cplllf(>'lli ~H~llIcp ~ ~, ~ ~ ~ rq~m"1fct+rm, ~(~)Office of the Assistant Mining Enginer, Deptt. Of Mines and Geology, Near malji ka kamra, Old Sale tax
office building, kothariya ka mohalla, Churu(Rajasthan) Tel. no [email protected]
No. AME/Churu/ MP/2017-18/STP(S)/ ['1s-1Mis VIS infra Solutions,411, 4th floor sun N moon chamber,
Ajmer pulia- 14,Jaipur - 302006 .
Subject :- Approval of Simplified mining Scheme in respect of your Application for Shortterm permit No. 05 for Masonary stone Near village - Baiera, TehsilBidasar, District-Churu over an area of 7339Sq.Mt. Submitted under Rule29 of The Rajasthan Minor Mineral Concession Rules 2017.
Sir,
In exercises of the power conferred by Rule 29 of The Rajasthan Minor Mineral
Concession Rules, 2017, I hereby approve the above said Simplified mining Scheme. This
approval is subject to the following conditions :-
1. This Simplified mining Scheme is approved without prejudice to any other laws
applicable to the applied STP area from time to time whether made by the Central
Government, State Government or any other authority.
2. It is clarified that the approval of your aforesaid Simplified mining Scheme does not in
any way imply the approval of the Government in terms of any other provisions of the
Mines and Minerals (Regulations and Development) Act, 1957 or The Rajasthan Minor
Mineral Concession Rules, 2017 or any other laws including Forest (Conservation) Act,
1980, Environment Protection Act, 1986 and the rules made there under.
3. It is further clarified that approval of the Simplified mining Scheme is subject to the
provisions of Forest (Conservation) Act, 1980, Forest (conservation) Rules, 1981 and
other relevant statues, orders and guidelines as may be applicable to the lease from
time to time.
4. The Simplified mining Scheme is approved without prejudice to any other' order or
direction from any court of competent jurisdiction.
5. This approval of proposed mining operations and associated activities is restricted to
the Short term permit area only.
6. The execution of Simplified mining Scheme shall be subjected to vacation of prohibitory
orders / notices, if any.
7. If anything found to be concealed as required by the Mines Act/Rules in the contents of
Simplified mining Scheme and the proposal for rectification has not been made, the
approval shall be deemed to have been withdrawn with immediate effect.
8. At any stage, if it is observed that the information furnished in the document are
incorrect or misrepresent facts, the approval of the document shall be revoked with
immediate effect.
9. The Licensee /applicant should deposit Financial Assurance to the concerned Mining
Engineer/ Assistant Mining Engineer, as required under Rule 29 of The Rajasthan Minor
Mineral Concession Rules, 2017.
Encl : One Copies of Approved Simplified mining Scheme Document
Your Faithfully,
Assista~g Engineer,Churu(Rajasthan) .
No. Dated:Copy forwarded for kind information to :
1. M/s Geomin Solution Pvt. Ltd. Opposite Pugal house, Bikaner.2. Guard File.
Assistant M ning Engineer,Churu( ajasthan).
SIMPLIFIED MINING SCHEME(Under Rule 29 OF RMMCR 2017 FOR EXTRACTION OF MASONARY
STONE)
For'The Simplifted Mining Scham&Has Been Apprc\!t;TJ "/;de Letaar1 ....17 MASON ARY STONENo J~s.' Date a.t1:>. ~,Ur.de: Rule RMMCR-2017
STP. NO.-5
Area - 0.7399 Hect
NEAR VILLAGE -BALERA,
TEHSIL -BIDASAR,
DISTRICT -CHURU.
------~E'-":=~~APPLICANT - f.--:/;. -<~;z'"
MIS VIS INFRA SOLUTIONS {,( " J~I411 4TIIFLOORSUNNMOONCHAMBr!~h;.·· .•:; ., #"~~:. ~ .
~ .... ~~~ :, , " _ \0 ..
