grants awarded by fygrants awarded by fy . faa - office of airports . report date 02/23/2006 . fy...
TRANSCRIPT
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
AL AAL AK Adak GA 002 770,569 Acquire Aircraft Rescue & Fire Fighting Vehicle
Aniak P 007 3,302,222 Construct Snow Removal Equipment Building
Bethel P 013 1,686,972 Construct Sand and Chemical Storage Building
014 16,100,000 Construct Runway - Plan-1, Construct Runway Safety Area - 18/36
Chevak 001 3,468,450 Construct New Airport [Phase 2 (Surfacing)], Construct Snow Removal Equipment Building
Chignik Regional (Proposed GA) 002 169,399 Conduct Airport Master Plan Study [Phase 2 (EA & ALP)]
Cold Bay CS 008 200,000 Conduct Airport Master Plan Study [(Terminal Plan)]
Deadhorse P 008 8,733,083 Expand Apron, Extend Runway Safety Area [(Phase 2)] - 04/22
English Bay CS 001 95,000 Update Airport Master Plan Study
False Pass GA 004 308,390 Conduct Environmental Study [Specialty marine studies]
Hoonah GA 001 2,076,714 Construct Seaplane Base
Hooper Bay CS 005 1,803,100 Rehabilitate Access Road, Rehabilitate Runway [(Maintenance)] - 13/31
Juneau International P 043 1,491,528 Construct Apron
045 25,953 Security Enhancements [(Security Vehicle)]
046 750,000 Construct Runway Safety Area [(Environmental)] - 08/26
Kenai Municipal P 034 2,094,233 Extend Taxiway [(Multi-Year, Year 2)], Extend Taxiway [Extend Twy P]
King Cove CS 003 7,155,400 Construct Snow Removal Equipment Building, Rehabilitate Apron, Rehabilitate
Kodiak P 009 1,000,000Runway [(RSA)] - 07/25, Rehabilitate Runway - 07/25 Extend Runway Safety Area [(EIS)] - 07/25, Extend Runway Safety Area [(EIS)] 18/36
Kokhanok GA 002 5,713,000 Construct Snow Removal Equipment Building, Expand Apron, Extend Runway [(RSA Development)] - 06/24, Extend Runway - 06/24
Merle K (Mudhole) Smith P 009 7,500,000 Construct Runway Safety Area [(Purchase EMAS, Phase 1)] - 09/27, Repair Utilities [(Power)]
Merrill Field P 036 3,752,500 Acquire Equipment [(RSAT Recommendations)], Extend Taxiway [(RSAT Recommendation)], Rehabilitate Runway - 06/24
Nenana Municipal GA 011 194,684 Acquire Snow Removal Equipment
Nome P 013 10,300,000 Construct Aircraft Rescue & Fire Fighting Building [(Phase 1)], Construct Snow
Palmer Municipal GA 012 437,990 Removal Equipment Building [(Phase 1)] Acquire Land For Approaches, Acquire Snow Removal Equipment [(Motor grader)], Rehabilitate Runway [Phase 1 (Design)] - 09/27, Rehabilitate Runway Lighting [(Design)] - 16/34
Selection Criteria Year: 2005
Page 1 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
AL AAL AK Perryville GA 001 6,604,400 Construct Apron, Construct Runway [(Replacement RWY)] - Plan-1, Construct Snow Removal Equipment Building, Modify Access Road
Port Alsworth Proposed 003 276,212 Conduct Airport Master Plan Study [Phase 2 (EA)]
Ralph Wien Memorial P 010 525,000 Update Airport Master Plan Study [(Relocation Study) Stg 1]
011 7,200,000 Construct Runway Safety Area - 08/26
Red Devil GA 001 2,386,400 Construct Snow Removal Equipment Building, Remove Obstructions
Sand Point CS 010 6,125,600 Extend Runway Safety Area [(Phase 3)] - 13/31
Sitka Rocky Gutierrez P 020 1,500,000 Conduct Environmental Study
Soldotna GA 005 375,250 Construct Runway [(Phae 1 design and EA)] - Turf
St George GA 006 10,669,205 Construct Snow Removal Equipment Building, Modify Access Road, Strengthen
State of Alaska 004 1,645,533Runway [Phase 2 (Construction)] - 11/29 Update State System Plan Study
Stevens Village
Ted Stevens Anchorage International P
002
082
7,009,850
7,443,000
Construct New Airport [Phase 2 (Surfacing)], Construct Snow Removal Equipment Building Construct Taxiway [LOI #2-01(grant 3): Construct twy Y (pymt 3)], Rehabilitate
083 5,500,000Taxiway [LOI #2-01 [grant 3]; DG6 Upgrade Twy K(J - Y) [pymt1]] Noise Mitigation Measures for Residences within 65 - 69 DNL [RSIP (phase 5), 150
084 1,162,661homes (est.)] Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire ARFF vehicle 1]
085 6,250,665 Construct Taxiway
086 4,918,750 Construct Apron [LOI #98-1 (grant 7): Postmark RRA (pymt 1)]
087 1,890,000 Rehabilitate Taxiway [Construct run-up pad (twy K)]
088 10,058,619 Modify Terminal Building [(Phase 1 [MYr 1])], Modify Terminal Building [(Phase 1
089 12,235,000[MYr 2])], Modify Terminal Building [(Phase 1 [MYr 3])] Rehabilitate Taxiway [Reconstr K from C-A (non-LOI), phase 1], Rehabilitate
Tenakee GA 001 1,209,995Taxiway [Reconstr K from C-A (non-LOI), phase 1; MY funds] Rehabilitate Seaplane Base
Trident Basin GA 001 356,804 Improve Seaplane Base [(Preliminary Design & Environmental)]
Unalakleet P 002 12,354,247 Strengthen Runway [(Phase 1)] - 08/26, Strengthen Runway [(Phase 1)] - 14/32
Unalaska P 011 500,000 Conduct Airport Master Plan Study [(Terminal Study)]
Various Locations in Alaska 049 2,600,000 Acquire Aircraft Rescue & Fire Fighting Vehicle (Merle K (Mudhole) Smith; Ralph Wien Memorial; Wiley Post-Will Rogers Memorial)
050 2,920,386 Acquire Friction Measuring Equipment (Adak), Acquire Snow Removal Equipment
Selection Criteria Year: 2005
Page 2 of 98
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
AL AAL AK
Wasilla
Wrangell
Report Total:
Region Total:
ADO Total:
State Total:
CE ACE IA Albia Municipal
Algona Municipal
Ames Municipal
Arthur N Neu
Atlantic Municipal
Selection Criteria Year: 2005
FY 2005
Service Grant Seq Level Number
050
051
052
GA 011
CS 011
53 Grants
53 Grants
53 Grants
2099 Grants
GA 002
003
GA 003
GA 015
GA 007
GA 005
AIP Federal Funds
1,568,498
3,032,426
250,000
5,731,984
203,429,672
203,429,672
203,429,672
3,549,617,470
153,619
93,699
228,950
355,288
1,482,000
2,581,385
Report Date 02/23/2006
Brief Description Of Work
(Adak; Bethel; Chenega Bay; Clarks Point; Newtok; Port Graham; St George;Talkeetna)Acquire Snow Removal Equipment (Deering; Golovin; Gulkana; Huslia; Merle K(Mudhole) Smith; Tetlin; Wiley Post-Will Rogers Memorial)Rehabilitate Runway (Akhiok - 04/22; Bethel - 11/29; Bethel - 18/36; Chignik Lake 08/26; Clear - 01/19; Dillingham - 01/19; False Pass - 13/31; Gambell - 16/34;Goodnews - 05/23; Gustavus - 02/20; Gustavus - 11/29; Haines - 08/26; Homer 03/21; Iliamna - 07/25; Iliamna - 17/35; Kake - 10/28; Kaltag - 03/21; Karluk - 10/28;Ketchikan International - 11/29; King Salmon - 11/29; King Salmon - 18/36; Kodiak 07/25; Kodiak - 11/29; Kodiak - 18/36; Larsen Bay - 04/22; Manokotak - 01/19;Minchumina - 02/20; Napakiak - 16/34; Napaskiak - 02/20; Nelson Lagoon - 08/26;Newtok - 15/33; Nondalton - 02/20; Nulato - 02/20; Pedro Bay - 09/27; Port Graham- 12/30; Port Lions - 06/24; Seldovia - 16/34; Seward - 12/30; Seward - 15/33;Sheldon Point - 01/19; Shungnak - 09/27; Sitka Rocky Gutierrez - 11/29; Skagway 02/20; Sleetmute - 14/32; Teller - 07/25; Togiak - 03/21; Togiak - 10/28; Willow 13/31)Construct Apron [(Design)]
Rehabilitate Runway [(Resurfacing)] - 10/28, Rehabilitate Runway [(RunwaySafety Area, Phase 1)] - 10/28
Construct Snow Removal Equipment Building, Improve Access Road [/Apron],Install Miscellaneous NAVAIDS [Beacon & Lit Wind Cones], Remove Obstructions[Bury OH Power]Acquire Snow Removal Equipment [Truck]
Construct Snow Removal Equipment Building, Install Miscellaneous NAVAIDS[Beacon]Rehabilitate Taxiway [(01/19)]
Construct Runway [PH 2 PAVE/MK/LT] - 03/21, Construct Runway - 03/21
Construct Runway [2-20 (PH 4) Grade & Pave Rd] - Plan-1
Page 3 of 98
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
CE ACE IA Audubon County
Cherokee Municipal
Clarion Municipal
Council Bluffs Municipal
Davenport Municipal
Decorah Municipal
Des Moines International
Dubuque Regional
Emmetsburg Municipal
Estherville Municipal
Fairfield Municipal
Forest City Municipal
Fort Dodge Regional
Fort Madison Municipal
Grinnell Regional
Guthrie County Regional
Harlan Municipal
Independence Municipal
Iowa City Municipal
James G. Whiting Memorial Field
Jefferson Municipal
Keokuk Municipal
FY 2005
Service Grant SeqLevel Number
GA 001
GA 005
GA 002
GA 011
GA 012
GA 002
P 039
040
041
P 038
039
GA 001
GA 005
GA 008
GA 006
CS 021
GA 002
GA 004
005
GA 002
GA 004
GA 003
GA 011
GA 002
GA 004
GA 013
AIP FederalFunds
102,236
25,304
325,941
2,701,118
405,650
26,600
3,110,485
1,295,351
4,458,632
636,280
46,550
742,378
63,998
3,512,670
103,550
1,000,937
99,173
128,250
133,000
142,255
460,750
182,400
150,000
106,606
413,891
271,335
Report Date 02/23/2006
Brief Description Of Work
Construct Taxiway [(Phase 1 - Design)], Expand Apron [(Phase 1 - Design)]
Install Miscellaneous NAVAIDS [Beacon]
Construct Taxiway [Conn], Improve Access Road [Pave], Rehabilitate Apron,Rehabilitate Taxiway [T-Hgrs], Remove ObstructionsConstruct Runway [18/36 (PH 5) Pave/Mk/Lt] - Plan-1
Rehabilitate Taxiway
Extend Runway [Phase 1 - Design] - 11/29, Update Airport Master Plan Study[Phase 1 - Update ALP Runway 11/29 Extension]Rehabilitate Runway [13L/31R (PH 2)] - 13/31, Rehabilitate Runway [RSA 31Rrelocate localizer] - 13/31Construct Runway [13R/31L (PH 1)] - Plan-1
Construct Runway [13R/31L (PH 2)] - Plan-1
Improve Snow Removal Equipment Building [Expand/Terminal Security Access]
Conduct Miscellaneous Study [Drainage]
Rehabilitate Runway [13/31 Widen/OL] - 13/31
Rehabilitate Taxiway [Taxilanes Hgrs. 6&7]
Construct Runway [18-36 (PH 5) (PAVE)] - 18/36
Rehabilitate Access Road
Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Snow Removal Equipment[Replace Snow Plow]Acquire Snow Removal Equipment [single axle truck]
Construct Taxiway [T-Hgr Access]
Install Weather Reporting Equipment [AWOS]
Construct Runway - 18/36
Construct Taxiway [Partial Par. R15]
Improve Access Road [Pave], Rehabilitate Runway [Phase 1 - Conduct RunwayPavement Study] - 17/35Extend Runway [7/25 (PH 3-Design for Grade & Obst. Removal)] - 07/25
Rehabilitate Apron, Rehabilitate Runway [crack seal & repair] - 02/20, RehabilitateTaxiway [crack seal & repair]Rehabilitate Access Road, Rehabilitate Apron [/TWY]
Rehabilitate Taxiway [T-Hgr Taxilanes]
Selection Criteria Year: 2005
Page 4 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
CE ACE IA Knoxville Municipal GA 008 81,476 Acquire Snow Removal Equipment
Maquoketa Municipal GA 001 218,464 Rehabilitate Apron, Rehabilitate Taxiway [T-Hgrs.]
Marshalltown Municipal GA 008 902,500 Rehabilitate Runway [12/30] - 12/30
Mason City Municipal P 024 4,763,627 Improve Runway Safety Area - 17/35, Rehabilitate Runway [17/35] - 17/35
025 2,082,542 Improve Runway Safety Area - 12/30, Rehabilitate Runway [12/30] - 12/30
Monticello Regional GA 002 163,305 Acquire Land For Approaches [RPZ 33 - Prull & Franzenburg], Expand Apron
Mount Pleasant Municipal GA 005 177,650 Rehabilitate Taxiway
Orange City Municipal GA 001 133,000 Conduct Airport Master Plan Study, Conduct Environmental Study [EA], Conduct
002 76,000Miscellaneous Study [BCA] Construct Fuel Farm
Osceola Municipal GA 003 153,900 Construct Snow Removal Equipment Building, Improve Access Road
004 77,254 Acquire Snow Removal Equipment
Oskaloosa Municipal GA 004 300,000 Construct Taxiway [Grade/Pave/Light Partial Parallel to R31]
Ottumwa Industrial GA 011 220,305 Install Miscellaneous NAVAIDS [SWC's - Runways 13/31 & 4/22], Rehabilitate
Pella Municipal GA 003 27,377
Runway [13/31 Crack Cleaning & Sealing] - 13/31, Rehabilitate Runway Lighting [13/31] - 13/31 Install Perimeter Fencing [PH 1 - WHA/WHMP]
Red Oak Municipal GA 005 300,504 Extend Runway [5/23 PH 2 Grade] - 05/23
Schenck Field GA 002 68,565 Construct Fuel Farm [Self Serve Fuel Dispenser]
Sioux Gateway/Col. Bud Day Field P 032 4,363,510 Extend Runway Safety Area [Grade ditch 17, remove arresting gear 17/35] - 17/35, Extend Taxiway [C]
Southeast Iowa Regional CS 023 4,458,090 Rehabilitate Runway [18/36] - 18/36, Rehabilitate Runway [Improve RSA 18/36] 18/36, Rehabilitate Taxiway [C (PH 2)]
Spencer Municipal GA 014 134,710 Acquire Snow Removal Equipment [Loader/Blower]
015 131,260 Construct Taxiway, Expand Building
State of Iowa 007 415,495 Update Airport Master Plan Study (Denison Municipal; Knoxville Municipal; Monticello Regional; Ottumwa Industrial; Spencer Municipal; Vinton Veterans Memorial
008 69,569Airpark) Conduct Miscellaneous Study
The Eastern Iowa P 031 4,344,189 Install Miscellaneous NAVAIDS [Replace Primary Wind Cone], Install Runway Sensors - 09/27, Rehabilitate Taxiway [PH 2 Construction]
032 271,814 Rehabilitate Runway [PH 1 Design] - 09/27
Selection Criteria Year: 2005
Page 5 of 98
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
CE ACE IA Vinton Veterans Memorial Airpark
Waterloo Municipal
State Total:
Waverly Municipal
Winterset-Madison County
CE ACE KS Allen County
Amelia Earhart
Anthony Municipal
Atkinson Municipal
Atwood-Rawlins County City-County
Belleville Municipal
Blosser Municipal
Captain Jack Thomas/El Dorado
Cheyenne County Municipal
Clay Center Municipal
Coffeyville Municipal
Dodge City Regional
Elkhart-Morton County
Forbes Field
Fort Scott Municipal
Garden City Regional
Gardner Municipal
Great Bend Municipal
FY 2005
Service Grant Seq Level Number
GA 002
P 025
026
027
028
GA 001
GA 002
63 Grants
GA 005
GA 003
GA 001
GA 009
GA 003
GA 004
GA 004
GA 004
GA 002
003
GA 004
GA 009
CS 017
GA 002
P 019
020
GA 006
CS 022
GA 002
GA 014
AIP Federal Funds
19,237
627,000
285,000
972,701
1,110,970
150,000
367,648
53,007,943
55,446
38,200
137,053
898,354
1,162,894
635,829
437,289
165,067
35,055
30,020
47,500
63,887
116,253
114,000
683,574
41,272
73,363
2,566,567
216,007
450,000
Report Date 02/23/2006
Brief Description Of Work
Install Miscellaneous NAVAIDS [Rotating Beacon]
Acquire Aircraft Rescue & Fire Fighting Vehicle
Install Guidance Signs [(PH 2)]
Security Enhancements [Wildlife Fence]
Rehabilitate Apron [(PH 2)]
Extend Runway [PH 1-Planning, Environmental, and Land] - 11/29
Rehabilitate Runway [14/32 Repair & Resurface] - 14/32
Construct Taxiway [Parallel Taxiway]
Rehabilitate Apron [phase 1 (design)]
Improve Airport Drainage, Rehabilitate Terminal Building
Rehabilitate Runway [PH3 OVERLAY RWY 3-21] - 03/21
Rehabilitate Runway - 16/34, Rehabilitate Taxiway [Phase 2]
Rehabilitate Runway - 18/36
Rehabilitate Runway - 17/35
Rehabilitate Runway - 04/22
Rehabilitate Runway [Environmental Assessment] - 13R/31L
Construct Apron [Design engineering for apron]
Rehabilitate Runway [Design Only (repair/ crack seal) runway, taxiways, apron] 17/35Acquire Land For Approaches
Rehabilitate Taxiway [Design Phase]
Rehabilitate Apron
Acquire Aircraft Rescue & Fire Fighting Vehicle
Rehabilitate Taxiway
Acquire Snow Removal Equipment
Rehabilitate Taxiway [PH2 TWY A]
Acquire Land For Approaches
Install Miscellaneous NAVAIDS, Rehabilitate Taxiway [parallel txy phase 1],
Selection Criteria Year: 2005
Page 6 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
CE ACE KS 014 Rehabilitate Taxiway Lighting
Herington Regional GA 002 608,073 Rehabilitate Runway - 17/35
Hill City Municipal GA 005 360,358 Rehabilitate Apron
Hutchinson Municipal GA 014 125,685 Update Airport Master Plan Study
Kingman Airport - Clyde Cessna Field GA 007 22,145 Install Weather Reporting Equipment [Install AWOS]
Larned-Pawnee County GA 007 19,952 Improve Utilities [Replace existing septic system], Install Weather Reporting
Lawrence Municipal GA 012 256,538Equipment [Install AWOS] Construct Taxiway [Construct Partial Parallel Taxiway], Rehabilitate Runway
Manhattan Regional P 024 327,346
Lighting [Rehab RWY lts] - 15/33, Rehabilitate Taxiway Lighting [Rehab Taxiway A Lighting] Conduct Environmental Study, Update Airport Master Plan Study
026 1,166,821 Rehabilitate Runway Lighting - 03/21, Rehabilitate Taxiway Lighting
027 489,204 Construct Building
McPherson GA 009 503,138 Construct Taxiway [Construct new connecting taxiway], Rehabilitate Taxiway [Phase 2 Apron to A-3.]
Medicine Lodge GA 001 93,812 Conduct Airport Master Plan Study
Miami County GA 006 70,157 Acquire Easement For Approaches [REIMBURSE EASEMENTFOR RPZ]
Moritz Memorial GA 003 150,000 Expand Apron
New Century Aircenter R 019 2,145,160 Rehabilitate Runway [PH2 REHAB RWY 17-35] - 17/35
Newton-City-County R 019 1,210,254 Rehabilitate Apron [APRON REHAB DESIGN ONLY], Rehabilitate Taxiway [REHAB TWY C], Rehabilitate Taxiway Lighting [REHAB MITL TWY'S A,B,C,D]
Oswego Municipal GA 002 46,370 Update Airport Master Plan Study [Update ALP and revalidate EA]
003 22,934 Remove Obstructions
Ottawa Municipal GA 007 103,630 Install Miscellaneous NAVAIDS [INSTALL PAPI'S RWY 17-35], Rehabilitate Apron [Design Apron Rehab]
Philip Billard Municipal GA 011 1,312,195 Rehabilitate Runway [Rehab RWY 13-31 and narrow to 100'] - 13/31
Phillipsburg Municipal GA 005 41,610 Update Airport Master Plan Study [UPDATE ALP]
Pratt Industrial GA 008 2,457,042 Rehabilitate Runway [PH3 Rehab runway 17-35.] - 17/35
Renner Field /Goodland Municipal/ GA 011 278,862 Construct Runway [reimb for EA (for RSA rwy 12 fill)], Improve Runway Safety
012 28,500Area - 12/30 Acquire Miscellaneous Land
Russell Municipal GA 004 1,240,410 Rehabilitate Runway [PH2 Rehab Runway 17-35] - 16/34
Selection Criteria Year: 2005
Page 7 of 98
FAA - Office Of Airports
Region ADO State Worksite
CE ACE KS Salina Municipal
State Total:
Scott City Municipal
Shalz Field
Strother Field
Syracuse-Hamilton County Municipal
Wichita Mid-Continent
CE ACE MO Charles B. Wheeler Downtown
Joplin Regional
Kansas City International
Lambert-St Louis International
Missouri State Block Grant Program
Springfield-Branson Regional
State Total:
CE ACE NE Albion Municipal
Selection Criteria Year: 2005
Grants Awarded by FY
FY 2005
Service Level
Grant Seq Number
CS 025
GA
GA
GA
GA
P
006
006
011
003
049
50 Grants
R
P
P
015
016
023
046
047
P 088
091
092
093
094
095
P
097
026
029
030
15 Grants
GA 005
AIP Federal Funds
4,039,731
156,832
270,123
218,177
202,544
5,944,578
31,879,811
5,415,000
1,100,000
3,501,523
4,634,255
7,464,005
386,687
7,028,210
19,909,600
4,790,400
2,251,054
6,137,729
176,172
15,603,594
5,381,109
4,000,000
87,779,338
93,850
Report Date 02/23/2006
Brief Description Of Work
Install Airport Beacons [Replace old beacon with new beacon], Install GuidanceSigns [Replace damaged and faded sign panels], Rehabilitate Runway [PH2 Rehabrwy 12-30 with drains] - 12/30, Rehabilitate Taxiway [Rehab TWY B & E with underdrains.]Extend Taxiway [construct T-Hanger Taxiway]
Rehabilitate Apron, Rehabilitate Taxiway [T-hangar taxiway]
Rehabilitate Taxiway Lighting [Rehab Partial Par TWY Lts]
Construct Runway [Project Design (grading & paving) and fencing] - Plan-1
Construct Taxiway [Taxiway H], Construct Taxiway [Taxiway L]
Rehabilitate Runway [phase 2] - 01/19
Rehabilitate Runway Lighting - 01/19
Construct Terminal Building [Construct new terminal building (phase 2)]
Rehabilitate Apron
Construct Deicing Containment Facility [Expand Glycol recovery system (phase 2)],Rehabilitate Runway Lighting [Airfield lightng control] - 01L/19RAcquire Aircraft Rescue & Fire Fighting Vehicle
Construct Runway - Plan-1
Acquire Land for Noise Compatibility within 70 - 74 DNL [Expansion noise land]
Noise Mitigation Measures for Residences within 65 - 69 DNL
Rehabilitate Taxiway [rehab txy Delta (6/24 to Charlie)]
Rehabilitate Apron [rehab NW aircarrier apron], Rehabilitate Apron [rehabconcourse C apron], Rehabilitate Taxiway [rehab txy Golf (Papa to 12R)]Acquire Aircraft Rescue & Fire Fighting Vehicle
Non primary development projects in state block grant program
Rehabilitate Runway [Phase 5 (final)]
Construct Terminal Building [phase 2]
Acquire Snow Removal Equipment
Page 8 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
CE ACE NE Alliance Municipal GA 010 1,025,000 Install Airfield Guidance Signs, Install Perimeter Fencing [Preliminary Phase work for the fence construction in FY 06 including the wildlife study by USDA], Rehabilitate
Antelope County GA 002 513,501Apron, Rehabilitate Taxiway Construct Taxiway [look back], Construct Taxiway, Expand Apron
Aurora Municipal - Al Potter Field GA 005 265,068 Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate Taxiway
Beatrice Municipal GA 009 183,872 Construct Snow Removal Equipment Building, Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS
Blair Municipal GA 006 939,051 Construct Apron, Construct Runway [Phase 4] - 13/31, Construct Taxiway, Install Miscellaneous NAVAIDS, Update Airport Master Plan Study
Brenner Field GA 004 11,000 Update Airport Master Plan Study
005 94,002 Acquire Snow Removal Equipment
Brewster Field GA 004 273,797 Expand Apron, Improve Fuel Farm
Broken Bow Municipal GA 003 121,021 Acquire Snow Removal Equipment
Central Nebraska Regional CS 026 219,863 Security Enhancements
027 2,863,676 Rehabilitate Apron
Chadron Municipal GA 007 111,944 Acquire Snow Removal Equipment
Columbus Municipal GA 005 693,880 Acquire Land For Approaches, Acquire Land For Approaches, Acquire Land For
Cozad Municipal GA 002 139,650Approaches Extend Runway [Land for Runway RPZ and BRL (Phase 1)] - 13/31
Creighton Municipal GA 002 104,500 Rehabilitate Runway - 12/30, Rehabilitate Taxiway
Crete Municipal GA 005 226,670 Construct Snow Removal Equipment Building
Eppley Airfield P 041 1,988,187 Construct Apron
042 1,932,371 Extend Runway
043 11,651,250 Extend Runway [Extend Runway 14L/32R by 1500 feet] - 14L/32R, Extend Runway - 14L/32R, Extend Runway - 14L/32R
Garden County GA 002 450,000 Construct Taxiway
Hartington Municipal GA 003 589,181 Construct Taxiway
Hastings Municipal GA 007 66,500 Update Airport Master Plan Study
008 137,602 Install Perimeter Fencing
Hebron Municipal GA 003 180,500 Construct Snow Removal Equipment Building
Jim Kelly Field GA 005 93,945 Acquire Snow Removal Equipment
006 15,000 Update Airport Master Plan Study
Selection Criteria Year: 2005
Page 9 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
CE ACE NE 007 380,721 Construct Terminal Building [Design Terminal area (Phase 1)]
Karl Stefan Memorial GA 012 97,324 Acquire Snow Removal Equipment
013 90,725 Acquire Snow Removal Equipment, Acquire Snow Removal Equipment
Kearney Municipal CS 015 949,050 Install Miscellaneous NAVAIDS, Rehabilitate Apron
016 802,471 Construct Snow Removal Equipment Building
Kimball Municipal/Robert E Arraj Field GA 004 602,547 Construct Taxiway
Lincoln Municipal P 033 902,500 Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS [Install ODALS on Runway 35 End], Install Miscellaneous NAVAIDS [Relocate windcones out of the RSA], Rehabilitate Runway - 17/35, Rehabilitate Service Road, Rehabilitate Taxiway, Security Enhancements
Miller Field GA 004 243,244 Extend Runway [Phase 3] - 03/21
Nebraska City Municipal GA 009 191,000 Construct Snow Removal Equipment Building
North Platte Regional Airport Lee Bird Field CS 020 103,550 Install Guidance Signs
Pender Municipal GA 003 49,400 Update Airport Master Plan Study
004 91,618 Acquire Snow Removal Equipment
Plattsmouth Municipal GA 008 104,500 Install Weather Reporting Equipment
Red Cloud Municipal GA 001 52,250 Update Airport Master Plan Study
Rock County GA 004 218,500 Construct Parking Lot, Improve Access Road, Rehabilitate Taxiway
Searle Field GA 003 393,300 Acquire Land For Approaches
004 1,525,374 Rehabilitate Runway [Phase 1] - 13/31
Seward Municipal GA 004 866,317 Extend Taxiway, Widen Taxiway
State of Nebraska 006 242,250 Update State System Plan Study
007 144,486 Conduct State System Plan Study, Update State System Plan Study
Stuart-Atkinson Municipal GA 002 306,000 Rehabilitate Apron, Rehabilitate Taxiway
Superior Municipal GA 001 420,000 Rehabilitate Apron, Rehabilitate Taxiway
Tecumseh Municipal GA 004 95,000 Acquire Miscellaneous Land
Tekamah Municipal GA 003 800,000 Construct Taxiway [Reimbursement for Taxiway constructed in FY-05], Construct Taxiway [Reimbursement for Taxiway constructed in FY-05], Construct Taxiway [The airport will finish construction in FY-05 and get reimbursement in FY-06 and
The O'Neill Municipal-John L Baker Field GA 002 123,323 07] Rehabilitate Runway - 13/31
Selection Criteria Year: 2005
Page 10 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
CE ACE NE Wahoo Municipal GA 003 300,515 Acquire Land for Development
Wayne Municipal GA 006 95,000 Install Weather Reporting Equipment
Western Nebraska Regional/William B. Heilig Field
CS 024 1,000,000 Construct Terminal Building
State Total: 55 Grants 36,175,846
ADO Total: 183 Grants 208,842,938
Region Total: 236 Grants 208,842,938
Report Total: 2099 Grants 3,549,617,470
EA BEC WV Braxton County GA 010 252,807 Install Perimeter Fencing, Rehabilitate Runway [Crack & Joint Repair] - 01/19
Eastern WV Regional/Shepherd Field R 020 200,000 Construct Terminal Building
021 1,513,021 Construct Taxiway
Elkins-Randolph County-Jennings Randolph Field
GA 011 215,131 Construct Runway Safety Area - 14/32, Install Airfield Guidance Signs
Fairmont Municipal-Frankman Field GA 005 505,400 Acquire Land For Approaches, Remove Obstructions
Grant County GA 015 780,772 Construct Taxiway [(TW "A")]
Greenbrier Valley
Harrison/Marion Regional
P
P
022
028
1,108,750
3,019,789
Expand Apron [phase 3], Improve Runway Safety Area [Environmental Assessment] - 04/22, Security Enhancements [Fencing & Terminal Modifications] Acquire Friction Measuring Equipment, Construct Aircraft Rescue & Fire Fighting
Jackson County GA 012 76,010
Building, Improve Runway Safety Area [Grading] - 03/21, Rehabilitate Emergency Generator, Security Enhancements [(Camera System)] Construct Taxiway, Install Emergency Generator
013 129,580 Rehabilitate Building [(Hangar)]
Kee Field GA 009 491,283 Improve Runway Safety Area - 8-26
Marshall County GA 013 187,482 Construct Snow Removal Equipment Building
Mason County GA 013 68,238 Remove Obstructions [Primary Surface]
Mercer County GA 017 555,998 Construct Fuel Farm [design], Improve Terminal Building, Remove Obstructions [RW
Mid-Ohio Valley Regional P 029 4,800,00023 Approach and Primary Surface] Improve Runway Safety Area [Grading] - 03/21, Rehabilitate Taxiway
Morgantown Municipal-Walter L. Bill Hart Field P 024 1,018,589 Construct Deicing Containment Facility, Rehabilitate Apron
Selection Criteria Year: 2005
Page 11 of 98
FAA - Office Of Airports
Region ADO State Worksite
EA BEC WV
Philippi/Barbour County Regional
Raleigh County Memorial
Tri-State/Milton J. Ferguson Field
Upshur County Regional
Wheeling Ohio County
Yeager
EA HAR DE
ADO Total:
State Total:
Delaware Airpark
New Castle
New Castle County
State of Delaware
Summit
State Total:
Sussex County
EA HAR PA Allegheny County
Selection Criteria Year: 2005
Grants Awarded by FY
FY 2005
Service Level
Grant Seq Number
GA
CS
P
025
026
006
019
033
GA
GA
016
021
P 035
24 Grants
24 Grants
GA
GA
GA
006
023
022
R
GA
003
007
008
019
7 Grants
R 013
AIP FederalFunds
97,119
4,750,000
175,816
299,917
910,288
567,362
400,000
7,075,861
29,199,213
29,199,213
1,800,000
114,670
3,631,943
152,000
52,098
236,540
566,846
6,554,097
237,500
Report Date 02/23/2006
Brief Description Of Work
Improve Snow Removal Equipment Building [Sewer Connection], Install TaxiwayLightingImprove Runway Safety Area - 18/36
Install Miscellaneous NAVAIDS [PAPIs & REILs]
Construct Taxiway [Design], Rehabilitate Terminal Building [Rehab RoofOverhangs], Security EnhancementsAcquire Snow Removal Equipment, Improve Runway Safety Area [EnvironmentalAssessment] - 12/30, Improve Terminal Building, Install Perimeter Fencing,Rehabilitate Access RoadInstall Apron Lighting [South Apron], Install Perimeter Fencing
Install Runway Vertical/Visual Guidance System [Phase 2 of 2] - 16/34, RehabilitateRunway [Crack Seal And Remark] - 03/21, Rehabilitate Runway [Crack Seal AndRemark] - 16/34Expand Terminal Building, Improve Runway Safety Area [RW 5 END] - 05/23,Improve Terminal Building, Rehabilitate Apron, Remove Obstructions [EnvironmentalAssessment]
Construct Runway [Land Acquisition and Wetlands, Phase II] - 09/27
Acquire Snow Removal Equipment [Six Wheel Dump Truck]
Construct Taxiway [Taxiway K-4 (including rehabilitation of Taxiway K], ExpandApron [Holding Area for Taxiway E at Runway 1 (including blast wall insulation)],Rehabilitate Taxiway [Old Taxiway M], Update Miscellaneous Study [PavementManagement System]Update State System Plan Study
Rehabilitate Runway [Remarking] - 17/35, Rehabilitate Runway Lighting - 11/29
Construct Taxiway [Parallel Taxiway (Environmental), Phase I], Extend Runway[Environmental, Phase I] - 17/35, Remove Obstructions [Environmental, Phase I]Construct Snow Removal Equipment Building [Design & Snow Plan], RehabilitateRunway [Land easements, Ph II] - Plan-1
Update Airport Master Plan Study
Page 12 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
EA HAR PA 014 248,875 Rehabilitate Runway Lighting
015 1,666,175 Improve Airport Drainage, Rehabilitate Taxiway [Convert Runway 5/23 to a
Allentown Queen City Municipal GA 008 150,000Taxiway], Rehabilitate Taxiway Construct Taxiway [(Taxilanes), Phase III]
Altoona-Blair County CS 030 2,643,810 Expand Apron [South Hangar Apron, Phase II], Improve Runway Safety Area [Runways 3/21 and 30, Phase II] - 03/21
031 178,484 Acquire Land For Approaches [Runway 2/20 and 12/30]
Arnold Palmer Regional P 028 260,680 Improve Airport Drainage [Sewer Extension], Improve Runway Safety Area [Obstruction removal, Phase III] - 05/23
030 739,250 Acquire Land for Development [One Acre - Tomasic Property], Acquire Snow Removal Equipment [Broom]
031 1,810,700 Construct Taxiway [T-hangar taxiway, Phase II]
Bradford Regional CS 029 396,000 Improve Runway Safety Area [(construct), Phase II] - 14/32
030 1,129,550 Acquire Miscellaneous Land [Mineral Rights], Rehabilitate Apron [Terminal Apron], Rehabilitate Runway Lighting [HIRL] - 14/32
Capital City R 014 1,799,930 Improve Runway Safety Area [Easements, land, construction replace ALS for Runway 8, Ph III] - 08/26, Improve Runway Safety Area [Runway 12 End] - 12/30
Commonwealth of Pennsylvania 003 330,000 Update State System Plan Study
Delaware Valley Region 005 325,000 Conduct Miscellaneous Study [Conduct Air Service Demand Study, Phase II]
006 281,000 Conduct Metropolitan System Plan Study [CASP XXIII]
Du Bois-Jefferson County CS 027 1,680,550 Construct Access Road [Access Road and Parking Lot, Phase II], Construct
Erie International/Tom Ridge Field P 041 432,250Taxiway [T-Hangar Taxiway], Improve Terminal Building [utilities-water] Rehabilitate Apron [Terminal Apron, Phase II]
Franklin County Regional GA 005 613,927 Rehabilitate Apron, Rehabilitate Runway - 06/24, Rehabilitate Taxiway
Harrisburg International P 041 6,660,000 Construct Apron [Phase IV], Construct Taxiway [Phase III], Install Runway Lighting [Phase II] - 13/31
042 3,830,105 Construct Apron [Cargo Apron, Phase II], Construct Terminal Building [Phase III]
John Murtha Johnstown-Cambria County CS 033 1,083,000 Improve Runway Safety Area - 05/23, Rehabilitate Runway [cracksealing] - 05/23, Rehabilitate Runway Lighting [internal electrical components, Phase II] - 15/33, Rehabilitate Taxiway [Taxiways B, C, D, F, F2 and G], Remove Obstructions
Lancaster GA 027 1,000,000[Runway Approaches] Extend Runway [Phase IX] - 08/26, Rehabilitate Taxiway [Design of Taxiways E, F,
Lehigh Valley International P 061 2,000,000 and M] Noise Mitigation Measures for Residences within 65 - 69 DNL
Selection Criteria Year: 2005
Page 13 of 98
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
EA HAR PA
Northeast Philadelphia
Pennsylvania State Block Grant Program
Philadelphia International
Pittsburgh International
Reading Regional/Carl A Spaatz Field
Rostraver
University Park
Wilkes-Barre/Scranton International
Williamsport Regional
State Total:
Selection Criteria Year: 2005
Report Date 02/23/2006
FY 2005
Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
062 3,591,522 Acquire Interactive Training System, Acquire Land for Development, Construct Snow Removal Equipment Building, Improve Runway Safety Area [Phase II] - 13/31, Security Enhancements [Install Security Fencing]
063 5,344,625 Rehabilitate Taxiway [Taxiway B, Phase III]
064 2,000,000 Acquire Land For Approaches [Runway 13 RPZ]
012R 3,252,222 Construct Taxiway [Taxiway C, Phase V]
022 6,300,000 Non primary development projects in state block grant program - GA/RL
023 4,961,076 Non primary development projects in state block grant program - GA/RL
024 628,000 Non primary development projects in state block grant program - GA/RL
025 1,326,928 Non primary development projects in state block grant program - GA/RL
026 1,907,000 Non primary development projects in state block grant program - GA/RL
027 1,499,500 Non primary development projects in state block grant program - GA/RL
072P 2,400,000 Noise Mitigation Measures for Residences within 65 - 69 DNL [Phase III]
073 6,000,054 Construct Runway [Environmental Impact Statement, Phase III] - 17/35
074 5,450,000 Rehabilitate Apron [D and E Apron including Taxiway J, Phase IV]
075 12,779,619 Extend Runway - 17/35
085P 5,323,879 Improve Runway Safety Area [10L Safety Area, Phase III] - 10L/28R, Improve Runway Safety Area [28R Safety Area] - 10L/28R, Security Enhancements [Police Vehicles]
086 5,578,206 Rehabilitate Taxiway [Taxiways T and V, Phase V]
087 1,843,647 Rehabilitate Taxiway [B2], Rehabilitate Taxiway [Taxiway R (design)]
040P 45,717 Acquire Snow Removal Equipment [Tow Vehicle], Rehabilitate Runway [Phase II] 13/31, Rehabilitate Runway - 18/36
010R 441,750 Acquire Land For Approaches [20 Acres], Improve Airport Drainage [Phase II], Improve Runway Safety Area [Design on Runway 8 End] - 08/26, Install Perimeter Fencing [Phase II]
037P 469,896 Update Airport Master Plan Study [Airport Layout Plan Update, environmental and preliminary design of ATCT]
038P 5,990,170 Construct Apron [Phase II], Construct Terminal Building [Phase V], Improve Airport Drainage, Rehabilitate Runway [renumber and signage] - 04/22
029P 788,500 Construct Runway Safety Area [Phase II] - 09/27, Construct Snow Removal Equipment Building [Design, Phase I]
45 Grants 107,419,097
Page 14 of 98
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
ADO Total:
EA NYC NJ Atlantic City International
Cape May County
Essex County
Greenwood Lake
Hammonton Municipal
Lakewood
Lincoln Park
Linden
Millville Municipal
Morristown Municipal
Newark Liberty International
FY 2005
Service Grant Seq AIP Federal Level Number Funds
52 Grants 113,973,194
P 060 366,469
061 3,458,358
GA 019 115,999
022 200,000
R 019 641,136
020 701,900
GA 001 25,000
GA 009 98,597
010 96,972
GA 006 51,775
R 005 142,500
006 1,076,484
R 009 94,927
GA 017 680,000
018 137,000
023 279,749
R 030 41,238
031 46,953
032 215,507
P 103 500,000
104 6,704,570
105 1,656,156
Report Date 02/23/2006
Brief Description Of Work
Environmental Mitigation [Phase II]
Security Enhancements [Security Enhancements - Phase III]
Conduct Airport Master Plan Study [Pavement Management Study], RemoveObstructions [Obstruction Study]Rehabilitate Taxiway ["B", "D", "G", and T-hangar taxiway]
Improve Runway Safety Area [Runways 4 & 9 Safety Areas, Phase I - PreliminaryEngineering & Environmental Only] - 04/22, Install Miscellaneous NAVAIDS [Acquire& Relocate Airport Beacon - Design & Installation], Rehabilitate Runway [Design] 09/27, Rehabilitate Taxiway [Taxiway "P" - Phase I, Design & Construct]Construct Building [14,000 Square-Foot, 9-Bay T-hangar]
Install Perimeter Fencing [Replace Existing Fence - Design Only]
Conduct Environmental Study [Environmental Assessment for short term projects.]
