rehabilitate Taxiway [Rehab TW F and TW B (Phase 1)]

1,372,100 Expand Apron [Expand NW Quadrant Cargo Apron]

17,820,432 Non primary development projects in state block grant program - RL

460,750 Non primary development projects in state block grant program - RL

4,800,000 Non primary development projects in state block grant program - RL

2,318,000 Non primary development projects in state block grant program - RL

3,220,750 Non primary development projects in state block grant program - RL

5,772,190 Non primary development projects in state block grant program - RL

1,588,600 Extend Taxiway [EXTEND TAXIWAYS A, E & H (PHASE 3)]

2,019,406 Rehabilitate Runway [RECONSTRUCT RUNWAY 5/23 (PHASE 1).] - 05/23

730,860 Improve Terminal Building [IMPROVE TERMINAL BUILDING - JET LOADING BRIDGE], Update Airport Master Plan Study [UPDATE MASTER PLAN (PHASE 2)]

1,000,000 Improve Runway Safety Area - 13/31, Improve Terminal Building [UPGRADE TERMINAL BUILDING TO ADA STANDARDS.], Rehabilitate Runway [REHABILITATE

Selection Criteria Year: 2005

Page 29 of 98

Page 30: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GL CHI IL 034 RUNWAY 18/36 (PHASE 1).] - 18/36

Scott AFB/Midamerica CS 023 709,672 Construct Deicing Containment Facility [Improve Glycol Collection System], Improve Airport Drainage [Improve Airport Drainage], Install Miscellaneous NAVAIDS [Install Lighted Wind Cones per 139]

State of Illinois 003 300,000 Update State System Plan Study

University of Illinois-Willard P 022 2,929,807 Rehabilitate Apron

Williamson County Regional P 023 1,130,610 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Aircraft Rescue & Fire Fighting Building [Construct ARFF Building], Update Airport Master Plan Study

State Total: 42 Grants 123,066,287

GL CHI IN Anderson Municipal-Darlington Field GA 016 202,700 Acquire Land for Development

017 1,005,428 Install Perimeter Fencing

Arens Field GA 004 77,900 Rehabilitate Runway - 09/27

Columbus Municipal GA 016 2,087,150 Rehabilitate Apron

Daviess County GA 008 548,150 Construct Taxiway

De Kalb County GA 012 150,000 Conduct Environmental Study [ENVIRONMENTAL ASSESSMENT FOR RUNWAY 9/27 EXTENSION (PHASE 2) - WETLANDS.], Construct Apron

Delaware County - Johnson Field GA 014 167,734 Acquire Land For Approaches, Rehabilitate Taxiway [Phase 2]

Delphi Municipal GA 006 38,950 Update Airport Master Plan Study

Elkhart Municipal GA 016 80,998 Update Airport Master Plan Study, Widen Taxiway

Evansville Regional P 040 1,909,684 Acquire Aircraft Rescue & Fire Fighting Vehicle [Replace Rescue 2 (22 years old)],

Fort Wayne International P 046 5,603,928Extend Runway - 18/36 Construct Taxiway [CONSTRUCT TAXIWAY C-4 AS PER 139 RECOMMENDATION AND RSAT.], Rehabilitate Runway [RECONSTRUCT RUNWAY 5/23 (PHASE 1).] ­05/23, Rehabilitate Runway Lighting [RECONSTRUCT LIGHTING VAULT.] - 05/23

Fulton County GA 006 449,149 Widen Runway [Phase 2, construction.] - 11/29

Gary/Chicago International GA 018 1,715,301 Acquire Snow Removal Equipment, Expand Apron, Install Runway Vertical/Visual

019 2,852,934Guidance System - 02/20, Strengthen Apron Improve Runway Safety Area - 12/30

Goshen Municipal GA 008 2,493,750 Extend Runway - 09/27

Greenwood Municipal GA 018 1,000,000 Extend Runway [Phase 2] - 01/19

019 482,618 Extend Runway [Phase 3] - 01/19

Selection Criteria Year: 2005

Page 30 of 98

Page 31: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

GL CHI IN Griffith-Merrillville R 006 143,450 Acquire Land for Development

Huntingburg GA 008 306,550 Construct Taxiway [Construct taxiway leading to corporate hangar]

Huntington Municipal GA 007 604,430 Construct Building, Construct Parking Lot

Indianapolis Executive R 011 150,000 Acquire Existing Airport [Project includes land reimbursement, runway safety area

012 1,287,037grading and glide slope relocation to meet standards.] Acquire Existing Airport

Indianapolis International P 095 15,000,000 Construct Access Road, Construct Apron, Construct Service Road, Construct Taxiway, Remove Obstructions [Relocate ATCT]

096

097

15,613,333

1,435,132

Noise Mitigation Measures for Residences within 65 - 69 DNL [Project will mitigate noise for 157 residences and 407 persons.] Security Enhancements [Access control security equipment and Phase 2 alarm

098 2,000,000system infrastructure.] Noise Mitigation Measures for Residences within 65 - 69 DNL

099 600,000 Rehabilitate Taxiway

Jasper County GA 001 161,526 Install Weather Reporting Equipment

Kendallville Municipal GA 011 74,575 Expand Apron, Rehabilitate Apron

Kentland Municipal GA 003 358,368 Expand Apron, Remove Obstructions

Kokomo Municipal GA 012 232,750 Rehabilitate Apron, Rehabilitate Runway Lighting - 14/32

La Porte Municipal GA 012 336,300 Construct Taxiway [Construct Southeast Partial Parallel Taxiway to RW 14/32],

Logansport Municipal GA 010 376,524Improve Runway Safety Area - 02/20 Rehabilitate Apron

Madison Municipal GA 007 150,000 Construct Building [Site Preparation for Maintenance Hangar], Extend Runway ­03/21

008 1,097,683 Extend Runway - 03/21

Marion Municipal GA 010 149,638 Rehabilitate Runway Lighting - 04/22, Rehabilitate Runway Lighting - 15/33

Michigan City Municipal GA 009 446,249 Acquire Land For Approaches

Monroe County GA 022 47,500 Update Airport Master Plan Study [-Phase 2]

023 467,563 Install Perimeter Fencing

Mount Comfort R 008 1,826,400 Rehabilitate Runway [NP funds from IND relievers for FY04 and 05 used.] - 07/25,

009 310,000Rehabilitate Runway - 07/25, Rehabilitate Runway - 07/25 Rehabilitate Runway [Engineering Design and Inspection costs] - 07/25

New Castle-Henry County Municipal GA 004 1,000,000 Acquire Land For Approaches

Selection Criteria Year: 2005

Page 31 of 98

Page 32: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GL CHI IN North Vernon GA 006 150,000 Install Weather Reporting Equipment

Perry County Municipal GA 003 539,849 Construct Building, Construct Taxiway, Expand Apron

Peru Municipal GA 006 1,459,433 Construct Taxiway

Plymouth Municipal GA 007 469,954 Acquire Land For Approaches

008 370,500 Construct Taxiway, Install Perimeter Fencing

Porter County Municipal GA 016 465,500 Install Taxiway Lighting [Phase 2, Construction]

Purdue University CS 026 1,642,000 Install Runway Vertical/Visual Guidance System - 05/23, Install Runway Vertical/Visual Guidance System - 10/28, Rehabilitate Runway Lighting - 10/28,

Putnam County GA 008 1,052,736Rehabilitate Taxiway Construct Taxiway [Taxiway A Construction - Phase 2]

Richmond Municipal GA 007 1,020,000 Rehabilitate Runway - 06/24

Salem Municipal GA 007 156,311 Conduct Environmental Study, Rehabilitate Apron

Shelbyville Municipal GA 015 323,000 Expand Apron [East Terminal]

South Bend Regional P 031 2,883,956 Extend Runway [Phase 3 - Land] - 18/36

Starke County GA

032

006

1,530,000

656,450

Improve Runway Safety Area - 09R/27L, Install Runway Lighting - 09R/27L, Rehabilitate Runway - 09R/27L Construct Taxiway [Construct Connector Taxiway], Install Taxiway Lighting

State of Indiana 003 158,204[Parallal taxiway MITL], Rehabilitate Taxiway [Rehab.Center of Parallel TW] Update State System Plan Study

Terre Haute International-Hulman Field GA 029 95,000 Install Perimeter Fencing

Tri-State Steuben County GA 006 953,483 Expand Apron, Rehabilitate Apron

Virgil I Grissom Municipal GA 004 303,075 Acquire Land For Approaches

Wabash Municipal GA 006 187,263 Construct Fuel Farm

Warsaw Municipal GA 006 478,325 Construct Taxiway, Expand Access Road

State Total: 62 Grants 79,936,421

ADO Total: 104 Grants 203,002,708

GL DET MI Alpena County Regional CS 010 734,350 Acquire Friction Measuring Equipment, Acquire Snow Removal Equipment, Improve

Bishop International P 038 289,750Airport Miscellaneous Improvements [Improve Airport Marking] Improve Terminal Building [flight information display system]

039 6,101,850 Improve Terminal Building [Baggage Claim addition (Phase 2)], Improve Terminal

Selection Criteria Year: 2005

Page 32 of 98

Page 33: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq Level Number

GL DET MI 039

Capital City P 038

Charlevoix Municipal P 005

006

Cherry Capital P 029

030

031

Chippewa County International P 017

018

Delta County CS 026

Detroit Metropolitan Wayne County P 071

072

073

074

075

Gerald R. Ford International P 036

Houghton County Memorial P 023

Kalamazoo/Battle Creek International P 030

031

MBS International P 030

031

032

AIP Federal Funds

4,333,900

1,383,200

455,000

1,398,874

1,520,000

880,650

57,000

1,434,450

1,045,000

11,799,973

17,638,853

1,361,798

3,914,651

2,950,000

5,745,160

1,900,000

2,603,950

2,560,000

195,700

619,400

600,400

Brief Description Of Work

Building [Baggage claim addition (Phase 1)]

Acquire Land For Approaches, Construct Service Road, Extend Runway [ModifyAssociated NAVAIDs] - 10R/28L, Extend Runway [Phase 1] - 10R/28L, ExtendRunway [Phase 2] - 10R/28LConstruct Snow Removal Equipment Building

Acquire Snow Removal Equipment [Blower], Acquire Snow Removal Equipment[Front End Loader], Acquire Snow Removal Equipment [Plow Truck]Acquire Snow Removal Equipment [PLOW], Acquire Snow Removal Equipment[SWEEPER], Construct Aircraft Rescue & Fire Fighting BuildingAcquire Aircraft Rescue & Fire Fighting Vehicle, Install Miscellaneous NAVAIDS[WINDCONE], Install Perimeter Fencing, Install Runway Sensors - 10/28Construct Runway Safety Area - 18/36

Security Enhancements

Acquire Emergency Generator, Construct Building [Benefit Cost Analysis],Rehabilitate Runway [Phase 1] - 16/34, Rehabilitate Runway [Phase 2] - 16/34,Rehabilitate Runway Lighting - 16/34Rehabilitate Apron, Rehabilitate Taxiway [C]

Noise Mitigation Measures for Residences within 65 - 69 DNL

Construct Apron, Construct Runway - 04L/22R, Environmental Mitigation

Construct Taxiway, Install Runway Lighting - 09L/27R

Noise Mitigation Measures for Residences within 65 - 69 DNL

Construct Deicing Containment Facility

Construct Service Road, Construct Taxiway, Rehabilitate Apron [Phase 1],Rehabilitate Apron [Phase 2], Rehabilitate TaxiwayEnvironmental Mitigation [Wetland Phase 2], Improve Runway Safety Area - 07/25,Install Runway Lighting [MIRL] - 07/25, Install Taxiway Lighting [MITL Phase 2],Modify Service Road [Phase 2], Modify Service Road [Phase 3], RehabilitateTaxiway ["C" Shoulders Phase 2], Rehabilitate Taxiway ["C" Shoulders Phase 3]Construct Terminal Building [Site Preparation]

Conduct Miscellaneous Study [Runway 17-35 Approach Survey], Improve RunwaySafety Area - 17/35, Install Perimeter FencingConduct Miscellaneous Study [Terminal Feasibility Study]

Security Enhancements

Acquire Snow Removal Equipment [Sand Spreader with Deicing Chemical

Selection Criteria Year: 2005

Page 33 of 98

Page 34: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State

GL DET MI

State Total:

GL DET OH

Worksite

Michigan State Block Grant Program

Muskegon County

Pellston Regional Airport of Emmet County

Sawyer International

Willow Run

Akron-Canton Regional

Alexander Salamon

Ashland County

Ashtabula County

Bolton Field

Butler County Regional

Service Level

Grant Seq Number

AIP Federal Funds

032

P

041

042

043

044

026

5,300,000

20,007,722

2,100,000

1,581,250

957,600

P 025 1,182,000

P 017 1,050,000

018 300,000

R 024 5,968,370

33 Grants 109,970,851

P 039 11,739,707

GA

040

041

004

1,739,707

5,000,000

94,990

GA 006 328,178

GA 007 150,001

R

R

013

014

016

471,342

237,500

994,557

Brief Description Of Work

Capability], Rehabilitate Runway [Pavement Marking] - 05/23, Repair Utilities[Terminal Sewer]Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Improve Runway Safety Area [Design] - 14/32, Improve Runway Safety Area[Land Acquisition, Fee Simple 1.89 Acres (Parcel 259)] - 14/32Acquire Land for Development, Acquire Snow Removal Equipment, Conduct AirportMaster Plan Study, Construct Access Road, Expand Terminal BuildingImprove Airport Drainage [Water Study - Design], Improve Building [Hangar 665],Improve Building [Tail Dock Assemblies, Hangars 664 and 665]Acquire Snow Removal Equipment [Sweeper], Improve Terminal Building [RehabGA Terminal Access Door], Rehabilitate Runway [Improve Airport Pavement(Markings)] - 01/19Construct Taxiway [B], Construct Taxiway [G], Improve Runway Safety Area ­14/32

Extend Runway [RSA Design & Construction - Design, relocate utilities, fill & grade,erosion/stormwater] - 05/23Improve Terminal Building [Construct Phase III]

Construct Deicing Containment Facility [EPA requirement]

Acquire Land For Approaches [Reimbursement (FS1 28 Acres)], Acquire SnowRemoval Equipment, Rehabilitate Runway [Crack Seal, Rehabilitate RunwayMarkings and Threshold Lighting] - 05/23Acquire Land for Development [Remaining acres of Parcel 3, Partial Parcel 1, Parcel5 (reimbursement)], Rehabilitate Apron [Construction - Phase I], RehabilitateRunway [Pavement condition index is 55] - 18/36Install Runway Vertical/Visual Guidance System [Design] - 08/26, RehabilitateRunway [Design Runway Rehabilitation & Triggered Runway Safety AreaImprovements] - 08/26Rehabilitate Apron

Install Perimeter Fencing

Acquire Land For Approaches [Parcel #23 within Runway 29 RPZ]

Selection Criteria Year: 2005

Page 34 of 98

Page 35: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GL DET OH Cambridge Municipal GA 004 253,885 Expand Apron

Carl R Keller Field GA 021 120,750 Conduct Airport Master Plan Study [Approach Survey], Conduct Environmental Study [phase II], Extend Runway [Grading Phase I] - 09/27, Rehabilitate Apron [Phase II], Rehabilitate Runway Lighting - 09/27

Carroll County-Tolson GA 005 16,150 Update Airport Master Plan Study [Phase 2]

Cincinnati Municipal Airport Lunken Field R 019 150,000 Rehabilitate Parking Lot

Cincinnati West GA 004 300,000 Acquire Land For Approaches [Partial reimbursement - approximately 6.84 ac. (Phase I)], Acquire Land For Approaches [Partial reimbursement - approximately 6.84 ac. (Phase II)]

Cleveland-Hopkins International P 072 9,559,556 Construct Runway - 06L/24R, Install Instrument Approach Aid - 06L/24R, Install Runway Lighting - 06L/24R, Remove Obstructions

073 3,659,432 Noise Mitigation Measures for Residences within 65 - 69 DNL

074 466,084 Conduct Noise Compatibility Plan Study

075 2,991,621 Improve Runway Safety Area - 10/28

076 1,589,006 Security Enhancements

077 2,100,000 Extend Runway [Extend & Shift Runway 960' southwest, Phase 1] - 06R/24L

Clinton Field GA 003 102,000 Acquire Land for Development, Conduct Airport Master Plan Study, Rehabilitate

Columbiana County GA 007 178,779Taxiway [Design], Remove Obstructions Improve Airport Miscellaneous Improvements [Taxiway Safety Area Grading],

Cuyahoga County R 015 150,000Rehabilitate Apron, Rehabilitate Taxiway Acquire Land For Approaches [Fee Simple Acquisition, Partial reimbursement #01]

Dayton-Wright Brothers R 007 150,000 Improve Runway Safety Area [Conduct Environmental Assessment (Phase 1)] ­02/20, Improve Runway Safety Area [Construct Road (Design)] - 02/20

Defiance Memorial GA 004 128,311 Construct Taxiway [design], Rehabilitate Taxiway

Delaware Municipal GA 013 163,157 Construct Taxiway [T-Hangar taxiway includes relocation]

Fairfield County

Fayette County

GA

GA

013

003

229,761

33,250

Install Perimeter Fencing, Rehabilitate Runway [CONSTRUCT RUN UP AREA] ­10/28, Update Airport Master Plan Study Construct Apron [Design], Construct Building [Terminal Building - Design], Construct Parking Lot [Design], Remove Obstructions [Old Terminal Building Demolition (Design)]

Findlay GA 015 2,319,022 Extend Taxiway [Site Preparation], Improve Runway Safety Area - 07/25, Install Runway Vertical/Visual Guidance System - 07/25, Rehabilitate Runway [Groove] ­07/25, Rehabilitate Runway [Install Guidance Signs] - 07/25, Rehabilitate Runway [Lighting] - 07/25, Rehabilitate Runway [Pavement] - 07/25, Rehabilitate Taxiway [lighting], Rehabilitate Taxiway [pavement]

Selection Criteria Year: 2005

Page 35 of 98

Page 36: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GL DET OH Fostoria Metropolitan

Fulton County

Gallia-Meigs Regional

Geauga County

Greater Portsmouth Regional

Grimes Field

Hardin County

Harrison County

Harry Clever Field

Henry County

Highland County

Holmes County

Hook Field Municipal

James A Rhodes

James M Cox Dayton International

Kent State University

Knox County

Lakefield

Lawrence County Airpark

GA

GA

GA

GA

GA

GA

GA

GA

GA

GA

GA

GA

GA

GA

P

GA

GA

GA

GA

005

004

004

009

008

012

003

004

006

004

005

004

007

004

051

052

053

010

007

008

008

004

272,000

38,844

225,700

276,250

166,187

38,000

83,861

128,985

191,443

97,375

186,880

68,368

336,217

241,534

1,670,000

2,133,630

3,474,598

69,000

2,955,705

500,000

198,504

138,225

Install Runway Vertical/Visual Guidance System - 09/27, Install Weather Reporting Equipment, Rehabilitate Taxiway Construct Taxiway [Design]

Rehabilitate Apron [Phase 3], Rehabilitate Runway [Crack Seal] - 05/23

Improve Airport Drainage, Remove Obstructions [Trees]

Acquire Land For Approaches [Parcel 13, 30 Acres, Phase-2], Install Perimeter Fencing [Phase-1] Conduct Miscellaneous Study

Acquire Snow Removal Equipment, Remove Obstructions, Update Airport Master Plan Study Install Taxiway Lighting [Lighting and Reflectors], Rehabilitate Taxiway [Phase 2 Rehabilitation] Construct Taxiway [(T-hangar)]

Acquire Snow Removal Equipment [Acquire truck with plow], Conduct Miscellaneous Study [Airport drainage study] Acquire Land for Development [Fee simple acquisition], Acquire Snow Removal Equipment Acquire Snow Removal Equipment, Conduct Miscellaneous Study

Install Perimeter Fencing [Phase I], Install Weather Reporting Equipment, Rehabilitate Airport Beacons [Relocate], Rehabilitate Runway Lighting - 05/23 Acquire Land For Approaches [(Parcel 20, Approximately 40 Acres, Phase 2)], Acquire Land for Development [Reimburesment (Parcels A-G, 89 Acres)], Extend Runway [Road Relocation (Meet RSA/OFA Stds) Design] - 01/19, Install Weather Reporting Equipment [AWOS (Phase-2)] Construct Service Road [Perimeter], Improve Runway Safety Area [6R/24L RSA Study] - 06R/24L Rehabilitate Access Road [(Terminal Drive Phase 3)]

Improve Terminal Building [Gate Enhancements]

Update Airport Master Plan Study

Acquire Land For Approaches [Land reimbursement for approach protection], Extend Runway [Runway Safety Area & Extend/Rehab Pavement] - 10/28 Extend Runway [phase 2] - 10/28

Acquire Miscellaneous Land, Remove Obstructions [Phase 1], Remove Obstructions [Phase 2] Acquire Land For Approaches, Conduct Environmental Study [Conduct

Selection Criteria Year: 2005

Page 36 of 98

Page 37: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GL DET OH 004 Environmental Study]

Lima Allen County GA 008 162,366 Rehabilitate Taxiway [(2005)], Rehabilitate Taxiway [(2006)]

Lorain County Regional R 016 118,981 Acquire Snow Removal Equipment [Snow Plow with auxillary equipment], Improve Airport Miscellaneous Improvements

Madison County GA 009 186,282 Acquire Snow Removal Equipment, Improve Airport Drainage [Design and Bid Only], Install Perimeter Fencing [Design and Bid Only], Rehabilitate Runway - 09/27,

Marion Municipal GA 016 189,240Rehabilitate Taxiway Construct Taxiway [Construct T-hangar Taxiway & Access Road]

Metcalf Field R 017 1,056,189 Rehabilitate Runway - 04/22, Rehabilitate Taxiway [Design]

Miami University GA 003 88,379 Conduct Airport Master Plan Study [Phase II], Conduct Miscellaneous Study, Install Runway Vertical/Visual Guidance System [Design] - 05/23

Middle Bass Island GA 012 170,629 Improve Airport Drainage

Monroe County GA 005 52,845 Acquire Land for Development [Fee Simple, Parcel 1, Sylvester 7.769 Ac.], Rehabilitate Runway [Crack Sealing & Marking] - 07/25, Update Airport Master Plan Study

Neil Armstrong GA 008 34,500 Conduct Miscellaneous Study [Conduct Runway Approach Survey], Rehabilitate Taxiway [Phase 1 - Design Only]

Newark-Heath GA 017 220,539 Acquire Land for Development, Construct Taxiway [Phase 1], Construct Taxiway [Phase 2]

Norwalk-Huron County GA 005 187,654 Update Airport Master Plan Study

Ohio State University R 019 1,018,988 Acquire Land for Development [REIMBURSEMENT]

Ohio University Snyder Field GA 010 38,109 Improve Airport Drainage [(Public Sewer Connection - Design)]

Perry County GA 004 65,000 Acquire Land For Approaches [(REIMBURSEMENT)], Improve Runway Safety Area [DESIGN] - 08/26, Rehabilitate Runway [PRE-DESIGN] - 08/26

Pickaway County Memorial GA 007 724,361 Construct Building [10 UNIT T-HANGARS], Construct Fuel Farm, Construct Parking Lot, Construct Taxiway [T-HANGAR], Strengthen Apron

Pike County GA 003 150,000 Install Perimeter Fencing [(8,000 L.F. X 6' High) (Phase 3)]

Port Columbus International P 055 4,000,000 Construct Apron, Construct Taxiway, Extend Taxiway