AJMER PULIA, JAIPUR-14, ! A" i~X,,·.: -._; .L. t ~-;~\.-'~r : ~
RAJASTHAN-302006 -4 -.. ....~~
"..~-~
CONSUL TANT-
GEOMIN SOLUTION PVT LTD
OPP. PUGAL HOUSE, OLD GINNANI,
BIKANER(RAJ) MOB. 09314185551, TEL. - 0151-2203255
Email id:[email protected]
~~Ilf~\~'~~-l \T?j~~~
~~
Page 1
IndexS.No DESCRIPTION PAGE NO.
01 Detail of applicant
02 Detail of applied area
03 Basic infrastructure available nearby applied area
04 Distance of habitation from applied area
05 Physiography & Drainage and Geology
06 Detail of earlier removed Masonary Stone lif any
07 Details of existing plantation in applied area
08 Scheme of collection and use of top soil
09 Detail of nalas, river, and water source nearby applied
area
10 Plan for rain water diversion lif required
11 Plan for extraction or removal of Masonary Stone and
required machineries
12 Details of production and dispatch of Masonary Stone v:~'_.'\13 Method of Estimation of Reserves / 7 fffi.'~ '.
;- . .~'.:~;/\. ~
14 Details of mining machinery deployed or to be I, "'.'~<':"':_,,-~_____/ /1
deployed and their detailed specifications ~~715 Extent of mechanization \ -' ..-~~~"::.:~:l...,,' .~ . .. . r116 Method of mining ! ._. _ ~i
I',_ . .,.'\._r, ..-' I j<~ , .. v -._:•.. " I
17 Measure taken for air pollution, noise pollution arid- _- JO
treatment of dust suppression
18 Programme of Afforestation
Page 2.
LIST OF PLATES
S.no. Particulars Plate no.
1. Applied area map 1
2. Key plan 2
3. Surface plan 3
4. Surface geological plan & section 4
5. Year wise removal and extraction plan & 5
section
6. Environment plan 6
7. Conceptual plan 7
List of Annexure
1. Copy of LO!.
2. Copy ofkhasra map andjamabandi showing applied area
3. Copy of applied area map.
Page 3
1. Detail Of Applicant
a. Name of licensee MIS VIS INFRA SOLUTIONS LLPb. Address of Applicant Rio 411, 4TH FLOOR SUNN
MOON CHAMBER,
AJMER PULIA, JAIPUR-14
RAJASTHAN-302006.
c. PAN AAMFV6504G
d. STPNo- 5
" e. Phone No. 9983300053
f. Status of the Applicant company
g. Details of the Area Near Village Balera
h. District and State Churu & Rajasthan
1. Tehsil Bidasar
J. Village BaIera
2. Detail of applied area:
~
f. /' ~-'f'$;/ ( '" '"• I .r : ,ttl"
a. Khasara No. 229 tl ffi ( ':' " _~'I~ !\1, l:i_ .;
b. Area of Khasara 256 bigga 13bisva \-' /,,_
i~~c. LOI area 0.7399 hect i '~-'~--....d. Revenue Village BaIera i ' .~";:;:r..", , "'): .'" .... ' .. Ie. Patwar Circle Bidasar ~i ~!.~.., If. Tehsil Bidasar
g. District Churu
Page 4
Details of area (with location map):
From To Bearing Distance
FRP A 890 15'43.82" 876.1170 MT
A B 490 90 MT
B C 1150 90 MT
C D 2290 90 MT
D A 2950 90 MT
LATTITUDE & LONGITUDE OF FRP - Tube well near mata ji temple
in Kodasar Bidawatan 270 44' 38.2" 740 19' 51.2"
details of the revenue record of the applied area
Near Tehsil District & Khasra Status of Area Period
Village State No. land
Baiera Bidasar Churu 229 Govt. land 0.7399 15
& Rajasthan Hect. Months
3 Basic infrastructure Available Near Applied Area
Road Connecting road of Bidasar to Sujangarh
Available at Balera ,~---~"I"'ICIr -~ •. :;'I",,,.~~Not Available at applied Area .. :" ;~~:\
\ " ~ /,'11
, .. <.1' -- /,,)"'~¥*':l~\
Middle school at Balera \ ~'~O\}~(\~Nearest Railway Station : Sujangarh \~
Tube well supply
Electricity
Telephone
Water supply
Dispensary Balera
Post Office Balera
School
PageS
4 Distance of Habitation from applied area:
s. no Village name Population Distance and direction
from applied area
01 Baiera 2016 2.SKM N DIRECTION
03 Gopalpura 7237 S.SKM NE DIRECTION
5 Physiography & Drainage and Geology
The lease area is showing almost undulated and hilly topography. The highest
assumed RL is 100 Mts. in the lease area while lowest RL is 99.00 Mts. in
the applied area. This provides an elevation difference of 1.0 Mts. the general
slope of the area is towards North direction. There is no seasonal nalla
flowing through mining lease area. The spot RL and other features are
marked in the surface plan and surface geological plan plate no. 3 & plate
no.4 respectively. These plans are prepared on a scale of 1:1000.