Install Perimeter Fencing [Phase II]
Conduct Environmental Study [Environmental Assessment Phase II.]
Conduct Environmental Study [CONDUCT ENVIRONMENTAL ASSESSMENT FORMASTER PLAN PROJECT]Construct Apron [Includes Associated Taxiway-Phase II]
Conduct Airport Master Plan Study [:Obstruction Study On/Off Airport Property]
Rehabilitate Taxiway Lighting [Rehabilitate t/w 'A' Ligthing ,Signage]
Conduct Airport Master Plan Study [Pavement Management System Study], RemoveObstructions [Obstruction Study]Rehabilitate Taxiway ["B","G","J" and North Apron Intersection(Design)]
Install Weather Reporting Equipment [INSTALL WEATHER REPORTING EQUIPMENT{AWOS} - Design & Permitting]Install Runway Vertical/Visual Guidance System [Install PAPI at Runway 5Approach End - Design and Permitting Only] - 05/23Improve Airport Drainage [Preliminary Design (Runway 13 End) & EnvironmentalAssessment]Improve Runway Safety Area [Phase I] - 11/29
Noise Mitigation Measures for Public Buildings [Soundproofing McKinley School Phase VII $6,251,900(Fed. Share)]Install Runway Incursion Caution Bars [Upgrade Runway Hold Bar Lighting]
Selection Criteria Year: 2005
Page 15 of 98
Grants Awarded by FY FAA - Office Of Airports
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
EA NYC NJ
Ocean City Municipal
Robert J. Miller Air Park
Somerset
106
007
008
009
013
014
005
GA
GA
R
8,217,000
103,071
28,761
17,978
285,000
525,000
622,328
Sussex 005R 198,271
Teterboro 026
028
029
030
031
R 3,166,993
4,150,000
500,000
6,030,027
500,000
Trenton Mercer
032
030
031
P
5,723,132
729,097
262,432
Trenton-Robbinsville
Woodbine Municipal
005
006
007
011
012
R
GA
268,579
262,182
37,525
28,500
188,503
State Total: 43 Grants 49,175,669
EA NYC NY Adirondack Regional 033
034
035
GA 467,685
1,044,405
276,500
Report Date 02/23/2006
Brief Description Of Work
Extend Taxiway ["P"]
Rehabilitate Runway [Sink hole repair (r/w rehabilitation)] - 06/24
Construct Snow Removal Equipment Building [Design and Permits]
Construct Fuel Farm [Design and Permits]
Construct Runway [14-32(new crosswind runway) design and permitting] - Plan-1
Rehabilitate Apron [Rehabilitation and Extension - Construction- Phase I]
Rehabilitate Apron [REHABILITATE TRANSIENT APRON (NORTH OF RUNWAY 1230) 33,000 SF]Remove Obstructions [Obstruction Removal at Runway 3 End Bury Power Lines(800 ft).]Construct Taxiway [Phase II]
Construct Taxiway [Construct Taxiway N (between Taxiways G and L)]
Improve Runway Safety Area [Prelim. Eng. & Env.] - 06/24
Noise Mitigation Measures for Public Buildings
Noise Mitigation Measures for Public Buildings [Soundproofing of H. P. BectonRegional School - Phase II $500,000]Construct Taxiway [Relocate Taxiway P - Phase IV]
Acquire Snow Removal Equipment [Acquire Snow Removal Equipment - Phase II]
Rehabilitate Taxiway [Rehabilitate Taxiways "A","C" and "J" - Phase I$285,000(Fed. Share)]Rehabilitate Apron [Rehabilitate Mid-Field Aircraft Parking Apron - Phase II]
Install Airfield Guidance Signs [Airfield Signage Improvements]
Acquire Land for Development [Property Transfer to Airport]
Install Weather Reporting Equipment [Design and Permits]
Acquire Land for Development [Phase I, Condemnation Proceedings], UpdateAirport Master Plan Study [Update Airport Layout Plan]
Construct Apron [Apron Expansion - Phase I (Construction)]
Construct Taxiway
Rehabilitate Runway [Runway 9-27 Rehabilitation (Design Only)] - 09/27,Rehabilitate Taxiway [Taxiways C, D & E and Ramp Rehabilitation (Design Only)]
Selection Criteria Year: 2005
Page 16 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
EA NYC NY 037 140,296 Acquire Snow Removal Equipment [Plow Truck], Conduct Airport Master Plan Study [Wildlife Hazard Assessment]
Akron R 011 313,797 Acquire Easement For Approaches [ACQUIRE EASEMENTS/OBSTRUCTION REMOVAL FOR RWYS. 25 AND 29 RPZ'S]
012 304,611 Construct Building [PURCHASE 2 10-BAY T-HANGARS (REIMBURSEMENT)]
Albany International P 080 834,058 Security Enhancements [Airfield Security/Service Access Road Improvements]
081 2,680,591 Security Enhancements [Terminal Concourse D Security Checkpoint Improvements]
082 1,330,773 Rehabilitate Apron [Southern Terminal Ramp Improvements - Phase 2]
083 1,130,181 Expand Apron [Northeast Quadrant Air Cargo Ramp Expansion]
085 503,500 Remove Obstructions [Runway 01/10 Obstruction (Tree) Removal]
Bayport Aerodrome GA
086
007
400,422
187,231
VALE Vehicle [VALE Program - Clean Fuel/American Fuel Fleet Conversion - Phase 1] Construct Snow Removal Equipment Building [Construct Snow Removal and
008 260,633Maintenance Equipment Building] Improve Access Road [Improve Airport Access Road - North End]
Buffalo Airfield R 013 82,431 Update Airport Master Plan Study [AIRPORT MASTER PLAN UPDATE]
014 86,724 Install Miscellaneous NAVAIDS [Replace Rotating Beacon, Lighted Wind Indicator
Buffalo Niagara International P 060 11,250,242and Regulator] Rehabilitate Runway [REHABILITATE AND EXTEND RUNWAY 5/23 AND PARALLEL TAXIWAY A, INCLUDING RELOCATION OF NAVIGATIONAL AIDS (PHASE 3)] 05/23
Canandaigua R 017
018
93,542
439,850
Construct Snow Removal Equipment Building [Phase I-Design], Remove Obstructions [Phase I-Study] Extend Runway [Acquire Land For Runway End 13 Extension and Runway
Chautauqua County/Dunkirk GA 032 133,752Protection Zone] - 13/31 Acquire Snow Removal Equipment [PURCHASE SNOW REMOVAL EQUIPMENT]
Chautauqua County/Jamestown CS 032 356,250 Acquire Snow Removal Equipment, Expand Apron [Design]
Corning-Painted Post GA 005 149,971 Acquire Snow Removal Equipment [PURCHASE SNOW REMOVAL EQUIPMENT]
006 2,522,019 Construct Runway [Pave and light runway, including associated obstruction removal] - 13/31
Cortland County-Chase Field GA 012 201,400 Install Weather Reporting Equipment [INSTALL AWOS-3]
Dansville Municipal GA 014 798,000 Construct Building [CONSTRUCT 8-BAY T-HANGAR], Construct Taxiway
Dutchess County GA 026 76,000 [CONSTRUCT T-HANGAR TAXILANE] Improve Airport Drainage [Improve Drainage For SRE Building]
Selection Criteria Year: 2005
Page 17 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
EA
Region
NYC NY
ADO State
Elmira/Corning Regional
Finger Lakes Regional
Floyd Bennett Memorial
Francis S Gabreski
Fulton County
Genesee County
Greater Binghamton/Edwin A Link Field
Greater Rochester International
Griffiss Airpark
Worksite
Hamilton Municipal
Ithaca Tompkins Regional
Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
P 042
043
4,512,888
988,924
Extend Runway [EXTEND RUNWAY END 6 BY 600'] - 06/24, Extend Taxiway [EXTEND TAXIWAY A BY 600'] Expand Terminal Building [Install Passenger Boarding Bridge]
GA
GA
015
032
286,900
159,600
Install Weather Reporting Equipment [INSTALL AN AUTOMATED WEATHER OBSERVING SYSTEM (AWOS-3)] Improve Runway Safety Area [RW 1-Design] - 01/19
GA
GA
012
013
314,441
210,720
Acquire Snow Removal Equipment [Acquire One Broom and One Snow Plow $432,250(Fed. Share)] Install Perimeter Fencing [Install Perimeter Fencing]
014 124,995 Acquire Snow Removal Equipment
R 018
019
285,000
1,630,789
Acquire Land For Approaches [ACQUIRE LAND AND EASEMENTS FOR THE RUNWAY END 10 RPZ (PHASE 3)], Rehabilitate Runway [REHABILITATE RUNWAY END 28 AND TAXIWAYS C AND D - PHASE 1 (DESIGN)] - 10/28 Rehabilitate Runway Lighting [Phase 1] - 10/28
P 045 5,436,510 Rehabilitate Runway [Runway 16-34 Rehabilitation (Construction)] - 16/34
P 054 13,613,405 Improve Runway Safety Area [Runway End 28 Safety Area-Phase 4] - 10/28
055 3,312,707 Improve Runway Safety Area [Phase 5] - 10/28
GA 008
009
010
011
270,750
3,676,500
636,500
750,000
Conduct Airport Master Plan Study [Pavement Management Study], Conduct Miscellaneous Study [Tenant Relocation Plan], Install Instrument Approach Aid [Feasibility Study/EA for Navaids Installation] - 15/33 Construct Building [30-Bay T-Hangar Building], Construct Fuel Farm [MAP] [Fuel Farm Upgrades], Improve Aircraft Rescue & Fire Fighting Building [Rehabilitate ARFF Building (Bldg. 45)], Rehabilitate Building [Rehabilitate Aircraft Storage Hangar (Bldg. 221)], Rehabilitate Building [Rehabilitate Fuel truck Storage Building (Bldg. 47)] Rehabilitate Apron [Phase I (Design)], Rehabilitate Building [Control Tower (Bldg. 504) Study & Design], Rehabilitate Building [Hangar/Offices - Phase I (Bldg. 100) Design], Rehabilitate Snow Removal Equipment Building [(Bldg. 220) Design] Acquire Snow Removal Equipment [Purchase Two Snowplows]
GA
P
009
043
044
150,468
2,420,450
405,793
Rehabilitate Runway [Runway 17-35 Reconstruction & Extension (Design Only)] 17/35 Extend Taxiway [EXTEND PARALLEL TAXIWAY A BETWEEN TAXIWAYS C AND E (CONSTRUCTION) Phase II] Acquire Friction Measuring Equipment [PURCHASE TOW-BEHIND RUNWAY FRICTION METER], Extend Taxiway [EXTEND PARALLEL TAXIWAY A BETWEEN TAXIWAY E AND RUNWAY END 32 (DESIGN)], Remove Obstructions
Selection Criteria Year: 2005
Page 18 of 98
Grants Awarded by FY FAA - Office Of Airports
EA NYC NY
Region ADO State
John F Kennedy International
Worksite
Joseph Y Resnick
Kingston-Ulster
La Guardia
Lake Placid
Le Roy
Long Island MacArthur
Lt Warren Eaton
Malone-Dufort
FY 2005
Service Grant Seq Level Number
044
046
P 137
138
139
140
141
142
143
GA 018
R 013
P 109
111
112
113
GA 021
023
R 013
014
P 063
064
065
068
GA 021
GA 017
AIP Federal Funds
1,013,308
7,000,000
738,000
1,000,000
1,841,925
3,577,004
947,600
1,146,589
252,859
247,097
5,866,239
1,000,000
3,163,761
6,842,107
178,600
164,350
102,795
163,892
378,385
767,571
1,713,700
396,001
242,250
237,500
Report Date 02/23/2006
Brief Description Of Work
[OBSTRUCTION REMOVAL FOR RUNWAY 14/32 (ENVIRONMENTALASSESSMENT)]Extend Taxiway [Phase III]
Improve Runway Safety Area - 04R/22L
Install Runway Lighting [Runway Hold Bar Upgrades - Phase II] - 13L/31R
Improve Runway Safety Area [Improve Runways 4L-22R & 13L-31R Safety Areas(Preliminary Engineering & Environmental) - Phase I] - 04L/22RConstruct Aircraft Rescue & Fire Fighting Training Facility [Phase III]
Rehabilitate Taxiway ["B"]
Security Enhancements [Security Enhancements, Project#3 - Phase II]
Rehabilitate Taxiway [Taxiway ZA]
Install Perimeter Fencing [Inadvertent Entry Fence (Approx. 5,000L.F.)]
Acquire Land For Approaches [Land Acquisition/Obstruction Removal R/W 15]
Rehabilitate Runway [Runway 13 Deck-Phase IV] - 13/31, Rehabilitate Runway[Runway 22 Deck-Phase IV] - 04/22Improve Runway Safety Area [Prelim. Eng. & Env.] - 13/31
Improve Access Road [Central Terminal Building Access Road Bridges]
Improve Access Road [East End Roadway Improvements - Phase I]
Acquire Snow Removal Equipment [Snowblower]
Expand Building [T-hangar]
Update Airport Master Plan Study [MASTER PLAN UPDATE/OBSTRUCTION STUDY]
Install Airfield Guidance Signs [REPLACE AIRFIELD GUIDANCE SIGNS]
Acquire Snow Removal Equipment
Construct Access Road [1606L.F X 20Ft], Construct Service Road [700L.F X 24Ft]
Construct Snow Removal Equipment Building
Improve Terminal Building
Install Runway Lighting [DISPLACE RUNWAY 19 THRESHOLD] - 01/19, InstallWeather Reporting Equipment [REPLACE AUTOMATED WEATHER OBSERVINGSYSTEM (AWOS)], Rehabilitate Runway [PERFORM RUNWAY CRACK REPAIR] 01/19Rehabilitate Runway [Runway 14-32 Rehabilitation (Construction)] - 14/32
Selection Criteria Year: 2005
Page 19 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
EA NYC NY Massena International-Richards Field GA 032 376,200 Acquire Snow Removal Equipment [Snowblower]
Montauk R 008 42,900 Rehabilitate Runway - 06/24
New 002 1,590,117 Rehabilitate Runway [Reconstruct and Widen RW 15-33 (2,500ft X 60ft)] - Plan-1
003 584,323 Acquire Land for Development [Land Acquisition - Phase I]
Niagara Falls International R 025 103,723 Remove Obstructions [OBSTRUCTION STUDY]
Ogdensburg International GA 025 996,518 Construct Access Road [North Ramp, Access Road & Utility (Construction)]
026 74,100 Construct Terminal Building [(Design)]
Oneonta Municipal GA 010 2,280,217 Install Perimeter Fencing [Install Perimeter Fencing], Rehabilitate Runway
Orange County GA 031 237,500[Rehabilitate Runway 6-24 and Obstructions Removal] - 06/24 Conduct Environmental Study [R/W 3/21 Relocation Phase I]
Oswego County GA 027 28,500 Improve Runway Safety Area [Runways 6/24 and 15/33-Design Only] - 15/33
Penn Yan GA 019 423,314 Acquire Land for Development [ACQUIRE GOLF COURSE LAND AND ASSOCIATED
020 265,020DAMAGES] Install Perimeter Fencing [INSTALL PERIMETER/INADVERTENT ENTRY FENCING]
Perry-Warsaw GA 019 62,549 Remove Obstructions [Design]
Piseco GA 015 395,191 Construct Snow Removal Equipment Building
Plattsburgh International GA 013
015
5,182,500
3,239,540
Construct Terminal Building [Phase III], Rehabilitate Runway [Rehabilitate Runway 17-35 (Construction) - Phase I] - 17/35 Install Instrument Approach Aid [Runway 17-35 NAVAIDS - ILS, PAPI, MALSR
016 316,350(Construction)] Install Taxiway Lighting [Lighting & Markings]
Potsdam Municipal/Damon Field/ GA 016 1,018,400 Construct Apron [Apron & Taxilane - Phase I (Construction)], Construct Fuel Farm, Install Miscellaneous NAVAIDS [NAVAID & Weather Equipment (Construction)]
Randall R 020 36,631 Extend Taxiway [Extend Existing Taxilanes G and H, T/W F and Construct New Taxilane J - Design]
Saratoga County GA 021 559,693 Acquire Easement For Approaches [Acquire Land/Easements for Approaches]
Schenectady County R 033 91,014 Conduct Miscellaneous Study
034 339,276 Construct Runway Safety Area [Runway 28 (Final Design & Construction)] - 10/28
Sidney Municipal GA 012 693,500 Expand Apron [EXPAND TRANSIENT AIRCRAFT PARKING APRON], Remove
Spadaro R 007 150,000Obstructions [PERFORM OBSTRUCTION REMOVAL FOR RUNWAY 7/25] Construct Runway [Runway Relocation Phase I] - 18/36
State of New York 004 250,000 Conduct State System Plan Study
Selection Criteria Year: 2005
Page 20 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
EA NYC NY 005 300,000 Conduct State System Plan Study
Stewart International P 043 1,245,000 Rehabilitate Runway Lighting [Rehabilitate Runway 9-27 Edge Lighting Design and
044 29,450Construction] - 09/27 Construct Sand and Chemical Storage Building [Construct Sand Storage Building
045 262,214Design Phase I $29,450(Fed.Share)] Security Enhancements [Security Project #1 Phase II]
046
047
747,750
4,180,000
Improve Runway Safety Area [Improve RSA for R/W 16-34 Phase I Design $1,700,000(Fed. Share)] - 16/34 Improve Terminal Building [Phase II and III]
Syracuse Hancock International P 071 5,169,900 Improve Airport Drainage [Rehabilitate Airfield Drainage - Phase II]
086 3,551,572 Noise Mitigation Measures for Public Buildings
087 299,250 Rehabilitate Apron [Rehabilitate GA Apron & Taxiways G, Y & N (Design Only)]
088 352,000 Improve Airport Miscellaneous Improvements [Safety Improvements to the General
Ticonderoga Municipal GA 013 85,501Aviation Area] Rehabilitate Runway [Design/Construct Runway 2-20 Crack Sealing & Emergency
Tri-Cities GA 011 573,018Repairs] - 02/20 Construct Fuel Farm
Watertown International GA 022 129,192 Acquire Snow Removal Equipment
023 317,105 Improve Airport Drainage
Wellsville Municipal Airport,Tarantine Field GA 017 538,586 Install Perimeter Fencing
Westchester County P 074 3,345,788 Security Enhancements [Install Security Perimeter Intrusion Detection System
075 396,887$3,667,000 (Fed Share)] Improve Utilities [Replace the Existing HIgh Voltage Cable]
Whitfords R 007 665,000 Construct Building [10-unit T-hangar and associated taxilane], Remove Obstructions [Bury utility line (Runway End 28)]
Williamson-Sodus R 017 225,971 Expand Building [9-Unit T-hangar]
018 200,236 Install Perimeter Fencing
State Total: 114 Grants 146,185,233
ADO Total: 157 Grants 195,360,902
EA WAS DC Washington Dulles International P 033 4,720,042 Rehabilitate Taxiway
034 3,284,049 Expand Apron
Selection Criteria Year: 2005
Page 21 of 98
Grants Awarded by FY FAA - Office Of Airports
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Level Number Funds
EA WAS DC Washington Metropolitan Area 004 293,889
State Total: 3 Grants 8,297,980
Report Date 02/23/2006
Brief Description Of Work
Conduct Metropolitan System Plan Study [Conduct Continous Airport Syst Planning]
Construct Apron
Update Airport Master Plan Study [phase 1 facility requirements]
Security Enhancements
Rehabilitate Apron [piers b & c construction phase 1]
Extend Taxiway [Acquire Land]
Extend Runway [Final Design] - 16/34
Extend Runway [Acquire Land] - 16/34
Construct Fuel Farm
Construct Apron [Southwest Apron]
Remove Obstructions [monocacy river]
Remove Obstructions [Gage parcel A1], Remove Obstructions [Toms Farm parcelA25]Extend Runway [construction phase 1] - 08/26
Construct Runway Safety Area [construction phase 3] - 09/27
Rehabilitate Apron [Phase 1-Design Only]
Construct Taxiway [Midfield Corporate]
Install Perimeter Fencing
Rehabilitate Runway - 14/32, Remove Obstructions [Design]
Rehabilitate Taxiway
Repair Utilities [MAP] [Convert utility from military base to commercial source]
Construct Taxiway [Design]
Expand Apron [Expand Apron, Conduct Environmental Assessment]
Rehabilitate Runway [Design Only] - 06/24
Construct Runway Safety Area [Construction, Overall PhaseIV]
Update Airport Master Plan Study
EA WAS MD Baltimore-Washington International P
Bay Bridge GA
Cambridge-Dorchester GA
Carroll County Regional/Jack B Poage Field R
Easton/Newnam Field GA
Frederick Municipal R
Garrett County GA
Hagerstown Regional-Richard A Henson Field P
Martin State R
Ocean City Municipal GA
Salisbury-Ocean City Wicomico Regional P
Tipton R
073
074
075
076
017
020
021
022
027
024
025
009
033
034
012
015
028
030
7,747,632
4,200,000
2,092,000
8,000,000
6,033,229
410,000
2,114,168
150,000
2,739,516
241,799
4,445,788
4,866,112
8,000,000
575,000
600,000
95,000
5,964,804
3,577,580
888,250012
State Total: 19 Grants 62,740,878
EA WAS VA Accomack County GA 010 76,000
Blue Ridge GA 014 270,000
Brookneal/Campbell County GA 001 77,540
Charlottesville-Albemarle P 035 3,353,840
Chesapeake Regional GA 010 142,500
Selection Criteria Year: 2005
Page 22 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
EA WAS VA Chesterfield County R 017 1,970,593 Construct Apron
Commonwealth of Virginia 003 450,000 Conduct State System Plan Study
Culpeper Regional GA 016 629,850 Construct Apron
Danville Regional GA 020 118,750 Update Airport Master Plan Study
021 45,552 Acquire Land For Approaches [Runway 20 RPZ, Acquisition Services]
Dinwiddie County GA 015 574,750 Remove Obstructions [Remove Obstructions Rwy 23 Approach], Remove
Emporia-Greensville Regional GA 006 54,150Obstructions [Remove Obstructions Rwy 5 Approach] Construct Taxiway [Partial Parallel Twy (1000' North End) Design Only]
Farmville Regional GA 010 319,770 Conduct Environmental Study
Franklin Municipal-John Beverly Rose GA 009 668,800 Construct Taxiway [Construction], Install Runway Vertical/Visual Guidance System
Front Royal-Warren County GA 010 95,000[PAPI] - 09/27 Update Airport Master Plan Study [Update ALP]
011 1,385,665 Construct Taxiway [Partial Parallel Taxiway]
Lee County GA 001 614,688 Construct Taxiway [Partial Parallel Taxiway (Design/Construction)]
Leesburg Executive R 029 1,131,405 Improve Runway Safety Area - 17/35
030 50,000 Install Perimeter Fencing
Louisa County/Freeman Field GA 012 850,307 Rehabilitate Apron
Luray Caverns GA 007 154,850 Update Airport Master Plan Study
Lynchburg Regional/Preston Glenn Field P 028 522,687 Extend Runway [Design] - 04/22
Mecklenburg-Brunswick Regional GA 008 56,588 Construct Taxiway [Partial Parallel Twy (Design)]
Middle Peninsula Regional GA 003 377,594 Acquire Land For Approaches [John Hancock Lumber, ITI, Carter, Tracts]
Mountain Empire GA 017 156,750 Update Airport Master Plan Study [Update ALP]
New 008 3,135,427 Construct New Airport [Site Preparation, Access Road]
Newport News/Williamsburg International P 034 3,072,635 Construct Apron [Terminal Ramp Apron, Phase 2]
Norfolk International P 050 353,331 Update Airport Master Plan Study
Orange County GA 008 135,755 Rehabilitate Runway [, Phase 1] - 07/25
Richmond International P 047 340,855 Rehabilitate Taxiway [Taxiway 'L' (design only)]
Roanoke Regional/Woodrum Field P 038 2,374,688 Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire ARFF Vehicle with Snozzle], Acquire Equipment [Runway Sweeper for FOD Removal (Part 139 Recommendation)], Rehabilitate Taxiway [Rehab. Taxiway A&G (Design), Overall PHIII], Remove Obstructions [Remove Obstructions (Runway 15 Approach, 60AC)]
Selection Criteria Year: 2005
Page 23 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
EA WAS VA
Shenandoah Valley Regional
Stafford Regional
Suffolk Municipal
Tangier Island
Tazewell County
Twin County
Virginia Highlands
Virginia Tech/Montgomery Executive
Warrenton-Fauquier
Winchester Regional
CS
R
GA
GA
GA
GA
GA
GA
R
GA
039
025
026
015
011
003
011
008
022
010
011
011
019
889,855
2,981,653
426,907
750,595
1,495,300
142,500
150,000
1,549,450
384,750
193,026
102,600
770,450
37,050
Update Airport Master Plan Study
Rehabilitate Taxiway [Design and Construction]
Acquire Snow Removal Equipment [Acquire Replacement Loader]
Construct Access Road
Improve Runway Safety Area [Design and Environmental Mitigation] - 04/22
Rehabilitate Runway [Design] - 02/20
Remove Obstructions [RW 25 Approach(Land Acquisition, Design)]
Rehabilitate Runway [Rehab/Widen Runway (Construction)] - 18/36
Extend Runway [Conduct Environmental Assessment] - 06/24
Update Airport Master Plan Study [Update ALP]
Expand Apron [Transient/Tiedown Apron (Design)]
Acquire Land For Approaches
Acquire Land For Approaches
State Total: 44 Grants 33,434,456
ADO Total: 66 Grants 104,473,314
Region Total: 535 Grants 443,006,623
Report Total: 2099 Grants 3,549,617,470
GL BIS ND Beach
Bismarck Municipal
Bottineau Municipal
Cando Municipal
Carrington Municipal
Casselton Robert Miller Regional
Cavalier Municipal
Cooperstown Municipal
GA
P
GA
GA
GA
GA
GA
GA
004
035
006
006
005
012
005
004
153,662
244,498
2,979,687
108,421
155,697
63,058
477,406
190,127
Construct Building, Construct Fuel Farm, Construct Taxiway, Improve Access Road, Rehabilitate Runway - 12/30 Rehabilitate Runway - 13/31
Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate Taxiway
Acquire Snow Removal Equipment, Install Perimeter Fencing, Rehabilitate Runway 16/34 Improve Access Road, Rehabilitate Runway - 13/31
Rehabilitate Apron, Rehabilitate Taxiway, Update Airport Master Plan Study
Install Airport Beacons, Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate Taxiway Construct Building, Construct Snow Removal Equipment Building, Construct Taxiway, Rehabilitate Runway - 13/31
Selection Criteria Year: 2005
Page 24 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
GL BIS ND Devils Lake Municipal GA 021 64,440 Rehabilitate Runway - 13/31, Remove Obstructions
Dickinson Municipal CS 018 190,182 Conduct Miscellaneous Study, Install Miscellaneous NAVAIDS, Rehabilitate Runway
019 962,171- 07/25, Rehabilitate Runway - 14/32 Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Perimeter Fencing
Ellendale Municipal GA 003 36,194 Conduct Airport Master Plan Study
Glen Ullin Regional GA 005 40,850 Construct Building, Rehabilitate Runway - 11/29
Grafton Municipal GA 004 89,191 Construct Fuel Farm, Rehabilitate Runway - 17/35
Grand Forks International P 029 881,246 Acquire Snow Removal Equipment, Environmental Mitigation [wildlife attractant],
Gwinner-Roger Melroe Field GA 004 287,850
Rehabilitate Runway - 17R/35L, Update Airport Master Plan Study [Phase 1 Airport facilities / needs] Construct Building
Hamry Field GA 006 161,607 Construct Building, Construct Snow Removal Equipment Building, Construct Taxiway
Harry Stern GA 009 150,261 Construct Access Road, Install Weather Reporting Equipment, Rehabilitate Apron
Hector International P 030 1,750,000 Construct Service Road [Service road recommended by RSAT.], Rehabilitate
Hettinger Municipal GA 007 216,448Runway - 18/36 Construct Fuel Farm, Rehabilitate Runway - 12/30, Update Airport Master Plan
Hillsboro Municipal GA 008 196,927Study Construct Building, Construct Fuel Farm
Jamestown Regional GA 024 5,703,182 Install Perimeter Fencing, Install Runway Lighting - 13/31, Rehabilitate Runway 13/31
Kenmare Municipal GA 005 119,033 Acquire Snow Removal Equipment, Rehabilitate Runway - 08/26
Lakota Municipal GA 005 192,364 Construct Taxiway, Rehabilitate Runway - 15/33
Linton Municipal GA 004 226,148 Acquire Snow Removal Equipment, Construct Building, Rehabilitate Runway - 09/27
005 58,505 Acquire Land For Approaches
Lisbon Municipal GA 002 251,978 Conduct Airport Master Plan Study, Construct Apron, Construct Taxiway, Install Miscellaneous NAVAIDS, Install Miscellaneous NAVAIDS, Remove Obstructions
Mandan Municipal GA 009 76,000 Rehabilitate Apron [Plans and specs], Rehabilitate Runway - 13/31, Rehabilitate
Minot International P 033 948,005Taxiway Rehabilitate Apron
Mohall Municipal GA 003 103,506 Construct Taxiway, Rehabilitate Runway - 13/31
Northwood Municipal-Vince Field GA 006 240,420 Construct Building, Rehabilitate Runway - 08/26
Oakes Municipal GA 006 88,471 Acquire Snow Removal Equipment, Rehabilitate Runway - 12/30
Selection Criteria Year: 2005
Page 25 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
GL BIS ND Park River - W C Skjerven Field GA 003 156,358 Install Runway Lighting - 12/30
Pembina Municipal GA 004 99,470 Improve Fuel Farm, Install Runway Vertical/Visual Guidance System - 15/33,
Rugby Municipal GA 006 369,217Rehabilitate Runway - 15/33 Rehabilitate Runway - 12/30, Rehabilitate Taxiway
Sloulin Field International CS 024 1,425,868 Acquire Aircraft Rescue & Fire Fighting Vehicle, Conduct Miscellaneous Study, Construct Access Road, Construct Apron
State of North Dakota 004 122,036 Update State System Plan Study
Tioga Municipal GA 003 122,215 Conduct Environmental Study, Install Airport Beacons, Rehabilitate Runway - 12/30
Walhalla Municipal GA 003 135,200 Acquire Snow Removal Equipment, Improve Fuel Farm, Rehabilitate Runway - 15/33
Washburn Municipal GA 005 89,876 Construct Snow Removal Equipment Building, Rehabilitate Runway - 08/26
Watford City Municipal GA 006 288,593 Construct Building, Construct Fuel Farm, Install Runway Vertical/Visual Guidance System - 12/30
State Total: 41 Grants 20,216,368
GL BIS SD Aberdeen Regional P 025 142,500 Construct Snow Removal Equipment Building [plans and specifications], Construct
Belle Fourche Municipal GA 006 25,000Terminal Building [Remove existing terminal.], Update Airport Master Plan Study Construct Snow Removal Equipment Building
Black Hills-Clyde Ice Field GA 012 186,200 Extend Runway [plans and specifications] - 12/30
Bob Wiley Field GA 006 213,750 Construct Snow Removal Equipment Building
Britton Municipal GA 005 76,000 Install Weather Reporting Equipment
Brookings Municipal GA 017 950,000 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Aircraft Rescue & Fire
Chamberlain Municipal GA 003 171,000Fighting Building, Construct Taxiway Install Perimeter Fencing
Chan Gurney Municipal GA 016 358,500 Acquire Snow Removal Equipment, Construct Building, Update Airport Master Plan Study
Clark County GA 003 1,092,500 Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate Taxiway
Custer County GA 006 646,000 Conduct Environmental Study, Construct Snow Removal Equipment Building,
Faith Municipal GA 005 304,000Expand Apron Construct Building, Install Runway Lighting - 13/31
Gettysburg Municipal
Gregory Municipal
GA
GA
005
004
76,000
603,250
Construct Access Road, Construct Terminal Building, Install Perimeter Fencing [design] Construct Taxiway, Expand Apron, Rehabilitate Taxiway
Harold Davidson Field GA 004 378,100 Construct Snow Removal Equipment Building, Install Miscellaneous NAVAIDS, Install
Selection Criteria Year: 2005
Page 26 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
GL BIS SD 004 Runway Vertical/Visual Guidance System - 12/30, Rehabilitate Runway Lighting 12/30
Highmore Municipal GA 002 1,235,000 Construct Runway [Construct Apron] - Plan-1, Construct Runway [Construct runway] - Plan-1, Construct Runway [Construct taxiway] - Plan-1
Hoven Municipal
Huron Regional
GA
GA
003
021
80,000
768,398
Construct Snow Removal Equipment Building, Install Miscellaneous NAVAIDS [design], Install Runway Lighting [Engineering Design] - 13/31 Acquire Aircraft Rescue & Fire Fighting Vehicle, Expand Terminal Building
Joe Foss Field P 034 2,783,500 Improve Airport Miscellaneous Improvements [ICAS], Rehabilitate Apron, Rehabilitate Taxiway, Rehabilitate Taxiway, Rehabilitate Taxiway Lighting
Lemmon Municipal GA 006 25,000 Construct Runway - Plan-1