056 2,501,321 Construct Service Road

057 2,127,849 Noise Mitigation Measures [NOISE MITIGATION MEASURES - RUN UP BARRIER (NO IMPACT, NEM 1/3/00)], Noise Mitigation Measures for Residences within 65 - 69 DNL [(135 RESIDENCES, NEM DATED 1/3/00)]

058 258,559 Security Enhancements

059 491,968 Install Noise Monitoring System [UPGRADE NOISE COMPUTERS (NO IMPACT, NEM

Selection Criteria Year: 2005

Page 37 of 98

Page 38: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GL DET OH 059 1/3/00)]

060 1,520,147 Rehabilitate Taxiway

Portage County GA 017 150,000 Acquire Land For Approaches [Phase 3], Install Perimeter Fencing [Design], Install Weather Reporting Equipment [Design], Rehabilitate Apron [Phase 2]

Put-in-Bay GA 011 209,755 Construct Utilities [WATER LINE (PHASE 1)], Install Perimeter Fencing [(4 FOOT)]

Putnam County GA 004 530,537 Construct Terminal Building, Expand Apron [Phase 1], Extend Taxiway, Install

Richard Downing GA 011 150,000

Miscellaneous NAVAIDS [Relocate Airport Beacon], Remove Obstructions [Remove existing Terminal Building] Install Perimeter Fencing [Phase 2 Construction, Phase 3 Design], Rehabilitate

Rickenbacker International P 030 1,385,048Apron [Construction] Acquire Snow Removal Equipment [3 High-speed Snow Brooms with plows], Install

031 3,380,665Perimeter Fencing, Rehabilitate Taxiway Construct Building [DESIGN], Improve Building [HANGARS]

032 52,673 Conduct Airport Master Plan Study [Phase,1], Conduct Airport Master Plan Study [Phase,2]

Ross County GA 009 45,600 Conduct Environmental Study, Update Airport Master Plan Study [ALP]

Seneca County GA 004 150,000 Install Weather Reporting Equipment

Sidney Municipal GA 008 88,912 Construct Taxiway, Expand Apron, Rehabilitate Taxiway

Springfield-Beckley Municipal GA 014 400,000 Acquire Land For Approaches, Acquire Miscellaneous Land

Toledo Express P 057 625,000 Install Perimeter Fencing [Install Perimeter Fence (Not Part 107)]

058 6,946,821 Modify Terminal Building [Phase 1], Modify Terminal Building [Phase 2], Modify

059 746,767Terminal Building [Phase 3] Construct Deicing Containment Facility

Union County

Van Wert County

GA

GA

013

007

150,000

26,125

Improve Runway Safety Area [Phase 1] - 09/27, Install Perimeter Fencing, Rehabilitate Runway [Design and Bid Only] - 09/27 Rehabilitate Apron [Design and bid]

Williams County GA 004 374,918 Install Runway Vertical/Visual Guidance System - 07/25, Rehabilitate Apron [Phase 1 (Design only)], Rehabilitate Runway [Re-Mark runway] - 07/25, Rehabilitate

Wood County GA 015 167,292Runway Lighting - 07/25 Construct Terminal Building, Install Perimeter Fencing, Update Airport Master Plan

Youngstown-Warren Regional CS 031 380,000Study Improve Airport Miscellaneous Improvements [Preliminary Engineering], Improve

032 218,500 Building [Preliminary Engineering], Install Perimeter Fencing [Phase 2] Conduct Airport Master Plan Study

Selection Criteria Year: 2005

Page 38 of 98

Page 39: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

GL DET OH

ADO Total:

State Total:

Zanesville Municipal

94 Grants

127 Grants

007GA

200,822,822

90,851,971

401,400

GL MSP MN Aitkin Municipal-Steve Kurtz Field

Albert Lea Municipal

Anoka County-Blaine Airport(Janes Field)

Austin Municipal

Baudette International

005

003

007

007

008

004

GA

GA

R

GA

GA

85,500

57,475

2,467,325

3,278,450

1,292,321

703,932

Bemidji-Beltrami County 015P 987,207

Benson Municipal 004GA 615,366

Blue Earth Municipal

Brainerd Lakes Regional

Buffalo Municipal

Cambridge Municipal

004

026

002

004

GA

P

GA

GA

80,750

6,852,864

340,100

155,402

Report Date 02/23/2006

Brief Description Of Work

Rehabilitate Apron

Install Perimeter Fencing

Install Runway Lighting [REILS] - 16/34

Extend Runway - 09/27

Rehabilitate Runway [runway rehab whitetopping and HIRLS] - 18/36

Remove Obstructions

Expand Apron [FY-2006], Expand Apron, Rehabilitate Apron, Strengthen Taxiway, Update Airport Master Plan Study Acquire Aircraft Deicing Equipment [Acquire boom deicing truck], Acquire Land For Approaches [Acquire Hill property (17.8 acres)], Conduct Miscellaneous Study [Prepare pavement condition report], Construct Deicing Containment Facility [Glycol containment structure], Improve Airport Drainage [Construct drainage ditch in GA hangar area], Improve Runway Safety Area [Prepare EA for runway shift] - 07/25, Install Airfield Guidance Signs [Replace airfield guidance signs], Rehabilitate Access Road [Bituminous overlay along terminal drive], Rehabilitate Apron [Crack routing and sealing], Rehabilitate Runway [Crack routing and sealing] - 07/25, Rehabilitate Runway [Crack routing and sealing] - 13/31, Rehabilitate Runway Lighting [Replace remote lighting control] - 13/31, Rehabilitate Service Road [Rehabilitate Snow removal service road] Install Airfield Guidance Signs [Install airfield guidance signs], Install Miscellaneous NAVAIDS [Install segmented circle and wind sock], Install Runway Vertical/Visual Guidance System [Install PAPIs and REILS on Rwy 14/32] - 14/32, Install Taxiway Lighting [Install retro-reflective markers on parallel & connecting taxiways], Rehabilitate Apron [Overaly GA apron], Rehabilitate Runway [Overlay runway 14/32] - 14/32, Rehabilitate Runway Lighting [Replace MIRL cables] - 14/32, Rehabilitate Taxiway [Overlay parallel, connecting & hangar taxiways] Extend Runway [EA] - 16/34

Construct Runway - Plan-1, Install Perimeter Fencing

Acquire Land for Development [Reimbursement for Outlot "A", 3.25 acres fee]

Install Perimeter Fencing

Selection Criteria Year: 2005

Page 39 of 98

Page 40: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GL MSP MN Chandler Field GA 005 329,567 Improve Access Road [Rehabilitate access road (mill and overlay)], Modify Snow Removal Equipment Building [Convert hangar to SRE storage building], Rehabilitate

Chisholm-Hibbing CS 021 715,265Taxiway [Rehabilitate taxiways in hangar area (mill and overlay)] Acquire Aircraft Deicing Equipment, Acquire Land For Approaches [Runway 4 Approach (Albrecht)], Acquire Snow Removal Equipment, Improve Runway Safety Area [Runway 13 Approach Area - Granding and Relocate Localizer] - 13/31, Install Perimeter Fencing

Cloquet Carlton County GA 005 288,262 Install Runway Vertical/Visual Guidance System - 17/35, Rehabilitate Runway Lighting [Multi-year amendment] - 17/35, Rehabilitate Runway Lighting - 17/35,

Crookston Municipal Kirkwood Field GA 005 172,659Update Airport Master Plan Study Acquire Snow Removal Equipment, Improve Airport Drainage, Rehabilitate Runway

Duluth International P 038 4,080,155- 13/31 Construct Service Road [Phase 2 (Includes Wetland Purchase)], Install Perimeter

039 2,335,152Fencing [Phase 2] Rehabilitate Runway [Phase 2 (west end) shoulders, drainage, signs, lighting, repair pavement] - 09/27

040 2,279,218 Expand Apron, Modify Terminal Building [Design - Plans and Specifications(2005)], Modify Terminal Building [Design - Plans and Specifications(2006)], Rehabilitate

Elbow Lake Municipal - Pride of the Prairie GA 003 321,812Apron Construct Runway [Land Acquistion (Parcels 3, 4&5, 7, 9, and 10 in fee; Parcels 6,

Ely Municipal GA 007 2,080,48011, and 12 in easement)] - 14/32 Improve Runway Safety Area - 12/30

Eveleth-Virginia Municipal GA 007 44,292 Conduct Environmental Study

Fairmont Municipal GA 006 522,500 Construct Building, Construct Building

Falls International P 017 3,888,747 Extend Runway [RSA Grading RWY 13 2006] - 13/31, Extend Runway [RWY extension] - 13/31, Extend Runway [RWY extension 2006] - 13/31, Install Perimeter

Faribault Municipal GA 004 435,550Fencing [Deer fencing], Install Perimeter Fencing [Deer fencing 2006] Construct Access Road, Construct Taxiway

Fergus Falls Municipal-Einar Mickelson Field GA 005 257,450 Construct Building [Construct 9-unit Tee hangar]

Flying Cloud R 007 441,272 Rehabilitate Runway [2006] - 10R/28L, Rehabilitate Runway [2007] - 10R/28L, Rehabilitate Runway - 10R/28L

Glenwood Municipal GA 002 337,045 Install Runway Lighting [Install MIRL] - 15/33

Grand Marais/Cook County GA 007 403,750 Construct Seaplane Base, Construct Taxiway [Construct taxiway(2005)]

Grand Rapids/Itasca County Airport-Gordon Newstrom Field

CS 011 1,254,000 Conduct Environmental Study [Runway 4/22 Proposal], Install Guidance Signs, Install Runway Vertical/Visual Guidance System - 16/34, Install Taxiway Lighting [Parallel Taxiway], Rehabilitate Runway Lighting - 16/34, Rehabilitate Taxiway,

Selection Criteria Year: 2005

Page 40 of 98

Page 41: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GL MSP MN 011 Update Airport Master Plan Study

Hawley Municipal GA 002 106,164 Construct Fuel Farm [Replace fueling system], Update Airport Master Plan Study

Hector Municipal GA 002 392,908[Update Airport Layout Plan] Construct Building, Construct Taxiway

Hutchinson Municipal-Butler Field GA 005 213,750 Construct Fuel Farm [Install tank and dispensing equipment for jet fuel], Install Runway Vertical/Visual Guidance System [Install new REILs] - 15/33, Rehabilitate

Jackson Municipal GA 004 87,875

Runway Lighting [Install new primary power and modify electrical distribution building] - 15/33 Rehabilitate Runway - 13/31

Lac qui Parle County GA 003 136,014 Acquire Snow Removal Equipment, Improve Access Road [Pave entrance road], Update Airport Master Plan Study [Update airport layout plan]

Lake Elmo R 003 137,429 Rehabilitate Runway Lighting [Includes installation of radio control] - 14/32, Rehabilitate Taxiway Lighting

Little Falls/Morrison County-Lindbergh Field GA 007 109,324 Acquire Land For Approaches, Improve Fuel Farm, Install Perimeter Fencing

Longville Municipal GA 004 157,902 Construct Access Road, Extend Taxiway

Mahnomen County GA 004 193,724 Construct Building

Minneapolis-St Paul International/Wold- P 079 8,000,000 Construct Runway - Plan-1 Chamberlain/ 080 5,114,354 Noise Mitigation Measures for Residences within 65 - 69 DNL

081 5,663,759 Construct Taxiway [Construct Taxiway Q between Rwy 4/22 and Taxiway D (Part of Txy C-D Complex Phase 1)], Rehabilitate Taxiway [Portions of Txys A, C, & D of Txy C-D Complex (Phase 1)]

082 569,378 Rehabilitate Apron [Concourses D & E]

Montevideo-Chippewa County GA 004 270,935 Rehabilitate Apron [Reconstruct apron and connecting taxiway and expand apron]

Mora Municipal GA 004 134,948 Acquire Land For Approaches [Parcels 16 & 17], Conduct Environmental Study

Myers Field GA 006 1,684,493 Construct Terminal Building [Construct Arrival/Departure building (includes improving access road and parking lot)], Extend Runway [Extend, rehabilitate, and widen Runway 11/29 to 4,000' x 75' (includes clearing & grubbing, relocating fuel system, MIRLs, REILs, PAPIs, beacon, windsock, and paved apron/taxiway)] ­

New Ulm Municipal GA 005 279,30011/29 Conduct Airport Master Plan Study, Rehabilitate Taxiway

Ortonville Municipal-Martinson Field GA 003 262,286 Install Runway Lighting [MIRLS, Threshold lights, MITLS, and electrical vault work] ­16/34

Owatonna Degner Regional GA 009 39,900 Conduct Environmental Study

Pine River Regional GA 001 436,513 Construct Taxiway, Remove Obstructions

Selection Criteria Year: 2005

Page 41 of 98

Page 42: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GL MSP MN Pipestone Municipal GA 002 125,687 Acquire Snow Removal Equipment [Acquire snow removal equipment (wheel loader)]

Princeton Municipal GA 005 229,900 Construct Taxiway, Install Taxiway Lighting

Richard B Helgeson GA 004 354,958 Construct Taxiway, Extend Taxiway, Rehabilitate Taxiway

Rochester International P 021 5,462,500 Extend Runway - 13/31

Silver Bay Municipal GA 002 235,600 Conduct Airport Master Plan Study, Construct Fuel Farm, Rehabilitate Runway ­

South St Paul Municipal-Richard E Fleming Field R 009 298,12207/25 Construct Building, Install Perimeter Fencing

Southwest Minnesota Regional Marshall/Ryan Field

GA 006 2,658,681 Expand Apron, Extend Runway [Extend runway to 7200' - Phase 1] - 12/30

Springfield Municipal GA 004 15,675 Improve Airport Drainage

St Paul Downtown Holman Field R 012 692,153 Install Runway Vertical/Visual Guidance System - 14/32, Rehabilitate Runway [(2005)] - 09/27, Rehabilitate Runway [(2006)] - 09/27, Rehabilitate Runway

013 4,581,277[(2007)] - 09/27, Rehabilitate Runway Lighting - 09/27 Improve Airport Drainage

Staples Municipal GA 002 163,400 Improve Fuel Farm, Install Runway Vertical/Visual Guidance System - 14/32

Thief River Falls Regional CS 009 183,540 Update Airport Master Plan Study

Todd Field GA 003 532,000 Construct Building, Install Runway Vertical/Visual Guidance System - 16/34

Tower Municipal GA 001 387,686 Construct Fuel Farm, Improve Seaplane Base

Tracy Municipal GA 004 159,620 Construct Taxiway [Construct taxiway to hangar area]

Walker Municipal GA 001 61,859 Conduct Airport Master Plan Study

Warroad International-Swede Carlson Field GA 006 9,160 Acquire Snow Removal Equipment

Waseca Municipal GA 004 370,500 Construct Snow Removal Equipment Building, Install Runway Lighting [Install threshold lights] - 15/33, Rehabilitate Access Road, Remove Obstructions [Remove trees & hangar]

Willmar Municipal 006 1,087,358 Construct New Airport [Runway grooving, marking, lighting, and signing; fencing]

Windom Municipal GA 004 876,101 Construct Building, Construct Building, Construct Fuel Farm, Construct Terminal Building, Rehabilitate Apron, Remove Obstructions

State Total: 70 Grants 79,580,601

GL MSP WI Austin Straubel International P 034 3,182,615 Construct Runway Safety Area - 18/36, Construct Runway Safety Area - 18/36

Central Wisconsin P 034 220,000 Acquire Snow Removal Equipment [replace anti icing vehicle #20]

Selection Criteria Year: 2005

Page 42 of 98

Page 43: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

GL MSP WI Chippewa Valley Regional

Dane County Regional-Truax Field

General Mitchell International

La Crosse Municipal

Outagamie County Regional

Rhinelander-Oneida County

Wisconsin State Block Grant Program

State Total:

ADO Total:

Region Total:

Report Total:

NE ANE CT Danbury Municipal

Danielson

Igor I Sikorsky Memorial

Meriden Markham Municipal

Tweed-New Haven

Report Date 02/23/2006

FY 2005

Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

025P 1,000,000 Acquire Aircraft Deicing Equipment, Acquire Snow Removal Equipment, Rehabilitate Apron

036P 8,483,709 Improve Runway Safety Area - 14/32

037 3,768,215 Improve Runway Safety Area - 14/32

048P 3,331,569 Construct Runway Safety Area [this is for the EA for the RSA work] - 01L/19R, Rehabilitate Apron [North FBO apron], Rehabilitate Apron [terminal apron joint repair], Rehabilitate Taxiway

049 5,785,646 Noise Mitigation Measures for Residences within 65 - 69 DNL

028P 1,365,234 Rehabilitate Taxiway [rehab txy A north], Security Enhancements

028P 505,788 Construct Service Road

029 2,229,043 Rehabilitate Taxiway [rehab taxiway B]

023P 617,500 Rehabilitate Apron [Crack sealing air carrier apron], Rehabilitate Runway [Crack sealing concrete pavement] - 09/27, Rehabilitate Runway [Rehabilitate Runway-Phase 1 design] - 15/33, Rehabilitate Taxiway [Crack sealing of TWY's A, B, C, and D], Update Airport Master Plan Study [ALP Update]

021 16,868,916 Non primary development projects in state block grant program

022 3,850,000 Non primary development projects in state block grant program

023 5,000,000 Non primary development projects in state block grant program

14 Grants 56,208,235

84 Grants 135,788,836

929 Grants 584,534,682

2099 Grants 3,549,617,470

026R 274,503 Light Obstructions [(Lighting & Design)]

006GA 347,196 Update Airport Master Plan Study

021GA 85,500 Rehabilitate Apron

007GA 1,380,066 Rehabilitate Runway - 18/36

026P 272,313 Rehabilitate Apron [Design]

027 289,750 Acquire Snow Removal Equipment

028 550,905 Improve Terminal Building

Selection Criteria Year: 2005

Page 43 of 98

Page 44: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

NE ANE CT

Waterbury-Oxford

State Total:

NE ANE MA Barnes Municipal

Barnstable Municipal-Boardman/Polando Field

Beverly Municipal

Gardner Municipal

General Edward Lawrence Logan International

Harriman-And-West

Laurence G Hanscom Field

Lawrence Municipal

Mansfield Municipal

Marshfield Municipal - George Harlow Field

Marthas Vineyard

Minute Man Air Field

Nantucket Memorial

New Bedford Regional

FY 2005

Service Grant Seq Level Number

029

GA 010

9 Grants

GA 022

023

P 040

041

042

R 022

023

GA 008

P 086

087

088

GA 017

P 023

R 022

GA 015

016

GA 011

012

P 029

GA 008

P 040

041

P 030

031

AIP Federal Funds

206,278

1,323,315

4,729,826

4,016,429

328,482

727,890

1,197,000

88,350

292,600

76,427

219,154

12,000,000

15,030,000

2,664,428

533,900

1,500,000

162,371

1,272,427

576,485

311,600

344,850

4,174,666

100,200

322,050

468,853

309,814

216,693

Report Date 02/23/2006

Brief Description Of Work

Update Airport Master Plan Study [terminal building study]

Extend Taxiway

Improve Runway Safety Area - 02/20, Install Instrument Approach Aid - 02/20, Rehabilitate Taxiway Update Airport Master Plan Study

Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Snow Removal Equipment

Construct Terminal Building, Construct Terminal Building

Update Airport Master Plan Study

Construct Runway Safety Area - 09/27

Conduct Environmental Study

Rehabilitate Apron

Noise Mitigation Measures for Residences within 65 - 69 DNL

Construct Runway - Plan-1

Extend Runway Safety Area - 04L/22R

Update Airport Master Plan Study

Rehabilitate Apron

Conduct Miscellaneous Study [obstruction analysis]

Construct Apron

Construct Snow Removal Equipment Building

Install Weather Reporting Equipment

Conduct Environmental Study

Construct Apron [taxiway/apron], Construct Apron, Construct Taxiway [taxiway/apron] Acquire Snow Removal Equipment

Security Enhancements

Construct Terminal Building [Phase 1]

Acquire Snow Removal Equipment

Rehabilitate Runway - 05/23

Selection Criteria Year: 2005

Page 44 of 98

Page 45: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NE ANE MA Norwood Memorial R 025 256,500 Update Airport Master Plan Study

026 589,004 Rehabilitate Apron

Plymouth Municipal GA 031 332,481 Light Obstructions

032 1,064,732 Construct Apron

Southbridge Municipal GA 014 142,500 Install Taxiway Lighting

Taunton Municipal GA 014 773,675 Conduct Miscellaneous Study, Rehabilitate Runway Lighting - 12/30, Rehabilitate

Turners Falls GA 010 237,690Taxiway Extend Runway - 16/34

Westover ARB/Metropolitan GA 011 2,500,000 Acquire Land for Noise Compatibility within 75 DNL

012 450,000 Improve Building [Phase I], Improve Building [Phase II], Improve Building [Phase III]

Worcester Regional GA 033 958,550 Rehabilitate Taxiway

State Total: 34 Grants 54,239,801

NE ANE ME Auburn/Lewiston Municipal R 013 216,030 Update Airport Master Plan Study

Augusta State CS 015 183,350 Update Airport Master Plan Study

Bangor International P 040 1,384,222 Construct Deicing Containment Facility

041 299,959 Acquire Snow Removal Equipment

042 219,545 Conduct Miscellaneous Study [terminal area study]

Belfast Municipal GA 006 28,500 Conduct Airport Master Plan Study

Bethel Regional GA 008 597,550 Expand Apron

Biddeford Municipal GA 005 161,686 Remove Obstructions

Caribou Municipal GA 008 223,578 Acquire Snow Removal Equipment

009 180,530 Acquire Land for Development

Central Maine Airport of Norridgewock GA 009 114,000 Update Airport Master Plan Study

Dewitt Field,Old Town Municipal GA 004 179,016 Improve Runway Safety Area - 04/22

Eastern Slopes Regional GA 010 166,250 Update Airport Master Plan Study

Greenville Municipal GA 009 4,154,730 Rehabilitate Runway - 14/32

Hancock County-Bar Harbor CS 020 155,610 Improve Terminal Building, Rehabilitate Runway - 17/35

Knox County Regional P 017 1,268,250 Rehabilitate Taxiway [Rehabilitate Taxiway, Improve Airport Signs, Marking and Lighting, Install security Gates, Fencing, and Wind Cone, Purchase Friction

Selection Criteria Year: 2005

Page 45 of 98

Page 46: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NE ANE ME 017 Measuring Equipment and Remove Obstructions.], Rehabilitate Taxiway [Rehabilitate Taxiway, miscellaneous Part 139 improvements]

018 171,000 Conduct Environmental Study

019 304,911 Acquire Snow Removal Equipment

Machias Valley GA 005 380,000 Conduct Airport Master Plan Study

Millinocket Municipal GA 007 156,779 Improve Runway Safety Area [Phase I design]

Newton Field GA 009 403,750 Construct Snow Removal Equipment Building

Northern Maine Regional Airport at Presque Isle P 024 2,371,623 Rehabilitate Taxiway, Rehabilitate Taxiway

Oxford County Regional GA 005 112,100 Conduct Environmental Study

Pittsfield Municipal GA 006 250,121 Construct Snow Removal Equipment Building

Portland International Jetport P 057 639,953 Update Airport Master Plan Study

058 5,464,400 Rehabilitate Taxiway, Rehabilitate Taxiway

Sanford Regional R 018 215,460 Rehabilitate Apron

State of Maine 004 162,000 Update State System Plan Study

Waterville Robert Lafleur GA 012 754,300 Rehabilitate Apron

013 204,250 Acquire Land for Development

Wiscasset GA 010 321,174 Extend Taxiway

State Total: 31 Grants 21,444,627

NE ANE NH Berlin Municipal GA 015 1,272,929 Rehabilitate Runway - 18/36

Boire Field R 026 291,650 Update Airport Master Plan Study

Claremont Municipal GA 016 474,050 Construct Building, Construct Building, Construct Building

