Public Meeting #2 Review of Alternatives P.S. 32 May 14, 2015 Gowanus Canal Combined Sewer Overflow Long Term Control Plan

Upload: others

Post on 20-May-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

Public Meeting #2

Review of Alternatives

P.S. 32

May 14, 2015

Gowanus Canal

Combined Sewer Overflow

Long Term Control Plan

Page 2: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

2

Welcome & Introductions

Emily Lloyd

Commissioner

DEP

Page 3: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

3

Context for LTCP

The Clean Water Act of 1972 sets as a national goal “water quality which provides for

the protection and propagation of fish, shellfish, and wildlife and provides for recreation

in and on the water.”

• In the Gowanus Canal, CSOs introduce pathogens that contain bacteria that is

harmful to humans when ingested in large quantities as well as organic matter that

reduces dissolved oxygen levels, posing threats to aquatic life.

• The goal of the Long Term Control Plan is to bring water quality into compliance with

DEC’s water quality standards for pathogens and dissolved oxygen.

• Upcoming milestone: submit LTCP to DEC by June 30

The Comprehensive Environmental Response, Compensation, and Liability Act of

1980 (CERCLA, or more commonly referred to as Superfund) establishes prohibitions

and requirements concerning closed and abandoned hazardous waste sites.

• In the Gowanus Canal, CSOs introduce polyaromatic hydrocarbons (PAHs) that may

be toxic to humans and wildlife.

• The goal of DEP’s remedy is to reduce CSOs by 58-74%.

• Upcoming milestone: submit site selection report to EPA by June 30

Page 4: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

4

Upcoming Milestones in Gowanus Canal

Long Term Control Plan

June 30: Submit LTCP to DEC

Superfund

June 30: Submit Site Recommendation Report to EPA

Page 5: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

5

Public Participation

Activities:

Local public meetings in each watershed and existing forums

Annual citywide public meetings rotating across boroughs

Meeting with key stakeholders and organizations

Briefings with elected officials and their staff

Communication Tools:

Program Website

Social Media

Advisories & Notifications

GOAL Raise awareness, foster understanding,

and encourage input on LTCP development

Page 6: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

6

LTCP Process and Public Involvement

ONGOING PUBLIC/STAKEHOLDER INPUT

Existing Information

Review

Data Collection &

Analysis Modeling

Alternatives Development & Evaluation

LTCP DEC Review

Kickoff

Meeting 11/19/15

Alternatives

Meeting TODAY

Final Plan

Review

Meeting TBD

LTCP Due 6/30/15

Riverkeeper

Meeting 5/5/15

Page 7: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

7

Gowanus Canal Watershed

STATEN ISLAND

BROOKLYN

QUEENS

WESTCHESTER

BRONX

STATEN ISLAND

BROOKLYN

QUEENS

WESTCHESTER

BRONX

Gowanus

Canal

Page 8: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

8

BROOKLYN

PARK SLOPE

SOUTH SLOPE

RED HOOK

CARROLL

GARDENS

BOERUM HILL

1

2

3

Gowanus Canal – Current Uses

Boat Access Points (Contains kayak/canoe launch site)

2nd Street Boat Launch

Waterfront Public Access

Whole Foods walkway with

seating – along the 4th St Basin

Lowe’s walkway with seating –

back of the parking lot between

10th St and 11th St

1

2nd Street Boat Launch Lowe’s Walkway

2

3

Page 9: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

9

NYCDEP Investments in

Water Quality Improvements

Jim Mueller, P.E.

Assistant Commissioner

DEP

Angela Licata

Deputy Commissioner

DEP

Page 10: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

10

Gowanus Grey Infrastructure Improvements

Flushing Tunnel Upgrades

3 pumps

New automated screens

Operational since May 2014

Benefits

Increase flow through tunnel

Improve dissolved oxygen

Minimize shutdowns

Pumping Station Upgrades

Increased pumping capacity from

20 to 30 MGD

Add screening device

Operational since June 2014

Benefits

Reduce CSO discharges by 34%

Reduce floatables discharges at

head end

Post-Upgrade Rendering of the

Gowanus Facilities

Total Capital Cost for

Pumping Station

& Flushing Tunnel Upgrades

= $190 Million

Page 11: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

11

Green Infrastructure in Gowanus (RH-034/OH-007)

Built

• 18 bioswales

o Including 11 ROW green

infrastructure sites in

partnership with the Gowanus

Canal Conservancy

• Porous pavement installation at 4th

Street and 5th Avenue

• Gil Hodges Community Garden

(grant)

• PS 261 playground (TPL project)