Madison Municipal GA 006 39,900 Update Airport Master Plan Study
Martin Municipal GA 004 57,000 Rehabilitate Runway [maintenance] - 14/32
Milbank Municipal GA 007 275,899 Construct Building [Hangar], Construct Snow Removal Equipment Building
Mission Sioux GA 005 95,000 Construct Snow Removal Equipment Building, Install Runway Vertical/Visual Guidance System - 11/29
Mobridge Municipal GA 006 63,650 Improve Airport Miscellaneous Improvements [Install windcone], Install Perimeter Fencing [Install Access gate], Update Airport Master Plan Study
Onida Municipal GA 005 39,045 Extend Runway [EA] - 13/31
Parkston Municipal GA 003 617,500 Construct Taxiway, Extend Runway - 15/33, Install Miscellaneous NAVAIDS, Install
Philip GA 003 61,750Runway Lighting - 15/33, Install Runway Vertical/Visual Guidance System - 15/33 Install Perimeter Fencing [Engineering design], Rehabilitate Apron
Pine Ridge GA 007 342,000 Install Perimeter Fencing, Rehabilitate Runway - 12/30
Platte Municipal GA 004 105,000 Extend Runway [Environmental Assessment] - 14/32
Rapid City Regional P 032 10,730,768 Rehabilitate Taxiway [A-Phase 2]
Redfield Municipal GA 003 15,688 Construct Fuel Farm
Springfield Municipal GA 004 926,250 Construct Taxiway, Improve Airport Miscellaneous Improvements [segmented circle], Install Runway Lighting - 15/33, Install Runway Vertical/Visual Guidance System - 15/33, Rehabilitate Apron, Rehabilitate Runway - 15/33
State of South Dakota 003 104,500 Update Miscellaneous Study
Various Locations in South Dakota 008 522,500 Rehabilitate Apron (Chan Gurney Municipal), Rehabilitate Runway (Canton Municipal - 17/35; Chan Gurney Municipal - 01/19; Edgemont Municipal - 12/30; Eureka Municipal - 12/30; Faith Municipal - 13/31; Martin Municipal - 14/32; Mobridge Municipal - 12/30; Murdo Municipal - 14/32; Philip - 12/30; Sturgis Municipal - 11/29; Wagner Municipal - 08/26), Rehabilitate Taxiway (Madison Municipal)
Selection Criteria Year: 2005
Page 27 of 98
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
GL BIS SD
GL CHI
ADO Total:
State Total:
IL
Wagner Municipal
Watertown Municipal
Wilder
Capital
Central IL Regional Airport at Bloomington-Normal
Chicago Midway International
Chicago O'Hare International
FY 2005
Service Grant Seq AIP Federal Level Number Funds
009 422,750
GA 003 29,450
CS 017 97,850
GA 004 42,750
38 Grants 24,703,948
79 Grants 44,920,316
P 042 3,629,144
043 955,045
P 042 4,872,200
043 1,858,995
044 3,526,409
P 061 12,000,000
062 5,837,000
063 5,858,608
064 1,420,000
P 066 6,359,572
069 868,000
070 4,056,000
071 5,420,000
072 461,000
073 928,000
Report Date 02/23/2006
Brief Description Of Work
Acquire Snow Removal Equipment (Black Hills-Clyde Ice Field; Canton Municipal;Harold Davidson Field; Miller Municipal; Mission Sioux; Sisseton Municipal; WagnerMunicipal)Update Airport Master Plan Study
Improve Airport Miscellaneous Improvements [Wind cones], Rehabilitate Apron
Construct Snow Removal Equipment Building, Install Runway Lighting [Design MIRL]- 15/33
Improve Runway Safety Area [Runway 13/31 RSA] - 13/31, Install AirfieldGuidance Signs, Rehabilitate Airport Beacons, Rehabilitate Runway Lighting[Electrical Vault] - 04/22Acquire Land for Development [Parcels 9-1-S, 16-3-J, 17-2-D], Improve TerminalBuilding [Acquire Jet Bridge - Phase 2], Rehabilitate Apron [Phase 2 of the terminalapron]Widen Runway - 02/20
Acquire Miscellaneous Land [Acquire Land (100 Acres) Miller propoertyreimbursement], Acquire Snow Removal EquipmentWiden Runway - 02/20
Construct Apron [aircraft parking apron, taxiways and taxilanes]
Noise Mitigation Measures for Public Buildings [Design/Construct Hancock HighSchool]Construct Terminal Building [Terminal Concourse]
Noise Mitigation Measures for Public Buildings [Design/Construct - John DoreSchool]Conduct Environmental Study
Noise Mitigation Measures for Public Buildings
Noise Mitigation Measures for Public Buildings [Design/Construct - Rhodes School]
Rehabilitate Taxiway
Noise Mitigation Measures for Public Buildings [Design - East Leyden High School]
Noise Mitigation Measures for Public Buildings [Design/Construct - StevensonSchool (Des Plaines)]
Selection Criteria Year: 2005
Page 28 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq Level Number
GL CHI IL 074
075
076
077
078
Decatur P 028
Greater Peoria Regional P 039
040
041
Greater Rockford P 041
042
043
044
Illinois State Block Grant Program 056
057
058
059
060
061
Quad City International P 052
053
054
Quincy Regional-Baldwin Field CS 034
AIP Federal Funds
Brief Description Of Work
192,000 Noise Mitigation Measures for Public Buildings [Design - St. Andrews Lutheran School]
2,551,000 Noise Mitigation Measures for Public Buildings [Design/Construct - Jane Addams School]
298,000 Noise Mitigation Measures for Public Buildings [Design - Stevenson School (Melrose Park)]
77,000 Noise Mitigation Measures for Public Buildings [Design - John Mills School]
700,000 Noise Mitigation Measures for Public Buildings [Construction - John Mills School]
2,640,447 Widen Taxiway [G, G1 and G2]
2,076,225 Extend Taxiway [Extend Taxiways A & D]
1,585,795 Acquire Miscellaneous Land [Land Reimbursement], Rehabilitate Terminal Building [Rehabilitate Terminal Building - Phase 3], Update Airport Master Plan Study
2,361,291 Rehabilitate Terminal Building
1,760,000 Expand Terminal Building [PHASE 1 TERMINAL IMPROVEMENTS (FIS FACILITY)], Expand Terminal Building [PHASE 2 TERMINAL IMPROVEMENTS (JET BRIDGE & BAGGAGE EQUIPMENT REPLACEMENT/EXPANSION).]
1,095,000 Acquire Aircraft Rescue & Fire Fighting Vehicle, Expand Aircraft Rescue & Fire Fighting Building
3,506,379 Improve Runway Safety Area [Construct Service Road (RIAT Improvement)] 01/19, Improve Runway Safety Area [Relocate Falcon Road] - 01/19, Rehabilitate Taxiway [Rehab TW F and TW B (Phase 1)]
1,372,100 Expand Apron [Expand NW Quadrant Cargo Apron]
17,820,432 Non primary development projects in state block grant program - RL
460,750 Non primary development projects in state block grant program - RL
4,800,000 Non primary development projects in state block grant program - RL
2,318,000 Non primary development projects in state block grant program - RL
3,220,750 Non primary development projects in state block grant program - RL
5,772,190 Non primary development projects in state block grant program - RL
1,588,600 Extend Taxiway [EXTEND TAXIWAYS A, E & H (PHASE 3)]
2,019,406 Rehabilitate Runway [RECONSTRUCT RUNWAY 5/23 (PHASE 1).] - 05/23
730,860 Improve Terminal Building [IMPROVE TERMINAL BUILDING - JET LOADING BRIDGE], Update Airport Master Plan Study [UPDATE MASTER PLAN (PHASE 2)]
1,000,000 Improve Runway Safety Area - 13/31, Improve Terminal Building [UPGRADE TERMINAL BUILDING TO ADA STANDARDS.], Rehabilitate Runway [REHABILITATE
Selection Criteria Year: 2005
Page 29 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
GL CHI IL 034 RUNWAY 18/36 (PHASE 1).] - 18/36
Scott AFB/Midamerica CS 023 709,672 Construct Deicing Containment Facility [Improve Glycol Collection System], Improve Airport Drainage [Improve Airport Drainage], Install Miscellaneous NAVAIDS [Install Lighted Wind Cones per 139]
State of Illinois 003 300,000 Update State System Plan Study
University of Illinois-Willard P 022 2,929,807 Rehabilitate Apron
Williamson County Regional P 023 1,130,610 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Aircraft Rescue & Fire Fighting Building [Construct ARFF Building], Update Airport Master Plan Study
State Total: 42 Grants 123,066,287
GL CHI IN Anderson Municipal-Darlington Field GA 016 202,700 Acquire Land for Development
017 1,005,428 Install Perimeter Fencing
Arens Field GA 004 77,900 Rehabilitate Runway - 09/27
Columbus Municipal GA 016 2,087,150 Rehabilitate Apron
Daviess County GA 008 548,150 Construct Taxiway
De Kalb County GA 012 150,000 Conduct Environmental Study [ENVIRONMENTAL ASSESSMENT FOR RUNWAY 9/27 EXTENSION (PHASE 2) - WETLANDS.], Construct Apron
Delaware County - Johnson Field GA 014 167,734 Acquire Land For Approaches, Rehabilitate Taxiway [Phase 2]
Delphi Municipal GA 006 38,950 Update Airport Master Plan Study
Elkhart Municipal GA 016 80,998 Update Airport Master Plan Study, Widen Taxiway
Evansville Regional P 040 1,909,684 Acquire Aircraft Rescue & Fire Fighting Vehicle [Replace Rescue 2 (22 years old)],
Fort Wayne International P 046 5,603,928Extend Runway - 18/36 Construct Taxiway [CONSTRUCT TAXIWAY C-4 AS PER 139 RECOMMENDATION AND RSAT.], Rehabilitate Runway [RECONSTRUCT RUNWAY 5/23 (PHASE 1).] 05/23, Rehabilitate Runway Lighting [RECONSTRUCT LIGHTING VAULT.] - 05/23
Fulton County GA 006 449,149 Widen Runway [Phase 2, construction.] - 11/29
Gary/Chicago International GA 018 1,715,301 Acquire Snow Removal Equipment, Expand Apron, Install Runway Vertical/Visual
019 2,852,934Guidance System - 02/20, Strengthen Apron Improve Runway Safety Area - 12/30
Goshen Municipal GA 008 2,493,750 Extend Runway - 09/27
Greenwood Municipal GA 018 1,000,000 Extend Runway [Phase 2] - 01/19
019 482,618 Extend Runway [Phase 3] - 01/19
Selection Criteria Year: 2005
Page 30 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
GL CHI IN Griffith-Merrillville R 006 143,450 Acquire Land for Development
Huntingburg GA 008 306,550 Construct Taxiway [Construct taxiway leading to corporate hangar]
Huntington Municipal GA 007 604,430 Construct Building, Construct Parking Lot
Indianapolis Executive R 011 150,000 Acquire Existing Airport [Project includes land reimbursement, runway safety area
012 1,287,037grading and glide slope relocation to meet standards.] Acquire Existing Airport
Indianapolis International P 095 15,000,000 Construct Access Road, Construct Apron, Construct Service Road, Construct Taxiway, Remove Obstructions [Relocate ATCT]
096
097
15,613,333
1,435,132
Noise Mitigation Measures for Residences within 65 - 69 DNL [Project will mitigate noise for 157 residences and 407 persons.] Security Enhancements [Access control security equipment and Phase 2 alarm
098 2,000,000system infrastructure.] Noise Mitigation Measures for Residences within 65 - 69 DNL
099 600,000 Rehabilitate Taxiway
Jasper County GA 001 161,526 Install Weather Reporting Equipment
Kendallville Municipal GA 011 74,575 Expand Apron, Rehabilitate Apron
Kentland Municipal GA 003 358,368 Expand Apron, Remove Obstructions
Kokomo Municipal GA 012 232,750 Rehabilitate Apron, Rehabilitate Runway Lighting - 14/32
La Porte Municipal GA 012 336,300 Construct Taxiway [Construct Southeast Partial Parallel Taxiway to RW 14/32],
Logansport Municipal GA 010 376,524Improve Runway Safety Area - 02/20 Rehabilitate Apron
Madison Municipal GA 007 150,000 Construct Building [Site Preparation for Maintenance Hangar], Extend Runway 03/21
008 1,097,683 Extend Runway - 03/21
Marion Municipal GA 010 149,638 Rehabilitate Runway Lighting - 04/22, Rehabilitate Runway Lighting - 15/33
Michigan City Municipal GA 009 446,249 Acquire Land For Approaches
Monroe County GA 022 47,500 Update Airport Master Plan Study [-Phase 2]
023 467,563 Install Perimeter Fencing
Mount Comfort R 008 1,826,400 Rehabilitate Runway [NP funds from IND relievers for FY04 and 05 used.] - 07/25,
009 310,000Rehabilitate Runway - 07/25, Rehabilitate Runway - 07/25 Rehabilitate Runway [Engineering Design and Inspection costs] - 07/25
New Castle-Henry County Municipal GA 004 1,000,000 Acquire Land For Approaches
Selection Criteria Year: 2005
Page 31 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
GL CHI IN North Vernon GA 006 150,000 Install Weather Reporting Equipment
Perry County Municipal GA 003 539,849 Construct Building, Construct Taxiway, Expand Apron
Peru Municipal GA 006 1,459,433 Construct Taxiway
Plymouth Municipal GA 007 469,954 Acquire Land For Approaches
008 370,500 Construct Taxiway, Install Perimeter Fencing
Porter County Municipal GA 016 465,500 Install Taxiway Lighting [Phase 2, Construction]
Purdue University CS 026 1,642,000 Install Runway Vertical/Visual Guidance System - 05/23, Install Runway Vertical/Visual Guidance System - 10/28, Rehabilitate Runway Lighting - 10/28,
Putnam County GA 008 1,052,736Rehabilitate Taxiway Construct Taxiway [Taxiway A Construction - Phase 2]
Richmond Municipal GA 007 1,020,000 Rehabilitate Runway - 06/24
Salem Municipal GA 007 156,311 Conduct Environmental Study, Rehabilitate Apron
Shelbyville Municipal GA 015 323,000 Expand Apron [East Terminal]
South Bend Regional P 031 2,883,956 Extend Runway [Phase 3 - Land] - 18/36
Starke County GA
032
006
1,530,000
656,450
Improve Runway Safety Area - 09R/27L, Install Runway Lighting - 09R/27L, Rehabilitate Runway - 09R/27L Construct Taxiway [Construct Connector Taxiway], Install Taxiway Lighting
State of Indiana 003 158,204[Parallal taxiway MITL], Rehabilitate Taxiway [Rehab.Center of Parallel TW] Update State System Plan Study
Terre Haute International-Hulman Field GA 029 95,000 Install Perimeter Fencing
Tri-State Steuben County GA 006 953,483 Expand Apron, Rehabilitate Apron
Virgil I Grissom Municipal GA 004 303,075 Acquire Land For Approaches
Wabash Municipal GA 006 187,263 Construct Fuel Farm
Warsaw Municipal GA 006 478,325 Construct Taxiway, Expand Access Road
State Total: 62 Grants 79,936,421
ADO Total: 104 Grants 203,002,708
GL DET MI Alpena County Regional CS 010 734,350 Acquire Friction Measuring Equipment, Acquire Snow Removal Equipment, Improve
Bishop International P 038 289,750Airport Miscellaneous Improvements [Improve Airport Marking] Improve Terminal Building [flight information display system]
039 6,101,850 Improve Terminal Building [Baggage Claim addition (Phase 2)], Improve Terminal
Selection Criteria Year: 2005
Page 32 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq Level Number
GL DET MI 039
Capital City P 038
Charlevoix Municipal P 005
006
Cherry Capital P 029
030
031
Chippewa County International P 017
018
Delta County CS 026
Detroit Metropolitan Wayne County P 071
072
073
074
075
Gerald R. Ford International P 036
Houghton County Memorial P 023
Kalamazoo/Battle Creek International P 030
031
MBS International P 030
031
032
AIP Federal Funds
4,333,900
1,383,200
455,000
1,398,874
1,520,000
880,650
57,000
1,434,450
1,045,000
11,799,973
17,638,853
1,361,798
3,914,651
2,950,000
5,745,160
1,900,000
2,603,950
2,560,000
195,700
619,400
600,400
Brief Description Of Work
Building [Baggage claim addition (Phase 1)]
Acquire Land For Approaches, Construct Service Road, Extend Runway [ModifyAssociated NAVAIDs] - 10R/28L, Extend Runway [Phase 1] - 10R/28L, ExtendRunway [Phase 2] - 10R/28LConstruct Snow Removal Equipment Building
Acquire Snow Removal Equipment [Blower], Acquire Snow Removal Equipment[Front End Loader], Acquire Snow Removal Equipment [Plow Truck]Acquire Snow Removal Equipment [PLOW], Acquire Snow Removal Equipment[SWEEPER], Construct Aircraft Rescue & Fire Fighting BuildingAcquire Aircraft Rescue & Fire Fighting Vehicle, Install Miscellaneous NAVAIDS[WINDCONE], Install Perimeter Fencing, Install Runway Sensors - 10/28Construct Runway Safety Area - 18/36
Security Enhancements
Acquire Emergency Generator, Construct Building [Benefit Cost Analysis],Rehabilitate Runway [Phase 1] - 16/34, Rehabilitate Runway [Phase 2] - 16/34,Rehabilitate Runway Lighting - 16/34Rehabilitate Apron, Rehabilitate Taxiway [C]
Noise Mitigation Measures for Residences within 65 - 69 DNL
Construct Apron, Construct Runway - 04L/22R, Environmental Mitigation
Construct Taxiway, Install Runway Lighting - 09L/27R
Noise Mitigation Measures for Residences within 65 - 69 DNL
Construct Deicing Containment Facility
Construct Service Road, Construct Taxiway, Rehabilitate Apron [Phase 1],Rehabilitate Apron [Phase 2], Rehabilitate TaxiwayEnvironmental Mitigation [Wetland Phase 2], Improve Runway Safety Area - 07/25,Install Runway Lighting [MIRL] - 07/25, Install Taxiway Lighting [MITL Phase 2],Modify Service Road [Phase 2], Modify Service Road [Phase 3], RehabilitateTaxiway ["C" Shoulders Phase 2], Rehabilitate Taxiway ["C" Shoulders Phase 3]Construct Terminal Building [Site Preparation]
Conduct Miscellaneous Study [Runway 17-35 Approach Survey], Improve RunwaySafety Area - 17/35, Install Perimeter FencingConduct Miscellaneous Study [Terminal Feasibility Study]
Security Enhancements
Acquire Snow Removal Equipment [Sand Spreader with Deicing Chemical
Selection Criteria Year: 2005
Page 33 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State
GL DET MI
State Total:
GL DET OH
Worksite
Michigan State Block Grant Program
Muskegon County
Pellston Regional Airport of Emmet County
Sawyer International
Willow Run
Akron-Canton Regional
Alexander Salamon
Ashland County
Ashtabula County
Bolton Field
Butler County Regional
Service Level
Grant Seq Number
AIP Federal Funds
032
P
041
042
043
044
026
5,300,000
20,007,722
2,100,000
1,581,250
957,600
P 025 1,182,000
P 017 1,050,000
018 300,000
R 024 5,968,370
33 Grants 109,970,851
P 039 11,739,707
GA
040
041
004
1,739,707
5,000,000
94,990
GA 006 328,178
GA 007 150,001
R
R
013
014
016
471,342
237,500
994,557
Brief Description Of Work
Capability], Rehabilitate Runway [Pavement Marking] - 05/23, Repair Utilities[Terminal Sewer]Non primary development projects in state block grant program
Non primary development projects in state block grant program
Non primary development projects in state block grant program
Non primary development projects in state block grant program
Improve Runway Safety Area [Design] - 14/32, Improve Runway Safety Area[Land Acquisition, Fee Simple 1.89 Acres (Parcel 259)] - 14/32Acquire Land for Development, Acquire Snow Removal Equipment, Conduct AirportMaster Plan Study, Construct Access Road, Expand Terminal BuildingImprove Airport Drainage [Water Study - Design], Improve Building [Hangar 665],Improve Building [Tail Dock Assemblies, Hangars 664 and 665]Acquire Snow Removal Equipment [Sweeper], Improve Terminal Building [RehabGA Terminal Access Door], Rehabilitate Runway [Improve Airport Pavement(Markings)] - 01/19Construct Taxiway [B], Construct Taxiway [G], Improve Runway Safety Area 14/32
Extend Runway [RSA Design & Construction - Design, relocate utilities, fill & grade,erosion/stormwater] - 05/23Improve Terminal Building [Construct Phase III]
Construct Deicing Containment Facility [EPA requirement]
Acquire Land For Approaches [Reimbursement (FS1 28 Acres)], Acquire SnowRemoval Equipment, Rehabilitate Runway [Crack Seal, Rehabilitate RunwayMarkings and Threshold Lighting] - 05/23Acquire Land for Development [Remaining acres of Parcel 3, Partial Parcel 1, Parcel5 (reimbursement)], Rehabilitate Apron [Construction - Phase I], RehabilitateRunway [Pavement condition index is 55] - 18/36Install Runway Vertical/Visual Guidance System [Design] - 08/26, RehabilitateRunway [Design Runway Rehabilitation & Triggered Runway Safety AreaImprovements] - 08/26Rehabilitate Apron
Install Perimeter Fencing
Acquire Land For Approaches [Parcel #23 within Runway 29 RPZ]
Selection Criteria Year: 2005
Page 34 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
GL DET OH Cambridge Municipal GA 004 253,885 Expand Apron
Carl R Keller Field GA 021 120,750 Conduct Airport Master Plan Study [Approach Survey], Conduct Environmental Study [phase II], Extend Runway [Grading Phase I] - 09/27, Rehabilitate Apron [Phase II], Rehabilitate Runway Lighting - 09/27
Carroll County-Tolson GA 005 16,150 Update Airport Master Plan Study [Phase 2]
Cincinnati Municipal Airport Lunken Field R 019 150,000 Rehabilitate Parking Lot
Cincinnati West GA 004 300,000 Acquire Land For Approaches [Partial reimbursement - approximately 6.84 ac. (Phase I)], Acquire Land For Approaches [Partial reimbursement - approximately 6.84 ac. (Phase II)]
Cleveland-Hopkins International P 072 9,559,556 Construct Runway - 06L/24R, Install Instrument Approach Aid - 06L/24R, Install Runway Lighting - 06L/24R, Remove Obstructions
073 3,659,432 Noise Mitigation Measures for Residences within 65 - 69 DNL
074 466,084 Conduct Noise Compatibility Plan Study
075 2,991,621 Improve Runway Safety Area - 10/28
076 1,589,006 Security Enhancements
077 2,100,000 Extend Runway [Extend & Shift Runway 960' southwest, Phase 1] - 06R/24L
Clinton Field GA 003 102,000 Acquire Land for Development, Conduct Airport Master Plan Study, Rehabilitate
Columbiana County GA 007 178,779Taxiway [Design], Remove Obstructions Improve Airport Miscellaneous Improvements [Taxiway Safety Area Grading],
Cuyahoga County R 015 150,000Rehabilitate Apron, Rehabilitate Taxiway Acquire Land For Approaches [Fee Simple Acquisition, Partial reimbursement #01]
Dayton-Wright Brothers R 007 150,000 Improve Runway Safety Area [Conduct Environmental Assessment (Phase 1)] 02/20, Improve Runway Safety Area [Construct Road (Design)] - 02/20
Defiance Memorial GA 004 128,311 Construct Taxiway [design], Rehabilitate Taxiway
Delaware Municipal GA 013 163,157 Construct Taxiway [T-Hangar taxiway includes relocation]
Fairfield County
Fayette County
GA
GA
013
003
229,761
33,250
Install Perimeter Fencing, Rehabilitate Runway [CONSTRUCT RUN UP AREA] 10/28, Update Airport Master Plan Study Construct Apron [Design], Construct Building [Terminal Building - Design], Construct Parking Lot [Design], Remove Obstructions [Old Terminal Building Demolition (Design)]
Findlay GA 015 2,319,022 Extend Taxiway [Site Preparation], Improve Runway Safety Area - 07/25, Install Runway Vertical/Visual Guidance System - 07/25, Rehabilitate Runway [Groove] 07/25, Rehabilitate Runway [Install Guidance Signs] - 07/25, Rehabilitate Runway [Lighting] - 07/25, Rehabilitate Runway [Pavement] - 07/25, Rehabilitate Taxiway [lighting], Rehabilitate Taxiway [pavement]
Selection Criteria Year: 2005
Page 35 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
GL DET OH Fostoria Metropolitan
Fulton County
Gallia-Meigs Regional
Geauga County
Greater Portsmouth Regional
Grimes Field
Hardin County
Harrison County
Harry Clever Field
Henry County
Highland County
Holmes County
Hook Field Municipal
James A Rhodes
James M Cox Dayton International
Kent State University
Knox County
Lakefield
Lawrence County Airpark
GA
GA
GA
GA
GA
GA
GA
GA
GA
GA
GA
GA
GA
GA
P
GA
GA
GA
GA
005
004
004
009
008
012
003
004
006
004
005
004
007
004
051
052
053
010
007
008
008
004
272,000
38,844
225,700
276,250
166,187
38,000
83,861
128,985
191,443
97,375
186,880
68,368
336,217
241,534
1,670,000
2,133,630
3,474,598
69,000
2,955,705
500,000
198,504
138,225
Install Runway Vertical/Visual Guidance System - 09/27, Install Weather Reporting Equipment, Rehabilitate Taxiway Construct Taxiway [Design]
Rehabilitate Apron [Phase 3], Rehabilitate Runway [Crack Seal] - 05/23
Improve Airport Drainage, Remove Obstructions [Trees]
Acquire Land For Approaches [Parcel 13, 30 Acres, Phase-2], Install Perimeter Fencing [Phase-1] Conduct Miscellaneous Study
Acquire Snow Removal Equipment, Remove Obstructions, Update Airport Master Plan Study Install Taxiway Lighting [Lighting and Reflectors], Rehabilitate Taxiway [Phase 2 Rehabilitation] Construct Taxiway [(T-hangar)]
Acquire Snow Removal Equipment [Acquire truck with plow], Conduct Miscellaneous Study [Airport drainage study] Acquire Land for Development [Fee simple acquisition], Acquire Snow Removal Equipment Acquire Snow Removal Equipment, Conduct Miscellaneous Study
Install Perimeter Fencing [Phase I], Install Weather Reporting Equipment, Rehabilitate Airport Beacons [Relocate], Rehabilitate Runway Lighting - 05/23 Acquire Land For Approaches [(Parcel 20, Approximately 40 Acres, Phase 2)], Acquire Land for Development [Reimburesment (Parcels A-G, 89 Acres)], Extend Runway [Road Relocation (Meet RSA/OFA Stds) Design] - 01/19, Install Weather Reporting Equipment [AWOS (Phase-2)] Construct Service Road [Perimeter], Improve Runway Safety Area [6R/24L RSA Study] - 06R/24L Rehabilitate Access Road [(Terminal Drive Phase 3)]
Improve Terminal Building [Gate Enhancements]
Update Airport Master Plan Study
Acquire Land For Approaches [Land reimbursement for approach protection], Extend Runway [Runway Safety Area & Extend/Rehab Pavement] - 10/28 Extend Runway [phase 2] - 10/28
Acquire Miscellaneous Land, Remove Obstructions [Phase 1], Remove Obstructions [Phase 2] Acquire Land For Approaches, Conduct Environmental Study [Conduct
Selection Criteria Year: 2005
Page 36 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
GL DET OH 004 Environmental Study]
Lima Allen County GA 008 162,366 Rehabilitate Taxiway [(2005)], Rehabilitate Taxiway [(2006)]
Lorain County Regional R 016 118,981 Acquire Snow Removal Equipment [Snow Plow with auxillary equipment], Improve Airport Miscellaneous Improvements
Madison County GA 009 186,282 Acquire Snow Removal Equipment, Improve Airport Drainage [Design and Bid Only], Install Perimeter Fencing [Design and Bid Only], Rehabilitate Runway - 09/27,
Marion Municipal GA 016 189,240Rehabilitate Taxiway Construct Taxiway [Construct T-hangar Taxiway & Access Road]
Metcalf Field R 017 1,056,189 Rehabilitate Runway - 04/22, Rehabilitate Taxiway [Design]
Miami University GA 003 88,379 Conduct Airport Master Plan Study [Phase II], Conduct Miscellaneous Study, Install Runway Vertical/Visual Guidance System [Design] - 05/23
Middle Bass Island GA 012 170,629 Improve Airport Drainage
Monroe County GA 005 52,845 Acquire Land for Development [Fee Simple, Parcel 1, Sylvester 7.769 Ac.], Rehabilitate Runway [Crack Sealing & Marking] - 07/25, Update Airport Master Plan Study
Neil Armstrong GA 008 34,500 Conduct Miscellaneous Study [Conduct Runway Approach Survey], Rehabilitate Taxiway [Phase 1 - Design Only]
Newark-Heath GA 017 220,539 Acquire Land for Development, Construct Taxiway [Phase 1], Construct Taxiway [Phase 2]
Norwalk-Huron County GA 005 187,654 Update Airport Master Plan Study
Ohio State University R 019 1,018,988 Acquire Land for Development [REIMBURSEMENT]
Ohio University Snyder Field GA 010 38,109 Improve Airport Drainage [(Public Sewer Connection - Design)]
Perry County GA 004 65,000 Acquire Land For Approaches [(REIMBURSEMENT)], Improve Runway Safety Area [DESIGN] - 08/26, Rehabilitate Runway [PRE-DESIGN] - 08/26
Pickaway County Memorial GA 007 724,361 Construct Building [10 UNIT T-HANGARS], Construct Fuel Farm, Construct Parking Lot, Construct Taxiway [T-HANGAR], Strengthen Apron
Pike County GA 003 150,000 Install Perimeter Fencing [(8,000 L.F. X 6' High) (Phase 3)]
Port Columbus International P 055 4,000,000 Construct Apron, Construct Taxiway, Extend Taxiway
056 2,501,321 Construct Service Road
057 2,127,849 Noise Mitigation Measures [NOISE MITIGATION MEASURES - RUN UP BARRIER (NO IMPACT, NEM 1/3/00)], Noise Mitigation Measures for Residences within 65 - 69 DNL [(135 RESIDENCES, NEM DATED 1/3/00)]
058 258,559 Security Enhancements
059 491,968 Install Noise Monitoring System [UPGRADE NOISE COMPUTERS (NO IMPACT, NEM
Selection Criteria Year: 2005
Page 37 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
GL DET OH 059 1/3/00)]
060 1,520,147 Rehabilitate Taxiway
Portage County GA 017 150,000 Acquire Land For Approaches [Phase 3], Install Perimeter Fencing [Design], Install Weather Reporting Equipment [Design], Rehabilitate Apron [Phase 2]
Put-in-Bay GA 011 209,755 Construct Utilities [WATER LINE (PHASE 1)], Install Perimeter Fencing [(4 FOOT)]
Putnam County GA 004 530,537 Construct Terminal Building, Expand Apron [Phase 1], Extend Taxiway, Install
Richard Downing GA 011 150,000
Miscellaneous NAVAIDS [Relocate Airport Beacon], Remove Obstructions [Remove existing Terminal Building] Install Perimeter Fencing [Phase 2 Construction, Phase 3 Design], Rehabilitate
Rickenbacker International P 030 1,385,048Apron [Construction] Acquire Snow Removal Equipment [3 High-speed Snow Brooms with plows], Install
031 3,380,665Perimeter Fencing, Rehabilitate Taxiway Construct Building [DESIGN], Improve Building [HANGARS]
032 52,673 Conduct Airport Master Plan Study [Phase,1], Conduct Airport Master Plan Study [Phase,2]
Ross County GA 009 45,600 Conduct Environmental Study, Update Airport Master Plan Study [ALP]
Seneca County GA 004 150,000 Install Weather Reporting Equipment
Sidney Municipal GA 008 88,912 Construct Taxiway, Expand Apron, Rehabilitate Taxiway
Springfield-Beckley Municipal GA 014 400,000 Acquire Land For Approaches, Acquire Miscellaneous Land
Toledo Express P 057 625,000 Install Perimeter Fencing [Install Perimeter Fence (Not Part 107)]
058 6,946,821 Modify Terminal Building [Phase 1], Modify Terminal Building [Phase 2], Modify