Concord Municipal GA 018 295,830 Remove Obstructions

Lebanon Municipal CS 029 190,000 Rehabilitate Apron [phase 1 design]

030 1,425,000 Rehabilitate Apron, Rehabilitate Taxiway

Manchester P 058 2,500,000 Noise Mitigation Measures for Residences within 65 - 69 DNL

059 5,143,554 Rehabilitate Runway - 17/35

Mount Washington Regional GA 013 61,750 Acquire Land For Approaches

014 1,617,746 Extend Runway - 10/28

Pease International Tradeport P 030 788,635 Noise Mitigation Measures for Residences within 65 - 69 DNL

Selection Criteria Year: 2005

Page 46 of 98

Page 47: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

FAA - Office Of Airports

Region ADO State Worksite

NE ANE NH

Skyhaven

State Total:

NE ANE RI Block Island State

Newport State

North Central State

Quonset State

Theodore Francis Green State

Westerly State

State Total:

NE ANE VT Burlington International

Middlebury State

Newport State

Rutland State

State of Vermont

Various Locations in Vermont

Grants Awarded by FY

FY 2005

Service Level

Grant Seq Number

GA

032

019

13 Grants

CS

GA

R

R

P

CS

010

013

014

015

012

071

073

074

013

014

015

11 Grants

P 055

056

057

GA

GA

GA

058

059

004

005

021

022

001

002

001

AIP Federal Funds

6,525,228

756,362

21,342,734

79,259

1,569,214

501,947

342,648

1,072,972

1,100,000

10,000,000

1,842,701

1,868,273

641,237

1,120,247

20,138,498

1,995,000

753,250

7,837,500

149,150

207,057

161,405

936,718

548,497

123,025

284,083

183,181

215,271

Report Date 02/23/2006

Brief Description Of Work

Rehabilitate Apron

Environmental Mitigation

Conduct Environmental Study

Remove Obstructions

Remove Obstructions

Rehabilitate Runway [Phase I] - 05/23

Rehabilitate Taxiway

Construct Terminal Building

Acquire Land for Noise Compatibility within 65 - 69 DNL

Conduct Environmental Study

Rehabilitate Runway - 07/25, Rehabilitate Taxiway

Remove Obstructions

Remove Obstructions

Acquire Land for Noise Compatibility within 65 - 69 DNL

Acquire Miscellaneous Land

Construct Apron [Phase I], Construct Apron [Phase II], Expand Terminal Building [Phase I] Construct Taxiway

Security Enhancements [Phase 2]

Conduct Environmental Study

Construct Apron

Security Enhancements [Fencing]

Acquire Snow Removal Equipment

Conduct State System Plan Study

Rehabilitate Runway, Update State System Plan Study

Install Perimeter Fencing (Caledonia County; Edward F Knapp State; Hartness State

Selection Criteria Year: 2005

Page 47 of 98

Page 48: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NE ANE VT 001 (Springfield); William H. Morse State)

State Total: 12 Grants 13,394,137

ADO Total: 110 Grants 135,289,623

Region Total: 1039 Grants 135,289,623

Report Total: 2099 Grants 3,549,617,470

NM DEN CO Aspen-Pitkin County/Sardy Field 031P 6,723,300 Improve Runway Safety Area [Relocate Taxiway A (A2-A4)] - 15/33

032 9,574,081 Improve Runway Safety Area [Relocate ARFF/SRE Building (Final Design & Construction)] - 15/33

Centennial 028R 466,180 Acquire Snow Removal Equipment

029 1,545,271 Acquire Land For Approaches

Central Colorado Regional 009GA 150,000 Install Weather Reporting Equipment, Update Airport Master Plan Study

City of Colorado Springs Municipal 040P 16,181,170 Rehabilitate Runway [(Phase II)] - 17L/35R

Colorado Plains Regional 010GA 800,000 Construct Taxiway

Denver International 036P 3,250,000 Construct Aircraft Rescue & Fire Fighting Building, Construct Runway [Phase IX] ­16R/34L

037 3,211,130 Construct Deicing Containment Facility [WA (Phase 2)], Install Runway Sensors ­16L/34R

038 10,000,000 Construct Deicing Containment Facility [WA (Phase 3)]

Durango-La Plata County 029P 3,487,582 Construct Apron [North GA Apron], Construct Taxiway [to/from North GA Apron]

Eagle County Regional 037P 1,606,200 Extend Runway [Phase II (Design Engineering, Drainage, and Fencing)] - 07/25

038 9,206,622 Extend Runway [Phase III (Site Preparation)] - 07/25

Erie Municipal 008R 625,000 Construct Access Road, Construct Taxiway, Install Perimeter Fencing

Fort Collins-Loveland Municipal 019P 1,150,000 Acquire Handicap Passenger Lift Device, Acquire Snow Removal Equipment, Improve Terminal Building, Install Perimeter Fencing, Rehabilitate Apron

Fremont County 006GA 450,000 Acquire Snow Removal Equipment, Expand Apron

007 56,919 Update Airport Master Plan Study

Front Range 029R 300,000 Install Weather Reporting Equipment, Rehabilitate Taxiway

Garfield County Regional 014GA 150,000 Conduct Environmental Study

Granby-Grand County 004GA 400,000 Improve Runway Safety Area [Phase 1: Acquire Land Parcels 16, 22, 24, 25, 25A,

Selection Criteria Year: 2005

Page 48 of 98

Page 49: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NM DEN CO 004 26, 28]

005 551,533 Improve Runway Safety Area [Phase 2: Relocate County Road]

Greeley-Weld County GA 017 412,519 Install Miscellaneous NAVAIDS, Install Runway Lighting

Gunnison-Crested Butte Regional P 037 70,000 Conduct Miscellaneous Study [(Conduct Wildlife Study)]

Harriet Alexander Field GA 008 275,443 Acquire Land for Development

Jeffco R 036 3,300,000 Construct Taxiway

037 550,000 Rehabilitate Apron

La Junta Municipal GA 005 464,936 Rehabilitate Apron

Mc Elroy Airfield GA 005 150,000 Update Airport Master Plan Study

Meadow Lake R 011 1,565,360 Acquire Land For Approaches

Meeker GA 005 111,018 Conduct Environmental Study

Montrose Regional P 032 550,364 Acquire Snow Removal Equipment

Perry Stokes GA 004 600,000 Construct Taxiway, Expand Apron

Pueblo Memorial CS 024 150,000 Update Airport Master Plan Study

025 1,606,900 Remove Obstructions

Rangely GA 006 119,200 Rehabilitate Runway [Phase 1 (Design Only)] - 06/24

San Luis Valley Regional/Bergman Field CS 015 655,000 Expand Apron, Rehabilitate Apron

Spanish Peaks Airfield GA 001 150,000 Rehabilitate Runway - 08/26

State of Colorado 004 246,140 Update State System Plan Study

Steamboat Springs/Bob Adams Field GA 014 790,600 Rehabilitate Apron

Telluride Regional P 020 1,000,000 Acquire Snow Removal Equipment, Rehabilitate Runway - 09/27

Walker Field P 030 3,055,000 Rehabilitate Apron

Yampa Valley P 031 5,194,454 Expand Terminal Building, Expand Terminal Building, Expand Terminal Building

032 5,400,000 Construct Apron

State Total: 43 Grants 96,301,922

NM DEN UT Beaver Municipal GA 007 150,000 Construct Taxiway

Blanding Municipal GA 011 68,610 Rehabilitate Apron [(Phase III)]

Brigham City GA 016 6,200,000 Acquire Miscellaneous Land, Improve Runway Safety Area [Construction, Phase I (Runway Extension, SA Grading C/D II)] - 16/34

Selection Criteria Year: 2005

Page 49 of 98

Page 50: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NM DEN UT Bryce Canyon GA 008 300,000 Install Taxiway Lighting

Canyonlands Field CS 016 344,375 Improve Runway Safety Area [Design Only] - 03/21

Delta Municipal GA 006 172,230 Construct Taxiway [(Improve Taxiway A & B Safety Area - grading)], Improve Runway Safety Area - 16/34

Duchesne Municipal GA 003 210,000 Rehabilitate Runway Lighting [Phase I] - 17/35

Hanksville GA 001 398,966 Construct Apron, Construct Taxiway

Heber City Municipal - Russ McDonald Field GA 018 561,575 Acquire Land For Approaches, Construct Taxiway [Sch I, (Design Only)]

Kanab Municipal GA 007 470,000 Rehabilitate Runway - 01/19

Logan-Cache GA 015 2,307,418 Acquire Land For Approaches [Parcels 12b, 13c], Rehabilitate Apron

016 150,000 Construct Taxiway [Design Only]

Manti-Ephraim GA 004 58,995 Update Airport Master Plan Study [(ALP Update)]

Milford Municipal GA 008 89,503 Improve Runway Safety Area [Construction, Sch II] - 16/34, Rehabilitate Runway -

Nephi Municipal GA 008 1,200,00016/34 Construct Runway [(Phase IV, Construct Parallel Taxiway to Runway)] - 16/34

Ogden-Hinckley R 028 315,759 Install Perimeter Fencing

Parowan GA 008 300,000 Construct Taxiway

Provo Municipal GA 024 1,932,344 Extend Taxiway [Construction, Sch I]

Richfield Municipal GA 007 155,306 Conduct Environmental Study

Roosevelt Municipal GA 007 467,293 Modify Access Road

Salt Lake City International P 079 3,710,427 Rehabilitate Taxiway [Taxiway M]

080 8,000,000 Rehabilitate Taxiway [Taxiway H H2 - H4]

081 939,752 Acquire Land for Noise Compatibility within 65 - 69 DNL

St George Municipal P 019 1,050,997 Rehabilitate Taxiway [Taxiway "A" & "B"]

State of Utah 004 324,501 Conduct State System Plan Study

Vernal GA 019 111,334 Acquire Land For Approaches

Wendover GA 017 484,915 Construct Apron [Construct Hardstands]

State Total: 27 Grants 30,474,300

NM DEN WY Big Piney-Marbleton GA 007 65,550 Update Airport Master Plan Study [(ALP)]

Cheyenne Regional/Jerry Olson Field P 036 1,000,000 Rehabilitate Apron, Rehabilitate Taxiway

Selection Criteria Year: 2005

Page 50 of 98

Page 51: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NM DEN WY Dixon GA 008 1,681,344 Rehabilitate Runway - 06/24

Evanston-Uinta County Burns Field GA 020 9,421,250 Improve Runway Safety Area [(Grading, Phase VIII;Construct Runway; Construct

Jackson Hole P 035 3,556,739Taxiway)] - 05/23 Conduct Miscellaneous Study, Expand Apron, Update Airport Master Plan Study

Johnson County

Kemmerer Municipal

GA

GA

011

013

551,259

503,029

Install Miscellaneous NAVAIDS, Rehabilitate Apron, Rehabilitate Taxiway [Taxiway "A" and "A2"] Construct Snow Removal Equipment Building [(Including Electrical Vault and GA Terminal) (FY 2004 NP -$50,000, FY 2005 NP - $150,000)], Rehabilitate Apron, Rehabilitate Taxiway

Laramie Regional CS 021 300,350 Construct Taxiway

022 599,650 Acquire Aircraft Rescue & Fire Fighting Vehicle

Natrona County International P 041 350,000 Expand Terminal Building

042 500,000 Rehabilitate Taxiway [Design Only]

Powell Municipal GA 009 456,971 Construct Building, Install Perimeter Fencing

Ralph Wenz Field GA 012 450,000 Acquire Land For Approaches

Rawlins Municipal/Harvey Field GA 010 330,890 Acquire Snow Removal Equipment, Construct Snow Removal Equipment Building

Riverton Regional P 024 704,404 Rehabilitate Runway [Design Only] - 10/28

Rock Springs-Sweetwater County CS 020 1,947,528 Install Airfield Guidance Signs, Rehabilitate Apron

Sheridan County P 027 82,773 Acquire Emergency Generator

028 106,931 Install Perimeter Fencing

State of Wyoming 003 233,000 Conduct State System Plan Study

Worland Municipal CS 015 731,662 Construct Runway [Schedule 1A]

State Total: 20 Grants 23,573,330

ADO Total: 90 Grants 150,349,552

NM HLN MT Baker Municipal GA 009 79,711 Conduct Environmental Study

Bert Mooney P 033 1,354,476 Conduct Airport Master Plan Study [Phase II], Install Weather Reporting Equipment [AWOS-II], Rehabilitate Apron [maintenance], Rehabilitate Runway [maintenance] ­

Big Sandy GA 002 88,350

11/29, Rehabilitate Runway [maintenance] - 15/33, Rehabilitate Taxiway ["D"], Security Enhancements Rehabilitate Runway - 06/24, Update Airport Master Plan Study

Selection Criteria Year: 2005

Page 51 of 98

Page 52: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NM HLN MT Billings Logan International P 029 2,002,983 Acquire Snow Removal Equipment [and Friction Measuring Equipment], Improve Airport Miscellaneous Improvements [improve runway 25 safety area grading], Install Guidance Signs, Rehabilitate Apron [air carrier apron design only], Rehabilitate Taxiway ["G"], Update Airport Master Plan Study

Bowman Field GA 007 55,290 Install Weather Reporting Equipment [AWOS-II]

Broadus (New) 002 1,761,241 Construct New Airport

Dawson Community GA 006 396,830 Construct Fuel Farm, Install Perimeter Fencing, Update Airport Master Plan Study

Deer Lodge-City-County GA 005 976,600 Extend Runway [Phase I - grading] - 12/30

Dillon GA 007 466,170 Rehabilitate Access Road

Edgar G Obie GA 007 90,656 Install Miscellaneous NAVAIDS, Rehabilitate Runway [Phase II - Rehabilitate Runway (design)] - 08/26

Eureka GA 006 186,615 Construct Fuel Farm, Install Weather Reporting Equipment

Fort Benton GA 004 50,140 Rehabilitate Runway [, including taxiways and apron (maintenance)] - 05/23

Frank Wiley Field GA 007 385,731 Acquire Snow Removal Equipment [front-end loader with attachments], Install Airfield Guidance Signs [distance remaining signs on runways 4/22 and 12/30], Modify Snow Removal Equipment Building [add doors], Rehabilitate Runway [and Runway 12/30 (maintenance)] - 04/22, Update Airport Master Plan Study

Gallatin Field P 030 2,227,750 Acquire Land For Approaches, Acquire Land for Development, Acquire Land for Development, Construct Taxiway, Install Perimeter Fencing

Glacier Park International P 030 4,132,443 Extend Runway [, including extension of a portion of Taxiway B and relocation of ILS Glide Slope and Approach Lighting System (MALSR)] - 02/20, Extend Runway [,

031 1,235,000

including extension of a portion of Taxiway B and relocation of ILS Glide Slope and Approach Lighting System (MALSR)] - 02/20 Extend Runway [Phase 2 (complete extension of Taxiway B)] - 02/20

Great Falls International P 034 12,732,445 Install Instrument Approach Aid - 03/21

Havre City-County GA 009 635,702 Install Airfield Guidance Signs, Modify Terminal Building, Rehabilitate Runway

Helena Regional P 031 1,388,184[,taxiways, and apron pavements (maintenance)] - 07/25 Acquire Aircraft Rescue & Fire Fighting Vehicle [(1,500 gallon vehicle and Quick

L M Clayton GA 004 292,994Response vehicle)], Modify Terminal Building Install Guidance Signs [relocate runway holding position signs], Install Perimeter

Laurel Municipal GA 011 91,200Fencing Install Weather Reporting Equipment

Lewistown Municipal GA 009 287,000 Construct Service Road, Construct Taxiway [(hangar access)], Improve Snow Removal Equipment Building, Install Guidance Signs [and Miscellaneous Navaid (Supplemental Windcone Runway 25)], Rehabilitate Runway [Pavement

Selection Criteria Year: 2005

Page 52 of 98

Page 53: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

NM HLN MT

Liberty County

Lincoln

Malta

Mission Field

Missoula International

Plains

Ravalli County

Ronan

Roundup

Scobey

Shelby

Sidney-Richland Municipal

Stanford

State of Montana

Three Forks

Tillitt Field

Townsend

Twin Bridges

White Sulphur Springs

Wokal Field/Glasgow International

FY 2005

Service Grant Seq Level Number

009

GA 003

GA 004

GA 005

GA 004

P 038

039

GA 004

GA 006

GA 007

GA 005

GA 004

GA 007

P 013

GA 004

004

GA 004

GA 004

GA 005

GA 006

GA 003

GA 010

AIP Federal Funds

65,550

2,597,245

142,999

473,000

947,933

1,189,421

1,094,000

307,800

162,450

89,395

91,314

191,000

1,199,161

59,850

63,887

341,192

67,319

156,000

266,000

144,979

331,999

Report Date 02/23/2006

Brief Description Of Work

(maintenance)] - 07/25

Rehabilitate Runway - 07/25

Construct Runway [,including land acquisition, obstruction removal, MIRLinstallation, taxiway and apron construction, PAPI installation, and miscellaneouselectrical (rotating beacon, segmented circle, lighted windcone).] - 04/22, InstallPerimeter Fencing [wildlife fence]Acquire Snow Removal Equipment, Install Weather Reporting Equipment

Construct Taxiway

Rehabilitate Runway - 07/25, Rehabilitate Taxiway, Update Airport Master PlanStudy [-Financial Plan]Improve Terminal Building

Construct Runway [Phase I - construct new runway (grading)] - 12/30

Construct Snow Removal Equipment Building, Rehabilitate Runway [(maintenance)]- 16/34 Acquire Snow Removal Equipment

Construct Fuel Farm

Install Weather Reporting Equipment

Construct Snow Removal Equipment Building

Install Perimeter Fencing, Rehabilitate Apron [, and Mark Runway 10/28 Aiming Points] Rehabilitate Runway [, including taxiways and apron (maintenance)] - 11/29, Update Airport Master Plan Study Conduct State System Plan Study

Acquire Land for Development, Construct Snow Removal Equipment Building

Update Airport Master Plan Study [(ALP Update)]

Construct Fuel Farm

Acquire Easement For Approaches, Acquire Land for Development

Construct Fuel Farm, Rehabilitate Runway [maintenance and preliminary engineering] - 01/19 Acquire Snow Removal Equipment, Install Guidance Signs [, Runway 8/26 and 12/30 Distance to Go signs, Taxiway C Lighting, Runway 8/26 Vertical/Visual Guidance Systems, and Miscellaneous Navaids (windcone)], Rehabilitate Runway [Runway 12/30, taxiway, and apron pavements (maintenance).] - 08/26

Selection Criteria Year: 2005

Page 53 of 98

Page 54: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

State Total:

ADO Total:

43 Grants

43 Grants

40,900,005

40,900,005

NM SEA ID Aberdeen Municipal

Arco-Butte County

GA

GA

001

006

556,000

450,000

Install Perimeter Fencing, Rehabilitate Apron, Rehabilitate Taxiway, Update Airport Master Plan Study Acquire Snow Removal Equipment, Rehabilitate Access Road, Rehabilitate Runway

Bear Lake County GA 003 375,000- 06/24, Rehabilitate Taxiway Construct Taxiway

Boise Air Terminal/Gowen Field P 044 65,000 Security Enhancements

045 4,662,314 Acquire Snow Removal Equipment, Expand Terminal Building, Improve Runway

Burley Municipal GA 004 169,100Safety Area - 10L/28R, Rehabilitate Taxiway Construct New Airport [including airspace analysis and master plan, fatal flaw

Caldwell Industrial R 015 1,000,000analysis and pre-environmental (Phase 1)] Construct Taxiway [Environmental assessment], Construct Taxiway [West Side],

Cascade GA 007 56,976Rehabilitate Taxiway [and Taxilanes], Update Airport Master Plan Study Rehabilitate Runway - 12/30

Coeur d'Alene Air Terminal GA 024 2,650,000 Construct Apron, Construct Taxiway, Install Perimeter Fencing

025 28,500 Conduct Airport Master Plan Study

Driggs-Reed Memorial GA 005 150,000 Acquire Snow Removal Equipment

Friedman Memorial P 030 4,500,000 Extend Runway Safety Area - 13/31, Remove Obstructions

Idaho County GA

031

007

1,687,306

789,216

Expand Apron [aircraft parking apron], Improve Terminal Building, Improve Terminal Building, Security Enhancements Construct Taxiway

Idaho Falls Regional P 025 3,239,040 Expand Apron [Expand south general aviation apron (design only)(Phase 1)], Rehabilitate Apron, Rehabilitate Taxiway, Remove Obstructions

026 848,486 Expand Apron [Expand south general aviation apron (Phase 2)]

Jerome County GA 005 180,000 Rehabilitate Runway - 08/26

Joslin Field - Magic Valley Regional P 024 3,600,000 Conduct Miscellaneous Study, Extend Taxiway, Install Miscellaneous NAVAIDS, Install Perimeter Fencing, Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate

Lemhi County GA 008 203,786Runway Lighting - 07/25 Install Perimeter Fencing [Phase 1 fencing and gates near town]

Lewiston-Nez Perce County P 022 853,893 Rehabilitate Taxiway [B, C D & E, partial (design)], Security Enhancements

Mountain Home Municipal GA 007 419,175 Install Airfield Guidance Signs, Install Perimeter Fencing, Install Taxiway Lighting, Rehabilitate Taxiway

Selection Criteria Year: 2005

Page 54 of 98

Page 55: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NM SEA ID Nampa Municipal GA 016 1,028,360 Construct Taxiway, Rehabilitate Apron

Pocatello Regional P 024 1,000,000 Construct Aircraft Rescue & Fire Fighting Building

Sandpoint GA 010 628,974 Construct Taxiway, Environmental Mitigation, Install Perimeter Fencing

Weiser Municipal GA 005 909,500 Acquire Snow Removal Equipment, Construct Parking Lot, Install Runway Vertical/Visual Guidance System - 12/30, Rehabilitate Apron, Rehabilitate Taxiway

State Total: 25 Grants 30,050,626

NM SEA OR Albany Municipal GA 007 150,000 Construct Taxiway, Install Apron Lighting, Install Miscellaneous NAVAIDS, Install

Astoria Regional GA 013 0Perimeter Fencing No projects assigned.