REGIONAL GEOLOGY OF THE AREA-
The regional and general geology of the area has been referred from an article
of Sh. Sinha Roy & Gupta and others, G.S.I. this article was published in
India mineral 1983. During his investigation of the area in 1969-70 noted an
extensiv~natu~ of occurrence ~f these rocks in Delhi Super gr~~
The stratigraphic sequence IS given below:- ; , ~4f;\:'i. "\. ,-r:'!~ '. /",.',", ~ ,/.,"
\(~/r~ " i'Geology: - The Gopalpura Quartzite deposits belong to Pun~p in
Delhi South fold belt.
The stratigraphic succession of the investigated area
~ Delhi (South) 01 SirohilRas/ Punagarb1Mica scbist, marble, basicvolcamcs
01 IDIBhim IIDungarkhera Ilpelitic and semi-pelitic schist I
Page 6
01 101 Todgarh IICalc-gneiss and marble 101 101Rajgarh IIPelitic schist with quartzite 1[II 10Isendra 1Metavolcanic" impure marble,
pelitic schist
~
~EJBMOtiya Metavolcanics, impure marbleBarotiya ~:ana Marble
Mica schist, conglomerate
01 101Gogunda IIQuartzite 1
~
Ajitgarh, Dadikar, Bairat, Harsora,
I II ISaladipura, Udaipur and SeoliGranite
~ ~CJArauli-Mandhan Quartzite, staurolite schist,
Bharkol phylliteQuartzite with carbon phyllite
01 101Ajabgarh IIThana Gazi IICarbon phyllite and schist 1~IDelhi (North) 101
I Kankwari Schist and quartzite:Rajgarh Sita Conglomerate and quartzite
1---------------------------------------------------- Unconformity -----------------------------------------1~I 101
1Weir-Sariska Ferruginous quartziteLimestone and phylliteKushalgarh
01 101 IIDamdama IIConglomerate, quartzite 1
~ ~EJBayana Quartzite, schistBadalgarh Feldspathic quartzite and shaleJogipura Quartzite
Tehla/Jahaj- Metavolcanics with quartzite,Raialo schistDelwara
Govindpura Conglomerate, quartziteNithar/SerrateGroup) Dogeta
Siliceous dolomite marble,phyllite
---------------------------------------------------- Unconformity --------------------------------~
~~~=~Anjana 1 II 1 l/ <Serpentinite, talc-trem~ite ",
.<,oil.'.../ .
''9.' "Rakhabdev schist \., - . ,;{)i'
Jharol Jharol Phyllite with thin quartzite' ..:<_ , '/Iswal bands -rConglomerate.j] :-.. -..~
1 -;,;' ;;i• -4, ,"'n A..: 00---------------------------------------------------- Unconfornuty ---------------- .------- """~.'-,;:.----.--- '",~
01 101 Leucogranite Intrusion I i ?- r-r'r:'~_'A__~":' ~...,}j..- ....
Page 7
Local Geology:
The area under consideration falls under Punagarh Group of rocks. Mining
lease area is covered by the Alluvium and some rock exposure is seen on the
surface. Geologically, recent to sub-recent formation having alluvium,
Weathered Quartzite and Quartzite beds are found.
Generalized litho-unites exposed in the applied lease area is listed below:
1. Alluvium 0- 0.5 mt.
2. Quartzite 0.5- 45 Mt.
6 Detail of earlier removed masonary stone lif any -
Applied area is Govt land and has not been removed in this area by
applicant.