059 746,767Terminal Building [Phase 3] Construct Deicing Containment Facility
Union County
Van Wert County
GA
GA
013
007
150,000
26,125
Improve Runway Safety Area [Phase 1] - 09/27, Install Perimeter Fencing, Rehabilitate Runway [Design and Bid Only] - 09/27 Rehabilitate Apron [Design and bid]
Williams County GA 004 374,918 Install Runway Vertical/Visual Guidance System - 07/25, Rehabilitate Apron [Phase 1 (Design only)], Rehabilitate Runway [Re-Mark runway] - 07/25, Rehabilitate
Wood County GA 015 167,292Runway Lighting - 07/25 Construct Terminal Building, Install Perimeter Fencing, Update Airport Master Plan
Youngstown-Warren Regional CS 031 380,000Study Improve Airport Miscellaneous Improvements [Preliminary Engineering], Improve
032 218,500 Building [Preliminary Engineering], Install Perimeter Fencing [Phase 2] Conduct Airport Master Plan Study
Selection Criteria Year: 2005
Page 38 of 98
Grants Awarded by FY FAA - Office Of Airports
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
GL DET OH
ADO Total:
State Total:
Zanesville Municipal
94 Grants
127 Grants
007GA
200,822,822
90,851,971
401,400
GL MSP MN Aitkin Municipal-Steve Kurtz Field
Albert Lea Municipal
Anoka County-Blaine Airport(Janes Field)
Austin Municipal
Baudette International
005
003
007
007
008
004
GA
GA
R
GA
GA
85,500
57,475
2,467,325
3,278,450
1,292,321
703,932
Bemidji-Beltrami County 015P 987,207
Benson Municipal 004GA 615,366
Blue Earth Municipal
Brainerd Lakes Regional
Buffalo Municipal
Cambridge Municipal
004
026
002
004
GA
P
GA
GA
80,750
6,852,864
340,100
155,402
Report Date 02/23/2006
Brief Description Of Work
Rehabilitate Apron
Install Perimeter Fencing
Install Runway Lighting [REILS] - 16/34
Extend Runway - 09/27
Rehabilitate Runway [runway rehab whitetopping and HIRLS] - 18/36
Remove Obstructions
Expand Apron [FY-2006], Expand Apron, Rehabilitate Apron, Strengthen Taxiway, Update Airport Master Plan Study Acquire Aircraft Deicing Equipment [Acquire boom deicing truck], Acquire Land For Approaches [Acquire Hill property (17.8 acres)], Conduct Miscellaneous Study [Prepare pavement condition report], Construct Deicing Containment Facility [Glycol containment structure], Improve Airport Drainage [Construct drainage ditch in GA hangar area], Improve Runway Safety Area [Prepare EA for runway shift] - 07/25, Install Airfield Guidance Signs [Replace airfield guidance signs], Rehabilitate Access Road [Bituminous overlay along terminal drive], Rehabilitate Apron [Crack routing and sealing], Rehabilitate Runway [Crack routing and sealing] - 07/25, Rehabilitate Runway [Crack routing and sealing] - 13/31, Rehabilitate Runway Lighting [Replace remote lighting control] - 13/31, Rehabilitate Service Road [Rehabilitate Snow removal service road] Install Airfield Guidance Signs [Install airfield guidance signs], Install Miscellaneous NAVAIDS [Install segmented circle and wind sock], Install Runway Vertical/Visual Guidance System [Install PAPIs and REILS on Rwy 14/32] - 14/32, Install Taxiway Lighting [Install retro-reflective markers on parallel & connecting taxiways], Rehabilitate Apron [Overaly GA apron], Rehabilitate Runway [Overlay runway 14/32] - 14/32, Rehabilitate Runway Lighting [Replace MIRL cables] - 14/32, Rehabilitate Taxiway [Overlay parallel, connecting & hangar taxiways] Extend Runway [EA] - 16/34
Construct Runway - Plan-1, Install Perimeter Fencing
Acquire Land for Development [Reimbursement for Outlot "A", 3.25 acres fee]
Install Perimeter Fencing
Selection Criteria Year: 2005
Page 39 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
GL MSP MN Chandler Field GA 005 329,567 Improve Access Road [Rehabilitate access road (mill and overlay)], Modify Snow Removal Equipment Building [Convert hangar to SRE storage building], Rehabilitate
Chisholm-Hibbing CS 021 715,265Taxiway [Rehabilitate taxiways in hangar area (mill and overlay)] Acquire Aircraft Deicing Equipment, Acquire Land For Approaches [Runway 4 Approach (Albrecht)], Acquire Snow Removal Equipment, Improve Runway Safety Area [Runway 13 Approach Area - Granding and Relocate Localizer] - 13/31, Install Perimeter Fencing
Cloquet Carlton County GA 005 288,262 Install Runway Vertical/Visual Guidance System - 17/35, Rehabilitate Runway Lighting [Multi-year amendment] - 17/35, Rehabilitate Runway Lighting - 17/35,
Crookston Municipal Kirkwood Field GA 005 172,659Update Airport Master Plan Study Acquire Snow Removal Equipment, Improve Airport Drainage, Rehabilitate Runway
Duluth International P 038 4,080,155- 13/31 Construct Service Road [Phase 2 (Includes Wetland Purchase)], Install Perimeter
039 2,335,152Fencing [Phase 2] Rehabilitate Runway [Phase 2 (west end) shoulders, drainage, signs, lighting, repair pavement] - 09/27
040 2,279,218 Expand Apron, Modify Terminal Building [Design - Plans and Specifications(2005)], Modify Terminal Building [Design - Plans and Specifications(2006)], Rehabilitate
Elbow Lake Municipal - Pride of the Prairie GA 003 321,812Apron Construct Runway [Land Acquistion (Parcels 3, 4&5, 7, 9, and 10 in fee; Parcels 6,
Ely Municipal GA 007 2,080,48011, and 12 in easement)] - 14/32 Improve Runway Safety Area - 12/30
Eveleth-Virginia Municipal GA 007 44,292 Conduct Environmental Study
Fairmont Municipal GA 006 522,500 Construct Building, Construct Building
Falls International P 017 3,888,747 Extend Runway [RSA Grading RWY 13 2006] - 13/31, Extend Runway [RWY extension] - 13/31, Extend Runway [RWY extension 2006] - 13/31, Install Perimeter
Faribault Municipal GA 004 435,550Fencing [Deer fencing], Install Perimeter Fencing [Deer fencing 2006] Construct Access Road, Construct Taxiway
Fergus Falls Municipal-Einar Mickelson Field GA 005 257,450 Construct Building [Construct 9-unit Tee hangar]
Flying Cloud R 007 441,272 Rehabilitate Runway [2006] - 10R/28L, Rehabilitate Runway [2007] - 10R/28L, Rehabilitate Runway - 10R/28L
Glenwood Municipal GA 002 337,045 Install Runway Lighting [Install MIRL] - 15/33
Grand Marais/Cook County GA 007 403,750 Construct Seaplane Base, Construct Taxiway [Construct taxiway(2005)]
Grand Rapids/Itasca County Airport-Gordon Newstrom Field
CS 011 1,254,000 Conduct Environmental Study [Runway 4/22 Proposal], Install Guidance Signs, Install Runway Vertical/Visual Guidance System - 16/34, Install Taxiway Lighting [Parallel Taxiway], Rehabilitate Runway Lighting - 16/34, Rehabilitate Taxiway,
Selection Criteria Year: 2005
Page 40 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
GL MSP MN 011 Update Airport Master Plan Study
Hawley Municipal GA 002 106,164 Construct Fuel Farm [Replace fueling system], Update Airport Master Plan Study
Hector Municipal GA 002 392,908[Update Airport Layout Plan] Construct Building, Construct Taxiway
Hutchinson Municipal-Butler Field GA 005 213,750 Construct Fuel Farm [Install tank and dispensing equipment for jet fuel], Install Runway Vertical/Visual Guidance System [Install new REILs] - 15/33, Rehabilitate
Jackson Municipal GA 004 87,875
Runway Lighting [Install new primary power and modify electrical distribution building] - 15/33 Rehabilitate Runway - 13/31
Lac qui Parle County GA 003 136,014 Acquire Snow Removal Equipment, Improve Access Road [Pave entrance road], Update Airport Master Plan Study [Update airport layout plan]
Lake Elmo R 003 137,429 Rehabilitate Runway Lighting [Includes installation of radio control] - 14/32, Rehabilitate Taxiway Lighting
Little Falls/Morrison County-Lindbergh Field GA 007 109,324 Acquire Land For Approaches, Improve Fuel Farm, Install Perimeter Fencing
Longville Municipal GA 004 157,902 Construct Access Road, Extend Taxiway
Mahnomen County GA 004 193,724 Construct Building
Minneapolis-St Paul International/Wold- P 079 8,000,000 Construct Runway - Plan-1 Chamberlain/ 080 5,114,354 Noise Mitigation Measures for Residences within 65 - 69 DNL
081 5,663,759 Construct Taxiway [Construct Taxiway Q between Rwy 4/22 and Taxiway D (Part of Txy C-D Complex Phase 1)], Rehabilitate Taxiway [Portions of Txys A, C, & D of Txy C-D Complex (Phase 1)]
082 569,378 Rehabilitate Apron [Concourses D & E]
Montevideo-Chippewa County GA 004 270,935 Rehabilitate Apron [Reconstruct apron and connecting taxiway and expand apron]
Mora Municipal GA 004 134,948 Acquire Land For Approaches [Parcels 16 & 17], Conduct Environmental Study
Myers Field GA 006 1,684,493 Construct Terminal Building [Construct Arrival/Departure building (includes improving access road and parking lot)], Extend Runway [Extend, rehabilitate, and widen Runway 11/29 to 4,000' x 75' (includes clearing & grubbing, relocating fuel system, MIRLs, REILs, PAPIs, beacon, windsock, and paved apron/taxiway)]
New Ulm Municipal GA 005 279,30011/29 Conduct Airport Master Plan Study, Rehabilitate Taxiway
Ortonville Municipal-Martinson Field GA 003 262,286 Install Runway Lighting [MIRLS, Threshold lights, MITLS, and electrical vault work] 16/34
Owatonna Degner Regional GA 009 39,900 Conduct Environmental Study
Pine River Regional GA 001 436,513 Construct Taxiway, Remove Obstructions
Selection Criteria Year: 2005
Page 41 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
GL MSP MN Pipestone Municipal GA 002 125,687 Acquire Snow Removal Equipment [Acquire snow removal equipment (wheel loader)]
Princeton Municipal GA 005 229,900 Construct Taxiway, Install Taxiway Lighting
Richard B Helgeson GA 004 354,958 Construct Taxiway, Extend Taxiway, Rehabilitate Taxiway
Rochester International P 021 5,462,500 Extend Runway - 13/31
Silver Bay Municipal GA 002 235,600 Conduct Airport Master Plan Study, Construct Fuel Farm, Rehabilitate Runway
South St Paul Municipal-Richard E Fleming Field R 009 298,12207/25 Construct Building, Install Perimeter Fencing
Southwest Minnesota Regional Marshall/Ryan Field
GA 006 2,658,681 Expand Apron, Extend Runway [Extend runway to 7200' - Phase 1] - 12/30
Springfield Municipal GA 004 15,675 Improve Airport Drainage
St Paul Downtown Holman Field R 012 692,153 Install Runway Vertical/Visual Guidance System - 14/32, Rehabilitate Runway [(2005)] - 09/27, Rehabilitate Runway [(2006)] - 09/27, Rehabilitate Runway
013 4,581,277[(2007)] - 09/27, Rehabilitate Runway Lighting - 09/27 Improve Airport Drainage
Staples Municipal GA 002 163,400 Improve Fuel Farm, Install Runway Vertical/Visual Guidance System - 14/32
Thief River Falls Regional CS 009 183,540 Update Airport Master Plan Study
Todd Field GA 003 532,000 Construct Building, Install Runway Vertical/Visual Guidance System - 16/34
Tower Municipal GA 001 387,686 Construct Fuel Farm, Improve Seaplane Base
Tracy Municipal GA 004 159,620 Construct Taxiway [Construct taxiway to hangar area]
Walker Municipal GA 001 61,859 Conduct Airport Master Plan Study
Warroad International-Swede Carlson Field GA 006 9,160 Acquire Snow Removal Equipment
Waseca Municipal GA 004 370,500 Construct Snow Removal Equipment Building, Install Runway Lighting [Install threshold lights] - 15/33, Rehabilitate Access Road, Remove Obstructions [Remove trees & hangar]
Willmar Municipal 006 1,087,358 Construct New Airport [Runway grooving, marking, lighting, and signing; fencing]
Windom Municipal GA 004 876,101 Construct Building, Construct Building, Construct Fuel Farm, Construct Terminal Building, Rehabilitate Apron, Remove Obstructions
State Total: 70 Grants 79,580,601
GL MSP WI Austin Straubel International P 034 3,182,615 Construct Runway Safety Area - 18/36, Construct Runway Safety Area - 18/36
Central Wisconsin P 034 220,000 Acquire Snow Removal Equipment [replace anti icing vehicle #20]
Selection Criteria Year: 2005
Page 42 of 98
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
GL MSP WI Chippewa Valley Regional
Dane County Regional-Truax Field
General Mitchell International
La Crosse Municipal
Outagamie County Regional
Rhinelander-Oneida County
Wisconsin State Block Grant Program
State Total:
ADO Total:
Region Total:
Report Total:
NE ANE CT Danbury Municipal
Danielson
Igor I Sikorsky Memorial
Meriden Markham Municipal
Tweed-New Haven
Report Date 02/23/2006
FY 2005
Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
025P 1,000,000 Acquire Aircraft Deicing Equipment, Acquire Snow Removal Equipment, Rehabilitate Apron
036P 8,483,709 Improve Runway Safety Area - 14/32
037 3,768,215 Improve Runway Safety Area - 14/32
048P 3,331,569 Construct Runway Safety Area [this is for the EA for the RSA work] - 01L/19R, Rehabilitate Apron [North FBO apron], Rehabilitate Apron [terminal apron joint repair], Rehabilitate Taxiway
049 5,785,646 Noise Mitigation Measures for Residences within 65 - 69 DNL
028P 1,365,234 Rehabilitate Taxiway [rehab txy A north], Security Enhancements
028P 505,788 Construct Service Road
029 2,229,043 Rehabilitate Taxiway [rehab taxiway B]
023P 617,500 Rehabilitate Apron [Crack sealing air carrier apron], Rehabilitate Runway [Crack sealing concrete pavement] - 09/27, Rehabilitate Runway [Rehabilitate Runway-Phase 1 design] - 15/33, Rehabilitate Taxiway [Crack sealing of TWY's A, B, C, and D], Update Airport Master Plan Study [ALP Update]
021 16,868,916 Non primary development projects in state block grant program
022 3,850,000 Non primary development projects in state block grant program
023 5,000,000 Non primary development projects in state block grant program
14 Grants 56,208,235
84 Grants 135,788,836
929 Grants 584,534,682
2099 Grants 3,549,617,470
026R 274,503 Light Obstructions [(Lighting & Design)]
006GA 347,196 Update Airport Master Plan Study
021GA 85,500 Rehabilitate Apron
007GA 1,380,066 Rehabilitate Runway - 18/36
026P 272,313 Rehabilitate Apron [Design]
027 289,750 Acquire Snow Removal Equipment
028 550,905 Improve Terminal Building
Selection Criteria Year: 2005
Page 43 of 98
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
NE ANE CT
Waterbury-Oxford
State Total:
NE ANE MA Barnes Municipal
Barnstable Municipal-Boardman/Polando Field
Beverly Municipal
Gardner Municipal
General Edward Lawrence Logan International
Harriman-And-West
Laurence G Hanscom Field
Lawrence Municipal
Mansfield Municipal
Marshfield Municipal - George Harlow Field
Marthas Vineyard
Minute Man Air Field
Nantucket Memorial
New Bedford Regional
FY 2005
Service Grant Seq Level Number
029
GA 010
9 Grants
GA 022
023
P 040
041
042
R 022
023
GA 008
P 086
087
088
GA 017
P 023
R 022
GA 015
016
GA 011
012
P 029
GA 008
P 040
041
P 030
031
AIP Federal Funds
206,278
1,323,315
4,729,826
4,016,429
328,482
727,890
1,197,000
88,350
292,600
76,427
219,154
12,000,000
15,030,000
2,664,428
533,900
1,500,000
162,371
1,272,427
576,485
311,600
344,850
4,174,666
100,200
322,050
468,853
309,814
216,693
Report Date 02/23/2006
Brief Description Of Work
Update Airport Master Plan Study [terminal building study]
Extend Taxiway
Improve Runway Safety Area - 02/20, Install Instrument Approach Aid - 02/20, Rehabilitate Taxiway Update Airport Master Plan Study
Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Snow Removal Equipment
Construct Terminal Building, Construct Terminal Building
Update Airport Master Plan Study
Construct Runway Safety Area - 09/27
Conduct Environmental Study
Rehabilitate Apron
Noise Mitigation Measures for Residences within 65 - 69 DNL
Construct Runway - Plan-1
Extend Runway Safety Area - 04L/22R
Update Airport Master Plan Study
Rehabilitate Apron
Conduct Miscellaneous Study [obstruction analysis]
Construct Apron
Construct Snow Removal Equipment Building
Install Weather Reporting Equipment
Conduct Environmental Study
Construct Apron [taxiway/apron], Construct Apron, Construct Taxiway [taxiway/apron] Acquire Snow Removal Equipment
Security Enhancements
Construct Terminal Building [Phase 1]
Acquire Snow Removal Equipment
Rehabilitate Runway - 05/23
Selection Criteria Year: 2005
Page 44 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NE ANE MA Norwood Memorial R 025 256,500 Update Airport Master Plan Study
026 589,004 Rehabilitate Apron
Plymouth Municipal GA 031 332,481 Light Obstructions
032 1,064,732 Construct Apron
Southbridge Municipal GA 014 142,500 Install Taxiway Lighting
Taunton Municipal GA 014 773,675 Conduct Miscellaneous Study, Rehabilitate Runway Lighting - 12/30, Rehabilitate
Turners Falls GA 010 237,690Taxiway Extend Runway - 16/34
Westover ARB/Metropolitan GA 011 2,500,000 Acquire Land for Noise Compatibility within 75 DNL
012 450,000 Improve Building [Phase I], Improve Building [Phase II], Improve Building [Phase III]
Worcester Regional GA 033 958,550 Rehabilitate Taxiway
State Total: 34 Grants 54,239,801
NE ANE ME Auburn/Lewiston Municipal R 013 216,030 Update Airport Master Plan Study
Augusta State CS 015 183,350 Update Airport Master Plan Study
Bangor International P 040 1,384,222 Construct Deicing Containment Facility
041 299,959 Acquire Snow Removal Equipment
042 219,545 Conduct Miscellaneous Study [terminal area study]
Belfast Municipal GA 006 28,500 Conduct Airport Master Plan Study
Bethel Regional GA 008 597,550 Expand Apron
Biddeford Municipal GA 005 161,686 Remove Obstructions
Caribou Municipal GA 008 223,578 Acquire Snow Removal Equipment
009 180,530 Acquire Land for Development
Central Maine Airport of Norridgewock GA 009 114,000 Update Airport Master Plan Study
Dewitt Field,Old Town Municipal GA 004 179,016 Improve Runway Safety Area - 04/22
Eastern Slopes Regional GA 010 166,250 Update Airport Master Plan Study
Greenville Municipal GA 009 4,154,730 Rehabilitate Runway - 14/32
Hancock County-Bar Harbor CS 020 155,610 Improve Terminal Building, Rehabilitate Runway - 17/35
Knox County Regional P 017 1,268,250 Rehabilitate Taxiway [Rehabilitate Taxiway, Improve Airport Signs, Marking and Lighting, Install security Gates, Fencing, and Wind Cone, Purchase Friction
Selection Criteria Year: 2005
Page 45 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NE ANE ME 017 Measuring Equipment and Remove Obstructions.], Rehabilitate Taxiway [Rehabilitate Taxiway, miscellaneous Part 139 improvements]
018 171,000 Conduct Environmental Study
019 304,911 Acquire Snow Removal Equipment
Machias Valley GA 005 380,000 Conduct Airport Master Plan Study
Millinocket Municipal GA 007 156,779 Improve Runway Safety Area [Phase I design]
Newton Field GA 009 403,750 Construct Snow Removal Equipment Building
Northern Maine Regional Airport at Presque Isle P 024 2,371,623 Rehabilitate Taxiway, Rehabilitate Taxiway
Oxford County Regional GA 005 112,100 Conduct Environmental Study
Pittsfield Municipal GA 006 250,121 Construct Snow Removal Equipment Building
Portland International Jetport P 057 639,953 Update Airport Master Plan Study
058 5,464,400 Rehabilitate Taxiway, Rehabilitate Taxiway
Sanford Regional R 018 215,460 Rehabilitate Apron
State of Maine 004 162,000 Update State System Plan Study
Waterville Robert Lafleur GA 012 754,300 Rehabilitate Apron
013 204,250 Acquire Land for Development
Wiscasset GA 010 321,174 Extend Taxiway
State Total: 31 Grants 21,444,627
NE ANE NH Berlin Municipal GA 015 1,272,929 Rehabilitate Runway - 18/36
Boire Field R 026 291,650 Update Airport Master Plan Study
Claremont Municipal GA 016 474,050 Construct Building, Construct Building, Construct Building
Concord Municipal GA 018 295,830 Remove Obstructions
Lebanon Municipal CS 029 190,000 Rehabilitate Apron [phase 1 design]
030 1,425,000 Rehabilitate Apron, Rehabilitate Taxiway
Manchester P 058 2,500,000 Noise Mitigation Measures for Residences within 65 - 69 DNL
059 5,143,554 Rehabilitate Runway - 17/35
Mount Washington Regional GA 013 61,750 Acquire Land For Approaches
014 1,617,746 Extend Runway - 10/28
Pease International Tradeport P 030 788,635 Noise Mitigation Measures for Residences within 65 - 69 DNL
Selection Criteria Year: 2005
Page 46 of 98
FAA - Office Of Airports
Region ADO State Worksite
NE ANE NH
Skyhaven
State Total:
NE ANE RI Block Island State
Newport State
North Central State
Quonset State
Theodore Francis Green State
Westerly State
State Total:
NE ANE VT Burlington International
Middlebury State
Newport State
Rutland State
State of Vermont
Various Locations in Vermont
Grants Awarded by FY
FY 2005
Service Level
Grant Seq Number
GA
032
019
13 Grants
CS
GA
R
R
P
CS
010
013
014
015
012
071
073
074
013
014
015
11 Grants
P 055
056
057
GA
GA
GA
058
059
004
005
021
022
001
002
001
AIP Federal Funds
6,525,228
756,362
21,342,734
79,259
1,569,214
501,947
342,648
1,072,972
1,100,000
10,000,000
1,842,701
1,868,273
641,237
1,120,247
20,138,498
1,995,000
753,250
7,837,500
149,150
207,057
161,405
936,718
548,497
123,025
284,083
183,181
215,271
Report Date 02/23/2006
Brief Description Of Work
Rehabilitate Apron
Environmental Mitigation
Conduct Environmental Study
Remove Obstructions
Remove Obstructions
Rehabilitate Runway [Phase I] - 05/23
Rehabilitate Taxiway
Construct Terminal Building
Acquire Land for Noise Compatibility within 65 - 69 DNL
Conduct Environmental Study
Rehabilitate Runway - 07/25, Rehabilitate Taxiway
Remove Obstructions
Remove Obstructions
Acquire Land for Noise Compatibility within 65 - 69 DNL
Acquire Miscellaneous Land
Construct Apron [Phase I], Construct Apron [Phase II], Expand Terminal Building [Phase I] Construct Taxiway
Security Enhancements [Phase 2]
Conduct Environmental Study
Construct Apron
Security Enhancements [Fencing]
Acquire Snow Removal Equipment
Conduct State System Plan Study
Rehabilitate Runway, Update State System Plan Study
Install Perimeter Fencing (Caledonia County; Edward F Knapp State; Hartness State
Selection Criteria Year: 2005
Page 47 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NE ANE VT 001 (Springfield); William H. Morse State)
State Total: 12 Grants 13,394,137
ADO Total: 110 Grants 135,289,623
Region Total: 1039 Grants 135,289,623
Report Total: 2099 Grants 3,549,617,470
NM DEN CO Aspen-Pitkin County/Sardy Field 031P 6,723,300 Improve Runway Safety Area [Relocate Taxiway A (A2-A4)] - 15/33
032 9,574,081 Improve Runway Safety Area [Relocate ARFF/SRE Building (Final Design & Construction)] - 15/33
Centennial 028R 466,180 Acquire Snow Removal Equipment
029 1,545,271 Acquire Land For Approaches
Central Colorado Regional 009GA 150,000 Install Weather Reporting Equipment, Update Airport Master Plan Study
City of Colorado Springs Municipal 040P 16,181,170 Rehabilitate Runway [(Phase II)] - 17L/35R
Colorado Plains Regional 010GA 800,000 Construct Taxiway
Denver International 036P 3,250,000 Construct Aircraft Rescue & Fire Fighting Building, Construct Runway [Phase IX] 16R/34L
037 3,211,130 Construct Deicing Containment Facility [WA (Phase 2)], Install Runway Sensors 16L/34R
038 10,000,000 Construct Deicing Containment Facility [WA (Phase 3)]
Durango-La Plata County 029P 3,487,582 Construct Apron [North GA Apron], Construct Taxiway [to/from North GA Apron]
Eagle County Regional 037P 1,606,200 Extend Runway [Phase II (Design Engineering, Drainage, and Fencing)] - 07/25
038 9,206,622 Extend Runway [Phase III (Site Preparation)] - 07/25
Erie Municipal 008R 625,000 Construct Access Road, Construct Taxiway, Install Perimeter Fencing
Fort Collins-Loveland Municipal 019P 1,150,000 Acquire Handicap Passenger Lift Device, Acquire Snow Removal Equipment, Improve Terminal Building, Install Perimeter Fencing, Rehabilitate Apron
Fremont County 006GA 450,000 Acquire Snow Removal Equipment, Expand Apron
007 56,919 Update Airport Master Plan Study
Front Range 029R 300,000 Install Weather Reporting Equipment, Rehabilitate Taxiway
Garfield County Regional 014GA 150,000 Conduct Environmental Study
Granby-Grand County 004GA 400,000 Improve Runway Safety Area [Phase 1: Acquire Land Parcels 16, 22, 24, 25, 25A,
Selection Criteria Year: 2005
Page 48 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NM DEN CO 004 26, 28]
005 551,533 Improve Runway Safety Area [Phase 2: Relocate County Road]
Greeley-Weld County GA 017 412,519 Install Miscellaneous NAVAIDS, Install Runway Lighting
Gunnison-Crested Butte Regional P 037 70,000 Conduct Miscellaneous Study [(Conduct Wildlife Study)]
Harriet Alexander Field GA 008 275,443 Acquire Land for Development
Jeffco R 036 3,300,000 Construct Taxiway
037 550,000 Rehabilitate Apron
La Junta Municipal GA 005 464,936 Rehabilitate Apron
Mc Elroy Airfield GA 005 150,000 Update Airport Master Plan Study
Meadow Lake R 011 1,565,360 Acquire Land For Approaches
Meeker GA 005 111,018 Conduct Environmental Study
Montrose Regional P 032 550,364 Acquire Snow Removal Equipment
Perry Stokes GA 004 600,000 Construct Taxiway, Expand Apron
Pueblo Memorial CS 024 150,000 Update Airport Master Plan Study
025 1,606,900 Remove Obstructions
Rangely GA 006 119,200 Rehabilitate Runway [Phase 1 (Design Only)] - 06/24
San Luis Valley Regional/Bergman Field CS 015 655,000 Expand Apron, Rehabilitate Apron
Spanish Peaks Airfield GA 001 150,000 Rehabilitate Runway - 08/26
State of Colorado 004 246,140 Update State System Plan Study
Steamboat Springs/Bob Adams Field GA 014 790,600 Rehabilitate Apron
Telluride Regional P 020 1,000,000 Acquire Snow Removal Equipment, Rehabilitate Runway - 09/27
Walker Field P 030 3,055,000 Rehabilitate Apron
Yampa Valley P 031 5,194,454 Expand Terminal Building, Expand Terminal Building, Expand Terminal Building
032 5,400,000 Construct Apron
State Total: 43 Grants 96,301,922
NM DEN UT Beaver Municipal GA 007 150,000 Construct Taxiway
Blanding Municipal GA 011 68,610 Rehabilitate Apron [(Phase III)]
Brigham City GA 016 6,200,000 Acquire Miscellaneous Land, Improve Runway Safety Area [Construction, Phase I (Runway Extension, SA Grading C/D II)] - 16/34
Selection Criteria Year: 2005
Page 49 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NM DEN UT Bryce Canyon GA 008 300,000 Install Taxiway Lighting
Canyonlands Field CS 016 344,375 Improve Runway Safety Area [Design Only] - 03/21
Delta Municipal GA 006 172,230 Construct Taxiway [(Improve Taxiway A & B Safety Area - grading)], Improve Runway Safety Area - 16/34
Duchesne Municipal GA 003 210,000 Rehabilitate Runway Lighting [Phase I] - 17/35
Hanksville GA 001 398,966 Construct Apron, Construct Taxiway
Heber City Municipal - Russ McDonald Field GA 018 561,575 Acquire Land For Approaches, Construct Taxiway [Sch I, (Design Only)]
Kanab Municipal GA 007 470,000 Rehabilitate Runway - 01/19
Logan-Cache GA 015 2,307,418 Acquire Land For Approaches [Parcels 12b, 13c], Rehabilitate Apron
016 150,000 Construct Taxiway [Design Only]
Manti-Ephraim GA 004 58,995 Update Airport Master Plan Study [(ALP Update)]
Milford Municipal GA 008 89,503 Improve Runway Safety Area [Construction, Sch II] - 16/34, Rehabilitate Runway -
Nephi Municipal GA 008 1,200,00016/34 Construct Runway [(Phase IV, Construct Parallel Taxiway to Runway)] - 16/34
Ogden-Hinckley R 028 315,759 Install Perimeter Fencing
Parowan GA 008 300,000 Construct Taxiway
Provo Municipal GA 024 1,932,344 Extend Taxiway [Construction, Sch I]
Richfield Municipal GA 007 155,306 Conduct Environmental Study
Roosevelt Municipal GA 007 467,293 Modify Access Road
Salt Lake City International P 079 3,710,427 Rehabilitate Taxiway [Taxiway M]
080 8,000,000 Rehabilitate Taxiway [Taxiway H H2 - H4]
081 939,752 Acquire Land for Noise Compatibility within 65 - 69 DNL
St George Municipal P 019 1,050,997 Rehabilitate Taxiway [Taxiway "A" & "B"]
State of Utah 004 324,501 Conduct State System Plan Study
Vernal GA 019 111,334 Acquire Land For Approaches
Wendover GA 017 484,915 Construct Apron [Construct Hardstands]
State Total: 27 Grants 30,474,300
NM DEN WY Big Piney-Marbleton GA 007 65,550 Update Airport Master Plan Study [(ALP)]
Cheyenne Regional/Jerry Olson Field P 036 1,000,000 Rehabilitate Apron, Rehabilitate Taxiway
Selection Criteria Year: 2005
Page 50 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NM DEN WY Dixon GA 008 1,681,344 Rehabilitate Runway - 06/24
Evanston-Uinta County Burns Field GA 020 9,421,250 Improve Runway Safety Area [(Grading, Phase VIII;Construct Runway; Construct
Jackson Hole P 035 3,556,739Taxiway)] - 05/23 Conduct Miscellaneous Study, Expand Apron, Update Airport Master Plan Study
Johnson County
Kemmerer Municipal
GA
GA
011
013
551,259
503,029
Install Miscellaneous NAVAIDS, Rehabilitate Apron, Rehabilitate Taxiway [Taxiway "A" and "A2"] Construct Snow Removal Equipment Building [(Including Electrical Vault and GA Terminal) (FY 2004 NP -$50,000, FY 2005 NP - $150,000)], Rehabilitate Apron, Rehabilitate Taxiway
Laramie Regional CS 021 300,350 Construct Taxiway
022 599,650 Acquire Aircraft Rescue & Fire Fighting Vehicle
Natrona County International P 041 350,000 Expand Terminal Building