Aurora State GA 011 1,100,000 Rehabilitate Runway - 17/35

Bend Municipal GA 012 150,000 Construct Runway [Conduct environmental assessment for shift runway] - 16/34

Brookings GA 003 350,000 Install Perimeter Fencing, Install Runway Vertical/Visual Guidance System - 12/30, Remove Obstructions

Burns Municipal GA 004 100,000 Construct Taxiway

City-County GA 004 450,000 Construct Terminal Building, Construct Terminal Building, Rehabilitate Apron

Columbia Gorge Regional/The Dalles Municipal GA 005 360,000 Install Airfield Guidance Signs, Install Airfield Guidance Signs, Install Runway

Corvallis Municipal GA 011 300,000Lighting [7/25 phase 2; 12/30 phase 3] - 07/25 Rehabilitate Runway - 17/35

012 1,850,000 Rehabilitate Runway [Phase 2] - 17/35

Gold Beach Municipal GA 005 175,000 Rehabilitate Runway [Phase 1 design] - 16/34

Grant County Regional/Ogilvie Field GA 002 447,280 Construct Taxiway, Rehabilitate Taxiway

Hobby Field GA 006 50,000 Improve Utilities [Phase I design]

Hood River GA 004 608,760 Acquire Land For Approaches

Klamath Falls P 021 4,200,000 Conduct Miscellaneous Study, Rehabilitate Runway - 07/25, Rehabilitate Runway ­

Lake County GA 003 150,00007/25 Improve Fuel Farm

Mahlon Sweet Field P 035 9,240,478 Acquire Snow Removal Equipment, Construct Runway - 16/34, Rehabilitate Apron, Rehabilitate Emergency Generator, Rehabilitate Taxiway, Update Miscellaneous

Newport Municipal GA 013 70,000Study Conduct Miscellaneous Study, Construct Building [Phase 1 Design], Install Miscellaneous NAVAIDS

North Bend Municipal P 022 515,000 Rehabilitate Runway [Design only] - 04/22, Rehabilitate Terminal Building

Selection Criteria Year: 2005

Page 55 of 98

Page 56: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NM SEA OR Ontario Municipal GA 005 350,000 Construct Apron, Construct Runway - 14/32, Construct Taxiway, Install Miscellaneous NAVAIDS

Portland International P 050 374,985 Extend Runway [including feasibility/justification study] - 10L/28R

051 3,111,112 Acquire Land for Development

052 131,250 Install Noise Monitoring System

Portland-Hillsboro R 018 1,502,875 Construct Taxiway

Prineville GA 004 1,536,559 Construct Taxiway, Rehabilitate Taxiway

Roberts Field P 025 2,503,932 Expand Terminal Building, Modify Access Road

Rogue Valley International - Medford P 027 5,186,791 Construct Terminal Building [Phase 2], Install Perimeter Fencing, Remove Obstructions

Roseburg Regional GA 014 2,210,000 Construct Apron, Construct Taxiway, Construct Taxiway, Construct Taxiway

State of Oregon 004 843,667 Update State System Plan Study

Tillamook GA 008 435,000 Construct Building, Construct Building, Improve Fuel Farm

Various Locations in Oregon 020 493,000 Improve Runway Safety Area (Bandon State - 16/34; Cottage Grove State - 15/33; Lebanon State - 16/34), Rehabilitate Apron (Seaside Municipal), Rehabilitate Runway (Albany Municipal - 16/34; Astoria Regional - 13/31; Lebanon State ­16/34; McMinnville Municipal - 04/22; Scappoose Industrial Airpark - 15/33; Seaside Municipal - 16/34; Tillamook - 13/31), Rehabilitate Taxiway (Portland-Mulino; Seaside Municipal; Tillamook), Update Airport Master Plan Study (Seaside Municipal)

State Total: 31 Grants 38,945,689

NM SEA WA Anacortes GA 012 1,369,963 Install Perimeter Fencing, Remove Obstructions

Arlington Municipal GA 014 1,738,087 Construct Apron, Construct Taxiway, Extend Taxiway

Bellingham International P 034 1,391,077 Acquire Handicap Passenger Lift Device, Rehabilitate Taxiway [2/2]

035 404,442 Modify Terminal Building

Boeing Field/King County International P 030 100,000 Conduct Miscellaneous Study

031 3,219,005 Rehabilitate Runway - 13R/31L, Rehabilitate Taxiway

Bremerton National GA 017 150,000 Acquire Snow Removal Equipment

Chehalis-Centralia GA 007 547,470 Construct Access Road, Construct Taxiway, Rehabilitate Runway - 15/33

Deer Park GA 014 235,355 Install Runway Vertical/Visual Guidance System - 16/34, Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate Taxiway

Ephrata Municipal GA 006 211,750 Rehabilitate Apron [Crack sealing pavement maintenance], Rehabilitate Runway

Selection Criteria Year: 2005

Page 56 of 98

Page 57: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NM SEA WA 006 [3/3] - 11/29

Grant County International CS 030 1,033,590 Acquire Snow Removal Equipment

Jefferson County International GA 008 1,685,352 Construct Taxiway, Construct Taxiway, Construct Taxiway

Lopez Island GA 008 465,500 Acquire Land for Development, Acquire Land for Development

Othello Municipal GA 002 30,934 Construct Taxiway, Install Perimeter Fencing, Install Runway Lighting - 07/25, Remove Obstructions

Pangborn Memorial P 025 3,148,876 Extend Runway - 12/30, Extend Runway - 12/30

Pullman/Moscow Regional P 024 485,000 Conduct Airport Master Plan Study

025 1,251,978 Acquire Safety Equipment, Construct Apron, Construct Apron

026 1,414,480 Improve Runway Safety Area [B-II to C-III] - 05/23, Install Weather Reporting

Quillayute GA 004 89,300Equipment Install Perimeter Fencing [Phase 1]

Renton Municipal R 015 150,000 Update Airport Master Plan Study

Richland GA 014 93,575 Conduct Airport Master Plan Study

Seattle-Tacoma International P 089 2,446,000 Noise Mitigation Measures for Residences within 70 - 74 DNL [Directional insulation for 3rd runway], Noise Mitigation Measures for Residences within 70 - 74 DNL [Multi-residences -- Pinebrook]

090 25,529,584 Construct Runway [Phase 10] - Plan-1

091 4,000,000 Improve Runway Safety Area [Runway 16L/34R safety area Phase 3] - 16R/34L

092 2,000,000 Install Runway Vertical/Visual Guidance System [Install bridge structure for ALSF, design and construction (Phase 1)] - Plan-1

093 3,352,000 Noise Mitigation Measures for Residences within 70 - 74 DNL [Tyee mobile]

094 4,471,000 Noise Mitigation Measures for Residences within 65 - 69 DNL

095 1,500,000 Rehabilitate Runway - 16R/34L

096 5,340,056 Noise Mitigation Measures for Residences within 70 - 74 DNL

Skagit Regional GA 012 144,031 Conduct Airport Master Plan Study

Snohomish County (Paine Field) R 040 2,437,500 Construct Apron, Construct Apron, Construct Apron

Spokane International P 035 8,723,222 Extend Taxiway, Extend Taxiway

State of Washington 004 23,799 Conduct State System Plan Study

Tacoma Narrows GA 009 3,000,000 Improve Runway Safety Area - 17/35

Tri-Cities P 028 3,786,373 Acquire Equipment [ADA passenger ramp], Construct Aircraft Rescue & Fire Fighting Building, Rehabilitate Runway [and 3L-21R intersection] - 12/30

Selection Criteria Year: 2005

Page 57 of 98

Page 58: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

NM SEA WA Various Locations in Washington

Walla Walla Regional

005

006

021P

302,616

1,891,946

1,826,487

Update Airport Master Plan Study (Davenport; Ione Municipal; Lake Chelan; Packwood; Sunnyside Municipal; Vashon Municipal) Install Miscellaneous NAVAIDS (Sanderson Field), Rehabilitate Apron (Anderson Field; Grand Coulee Dam; Sanderson Field), Rehabilitate Runway (Anderson Field ­07/25; Grand Coulee Dam - 03/21), Rehabilitate Taxiway (Anderson Field; Grand Coulee Dam) Acquire Land For Approaches, Install Emergency Generator, Install Miscellaneous NAVAIDS

William R Fairchild International 022P 970,589 Conduct Miscellaneous Study [(Part 139 Sign Plan)], Rehabilitate Apron, Rehabilitate Runway Lighting [(Phase 2)] - 08/26, Remove Obstructions, Update Airport Master Plan Study

State Total: 39 Grants 90,960,937

ADO Total: 95 Grants 159,957,252

Region Total: 1267 Grants 351,206,809

Report Total: 2099 Grants 3,549,617,470

SO ATL GA Athens/Ben Epps

Augusta Regional at Bush Field

020

028

CS

P

1,000,000

1,595,000

Construct Access Road, Construct Aircraft Rescue & Fire Fighting Building [phase ii], Rehabilitate Apron, Update Miscellaneous Study Expand Terminal Building [Construction], Rehabilitate Apron

Brunswick Golden Isles

Cobb County-McCollum Field

022

021

P

R

142,500

209,855

Acquire Aircraft Rescue & Fire Fighting Vehicle [Bid Package Planning], Acquire Equipment [Bid Package Planning], Install Miscellaneous NAVAIDS, Rehabilitate Apron [Design/Planning] Rehabilitate Runway - 09/27

Columbus Metropolitan 026

027

P 2,089,000

316,065

Construct Taxiway [Phase 1 - Relocate twy "C" site prep], Improve Runway Safety Area [Phase 1 - all improvements except relocation of Navaids] - 06/24 Construct Taxiway [Phase 2 - Relocate twy "C"]

Daniel Field

Dekalb-Peachtree

011

031

GA

R

165,630

738,075

Install Perimeter Fencing [Terminal and ramp areas, security lighting], Rehabilitate Parking Lot, Rehabilitate Runway [Crack seal Runway 05/23, parallel taxiway, and apron] - 05/23 Rehabilitate Taxiway, Rehabilitate Taxiway

Fitzgerald Municipal 004GA 68,400 Extend Runway [Design Only] - 01/19

Greene County Regional 001GA 1,500,000 Extend Runway [Land acquisition] - 06/24

Hartsfield - Jackson Atlanta International 067P 24,100,000 Acquire Land for Noise Compatibility within 70 - 74 DNL

Selection Criteria Year: 2005

Page 58 of 98

Page 59: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

SO

Region

ATL GA

ADO State Worksite

Heart of Georgia Regional

Herbert Smart Downtown

Lee Gilmer Memorial

Malcolm McKinnon

Middle Georgia Regional

Paulding County (New)

Roosevelt Memorial

Savannah/Hilton Head International

Southwest Georgia Regional

St Marys

Toccoa - R G LeTourneau Field

Valdosta Regional

Various Locations in Georgia

Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

068 6,368,300 Construct Runway - Plan-1

069 14,000,000 Extend Runway - 10/28

070 8,434,601 Construct Runway [I-285 bridge structures and paving] - Plan-1

GA 003 479,182 Acquire Land for Development

GA 005 251,720 Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Lighting

R 011 450,000 Construct Taxiway [MY funds 2005-2007]

GA 013 150,000 Light Obstructions [Construction]

P 020

002

427,530

2,360,577

Acquire Equipment, Improve Airport Drainage [Design], Improve Runway Safety Area [Planning/Design] - 05/23, Rehabilitate Terminal Building [Phase II, Construction] Construct New Airport [Environmental Mitigation and Clearing/Drainage Phase I]

GA 004 36,625 Conduct Environmental Study

P

P

GA

040

025

003

9,961,388

1,969,735

321,767

Construct Taxiway [Construction Phase II, Twy C1 and Roadway R1], Expand Terminal Building [Terminal Construction Ph 1, Terminal Apron Expansion Design Only], Expand Terminal Building [Terminal Construction Ph 2], Expand Terminal Building [Terminal Construction Ph 3], Rehabilitate Runway Lighting [Rehab and Expand Airfield Electrical Vault Construction] - 09/27, Rehabilitate Taxiway Construct Access Road [Air Cargo Access Road, Phase II], Construct Aircraft Rescue & Fire Fighting Building [Design & Construct], Rehabilitate Apron, Widen Taxiway [Design only] Conduct Environmental Study, Conduct Environmental Study

GA 010 627,000 Extend Runway [Final Phase]

P 021 2,448,940 Extend Runway - 17/35

005 20,977,100 Acquire Land For Approaches (Berrien County; Claxton-Evans County; Dalton Municipal; Gilmer County; Greene County Regional; Habersham County; La Grange-Callaway; Monroe-Walton County; Moultrie Municipal; Thomasville Regional; Turner County), Acquire Land for Development (Dawson Municipal; Heart of Georgia Regional; Wrens Memorial), Conduct Environmental Study (Franklin County; Kaolin Field; La Grange-Callaway; Polk County Airport- Cornelius Moore Field; Swinton Smith Field at Reidsville Municipal), Construct Apron (Butler Municipal; Covington Municipal; Louisville Municipal), Construct Fuel Farm (Callaway Gardens-Harris County), Construct Runway (Cochran - Plan-1; Franklin County - 08/26), Construct Taxiway (Bacon County; Cartersville; Cherokee County; Cook County; Donalsonville Municipal; Habersham County; Kaolin Field; Millen; Perry-Houston County; Plantation

Selection Criteria Year: 2005

Page 59 of 98

Page 60: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite

SO ATL GA

Winder-Barrow

Wright AAF (Fort Stewart)

State Total:

SO ATL NC Albert J Ellis

Asheville Regional

Charlotte/Douglas International

Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

GA

005

014 500,000

Airpark; Statesboro-Bulloch County; Waycross-Ware County), Expand Apron (Blairsville; Elbert County-Patz Field; Kaolin Field; Pickens County; Thomson-McDuffie County; Tom B. David Field), Extend Runway (Camilla-Mitchell County ­08/26; Clayton County - Tara Field - 06/24; Hazlehurst - 14/32; Jackson County ­16/34; La Grange-Callaway - 13/31; Metter Municipal - 10/28; Quitman Brooks County - 09/27; Swinton Smith Field at Reidsville Municipal - 11/29; Thomaston-Upson County - 12/30), Improve Airport Drainage (Souther Field), Improve Runway Safety Area (Telfair-Wheeler - 03/21), Install Perimeter Fencing (Bacon County; Baxley Municipal; Cartersville; Donalsonville Municipal; Douglas Municipal; Emanuel County; Henry Tift Myers; Homerville), Install Runway Lighting (Dr. C P Savage Sr. ­18/36; Vidalia Regional - 06/24; West Georgia Regional - O V Gray Field - 17/35), Install Taxiway Lighting (Elbert County-Patz Field), Install Weather Reporting Equipment (Barwick Lafayette; Dr. C P Savage Sr.), Rehabilitate Apron (Baldwin County; Griffin-Spalding County; Tom B. David Field), Rehabilitate Runway (Burke County - 08/26; Cairo-Grady County - 12/30; Callaway Gardens-Harris County ­09/27; Crisp County-Cordele - 10/28; Newnan Coweta County - 14/32; Polk County Airport- Cornelius Moore Field - 10/28), Rehabilitate Runway Lighting (Donalsonville Municipal - 18/36; Jekyll Island - 18/36; Plantation Airpark - 05/23; Turner County ­16/34), Rehabilitate Taxiway (Griffin-Spalding County; Richard B Russell), Rehabilitate Taxiway Lighting (Jekyll Island), Remove Obstructions (Camilla-Mitchell County; Claxton-Evans County; Early County; Emanuel County; Homerville), Strengthen Runway (Millen - 17/35; W H 'Bud' Barron - 02/20), Strengthen Taxiway (Decatur County Industrial Air Park), Update Airport Master Plan Study (Cuthbert-Randolph; Turner County), Widen Runway (Barwick Lafayette - 02/20; Cuthbert-Randolph - 18/36; Madison Municipal - 14/32) Acquire Land For Approaches

GA 002 2,552,269 Install Taxiway Lighting, Rehabilitate Runway - 06L/24R, Rehabilitate Runway Lighting - 06L/24R, Rehabilitate Taxiway

29 Grants 104,241,259

P 025 521,525 Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Handicap Passenger Lift Device, Improve Terminal Building [Design], Remove Obstructions, Security Enhancements

P 030 836,729 Expand Apron

P 052 15,089,210 Construct Runway [Phase VI, Master Plan Land Acquisition] - 18L/36R, Construct Taxiway, Expand Apron

Selection Criteria Year: 2005

Page 60 of 98

Page 61: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

SO ATL NC 053 4,875,000 Improve Runway Safety Area [18L, Installation of Engineered Material Arresting System (EMAS), Phase I] - 18L/36R

Craven County Regional P 025 810,825 Acquire Friction Measuring Equipment, Improve Airport Drainage [planning], Rehabilitate Taxiway, Update Airport Master Plan Study

Fayetteville Regional/Grannis Field

Hickory Regional

P

GA

030

020

3,039,226

888,000

Conduct Miscellaneous Study, Improve Terminal Building [Phase III, Design and Construction], Rehabilitate Access Road, Rehabilitate Airport Beacons Construct Taxiway [SHORT FORM EA], Rehabilitate Runway [Phase II] - 06/24,

North Carolina State Block Grant Program 030 23,205,984Rehabilitate Runway Lighting [CONSTRUCTION OF HIRLs] - 06/24 Non primary development projects in state block grant program - GA

Piedmont Triad International P 044 11,076,243 Construct Runway [Phase IV] - Plan-1

046 1,672,000 Rehabilitate Apron [South Apron], Rehabilitate Apron [West apron]

Pitt-Greenville P 028 1,282,500 Acquire Friction Measuring Equipment, Construct Taxiway [Relocate Taxiway A (includes construction of Taxiway A2)], Construct Taxiway

Raleigh-Durham International P 032 6,227,793 Construct Taxiway [Phase II], Construct Taxiway [Phase III], Expand Apron [Phase II], Expand Apron [Phase III]

033 7,229,652 Improve Runway Safety Area [Phase II] - 05R/23L

Wilmington International P 034 1,863,602 Expand Apron, Improve Airport Drainage

035 1,000,000 Improve Runway Safety Area - 17/35

State Total: 15 Grants 79,618,289

SO ATL SC Allendale County GA 009 137,004 Construct Taxiway [phase II]

Anderson Regional GA 014 2,931,000 Extend Runway [Phase III (relocation of MALSR, Glideslope, and PAPIs ­Construction; Paving; Marking; and Lighting)] - 05/23

Bamberg County GA 003 79,500 Construct Taxiway [phase II]

Beaufort County GA 008 1,168,088 Construct Taxiway [construct partial parallel taxiway], Rehabilitate Apron

Berkeley County GA 013 150,000 Extend Taxiway [ea/ design]

Charleston AFB/International P 025 111,575 Security Enhancements

Charleston Executive

Cheraw Municipal/Lynch Bellinger Field

GA

GA

010

006

3,095,023

126,713

Expand Apron, Rehabilitate Runway, Rehabilitate Taxiway [Reconstruction of Taxiway E/W Section 1] Install Perimeter Fencing

Columbia Metropolitan P 029 5,998,940 Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Perimeter Fencing, Modify Terminal Building, Rehabilitate Apron [Phase II Construction], Rehabilitate Apron [Phase III Construction], Rehabilitate Apron [Phase III Construction], Rehabilitate Taxiway [taxiway U]

Selection Criteria Year: 2005

Page 61 of 98

Page 62: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

SO ATL SC Conway-Horry County GA 013 300,000 Install Perimeter Fencing [Construction]

Darlington County Jetport GA 006 888,296 Extend Runway, Modify Access Road

Donaldson Center GA 014 1,481,501 Acquire Land for Development [(552 Perimeter Road - 6.14 acres)]

East Cooper GA 008 149,649 Install Weather Reporting Equipment

Fairfield County GA 009 276,336 Extend Runway - 04/22

Florence Regional P 023 2,898,336 Acquire Handicap Passenger Lift Device, Rehabilitate Apron, Rehabilitate Runway

Georgetown County GA 008 1,597,165 Conduct Environmental Study, Expand Apron, Improve Access Road, Install Apron Lighting, Install Miscellaneous NAVAIDS [Rotating Beacon], Rehabilitate Runway

Grand Strand GA 011 205,000Lighting [Vault-includes utility relocation] - 05/23 Install Airfield Guidance Signs

Greenville Spartanburg International P 037 3,726,847 Construct Access Road [Phase II], Expand Access Road, Improve Utilities

Greenwood County GA 007 337,902 Rehabilitate Taxiway

Hartsville Regional GA 008 227,640 Acquire Land For Approaches, Update Airport Master Plan Study

Lancaster County-Mc Whirter Field GA 009 300,000 Install Weather Reporting Equipment [Install AWOS Facility]

Lee County GA 003 558,400 Extend Runway - 05/23

Marlboro County Jetport - H.E. Avent Field GA 006 51,339 Conduct Airport Master Plan Study, Rehabilitate Runway - 06/24

Myrtle Beach International P 033 3,575,138 Construct Access Road, Construct Apron, Construct Terminal Building

034 340,251 Conduct Miscellaneous Study

035 1,284,800 Acquire Snow Removal Equipment, Rehabilitate Taxiway [taxiway J]

New 001 350,000 Construct New Airport [project formulation]

Newberry County GA 005 125,000 Construct Fuel Farm

Oconee County Regional GA 014 115,900 Update Airport Master Plan Study

Orangeburg Municipal GA 013 660,000 Construct Building, Expand Apron

Pageland GA 003 300,000 Acquire Land for Development [initial land acq (additional parcels necessary)]

Ridgeland GA 004 50,000 Rehabilitate Runway - 03/21, Rehabilitate Runway Lighting - 03/21

Robert F Swinnie GA 004 150,000 Remove Obstructions

Rock Hill/York County/Bryant Field R 017 294,708 Expand Apron

Saluda County GA 003 309,733 Rehabilitate Runway

St George GA 004 725,319 Rehabilitate Apron, Rehabilitate Runway - 05/23

Sumter GA 009 300,000 Rehabilitate Runway [phase ii] - 05/23

Selection Criteria Year: 2005

Page 62 of 98

Page 63: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

SO ATL SC Various Locations in South Carolina

SO JAN

ADO Total:

State Total:

AL

Williamsburg Regional

Andalusia-Opp

Ashland/Lineville

Atmore Municipal

Auburn-Opelika Robert G. Pitts

Autauga County

Bay Minette Municipal

Bessemer

Bibb County

Birmingham International

Blackwell Field

Carl Folsom

Demopolis Municipal

Selection Criteria Year: 2005

FY 2005

Service Level

Grant Seq Number

007

008

GA

40 Grants

84 Grants

007

GA 009

GA

GA

GA

GA

GA

001

003

017

009

005

R

GA

P

GA

GA

GA

009

002

059

060

061

006

001

006

AIP FederalFunds

1,016,631

455,200

82,270

36,931,204

220,790,752

3,509,721

314,602

1,233,149

131,348

242,004

113,947

1,728,512

1,053,572

4,542,671

4,000,000

11,088,000

1,883,094

372,080

300,000

Report Date 02/23/2006

Brief Description Of Work

Install Weather Reporting Equipment (Aiken Municipal; Barnwell County; BeaufortCounty; Berkeley County; Charleston Executive; Cheraw Municipal/Lynch BellingerField; Conway-Horry County; Donaldson Center; East Cooper; Fairfield County;Georgetown County; Hartsville Regional; Laurens County; Lowcountry Regional;Marlboro County Jetport - H.E. Avent Field; Newberry County; Pickens County;Spartanburg Downtown Memorial; Summerville; Sumter; Williamsburg Regional;Woodward Field)Construct Building (Marion County), Construct Taxiway (Marion County), InstallMiscellaneous NAVAIDS (Marion County), Install Runway Vertical/Visual GuidanceSystem (Marion County - 04/22), Rehabilitate Apron (Marion County), RehabilitateRunway Lighting (Marion County - 04/22), Remove Obstructions (Marion County),Update Airport Master Plan Study (Marion County)Construct Taxiway [Design]

Construct Apron [Construct North Apron and Connector Taxiway], Extend Runway[Environmental Assessment] - 11/29, Improve Runway Safety Area - 11/29,Rehabilitate Runway - 11/29Acquire Land For Approaches

Construct Apron

Construct Apron [Site Prep(Phase 1)]

Conduct Miscellaneous Study, Construct Fuel Farm, Expand Apron

Construct Building [Phase -1 Design Only of Hangar unit and associated grading.],Construct Fuel Farm, Update Airport Master Plan StudyExtend Runway - 05/23

Rehabilitate Runway - 10/28

Construct Access Road, Construct Apron

Acquire Land for Noise Compatibility within 65 - 69 DNL

Remove Obstructions

Construct Taxiway [Site prep, & pave]

Acquire Land For Approaches [Acquire protection zone land RW 1/19 Phase 1]

Construct Building

Page 63 of 98

Page 64: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

SO JAN AL Dothan Regional P 025 2,127,150 Improve Runway Safety Area [Install LOC/DME to replace RW14 approach lost due to RSA grading project.] - 14/32, Improve Runway Safety Area [Replace

Folsom Field GA 013 412,539nonfrangible approach lights in RW32 safety area.] - 14/32 Expand Apron, Rehabilitate Runway - 02/20, Rehabilitate Taxiway