In-Construction

• RH-034/OH-007 Area-wide Contract

o 90 bioswales

o 2 stormwater greenstreets

GCC Project Area

Right of way Bioswale

Page 12: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

12

PS 261 – DEP, DOE, TPL Partnership

Project

• Synthetic turf field with infiltration

capability

• Rain Garden

• Trees with porous pavers

NYRP Gil Hodges Community Garden,

2011 Green Infrastructure Grantee

• Underground infiltration basin for

stormwater storage

• Porous pavers

• One bioswale on Denton Place

PS 261

Green Infrastructure in Gowanus (RH-034/OH-007)

Gil Hodges Community Garden

Page 13: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

13

Planned Retrofits

• GI Grant Projects with private owner:

o Gowanus Arts Block

– rooftop garden/farm

• DOE Public Schoolyards:

o PS 321

o PS 9

• DPR Playgrounds:

o Washington Park/MS 51

o Boerum Park/Cobble Hill School

o Park Slope Playground/PS 282

• NYCHA properties:

o Gowanus Houses

o Wyckoff Houses

• DPR Parks:

o Carroll Park

Green Infrastructure in Gowanus (RH-034/OH-007)

Page 14: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

14

Review of Water Quality

& LTCP Alternatives

Jim Mueller, P.E.

Assistant Commissioner

DEP

Page 15: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

15

Gowanus Canal Watershed

Watershed Drainage Area

1,958 Acres

Combined Sewer System

Red Hook and Owls Head

WWTP Service Areas

Gowanus Pump Station

13 CSO Outfalls ( )

3 MS4 Outfalls ( )

Annual Wet-Weather

Discharge Volume:

≈ 300 MGal (typical year)

RH-034

RH-033

RH-038

RH-037

RH-036

OH-005

OH-007

RH-035

OH-607

OH-616

RH-031

RH-030

OH-006

OH-026

OH-024

RH-601

Page 16: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

16

Gowanus Canal Classifications

STATEN

ISLAND

BROOKLYN

QUEENS

WESTCHESTER

BRONX

Gowanus

Canal

CLASS I B o a t i n g / F i s h i n g

CLASS SD F i s h S u r v i v a l Hamilton Ave.

Page 17: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

17

Water Quality Standards

Classification Dissolved

Oxygen (mg/l)

Bacteria

Fecal

Coliform (col/100 ml)

Total

Coliform (col/100 ml)

Enterococcus

(col/100 ml)

Current

Head End to

Hamilton Ave. SD ≥ 3.0 no limit no limit N/A

Hamilton Ave.

to Upper Bay I ≥ 4.0 ≤ 2,000* (Monthly GM)

≤ 10,000 (Monthly GM)

N/A

DEC Proposed

Rulemaking -

No

change ≤ 200

(Monthly GM)

≤ 2,400 (Monthly Median)

and

80% ≤ 5,000

No Change

EPA Potential

Future Primary

Contact Criteria -

No

Change None None

≤ 30 (30-day-rolling GM)

and

STV ≤ 110

STV = Statistical Threshold Value = 30-Day-Rolling-90th Percentile

Page 18: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

18

Overview of Sampling Stations

Note: Locations GC3, GC4, GC5,

GC6 and GC8 are

consistent HSM locations.

Sampling locations selected

to assess tidal phases.

Page 19: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

19

CSO Outfall Sampling & Flow Monitoring Locations

Sampling & Flow

Monitoring Period:

July 2014 to Oct 2014

CSO Outfalls ( ):

RH-034

OH-007

OH-026

Page 20: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

20

Additional Sampling Locations

TB5

TB4

TB1

TB3

TB2

Sampling Period:

Dec 2014 to Present

Original Stations: GC1 – GC11

GC7 is consistent with

Riverkeeper sampling location

Added Sampling Points:

Turning Basin: TB1-TB5

TB1 and TB3 are consistent

with Citizen sampling locations

LTCP2 Turning Basins Sampling

LTCP2 Receiving Water Sampling

Citizen Sampling Locations

Riverkeeper Sampling Location

Page 21: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

21

Sampling Program Overview

LTCP: 11 Locations (1300+ analyses)

Sampled GC1-GC11

4 Wet Events Total Precipitation (0.27” to 0.77”)

Peak Intensity (0.04” to 0.10”)

3 Dry Events

Additional LTCP: 14 Locations (1400+ analyses)

Sampled GC3-GC11 and TB1-TB5

Limited access to GC1-GC2 due to

National Grid cable installations

3 Wet Events

Total Precipitation (0.75” to 1.63”)