042 500,000 Rehabilitate Taxiway [Design Only]
Powell Municipal GA 009 456,971 Construct Building, Install Perimeter Fencing
Ralph Wenz Field GA 012 450,000 Acquire Land For Approaches
Rawlins Municipal/Harvey Field GA 010 330,890 Acquire Snow Removal Equipment, Construct Snow Removal Equipment Building
Riverton Regional P 024 704,404 Rehabilitate Runway [Design Only] - 10/28
Rock Springs-Sweetwater County CS 020 1,947,528 Install Airfield Guidance Signs, Rehabilitate Apron
Sheridan County P 027 82,773 Acquire Emergency Generator
028 106,931 Install Perimeter Fencing
State of Wyoming 003 233,000 Conduct State System Plan Study
Worland Municipal CS 015 731,662 Construct Runway [Schedule 1A]
State Total: 20 Grants 23,573,330
ADO Total: 90 Grants 150,349,552
NM HLN MT Baker Municipal GA 009 79,711 Conduct Environmental Study
Bert Mooney P 033 1,354,476 Conduct Airport Master Plan Study [Phase II], Install Weather Reporting Equipment [AWOS-II], Rehabilitate Apron [maintenance], Rehabilitate Runway [maintenance]
Big Sandy GA 002 88,350
11/29, Rehabilitate Runway [maintenance] - 15/33, Rehabilitate Taxiway ["D"], Security Enhancements Rehabilitate Runway - 06/24, Update Airport Master Plan Study
Selection Criteria Year: 2005
Page 51 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NM HLN MT Billings Logan International P 029 2,002,983 Acquire Snow Removal Equipment [and Friction Measuring Equipment], Improve Airport Miscellaneous Improvements [improve runway 25 safety area grading], Install Guidance Signs, Rehabilitate Apron [air carrier apron design only], Rehabilitate Taxiway ["G"], Update Airport Master Plan Study
Bowman Field GA 007 55,290 Install Weather Reporting Equipment [AWOS-II]
Broadus (New) 002 1,761,241 Construct New Airport
Dawson Community GA 006 396,830 Construct Fuel Farm, Install Perimeter Fencing, Update Airport Master Plan Study
Deer Lodge-City-County GA 005 976,600 Extend Runway [Phase I - grading] - 12/30
Dillon GA 007 466,170 Rehabilitate Access Road
Edgar G Obie GA 007 90,656 Install Miscellaneous NAVAIDS, Rehabilitate Runway [Phase II - Rehabilitate Runway (design)] - 08/26
Eureka GA 006 186,615 Construct Fuel Farm, Install Weather Reporting Equipment
Fort Benton GA 004 50,140 Rehabilitate Runway [, including taxiways and apron (maintenance)] - 05/23
Frank Wiley Field GA 007 385,731 Acquire Snow Removal Equipment [front-end loader with attachments], Install Airfield Guidance Signs [distance remaining signs on runways 4/22 and 12/30], Modify Snow Removal Equipment Building [add doors], Rehabilitate Runway [and Runway 12/30 (maintenance)] - 04/22, Update Airport Master Plan Study
Gallatin Field P 030 2,227,750 Acquire Land For Approaches, Acquire Land for Development, Acquire Land for Development, Construct Taxiway, Install Perimeter Fencing
Glacier Park International P 030 4,132,443 Extend Runway [, including extension of a portion of Taxiway B and relocation of ILS Glide Slope and Approach Lighting System (MALSR)] - 02/20, Extend Runway [,
031 1,235,000
including extension of a portion of Taxiway B and relocation of ILS Glide Slope and Approach Lighting System (MALSR)] - 02/20 Extend Runway [Phase 2 (complete extension of Taxiway B)] - 02/20
Great Falls International P 034 12,732,445 Install Instrument Approach Aid - 03/21
Havre City-County GA 009 635,702 Install Airfield Guidance Signs, Modify Terminal Building, Rehabilitate Runway
Helena Regional P 031 1,388,184[,taxiways, and apron pavements (maintenance)] - 07/25 Acquire Aircraft Rescue & Fire Fighting Vehicle [(1,500 gallon vehicle and Quick
L M Clayton GA 004 292,994Response vehicle)], Modify Terminal Building Install Guidance Signs [relocate runway holding position signs], Install Perimeter
Laurel Municipal GA 011 91,200Fencing Install Weather Reporting Equipment
Lewistown Municipal GA 009 287,000 Construct Service Road, Construct Taxiway [(hangar access)], Improve Snow Removal Equipment Building, Install Guidance Signs [and Miscellaneous Navaid (Supplemental Windcone Runway 25)], Rehabilitate Runway [Pavement
Selection Criteria Year: 2005
Page 52 of 98
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
NM HLN MT
Liberty County
Lincoln
Malta
Mission Field
Missoula International
Plains
Ravalli County
Ronan
Roundup
Scobey
Shelby
Sidney-Richland Municipal
Stanford
State of Montana
Three Forks
Tillitt Field
Townsend
Twin Bridges
White Sulphur Springs
Wokal Field/Glasgow International
FY 2005
Service Grant Seq Level Number
009
GA 003
GA 004
GA 005
GA 004
P 038
039
GA 004
GA 006
GA 007
GA 005
GA 004
GA 007
P 013
GA 004
004
GA 004
GA 004
GA 005
GA 006
GA 003
GA 010
AIP Federal Funds
65,550
2,597,245
142,999
473,000
947,933
1,189,421
1,094,000
307,800
162,450
89,395
91,314
191,000
1,199,161
59,850
63,887
341,192
67,319
156,000
266,000
144,979
331,999
Report Date 02/23/2006
Brief Description Of Work
(maintenance)] - 07/25
Rehabilitate Runway - 07/25
Construct Runway [,including land acquisition, obstruction removal, MIRLinstallation, taxiway and apron construction, PAPI installation, and miscellaneouselectrical (rotating beacon, segmented circle, lighted windcone).] - 04/22, InstallPerimeter Fencing [wildlife fence]Acquire Snow Removal Equipment, Install Weather Reporting Equipment
Construct Taxiway
Rehabilitate Runway - 07/25, Rehabilitate Taxiway, Update Airport Master PlanStudy [-Financial Plan]Improve Terminal Building
Construct Runway [Phase I - construct new runway (grading)] - 12/30
Construct Snow Removal Equipment Building, Rehabilitate Runway [(maintenance)]- 16/34 Acquire Snow Removal Equipment
Construct Fuel Farm
Install Weather Reporting Equipment
Construct Snow Removal Equipment Building
Install Perimeter Fencing, Rehabilitate Apron [, and Mark Runway 10/28 Aiming Points] Rehabilitate Runway [, including taxiways and apron (maintenance)] - 11/29, Update Airport Master Plan Study Conduct State System Plan Study
Acquire Land for Development, Construct Snow Removal Equipment Building
Update Airport Master Plan Study [(ALP Update)]
Construct Fuel Farm
Acquire Easement For Approaches, Acquire Land for Development
Construct Fuel Farm, Rehabilitate Runway [maintenance and preliminary engineering] - 01/19 Acquire Snow Removal Equipment, Install Guidance Signs [, Runway 8/26 and 12/30 Distance to Go signs, Taxiway C Lighting, Runway 8/26 Vertical/Visual Guidance Systems, and Miscellaneous Navaids (windcone)], Rehabilitate Runway [Runway 12/30, taxiway, and apron pavements (maintenance).] - 08/26
Selection Criteria Year: 2005
Page 53 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
State Total:
ADO Total:
43 Grants
43 Grants
40,900,005
40,900,005
NM SEA ID Aberdeen Municipal
Arco-Butte County
GA
GA
001
006
556,000
450,000
Install Perimeter Fencing, Rehabilitate Apron, Rehabilitate Taxiway, Update Airport Master Plan Study Acquire Snow Removal Equipment, Rehabilitate Access Road, Rehabilitate Runway
Bear Lake County GA 003 375,000- 06/24, Rehabilitate Taxiway Construct Taxiway
Boise Air Terminal/Gowen Field P 044 65,000 Security Enhancements
045 4,662,314 Acquire Snow Removal Equipment, Expand Terminal Building, Improve Runway
Burley Municipal GA 004 169,100Safety Area - 10L/28R, Rehabilitate Taxiway Construct New Airport [including airspace analysis and master plan, fatal flaw
Caldwell Industrial R 015 1,000,000analysis and pre-environmental (Phase 1)] Construct Taxiway [Environmental assessment], Construct Taxiway [West Side],
Cascade GA 007 56,976Rehabilitate Taxiway [and Taxilanes], Update Airport Master Plan Study Rehabilitate Runway - 12/30
Coeur d'Alene Air Terminal GA 024 2,650,000 Construct Apron, Construct Taxiway, Install Perimeter Fencing
025 28,500 Conduct Airport Master Plan Study
Driggs-Reed Memorial GA 005 150,000 Acquire Snow Removal Equipment
Friedman Memorial P 030 4,500,000 Extend Runway Safety Area - 13/31, Remove Obstructions
Idaho County GA
031
007
1,687,306
789,216
Expand Apron [aircraft parking apron], Improve Terminal Building, Improve Terminal Building, Security Enhancements Construct Taxiway
Idaho Falls Regional P 025 3,239,040 Expand Apron [Expand south general aviation apron (design only)(Phase 1)], Rehabilitate Apron, Rehabilitate Taxiway, Remove Obstructions
026 848,486 Expand Apron [Expand south general aviation apron (Phase 2)]
Jerome County GA 005 180,000 Rehabilitate Runway - 08/26
Joslin Field - Magic Valley Regional P 024 3,600,000 Conduct Miscellaneous Study, Extend Taxiway, Install Miscellaneous NAVAIDS, Install Perimeter Fencing, Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate
Lemhi County GA 008 203,786Runway Lighting - 07/25 Install Perimeter Fencing [Phase 1 fencing and gates near town]
Lewiston-Nez Perce County P 022 853,893 Rehabilitate Taxiway [B, C D & E, partial (design)], Security Enhancements
Mountain Home Municipal GA 007 419,175 Install Airfield Guidance Signs, Install Perimeter Fencing, Install Taxiway Lighting, Rehabilitate Taxiway
Selection Criteria Year: 2005
Page 54 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NM SEA ID Nampa Municipal GA 016 1,028,360 Construct Taxiway, Rehabilitate Apron
Pocatello Regional P 024 1,000,000 Construct Aircraft Rescue & Fire Fighting Building
Sandpoint GA 010 628,974 Construct Taxiway, Environmental Mitigation, Install Perimeter Fencing
Weiser Municipal GA 005 909,500 Acquire Snow Removal Equipment, Construct Parking Lot, Install Runway Vertical/Visual Guidance System - 12/30, Rehabilitate Apron, Rehabilitate Taxiway
State Total: 25 Grants 30,050,626
NM SEA OR Albany Municipal GA 007 150,000 Construct Taxiway, Install Apron Lighting, Install Miscellaneous NAVAIDS, Install
Astoria Regional GA 013 0Perimeter Fencing No projects assigned.
Aurora State GA 011 1,100,000 Rehabilitate Runway - 17/35
Bend Municipal GA 012 150,000 Construct Runway [Conduct environmental assessment for shift runway] - 16/34
Brookings GA 003 350,000 Install Perimeter Fencing, Install Runway Vertical/Visual Guidance System - 12/30, Remove Obstructions
Burns Municipal GA 004 100,000 Construct Taxiway
City-County GA 004 450,000 Construct Terminal Building, Construct Terminal Building, Rehabilitate Apron
Columbia Gorge Regional/The Dalles Municipal GA 005 360,000 Install Airfield Guidance Signs, Install Airfield Guidance Signs, Install Runway
Corvallis Municipal GA 011 300,000Lighting [7/25 phase 2; 12/30 phase 3] - 07/25 Rehabilitate Runway - 17/35
012 1,850,000 Rehabilitate Runway [Phase 2] - 17/35
Gold Beach Municipal GA 005 175,000 Rehabilitate Runway [Phase 1 design] - 16/34
Grant County Regional/Ogilvie Field GA 002 447,280 Construct Taxiway, Rehabilitate Taxiway
Hobby Field GA 006 50,000 Improve Utilities [Phase I design]
Hood River GA 004 608,760 Acquire Land For Approaches
Klamath Falls P 021 4,200,000 Conduct Miscellaneous Study, Rehabilitate Runway - 07/25, Rehabilitate Runway
Lake County GA 003 150,00007/25 Improve Fuel Farm
Mahlon Sweet Field P 035 9,240,478 Acquire Snow Removal Equipment, Construct Runway - 16/34, Rehabilitate Apron, Rehabilitate Emergency Generator, Rehabilitate Taxiway, Update Miscellaneous
Newport Municipal GA 013 70,000Study Conduct Miscellaneous Study, Construct Building [Phase 1 Design], Install Miscellaneous NAVAIDS
North Bend Municipal P 022 515,000 Rehabilitate Runway [Design only] - 04/22, Rehabilitate Terminal Building
Selection Criteria Year: 2005
Page 55 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NM SEA OR Ontario Municipal GA 005 350,000 Construct Apron, Construct Runway - 14/32, Construct Taxiway, Install Miscellaneous NAVAIDS
Portland International P 050 374,985 Extend Runway [including feasibility/justification study] - 10L/28R
051 3,111,112 Acquire Land for Development
052 131,250 Install Noise Monitoring System
Portland-Hillsboro R 018 1,502,875 Construct Taxiway
Prineville GA 004 1,536,559 Construct Taxiway, Rehabilitate Taxiway
Roberts Field P 025 2,503,932 Expand Terminal Building, Modify Access Road
Rogue Valley International - Medford P 027 5,186,791 Construct Terminal Building [Phase 2], Install Perimeter Fencing, Remove Obstructions
Roseburg Regional GA 014 2,210,000 Construct Apron, Construct Taxiway, Construct Taxiway, Construct Taxiway
State of Oregon 004 843,667 Update State System Plan Study
Tillamook GA 008 435,000 Construct Building, Construct Building, Improve Fuel Farm
Various Locations in Oregon 020 493,000 Improve Runway Safety Area (Bandon State - 16/34; Cottage Grove State - 15/33; Lebanon State - 16/34), Rehabilitate Apron (Seaside Municipal), Rehabilitate Runway (Albany Municipal - 16/34; Astoria Regional - 13/31; Lebanon State 16/34; McMinnville Municipal - 04/22; Scappoose Industrial Airpark - 15/33; Seaside Municipal - 16/34; Tillamook - 13/31), Rehabilitate Taxiway (Portland-Mulino; Seaside Municipal; Tillamook), Update Airport Master Plan Study (Seaside Municipal)
State Total: 31 Grants 38,945,689
NM SEA WA Anacortes GA 012 1,369,963 Install Perimeter Fencing, Remove Obstructions
Arlington Municipal GA 014 1,738,087 Construct Apron, Construct Taxiway, Extend Taxiway
Bellingham International P 034 1,391,077 Acquire Handicap Passenger Lift Device, Rehabilitate Taxiway [2/2]
035 404,442 Modify Terminal Building
Boeing Field/King County International P 030 100,000 Conduct Miscellaneous Study
031 3,219,005 Rehabilitate Runway - 13R/31L, Rehabilitate Taxiway
Bremerton National GA 017 150,000 Acquire Snow Removal Equipment
Chehalis-Centralia GA 007 547,470 Construct Access Road, Construct Taxiway, Rehabilitate Runway - 15/33
Deer Park GA 014 235,355 Install Runway Vertical/Visual Guidance System - 16/34, Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate Taxiway
Ephrata Municipal GA 006 211,750 Rehabilitate Apron [Crack sealing pavement maintenance], Rehabilitate Runway
Selection Criteria Year: 2005
Page 56 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NM SEA WA 006 [3/3] - 11/29
Grant County International CS 030 1,033,590 Acquire Snow Removal Equipment
Jefferson County International GA 008 1,685,352 Construct Taxiway, Construct Taxiway, Construct Taxiway
Lopez Island GA 008 465,500 Acquire Land for Development, Acquire Land for Development
Othello Municipal GA 002 30,934 Construct Taxiway, Install Perimeter Fencing, Install Runway Lighting - 07/25, Remove Obstructions
Pangborn Memorial P 025 3,148,876 Extend Runway - 12/30, Extend Runway - 12/30
Pullman/Moscow Regional P 024 485,000 Conduct Airport Master Plan Study
025 1,251,978 Acquire Safety Equipment, Construct Apron, Construct Apron
026 1,414,480 Improve Runway Safety Area [B-II to C-III] - 05/23, Install Weather Reporting
Quillayute GA 004 89,300Equipment Install Perimeter Fencing [Phase 1]
Renton Municipal R 015 150,000 Update Airport Master Plan Study
Richland GA 014 93,575 Conduct Airport Master Plan Study
Seattle-Tacoma International P 089 2,446,000 Noise Mitigation Measures for Residences within 70 - 74 DNL [Directional insulation for 3rd runway], Noise Mitigation Measures for Residences within 70 - 74 DNL [Multi-residences -- Pinebrook]
090 25,529,584 Construct Runway [Phase 10] - Plan-1
091 4,000,000 Improve Runway Safety Area [Runway 16L/34R safety area Phase 3] - 16R/34L
092 2,000,000 Install Runway Vertical/Visual Guidance System [Install bridge structure for ALSF, design and construction (Phase 1)] - Plan-1
093 3,352,000 Noise Mitigation Measures for Residences within 70 - 74 DNL [Tyee mobile]
094 4,471,000 Noise Mitigation Measures for Residences within 65 - 69 DNL
095 1,500,000 Rehabilitate Runway - 16R/34L
096 5,340,056 Noise Mitigation Measures for Residences within 70 - 74 DNL
Skagit Regional GA 012 144,031 Conduct Airport Master Plan Study
Snohomish County (Paine Field) R 040 2,437,500 Construct Apron, Construct Apron, Construct Apron
Spokane International P 035 8,723,222 Extend Taxiway, Extend Taxiway
State of Washington 004 23,799 Conduct State System Plan Study
Tacoma Narrows GA 009 3,000,000 Improve Runway Safety Area - 17/35
Tri-Cities P 028 3,786,373 Acquire Equipment [ADA passenger ramp], Construct Aircraft Rescue & Fire Fighting Building, Rehabilitate Runway [and 3L-21R intersection] - 12/30
Selection Criteria Year: 2005
Page 57 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NM SEA WA Various Locations in Washington
Walla Walla Regional
005
006
021P
302,616
1,891,946
1,826,487
Update Airport Master Plan Study (Davenport; Ione Municipal; Lake Chelan; Packwood; Sunnyside Municipal; Vashon Municipal) Install Miscellaneous NAVAIDS (Sanderson Field), Rehabilitate Apron (Anderson Field; Grand Coulee Dam; Sanderson Field), Rehabilitate Runway (Anderson Field 07/25; Grand Coulee Dam - 03/21), Rehabilitate Taxiway (Anderson Field; Grand Coulee Dam) Acquire Land For Approaches, Install Emergency Generator, Install Miscellaneous NAVAIDS
William R Fairchild International 022P 970,589 Conduct Miscellaneous Study [(Part 139 Sign Plan)], Rehabilitate Apron, Rehabilitate Runway Lighting [(Phase 2)] - 08/26, Remove Obstructions, Update Airport Master Plan Study
State Total: 39 Grants 90,960,937
ADO Total: 95 Grants 159,957,252
Region Total: 1267 Grants 351,206,809
Report Total: 2099 Grants 3,549,617,470
SO ATL GA Athens/Ben Epps
Augusta Regional at Bush Field
020
028
CS
P
1,000,000
1,595,000
Construct Access Road, Construct Aircraft Rescue & Fire Fighting Building [phase ii], Rehabilitate Apron, Update Miscellaneous Study Expand Terminal Building [Construction], Rehabilitate Apron
Brunswick Golden Isles
Cobb County-McCollum Field
022
021
P
R
142,500
209,855
Acquire Aircraft Rescue & Fire Fighting Vehicle [Bid Package Planning], Acquire Equipment [Bid Package Planning], Install Miscellaneous NAVAIDS, Rehabilitate Apron [Design/Planning] Rehabilitate Runway - 09/27
Columbus Metropolitan 026
027
P 2,089,000
316,065
Construct Taxiway [Phase 1 - Relocate twy "C" site prep], Improve Runway Safety Area [Phase 1 - all improvements except relocation of Navaids] - 06/24 Construct Taxiway [Phase 2 - Relocate twy "C"]
Daniel Field
Dekalb-Peachtree
011
031
GA
R
165,630
738,075
Install Perimeter Fencing [Terminal and ramp areas, security lighting], Rehabilitate Parking Lot, Rehabilitate Runway [Crack seal Runway 05/23, parallel taxiway, and apron] - 05/23 Rehabilitate Taxiway, Rehabilitate Taxiway
Fitzgerald Municipal 004GA 68,400 Extend Runway [Design Only] - 01/19
Greene County Regional 001GA 1,500,000 Extend Runway [Land acquisition] - 06/24
Hartsfield - Jackson Atlanta International 067P 24,100,000 Acquire Land for Noise Compatibility within 70 - 74 DNL
Selection Criteria Year: 2005
Page 58 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
SO
Region
ATL GA
ADO State Worksite
Heart of Georgia Regional
Herbert Smart Downtown
Lee Gilmer Memorial
Malcolm McKinnon
Middle Georgia Regional
Paulding County (New)
Roosevelt Memorial
Savannah/Hilton Head International
Southwest Georgia Regional
St Marys
Toccoa - R G LeTourneau Field
Valdosta Regional
Various Locations in Georgia
Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
068 6,368,300 Construct Runway - Plan-1
069 14,000,000 Extend Runway - 10/28
070 8,434,601 Construct Runway [I-285 bridge structures and paving] - Plan-1
GA 003 479,182 Acquire Land for Development
GA 005 251,720 Install Miscellaneous NAVAIDS, Rehabilitate Taxiway Lighting
R 011 450,000 Construct Taxiway [MY funds 2005-2007]
GA 013 150,000 Light Obstructions [Construction]
P 020
002
427,530
2,360,577
Acquire Equipment, Improve Airport Drainage [Design], Improve Runway Safety Area [Planning/Design] - 05/23, Rehabilitate Terminal Building [Phase II, Construction] Construct New Airport [Environmental Mitigation and Clearing/Drainage Phase I]
GA 004 36,625 Conduct Environmental Study
P
P
GA
040
025
003
9,961,388
1,969,735
321,767
Construct Taxiway [Construction Phase II, Twy C1 and Roadway R1], Expand Terminal Building [Terminal Construction Ph 1, Terminal Apron Expansion Design Only], Expand Terminal Building [Terminal Construction Ph 2], Expand Terminal Building [Terminal Construction Ph 3], Rehabilitate Runway Lighting [Rehab and Expand Airfield Electrical Vault Construction] - 09/27, Rehabilitate Taxiway Construct Access Road [Air Cargo Access Road, Phase II], Construct Aircraft Rescue & Fire Fighting Building [Design & Construct], Rehabilitate Apron, Widen Taxiway [Design only] Conduct Environmental Study, Conduct Environmental Study
GA 010 627,000 Extend Runway [Final Phase]
P 021 2,448,940 Extend Runway - 17/35
005 20,977,100 Acquire Land For Approaches (Berrien County; Claxton-Evans County; Dalton Municipal; Gilmer County; Greene County Regional; Habersham County; La Grange-Callaway; Monroe-Walton County; Moultrie Municipal; Thomasville Regional; Turner County), Acquire Land for Development (Dawson Municipal; Heart of Georgia Regional; Wrens Memorial), Conduct Environmental Study (Franklin County; Kaolin Field; La Grange-Callaway; Polk County Airport- Cornelius Moore Field; Swinton Smith Field at Reidsville Municipal), Construct Apron (Butler Municipal; Covington Municipal; Louisville Municipal), Construct Fuel Farm (Callaway Gardens-Harris County), Construct Runway (Cochran - Plan-1; Franklin County - 08/26), Construct Taxiway (Bacon County; Cartersville; Cherokee County; Cook County; Donalsonville Municipal; Habersham County; Kaolin Field; Millen; Perry-Houston County; Plantation
Selection Criteria Year: 2005
Page 59 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite
SO ATL GA
Winder-Barrow
Wright AAF (Fort Stewart)
State Total:
SO ATL NC Albert J Ellis
Asheville Regional
Charlotte/Douglas International
Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
GA
005
014 500,000
Airpark; Statesboro-Bulloch County; Waycross-Ware County), Expand Apron (Blairsville; Elbert County-Patz Field; Kaolin Field; Pickens County; Thomson-McDuffie County; Tom B. David Field), Extend Runway (Camilla-Mitchell County 08/26; Clayton County - Tara Field - 06/24; Hazlehurst - 14/32; Jackson County 16/34; La Grange-Callaway - 13/31; Metter Municipal - 10/28; Quitman Brooks County - 09/27; Swinton Smith Field at Reidsville Municipal - 11/29; Thomaston-Upson County - 12/30), Improve Airport Drainage (Souther Field), Improve Runway Safety Area (Telfair-Wheeler - 03/21), Install Perimeter Fencing (Bacon County; Baxley Municipal; Cartersville; Donalsonville Municipal; Douglas Municipal; Emanuel County; Henry Tift Myers; Homerville), Install Runway Lighting (Dr. C P Savage Sr. 18/36; Vidalia Regional - 06/24; West Georgia Regional - O V Gray Field - 17/35), Install Taxiway Lighting (Elbert County-Patz Field), Install Weather Reporting Equipment (Barwick Lafayette; Dr. C P Savage Sr.), Rehabilitate Apron (Baldwin County; Griffin-Spalding County; Tom B. David Field), Rehabilitate Runway (Burke County - 08/26; Cairo-Grady County - 12/30; Callaway Gardens-Harris County 09/27; Crisp County-Cordele - 10/28; Newnan Coweta County - 14/32; Polk County Airport- Cornelius Moore Field - 10/28), Rehabilitate Runway Lighting (Donalsonville Municipal - 18/36; Jekyll Island - 18/36; Plantation Airpark - 05/23; Turner County 16/34), Rehabilitate Taxiway (Griffin-Spalding County; Richard B Russell), Rehabilitate Taxiway Lighting (Jekyll Island), Remove Obstructions (Camilla-Mitchell County; Claxton-Evans County; Early County; Emanuel County; Homerville), Strengthen Runway (Millen - 17/35; W H 'Bud' Barron - 02/20), Strengthen Taxiway (Decatur County Industrial Air Park), Update Airport Master Plan Study (Cuthbert-Randolph; Turner County), Widen Runway (Barwick Lafayette - 02/20; Cuthbert-Randolph - 18/36; Madison Municipal - 14/32) Acquire Land For Approaches
GA 002 2,552,269 Install Taxiway Lighting, Rehabilitate Runway - 06L/24R, Rehabilitate Runway Lighting - 06L/24R, Rehabilitate Taxiway
29 Grants 104,241,259
P 025 521,525 Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Handicap Passenger Lift Device, Improve Terminal Building [Design], Remove Obstructions, Security Enhancements
P 030 836,729 Expand Apron
P 052 15,089,210 Construct Runway [Phase VI, Master Plan Land Acquisition] - 18L/36R, Construct Taxiway, Expand Apron
Selection Criteria Year: 2005
Page 60 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO ATL NC 053 4,875,000 Improve Runway Safety Area [18L, Installation of Engineered Material Arresting System (EMAS), Phase I] - 18L/36R
Craven County Regional P 025 810,825 Acquire Friction Measuring Equipment, Improve Airport Drainage [planning], Rehabilitate Taxiway, Update Airport Master Plan Study
Fayetteville Regional/Grannis Field
Hickory Regional
P
GA
030
020
3,039,226
888,000
Conduct Miscellaneous Study, Improve Terminal Building [Phase III, Design and Construction], Rehabilitate Access Road, Rehabilitate Airport Beacons Construct Taxiway [SHORT FORM EA], Rehabilitate Runway [Phase II] - 06/24,
North Carolina State Block Grant Program 030 23,205,984Rehabilitate Runway Lighting [CONSTRUCTION OF HIRLs] - 06/24 Non primary development projects in state block grant program - GA
Piedmont Triad International P 044 11,076,243 Construct Runway [Phase IV] - Plan-1
046 1,672,000 Rehabilitate Apron [South Apron], Rehabilitate Apron [West apron]
Pitt-Greenville P 028 1,282,500 Acquire Friction Measuring Equipment, Construct Taxiway [Relocate Taxiway A (includes construction of Taxiway A2)], Construct Taxiway
Raleigh-Durham International P 032 6,227,793 Construct Taxiway [Phase II], Construct Taxiway [Phase III], Expand Apron [Phase II], Expand Apron [Phase III]
033 7,229,652 Improve Runway Safety Area [Phase II] - 05R/23L
Wilmington International P 034 1,863,602 Expand Apron, Improve Airport Drainage
035 1,000,000 Improve Runway Safety Area - 17/35
State Total: 15 Grants 79,618,289
SO ATL SC Allendale County GA 009 137,004 Construct Taxiway [phase II]
Anderson Regional GA 014 2,931,000 Extend Runway [Phase III (relocation of MALSR, Glideslope, and PAPIs Construction; Paving; Marking; and Lighting)] - 05/23
Bamberg County GA 003 79,500 Construct Taxiway [phase II]
Beaufort County GA 008 1,168,088 Construct Taxiway [construct partial parallel taxiway], Rehabilitate Apron
Berkeley County GA 013 150,000 Extend Taxiway [ea/ design]
Charleston AFB/International P 025 111,575 Security Enhancements
Charleston Executive
Cheraw Municipal/Lynch Bellinger Field
GA
GA
010
006
3,095,023
126,713
Expand Apron, Rehabilitate Runway, Rehabilitate Taxiway [Reconstruction of Taxiway E/W Section 1] Install Perimeter Fencing
Columbia Metropolitan P 029 5,998,940 Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Perimeter Fencing, Modify Terminal Building, Rehabilitate Apron [Phase II Construction], Rehabilitate Apron [Phase III Construction], Rehabilitate Apron [Phase III Construction], Rehabilitate Taxiway [taxiway U]
Selection Criteria Year: 2005
Page 61 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO ATL SC Conway-Horry County GA 013 300,000 Install Perimeter Fencing [Construction]
Darlington County Jetport GA 006 888,296 Extend Runway, Modify Access Road
Donaldson Center GA 014 1,481,501 Acquire Land for Development [(552 Perimeter Road - 6.14 acres)]
East Cooper GA 008 149,649 Install Weather Reporting Equipment
Fairfield County GA 009 276,336 Extend Runway - 04/22
Florence Regional P 023 2,898,336 Acquire Handicap Passenger Lift Device, Rehabilitate Apron, Rehabilitate Runway
Georgetown County GA 008 1,597,165 Conduct Environmental Study, Expand Apron, Improve Access Road, Install Apron Lighting, Install Miscellaneous NAVAIDS [Rotating Beacon], Rehabilitate Runway
Grand Strand GA 011 205,000Lighting [Vault-includes utility relocation] - 05/23 Install Airfield Guidance Signs
Greenville Spartanburg International P 037 3,726,847 Construct Access Road [Phase II], Expand Access Road, Improve Utilities
Greenwood County GA 007 337,902 Rehabilitate Taxiway
Hartsville Regional GA 008 227,640 Acquire Land For Approaches, Update Airport Master Plan Study
Lancaster County-Mc Whirter Field GA 009 300,000 Install Weather Reporting Equipment [Install AWOS Facility]
Lee County GA 003 558,400 Extend Runway - 05/23
Marlboro County Jetport - H.E. Avent Field GA 006 51,339 Conduct Airport Master Plan Study, Rehabilitate Runway - 06/24
Myrtle Beach International P 033 3,575,138 Construct Access Road, Construct Apron, Construct Terminal Building
034 340,251 Conduct Miscellaneous Study
035 1,284,800 Acquire Snow Removal Equipment, Rehabilitate Taxiway [taxiway J]
New 001 350,000 Construct New Airport [project formulation]