Franklin Field GA 001 403,000 Acquire Land For Approaches

Geneva Municipal GA 001 544,551 Acquire Land For Approaches

George Downer GA 003 109,070 Acquire Land For Approaches, Conduct Miscellaneous Study

Gragg-Wade Field GA 003 150,000 Acquire Land For Approaches

Guntersville Municipal - Joe Starnes Field GA 008 1,073,164 Construct Runway - Plan-1

H. L. (Sonny) Callahan GA 008 249,999 Construct Building [Construct Hangar to be leased to State Police]

Headland Municipal GA 006 637,942 Strengthen Runway [Overlay Runway] - 09/27

Huntsville International-Carl T Jones Field P 045 2,781,966 Construct Taxiway, Rehabilitate Apron, Rehabilitate Runway - 18L/36R, Security Enhancements

046 3,396,302 Rehabilitate Terminal Building

047 600,000 Update Airport Master Plan Study

Isbell Field GA 012 285,662 Construct Taxiway, Rehabilitate Taxiway Lighting

Jack Edwards GA 020 226,100 Acquire Land for Development [North side access (10 acres) [Anticipate $100K

Jackson Municipal GA 002 364,138land release funds to go toward this.]] Acquire Land For Approaches, Install Airport Beacons, Install Runway Vertical/Visual Guidance System - 18/36, Rehabilitate Runway Lighting, Remove Obstructions [Remove approach obstructions]

Lanett Municipal GA 002 384,864 Improve Runway Safety Area - 08/26, Remove Obstructions

Lawrence County GA 004 312,550 Conduct Miscellaneous Study, Rehabilitate Taxiway

Mobile Downtown R 016 3,529,383 Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System ­14/32, Install Runway Vertical/Visual Guidance System - 18/36, Rehabilitate

Mobile Regional P 035 4,814,271Runway - 14/32 Acquire Land for Development, Conduct Miscellaneous Study, Expand Service Road [Fuel Farm Road extension construction], Improve Terminal Building [Install Terminal Building Air Handler Units 5, 6 & 7; Install Jet Bridges 1 & 3], Rehabilitate Access Road, Rehabilitate Taxiway [Design Only for TW-A paving and lighting

036 40,000rehab.], Security Enhancements Install Miscellaneous NAVAIDS

Montgomery Regional (Dannelly Field) P 035 2,000,000 Construct Terminal Building

Selection Criteria Year: 2005

Page 64 of 98

Page 65: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

SO JAN AL Moton Field Municipal

New

Posey Field

Richard Arthur Field

Roanoke Municipal

Robbins Field

Russellville Municipal

Scottsboro Municipal-Word Field

Shelby County

St Clair County

St Elmo

Talladega Municipal

The Albertville Municipal-Thomas J Brumlik Field

Troy Municipal

Tuscaloosa Regional

Walker County-Bevill Field

Weedon Field

State Total:

SO JAN MS Belzoni Municipal

Bobby L Chain Municipal

Booneville/Baldwyn

Brookhaven-Lincoln County

Bruce Campbell Field

Calhoun County

Carthage-Leake County

Cleveland Municipal

FY 2005

Service Level

Grant Seq Number

GA 008

GA

GA

003

003

004

GA

GA

GA

GA

R

R

GA

GA

GA

GA

GA

GA

GA

001

003

005

009

011

006

004

012

015

010

019

009

010

012

53 Grants

GA

GA

GA

GA

GA

GA

GA

005

012

006

005

013

003

004

GA 012

AIP Federal Funds

1,000,000

1,516,680

115,028

150,000

452,200

356,667

321,415

184,520

872,538

568,380

450,000

1,150,000

848,856

1,150,000

443,460

87,881

208,317

387,726

65,219,019

130,695

248,730

524,287

229,830

525,949

33,189

313,646

167,405

Report Date 02/23/2006

Brief Description Of Work

Construct Access Road, Expand Apron, Install Perimeter Fencing, RehabilitateRunway Lighting - 13/31Construct Apron, Construct Runway [Paving] - Plan-1, Construct Taxiway

Improve Building

Construct Fuel Farm, Install Runway Vertical/Visual Guidance System - 18/36,Rehabilitate Airport BeaconsAcquire Land For Approaches

Expand Apron

Conduct Miscellaneous Study, Improve Fuel Farm

Acquire Land for Development, Construct Building, Rehabilitate Runway

Rehabilitate Apron, Rehabilitate Runway - 15/33, Rehabilitate Taxiway

Expand Apron

Construct Building [Construct Storage Hangar]

Construct Taxiway

Acquire Equipment, Rehabilitate Runway - 05/23, Rehabilitate Taxiway

Extend Runway [Acquire land Phase 1; Wetland mitigation]

Expand Building

Construct Apron, Improve Airport Drainage, Remove Obstructions

Rehabilitate Runway Lighting - 09/27

Construct Building

Install Perimeter Fencing

Rehabilitate Taxiway

Extend Runway - 15/33

Install Perimeter Fencing, Install Weather Reporting Equipment

Extend Taxiway, Update Airport Master Plan Study

Improve Runway Safety Area - 15/33

Construct Building, Construct Taxiway, Improve Runway Safety Area [Completenorth safety area], Install Perimeter FencingAcquire Land For Approaches, Conduct Environmental Study

Selection Criteria Year: 2005

Page 65 of 98

Page 66: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

SO JAN MS Columbus-Lowndes County GA 008 72,025 Rehabilitate Runway Lighting

Dean Griffin Memorial GA 006 124,204 Rehabilitate Runway Lighting [Replace runway edge lights]

Eupora GA 003 157,795 Install Airport Beacons, Install Miscellaneous NAVAIDS, Install Runway Lighting ­14/32

George M Bryan GA 010 1,818,701 Construct Apron, Construct Taxiway

Golden Triangle Regional P 036 3,680,000 Construct Apron, Rehabilitate Runway - 18/36

Greenwood-Leflore GA 010 259,462 Rehabilitate Runway [Seal Coat] - 18/36, Update Airport Master Plan Study

Grenada Municipal GA 005 247,338 Improve Airport Drainage

Gulfport-Biloxi International P 049 3,798,574 Acquire Easement for Noise Compatibility within 65 - 69 DNL

050 743,801 Install Runway Lighting [Plans & Specifications Only] - 14/32, Rehabilitate Taxiway

051 2,433,032 Acquire Equipment, Acquire Land For Approaches, Acquire Land for Development, Expand Terminal Building [Phase III]

052

053

940,548

14,244

Improve Runway Safety Area [Grade Runway Safety Area] - 14/32, Rehabilitate Runway [Rehabilitate concrete portion of Runway 14/32] - 14/32 Install Guidance Signs [Repair hurricane damaged signs], Rehabilitate Terminal

054 0Building [Design and immediate repairs], Remove Obstructions Rehabilitate Apron

Hardy-Anders Field Natchez-Adams County GA 015 150,000 Construct Building

Hattiesburg-Laurel Regional P 024 935,523 Construct Access Road [Phase I], Environmental Mitigation, Install Apron Lighting [Apron Lighting Upgrade], Rehabilitate Airport Beacons [Rehab Beacon], Security Enhancements [Security Vehicle]

Holly Springs-Marshall County GA 007 138,152 Install Runway Lighting - 18/36, Install Runway Vertical/Visual Guidance System ­18/36

Houston Municipal GA 006 148,907 Construct Taxiway, Remove Obstructions

Indianola Municipal GA 007 127,610 Improve Airport Drainage, Rehabilitate Taxiway

Iuka GA 003 354,292 Strengthen Runway - 18/36

Jackson International P 036 4,840,217 Acquire Interactive Training System, Improve Terminal Building, Rehabilitate Apron,

Jackson-Evers International P 037 395,158Rehabilitate Runway Lighting - 16L/34R Rehabilitate Runway Lighting - 16L/34R

James H Easom Field GA 004 741,755 Acquire Land for Development, Construct Apron, Improve Fuel Farm, Remove

John Bell Williams GA 010 1,822,103 Obstructions [Remove obstructions] Extend Runway [Land Acquisition] - 12/30, Remove Obstructions [Natchez Trace ­Phase I]

Selection Criteria Year: 2005

Page 66 of 98

Page 67: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

SO JAN MS Key Field P 020 442,225 Improve Runway Safety Area - 01/19, Install Airfield Guidance Signs, Rehabilitate Apron, Rehabilitate Terminal Building

Kosciusko-Attala County GA 004 158,206 Install Runway Lighting, Install Runway Vertical/Visual Guidance System

Macon Municipal GA 004 148,420 Improve Access Road

Magee Municipal GA 004 473,396 Expand Access Road, Install Runway Lighting - 18/36, Rehabilitate Runway [Asphalt Overlay]

McCharen Field GA 006 76,659 Install Perimeter Fencing

McComb/Pike County/John E Lewis Field GA 011 217,075 Rehabilitate Apron, Rehabilitate Taxiway [Hangar Taxiways]

Mid Delta Regional CS 022 3,200,000 Extend Taxiway, Rehabilitate Runway Lighting - 18R/36L

New Albany-Union County GA 007 367,153 Rehabilitate Runway, Rehabilitate Taxiway

Okolona Municipal-Richard Stovall Field GA 006 254,023 Construct Building, Improve Runway Safety Area

Olive Branch R 014 600,000 Construct Fuel Farm

Panola County GA 006 174,589 Construct Building, Install Perimeter Fencing, Install Runway Lighting - 01/19

Paul Pittman Memorial GA 006 95,000 Acquire Land For Approaches

Philadelphia Municipal GA 007 594,135 Construct Building

Picayune Municipal GA 012 329,740 Construct Building [New GA Terminal]

Poplarville-Pearl River County

Richton-Perry County

GA

GA

005

005

164,350

240,825

Construct Fuel Farm [Construct Fuel Farm], Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System - 16/34 Construct Building

Roscoe Turner GA 014 1,279,782 Install Runway Lighting, Install Weather Reporting Equipment, Rehabilitate Runway

Ruleville-Drew GA 006 125,931 Improve Access Road [Improve Access Road], Improve Airport Drainage [Drainage

State of Mississippi 002 89,775Improvements], Rehabilitate Airport Beacons [Rehab Airport Beacon] Conduct Miscellaneous Study

003 47,880 Conduct Miscellaneous Study

004 0 No projects assigned.

Stennis International R 019 0 Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Miscellaneous NAVAIDS [Replace damaged visual navaids.], Install Weather Reporting Equipment, Rehabilitate Aircraft Rescue & Fire Fighting Building [Repair hurricane damage to ARFF building.], Rehabilitate Runway Lighting [Replace damaged PAPI, REIL and Distance to go markers.] - 18/36, Rehabilitate Runway Lighting [Replace runway lights] - 18/36, Rehabilitate Taxiway Lighting [Replace Taxiway A edge lights],

Tishomingo County GA 006 134,387 Rehabilitate Taxiway Lighting [Replace Taxiway Signage] Acquire Land For Approaches, Install Perimeter Fencing, Rehabilitate Runway

Selection Criteria Year: 2005

Page 67 of 98

Page 68: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

SO JAN MS 006 Lighting - 17/35

Trent Lott International GA 019 150,000 Construct Building

Tunica Municipal GA 007 450,000 Construct Building [FBO Hangar]

Tupelo Regional P 026 2,809,036 Acquire Interactive Training System, Conduct Noise Compatibility Plan Study, Environmental Mitigation [Air Service Ramp Spill Containment], Expand Terminal Building, Rehabilitate Runway [Marking] - 18/36, Update Airport Master Plan Study

027 1,462,620 Expand Terminal Building

University-Oxford GA 019 692,440 Improve Runway Safety Area, Rehabilitate Runway - 09/27

Water Valley Municipal GA 003 66,795 Improve Access Road, Rehabilitate Airport Beacons

Winona-Montgomery County GA 004 324,793 Expand Apron, Extend Taxiway, Install Runway Vertical/Visual Guidance System ­

Yazoo County GA 006 122,75403/21, Install Taxiway Lighting Install Runway Vertical/Visual Guidance System [Install PAPI's] - 17/35, Install Taxiway Lighting

State Total: 62 Grants 41,409,161

ADO Total: 115 Grants 106,628,180

SO MEM KY Addington Field GA 011 450,000 Construct Building

Barkley Regional P 026 166,820 Rehabilitate Runway [Overlay RW 4/22, 14/32, and TW "A" South Phase 1 -Design]

027 3,902,654- 04/22 Rehabilitate Runway [Overlay 14/32 and TW "A" South Phase 3] - 04/22, Rehabilitate Runway [Overlay 14/32 and TW "A" South Phase 3] - 04/22, Rehabilitate Runway [Overlay RW 4/22 Phase 2] - 04/22

Big Sandy Regional GA 007 35,400 Install Perimeter Fencing

Blue Grass P 036 617,228 Acquire Snow Removal Equipment

037 8,460,393 Construct Taxiway [RW 22 Taxiway Connector Required by RSA Project], Improve Runway Safety Area [Phase 3, RSA Improvement Project] - 04/22, Widen Taxiway

Bowling Green-Warren County Regional GA 017 23,750[Phase 1 of Taxiway Widening and Rehabilitation] Conduct Miscellaneous Study

Bowman Field R 014 150,000 Conduct Miscellaneous Study, Update Airport Master Plan Study [Airport Layout

015 1,759,405Plan Update] Rehabilitate Runway - 14/32

Breckinridge County GA 001 57,000 Update Airport Master Plan Study

Capital City GA 007 4,040,781 Extend Runway [Extend Runway 6-24] - 06/24, Extend Runway [Improve Runway

Selection Criteria Year: 2005

Page 68 of 98

Page 69: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

SO MEM KY

Cincinnati/Northern Kentucky International

Fulton

Gene Snyder

Glasgow Municipal

Grayson County

Henderson City-County

Julian Carroll

Kyle-Oakley Field

Lebanon-Springfield

London-Corbin Airport-Magee Field

Louisville International-Standiford Field

Madison

Madisonville Municipal

Marion-Crittenden County

McCreary County

Middlesboro-Bell County

Morehead-Rowan County

Mount Sterling-Montgomery County

FY 2005

Service Grant Seq Level Number

007

P 050

051

GA 002

GA 007

GA 013

GA 002

GA 014

015

GA 002

GA 014

GA 005

GA 013

P 075

076

GA 008

GA 012

GA 005

GA 004

GA 007

GA 003

004

GA 009

AIP Federal Funds

19,150,137

9,143,225

560,459

77,900

82,650

50,000

275,000

1,028,000

263,632

45,781

49,400

163,970

15,000,000

16,946,436

158,833

52,250

444,987

140,600

145,000

601,580

373,968

561,187

Report Date 02/23/2006

Brief Description Of Work

safety Area 6] - 06/24, Install Perimeter Fencing, Rehabilitate Runway [Install Runway Drainage System] - 06/24 Construct Runway

Noise Mitigation Measures for Public Buildings

Construct Apron

Acquire Land for Development

Acquire Land for Development, Install Perimeter Fencing, Install Weather Reporting Equipment Improve Runway Safety Area - 02/20

Construct Building [Terminal Bldge Construction Phase 1], Construct Building [Terminal Building Construction Phase 2] Widen Runway - 09/27

Construct Fuel Farm

Construct Building [Terminal Building (Design - Phase 1)]

Acquire Land for Development, Install Weather Reporting Equipment [Design]

Construct Building

Acquire Land for Noise Compatibility within 65 - 69 DNL [Continue Implementation of FAA Approved Noise Compatibility program] Acquire Land for Development, Acquire Snow Removal Equipment, Extend Runway - 17R/35L, Extend Runway - 17R/35L, Improve Aircraft Rescue & Fire Fighting Building, Improve Service Road, Rehabilitate Apron, Rehabilitate Runway Lighting ­Plan-1, Rehabilitate Taxiway Expand Apron

Conduct Miscellaneous Study

Install Perimeter Fencing, Install Runway Lighting [Install MITL & conduct 405 survey.] Construct Building

Expand Apron, Improve Airport Drainage, Install Airfield Guidance Signs, Install Perimeter Fencing, Mark Obstructions Construct New Airport [Environmental Mitigation In-lieu payment]

Install Perimeter Fencing

Improve Runway Safety Area - 03/21, Rehabilitate Runway [2nd Year of Multi-Year] - 03/21, Rehabilitate Runway [Multi-year Project] - 03/21, Rehabilitate

Selection Criteria Year: 2005

Page 69 of 98

Page 70: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

FAA - Office Of Airports

Region ADO State Worksite

SO MEM KY

Muhlenberg County

New

Ohio County

Owensboro-Daviess County

Pike County-Hatcher Field

Princeton-Caldwell County

Russellville-Logan County

Samuels Field

Somerset-Pulaski County-J.T. Wilson Field

Stanton

State of Kentucky

Stuart Powell Field

Sturgis Municipal

Tucker-Guthrie Memorial

Wendell H Ford

West Liberty

Williamsburg-Whitley County (New)

State Total:

SO MEM TN Lovell Field

McGhee Tyson

Grants Awarded by FY

FY 2005

Service Grant SeqLevel Number

GA

GA

CS

GA

GA

GA

GA

GA

GA

GA

GA

GA

GA

GA

P

P

009

002

005

004

032

007

004

007

008

013

001

001

011

006

004

009

002

008

50 Grants

034

035

036

037

049

050

AIP FederalFunds

476,950

881,000

233,082

2,500,000

181,562

351,907

342,000

25,000

189,148

47,500

614,604

95,000

130,790

235,921

574,960

274,046

650,000

92,781,896

1,509,453

3,500,000

1,644,768

333,209

308,627

11,305,001

Report Date 02/23/2006

Brief Description Of Work

Taxiway [Taxiway Rehabilitation Assocuated with Runway Rehabilitation]

Construct Building

Construct New Airport

Construct Building [5-unit T-hangar]

Extend Runway - 18/36

Install Runway Vertical/Visual Guidance System - 09/27, Rehabilitate Building

Construct Apron

Construct Taxiway

Construct Building

Install Perimeter Fencing

Conduct Airport Master Plan Study [Conduct Airport Layout Plan]

Conduct State System Plan Study

Acquire Miscellaneous Land

Rehabilitate Runway Lighting

Install Perimeter Fencing

Install Perimeter Fencing

Construct Apron, Construct Taxiway

Acquire Land for Development

Construct Aircraft Rescue & Fire Fighting Building, Construct Taxiway, Update Airport Master Plan Study Rehabilitate Runway [Construct Electrical Vault] - 15/33, Rehabilitate Runway [Rehab RW 15-33] - 15/33, Rehabilitate Runway [Rehab TW J, Z and a portion of TW D] - 15/33 Construct Aircraft Rescue & Fire Fighting Building [Phase 1 Connectivity.], Rehabilitate Taxiway Construct Aircraft Rescue & Fire Fighting Building [Connectivity], Construct Aircraft Rescue & Fire Fighting Building, Rehabilitate Taxiway Acquire Emergency Generator, Acquire Equipment [Runway Sweeper], Acquire Snow Removal Equipment, Install Miscellaneous NAVAIDS Construct Apron [Service Road (West AV), Service Road (Snow Rem Bldg),

Selection Criteria Year: 2005

Page 70 of 98

Page 71: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

SO MEM TN 050

McKellar-Sipes Regional 015CS

Memphis International 066

067

P

Nashville International 074

075

P

076

Tennessee State Block Grant Program

Tri-Cities Regional TN/VA

022

023

024

025

042P

State Total: 17 Grants

ADO Total: 67 Grants

SO ORL FL Albert Whitted

Apalachicola Municipal

Avon Park Municipal

Boca Raton

013

002

012

009

R

GA

GA

R

AIP FederalFunds

1,951,590

6,149,000

22,639,370

926,250

3,711,334

1,472,968

13,911,096

750,000

2,093,950

1,845,000

1,120,014

75,171,630

167,953,526

375,200

61,000

94,850

247,000

Report Date 02/23/2006

Brief Description Of Work

Taxiway D and Apron Site Prep Ph. 3], Construct Apron [Service Road (West AV), Service Road (Snow Rem Bldg), Taxiway D and Apron, PH 4], Construct Apron [Service Road (West AV), Service Road (Snow Rem. Bldg), Taxiway Site Prep and Apron, Phase 2], Construct Apron [West Aviation Development - Final Phase] Acquire Equipment [Acquire ATCT Equipment], Construct Access Road, Expand Terminal Building Rehabilitate Runway

Acquire Snow Removal Equipment [Snow Broom], Construct Aircraft Rescue & Fire Fighting Building [Construct ARFF Phase 2], Construct Apron [Cargo Ramp], Construct Taxiway [TWY Victor Reimb.], Extend Taxiway [Taxiway Papa Extension], Improve Airport Drainage, Improve Service Road [Widen North Service Road], Update Airport Master Plan Study [GIS Applications for 3DALP], Widen Runway [Phase 1 - Design] - 18C/36C Expand Aircraft Rescue & Fire Fighting Building

Conduct Miscellaneous Study [Exhibit A Property Map], Rehabilitate Taxiway [Rehabilitation of Taxiway T-6 at Terminal Ramp], Rehabilitate Taxiway [Rehabiltation of Taxiway T-6 at Juliet & Lima] Extend Runway Safety Area [Phase 1, Engineering Report & design 02L/20R & 02R/20L] - 02L/20R Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Acquire Land For Approaches, Improve Runway Safety Area - 05/23, Improve Terminal Building, Rehabilitate Parking Lot, Rehabilitate Runway Lighting - 05/23, Update Airport Master Plan Study

Install Airfield Guidance Signs [Install Airfield Guidance Signs]

Update Airport Master Plan Study

Rehabilitate Runway [Rehabilitate Runway 9/27-PHI (Design)] - 09/27

Conduct Noise Compatibility Plan Study

Selection Criteria Year: 2005

Page 71 of 98

Page 72: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite

SO ORL FL Cecil Field

Charlotte County

Craig Municipal

Crystal River

Daytona Beach International

DeLand Municipal-Sidney H Taylor Field

Defuniak Springs

Eglin AFB

Fernandina Beach Municipal

Fort Lauderdale Executive

Fort Lauderdale/Hollywood International

Gainesville Regional

Herlong

Hernando County

Jacksonville International

Kay Larkin

Key West International

Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

R 007 3,153,730 Improve Airport Drainage [Phase 1], Rehabilitate Building [Rehabilitate Buildings 82 (Air Traffic Control Tower), 313, 312, and Fireloop, Demolish Building 214], Rehabilitate Taxiway Lighting [B, C, D], Remove Obstructions [Demolish Refuelers]

GA 020 190,039 Update Airport Master Plan Study

R 016 150,000 Construct Taxiway [Construct Portion of Taxiway A-3]

GA 002 149,269 Update Airport Master Plan Study [Update Master Plan and ALP]

P 047 6,270,000 Expand Terminal Building

048 3,703,726 Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire Aircraft Rescue Fire Fighting Venicle], Construct Service Road [Construct Perimeter Road-PH3], Install Miscellaneous NAVAIDS [Relocate wind cones], Install Runway Lighting - 07L/25R, Rehabilitate Runway - 07L/25R, Remove Obstructions [Remove Obstructions]

R 015 123,500 Extend Taxiway [Extend and Light Taxiway D (design)], Install Guidance Signs [Install Airfield Signage (for both Runways and Taxiways (design phase))]

GA 002 675,627 Construct Taxiway [Construct Parallel Taxiway (Phase 2)]

P 016 2,231,671 Expand Terminal Building [(Phase 5)]

R 015 152,883 Construct Access Road [Construct Access Road (east terminal area)]

R 021 764,914 Extend Taxiway [(relocate Taxiway A-design)], Rehabilitate Runway [(design)] ­13/31

P 048 8,353,985 Construct Taxiway [Construct Taxiway C], Security Enhancements [Security Enhancements]

049 838,732 Conduct Noise Compatibility Plan Study [Conduct Part 150]