Peak Intensity (0.03” to 0.22”)

5 Dry Events TB5

TB4

TB1

TB3

TB2

Page 22: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

22

Fecal Coliform – Sampling Data – GMs

21 23

17 17

29

17

24 19

30 27

35

19

10 12

133 170

93 94 100 98

160

115

166 184 236

131

93 119

1

10

100

1000

GC11 GC1 GC2 GC3 GC4 GC5 TB1 TB2 TB3 TB4 TB5 GC6 GC7 GC8 GC9 GC10

Fec

al C

olifo

rm, c

fu/1

00

mL

Sampling Location

LTCP - Dry LTCP - Wet

Additional - Dry Additional - Wet

DEC Proposed Rulemaking

Monthly GM ≤ 200 cfu/100mL

Additional Dec. 2014 to April 2015

LTCP Jul. 2014 to Sept. 2014

Sampling Period:

*GC3, GC4, GC5, GC6 and GC8 includes Harbor Survey results within each timeframe

RH-031 RH-035

OH-007 RH-034

LTCP - Dry

LTCP - Wet

Turning Basin Sampled Only for

Additional Sampling Program

Additional - Dry

Additional - Wet

Buttermilk

Channel

OH-006 OH-024

Page 23: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

23

Projected Time to Recover (Based on August 2008 Storm)

Class Station Baseline

Projected Time to Recover (hours) (≤ 24hrs for Max. Fecal Coliform of 1,000 cfu/100mL)

SD GC1 to GC7 8 - 14

I GC8 to GC10 0 - 10

Compliance with Time to Recover (≤ 24hrs) is projected

throughout Gowanus Canal under Baseline Conditions.

Page 24: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

24

Enterococci – Sampling Data – GMs

7

18

7 8

9 7

8 7

15 14

19

8

5 6

60

24

45 48 39 39

80

56

78

135 157

73

48 53

1

10

100

1000

GC11 GC1 GC2 GC3 GC4 GC5 TB1 TB2 TB3 TB4 TB5 GC6 GC7 GC8 GC9 GC10

En

tero

co

cc

i, c

fu/1

00

mL

Sampling Location

LTCP - Dry LTCP - Wet

Additional - Dry Additional - Wet

Additional Dec. 2014 to April 2015

LTCP Jul. 2014 to Sept. 2014

Sampling Period:

*GC3, GC4, GC5, GC6 and GC8 includes Harbor Survey results within each timeframe

RH-035

OH-007 RH-034

LTCP - Dry

LTCP - Wet

Turning Basin Sampled Only for

Additional Sampling Program

Additional - Dry

Additional - Wet

EPA Potential Future

30-day rolling GM < 30 cfu/100 mL

Buttermilk

Channel

RH-031 OH-006 OH-024

Page 25: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

25

10.4

11.6 11.7 11.3

11.6 11.7 11.5 11.3

11.5 11.3

10.5 10.5 10.3

10.3

11.0 11.2

10.6

11.3 11.0 11.1 11.2 11.0 10.9

10.4 10.3 10.3

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

GC11 GC1 GC2 GC3 GC4 GC5 TB1 TB2 TB3 TB4 TB5 GC6 GC7 GC8 GC9 GC10

Dis

solv

ed O

xyge

n, m

g/L

Sampling Locations

LTCP-Dry Additional-Dry

LTCP-Wet Additional-Wet

Dissolved Oxygen – Sampling Data – Averages

Additional Dec 2014 to Apr 2015

LTCP Jul. 2014 to Sept. 2014

Sampling Periods:

Current WQ Standard Class SD

≥ 3.0 mg/L

Current WQ Standard for Class I

≥ 4.0 mg/L

Turning Basin Sampled Only for

Additional Sampling Program

Buttermilk

Channel

RH-035

OH-007 RH-034 RH-031 OH-006 OH-024

Page 26: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

26

Modeled Gowanus CSO Volumes

182 137

128

5

69

58

41

17

47

46

0

50

100

150

200

250

300

350

400

450

500

Pre-WWFP LTCP Baseline w/ GI

CS

O D

isch

arg

e V

olu

me

(MG

Y)

RH-034 RH-035 OH-007 RH-031 Other

Approx.