Newberry County GA 005 125,000 Construct Fuel Farm
Oconee County Regional GA 014 115,900 Update Airport Master Plan Study
Orangeburg Municipal GA 013 660,000 Construct Building, Expand Apron
Pageland GA 003 300,000 Acquire Land for Development [initial land acq (additional parcels necessary)]
Ridgeland GA 004 50,000 Rehabilitate Runway - 03/21, Rehabilitate Runway Lighting - 03/21
Robert F Swinnie GA 004 150,000 Remove Obstructions
Rock Hill/York County/Bryant Field R 017 294,708 Expand Apron
Saluda County GA 003 309,733 Rehabilitate Runway
St George GA 004 725,319 Rehabilitate Apron, Rehabilitate Runway - 05/23
Sumter GA 009 300,000 Rehabilitate Runway [phase ii] - 05/23
Selection Criteria Year: 2005
Page 62 of 98
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
SO ATL SC Various Locations in South Carolina
SO JAN
ADO Total:
State Total:
AL
Williamsburg Regional
Andalusia-Opp
Ashland/Lineville
Atmore Municipal
Auburn-Opelika Robert G. Pitts
Autauga County
Bay Minette Municipal
Bessemer
Bibb County
Birmingham International
Blackwell Field
Carl Folsom
Demopolis Municipal
Selection Criteria Year: 2005
FY 2005
Service Level
Grant Seq Number
007
008
GA
40 Grants
84 Grants
007
GA 009
GA
GA
GA
GA
GA
001
003
017
009
005
R
GA
P
GA
GA
GA
009
002
059
060
061
006
001
006
AIP FederalFunds
1,016,631
455,200
82,270
36,931,204
220,790,752
3,509,721
314,602
1,233,149
131,348
242,004
113,947
1,728,512
1,053,572
4,542,671
4,000,000
11,088,000
1,883,094
372,080
300,000
Report Date 02/23/2006
Brief Description Of Work
Install Weather Reporting Equipment (Aiken Municipal; Barnwell County; BeaufortCounty; Berkeley County; Charleston Executive; Cheraw Municipal/Lynch BellingerField; Conway-Horry County; Donaldson Center; East Cooper; Fairfield County;Georgetown County; Hartsville Regional; Laurens County; Lowcountry Regional;Marlboro County Jetport - H.E. Avent Field; Newberry County; Pickens County;Spartanburg Downtown Memorial; Summerville; Sumter; Williamsburg Regional;Woodward Field)Construct Building (Marion County), Construct Taxiway (Marion County), InstallMiscellaneous NAVAIDS (Marion County), Install Runway Vertical/Visual GuidanceSystem (Marion County - 04/22), Rehabilitate Apron (Marion County), RehabilitateRunway Lighting (Marion County - 04/22), Remove Obstructions (Marion County),Update Airport Master Plan Study (Marion County)Construct Taxiway [Design]
Construct Apron [Construct North Apron and Connector Taxiway], Extend Runway[Environmental Assessment] - 11/29, Improve Runway Safety Area - 11/29,Rehabilitate Runway - 11/29Acquire Land For Approaches
Construct Apron
Construct Apron [Site Prep(Phase 1)]
Conduct Miscellaneous Study, Construct Fuel Farm, Expand Apron
Construct Building [Phase -1 Design Only of Hangar unit and associated grading.],Construct Fuel Farm, Update Airport Master Plan StudyExtend Runway - 05/23
Rehabilitate Runway - 10/28
Construct Access Road, Construct Apron
Acquire Land for Noise Compatibility within 65 - 69 DNL
Remove Obstructions
Construct Taxiway [Site prep, & pave]
Acquire Land For Approaches [Acquire protection zone land RW 1/19 Phase 1]
Construct Building
Page 63 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
SO JAN AL Dothan Regional P 025 2,127,150 Improve Runway Safety Area [Install LOC/DME to replace RW14 approach lost due to RSA grading project.] - 14/32, Improve Runway Safety Area [Replace
Folsom Field GA 013 412,539nonfrangible approach lights in RW32 safety area.] - 14/32 Expand Apron, Rehabilitate Runway - 02/20, Rehabilitate Taxiway
Franklin Field GA 001 403,000 Acquire Land For Approaches
Geneva Municipal GA 001 544,551 Acquire Land For Approaches
George Downer GA 003 109,070 Acquire Land For Approaches, Conduct Miscellaneous Study
Gragg-Wade Field GA 003 150,000 Acquire Land For Approaches
Guntersville Municipal - Joe Starnes Field GA 008 1,073,164 Construct Runway - Plan-1
H. L. (Sonny) Callahan GA 008 249,999 Construct Building [Construct Hangar to be leased to State Police]
Headland Municipal GA 006 637,942 Strengthen Runway [Overlay Runway] - 09/27
Huntsville International-Carl T Jones Field P 045 2,781,966 Construct Taxiway, Rehabilitate Apron, Rehabilitate Runway - 18L/36R, Security Enhancements
046 3,396,302 Rehabilitate Terminal Building
047 600,000 Update Airport Master Plan Study
Isbell Field GA 012 285,662 Construct Taxiway, Rehabilitate Taxiway Lighting
Jack Edwards GA 020 226,100 Acquire Land for Development [North side access (10 acres) [Anticipate $100K
Jackson Municipal GA 002 364,138land release funds to go toward this.]] Acquire Land For Approaches, Install Airport Beacons, Install Runway Vertical/Visual Guidance System - 18/36, Rehabilitate Runway Lighting, Remove Obstructions [Remove approach obstructions]
Lanett Municipal GA 002 384,864 Improve Runway Safety Area - 08/26, Remove Obstructions
Lawrence County GA 004 312,550 Conduct Miscellaneous Study, Rehabilitate Taxiway
Mobile Downtown R 016 3,529,383 Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System 14/32, Install Runway Vertical/Visual Guidance System - 18/36, Rehabilitate
Mobile Regional P 035 4,814,271Runway - 14/32 Acquire Land for Development, Conduct Miscellaneous Study, Expand Service Road [Fuel Farm Road extension construction], Improve Terminal Building [Install Terminal Building Air Handler Units 5, 6 & 7; Install Jet Bridges 1 & 3], Rehabilitate Access Road, Rehabilitate Taxiway [Design Only for TW-A paving and lighting
036 40,000rehab.], Security Enhancements Install Miscellaneous NAVAIDS
Montgomery Regional (Dannelly Field) P 035 2,000,000 Construct Terminal Building
Selection Criteria Year: 2005
Page 64 of 98
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
SO JAN AL Moton Field Municipal
New
Posey Field
Richard Arthur Field
Roanoke Municipal
Robbins Field
Russellville Municipal
Scottsboro Municipal-Word Field
Shelby County
St Clair County
St Elmo
Talladega Municipal
The Albertville Municipal-Thomas J Brumlik Field
Troy Municipal
Tuscaloosa Regional
Walker County-Bevill Field
Weedon Field
State Total:
SO JAN MS Belzoni Municipal
Bobby L Chain Municipal
Booneville/Baldwyn
Brookhaven-Lincoln County
Bruce Campbell Field
Calhoun County
Carthage-Leake County
Cleveland Municipal
FY 2005
Service Level
Grant Seq Number
GA 008
GA
GA
003
003
004
GA
GA
GA
GA
R
R
GA
GA
GA
GA
GA
GA
GA
001
003
005
009
011
006
004
012
015
010
019
009
010
012
53 Grants
GA
GA
GA
GA
GA
GA
GA
005
012
006
005
013
003
004
GA 012
AIP Federal Funds
1,000,000
1,516,680
115,028
150,000
452,200
356,667
321,415
184,520
872,538
568,380
450,000
1,150,000
848,856
1,150,000
443,460
87,881
208,317
387,726
65,219,019
130,695
248,730
524,287
229,830
525,949
33,189
313,646
167,405
Report Date 02/23/2006
Brief Description Of Work
Construct Access Road, Expand Apron, Install Perimeter Fencing, RehabilitateRunway Lighting - 13/31Construct Apron, Construct Runway [Paving] - Plan-1, Construct Taxiway
Improve Building
Construct Fuel Farm, Install Runway Vertical/Visual Guidance System - 18/36,Rehabilitate Airport BeaconsAcquire Land For Approaches
Expand Apron
Conduct Miscellaneous Study, Improve Fuel Farm
Acquire Land for Development, Construct Building, Rehabilitate Runway
Rehabilitate Apron, Rehabilitate Runway - 15/33, Rehabilitate Taxiway
Expand Apron
Construct Building [Construct Storage Hangar]
Construct Taxiway
Acquire Equipment, Rehabilitate Runway - 05/23, Rehabilitate Taxiway
Extend Runway [Acquire land Phase 1; Wetland mitigation]
Expand Building
Construct Apron, Improve Airport Drainage, Remove Obstructions
Rehabilitate Runway Lighting - 09/27
Construct Building
Install Perimeter Fencing
Rehabilitate Taxiway
Extend Runway - 15/33
Install Perimeter Fencing, Install Weather Reporting Equipment
Extend Taxiway, Update Airport Master Plan Study
Improve Runway Safety Area - 15/33
Construct Building, Construct Taxiway, Improve Runway Safety Area [Completenorth safety area], Install Perimeter FencingAcquire Land For Approaches, Conduct Environmental Study
Selection Criteria Year: 2005
Page 65 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
SO JAN MS Columbus-Lowndes County GA 008 72,025 Rehabilitate Runway Lighting
Dean Griffin Memorial GA 006 124,204 Rehabilitate Runway Lighting [Replace runway edge lights]
Eupora GA 003 157,795 Install Airport Beacons, Install Miscellaneous NAVAIDS, Install Runway Lighting 14/32
George M Bryan GA 010 1,818,701 Construct Apron, Construct Taxiway
Golden Triangle Regional P 036 3,680,000 Construct Apron, Rehabilitate Runway - 18/36
Greenwood-Leflore GA 010 259,462 Rehabilitate Runway [Seal Coat] - 18/36, Update Airport Master Plan Study
Grenada Municipal GA 005 247,338 Improve Airport Drainage
Gulfport-Biloxi International P 049 3,798,574 Acquire Easement for Noise Compatibility within 65 - 69 DNL
050 743,801 Install Runway Lighting [Plans & Specifications Only] - 14/32, Rehabilitate Taxiway
051 2,433,032 Acquire Equipment, Acquire Land For Approaches, Acquire Land for Development, Expand Terminal Building [Phase III]
052
053
940,548
14,244
Improve Runway Safety Area [Grade Runway Safety Area] - 14/32, Rehabilitate Runway [Rehabilitate concrete portion of Runway 14/32] - 14/32 Install Guidance Signs [Repair hurricane damaged signs], Rehabilitate Terminal
054 0Building [Design and immediate repairs], Remove Obstructions Rehabilitate Apron
Hardy-Anders Field Natchez-Adams County GA 015 150,000 Construct Building
Hattiesburg-Laurel Regional P 024 935,523 Construct Access Road [Phase I], Environmental Mitigation, Install Apron Lighting [Apron Lighting Upgrade], Rehabilitate Airport Beacons [Rehab Beacon], Security Enhancements [Security Vehicle]
Holly Springs-Marshall County GA 007 138,152 Install Runway Lighting - 18/36, Install Runway Vertical/Visual Guidance System 18/36
Houston Municipal GA 006 148,907 Construct Taxiway, Remove Obstructions
Indianola Municipal GA 007 127,610 Improve Airport Drainage, Rehabilitate Taxiway
Iuka GA 003 354,292 Strengthen Runway - 18/36
Jackson International P 036 4,840,217 Acquire Interactive Training System, Improve Terminal Building, Rehabilitate Apron,
Jackson-Evers International P 037 395,158Rehabilitate Runway Lighting - 16L/34R Rehabilitate Runway Lighting - 16L/34R
James H Easom Field GA 004 741,755 Acquire Land for Development, Construct Apron, Improve Fuel Farm, Remove
John Bell Williams GA 010 1,822,103 Obstructions [Remove obstructions] Extend Runway [Land Acquisition] - 12/30, Remove Obstructions [Natchez Trace Phase I]
Selection Criteria Year: 2005
Page 66 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
SO JAN MS Key Field P 020 442,225 Improve Runway Safety Area - 01/19, Install Airfield Guidance Signs, Rehabilitate Apron, Rehabilitate Terminal Building
Kosciusko-Attala County GA 004 158,206 Install Runway Lighting, Install Runway Vertical/Visual Guidance System
Macon Municipal GA 004 148,420 Improve Access Road
Magee Municipal GA 004 473,396 Expand Access Road, Install Runway Lighting - 18/36, Rehabilitate Runway [Asphalt Overlay]
McCharen Field GA 006 76,659 Install Perimeter Fencing
McComb/Pike County/John E Lewis Field GA 011 217,075 Rehabilitate Apron, Rehabilitate Taxiway [Hangar Taxiways]
Mid Delta Regional CS 022 3,200,000 Extend Taxiway, Rehabilitate Runway Lighting - 18R/36L
New Albany-Union County GA 007 367,153 Rehabilitate Runway, Rehabilitate Taxiway
Okolona Municipal-Richard Stovall Field GA 006 254,023 Construct Building, Improve Runway Safety Area
Olive Branch R 014 600,000 Construct Fuel Farm
Panola County GA 006 174,589 Construct Building, Install Perimeter Fencing, Install Runway Lighting - 01/19
Paul Pittman Memorial GA 006 95,000 Acquire Land For Approaches
Philadelphia Municipal GA 007 594,135 Construct Building
Picayune Municipal GA 012 329,740 Construct Building [New GA Terminal]
Poplarville-Pearl River County
Richton-Perry County
GA
GA
005
005
164,350
240,825
Construct Fuel Farm [Construct Fuel Farm], Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System - 16/34 Construct Building
Roscoe Turner GA 014 1,279,782 Install Runway Lighting, Install Weather Reporting Equipment, Rehabilitate Runway
Ruleville-Drew GA 006 125,931 Improve Access Road [Improve Access Road], Improve Airport Drainage [Drainage
State of Mississippi 002 89,775Improvements], Rehabilitate Airport Beacons [Rehab Airport Beacon] Conduct Miscellaneous Study
003 47,880 Conduct Miscellaneous Study
004 0 No projects assigned.
Stennis International R 019 0 Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Miscellaneous NAVAIDS [Replace damaged visual navaids.], Install Weather Reporting Equipment, Rehabilitate Aircraft Rescue & Fire Fighting Building [Repair hurricane damage to ARFF building.], Rehabilitate Runway Lighting [Replace damaged PAPI, REIL and Distance to go markers.] - 18/36, Rehabilitate Runway Lighting [Replace runway lights] - 18/36, Rehabilitate Taxiway Lighting [Replace Taxiway A edge lights],
Tishomingo County GA 006 134,387 Rehabilitate Taxiway Lighting [Replace Taxiway Signage] Acquire Land For Approaches, Install Perimeter Fencing, Rehabilitate Runway
Selection Criteria Year: 2005
Page 67 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO JAN MS 006 Lighting - 17/35
Trent Lott International GA 019 150,000 Construct Building
Tunica Municipal GA 007 450,000 Construct Building [FBO Hangar]
Tupelo Regional P 026 2,809,036 Acquire Interactive Training System, Conduct Noise Compatibility Plan Study, Environmental Mitigation [Air Service Ramp Spill Containment], Expand Terminal Building, Rehabilitate Runway [Marking] - 18/36, Update Airport Master Plan Study
027 1,462,620 Expand Terminal Building
University-Oxford GA 019 692,440 Improve Runway Safety Area, Rehabilitate Runway - 09/27
Water Valley Municipal GA 003 66,795 Improve Access Road, Rehabilitate Airport Beacons
Winona-Montgomery County GA 004 324,793 Expand Apron, Extend Taxiway, Install Runway Vertical/Visual Guidance System
Yazoo County GA 006 122,75403/21, Install Taxiway Lighting Install Runway Vertical/Visual Guidance System [Install PAPI's] - 17/35, Install Taxiway Lighting
State Total: 62 Grants 41,409,161
ADO Total: 115 Grants 106,628,180
SO MEM KY Addington Field GA 011 450,000 Construct Building
Barkley Regional P 026 166,820 Rehabilitate Runway [Overlay RW 4/22, 14/32, and TW "A" South Phase 1 -Design]
027 3,902,654- 04/22 Rehabilitate Runway [Overlay 14/32 and TW "A" South Phase 3] - 04/22, Rehabilitate Runway [Overlay 14/32 and TW "A" South Phase 3] - 04/22, Rehabilitate Runway [Overlay RW 4/22 Phase 2] - 04/22
Big Sandy Regional GA 007 35,400 Install Perimeter Fencing
Blue Grass P 036 617,228 Acquire Snow Removal Equipment
037 8,460,393 Construct Taxiway [RW 22 Taxiway Connector Required by RSA Project], Improve Runway Safety Area [Phase 3, RSA Improvement Project] - 04/22, Widen Taxiway
Bowling Green-Warren County Regional GA 017 23,750[Phase 1 of Taxiway Widening and Rehabilitation] Conduct Miscellaneous Study
Bowman Field R 014 150,000 Conduct Miscellaneous Study, Update Airport Master Plan Study [Airport Layout
015 1,759,405Plan Update] Rehabilitate Runway - 14/32
Breckinridge County GA 001 57,000 Update Airport Master Plan Study
Capital City GA 007 4,040,781 Extend Runway [Extend Runway 6-24] - 06/24, Extend Runway [Improve Runway
Selection Criteria Year: 2005
Page 68 of 98
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
SO MEM KY
Cincinnati/Northern Kentucky International
Fulton
Gene Snyder
Glasgow Municipal
Grayson County
Henderson City-County
Julian Carroll
Kyle-Oakley Field
Lebanon-Springfield
London-Corbin Airport-Magee Field
Louisville International-Standiford Field
Madison
Madisonville Municipal
Marion-Crittenden County
McCreary County
Middlesboro-Bell County
Morehead-Rowan County
Mount Sterling-Montgomery County
FY 2005
Service Grant Seq Level Number
007
P 050
051
GA 002
GA 007
GA 013
GA 002
GA 014
015
GA 002
GA 014
GA 005
GA 013
P 075
076
GA 008
GA 012
GA 005
GA 004
GA 007
GA 003
004
GA 009
AIP Federal Funds
19,150,137
9,143,225
560,459
77,900
82,650
50,000
275,000
1,028,000
263,632
45,781
49,400
163,970
15,000,000
16,946,436
158,833
52,250
444,987
140,600
145,000
601,580
373,968
561,187
Report Date 02/23/2006
Brief Description Of Work
safety Area 6] - 06/24, Install Perimeter Fencing, Rehabilitate Runway [Install Runway Drainage System] - 06/24 Construct Runway
Noise Mitigation Measures for Public Buildings
Construct Apron
Acquire Land for Development
Acquire Land for Development, Install Perimeter Fencing, Install Weather Reporting Equipment Improve Runway Safety Area - 02/20
Construct Building [Terminal Bldge Construction Phase 1], Construct Building [Terminal Building Construction Phase 2] Widen Runway - 09/27
Construct Fuel Farm
Construct Building [Terminal Building (Design - Phase 1)]
Acquire Land for Development, Install Weather Reporting Equipment [Design]
Construct Building
Acquire Land for Noise Compatibility within 65 - 69 DNL [Continue Implementation of FAA Approved Noise Compatibility program] Acquire Land for Development, Acquire Snow Removal Equipment, Extend Runway - 17R/35L, Extend Runway - 17R/35L, Improve Aircraft Rescue & Fire Fighting Building, Improve Service Road, Rehabilitate Apron, Rehabilitate Runway Lighting Plan-1, Rehabilitate Taxiway Expand Apron
Conduct Miscellaneous Study
Install Perimeter Fencing, Install Runway Lighting [Install MITL & conduct 405 survey.] Construct Building
Expand Apron, Improve Airport Drainage, Install Airfield Guidance Signs, Install Perimeter Fencing, Mark Obstructions Construct New Airport [Environmental Mitigation In-lieu payment]
Install Perimeter Fencing
Improve Runway Safety Area - 03/21, Rehabilitate Runway [2nd Year of Multi-Year] - 03/21, Rehabilitate Runway [Multi-year Project] - 03/21, Rehabilitate
Selection Criteria Year: 2005
Page 69 of 98
FAA - Office Of Airports
Region ADO State Worksite
SO MEM KY
Muhlenberg County
New
Ohio County
Owensboro-Daviess County
Pike County-Hatcher Field
Princeton-Caldwell County
Russellville-Logan County
Samuels Field
Somerset-Pulaski County-J.T. Wilson Field
Stanton
State of Kentucky
Stuart Powell Field
Sturgis Municipal
Tucker-Guthrie Memorial
Wendell H Ford
West Liberty
Williamsburg-Whitley County (New)
State Total:
SO MEM TN Lovell Field
McGhee Tyson
Grants Awarded by FY
FY 2005
Service Grant SeqLevel Number
GA
GA
CS
GA
GA
GA
GA
GA
GA
GA
GA
GA
GA
GA
P
P
009
002
005
004
032
007
004
007
008
013
001
001
011
006
004
009
002
008
50 Grants
034
035
036
037
049
050
AIP FederalFunds
476,950
881,000
233,082
2,500,000
181,562
351,907
342,000
25,000
189,148
47,500
614,604
95,000
130,790
235,921
574,960
274,046
650,000
92,781,896
1,509,453
3,500,000
1,644,768
333,209
308,627
11,305,001
Report Date 02/23/2006
Brief Description Of Work
Taxiway [Taxiway Rehabilitation Assocuated with Runway Rehabilitation]
Construct Building
Construct New Airport
Construct Building [5-unit T-hangar]
Extend Runway - 18/36
Install Runway Vertical/Visual Guidance System - 09/27, Rehabilitate Building
Construct Apron
Construct Taxiway
Construct Building
Install Perimeter Fencing
Conduct Airport Master Plan Study [Conduct Airport Layout Plan]
Conduct State System Plan Study
Acquire Miscellaneous Land
Rehabilitate Runway Lighting
Install Perimeter Fencing
Install Perimeter Fencing
Construct Apron, Construct Taxiway
Acquire Land for Development
Construct Aircraft Rescue & Fire Fighting Building, Construct Taxiway, Update Airport Master Plan Study Rehabilitate Runway [Construct Electrical Vault] - 15/33, Rehabilitate Runway [Rehab RW 15-33] - 15/33, Rehabilitate Runway [Rehab TW J, Z and a portion of TW D] - 15/33 Construct Aircraft Rescue & Fire Fighting Building [Phase 1 Connectivity.], Rehabilitate Taxiway Construct Aircraft Rescue & Fire Fighting Building [Connectivity], Construct Aircraft Rescue & Fire Fighting Building, Rehabilitate Taxiway Acquire Emergency Generator, Acquire Equipment [Runway Sweeper], Acquire Snow Removal Equipment, Install Miscellaneous NAVAIDS Construct Apron [Service Road (West AV), Service Road (Snow Rem Bldg),
Selection Criteria Year: 2005
Page 70 of 98
Grants Awarded by FY FAA - Office Of Airports
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
SO MEM TN 050
McKellar-Sipes Regional 015CS
Memphis International 066
067
P
Nashville International 074
075
P
076
Tennessee State Block Grant Program
Tri-Cities Regional TN/VA
022
023
024
025
042P
State Total: 17 Grants
ADO Total: 67 Grants
SO ORL FL Albert Whitted
Apalachicola Municipal
Avon Park Municipal
Boca Raton
013
002
012
009
R
GA
GA
R
AIP FederalFunds
1,951,590
6,149,000
22,639,370
926,250
3,711,334
1,472,968
13,911,096
750,000
2,093,950
1,845,000
1,120,014
75,171,630
167,953,526
375,200
61,000
94,850
247,000
Report Date 02/23/2006
Brief Description Of Work
Taxiway D and Apron Site Prep Ph. 3], Construct Apron [Service Road (West AV), Service Road (Snow Rem Bldg), Taxiway D and Apron, PH 4], Construct Apron [Service Road (West AV), Service Road (Snow Rem. Bldg), Taxiway Site Prep and Apron, Phase 2], Construct Apron [West Aviation Development - Final Phase] Acquire Equipment [Acquire ATCT Equipment], Construct Access Road, Expand Terminal Building Rehabilitate Runway
Acquire Snow Removal Equipment [Snow Broom], Construct Aircraft Rescue & Fire Fighting Building [Construct ARFF Phase 2], Construct Apron [Cargo Ramp], Construct Taxiway [TWY Victor Reimb.], Extend Taxiway [Taxiway Papa Extension], Improve Airport Drainage, Improve Service Road [Widen North Service Road], Update Airport Master Plan Study [GIS Applications for 3DALP], Widen Runway [Phase 1 - Design] - 18C/36C Expand Aircraft Rescue & Fire Fighting Building
Conduct Miscellaneous Study [Exhibit A Property Map], Rehabilitate Taxiway [Rehabilitation of Taxiway T-6 at Terminal Ramp], Rehabilitate Taxiway [Rehabiltation of Taxiway T-6 at Juliet & Lima] Extend Runway Safety Area [Phase 1, Engineering Report & design 02L/20R & 02R/20L] - 02L/20R Non primary development projects in state block grant program
Non primary development projects in state block grant program
Non primary development projects in state block grant program
Non primary development projects in state block grant program
Acquire Land For Approaches, Improve Runway Safety Area - 05/23, Improve Terminal Building, Rehabilitate Parking Lot, Rehabilitate Runway Lighting - 05/23, Update Airport Master Plan Study
Install Airfield Guidance Signs [Install Airfield Guidance Signs]
Update Airport Master Plan Study
Rehabilitate Runway [Rehabilitate Runway 9/27-PHI (Design)] - 09/27
Conduct Noise Compatibility Plan Study
Selection Criteria Year: 2005
Page 71 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite
SO ORL FL Cecil Field
Charlotte County
Craig Municipal
Crystal River
Daytona Beach International
DeLand Municipal-Sidney H Taylor Field
Defuniak Springs
Eglin AFB
Fernandina Beach Municipal
Fort Lauderdale Executive
Fort Lauderdale/Hollywood International
Gainesville Regional
Herlong
Hernando County
Jacksonville International
Kay Larkin
Key West International
Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
R 007 3,153,730 Improve Airport Drainage [Phase 1], Rehabilitate Building [Rehabilitate Buildings 82 (Air Traffic Control Tower), 313, 312, and Fireloop, Demolish Building 214], Rehabilitate Taxiway Lighting [B, C, D], Remove Obstructions [Demolish Refuelers]
GA 020 190,039 Update Airport Master Plan Study
R 016 150,000 Construct Taxiway [Construct Portion of Taxiway A-3]
GA 002 149,269 Update Airport Master Plan Study [Update Master Plan and ALP]
P 047 6,270,000 Expand Terminal Building
048 3,703,726 Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire Aircraft Rescue Fire Fighting Venicle], Construct Service Road [Construct Perimeter Road-PH3], Install Miscellaneous NAVAIDS [Relocate wind cones], Install Runway Lighting - 07L/25R, Rehabilitate Runway - 07L/25R, Remove Obstructions [Remove Obstructions]
R 015 123,500 Extend Taxiway [Extend and Light Taxiway D (design)], Install Guidance Signs [Install Airfield Signage (for both Runways and Taxiways (design phase))]
GA 002 675,627 Construct Taxiway [Construct Parallel Taxiway (Phase 2)]
P 016 2,231,671 Expand Terminal Building [(Phase 5)]
R 015 152,883 Construct Access Road [Construct Access Road (east terminal area)]
R 021 764,914 Extend Taxiway [(relocate Taxiway A-design)], Rehabilitate Runway [(design)] 13/31
P 048 8,353,985 Construct Taxiway [Construct Taxiway C], Security Enhancements [Security Enhancements]
049 838,732 Conduct Noise Compatibility Plan Study [Conduct Part 150]
P 022 3,677,853 Improve Terminal Building [Phase 2]
R 011 149,961 Update Airport Master Plan Study [Update Airport Maxter Plan/Airport Layout Plan]
GA 014 519,831 Install Apron Lighting, Install Perimeter Fencing
P 040 5,961,543 Rehabilitate Apron, Rehabilitate Taxiway
GA 013 1,296,470 Improve Runway Safety Area - 17/35, Install Airfield Guidance Signs, Install Perimeter Fencing, Install Taxiway Lighting [(Taxiways C&D, Medium Intensity Taxiway Lighting)], Rehabilitate Runway Lighting [High Intensity Runway Lighting] 17/35, Rehabilitate Taxiway [A], Rehabilitate Taxiway Lighting [Medium Intensity Taxiway Lighting]
P 027 4,089,835 Conduct Miscellaneous Study [Develop Wildlife Plan], Conduct Noise Compatibility Plan Study [Noise Contour Updae], Noise Mitigation Measures for Residences within 70 - 74 DNL [Part 150-Noise Mitigation, 50 homes, Phase 4 (Construction), Part 150Noise Mitigation, 50 homes, Phase 5 (Design)]
Selection Criteria Year: 2005
Page 72 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO ORL FL Keystone Airpark GA 015 157,888 Install Perimeter Fencing
Kissimmee Gateway R 027 608,340 Install Runway Vertical/Visual Guidance System [(precision approach path indicator, Runway 15/33 and Runway 6/24)] - 06/24, Remove Obstructions [(Runway 15/33, Phase 2 (construction))], Widen Taxiway [(holdbay-Runway 6
Lake City Municipal GA 015 161,270end)] Rehabilitate Runway [(portions of Runways 5/23 and 28)] - 05/23
Lakeland Linder Regional R 027 3,882,952 Rehabilitate Runway [Rehabilitate Runway 5/23] - 05/23
Leesburg Regional GA 013 331,288 Conduct Environmental Study [Environmental Study (Extend RW 13/31)]
Melbourne International P 029 1,634,950 Acquire Equipment [(Aircraft Loading Bridge)], Rehabilitate Apron [(Reseal Terminal Apron)], Rehabilitate Taxiway [(Overlay Taxiways K and Q)], Security Enhancements
Merritt Island GA 014 692,550 Install Guidance Signs, Install Miscellaneous NAVAIDS [(precision approach path indicator (PAPI-2)both ends of runway)], Rehabilitate Runway Lighting - 11/29,
Miami International P 049 8,000,000Rehabilitate Taxiway Lighting Construct Runway [Construct Runway 8L/26R (LOI)] - 08L/26R
050 1,464,319 Security Enhancements [Acquire Security Equipment (Concourse J-Access Control)]
051 9,551,609 Rehabilitate Runway [Rehabilitate Runway 9/27] - 09/27
Naples Municipal CS 023 1,897,538 Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire Aircraft Rescue & Fire
New Smyrna Beach Municipal R 010 1,176,100Fighting Vehicle], Install Runway Lighting - 14/32 Install Taxiway Lighting [(medium intensity taxiway lights, Taxiway B and C)], Install Weather Reporting Equipment, Rehabilitate Runway Lighting - 06/24
North Palm Beach County General Aviation R 012 885,000 Conduct Environmental Study [Conduct Environmental Assessment, Runway 13/31]
Ocala International-Jim Taylor Field GA 019 2,088,130 Construct Runway Safety Area - 18/36, Extend Taxiway, Rehabilitate Taxiway
Okeechobee County GA 013 124,472 Install Apron Lighting [Install Apron Lighting, Phase 2], Install Perimeter Fencing [Install Perimeter Fencing]
Orlando International P 088 2,000,000 Construct Taxiway [(North Crossfield)]
089 3,000,000 Environmental Mitigation [(removal of remnant wetlands, Phase 1)]
090 5,360,000 Construct Runway [Construct Runway 17L/35R] - 17L/35R
091 3,725,758 Rehabilitate Terminal Building [(airside 1 & 3, BP-370)]
Orlando Sanford P 048 1,779,777 Conduct Noise Compatibility Plan Study [(Noise Exposure Map Update)], Construct Apron [Construct New Apron (Northside)]
049 2,737,542 Extend Runway [Design] - 09R/27L, Rehabilitate Runway [Rehab Runway 9C/27C] - 09C/27C
Selection Criteria Year: 2005