P 022 3,677,853 Improve Terminal Building [Phase 2]

R 011 149,961 Update Airport Master Plan Study [Update Airport Maxter Plan/Airport Layout Plan]

GA 014 519,831 Install Apron Lighting, Install Perimeter Fencing

P 040 5,961,543 Rehabilitate Apron, Rehabilitate Taxiway

GA 013 1,296,470 Improve Runway Safety Area - 17/35, Install Airfield Guidance Signs, Install Perimeter Fencing, Install Taxiway Lighting [(Taxiways C&D, Medium Intensity Taxiway Lighting)], Rehabilitate Runway Lighting [High Intensity Runway Lighting] ­17/35, Rehabilitate Taxiway [A], Rehabilitate Taxiway Lighting [Medium Intensity Taxiway Lighting]

P 027 4,089,835 Conduct Miscellaneous Study [Develop Wildlife Plan], Conduct Noise Compatibility Plan Study [Noise Contour Updae], Noise Mitigation Measures for Residences within 70 - 74 DNL [Part 150-Noise Mitigation, 50 homes, Phase 4 (Construction), Part 150­Noise Mitigation, 50 homes, Phase 5 (Design)]

Selection Criteria Year: 2005

Page 72 of 98

Page 73: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

SO ORL FL Keystone Airpark GA 015 157,888 Install Perimeter Fencing

Kissimmee Gateway R 027 608,340 Install Runway Vertical/Visual Guidance System [(precision approach path indicator, Runway 15/33 and Runway 6/24)] - 06/24, Remove Obstructions [(Runway 15/33, Phase 2 (construction))], Widen Taxiway [(holdbay-Runway 6

Lake City Municipal GA 015 161,270end)] Rehabilitate Runway [(portions of Runways 5/23 and 28)] - 05/23

Lakeland Linder Regional R 027 3,882,952 Rehabilitate Runway [Rehabilitate Runway 5/23] - 05/23

Leesburg Regional GA 013 331,288 Conduct Environmental Study [Environmental Study (Extend RW 13/31)]

Melbourne International P 029 1,634,950 Acquire Equipment [(Aircraft Loading Bridge)], Rehabilitate Apron [(Reseal Terminal Apron)], Rehabilitate Taxiway [(Overlay Taxiways K and Q)], Security Enhancements

Merritt Island GA 014 692,550 Install Guidance Signs, Install Miscellaneous NAVAIDS [(precision approach path indicator (PAPI-2)both ends of runway)], Rehabilitate Runway Lighting - 11/29,

Miami International P 049 8,000,000Rehabilitate Taxiway Lighting Construct Runway [Construct Runway 8L/26R (LOI)] - 08L/26R

050 1,464,319 Security Enhancements [Acquire Security Equipment (Concourse J-Access Control)]

051 9,551,609 Rehabilitate Runway [Rehabilitate Runway 9/27] - 09/27

Naples Municipal CS 023 1,897,538 Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire Aircraft Rescue & Fire

New Smyrna Beach Municipal R 010 1,176,100Fighting Vehicle], Install Runway Lighting - 14/32 Install Taxiway Lighting [(medium intensity taxiway lights, Taxiway B and C)], Install Weather Reporting Equipment, Rehabilitate Runway Lighting - 06/24

North Palm Beach County General Aviation R 012 885,000 Conduct Environmental Study [Conduct Environmental Assessment, Runway 13/31]

Ocala International-Jim Taylor Field GA 019 2,088,130 Construct Runway Safety Area - 18/36, Extend Taxiway, Rehabilitate Taxiway

Okeechobee County GA 013 124,472 Install Apron Lighting [Install Apron Lighting, Phase 2], Install Perimeter Fencing [Install Perimeter Fencing]

Orlando International P 088 2,000,000 Construct Taxiway [(North Crossfield)]

089 3,000,000 Environmental Mitigation [(removal of remnant wetlands, Phase 1)]

090 5,360,000 Construct Runway [Construct Runway 17L/35R] - 17L/35R

091 3,725,758 Rehabilitate Terminal Building [(airside 1 & 3, BP-370)]

Orlando Sanford P 048 1,779,777 Conduct Noise Compatibility Plan Study [(Noise Exposure Map Update)], Construct Apron [Construct New Apron (Northside)]

049 2,737,542 Extend Runway [Design] - 09R/27L, Rehabilitate Runway [Rehab Runway 9C/27C] - 09C/27C

Selection Criteria Year: 2005

Page 73 of 98

Page 74: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

SO ORL FL Ormond Beach Municipal R 010 219,989 Construct Taxiway [(T-Hangar Taxilanes)], Improve Airport Miscellaneous Improvements [(Install Infrastructure for T-Hangar Development)], Install Airfield Guidance Signs, Rehabilitate Runway [Mark Runway 17/35] - 17/35, Rehabilitate Runway [Mark Runway 8/26] - 08/26

Page Field GA 012 150,000 Construct Taxiway [("D"-Design)], Extend Taxiway [("C"- Design)]

013 4,124,680 Construct Taxiway ["D"], Extend Taxiway ["C"]

Palm Beach International P 044 1,602,767 Construct Building [Construct Emergency Operation Center (EOCC)], Install Runway Vertical/Visual Guidance System [Install Runway End Identification Lights] ­09R/27L

Panama City-Bay County International P 035 2,699,975 Conduct Environmental Study [Conduct EIS PH5 (BCA, Forecast Study, Airspace)]

036 775,057 Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire ARFF Truck], Acquire

Pensacola Regional P 033 14,985,858Equipment [(sweeper truck)], Acquire Handicap Passenger Lift Device Rehabilitate Runway - 17/35

Perry-Foley GA 005 189,794 Construct Building [(design only, 10 unit T-Hangar)], Install Weather Reporting Equipment [(Automated Weather Observing System (AWOS))]

Peter Prince Field GA 008 766,109 Construct Taxiway [Construct Taxiway], Improve Runway Safety Area [Improve RSA Runway 18] - 18

Plant City Municipal GA 005 388,200 Install Airfield Guidance Signs, Rehabilitate Apron [Overlay West Ramp]

Quincy Municipal GA 002 87,476 Update Airport Master Plan Study

Sarasota/Bradenton International P 038 3,422,959 Construct Service Road [(North Quad Serivce Road/Access, Phase 1 - Design)], Construct Taxiway [(T-Hangar Phase 3 Area)], Expand Terminal Building [(Federal Inspection Station in Concourse B)], Improve Airport Drainage, Rehabilitate Runway

Southwest Florida International P 035 4,000,000[(Phase 1 - Design)] - 14/32 Construct Apron [Construct Apron-Airfield Site Prep]

036 1,588,058 Construct Terminal Building [Construct New Terminal Building (Midfield)], Install Apron Lighting [Install Apron Lighting], Install Guidance Signs [Install Guidance

037 10,833,899Signs] Rehabilitate Runway [Rehab Runway 6/24] - 06/24

038 6,961,434 Rehabilitate Runway - 06/24

St Lucie County International GA 025 919,498 Construct Runway [Design Parallel Runway 9L/27R] - Plan-1, Rehabilitate Runway

St Petersburg-Clearwater International P 031 14,273,418Lighting - 09/27 Extend Runway [(Phase 2-Construction)] - 17L/35R, Improve Terminal Building

State of Florida 004 2,000,000[(Phase 1-Planning & Design)and Rehabilitate], Security Enhancements [(Part 1542)] Conduct State System Plan Study

Suwannee County GA 005 76,038 Rehabilitate Runway [Rehab Runway 7/25] - 07/25

Selection Criteria Year: 2005

Page 74 of 98

Page 75: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

FAA - Office Of Airports

Region ADO State Worksite

SO ORL FL Tallahassee Regional

Tampa International

The Florida Keys Marathon

Venice Municipal

Wauchula Municipal

Williston Municipal

Winter Haven's Gilbert

Witham Field

State Total:

SO ORL PR

State Total:

Antonio Rivera Rodriguez

Commonwealth of Puerto Rico

Eugenio Maria De Hostos

Fernando Luis Ribas Dominicci

Luis Munoz Marin International

Mercedita

Rafael Hernandez

SO ORL VI

State Total:

Cyril E King

Selection Criteria Year: 2005

Grants Awarded by FY

FY 2005

Service Level

Grant Seq Number

AIP Federal Funds

P

P

030

045

7,293,366

6,241,900

GA 021 112,438

R

GA

GA

010

006

007

333,545

71,967

213,860

GA 017 311,183

GA 010 2,416,805

72 Grants 181,551,375

P

P

CS

P

CS

P

7 Grants

014

004

012

004

041

014

018

2,284,808

193,952

124,868

180,752

184,821

1,220,476

186,773

193,166

P

1 Grants

024

7,007,588

7,007,588

Report Date 02/23/2006

Brief Description Of Work

Construct Access Road [(Terminal)], Construct Apron [(Air Cargo)]

Construct Taxiway [Construct New High Speed Taxiway, Design/Construct],Construct Taxiway [Construct Taxiway A, Phase 1, Design/Construct], ConstructTaxiway [Construct Taxiway D, Phase 1, Design], Construct Taxiway [ConstructTaxiway E, Phase 1, Design], Construct Taxiway [W]Acquire Emergency Generator [Acquire Generator (Airport Beacon)], ConstructApron [(General Aviation, Design Only)], Improve Terminal Building [RehabilitateTerminal (Canopy, Phase 2)], Rehabilitate Apron [(General Aviation, Design Only)]Conduct Airport Master Plan Study

Update Airport Master Plan Study [Update MP/ALP]

Install Airfield Guidance Signs, Install Runway Lighting [High Intensity RunwayLights] - 05/23, Install Runway Vertical/Visual Guidance System [PrecisionApproach Path Indicator] - 05/23, Install Runway Vertical/Visual Guidance System[Runway End Identification Lights] - 05/23Construct Apron [Construct Apron], Install Perimeter Fencing [Install PerimeterFencing]Acquire Land for Noise Compatibility within 65 - 69 DNL [Land Acquisition (Noise65-69 Day Night Level)], Install Weather Reporting Equipment [Automated WeatherObserving System]

Improve Runway Safety Area - 09/27

Conduct Miscellaneous Study

Improve Runway Safety Area - 09/27

Construct Apron

Acquire Equipment, Security Enhancements [(Design Only)]

Construct Runway Safety Area - 12/30

Acquire Equipment [(Runway/Airfield Sweeper)]

Rehabilitate Taxiway [Terminal Taxilane]

Page 75 of 98

Page 76: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

ADO Total:

Report Total:

Region Total:

80 Grants

1613 Grants

2099 Grants

190,843,771

3,549,617,470

686,216,229

SW AROK AR Adams Field P 058 6,012,179 Acquire Aircraft Rescue & Fire Fighting Vehicle [Replace ARFF Vehicle No.1], Acquire Land for Noise Compatibility within 75 DNL [RW 4R Extension - Phase II],

059 1,126,939Rehabilitate Apron [Apron pavement removal - (Timex Hangar)] Acquire Land For Approaches [RW 18 Approach]

Almyra Municipal GA

060

002

2,000,000

52,250

Noise Mitigation Measures for Residences within 65 - 69 DNL [Part 150 Voluntary Program Property Acquisition] Conduct Airport Master Plan Study

Batesville Regional GA 008 401,300 Extend Taxiway

Baxter County Regional GA 010 1,389,374 Acquire Land For Approaches [Acquire Land for Runway 23 RPZ], Improve Runway Safety Area - 05/23, Install Miscellaneous NAVAIDS [Install (2) Wind Cones], Modify Access Road, Rehabilitate Runway Lighting - 05/23, Remove

Bentonville Municipal/Louise M Thaden Field GA 005 534,464Obstructions [Relocate T-Hangars and Remove Building] Acquire Land For Approaches [RW 36]

Billy Free Municipal GA 002 207,138 Improve Airport Drainage, Remove Obstructions

Blytheville Municipal GA 009 236,465 Install Taxiway Lighting

Boone County CS 014 232,763 Conduct Miscellaneous Study, Rehabilitate Runway, Rehabilitate Taxiway

Carlisle Municipal GA 005 89,443 Construct Taxiway [Construct Hangar Access Taxiways (Base Course and

Carroll County GA 006 223,302Asphalt Surfacing)] Conduct Miscellaneous Study, Construct Taxiway

Clarksville Municipal GA 005 122,898 Install Perimeter Fencing, Rehabilitate Apron [Phase 3]

Corning Municipal GA 009 194,347 Rehabilitate Runway Lighting - 18/36

De Witt Municipal GA 002 197,724 Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System [Install PAPIs on Runway 18 and Runway 36] - 18/36, Install Runway

Drake Field GA 033 116,605

Vertical/Visual Guidance System [Install REILs on Runway 18 and Runway 36] ­18/36, Rehabilitate Runway Lighting - 18/36 Update Airport Master Plan Study

034 928,030 Construct Apron

Fort Smith Regional P 035 543,210 Update Airport Master Plan Study

Grider Field GA 008 356,705 Rehabilitate Building

Selection Criteria Year: 2005

Page 76 of 98

Page 77: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

SW AROK AR H L Hopkins-Fordyce Municipal

Harrell Field

Heber Springs Municipal

Hope Municipal

Howard County

J Lynn Helms Sevier County

Jonesboro Municipal

Lake Village Municipal

Marion County Regional

Marked Tree Municipal

McGehee Municipal

Melbourne Municipal - John E Miller Field

Memorial Field

Morrilton Municipal

Northwest Arkansas Regional

Osceola Municipal

Piggott Municipal

Rogers Municipal-Carter Field

Russellville Regional

Saline County/Watts Field

Searcy County

South Arkansas Regional at Goodwin Field

GA

GA

GA

GA

GA

GA

GA

GA

GA

GA

GA

GA

CS

GA

P

GA

GA

GA

GA

GA

GA

GA

002

008

005

005

002

005

013

003

004

003

005

008

013

005

025

003

004

022

006

009

006

010

52,725

113,257

398,349

946,000

390,880

149,689

1,755,316

54,901

348,223

89,775

40,070

94,430

1,490,000

713,467

2,221,198

785,577

387,595

4,837,299

101,650

2,745,075

150,602

867,500

Rehabilitate Runway [Phase I - Design/engineering, environmental, DBE and produce plans and specifications] - 04/22 Conduct Airport Master Plan Study

Acquire Land For Approaches [Acquire Land for Runway 5 RPZ], Install Airfield Guidance Signs Extend Taxiway [Extend TW to RW 34 end Phase II], Update Miscellaneous Study [Update Airport Layout Drawing] Install Runway Lighting [MIRL] - 1/19, Widen Runway [Widen runway 1/19 to 75' and shift runway centerline to meet standards] - 1/19 Install Miscellaneous NAVAIDS [Relocate Rotating Beacon and Install REIL's], Rehabilitate Runway Lighting - 08/26 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Aircraft Rescue & Fire Fighting Building, Install Guidance Signs Construct Taxiway [Phase I - DBE Program and Goals, Design/Engineering for complete Plans and Specifications] Construct Taxiway [Phase 2 - Pave & Light Partial Parallel from ramp to RW 22 end], Install Runway Vertical/Visual Guidance System - 04/22, Rehabilitate Runway Lighting - 04/22 Acquire Easement For Approaches, Acquire Land for Development

Rehabilitate Runway [Phase I - Design, Plans and specifications and DBE Plan] ­18/36 Update Airport Master Plan Study

Rehabilitate Runway [Mill, Overlay and Groove Runway, Rehabiliate Runway Lighting System and Remark Runway to meet Standards] - 05/23 Widen Runway - 09/27

Construct Taxiway [Conduct Benefit-Cost Analysis for Second Landing Surface, Design TW Alpha & Conduct Master Drainage Study] Rehabilitate Runway [Rehabilitate and Widen Runway 1/19] - 01/19, Widen Runway - 01/19 Construct Apron

Construct Taxiway [Phase 2 - Construct TW B SW and MW segments]

Construct Taxiway [Phase 1 - Design Only (for two construction phases)]

Construct New Airport [Phase 4-complete runway and apron aving and utilities]

Install Perimeter Fencing

Improve Runway Safety Area [RW 4 End] - 04/22, Rehabilitate Runway [Runway

Selection Criteria Year: 2005

Page 77 of 98

Page 78: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

SW AROK AR 010

Springdale Municipal 012GA 333,911

013 465,998

State of Arkansas 004 116,711

Stuttgart Municipal 011GA 149,150

Texarkana Regional-Webb Field 024P 595,332

Thompson-Robbins 005GA 688,431

Waldron Municipal 002GA 85,115

Walnut Ridge Regional 008GA 2,775,000

West Memphis Municipal 018R 1,856,540

Z M Jack Stell Field 002GA 403,901

State Total: 51 Grants 41,168,803

SW AROK OK Ada Municipal 008GA 402,354

Ardmore Downtown Executive 006GA 39,995

Ardmore Municipal 009GA 2,061,712

Atoka Municipal 004GA 42,560

Bartlesville Municipal 006GA 1,250,000

Blackwell-Tonkawa Municipal 006GA 245,100

Claremore Regional 009GA 281,637

Cleveland Municipal 003GA 28,500

Clinton-Sherman 001GA 128,300

Cushing Municipal 007GA 93,100

El Reno Municipal Air Park 006GA 354,584

Elk City Municipal 007GA 88,260

Report Date 02/23/2006

Brief Description Of Work

Holding Position Markings] - 04/22

Extend Taxiway, Widen Taxiway

Acquire Land For Approaches

Update State System Plan Study

Rehabilitate Taxiway [Design Only], Update Airport Master Plan Study

Acquire Aircraft Rescue & Fire Fighting Vehicle

Construct Runway Safety Area [Improve Runway Safety Area (GradingImprovements both sides of Runway 17/35 and Culvert Installation north ofRunway 17)] - 17/35, Rehabilitate Runway [Crack Seal Runway and Taxiways,includes pavement markings] - 17/35Widen Runway [Phase I - Design, Environmental & DBE Plan] - 09/27

Rehabilitate Runway - 04/22

Widen Taxiway [Widen Taxiway A, Phase 1, includes MITL Rehab and limitedRunway 17/35 Rehab]Rehabilitate Apron [Main apron rehabilitation]

Rehabilitate Runway [Rehabilitate RWY 17/35] - 17/35

Conduct Miscellaneous Study

Rehabilitate Runway - 17/35

Conduct Environmental Study

Improve Runway Safety Area [Improve Runway 17/35 Saftety Area] - 17/35,Improve Runway Safety Area - 17/35Acquire Land For Approaches, Construct Access Road

Expand Apron

Install Airport Beacons, Strengthen Apron

Rehabilitate Runway Lighting [Phase 1 design and replace electrical service] ­17R/35L, Update Airport Master Plan StudyInstall Runway Vertical/Visual Guidance System - 18/36

Construct Access Road, Expand Apron

Acquire Land For Approaches

Selection Criteria Year: 2005

Page 78 of 98

Page 79: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

SW AROK OK Enid Woodring Regional GA 017 1,821,866 Rehabilitate Runway - 17/35, Rehabilitate Runway - 17/35

Grandfield Municipal GA 004 177,173 Install Perimeter Fencing, Rehabilitate Apron

Grove Municipal GA 010 49,400 Acquire Land for Development, Rehabilitate Taxiway [Phase 1-Design for taxiway rehabilitation project]

Guthrie Municipal GA 007 650,000 Extend Taxiway [Phase III (comletion) of RWY 16/34 extension]

Healdton Municipal GA 003 108,918 Construct Runway [Phase 1 design-construct new runway] - 17/35

Hobart Municipal GA 001 600,000 Rehabilitate Taxiway

Hooker Municipal GA 002 402,367 Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System ­

Jones Memorial GA 002 121,60017/35, Rehabilitate Runway - 17/35 Rehabilitate Apron, Rehabilitate Runway Lighting - 17/35

Lawton-Fort Sill Regional P 021 781,850 Construct Building, Improve Airport Drainage, Rehabilitate Apron [Phase 1 design]

McAlester Regional GA 008 300,000 Construct Apron, Construct Taxiway

Medford Municipal GA 003 88,140 Rehabilitate Apron, Rehabilitate Runway - 17/35, Rehabilitate Taxiway

Miami Municipal GA 010 13,775 Rehabilitate Apron [Phase I Design Only]

Mid-America Industrial GA 007 741,000 Construct Taxiway

Okemah Flying Field GA 002 86,360 Install Perimeter Fencing [Install perimeter fence]

Okmulgee Regional

Perry Municipal

GA

GA

011

004

134,530

352,910

Rehabilitate Airport Beacons, Rehabilitate Runway - 17/35, Rehabilitate Runway Lighting - 17/35, Rehabilitate Taxiway Install Perimeter Fencing, Rehabilitate Runway Lighting - 17/35

Ponca City Regional CS 011 1,122,750 Acquire Equipment, Acquire Snow Removal Equipment, Construct Snow Removal Equipment Building

Richard Lloyd Jones Jr R 015 1,178,154 Improve Airport Drainage [Phase 1A - begin 78" RCP outfall construction]

Robert S Kerr GA 007 193,409 Rehabilitate Taxiway

Sallisaw Municipal GA 006 71,250 Conduct Environmental Study

Sayre Municipal GA 002 87,409 Rehabilitate Apron, Rehabilitate Taxiway

Shawnee Regional GA 009 27,160 Install Perimeter Fencing

010 339,150 Rehabilitate Taxiway [Rehabilitate Taxiway "D"]

Skiatook Municipal GA 002 277,400 Extend Taxiway

State of Oklahoma 005 140,000 Update State System Plan Study

Stigler Municipal GA 002 115,682 Install Perimeter Fencing, Rehabilitate Runway Lighting - 17/35

Stillwater Regional GA 015 300,000 Acquire Equipment, Rehabilitate Apron

Selection Criteria Year: 2005

Page 79 of 98

Page 80: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

Region ADO State Worksite

SW AROK OK Stroud Municipal

Tahlequah Municipal

Thomas P Stafford

Tulsa International

University of Oklahoma Westheimer

Wilburton Municipal

Will Rogers World

State Total:

William R. Pogue Municipal

ADO Total:

SW LANM LA Abbeville Chris Crusta Memorial

Acadiana Regional

Alexandria International

Baton Rouge Metropolitan, Ryan Field

FY 2005

Service Grant Seq AIP Federal Level Number Funds

003GA 180,500

005GA 91,247

005GA 450,434

054P 6,600,000

055 6,768,750

056 1,557,685

018R 2,290,007

002GA 34,675

051P 3,850,000

052 5,555,000

011GA 126,962

50 Grants 42,803,615

101 Grants 83,972,418

GA 011 155,950

GA 010 169,290

P 029 2,236,137

030 1,364,984

031 1,972,200

P 067 2,721,212

068 500,000

069 3,100,000

Report Date 02/23/2006

Brief Description Of Work

Rehabilitate Apron, Rehabilitate Taxiway

Improve Airport Miscellaneous Improvements [Develop Airport Action Plan; ALP &CIP]Construct Apron, Construct Taxiway

Noise Mitigation Measures for Residences within 65 - 69 DNL [Noise mitigation #6.]