44% Reduction

263 MGY

467 MGY

Page 27: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

27

Model Updates & Baseline Assumptions

Alternative model runs are based 1 year of data (2008, “typical year rainfall”)

Selected Plan model run is based on 10 years of data (2002-2011)

2040 population projections

Model is calibrated with Harbor Survey data plus LTCP sampling data

2012 InfoWorks recalibration based on revised impervious areas

2002-2011

10-year

Water Quality

Period for

Selected Plan

5-Year Moving

Average

Standard for WWFP (JFK 1988 – 40.6 inches)

Recent Typical (JFK 2008 – 46.3 inches)

Page 28: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

28

WQ Attainment Summary

Water Quality Model

Model Projections

Water Quality Parameters Projected Water Compliance

Metric Frequency Current

Regulatory

Status

Recreational

Season (May 1 - Oct 31)

Annual Time To

Recover2

Fecal

Coliform ≤ 200 cfu/100 mL

Monthly

Geomean DEC Proposed

Rulemaking Meets

Standard

One month out

of compliance

(Feb 2008)

Meets

Target

Enterococcus

≤ 30 cfu/100 mL 30-day-rolling

Geomean EPA Potential

Future Meets Potential

Standard

STV1 ≤ 110 cfu/100 mL 30-day-rolling

90th percentile EPA Potential

Future

Exceeds Potential

Standard

Dissolved

Oxygen

≥ 3 mg/L Class SD Never Less Than

Existing

Standards Meets

Standard Meets

Standard

≥ 4 mg/L Class I

1) STV = Statistical Threshold Value

2) Time to Recover = ≤ 24 hrs for Max. Fecal Coliform to reach 1000 cfu/100 mL = Current LTCP Benchmark

Sampling Data

Page 29: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

29

Future Grey Infrastructure in Gowanus

High Level Storm Sewers

HLSS to be built on 14% of

Gowanus PS drainage area (RH-

034)

This captures 50% of the runoff

within the HLSS built area

96-acre area bounded by 1st Pl,

4th Ave, State St, 3rd Ave

Total estimated construction cost

= $35 M

Environmental Dredging (deferred due to ongoing Superfund

remediation under consideration)

High Level

Storm Sewers

Page 30: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

30

Summary

Current Status:

Flushing Tunnel Activation and Gowanus

PS Upgrade with floatables control enables

Gowanus to meet current & future

dissolved oxygen and recreational

season fecal water quality standards

EPA ROD requires an estimated reduction

of 58% to 74% of sewer solids at:

• OH-007

• RH-034

DEP CERCLA remedy will be the proposed

LTCP.

DEP is evaluating alternatives to meet ROD reductions…

Page 31: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

31

CSO Storage Tanks Under Evaluation

Outfall

Alternatives Under Evaluation

ROD Proposed* 58%

Sewer Solids Reduction

74% Sewer Solids Reduction

RH-034

OH-007

8 MG 5.7 MG

4 MG 2.5 MG

3.5 MG

1.4 MG

*ROD Proposed tanks would result in:

• RH-034 = 82% Sewer Solids Reduction

• OH-007 = 87% Sewer Solids Reduction

Page 32: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

32

Site A: RH–034

Tanks

Staging Area

Park

Zoned Residential

Zoned Manufacturing

Page 33: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

33

Site 5: RH-034

Tanks

Staging Area

Park

Zoned Residential

Zoned Manufacturing

Page 34: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

34

Site A: OH-007

Tanks

Staging Area

Zoned Manufacturing

Page 35: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

35

Site B: OH-007

Tanks

Staging Area

Zoned Manufacturing

Page 36: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

36

Alternative to Tank Under Consideration at OH-007

OH-007 Weir Modification:

Takes advantage of available capacity in sewer system to achieve

58% to 74% sewer solids reduction

Before After Weir Modification

Page 37: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

37

Next Steps

DEP will continue analysis of alternatives

Coordination with other agencies (DEC, USEPA)

Additional public forums: TBD

• LTCP

• Siting Recommendations under Superfund

Comments can be submitted to:

• New York City DEP at: [email protected]

Page 38: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

38

Additional Information & Resources

Visit the informational tables tonight for handouts and

poster boards with detailed information

Go to www.nyc.gov/dep/ltcp to access:

LTCP Public Participation Plan

Presentation, handouts and poster boards from this meeting

Links to Waterbody/Watershed Facility Plans

CSO Order including LTCP Goal Statement

NYC’s Green Infrastructure Plan

Green Infrastructure Pilots 2011 and 2012 Monitoring Results

NYC Waterbody Advisory Program

Upcoming meeting announcements

Other LTCP updates

Page 39: Gowanus Canal Combined Sewer Overflow Long …...Gowanus Canal Combined Sewer Overflow Long Term Control Plan 2 Welcome & Introductions Emily Lloyd Commissioner DEP 3 Context for LTCP

39

Discussion and

Q&A Session