Page 73 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO ORL FL Ormond Beach Municipal R 010 219,989 Construct Taxiway [(T-Hangar Taxilanes)], Improve Airport Miscellaneous Improvements [(Install Infrastructure for T-Hangar Development)], Install Airfield Guidance Signs, Rehabilitate Runway [Mark Runway 17/35] - 17/35, Rehabilitate Runway [Mark Runway 8/26] - 08/26
Page Field GA 012 150,000 Construct Taxiway [("D"-Design)], Extend Taxiway [("C"- Design)]
013 4,124,680 Construct Taxiway ["D"], Extend Taxiway ["C"]
Palm Beach International P 044 1,602,767 Construct Building [Construct Emergency Operation Center (EOCC)], Install Runway Vertical/Visual Guidance System [Install Runway End Identification Lights] 09R/27L
Panama City-Bay County International P 035 2,699,975 Conduct Environmental Study [Conduct EIS PH5 (BCA, Forecast Study, Airspace)]
036 775,057 Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire ARFF Truck], Acquire
Pensacola Regional P 033 14,985,858Equipment [(sweeper truck)], Acquire Handicap Passenger Lift Device Rehabilitate Runway - 17/35
Perry-Foley GA 005 189,794 Construct Building [(design only, 10 unit T-Hangar)], Install Weather Reporting Equipment [(Automated Weather Observing System (AWOS))]
Peter Prince Field GA 008 766,109 Construct Taxiway [Construct Taxiway], Improve Runway Safety Area [Improve RSA Runway 18] - 18
Plant City Municipal GA 005 388,200 Install Airfield Guidance Signs, Rehabilitate Apron [Overlay West Ramp]
Quincy Municipal GA 002 87,476 Update Airport Master Plan Study
Sarasota/Bradenton International P 038 3,422,959 Construct Service Road [(North Quad Serivce Road/Access, Phase 1 - Design)], Construct Taxiway [(T-Hangar Phase 3 Area)], Expand Terminal Building [(Federal Inspection Station in Concourse B)], Improve Airport Drainage, Rehabilitate Runway
Southwest Florida International P 035 4,000,000[(Phase 1 - Design)] - 14/32 Construct Apron [Construct Apron-Airfield Site Prep]
036 1,588,058 Construct Terminal Building [Construct New Terminal Building (Midfield)], Install Apron Lighting [Install Apron Lighting], Install Guidance Signs [Install Guidance
037 10,833,899Signs] Rehabilitate Runway [Rehab Runway 6/24] - 06/24
038 6,961,434 Rehabilitate Runway - 06/24
St Lucie County International GA 025 919,498 Construct Runway [Design Parallel Runway 9L/27R] - Plan-1, Rehabilitate Runway
St Petersburg-Clearwater International P 031 14,273,418Lighting - 09/27 Extend Runway [(Phase 2-Construction)] - 17L/35R, Improve Terminal Building
State of Florida 004 2,000,000[(Phase 1-Planning & Design)and Rehabilitate], Security Enhancements [(Part 1542)] Conduct State System Plan Study
Suwannee County GA 005 76,038 Rehabilitate Runway [Rehab Runway 7/25] - 07/25
Selection Criteria Year: 2005
Page 74 of 98
FAA - Office Of Airports
Region ADO State Worksite
SO ORL FL Tallahassee Regional
Tampa International
The Florida Keys Marathon
Venice Municipal
Wauchula Municipal
Williston Municipal
Winter Haven's Gilbert
Witham Field
State Total:
SO ORL PR
State Total:
Antonio Rivera Rodriguez
Commonwealth of Puerto Rico
Eugenio Maria De Hostos
Fernando Luis Ribas Dominicci
Luis Munoz Marin International
Mercedita
Rafael Hernandez
SO ORL VI
State Total:
Cyril E King
Selection Criteria Year: 2005
Grants Awarded by FY
FY 2005
Service Level
Grant Seq Number
AIP Federal Funds
P
P
030
045
7,293,366
6,241,900
GA 021 112,438
R
GA
GA
010
006
007
333,545
71,967
213,860
GA 017 311,183
GA 010 2,416,805
72 Grants 181,551,375
P
P
CS
P
CS
P
7 Grants
014
004
012
004
041
014
018
2,284,808
193,952
124,868
180,752
184,821
1,220,476
186,773
193,166
P
1 Grants
024
7,007,588
7,007,588
Report Date 02/23/2006
Brief Description Of Work
Construct Access Road [(Terminal)], Construct Apron [(Air Cargo)]
Construct Taxiway [Construct New High Speed Taxiway, Design/Construct],Construct Taxiway [Construct Taxiway A, Phase 1, Design/Construct], ConstructTaxiway [Construct Taxiway D, Phase 1, Design], Construct Taxiway [ConstructTaxiway E, Phase 1, Design], Construct Taxiway [W]Acquire Emergency Generator [Acquire Generator (Airport Beacon)], ConstructApron [(General Aviation, Design Only)], Improve Terminal Building [RehabilitateTerminal (Canopy, Phase 2)], Rehabilitate Apron [(General Aviation, Design Only)]Conduct Airport Master Plan Study
Update Airport Master Plan Study [Update MP/ALP]
Install Airfield Guidance Signs, Install Runway Lighting [High Intensity RunwayLights] - 05/23, Install Runway Vertical/Visual Guidance System [PrecisionApproach Path Indicator] - 05/23, Install Runway Vertical/Visual Guidance System[Runway End Identification Lights] - 05/23Construct Apron [Construct Apron], Install Perimeter Fencing [Install PerimeterFencing]Acquire Land for Noise Compatibility within 65 - 69 DNL [Land Acquisition (Noise65-69 Day Night Level)], Install Weather Reporting Equipment [Automated WeatherObserving System]
Improve Runway Safety Area - 09/27
Conduct Miscellaneous Study
Improve Runway Safety Area - 09/27
Construct Apron
Acquire Equipment, Security Enhancements [(Design Only)]
Construct Runway Safety Area - 12/30
Acquire Equipment [(Runway/Airfield Sweeper)]
Rehabilitate Taxiway [Terminal Taxilane]
Page 75 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
ADO Total:
Report Total:
Region Total:
80 Grants
1613 Grants
2099 Grants
190,843,771
3,549,617,470
686,216,229
SW AROK AR Adams Field P 058 6,012,179 Acquire Aircraft Rescue & Fire Fighting Vehicle [Replace ARFF Vehicle No.1], Acquire Land for Noise Compatibility within 75 DNL [RW 4R Extension - Phase II],
059 1,126,939Rehabilitate Apron [Apron pavement removal - (Timex Hangar)] Acquire Land For Approaches [RW 18 Approach]
Almyra Municipal GA
060
002
2,000,000
52,250
Noise Mitigation Measures for Residences within 65 - 69 DNL [Part 150 Voluntary Program Property Acquisition] Conduct Airport Master Plan Study
Batesville Regional GA 008 401,300 Extend Taxiway
Baxter County Regional GA 010 1,389,374 Acquire Land For Approaches [Acquire Land for Runway 23 RPZ], Improve Runway Safety Area - 05/23, Install Miscellaneous NAVAIDS [Install (2) Wind Cones], Modify Access Road, Rehabilitate Runway Lighting - 05/23, Remove
Bentonville Municipal/Louise M Thaden Field GA 005 534,464Obstructions [Relocate T-Hangars and Remove Building] Acquire Land For Approaches [RW 36]
Billy Free Municipal GA 002 207,138 Improve Airport Drainage, Remove Obstructions
Blytheville Municipal GA 009 236,465 Install Taxiway Lighting
Boone County CS 014 232,763 Conduct Miscellaneous Study, Rehabilitate Runway, Rehabilitate Taxiway
Carlisle Municipal GA 005 89,443 Construct Taxiway [Construct Hangar Access Taxiways (Base Course and
Carroll County GA 006 223,302Asphalt Surfacing)] Conduct Miscellaneous Study, Construct Taxiway
Clarksville Municipal GA 005 122,898 Install Perimeter Fencing, Rehabilitate Apron [Phase 3]
Corning Municipal GA 009 194,347 Rehabilitate Runway Lighting - 18/36
De Witt Municipal GA 002 197,724 Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System [Install PAPIs on Runway 18 and Runway 36] - 18/36, Install Runway
Drake Field GA 033 116,605
Vertical/Visual Guidance System [Install REILs on Runway 18 and Runway 36] 18/36, Rehabilitate Runway Lighting - 18/36 Update Airport Master Plan Study
034 928,030 Construct Apron
Fort Smith Regional P 035 543,210 Update Airport Master Plan Study
Grider Field GA 008 356,705 Rehabilitate Building
Selection Criteria Year: 2005
Page 76 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SW AROK AR H L Hopkins-Fordyce Municipal
Harrell Field
Heber Springs Municipal
Hope Municipal
Howard County
J Lynn Helms Sevier County
Jonesboro Municipal
Lake Village Municipal
Marion County Regional
Marked Tree Municipal
McGehee Municipal
Melbourne Municipal - John E Miller Field
Memorial Field
Morrilton Municipal
Northwest Arkansas Regional
Osceola Municipal
Piggott Municipal
Rogers Municipal-Carter Field
Russellville Regional
Saline County/Watts Field
Searcy County
South Arkansas Regional at Goodwin Field
GA
GA
GA
GA
GA
GA
GA
GA
GA
GA
GA
GA
CS
GA
P
GA
GA
GA
GA
GA
GA
GA
002
008
005
005
002
005
013
003
004
003
005
008
013
005
025
003
004
022
006
009
006
010
52,725
113,257
398,349
946,000
390,880
149,689
1,755,316
54,901
348,223
89,775
40,070
94,430
1,490,000
713,467
2,221,198
785,577
387,595
4,837,299
101,650
2,745,075
150,602
867,500
Rehabilitate Runway [Phase I - Design/engineering, environmental, DBE and produce plans and specifications] - 04/22 Conduct Airport Master Plan Study
Acquire Land For Approaches [Acquire Land for Runway 5 RPZ], Install Airfield Guidance Signs Extend Taxiway [Extend TW to RW 34 end Phase II], Update Miscellaneous Study [Update Airport Layout Drawing] Install Runway Lighting [MIRL] - 1/19, Widen Runway [Widen runway 1/19 to 75' and shift runway centerline to meet standards] - 1/19 Install Miscellaneous NAVAIDS [Relocate Rotating Beacon and Install REIL's], Rehabilitate Runway Lighting - 08/26 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Aircraft Rescue & Fire Fighting Building, Install Guidance Signs Construct Taxiway [Phase I - DBE Program and Goals, Design/Engineering for complete Plans and Specifications] Construct Taxiway [Phase 2 - Pave & Light Partial Parallel from ramp to RW 22 end], Install Runway Vertical/Visual Guidance System - 04/22, Rehabilitate Runway Lighting - 04/22 Acquire Easement For Approaches, Acquire Land for Development
Rehabilitate Runway [Phase I - Design, Plans and specifications and DBE Plan] 18/36 Update Airport Master Plan Study
Rehabilitate Runway [Mill, Overlay and Groove Runway, Rehabiliate Runway Lighting System and Remark Runway to meet Standards] - 05/23 Widen Runway - 09/27
Construct Taxiway [Conduct Benefit-Cost Analysis for Second Landing Surface, Design TW Alpha & Conduct Master Drainage Study] Rehabilitate Runway [Rehabilitate and Widen Runway 1/19] - 01/19, Widen Runway - 01/19 Construct Apron
Construct Taxiway [Phase 2 - Construct TW B SW and MW segments]
Construct Taxiway [Phase 1 - Design Only (for two construction phases)]
Construct New Airport [Phase 4-complete runway and apron aving and utilities]
Install Perimeter Fencing
Improve Runway Safety Area [RW 4 End] - 04/22, Rehabilitate Runway [Runway
Selection Criteria Year: 2005
Page 77 of 98
Grants Awarded by FY FAA - Office Of Airports
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
SW AROK AR 010
Springdale Municipal 012GA 333,911
013 465,998
State of Arkansas 004 116,711
Stuttgart Municipal 011GA 149,150
Texarkana Regional-Webb Field 024P 595,332
Thompson-Robbins 005GA 688,431
Waldron Municipal 002GA 85,115
Walnut Ridge Regional 008GA 2,775,000
West Memphis Municipal 018R 1,856,540
Z M Jack Stell Field 002GA 403,901
State Total: 51 Grants 41,168,803
SW AROK OK Ada Municipal 008GA 402,354
Ardmore Downtown Executive 006GA 39,995
Ardmore Municipal 009GA 2,061,712
Atoka Municipal 004GA 42,560
Bartlesville Municipal 006GA 1,250,000
Blackwell-Tonkawa Municipal 006GA 245,100
Claremore Regional 009GA 281,637
Cleveland Municipal 003GA 28,500
Clinton-Sherman 001GA 128,300
Cushing Municipal 007GA 93,100
El Reno Municipal Air Park 006GA 354,584
Elk City Municipal 007GA 88,260
Report Date 02/23/2006
Brief Description Of Work
Holding Position Markings] - 04/22
Extend Taxiway, Widen Taxiway
Acquire Land For Approaches
Update State System Plan Study
Rehabilitate Taxiway [Design Only], Update Airport Master Plan Study
Acquire Aircraft Rescue & Fire Fighting Vehicle
Construct Runway Safety Area [Improve Runway Safety Area (GradingImprovements both sides of Runway 17/35 and Culvert Installation north ofRunway 17)] - 17/35, Rehabilitate Runway [Crack Seal Runway and Taxiways,includes pavement markings] - 17/35Widen Runway [Phase I - Design, Environmental & DBE Plan] - 09/27
Rehabilitate Runway - 04/22
Widen Taxiway [Widen Taxiway A, Phase 1, includes MITL Rehab and limitedRunway 17/35 Rehab]Rehabilitate Apron [Main apron rehabilitation]
Rehabilitate Runway [Rehabilitate RWY 17/35] - 17/35
Conduct Miscellaneous Study
Rehabilitate Runway - 17/35
Conduct Environmental Study
Improve Runway Safety Area [Improve Runway 17/35 Saftety Area] - 17/35,Improve Runway Safety Area - 17/35Acquire Land For Approaches, Construct Access Road
Expand Apron
Install Airport Beacons, Strengthen Apron
Rehabilitate Runway Lighting [Phase 1 design and replace electrical service] 17R/35L, Update Airport Master Plan StudyInstall Runway Vertical/Visual Guidance System - 18/36
Construct Access Road, Expand Apron
Acquire Land For Approaches
Selection Criteria Year: 2005
Page 78 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SW AROK OK Enid Woodring Regional GA 017 1,821,866 Rehabilitate Runway - 17/35, Rehabilitate Runway - 17/35
Grandfield Municipal GA 004 177,173 Install Perimeter Fencing, Rehabilitate Apron
Grove Municipal GA 010 49,400 Acquire Land for Development, Rehabilitate Taxiway [Phase 1-Design for taxiway rehabilitation project]
Guthrie Municipal GA 007 650,000 Extend Taxiway [Phase III (comletion) of RWY 16/34 extension]
Healdton Municipal GA 003 108,918 Construct Runway [Phase 1 design-construct new runway] - 17/35
Hobart Municipal GA 001 600,000 Rehabilitate Taxiway
Hooker Municipal GA 002 402,367 Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System
Jones Memorial GA 002 121,60017/35, Rehabilitate Runway - 17/35 Rehabilitate Apron, Rehabilitate Runway Lighting - 17/35
Lawton-Fort Sill Regional P 021 781,850 Construct Building, Improve Airport Drainage, Rehabilitate Apron [Phase 1 design]
McAlester Regional GA 008 300,000 Construct Apron, Construct Taxiway
Medford Municipal GA 003 88,140 Rehabilitate Apron, Rehabilitate Runway - 17/35, Rehabilitate Taxiway
Miami Municipal GA 010 13,775 Rehabilitate Apron [Phase I Design Only]
Mid-America Industrial GA 007 741,000 Construct Taxiway
Okemah Flying Field GA 002 86,360 Install Perimeter Fencing [Install perimeter fence]
Okmulgee Regional
Perry Municipal
GA
GA
011
004
134,530
352,910
Rehabilitate Airport Beacons, Rehabilitate Runway - 17/35, Rehabilitate Runway Lighting - 17/35, Rehabilitate Taxiway Install Perimeter Fencing, Rehabilitate Runway Lighting - 17/35
Ponca City Regional CS 011 1,122,750 Acquire Equipment, Acquire Snow Removal Equipment, Construct Snow Removal Equipment Building
Richard Lloyd Jones Jr R 015 1,178,154 Improve Airport Drainage [Phase 1A - begin 78" RCP outfall construction]
Robert S Kerr GA 007 193,409 Rehabilitate Taxiway
Sallisaw Municipal GA 006 71,250 Conduct Environmental Study
Sayre Municipal GA 002 87,409 Rehabilitate Apron, Rehabilitate Taxiway
Shawnee Regional GA 009 27,160 Install Perimeter Fencing
010 339,150 Rehabilitate Taxiway [Rehabilitate Taxiway "D"]
Skiatook Municipal GA 002 277,400 Extend Taxiway
State of Oklahoma 005 140,000 Update State System Plan Study
Stigler Municipal GA 002 115,682 Install Perimeter Fencing, Rehabilitate Runway Lighting - 17/35
Stillwater Regional GA 015 300,000 Acquire Equipment, Rehabilitate Apron
Selection Criteria Year: 2005
Page 79 of 98
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
SW AROK OK Stroud Municipal
Tahlequah Municipal
Thomas P Stafford
Tulsa International
University of Oklahoma Westheimer
Wilburton Municipal
Will Rogers World
State Total:
William R. Pogue Municipal
ADO Total:
SW LANM LA Abbeville Chris Crusta Memorial
Acadiana Regional
Alexandria International
Baton Rouge Metropolitan, Ryan Field
FY 2005
Service Grant Seq AIP Federal Level Number Funds
003GA 180,500
005GA 91,247
005GA 450,434
054P 6,600,000
055 6,768,750
056 1,557,685
018R 2,290,007
002GA 34,675
051P 3,850,000
052 5,555,000
011GA 126,962
50 Grants 42,803,615
101 Grants 83,972,418
GA 011 155,950
GA 010 169,290
P 029 2,236,137
030 1,364,984
031 1,972,200
P 067 2,721,212
068 500,000
069 3,100,000
Report Date 02/23/2006
Brief Description Of Work
Rehabilitate Apron, Rehabilitate Taxiway
Improve Airport Miscellaneous Improvements [Develop Airport Action Plan; ALP &CIP]Construct Apron, Construct Taxiway
Noise Mitigation Measures for Residences within 65 - 69 DNL [Noise mitigation #6.]
Extend Runway [Phase 1A Portion of Extend Parallel Taxiway C west of Rwy18L/36R.] - 08/26, Rehabilitate Runway - 18R/36L, Rehabilitate TaxiwayExtend Runway [Phase 1B Complete Extend parallel Taxiway C west of Rwy18L/36R.] - 08/26Rehabilitate Apron [Phase 2-Reconstruct north portion of terminal apron.],Rehabilitate TaxiwayRehabilitate Apron
Acquire Interactive Training System, Improve Service Road, Install Runway Lighting- 17R/35L, Rehabilitate Runway - 13/31, Rehabilitate Runway - 17L/35R, Rehabilitate Runway - 17R/35L, Rehabilitate Runway - 18/36, Rehabilitate Runway Lighting - 13/31, Rehabilitate Runway Lighting - 17L/35R, Rehabilitate Runway Lighting - 17R/35L, Rehabilitate Taxiway Rehabilitate Taxiway
Install Weather Reporting Equipment
Improve Runway Safety Area [tree removal and grading of safety area phase 1] 15/33 Install Perimeter Fencing [install perimeter fencing for animal (alligator) control at waterway], Update Miscellaneous Study [ALP, ops manual, ACM] Construct Terminal Building [Phase IX]
Construct Terminal Building
Rehabilitate Taxiway
Extend Runway - 04L/22R, Improve Runway Safety Area - 04L/22R, Security Enhancements Conduct Noise Compatibility Plan Study
Noise Mitigation Measures for Public Buildings
Selection Criteria Year: 2005
Page 80 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
SW LANM LA 070 550,000 Update Airport Master Plan Study
Beauregard Parish GA 011 705,922 Construct Taxiway [construct Taxiway Echo]
Concordia Parish GA 005 465,531 Construct Taxiway
Esler Regional GA 022 564,357 Improve Airport Drainage
False River Regional GA 011 126,216 Rehabilitate Runway [sealcoat runway and all taxiways] - 18/36
George R Carr Memorial Air Field GA 012 700,000 Improve Runway Safety Area [Earthwork] - 18/36
Hammond Municipal GA 014 2,075,000 Rehabilitate Runway [portion of rwy east of 18/36] - 13/31
Hart GA 006 475,257 Extend Runway [Phase I Runway Extension, 450' at RW 30] - 12/30
Homer Municipal GA 002 214,260 Improve Runway Safety Area - 12/30
Jonesboro GA 002 28,580 Remove Obstructions [Engineering Only]
Kelly GA 009 515,887 Construct Taxiway [Taxiway to new hangar area]
Lafayette Regional P 030 4,382,683 Construct Aircraft Rescue & Fire Fighting Building, Rehabilitate Taxiway [Phase 1 of reconstruct Taxiway Bravo east of Runway 4/22. Taxiway cannot support user air carrier aircraft for Runway 11/29 operations. Aircraft require extensive back-taxi
Lake Charles Regional P 029 607,852operations.] Install Guidance Signs [Replace old guidance signs per 139 Inspection], Modify Terminal Building [Phase 2 and final of terminal improvements]
030 0 No projects assigned.
Louis Armstrong New Orleans International P 073 6,795,464 Rehabilitate Runway [Phase IIIa Committing 2005 Entitlements] - 10/28, Rehabilitate Runway [Phase IIIb Committing 2006 Entitlements] - 10/28, Rehabilitate Runway [Phase IIIc Committing 2007 Entitlements] - 10/28
075 10,063,877 Rehabilitate Runway [Phase IV Committing 2005 Discretionary] - 10/28
076 0 Improve Aircraft Rescue & Fire Fighting Building, Rehabilitate Runway Lighting
Louisiana Regional GA 008 117,85610/28, Security Enhancements Improve Runway Safety Area [Finalize EA and Conduct Engineering for RSA
Morehouse Memorial GA 009 479,359Project] - 17/35 Construct Taxiway [Taxiway]
New Orleans Downtown GA 004 323,000 Update Airport Master Plan Study
Ruston Regional GA 011 550,836 Acquire Land For Approaches, Improve Airport Erosion Control
Shreveport Regional P 038 404,700 Improve Service Road [Engineering Design], Rehabilitate Runway Lighting [Rehab RW Lighting on 05/23] - 05/23, Rehabilitate Taxiway [Sealcoat TW C & B], Rehabilitate Taxiway Lighting [Rehab. TW Lighting on J], Security Enhancements [Engineering Only]
Selection Criteria Year: 2005
Page 81 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SW LANM LA Slidell R 014 1,781,724 Extend Runway [Wetland Mitigation, Runway 18 Extension, and Parallel Taxiway (A) Extension] - 18/36
South Lafourche GA 007 2,199,999 Extend Runway [Complete EA, Site Prep for 1200' Extension, Pave 1200' Extension, Widen Existing 3800' to 100' Wide] - 18/36
Southland Field GA 009 199,902 Install Weather Reporting Equipment
Springhill GA 004 442,404 Install Perimeter Fencing, Rehabilitate Taxiway
St John the Baptist Parish
St Landry Parish-Ahart Field
GA
GA
011
009
205,807
150,000
Construct Taxiway [Phase I - Engineering], Construct Taxiway [Phase I Engineering], Remove Obstructions [Remove Obstructions to Runway 17] Construct Fuel Farm
St. Tammany Regional GA 004 150,000 Extend Runway [Phase I for Acquire Land] - 18/36, Update Airport Master Plan Study
Various Locations in Louisiana 003 0 No projects assigned.
Vicksburg Tallulah Regional GA 007 970,001 Strengthen Runway [Strengthen Runway] - 18/36
Vivian GA 003 318,250 Acquire Existing Airport [Phase I of final land acquisition for airport. Two phases required.], Acquire Existing Airport [Phase II of Final Land Acquisition for Airport.]
State Total: 40 Grants 48,784,497
SW LANM NM Albuquerque International Sunport P 029 3,872,490 Security Enhancements
030 1,043,078 Rehabilitate Apron
Alexander Municipal GA 006 871,287 Construct Runway [acqiure land for new runway 12/30] - Plan-1
Artesia Municipal GA 007 345,390 Rehabilitate Runway Lighting [new regulator] - 12/30, Rehabilitate Taxiway
Black Rock GA 002 73,091 Conduct Environmental Study
Cavern City Air Terminal GA 015 32,665 Improve Runway Safety Area - 14R/32L
Clovis Municipal GA 018 1,019,012 Rehabilitate Taxiway [Taxiway B]
Deming Municipal GA 009 409,129 Conduct Environmental Study, Improve Runway Safety Area - 04/22, Improve
Dona Ana County at Santa Teresa GA 015 1,150,000Runway Safety Area - 08/26, Install Guidance Signs Extend Runway - 10/28, Install Weather Reporting Equipment
Double Eagle II R 011 868,415 Extend Runway [Environmental Assessment / EIS] - 17/35
Fort Sumner Municipal GA 005 127,645 Rehabilitate Runway Lighting - 03/21
Gallup Municipal GA 018 760,000 Rehabilitate Apron, Rehabilitate Taxiway
Lea County Regional GA 014 170,782 Install Weather Reporting Equipment
Lea County-Zip Franklin Memorial GA 005 192,465 Acquire Land For Approaches, Install Runway Vertical/Visual Guidance System
Selection Criteria Year: 2005
Page 82 of 98
FAA - Office Of Airports
Region ADO State Worksite
SW LANM NM
Los Alamos
Proposed - GA
Questa Municipal Nr 2
Ramah
Raton Municipal/Crews Field
Roswell Industrial Air Center
Santa Fe Municipal
State Total:
Sierra Blanca Regional
State of New Mexico
Tucumcari Municipal
ADO Total:
SW TEX TX Abilene Regional
Amarillo International
Austin-Bergstrom International
Grants Awarded by FY
FY 2005
Service Level
Grant Seq Number
CS
GA
GA
P
P
005
001
003
004
002
011
016
025
026
GA
GA
016
003
008
25 Grants
65 Grants
P 029
P 029
P 033
034
AIP Federal Funds
350,637
1,555,694
162,000
70,000
71,250
704,268
200,000
957,591
307,580
123,500
1,155,910
16,593,879
65,378,376
3,892,010
2,440,714
3,500,000
4,227,894
Brownsville/South Padre Island International
Corpus Christi International
P
P
027
028
037
1,504,548
955,349
7,788,088
Dallas Love Field
Dallas/Fort Worth International
P
P
028
075
076
10,350,375
5,692,000
12,900,672
Report Date 02/23/2006
Brief Description Of Work
03/21, Rehabilitate Runway - 03/21, Rehabilitate Runway - 12/30
Construct Access Road, Expand Apron, Rehabilitate Apron
Construct New Airport [Site Prep]
Rehabilitate Runway - 17/35
Conduct Environmental Study
Conduct Environmental Study
Improve Service Road, Rehabilitate Taxiway [Taxiway juliet]
Conduct Noise Compatibility Plan Study
Construct Runway Safety Area [Acquire Land in Safety Area] - 15/33, Rehabilitate Apron [Repair Apron], Rehabilitate Runway - 02/20 Acquire Aircraft Rescue & Fire Fighting Vehicle
Conduct State System Plan Study
Rehabilitate Runway - 08/26
Extend Taxiway, Improve Terminal Building [Phase 4, Design], Rehabilitate Apron, Rehabilitate Apron, Rehabilitate Taxiway Acquire Snow Removal Equipment, Rehabilitate Runway - 04/22, Rehabilitate Taxiway Acquire Land for Noise Compatibility within 65 - 69 DNL [Acquire land]
Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Miscellaneous Land, Modify Terminal Building Expand Apron
Acquire Land for Noise Compatibility within 65 - 69 DNL
Improve Airport Drainage [Improve Airport Drainage (Phase V-Southwest /Line C)(Design Only)], Rehabilitate Runway [Runway 13/31] - 13/31 Improve Terminal Building [Baggage Claim Renovation], Rehabilitate Apron
Extend Runway [LOI Payment #6] - 17C/35C
Construct Taxiway [Design], Improve Airport Drainage [Drainage - J1A Culvert / Tunnel], Improve Terminal Building [Install CUTE Equipment - Board Owned Gates, Phase 1], Rehabilitate Apron [Rehabilitate Aircraft Parking Aprons - Various],
Selection Criteria Year: 2005
Page 83 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
SW TEX TX 076 Rehabilitate Runway Lighting [Rehabilitate Airfield Lighting - Phase 1] - 17C/35C, Rehabilitate Service Road [Rehabilitate ARFF & Operations Road], Rehabilitate
East Texas Regional P 024 2,500,000Taxiway [Rehabilitate Taxiways - Various Locations] Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire aircraft rescue and firefighting vehicle.], Acquire Equipment, Conduct Miscellaneous Study, Improve Airport Drainage, Rehabilitate Taxiway [Rehabilitate Taxiways B, C, D, & E.], Update Airport Master Plan Study
Easterwood Field P 022 1,923,485 Improve Airport Drainage [Phase II & III], Improve Runway Safety Area - 16/34, Install Perimeter Fencing [Install Perimeter Fencing, Phase 2]
Ellington Field P 017 7,350,000 Rehabilitate Runway - 04/22
Fort Worth Alliance R 027 10,561,878 Extend Runway [Extend Runway - Phase 1] - 16L/34R
028 302,513 Improve Airport Miscellaneous Improvements [Replace Windcones], Improve Runway Safety Area [Runway 34R POFZ - Design] - 16L/34R, Install Airfield
Fort Worth Meacham International R 014 3,230,000Guidance Signs [Replace 23 Sign Fixtures and Inserts] Acquire Land for Noise Compatibility within 65 - 69 DNL
George Bush Intercontinental P 053 17,500,000 Construct Runway - 08L/26R
054 3,500,000 Noise Mitigation Measures for Residences within 70 - 74 DNL
055 12,000,000 Rehabilitate Runway - 15L/33R
George Bush Intercontinental/Houston P 056 42,655 VALE Vehicle [Acquire Ten Vehicles]
Kickapoo Downtown Airpark GA 006 1,000,000 Improve Airport Drainage, Rehabilitate Taxiway [Pass]
Laredo International P 044 4,271,932 Improve Runway Safety Area - 17R/35L, Rehabilitate Runway - 17R/35L
046 1,000,000 Acquire Land For Approaches
Lubbock International P 028 5,620,082 Extend Taxiway [Extend Taxiway L Phase 2.], Rehabilitate Apron
McAllen Miller International P 034 1,062,361 Rehabilitate Apron, Rehabilitate Taxiway [Rehab TWs A and C]
Midland International P 042 3,456,282 Construct Apron, Construct Taxiway, Rehabilitate Runway - 16L/34R
Rick Husband Amarillo International P 030 5,949,107 Improve Terminal Building, Improve Terminal Building, Improve Terminal Building
Robert Gray AAF GA 011 10,069,944 Construct New Airport, Construct Runway Safety Area [IMPROVE RSA, PH. II],
San Angelo Regional/Mathis Field P 023 2,500,000Expand Apron Improve Terminal Building [Construct Terminal Concourse, Phase I], Rehabilitate Apron, Rehabilitate Runway [Rehabilitate Runway 18/36 With Runway Lighting
San Antonio International P 050 7,646,366 Modifications(Design)] - 18/36 Expand Apron [Design Only], Noise Mitigation Measures for Residences within 65 69 DNL [Phase 1], Rehabilitate Apron
Selection Criteria Year: 2005
Page 84 of 98
Grants Awarded by FY FAA - Office Of Airports
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
SW TEX TX Southeast Texas Regional P 020
State of Texas
Texas State Block Grant Program
Tyler Pounds Regional P
021
001
031
032
033
035
038
039
019
Valley International P 039
State Total:
William P Hobby P
42 Grants
027
ADO Total: 42 Grants
Report Total:
Region Total: 1821 Grants
2099 Grants
WP HNL AS Fitiuta CS 020
021
Ofu
Pago Pago International
GA
P
006
033
034
035
036
State Total: 7 Grants
Selection Criteria Year: 2005
AIP Federal Funds
2,974,395
0
500,000
16,995,382
20,884,556
5,965,000
3,619,364
6,735,000
1,331,548
2,203,655
2,951,584
13,128,110
232,026,849
232,026,849
381,377,643
3,549,617,470
485,000
157,000
385,000
5,000,000
4,500,000
1,400,000
500,000
12,427,000
Report Date 02/23/2006
Brief Description Of Work
Construct Service Road, Improve Airport Miscellaneous Improvements, Install Perimeter Fencing, Rehabilitate Apron No projects assigned.