Extend Runway [Phase 1A Portion of Extend Parallel Taxiway C west of Rwy18L/36R.] - 08/26, Rehabilitate Runway - 18R/36L, Rehabilitate TaxiwayExtend Runway [Phase 1B Complete Extend parallel Taxiway C west of Rwy18L/36R.] - 08/26Rehabilitate Apron [Phase 2-Reconstruct north portion of terminal apron.],Rehabilitate TaxiwayRehabilitate Apron

Acquire Interactive Training System, Improve Service Road, Install Runway Lighting- 17R/35L, Rehabilitate Runway - 13/31, Rehabilitate Runway - 17L/35R, Rehabilitate Runway - 17R/35L, Rehabilitate Runway - 18/36, Rehabilitate Runway Lighting - 13/31, Rehabilitate Runway Lighting - 17L/35R, Rehabilitate Runway Lighting - 17R/35L, Rehabilitate Taxiway Rehabilitate Taxiway

Install Weather Reporting Equipment

Improve Runway Safety Area [tree removal and grading of safety area phase 1] ­15/33 Install Perimeter Fencing [install perimeter fencing for animal (alligator) control at waterway], Update Miscellaneous Study [ALP, ops manual, ACM] Construct Terminal Building [Phase IX]

Construct Terminal Building

Rehabilitate Taxiway

Extend Runway - 04L/22R, Improve Runway Safety Area - 04L/22R, Security Enhancements Conduct Noise Compatibility Plan Study

Noise Mitigation Measures for Public Buildings

Selection Criteria Year: 2005

Page 80 of 98

Page 81: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

SW LANM LA 070 550,000 Update Airport Master Plan Study

Beauregard Parish GA 011 705,922 Construct Taxiway [construct Taxiway Echo]

Concordia Parish GA 005 465,531 Construct Taxiway

Esler Regional GA 022 564,357 Improve Airport Drainage

False River Regional GA 011 126,216 Rehabilitate Runway [sealcoat runway and all taxiways] - 18/36

George R Carr Memorial Air Field GA 012 700,000 Improve Runway Safety Area [Earthwork] - 18/36

Hammond Municipal GA 014 2,075,000 Rehabilitate Runway [portion of rwy east of 18/36] - 13/31

Hart GA 006 475,257 Extend Runway [Phase I Runway Extension, 450' at RW 30] - 12/30

Homer Municipal GA 002 214,260 Improve Runway Safety Area - 12/30

Jonesboro GA 002 28,580 Remove Obstructions [Engineering Only]

Kelly GA 009 515,887 Construct Taxiway [Taxiway to new hangar area]

Lafayette Regional P 030 4,382,683 Construct Aircraft Rescue & Fire Fighting Building, Rehabilitate Taxiway [Phase 1 of reconstruct Taxiway Bravo east of Runway 4/22. Taxiway cannot support user air carrier aircraft for Runway 11/29 operations. Aircraft require extensive back-taxi

Lake Charles Regional P 029 607,852operations.] Install Guidance Signs [Replace old guidance signs per 139 Inspection], Modify Terminal Building [Phase 2 and final of terminal improvements]

030 0 No projects assigned.

Louis Armstrong New Orleans International P 073 6,795,464 Rehabilitate Runway [Phase IIIa Committing 2005 Entitlements] - 10/28, Rehabilitate Runway [Phase IIIb Committing 2006 Entitlements] - 10/28, Rehabilitate Runway [Phase IIIc Committing 2007 Entitlements] - 10/28

075 10,063,877 Rehabilitate Runway [Phase IV Committing 2005 Discretionary] - 10/28

076 0 Improve Aircraft Rescue & Fire Fighting Building, Rehabilitate Runway Lighting ­

Louisiana Regional GA 008 117,85610/28, Security Enhancements Improve Runway Safety Area [Finalize EA and Conduct Engineering for RSA

Morehouse Memorial GA 009 479,359Project] - 17/35 Construct Taxiway [Taxiway]

New Orleans Downtown GA 004 323,000 Update Airport Master Plan Study

Ruston Regional GA 011 550,836 Acquire Land For Approaches, Improve Airport Erosion Control

Shreveport Regional P 038 404,700 Improve Service Road [Engineering Design], Rehabilitate Runway Lighting [Rehab RW Lighting on 05/23] - 05/23, Rehabilitate Taxiway [Sealcoat TW C & B], Rehabilitate Taxiway Lighting [Rehab. TW Lighting on J], Security Enhancements [Engineering Only]

Selection Criteria Year: 2005

Page 81 of 98

Page 82: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

SW LANM LA Slidell R 014 1,781,724 Extend Runway [Wetland Mitigation, Runway 18 Extension, and Parallel Taxiway (A) Extension] - 18/36

South Lafourche GA 007 2,199,999 Extend Runway [Complete EA, Site Prep for 1200' Extension, Pave 1200' Extension, Widen Existing 3800' to 100' Wide] - 18/36

Southland Field GA 009 199,902 Install Weather Reporting Equipment

Springhill GA 004 442,404 Install Perimeter Fencing, Rehabilitate Taxiway

St John the Baptist Parish

St Landry Parish-Ahart Field

GA

GA

011

009

205,807

150,000

Construct Taxiway [Phase I - Engineering], Construct Taxiway [Phase I ­Engineering], Remove Obstructions [Remove Obstructions to Runway 17] Construct Fuel Farm

St. Tammany Regional GA 004 150,000 Extend Runway [Phase I for Acquire Land] - 18/36, Update Airport Master Plan Study

Various Locations in Louisiana 003 0 No projects assigned.

Vicksburg Tallulah Regional GA 007 970,001 Strengthen Runway [Strengthen Runway] - 18/36

Vivian GA 003 318,250 Acquire Existing Airport [Phase I of final land acquisition for airport. Two phases required.], Acquire Existing Airport [Phase II of Final Land Acquisition for Airport.]

State Total: 40 Grants 48,784,497

SW LANM NM Albuquerque International Sunport P 029 3,872,490 Security Enhancements

030 1,043,078 Rehabilitate Apron

Alexander Municipal GA 006 871,287 Construct Runway [acqiure land for new runway 12/30] - Plan-1

Artesia Municipal GA 007 345,390 Rehabilitate Runway Lighting [new regulator] - 12/30, Rehabilitate Taxiway

Black Rock GA 002 73,091 Conduct Environmental Study

Cavern City Air Terminal GA 015 32,665 Improve Runway Safety Area - 14R/32L

Clovis Municipal GA 018 1,019,012 Rehabilitate Taxiway [Taxiway B]

Deming Municipal GA 009 409,129 Conduct Environmental Study, Improve Runway Safety Area - 04/22, Improve

Dona Ana County at Santa Teresa GA 015 1,150,000Runway Safety Area - 08/26, Install Guidance Signs Extend Runway - 10/28, Install Weather Reporting Equipment

Double Eagle II R 011 868,415 Extend Runway [Environmental Assessment / EIS] - 17/35

Fort Sumner Municipal GA 005 127,645 Rehabilitate Runway Lighting - 03/21

Gallup Municipal GA 018 760,000 Rehabilitate Apron, Rehabilitate Taxiway

Lea County Regional GA 014 170,782 Install Weather Reporting Equipment

Lea County-Zip Franklin Memorial GA 005 192,465 Acquire Land For Approaches, Install Runway Vertical/Visual Guidance System ­

Selection Criteria Year: 2005

Page 82 of 98

Page 83: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

FAA - Office Of Airports

Region ADO State Worksite

SW LANM NM

Los Alamos

Proposed - GA

Questa Municipal Nr 2

Ramah

Raton Municipal/Crews Field

Roswell Industrial Air Center

Santa Fe Municipal

State Total:

Sierra Blanca Regional

State of New Mexico

Tucumcari Municipal

ADO Total:

SW TEX TX Abilene Regional

Amarillo International

Austin-Bergstrom International

Grants Awarded by FY

FY 2005

Service Level

Grant Seq Number

CS

GA

GA

P

P

005

001

003

004

002

011

016

025

026

GA

GA

016

003

008

25 Grants

65 Grants

P 029

P 029

P 033

034

AIP Federal Funds

350,637

1,555,694

162,000

70,000

71,250

704,268

200,000

957,591

307,580

123,500

1,155,910

16,593,879

65,378,376

3,892,010

2,440,714

3,500,000

4,227,894

Brownsville/South Padre Island International

Corpus Christi International

P

P

027

028

037

1,504,548

955,349

7,788,088

Dallas Love Field

Dallas/Fort Worth International

P

P

028

075

076

10,350,375

5,692,000

12,900,672

Report Date 02/23/2006

Brief Description Of Work

03/21, Rehabilitate Runway - 03/21, Rehabilitate Runway - 12/30

Construct Access Road, Expand Apron, Rehabilitate Apron

Construct New Airport [Site Prep]

Rehabilitate Runway - 17/35

Conduct Environmental Study

Conduct Environmental Study

Improve Service Road, Rehabilitate Taxiway [Taxiway juliet]

Conduct Noise Compatibility Plan Study

Construct Runway Safety Area [Acquire Land in Safety Area] - 15/33, Rehabilitate Apron [Repair Apron], Rehabilitate Runway - 02/20 Acquire Aircraft Rescue & Fire Fighting Vehicle

Conduct State System Plan Study

Rehabilitate Runway - 08/26

Extend Taxiway, Improve Terminal Building [Phase 4, Design], Rehabilitate Apron, Rehabilitate Apron, Rehabilitate Taxiway Acquire Snow Removal Equipment, Rehabilitate Runway - 04/22, Rehabilitate Taxiway Acquire Land for Noise Compatibility within 65 - 69 DNL [Acquire land]

Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Miscellaneous Land, Modify Terminal Building Expand Apron

Acquire Land for Noise Compatibility within 65 - 69 DNL

Improve Airport Drainage [Improve Airport Drainage (Phase V-Southwest /Line C)(Design Only)], Rehabilitate Runway [Runway 13/31] - 13/31 Improve Terminal Building [Baggage Claim Renovation], Rehabilitate Apron

Extend Runway [LOI Payment #6] - 17C/35C

Construct Taxiway [Design], Improve Airport Drainage [Drainage - J1A Culvert / Tunnel], Improve Terminal Building [Install CUTE Equipment - Board Owned Gates, Phase 1], Rehabilitate Apron [Rehabilitate Aircraft Parking Aprons - Various],

Selection Criteria Year: 2005

Page 83 of 98

Page 84: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

SW TEX TX 076 Rehabilitate Runway Lighting [Rehabilitate Airfield Lighting - Phase 1] - 17C/35C, Rehabilitate Service Road [Rehabilitate ARFF & Operations Road], Rehabilitate

East Texas Regional P 024 2,500,000Taxiway [Rehabilitate Taxiways - Various Locations] Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire aircraft rescue and firefighting vehicle.], Acquire Equipment, Conduct Miscellaneous Study, Improve Airport Drainage, Rehabilitate Taxiway [Rehabilitate Taxiways B, C, D, & E.], Update Airport Master Plan Study

Easterwood Field P 022 1,923,485 Improve Airport Drainage [Phase II & III], Improve Runway Safety Area - 16/34, Install Perimeter Fencing [Install Perimeter Fencing, Phase 2]

Ellington Field P 017 7,350,000 Rehabilitate Runway - 04/22

Fort Worth Alliance R 027 10,561,878 Extend Runway [Extend Runway - Phase 1] - 16L/34R

028 302,513 Improve Airport Miscellaneous Improvements [Replace Windcones], Improve Runway Safety Area [Runway 34R POFZ - Design] - 16L/34R, Install Airfield

Fort Worth Meacham International R 014 3,230,000Guidance Signs [Replace 23 Sign Fixtures and Inserts] Acquire Land for Noise Compatibility within 65 - 69 DNL

George Bush Intercontinental P 053 17,500,000 Construct Runway - 08L/26R

054 3,500,000 Noise Mitigation Measures for Residences within 70 - 74 DNL

055 12,000,000 Rehabilitate Runway - 15L/33R

George Bush Intercontinental/Houston P 056 42,655 VALE Vehicle [Acquire Ten Vehicles]

Kickapoo Downtown Airpark GA 006 1,000,000 Improve Airport Drainage, Rehabilitate Taxiway [Pass]

Laredo International P 044 4,271,932 Improve Runway Safety Area - 17R/35L, Rehabilitate Runway - 17R/35L

046 1,000,000 Acquire Land For Approaches

Lubbock International P 028 5,620,082 Extend Taxiway [Extend Taxiway L Phase 2.], Rehabilitate Apron

McAllen Miller International P 034 1,062,361 Rehabilitate Apron, Rehabilitate Taxiway [Rehab TWs A and C]

Midland International P 042 3,456,282 Construct Apron, Construct Taxiway, Rehabilitate Runway - 16L/34R

Rick Husband Amarillo International P 030 5,949,107 Improve Terminal Building, Improve Terminal Building, Improve Terminal Building

Robert Gray AAF GA 011 10,069,944 Construct New Airport, Construct Runway Safety Area [IMPROVE RSA, PH. II],

San Angelo Regional/Mathis Field P 023 2,500,000Expand Apron Improve Terminal Building [Construct Terminal Concourse, Phase I], Rehabilitate Apron, Rehabilitate Runway [Rehabilitate Runway 18/36 With Runway Lighting

San Antonio International P 050 7,646,366 Modifications(Design)] - 18/36 Expand Apron [Design Only], Noise Mitigation Measures for Residences within 65 ­69 DNL [Phase 1], Rehabilitate Apron

Selection Criteria Year: 2005

Page 84 of 98

Page 85: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

SW TEX TX Southeast Texas Regional P 020

State of Texas

Texas State Block Grant Program

Tyler Pounds Regional P

021

001

031

032

033

035

038

039

019

Valley International P 039

State Total:

William P Hobby P

42 Grants

027

ADO Total: 42 Grants

Report Total:

Region Total: 1821 Grants

2099 Grants

WP HNL AS Fitiuta CS 020

021

Ofu

Pago Pago International

GA

P

006

033

034

035

036

State Total: 7 Grants

Selection Criteria Year: 2005

AIP Federal Funds

2,974,395

0

500,000

16,995,382

20,884,556

5,965,000

3,619,364

6,735,000

1,331,548

2,203,655

2,951,584

13,128,110

232,026,849

232,026,849

381,377,643

3,549,617,470

485,000

157,000

385,000

5,000,000

4,500,000

1,400,000

500,000

12,427,000

Report Date 02/23/2006

Brief Description Of Work

Construct Service Road, Improve Airport Miscellaneous Improvements, Install Perimeter Fencing, Rehabilitate Apron No projects assigned.

Update State System Plan Study

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Non primary development projects in state block grant program

Acquire Safety Equipment, Construct Service Road, Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate Taxiway Lighting Expand Apron, Improve Runway Safety Area - 17L/35R, Rehabilitate Service Road, Update Airport Master Plan Study [Update ALP] Extend Taxiway [Extends Taxiway H, Install SMGCS], Install Taxiway Lighting

Construct Aircraft Rescue & Fire Fighting Building [Phase II]

Install Miscellaneous NAVAIDS, Install Perimeter Fencing [Cyclone Olaf Damage],Install Runway Lighting - 12/30, Rehabilitate BuildingConduct Environmental Study [for Runway Extension - Phase II]

Construct Aircraft Rescue & Fire Fighting Building [Phase III]

Construct Aircraft Rescue & Fire Fighting Training Facility [Phase III]

Acquire Aircraft Rescue & Fire Fighting Vehicle [Three ARFF Vehicles andProximity Suits]Update Airport Master Plan Study

Page 85 of 98

Page 86: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

WP HNL GU Guam International 047

048

049

050

051

P 3,867,500

1,900,000

375,120

1,757,000

2,282,589

State Total: 5 Grants 10,182,209

WP HNL HI Dillingham Airfield

Hana

Hilo International

003

005

021

022

GA

CS

P

735,810

700,000

845,500

3,870,575

Honolulu International

023

078

079

080

081

P

1,382,250

1,071,326

3,240,900

3,381,000

1,757,000

082 4,276,546

083

084

085

4,251,256

318,750

9,927,210

Kahului

Kalaeloa (John Rodgers Field)

Kalaupapa

039

040

041

008

009

003

P

R

GA

1,578,336

1,350,000

900,000

3,800,000

2,000,000

679,250

Report Date 02/23/2006

Brief Description Of Work

Improve Terminal Building

Noise Mitigation Measures for Residences within 65 - 69 DNL

Acquire Equipment, Acquire Friction Measuring Equipment

Improve Utilities [MAP] [Phase IV]

Improve Airport Miscellaneous Improvements [(MAP) Demolition of Naval Housing Units]

Extend Taxiway [Phase II]

Construct Aircraft Rescue & Fire Fighting Building, Install Perimeter Fencing

Acquire Aircraft Rescue & Fire Fighting Vehicle

Improve Terminal Building [Replace passenger loading bridges - Phase II], Improve Terminal Building [Upgrade electrical distribution system - Phase II], Rehabilitate Apron, Rehabilitate Taxiway [and Ramps] Improve Terminal Building [Replace Escalators]

Improve Terminal Building [Reroof Gates 33 and 34]

Rehabilitate Taxiway [C and F]

Improve Terminal Building [IAB Ceiling - Design & CM]

Improve Terminal Building [EWA and DH Concourse 3rd Level Ceiling Replacement (Design)] Improve Terminal Building [OST Roof/Drainage and Loading Bridges, Phase II], Rehabilitate Taxiway [Rehabilitate Taxiway A, Phase II] Environmental Mitigation [Washwater Containment]

Security Enhancements [Vehicle Barriers]

Improve Access Road [Phase I, FY-2005 grant], Improve Access Road [Phase II, FY-2006 grant] Rehabilitate Taxiway [A, B, E, F, and K]

Improve Terminal Building [Chiller Plant - Ph. II]

Construct Access Road [Phase I - Design]

Construct Building [Construct T-Hangars, Phase I]

Rehabilitate Apron [Rehabilitate Airfield Pavement], Rehabilitate Taxiway

Construct Aircraft Rescue & Fire Fighting Building [Phase I], Install Perimeter

Selection Criteria Year: 2005

Page 86 of 98

Page 87: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

FAA - Office Of Airports

Region ADO State Worksite

WP HNL HI

Kona International at Keahole

Lihue

Molokai

Port Allen

Upolu

Waimea-Kohala

State Total:

WP HNL MP Francisco C. Ada/Saipan International

State Total:

Pagan Airstrip

Rota International

Tinian International

WP HNL TT Babelthuap/Koror

Chuuk International

Kosrae

Marshall Islands International

Pohnpei International

Grants Awarded by FY

FY 2005

Service Level

Grant Seq Number

P

P

P

003

024

025

034

012

GA

GA

CS

013

005

004

002

003

28 Grants

P

GA

P

P

052

053

054

001

019

018

6 Grants

GA

GA

GA

GA

GA

002

003

004

009

006

004

005

007

AIP Federal Funds

1,322,897

845,500

2,900,000

199,500

3,635,501

742,900

950,000

679,250

1,425,000

58,766,257

2,510,103

5,000,000

500,000

300,000

5,000,000

1,045,657

14,355,760

1,000,000

2,100,000

8,813,224

300,000

300,000

1,000,000

10,000,000

350,000

Report Date 02/23/2006

Brief Description Of Work

Fencing

Rehabilitate Access Road [Phase II], Rehabilitate Taxiway

Acquire Aircraft Rescue & Fire Fighting Vehicle

Rehabilitate Runway - 17/35, Rehabilitate Taxiway [E and H]

Improve Runway Safety Area [Improve Runway 23 Culvert, Phase I (Design)] ­05/23Rehabilitate Runway

Rehabilitate Runway - 09/27

Rehabilitate Runway - 07/25

Construct Aircraft Rescue & Fire Fighting Building [Phase I], Install PerimeterFencingRehabilitate Runway - 04/22

Expand Terminal Building [Phase I]

Rehabilitate Runway [Phase IV] - 07/25

Expand Aircraft Rescue & Fire Fighting Building [Design only]

Conduct Airport Master Plan Study

Extend Runway

Modify Aircraft Rescue & Fire Fighting Building [Relocate ARFF Building]

Construct Aircraft Rescue & Fire Fighting Building

Rehabilitate Runway [Phase I] - 09/27

Rehabilitate Runway [Phase II] - 09/27

Construct Aircraft Rescue & Fire Fighting Building [Phase I - Design]

Construct Aircraft Rescue & Fire Fighting Building [Expand ARFF Building]

Construct Aircraft Rescue & Fire Fighting Building [Phase I - Design]

Rehabilitate Runway [Phase I] - 07/25

Construct Aircraft Rescue & Fire Fighting Building

Selection Criteria Year: 2005

Page 87 of 98

Page 88: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

WP HNL TT 008 2,100,000 Rehabilitate Runway [Phase I] - 09/27

Yap International GA 007 300,000 Construct Aircraft Rescue & Fire Fighting Building

State Total: 10 Grants 26,263,224

ADO Total: 56 Grants 121,994,450

WP LAX AZ Avi Suquilla GA 007 450,000 Construct Runway [Phase I] - 01/19

Bagdad GA 005 19,912 Install Perimeter Fencing

Benson Municipal GA 010 1,192,250 Construct Apron [Phase II], Install Perimeter Fencing

Bisbee Douglas International GA 004 261,250 Rehabilitate Apron

Bisbee Municipal GA 007 190,000 Widen Runway [Phase I (Design)] - 17/35

Buckeye Municipal GA 010 371,450 Install Perimeter Fencing

011 200,000 Conduct Noise Compatibility Plan Study

Casa Grande Municipal GA 009 210,000 Construct Apron

Chandler Municipal R 016 1,521,960 Construct Heliport/Helipad [Relocate Heliport Per Part 150 Study, Phase III], Install Airfield Guidance Signs

Chinle Municipal GA 007 90,400 Construct Utilities

008 85,500 Update Airport Master Plan Study [and ALP]

Colorado City Municipal GA 010 57,000 Conduct Environmental Study

Coolidge Municipal GA 004 920,952 Install Runway Vertical/Visual Guidance System [Runway 5/23 Papi] - 05/23,

005 71,250Rehabilitate Apron Update Airport Master Plan Study

Cottonwood GA 011 152,500 Construct Service Road, Install Perimeter Fencing [Phase II]

Eloy Municipal GA 007 171,000 Install Perimeter Fencing

Ernest A. Love Field CS 023 872,114 Improve Runway Safety Area - 12/30, Rehabilitate Taxiway Lighting

Flagstaff Pulliam P 026 247,000 Conduct Environmental Study

027 1,016,825 Construct Access Road

Ganado GA 003 24,300 Improve Access Road [Phase I (Design)]

Gila Bend Municipal GA 010 189,264 Install Perimeter Fencing

Glendale Municipal R 017 1,650,000 Acquire Land For Approaches [Northeast corner - Runway 19 RSA and future Taxiway B extension]

Selection Criteria Year: 2005

Page 88 of 98

Page 89: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

WP LAX AZ Grand Canyon National Park P 019 4,180,000 Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Snow Removal Equipment, Conduct Miscellaneous Study [Terminal Area Plan], Construct Aircraft Rescue & Fire Fighting Building [Phase II], Security Enhancements [Terminal Facility & Security Access Control System Design]

Greenlee County GA 007 161,501 Rehabilitate Runway [Phase I (Design)], Rehabilitate Taxiway [Phase II]

H.A. Clark Memorial Field GA 018 1,142,582 Rehabilitate Apron [and Expand]

Holbrook Municipal GA 010 1,303,400 Rehabilitate Runway - 11/29

Kayenta GA 005 525,000 Construct Access Road [Design], Construct Runway [Design] - 05/23

Kingman

Lake Havasu City

CS

CS

015

018

783,750

156,750

Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Aircraft Rescue & Fire Fighting Building, Improve Terminal Building [Phase I (Design)] Update Airport Master Plan Study

Marana Northwest Regional R 012 200,000 Conduct Noise Compatibility Plan Study

Marana Regional R 013 2,157,395 Construct Taxiway [E]

Nogales International GA 012 973,750 Rehabilitate Taxiway

Page Municipal P 017 180,375 Construct Heliport/Helipad, Construct Service Road, Construct Taxiway, Rehabilitate Apron [South Apron Drainage Improvements], Security Enhancements [Install Security Fencing]

018 174,254 Update Airport Master Plan Study

Payson GA 013 1,700,000 Construct Apron [and Relocate Access Road]

Phoenix Deer Valley R 020 442,500 Acquire Land for Development [and Relocation (7.5 Acres)]

Phoenix Sky Harbor International P 060 10,886,050 Rehabilitate Taxiway [Phase III]

061 12,309,187 Acquire Land for Noise Compatibility within 65 - 69 DNL

Polacca GA 001 142,500 Conduct Airport Master Plan Study

Ryan Field R 015 107,585 Install Perimeter Fencing

Safford Regional GA 014 226,100 Construct Access Road [Phase I, Design], Extend Taxiway [Phase I, Design], Install

San Carlos Apache GA 012 155,345Perimeter Fencing [Phase I, Design] Update Airport Master Plan Study

013 259,864 Construct Heliport/Helipad [Phase II], Install Weather Reporting Equipment

Scottsdale R 021 356,951 Environmental Mitigation [Install Blast Fence], Install Noise Monitoring System

Sedona GA 015 1,019,500 Improve Utilities [Fire Protection Waterline], Rehabilitate Apron [and Expand]

Show Low Regional CS 014 877,639 Acquire Equipment [Sweeper], Acquire Snow Removal Equipment, Construct Heliport/Helipad, Rehabilitate Taxiway

Selection Criteria Year: 2005

Page 89 of 98

Page 90: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

WP LAX AZ Sierra Vista Municipal-Libby AAF GA 017 2,422,493 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Apron [GA Apron], Extend Taxiway [Phase IV]

St Johns Industrial Air Park GA 010 391,000 Improve Runway Safety Area, Install Runway Vertical/Visual Guidance System

State of Arizona 001 500,000 Conduct State System Plan Study

Taylor GA 013 336,350 Rehabilitate Runway Lighting - 03/21

Town of Springerville Municipal GA 013 150,000 Update Airport Master Plan Study

Tuba City GA 008 95,000 Update Airport Master Plan Study

Tucson International P 047 4,919,633 Install Perimeter Fencing, Rehabilitate Runway [Phase I (Design)] - 11L/29R

048 728,480 Conduct Environmental Study [EIS for Runway Upgrade]

049 3,783,887 Acquire Land for Development [Phase I, Reimbursement], Acquire Land for

Whiteriver GA 008 589,290Development Construct Heliport/Helipad [Phase III]

Wickenburg Municipal GA 013 150,000 Extend Runway [Phase II] - 05/23

014 4,500,000 Extend Runway [Phase I] - 05/23, Extend Runway - 05/23, Extend Taxiway [Phase I], Extend Taxiway, Improve Runway Safety Area - 05/23, Install Perimeter Fencing,

Williams Gateway R 014 3,873,838Install Runway Lighting - 05/23, Install Taxiway Lighting Improve Runway Safety Area - 12R/30L

015 5,137,500 Construct Taxiway [Parallel Taxiway B], Improve Building [Install hangar fire suppression system (MAP)]

Window Rock GA 010 85,500 Conduct Airport Master Plan Study [and ALP]

Winslow-Lindbergh Regional GA 013 570,950 Widen Taxiway

Yuma MCAS/Yuma International P 025 2,000,000 Construct Apron [Cargo Apron]

State Total: 63 Grants 80,620,826

WP LAX CA Apple Valley GA 006 544,578 Rehabilitate Taxiway

Barstow-Daggett GA 005 150,000 Rehabilitate Access Road

Big Bear City GA 013 1,812,298 Improve Runway Safety Area - 08/26, Install Perimeter Fencing, Rehabilitate Apron

Bob Hope P 040 8,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL

Borrego Valley GA 011 94,244 Rehabilitate Runway [Including Taxiway and Apron]

Calexico International GA 010 150,000 Rehabilitate Runway - 08/26

Camarillo R 022 1,733,485 Install Perimeter Fencing, Rehabilitate Apron [PCC Apron and Taxiways (including drainage improvement)]

Selection Criteria Year: 2005

Page 90 of 98

Page 91: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

WP LAX CA Chino R 026 2,330,255 Improve Runway Safety Area [03/21 and] - 08L/26R

Compton/Woodley R 005 150,000 Install Perimeter Fencing [Phase II]

Delano Municipal GA 008 219,811 Construct Runway Safety Area - 14/32

El Monte R 008 300,000 Install Perimeter Fencing [Phase II]

Fallbrook Community Airpark GA 002 250,755 Rehabilitate Apron

French Valley GA 020 396,419 Rehabilitate Runway [Sealcoat Runway and Taxiway; Install Security Lighting] ­

Fullerton Municipal R 016 437,15918/36 Acquire Easement For Approaches [(RPZ Appraisals Only), Phase I], Construct

Gillespie Field R 011 1,260,000Building Rehabilitate Runway [Including Taxiway] - 17/35

012 80,000 Update Airport Master Plan Study

Hemet-Ryan GA 010 309,583 Install Perimeter Fencing, Rehabilitate Access Road, Rehabilitate Runway - 05/23, Rehabilitate Taxiway

Imperial County CS 019 1,000,000 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Apron [Cargo Apron]

Jack Northrop Field/Hawthorne Municipal R 009 215,000 Update Airport Master Plan Study

Jacqueline Cochran Regional GA 013 475,000 Construct Service Road, Install Runway Vertical/Visual Guidance System - 12/30, Rehabilitate Access Road, Rehabilitate Taxiway

John Wayne Airport-Orange County P 035 12,795,061 Construct Apron

Lompoc GA 010 250,000 Construct Fuel Farm

011 142,500 Update Airport Master Plan Study

Long Beach /Daugherty Field/ P 026 6,796,539 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Taxiway [Construct

Los Angeles International P 031 10,000,000Taxilane], Install Runway Incursion Caution Bars, Rehabilitate Taxiway Noise Mitigation Measures for Residences within 65 - 69 DNL

032 2,000,000 Noise Mitigation Measures for Residences within 70 - 74 DNL

033 10,000,000 Acquire Land for Noise Compatibility within 65 - 69 DNL

034 5,000,000 Noise Mitigation Measures for Residences within 70 - 74 DNL

035 38,826,223 Construct Runway [Relocate Runway] - 07R/25L

McClellan-Palomar P 020 1,204,750 Acquire Aircraft Rescue & Fire Fighting Vehicle, Improve Runway Safety Area [Phase I] - 06/24

021 6,552,000 Construct Apron [North Apron], Construct Taxiway

Meadows Field P 027 1,197,945 Construct Terminal Building

Mojave GA 016 150,000 Update Airport Master Plan Study

Selection Criteria Year: 2005

Page 91 of 98

Page 92: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

FAA - Office Of Airports

Region ADO State Worksite

WP LAX CA

Montgomery Field

Ontario International

Oxnard

Palm Springs International

Ramona

Redlands Municipal

Riverside Municipal

San Bernardino International

San Diego International

ADO Total:

State Total:

Santa Barbara Municipal

Santa Maria Public/Capt G Allan Hancock Field

Santa Ynez

Shafter-Minter Field

Six Southern California Counties

Southern California Logistics

WP SFO CA Alturas Municipal

Arcata

Grants Awarded by FY

FY 2005

Service Grant Seq AIP Federal Level Number Funds

017 7,610,232

R 009 1,051,200

P 025 3,500,000

P 024 1,198,384

P 038 10,714,027

039 2,259,100

R 010 634,416

GA 008 142,500

R 021 1,043,600

R 019 5,973,513

P 042 2,800,000

043 10,000,000

044 4,895,329

P 033 2,776,290

P 026 1,000,000

GA 009 818,802

GA 013 25,000

004 500,000

P 012 3,495,602

52 Grants 175,261,600

115 Grants 255,882,426

GA 004 185,000

P 029 65,000

Report Date 02/23/2006

Brief Description Of Work

Extend Runway - 12/30

Construct Heliport/Helipad [and Access Road]

Noise Mitigation Measures for Residences within 65 - 69 DNL

Improve Runway Safety Area - 07/25, Install Perimeter Fencing, Rehabilitate Apron,Rehabilitate Taxiway [Rehabilitate Taxiways, Blast Pad and Apron]Expand Terminal Building [Holdrooms and checkpoints], Expand Terminal Building[Holdrooms and checkpoints], Expand Terminal Building [Holdrooms andcheckpoints]Construct Apron

Construct Access Road, Environmental Mitigation [Land Acquisition]

Update Airport Master Plan Study

Construct Taxiway [North Taxiway Site Preparation]

Rehabilitate Runway [Rehabilitate Runway 6/24, Phase IV] - 06/24

Conduct Airport Master Plan Study [Site Selection Study, Phase II]

Noise Mitigation Measures for Residences within 65 - 69 DNL

Rehabilitate Apron [Rehabilitate commercial apron]

Construct Access Road, Construct Runway Safety Area - 07/25, SecurityEnhancementsExpand Terminal Building [and Construct Taxiway, Phase I (Design)]

Improve Airport Drainage, Rehabilitate Access Road, Rehabilitate Apron

Install Perimeter Fencing

Conduct Metropolitan System Plan Study

Rehabilitate Runway Lighting [Rehabilitate Runway/Taxiway Lighting and Vault]

Install Miscellaneous NAVAIDS [- replace non-directional beacon], Install TaxiwayLighting [- install medium intensity taxiway edge lights - Design], RehabilitateService Road [- rehabilitate service road (approximately 30' X 300') - Design],Update Airport Master Plan Study [- update Airport Layout Plan]Rehabilitate Runway [Rehabilitate Runway 2-20 (approximately 150' X 4,500') andTaxiways B and G (approximately 50' X 3,000') including drainage improvement ­

Selection Criteria Year: 2005

Page 92 of 98

Page 93: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

WP SFO CA 029 Design] - 02/20

Benton Field GA 008 142,500 Conduct Environmental Study [Conduct Environmental Assessment Study]

Boonville GA 002 210,500 Construct Taxiway, Expand Apron, Install Perimeter Fencing

Buchanan Field R 015 100,000 Conduct Miscellaneous Study [Runway Safety Area Study for Runways

Calaveras County-Maury Rasmussen Field GA 005 531,92032R/14L,32L/14R,19R/1L & 19L/1R] Construct Access Road, Construct Taxiway, Rehabilitate Apron

Cedarville GA 003 222,800 Rehabilitate Apron [- rehabilitate aircraft tie down apron (approximately 106,000 SF) - Phase II]

Charles M. Schulz - Sonoma County GA 028 1,250,000 Conduct Miscellaneous Study [Wildlife Hazards], Improve Runway Safety Area [(Relocate Service Road)] - 01/19, Rehabilitate Taxiway [Taxiway H], Security Enhancements [install security fencing]

Chico Municipal P 023 890,000 Acquire Aircraft Rescue & Fire Fighting Vehicle [- acquire one ARFF Vehicle]

024 2,517,500 Rehabilitate Apron [Rehabilitate Aircraft Parkig Apron (approximately 600' X 1,180')

Columbia GA 011 33,250- Construction] Update Airport Master Plan Study

Colusa County GA 008 270,203 Improve Runway Safety Area [Runway and Taxiway Shoulder Stabilizatioon] ­13/31

Dinsmore GA 004 33,156 Improve Airport Drainage [- improve airport drainage including installation of underground storm drain pipe (approximately 200LF) - Construction]

Dunsmuir Municipal-Mott GA 007 97,000 Update Airport Master Plan Study [and Exhibit A]

Fall River Mills GA 006 3,600,000 Construct Access Road, Construct Taxiway [Realign and extend parallel taxiway ­Phase 1], Construct Utilities [Relocate 2 sewer treatment ponds], Expand Apron, Extend Runway [Phase 1 Earthwork] - 02/20, Remove Obstructions [for runway/taxiway extension]

Fresno Yosemite International P 047 1,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL

048 5,999,453 Rehabilitate Aircraft Rescue & Fire Fighting Building, Rehabilitate Taxiway [Phase II]

Fresno-Chandler Downtown R 010 325,000 Rehabilitate Taxiway [Rehabilitate Taxilanes], Rehabilitate Terminal Building [(Historic Building), Phase III]

Gansner Field GA 006 460,000 Rehabilitate Apron [- rehabilitate aircraft parking apron (approximately 134,000 SF), Phase II, including drainage improvements (approximately 1,800 LF) - Construction]

Gustine GA 005 142,500 Conduct Miscellaneous Study [Environmental Baseline and Airport Drainage Study]

Half Moon Bay R 010 250,000 Construct Access Road [Phase 1, design], Construct Apron [Phase 1, design], Improve Airport Drainage [Phase 1, design], Install Perimeter Fencing [Phase 1, design], Rehabilitate Taxiway [Phase 1, design]

Hanford Municipal GA 014 150,000 Acquire Land For Approaches

Selection Criteria Year: 2005

Page 93 of 98

Page 94: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

WP SFO CA Hayfork GA 004 75,000 Update Airport Master Plan Study

Hollister Municipal GA 009 450,000 Install Perimeter Fencing

Jack McNamara Field P 014 285,000 Rehabilitate Taxiway [- rehabilitate existing general aviation taxilanes (approximately 74,510 SF) - Construction]

Kneeland GA 004 190,520 Rehabilitate Apron [- rehabilitate existing tie-down apron (approximatley 100,000 SF) - Construction], Rehabilitate Runway [- rehabilitate Runway 15/33 including

Lake Tahoe GA 024 495,748aircraft tie down apron (approximately 113,500 SF) - Construction] - 15/33 Conduct Miscellaneous Study [(Runway Safty Area & Feasibility Studies & Update ALP)], Rehabilitate Runway [(Crack & Slurry Sealing)] - 18/36

Los Banos Municipal GA 005 250,000 Rehabilitate Runway Lighting [(medium intensity runway lighting)] - 14/32

Madera Municipal GA 013 400,000 Remove Obstructions, Update Airport Master Plan Study [Update ALP]

Marina Municipal GA 006 200,000 Install Weather Reporting Equipment [Install AWOS-III]

Mariposa-Yosemite GA 006 150,000 Update Airport Master Plan Study

Mefford Field GA 006 150,000 Acquire Land for Development

Merced Municipal/MacReady Field CS 012 1,450,000 Acquire Emergency Generator, Rehabilitate Runway - 12/30

Metropolitan Oakland International P 037 18,123,134 Rehabilitate Apron [East Apron, South Field, Phase II]

038 1,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL

039 1,500,000 Conduct Environmental Study [Environmental review for RSA improvments to Runway 11-29]

Modesto City County-Harry Sham Field P 029 1,450,000 Rehabilitate Apron [Aircraft Carrier and Transient]

Monterey Bay Metropolitan Area 001 200,000 Conduct Metropolitan System Plan Study [Land Use Plan]

Monterey Peninsula P 040 2,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL

041 1,280,053 Rehabilitate Terminal Building

Murray Field GA 006 30,365 Install Perimeter Fencing [- replace existing perimeter fencing (approximately 1,700 LF) including installation of automated entrance gates - Construction]

007 250,000 Conduct Environmental Study [(installation of fencing and lighting)]

Napa County R 020 2,231,098 Construct Taxiway, Rehabilitate Apron [Rehabitate Apron & Tee hangar Taxiway]

Nevada County Air Park GA 008 139,947 Install Weather Reporting Equipment [- install Automoated Weather Observation System (AWOS III) - Construction]

New Coalinga Municipal

Norman Y. Mineta San Jose International

GA

P

005

060

150,000

3,842,664

Install Perimeter Fencing, Install Weather Reporting Equipment, Rehabilitate Runway - 12/30 Extend Runway [(LOI - Reimbursement) Rehabilitate and Extend Runways 12L/30R and 12R/30L] - 12L/30R

Selection Criteria Year: 2005

Page 94 of 98

Page 95: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

WP SFO CA 061 3,400,000 Install Noise Monitoring System, Noise Mitigation Measures for Residences within 65 - 69 DNL

062 14,659,598 Install Guidance Signs, Rehabilitate Taxiway, Widen Taxiway

Nut Tree GA 009 142,500 Update Airport Master Plan Study [Update ALP including Exhibit A Map]

010 142,500 Conduct Environmental Study [Conduct Environmental Assessment Study for Various Airport Improvement Projects]

Palo Alto Airport of Santa Clara County R 006 300,000 Install Miscellaneous NAVAIDS [Pilot controlled lighting], Install Perimeter Fencing [Including Gates and Access Control, Phase I (Design)], Install Weather Reporting Equipment [AWOS]

Paso Robles Municipal GA 017 329,300 Rehabilitate Taxiway

Petaluma Municipal R 015 150,000 Construct Building [Hangar Development]

Placerville GA 009 270,000 Rehabilitate Apron

Redding Municipal P 028 2,336,340 Acquire Handicap Passenger Lift Device [- acquire handicap passenger lift device], Acquire Land For Approaches [- acquire land for approach protection (approximately 148 acres) - Phase II]

029 168,660 Conduct Environmental Study

Reedley Municipal GA 007 350,000 Construct Runway Safety Area - 15/33, Install Runway Vertical/Visual Guidance

Reid-Hillview of Santa Clara County R 010 435,000System, Rehabilitate Runway Lighting Install Airfield Guidance Signs, Rehabilitate Apron

Rio Vista Municipal GA 011 181,500 Construct Service Road [Construct airfield perimeter service road - Design], Improve Airport Drainage [Improve aircraft parking apron drainage - Design], Install Apron Lighting [Install apron lighting - Design], Install Perimeter Fencing [Install perimeter fencing including key-pad controlled accedd gates - Design], Install Weather Reporting Equipment [Install AWOS], Remove Obstructions [Remove

Rogers Field GA 010 72,439Obstruction] Rehabilitate Apron [-including reseal pavement joints (approximately 27,000 LF)]

Rohnerville GA 005 70,000 Rehabilitate Runway [- rehabilitate Runway 11/29 and parallel taxiway (approximately 587,500 SF) - Design] - 11/29, Rehabilitate Runway Lighting [­

Ruth GA 002 75,000rehabilitate Runway 11/29 and associated taxiway lighting - Design] - 11/29 Update Airport Master Plan Study

Sacramento International P 037 1,500,000 Conduct Environmental Study [- conduct environmental impact statement study]

Sacramento Mather R 013 750,000 Conduct Environmental Study

Salinas Municipal GA 013 1,750,000 Rehabilitate Runway [Phase II] - 13/31

San Carlos R 010 285,000 Improve Airport Drainage [Phase 1, design], Install Perimeter Fencing [Phase 1,

Selection Criteria Year: 2005

Page 95 of 98

Page 96: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

WP SFO CA 010 design], Rehabilitate Access Road [Phase 1, design], Rehabilitate Apron [Phase 1, design]

San Francisco International P 033 24,177,111 Conduct Miscellaneous Study [runway safety area study], Construct Apron [Reconstruct Terminal Apron], Improve Airport Drainage, Improve Terminal Building [North Terminal Structural Upgrade, Phase I], Rehabilitate Runway Lighting ­01R/19L, Rehabilitate Taxiway, Security Enhancements [Install Security Fencing], Widen Taxiway [Modify Taxiways, Signage and Related Airfield Components to

San Luis County Regional P 030 662,256Accommodate Group-VI Operations] Construct Access Road [phase II], Construct Apron, Construct Taxiway [phase II], Improve Airport Miscellaneous Improvements [Install Fire Protection Water Line (approx. 3,200 LF)]

031 2,500,000 Construct Taxiway

Scott Valley GA 004 435,000 Rehabilitate Runway - 16/34

Siskiyou County GA 005 2,000,000 Rehabilitate Runway - 17/35

South County Airport of Santa Clara County R 006 150,000 Remove Obstructions

Stockton Metropolitan P 021 1,250,000 Expand Apron [Air Cargo Apron], Modify Terminal Building, Security Enhancements, Update Airport Master Plan Study

Sutter County

Tracy Municipal

GA

GA

003

010

245,222

300,000

Rehabilitate Taxiway [- rehabilitate taxiway (approximately 156,500 SF) including run-up apron construction (approximately 7,600 SF) - Construction] Improve Airport Drainage, Improve Runway Safety Area [design only] - 12/30,

Trinity Center GA 004 75,000Install Perimeter Fencing, Install Runway Vertical/Visual Guidance System - 07/25 Update Airport Master Plan Study

Turlock Municipal GA 006 800,000 Improve Airport Miscellaneous Improvements, Install Perimeter Fencing, Rehabilitate Runway [(crack filler & slurry sealing)] - 12/30

Ukiah Municipal GA 008 114,285 Rehabilitate Runway [Crack Seal Runway & Taxiway, Phase I] - 15/33, Repair Utilities [Replace & Repair Storm Drainage System (Design Only) PhaseI]

Visalia Municipal CS 022 250,000 Construct Taxiway [Parallel Taxiway], Install Runway Vertical/Visual Guidance System [Runway 30 PAPI]

Yuba County GA 012 350,840 Rehabilitate Runway [(Crack & Slurry Sealing)] - 14/32

State Total: 80 Grants 115,446,862

WP SFO NV Austin GA 009 152,000 Acquire Equipment

Battle Mountain GA 015 75,900 Construct Taxiway

Beatty GA 006 550,791 Install Apron Lighting, Install Perimeter Fencing, Rehabilitate Runway - 16/34

Selection Criteria Year: 2005

Page 96 of 98

Page 97: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Level

Grant Seq Number

AIP Federal Funds

Brief Description Of Work

WP SFO NV Boulder City Municipal GA 009 150,000 Install Weather Reporting Equipment [AWOS]

Derby Field GA 008 150,000 Update Airport Master Plan Study [Update Master Plan]

Elko Regional P 029 5,775,179 Construct Taxiway [Rehabilitate and Realign Parallel Taxiway, Phase III]

Gabbs GA 004 825,000 Improve Runway Safety Area [Phase I] - 08/26

Henderson Executive P 018 1,900,000 Construct Taxiway [Taxilane B]

019 864,500 Install Perimeter Fencing

Jackpot/Hayden Field GA 004 2,754,028 Construct Taxiway [Construct Parallel Taxiway A]

McCarran International P 057 15,233,688 Rehabilitate Runway [and Taxiway D, Phase II] - 01R/19L

058 4,861,973 Rehabilitate Apron

059 7,000,000 Conduct Environmental Study

Mesquite GA 009 471,200 Conduct Environmental Study

Minden-Tahoe GA 015 1,930,520 Acquire Land For Approaches [Runway 16], Rehabilitate Runway [Phase II] ­

North Las Vegas P 022 4,675,73216/34, Remove Obstructions Remove Obstructions [Relocate Powerline In Runway 30 Approach]

Owyhee GA 002 150,000 Conduct Environmental Study

Perkins Field GA 004 745,495 Rehabilitate Apron

Reno/Stead R 022 70,000 Rehabilitate Service Road [Ramp Road, Phase I (Design)]

Reno/Tahoe International P 064 8,249,106 Rehabilitate Apron [Terminal and Cargo Aprons, Phase II]

065 2,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL

066 2,000,000 Acquire Land for Noise Compatibility within 65 - 69 DNL

067 413,641 Acquire Equipment

Silver Springs GA 007 65,000 Construct Access Road, Expand Apron, Install Weather Reporting Equipment

State of Nevada 004 250,000 Conduct State System Plan Study

Tonopah GA 007 418,000 Install Runway Lighting - 11/29

Winnemucca Municipal GA 010 657,760 Rehabilitate Runway - 14/32

State Total: 27 Grants 62,389,513

ADO Total: 107 Grants 177,836,375

Region Total: 2099 Grants 555,713,251

Selection Criteria Year: 2005

Page 97 of 98

Page 98: Grants Awarded by FYGrants Awarded by FY . FAA - Office Of Airports . Report Date 02/23/2006 . FY 2005. Region ADO State Worksite Service Grant Seq AIP Federal . Brief Description

Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006

FY 2005

Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds

Report Total: 2099 Grants 3,549,617,470

Selection Criteria Year: 2005

Page 98 of 98