Update State System Plan Study
Non primary development projects in state block grant program
Non primary development projects in state block grant program
Non primary development projects in state block grant program
Non primary development projects in state block grant program
Non primary development projects in state block grant program
Non primary development projects in state block grant program
Acquire Safety Equipment, Construct Service Road, Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate Taxiway Lighting Expand Apron, Improve Runway Safety Area - 17L/35R, Rehabilitate Service Road, Update Airport Master Plan Study [Update ALP] Extend Taxiway [Extends Taxiway H, Install SMGCS], Install Taxiway Lighting
Construct Aircraft Rescue & Fire Fighting Building [Phase II]
Install Miscellaneous NAVAIDS, Install Perimeter Fencing [Cyclone Olaf Damage],Install Runway Lighting - 12/30, Rehabilitate BuildingConduct Environmental Study [for Runway Extension - Phase II]
Construct Aircraft Rescue & Fire Fighting Building [Phase III]
Construct Aircraft Rescue & Fire Fighting Training Facility [Phase III]
Acquire Aircraft Rescue & Fire Fighting Vehicle [Three ARFF Vehicles andProximity Suits]Update Airport Master Plan Study
Page 85 of 98
Grants Awarded by FY FAA - Office Of Airports
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
WP HNL GU Guam International 047
048
049
050
051
P 3,867,500
1,900,000
375,120
1,757,000
2,282,589
State Total: 5 Grants 10,182,209
WP HNL HI Dillingham Airfield
Hana
Hilo International
003
005
021
022
GA
CS
P
735,810
700,000
845,500
3,870,575
Honolulu International
023
078
079
080
081
P
1,382,250
1,071,326
3,240,900
3,381,000
1,757,000
082 4,276,546
083
084
085
4,251,256
318,750
9,927,210
Kahului
Kalaeloa (John Rodgers Field)
Kalaupapa
039
040
041
008
009
003
P
R
GA
1,578,336
1,350,000
900,000
3,800,000
2,000,000
679,250
Report Date 02/23/2006
Brief Description Of Work
Improve Terminal Building
Noise Mitigation Measures for Residences within 65 - 69 DNL
Acquire Equipment, Acquire Friction Measuring Equipment
Improve Utilities [MAP] [Phase IV]
Improve Airport Miscellaneous Improvements [(MAP) Demolition of Naval Housing Units]
Extend Taxiway [Phase II]
Construct Aircraft Rescue & Fire Fighting Building, Install Perimeter Fencing
Acquire Aircraft Rescue & Fire Fighting Vehicle
Improve Terminal Building [Replace passenger loading bridges - Phase II], Improve Terminal Building [Upgrade electrical distribution system - Phase II], Rehabilitate Apron, Rehabilitate Taxiway [and Ramps] Improve Terminal Building [Replace Escalators]
Improve Terminal Building [Reroof Gates 33 and 34]
Rehabilitate Taxiway [C and F]
Improve Terminal Building [IAB Ceiling - Design & CM]
Improve Terminal Building [EWA and DH Concourse 3rd Level Ceiling Replacement (Design)] Improve Terminal Building [OST Roof/Drainage and Loading Bridges, Phase II], Rehabilitate Taxiway [Rehabilitate Taxiway A, Phase II] Environmental Mitigation [Washwater Containment]
Security Enhancements [Vehicle Barriers]
Improve Access Road [Phase I, FY-2005 grant], Improve Access Road [Phase II, FY-2006 grant] Rehabilitate Taxiway [A, B, E, F, and K]
Improve Terminal Building [Chiller Plant - Ph. II]
Construct Access Road [Phase I - Design]
Construct Building [Construct T-Hangars, Phase I]
Rehabilitate Apron [Rehabilitate Airfield Pavement], Rehabilitate Taxiway
Construct Aircraft Rescue & Fire Fighting Building [Phase I], Install Perimeter
Selection Criteria Year: 2005
Page 86 of 98
FAA - Office Of Airports
Region ADO State Worksite
WP HNL HI
Kona International at Keahole
Lihue
Molokai
Port Allen
Upolu
Waimea-Kohala
State Total:
WP HNL MP Francisco C. Ada/Saipan International
State Total:
Pagan Airstrip
Rota International
Tinian International
WP HNL TT Babelthuap/Koror
Chuuk International
Kosrae
Marshall Islands International
Pohnpei International
Grants Awarded by FY
FY 2005
Service Level
Grant Seq Number
P
P
P
003
024
025
034
012
GA
GA
CS
013
005
004
002
003
28 Grants
P
GA
P
P
052
053
054
001
019
018
6 Grants
GA
GA
GA
GA
GA
002
003
004
009
006
004
005
007
AIP Federal Funds
1,322,897
845,500
2,900,000
199,500
3,635,501
742,900
950,000
679,250
1,425,000
58,766,257
2,510,103
5,000,000
500,000
300,000
5,000,000
1,045,657
14,355,760
1,000,000
2,100,000
8,813,224
300,000
300,000
1,000,000
10,000,000
350,000
Report Date 02/23/2006
Brief Description Of Work
Fencing
Rehabilitate Access Road [Phase II], Rehabilitate Taxiway
Acquire Aircraft Rescue & Fire Fighting Vehicle
Rehabilitate Runway - 17/35, Rehabilitate Taxiway [E and H]
Improve Runway Safety Area [Improve Runway 23 Culvert, Phase I (Design)] 05/23Rehabilitate Runway
Rehabilitate Runway - 09/27
Rehabilitate Runway - 07/25
Construct Aircraft Rescue & Fire Fighting Building [Phase I], Install PerimeterFencingRehabilitate Runway - 04/22
Expand Terminal Building [Phase I]
Rehabilitate Runway [Phase IV] - 07/25
Expand Aircraft Rescue & Fire Fighting Building [Design only]
Conduct Airport Master Plan Study
Extend Runway
Modify Aircraft Rescue & Fire Fighting Building [Relocate ARFF Building]
Construct Aircraft Rescue & Fire Fighting Building
Rehabilitate Runway [Phase I] - 09/27
Rehabilitate Runway [Phase II] - 09/27
Construct Aircraft Rescue & Fire Fighting Building [Phase I - Design]
Construct Aircraft Rescue & Fire Fighting Building [Expand ARFF Building]
Construct Aircraft Rescue & Fire Fighting Building [Phase I - Design]
Rehabilitate Runway [Phase I] - 07/25
Construct Aircraft Rescue & Fire Fighting Building
Selection Criteria Year: 2005
Page 87 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
WP HNL TT 008 2,100,000 Rehabilitate Runway [Phase I] - 09/27
Yap International GA 007 300,000 Construct Aircraft Rescue & Fire Fighting Building
State Total: 10 Grants 26,263,224
ADO Total: 56 Grants 121,994,450
WP LAX AZ Avi Suquilla GA 007 450,000 Construct Runway [Phase I] - 01/19
Bagdad GA 005 19,912 Install Perimeter Fencing
Benson Municipal GA 010 1,192,250 Construct Apron [Phase II], Install Perimeter Fencing
Bisbee Douglas International GA 004 261,250 Rehabilitate Apron
Bisbee Municipal GA 007 190,000 Widen Runway [Phase I (Design)] - 17/35
Buckeye Municipal GA 010 371,450 Install Perimeter Fencing
011 200,000 Conduct Noise Compatibility Plan Study
Casa Grande Municipal GA 009 210,000 Construct Apron
Chandler Municipal R 016 1,521,960 Construct Heliport/Helipad [Relocate Heliport Per Part 150 Study, Phase III], Install Airfield Guidance Signs
Chinle Municipal GA 007 90,400 Construct Utilities
008 85,500 Update Airport Master Plan Study [and ALP]
Colorado City Municipal GA 010 57,000 Conduct Environmental Study
Coolidge Municipal GA 004 920,952 Install Runway Vertical/Visual Guidance System [Runway 5/23 Papi] - 05/23,
005 71,250Rehabilitate Apron Update Airport Master Plan Study
Cottonwood GA 011 152,500 Construct Service Road, Install Perimeter Fencing [Phase II]
Eloy Municipal GA 007 171,000 Install Perimeter Fencing
Ernest A. Love Field CS 023 872,114 Improve Runway Safety Area - 12/30, Rehabilitate Taxiway Lighting
Flagstaff Pulliam P 026 247,000 Conduct Environmental Study
027 1,016,825 Construct Access Road
Ganado GA 003 24,300 Improve Access Road [Phase I (Design)]
Gila Bend Municipal GA 010 189,264 Install Perimeter Fencing
Glendale Municipal R 017 1,650,000 Acquire Land For Approaches [Northeast corner - Runway 19 RSA and future Taxiway B extension]
Selection Criteria Year: 2005
Page 88 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
WP LAX AZ Grand Canyon National Park P 019 4,180,000 Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Snow Removal Equipment, Conduct Miscellaneous Study [Terminal Area Plan], Construct Aircraft Rescue & Fire Fighting Building [Phase II], Security Enhancements [Terminal Facility & Security Access Control System Design]
Greenlee County GA 007 161,501 Rehabilitate Runway [Phase I (Design)], Rehabilitate Taxiway [Phase II]
H.A. Clark Memorial Field GA 018 1,142,582 Rehabilitate Apron [and Expand]
Holbrook Municipal GA 010 1,303,400 Rehabilitate Runway - 11/29
Kayenta GA 005 525,000 Construct Access Road [Design], Construct Runway [Design] - 05/23
Kingman
Lake Havasu City
CS
CS
015
018
783,750
156,750
Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Aircraft Rescue & Fire Fighting Building, Improve Terminal Building [Phase I (Design)] Update Airport Master Plan Study
Marana Northwest Regional R 012 200,000 Conduct Noise Compatibility Plan Study
Marana Regional R 013 2,157,395 Construct Taxiway [E]
Nogales International GA 012 973,750 Rehabilitate Taxiway
Page Municipal P 017 180,375 Construct Heliport/Helipad, Construct Service Road, Construct Taxiway, Rehabilitate Apron [South Apron Drainage Improvements], Security Enhancements [Install Security Fencing]
018 174,254 Update Airport Master Plan Study
Payson GA 013 1,700,000 Construct Apron [and Relocate Access Road]
Phoenix Deer Valley R 020 442,500 Acquire Land for Development [and Relocation (7.5 Acres)]
Phoenix Sky Harbor International P 060 10,886,050 Rehabilitate Taxiway [Phase III]
061 12,309,187 Acquire Land for Noise Compatibility within 65 - 69 DNL
Polacca GA 001 142,500 Conduct Airport Master Plan Study
Ryan Field R 015 107,585 Install Perimeter Fencing
Safford Regional GA 014 226,100 Construct Access Road [Phase I, Design], Extend Taxiway [Phase I, Design], Install
San Carlos Apache GA 012 155,345Perimeter Fencing [Phase I, Design] Update Airport Master Plan Study
013 259,864 Construct Heliport/Helipad [Phase II], Install Weather Reporting Equipment
Scottsdale R 021 356,951 Environmental Mitigation [Install Blast Fence], Install Noise Monitoring System
Sedona GA 015 1,019,500 Improve Utilities [Fire Protection Waterline], Rehabilitate Apron [and Expand]
Show Low Regional CS 014 877,639 Acquire Equipment [Sweeper], Acquire Snow Removal Equipment, Construct Heliport/Helipad, Rehabilitate Taxiway
Selection Criteria Year: 2005
Page 89 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
WP LAX AZ Sierra Vista Municipal-Libby AAF GA 017 2,422,493 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Apron [GA Apron], Extend Taxiway [Phase IV]
St Johns Industrial Air Park GA 010 391,000 Improve Runway Safety Area, Install Runway Vertical/Visual Guidance System
State of Arizona 001 500,000 Conduct State System Plan Study
Taylor GA 013 336,350 Rehabilitate Runway Lighting - 03/21
Town of Springerville Municipal GA 013 150,000 Update Airport Master Plan Study
Tuba City GA 008 95,000 Update Airport Master Plan Study
Tucson International P 047 4,919,633 Install Perimeter Fencing, Rehabilitate Runway [Phase I (Design)] - 11L/29R
048 728,480 Conduct Environmental Study [EIS for Runway Upgrade]
049 3,783,887 Acquire Land for Development [Phase I, Reimbursement], Acquire Land for
Whiteriver GA 008 589,290Development Construct Heliport/Helipad [Phase III]
Wickenburg Municipal GA 013 150,000 Extend Runway [Phase II] - 05/23
014 4,500,000 Extend Runway [Phase I] - 05/23, Extend Runway - 05/23, Extend Taxiway [Phase I], Extend Taxiway, Improve Runway Safety Area - 05/23, Install Perimeter Fencing,
Williams Gateway R 014 3,873,838Install Runway Lighting - 05/23, Install Taxiway Lighting Improve Runway Safety Area - 12R/30L
015 5,137,500 Construct Taxiway [Parallel Taxiway B], Improve Building [Install hangar fire suppression system (MAP)]
Window Rock GA 010 85,500 Conduct Airport Master Plan Study [and ALP]
Winslow-Lindbergh Regional GA 013 570,950 Widen Taxiway
Yuma MCAS/Yuma International P 025 2,000,000 Construct Apron [Cargo Apron]
State Total: 63 Grants 80,620,826
WP LAX CA Apple Valley GA 006 544,578 Rehabilitate Taxiway
Barstow-Daggett GA 005 150,000 Rehabilitate Access Road
Big Bear City GA 013 1,812,298 Improve Runway Safety Area - 08/26, Install Perimeter Fencing, Rehabilitate Apron
Bob Hope P 040 8,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL
Borrego Valley GA 011 94,244 Rehabilitate Runway [Including Taxiway and Apron]
Calexico International GA 010 150,000 Rehabilitate Runway - 08/26
Camarillo R 022 1,733,485 Install Perimeter Fencing, Rehabilitate Apron [PCC Apron and Taxiways (including drainage improvement)]
Selection Criteria Year: 2005
Page 90 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
WP LAX CA Chino R 026 2,330,255 Improve Runway Safety Area [03/21 and] - 08L/26R
Compton/Woodley R 005 150,000 Install Perimeter Fencing [Phase II]
Delano Municipal GA 008 219,811 Construct Runway Safety Area - 14/32
El Monte R 008 300,000 Install Perimeter Fencing [Phase II]
Fallbrook Community Airpark GA 002 250,755 Rehabilitate Apron
French Valley GA 020 396,419 Rehabilitate Runway [Sealcoat Runway and Taxiway; Install Security Lighting]
Fullerton Municipal R 016 437,15918/36 Acquire Easement For Approaches [(RPZ Appraisals Only), Phase I], Construct
Gillespie Field R 011 1,260,000Building Rehabilitate Runway [Including Taxiway] - 17/35
012 80,000 Update Airport Master Plan Study
Hemet-Ryan GA 010 309,583 Install Perimeter Fencing, Rehabilitate Access Road, Rehabilitate Runway - 05/23, Rehabilitate Taxiway
Imperial County CS 019 1,000,000 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Apron [Cargo Apron]
Jack Northrop Field/Hawthorne Municipal R 009 215,000 Update Airport Master Plan Study
Jacqueline Cochran Regional GA 013 475,000 Construct Service Road, Install Runway Vertical/Visual Guidance System - 12/30, Rehabilitate Access Road, Rehabilitate Taxiway
John Wayne Airport-Orange County P 035 12,795,061 Construct Apron
Lompoc GA 010 250,000 Construct Fuel Farm
011 142,500 Update Airport Master Plan Study
Long Beach /Daugherty Field/ P 026 6,796,539 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Taxiway [Construct
Los Angeles International P 031 10,000,000Taxilane], Install Runway Incursion Caution Bars, Rehabilitate Taxiway Noise Mitigation Measures for Residences within 65 - 69 DNL
032 2,000,000 Noise Mitigation Measures for Residences within 70 - 74 DNL
033 10,000,000 Acquire Land for Noise Compatibility within 65 - 69 DNL
034 5,000,000 Noise Mitigation Measures for Residences within 70 - 74 DNL
035 38,826,223 Construct Runway [Relocate Runway] - 07R/25L
McClellan-Palomar P 020 1,204,750 Acquire Aircraft Rescue & Fire Fighting Vehicle, Improve Runway Safety Area [Phase I] - 06/24
021 6,552,000 Construct Apron [North Apron], Construct Taxiway
Meadows Field P 027 1,197,945 Construct Terminal Building
Mojave GA 016 150,000 Update Airport Master Plan Study
Selection Criteria Year: 2005
Page 91 of 98
FAA - Office Of Airports
Region ADO State Worksite
WP LAX CA
Montgomery Field
Ontario International
Oxnard
Palm Springs International
Ramona
Redlands Municipal
Riverside Municipal
San Bernardino International
San Diego International
ADO Total:
State Total:
Santa Barbara Municipal
Santa Maria Public/Capt G Allan Hancock Field
Santa Ynez
Shafter-Minter Field
Six Southern California Counties
Southern California Logistics
WP SFO CA Alturas Municipal
Arcata
Grants Awarded by FY
FY 2005
Service Grant Seq AIP Federal Level Number Funds
017 7,610,232
R 009 1,051,200
P 025 3,500,000
P 024 1,198,384
P 038 10,714,027
039 2,259,100
R 010 634,416
GA 008 142,500
R 021 1,043,600
R 019 5,973,513
P 042 2,800,000
043 10,000,000
044 4,895,329
P 033 2,776,290
P 026 1,000,000
GA 009 818,802
GA 013 25,000
004 500,000
P 012 3,495,602
52 Grants 175,261,600
115 Grants 255,882,426
GA 004 185,000
P 029 65,000
Report Date 02/23/2006
Brief Description Of Work
Extend Runway - 12/30
Construct Heliport/Helipad [and Access Road]
Noise Mitigation Measures for Residences within 65 - 69 DNL
Improve Runway Safety Area - 07/25, Install Perimeter Fencing, Rehabilitate Apron,Rehabilitate Taxiway [Rehabilitate Taxiways, Blast Pad and Apron]Expand Terminal Building [Holdrooms and checkpoints], Expand Terminal Building[Holdrooms and checkpoints], Expand Terminal Building [Holdrooms andcheckpoints]Construct Apron
Construct Access Road, Environmental Mitigation [Land Acquisition]
Update Airport Master Plan Study
Construct Taxiway [North Taxiway Site Preparation]
Rehabilitate Runway [Rehabilitate Runway 6/24, Phase IV] - 06/24
Conduct Airport Master Plan Study [Site Selection Study, Phase II]
Noise Mitigation Measures for Residences within 65 - 69 DNL
Rehabilitate Apron [Rehabilitate commercial apron]
Construct Access Road, Construct Runway Safety Area - 07/25, SecurityEnhancementsExpand Terminal Building [and Construct Taxiway, Phase I (Design)]
Improve Airport Drainage, Rehabilitate Access Road, Rehabilitate Apron
Install Perimeter Fencing
Conduct Metropolitan System Plan Study
Rehabilitate Runway Lighting [Rehabilitate Runway/Taxiway Lighting and Vault]
Install Miscellaneous NAVAIDS [- replace non-directional beacon], Install TaxiwayLighting [- install medium intensity taxiway edge lights - Design], RehabilitateService Road [- rehabilitate service road (approximately 30' X 300') - Design],Update Airport Master Plan Study [- update Airport Layout Plan]Rehabilitate Runway [Rehabilitate Runway 2-20 (approximately 150' X 4,500') andTaxiways B and G (approximately 50' X 3,000') including drainage improvement
Selection Criteria Year: 2005
Page 92 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
WP SFO CA 029 Design] - 02/20
Benton Field GA 008 142,500 Conduct Environmental Study [Conduct Environmental Assessment Study]
Boonville GA 002 210,500 Construct Taxiway, Expand Apron, Install Perimeter Fencing
Buchanan Field R 015 100,000 Conduct Miscellaneous Study [Runway Safety Area Study for Runways
Calaveras County-Maury Rasmussen Field GA 005 531,92032R/14L,32L/14R,19R/1L & 19L/1R] Construct Access Road, Construct Taxiway, Rehabilitate Apron
Cedarville GA 003 222,800 Rehabilitate Apron [- rehabilitate aircraft tie down apron (approximately 106,000 SF) - Phase II]
Charles M. Schulz - Sonoma County GA 028 1,250,000 Conduct Miscellaneous Study [Wildlife Hazards], Improve Runway Safety Area [(Relocate Service Road)] - 01/19, Rehabilitate Taxiway [Taxiway H], Security Enhancements [install security fencing]
Chico Municipal P 023 890,000 Acquire Aircraft Rescue & Fire Fighting Vehicle [- acquire one ARFF Vehicle]
024 2,517,500 Rehabilitate Apron [Rehabilitate Aircraft Parkig Apron (approximately 600' X 1,180')
Columbia GA 011 33,250- Construction] Update Airport Master Plan Study
Colusa County GA 008 270,203 Improve Runway Safety Area [Runway and Taxiway Shoulder Stabilizatioon] 13/31
Dinsmore GA 004 33,156 Improve Airport Drainage [- improve airport drainage including installation of underground storm drain pipe (approximately 200LF) - Construction]
Dunsmuir Municipal-Mott GA 007 97,000 Update Airport Master Plan Study [and Exhibit A]
Fall River Mills GA 006 3,600,000 Construct Access Road, Construct Taxiway [Realign and extend parallel taxiway Phase 1], Construct Utilities [Relocate 2 sewer treatment ponds], Expand Apron, Extend Runway [Phase 1 Earthwork] - 02/20, Remove Obstructions [for runway/taxiway extension]
Fresno Yosemite International P 047 1,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL
048 5,999,453 Rehabilitate Aircraft Rescue & Fire Fighting Building, Rehabilitate Taxiway [Phase II]
Fresno-Chandler Downtown R 010 325,000 Rehabilitate Taxiway [Rehabilitate Taxilanes], Rehabilitate Terminal Building [(Historic Building), Phase III]
Gansner Field GA 006 460,000 Rehabilitate Apron [- rehabilitate aircraft parking apron (approximately 134,000 SF), Phase II, including drainage improvements (approximately 1,800 LF) - Construction]
Gustine GA 005 142,500 Conduct Miscellaneous Study [Environmental Baseline and Airport Drainage Study]
Half Moon Bay R 010 250,000 Construct Access Road [Phase 1, design], Construct Apron [Phase 1, design], Improve Airport Drainage [Phase 1, design], Install Perimeter Fencing [Phase 1, design], Rehabilitate Taxiway [Phase 1, design]
Hanford Municipal GA 014 150,000 Acquire Land For Approaches
Selection Criteria Year: 2005
Page 93 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
WP SFO CA Hayfork GA 004 75,000 Update Airport Master Plan Study
Hollister Municipal GA 009 450,000 Install Perimeter Fencing
Jack McNamara Field P 014 285,000 Rehabilitate Taxiway [- rehabilitate existing general aviation taxilanes (approximately 74,510 SF) - Construction]
Kneeland GA 004 190,520 Rehabilitate Apron [- rehabilitate existing tie-down apron (approximatley 100,000 SF) - Construction], Rehabilitate Runway [- rehabilitate Runway 15/33 including
Lake Tahoe GA 024 495,748aircraft tie down apron (approximately 113,500 SF) - Construction] - 15/33 Conduct Miscellaneous Study [(Runway Safty Area & Feasibility Studies & Update ALP)], Rehabilitate Runway [(Crack & Slurry Sealing)] - 18/36
Los Banos Municipal GA 005 250,000 Rehabilitate Runway Lighting [(medium intensity runway lighting)] - 14/32
Madera Municipal GA 013 400,000 Remove Obstructions, Update Airport Master Plan Study [Update ALP]
Marina Municipal GA 006 200,000 Install Weather Reporting Equipment [Install AWOS-III]
Mariposa-Yosemite GA 006 150,000 Update Airport Master Plan Study
Mefford Field GA 006 150,000 Acquire Land for Development
Merced Municipal/MacReady Field CS 012 1,450,000 Acquire Emergency Generator, Rehabilitate Runway - 12/30
Metropolitan Oakland International P 037 18,123,134 Rehabilitate Apron [East Apron, South Field, Phase II]
038 1,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL
039 1,500,000 Conduct Environmental Study [Environmental review for RSA improvments to Runway 11-29]
Modesto City County-Harry Sham Field P 029 1,450,000 Rehabilitate Apron [Aircraft Carrier and Transient]
Monterey Bay Metropolitan Area 001 200,000 Conduct Metropolitan System Plan Study [Land Use Plan]
Monterey Peninsula P 040 2,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL
041 1,280,053 Rehabilitate Terminal Building
Murray Field GA 006 30,365 Install Perimeter Fencing [- replace existing perimeter fencing (approximately 1,700 LF) including installation of automated entrance gates - Construction]
007 250,000 Conduct Environmental Study [(installation of fencing and lighting)]
Napa County R 020 2,231,098 Construct Taxiway, Rehabilitate Apron [Rehabitate Apron & Tee hangar Taxiway]
Nevada County Air Park GA 008 139,947 Install Weather Reporting Equipment [- install Automoated Weather Observation System (AWOS III) - Construction]
New Coalinga Municipal
Norman Y. Mineta San Jose International
GA
P
005
060
150,000
3,842,664
Install Perimeter Fencing, Install Weather Reporting Equipment, Rehabilitate Runway - 12/30 Extend Runway [(LOI - Reimbursement) Rehabilitate and Extend Runways 12L/30R and 12R/30L] - 12L/30R
Selection Criteria Year: 2005
Page 94 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
WP SFO CA 061 3,400,000 Install Noise Monitoring System, Noise Mitigation Measures for Residences within 65 - 69 DNL
062 14,659,598 Install Guidance Signs, Rehabilitate Taxiway, Widen Taxiway
Nut Tree GA 009 142,500 Update Airport Master Plan Study [Update ALP including Exhibit A Map]
010 142,500 Conduct Environmental Study [Conduct Environmental Assessment Study for Various Airport Improvement Projects]
Palo Alto Airport of Santa Clara County R 006 300,000 Install Miscellaneous NAVAIDS [Pilot controlled lighting], Install Perimeter Fencing [Including Gates and Access Control, Phase I (Design)], Install Weather Reporting Equipment [AWOS]
Paso Robles Municipal GA 017 329,300 Rehabilitate Taxiway
Petaluma Municipal R 015 150,000 Construct Building [Hangar Development]
Placerville GA 009 270,000 Rehabilitate Apron
Redding Municipal P 028 2,336,340 Acquire Handicap Passenger Lift Device [- acquire handicap passenger lift device], Acquire Land For Approaches [- acquire land for approach protection (approximately 148 acres) - Phase II]
029 168,660 Conduct Environmental Study
Reedley Municipal GA 007 350,000 Construct Runway Safety Area - 15/33, Install Runway Vertical/Visual Guidance
Reid-Hillview of Santa Clara County R 010 435,000System, Rehabilitate Runway Lighting Install Airfield Guidance Signs, Rehabilitate Apron
Rio Vista Municipal GA 011 181,500 Construct Service Road [Construct airfield perimeter service road - Design], Improve Airport Drainage [Improve aircraft parking apron drainage - Design], Install Apron Lighting [Install apron lighting - Design], Install Perimeter Fencing [Install perimeter fencing including key-pad controlled accedd gates - Design], Install Weather Reporting Equipment [Install AWOS], Remove Obstructions [Remove
Rogers Field GA 010 72,439Obstruction] Rehabilitate Apron [-including reseal pavement joints (approximately 27,000 LF)]
Rohnerville GA 005 70,000 Rehabilitate Runway [- rehabilitate Runway 11/29 and parallel taxiway (approximately 587,500 SF) - Design] - 11/29, Rehabilitate Runway Lighting [
Ruth GA 002 75,000rehabilitate Runway 11/29 and associated taxiway lighting - Design] - 11/29 Update Airport Master Plan Study
Sacramento International P 037 1,500,000 Conduct Environmental Study [- conduct environmental impact statement study]
Sacramento Mather R 013 750,000 Conduct Environmental Study
Salinas Municipal GA 013 1,750,000 Rehabilitate Runway [Phase II] - 13/31
San Carlos R 010 285,000 Improve Airport Drainage [Phase 1, design], Install Perimeter Fencing [Phase 1,
Selection Criteria Year: 2005
Page 95 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
WP SFO CA 010 design], Rehabilitate Access Road [Phase 1, design], Rehabilitate Apron [Phase 1, design]
San Francisco International P 033 24,177,111 Conduct Miscellaneous Study [runway safety area study], Construct Apron [Reconstruct Terminal Apron], Improve Airport Drainage, Improve Terminal Building [North Terminal Structural Upgrade, Phase I], Rehabilitate Runway Lighting 01R/19L, Rehabilitate Taxiway, Security Enhancements [Install Security Fencing], Widen Taxiway [Modify Taxiways, Signage and Related Airfield Components to
San Luis County Regional P 030 662,256Accommodate Group-VI Operations] Construct Access Road [phase II], Construct Apron, Construct Taxiway [phase II], Improve Airport Miscellaneous Improvements [Install Fire Protection Water Line (approx. 3,200 LF)]
031 2,500,000 Construct Taxiway
Scott Valley GA 004 435,000 Rehabilitate Runway - 16/34
Siskiyou County GA 005 2,000,000 Rehabilitate Runway - 17/35
South County Airport of Santa Clara County R 006 150,000 Remove Obstructions
Stockton Metropolitan P 021 1,250,000 Expand Apron [Air Cargo Apron], Modify Terminal Building, Security Enhancements, Update Airport Master Plan Study
Sutter County
Tracy Municipal
GA
GA
003
010
245,222
300,000
Rehabilitate Taxiway [- rehabilitate taxiway (approximately 156,500 SF) including run-up apron construction (approximately 7,600 SF) - Construction] Improve Airport Drainage, Improve Runway Safety Area [design only] - 12/30,
Trinity Center GA 004 75,000Install Perimeter Fencing, Install Runway Vertical/Visual Guidance System - 07/25 Update Airport Master Plan Study
Turlock Municipal GA 006 800,000 Improve Airport Miscellaneous Improvements, Install Perimeter Fencing, Rehabilitate Runway [(crack filler & slurry sealing)] - 12/30
Ukiah Municipal GA 008 114,285 Rehabilitate Runway [Crack Seal Runway & Taxiway, Phase I] - 15/33, Repair Utilities [Replace & Repair Storm Drainage System (Design Only) PhaseI]
Visalia Municipal CS 022 250,000 Construct Taxiway [Parallel Taxiway], Install Runway Vertical/Visual Guidance System [Runway 30 PAPI]
Yuba County GA 012 350,840 Rehabilitate Runway [(Crack & Slurry Sealing)] - 14/32
State Total: 80 Grants 115,446,862
WP SFO NV Austin GA 009 152,000 Acquire Equipment
Battle Mountain GA 015 75,900 Construct Taxiway
Beatty GA 006 550,791 Install Apron Lighting, Install Perimeter Fencing, Rehabilitate Runway - 16/34
Selection Criteria Year: 2005
Page 96 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
WP SFO NV Boulder City Municipal GA 009 150,000 Install Weather Reporting Equipment [AWOS]
Derby Field GA 008 150,000 Update Airport Master Plan Study [Update Master Plan]
Elko Regional P 029 5,775,179 Construct Taxiway [Rehabilitate and Realign Parallel Taxiway, Phase III]
Gabbs GA 004 825,000 Improve Runway Safety Area [Phase I] - 08/26
Henderson Executive P 018 1,900,000 Construct Taxiway [Taxilane B]
019 864,500 Install Perimeter Fencing
Jackpot/Hayden Field GA 004 2,754,028 Construct Taxiway [Construct Parallel Taxiway A]
McCarran International P 057 15,233,688 Rehabilitate Runway [and Taxiway D, Phase II] - 01R/19L
058 4,861,973 Rehabilitate Apron
059 7,000,000 Conduct Environmental Study
Mesquite GA 009 471,200 Conduct Environmental Study
Minden-Tahoe GA 015 1,930,520 Acquire Land For Approaches [Runway 16], Rehabilitate Runway [Phase II]
North Las Vegas P 022 4,675,73216/34, Remove Obstructions Remove Obstructions [Relocate Powerline In Runway 30 Approach]
Owyhee GA 002 150,000 Conduct Environmental Study
Perkins Field GA 004 745,495 Rehabilitate Apron
Reno/Stead R 022 70,000 Rehabilitate Service Road [Ramp Road, Phase I (Design)]
Reno/Tahoe International P 064 8,249,106 Rehabilitate Apron [Terminal and Cargo Aprons, Phase II]
065 2,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL
066 2,000,000 Acquire Land for Noise Compatibility within 65 - 69 DNL
067 413,641 Acquire Equipment
Silver Springs GA 007 65,000 Construct Access Road, Expand Apron, Install Weather Reporting Equipment
State of Nevada 004 250,000 Conduct State System Plan Study
Tonopah GA 007 418,000 Install Runway Lighting - 11/29
Winnemucca Municipal GA 010 657,760 Rehabilitate Runway - 14/32
State Total: 27 Grants 62,389,513
ADO Total: 107 Grants 177,836,375
Region Total: 2099 Grants 555,713,251
Selection Criteria Year: 2005
Page 97 of 98
Grants Awarded by FY FAA - Office Of Airports Report Date 02/23/2006
FY 2005
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
Report Total: 2099 Grants 3,549,617,470
Selection Criteria Year: 2005
Page 98 of 98