7 Detail of existing plantation in applied area -
This is virgin Govt Land so there is not found any type of plantation in
applied area. there is not significant number of trees or plants.~'" ,,''''/~"~~.
,I,' I frJ:l' ,~8 Scheme of collection and use of top soil - \,~\ ~',-, ..\
Over burden is alluvium soil it will be collected and stack se~at~~ ~...r----~ ...;..;:...···~"",,,,.,==::;.__
:3f ::l~\.,~: r
i /~~I"C~,I ~::rJ9 Detail of nalas, river, water stream, and other source - ' - ... '.
appropriate place for development in plantation.
There is no water stream river and nallah nearby and passing through the
applied area. There is water source of drinking and agriculture purpose is
ground water.
10 Plan for rain water diversion/if required -
The applied area is undulating of western rajasthan it is arid climate
average annual rainfall is about more than 200 mm. rain water scarcity is
too much so there is no requirement of rain water diversion.
Page B
11Plan for Extraction or removal of Masonary Stone and requiredmachinery
The masonary Stone is overlain by soil so for the exploitation of mineral
there is requirement of removal of the over burden and stack soil cover
separately at the appropriate location. Since the deposit occurs at a depth
of 0-1.0 mts and the thickness of the deposit is sufficient to be
economically mineable. Semi mechanized open cast mining is the suitable
method for mining. The mining will be made during the mining as per
requirement. The height of the benches will be kept 6.0 mt in mineral.
Occasionally overburden will be removed and transportation of Masonary
Stone from face to pit top will also be made Semi mechanized where as
waste will be directly loaded in to tractor trolleys. The overburden is
unconsolidated and Alluvium . In view the above drilling and blasting of
rock would not be required.
12. Details of production and dispatch of masonary stone:-
The applied area is granted for STP for a period of 15 months year .
proposed production of the year is 220000 tons.
13 METHOD OF ESTIMATION OF RESERVES ."..The geological cross-sectional method of reserves estimation is adopted
for calculating the reserves. The reserves are calculated by following
formula: ~~Volume of mineral = Area of section X sectional influence le* r~j-\ ~:)Mineral in tones= Volume of mineral x bulk density \1 f~J,\g-~. ..)
\. ,0 >--.._ " !
The details are as follows: '~!_!:;;-:.:j:/Presently the reserves are computed for Masonary
"~\.f~·.
Page 9
Reserves:
The prospected pit nearby the area shows the presence of flat Masonary
Stone bed of almost uniform thickness of homogeneous nature. Thus, plan
area method is adopted for assessment of reserves.
A. PROVED RESERVES
On the basis of previous experience of similar type deposit whole area has
been taken from surface under the proved category of reserves. The thickness
of proved reserve of Masonary Stone has been taken 20.0m, will give volume
of R.O.M. to get the tonnage of mineral volume is multiply by the bulk
density.
RESERVE CALCULATION OF MASONARY STONECategory Area Thickness Volume Bulk Masonary Stone
density (100%)Ton(Sqm.) (Mts.) (Cum.) (tonnes) (Mt.)
Proved 7399 20 147980 2.6 384748
Total 384748
14 Details of mining machinery deployed or to be deployed and their
detailed specifications
16. Method Of Mining
Proposed year wise development for 15 Months
First year Development & Production:
In the first year of mining will be done by extending the working pit in East
and west. one bench will be developed in the overburden at the RL of 100 to
94 mts . four benches will be developed in the Masonary Stone bed at the RL
100.0 mts. to 94.00mts. , 94.00mts to 89.00mts , 89.00mts to 83.00mts and
89.00 mts. to 83.00 mts . advancing towards east and west directions. Total
Marketable Masonary Stone 219999.93(2,20,000) tonnes will be produced in
the first year of mining plan. The calculations are tabulated in table no. VI
(Refer -plate no. 5 proposed year wise development plan).
Year wise production of mineral
Year BENCH R.L. AREA AVG. VOLUME Sp. Market Able Over(mts.) THIC (Cum.) Gravity Masonnary Burden
KNES stone (100%)S (Ton)(Mts.)
from To1. 1. 100 99.5 7399.0 0.5 3699.5 ' 3699.5
II. 99.5 93.5 7399.0 6 44394.0 . 2.6 115424.4III. 93.5 87.5 3710.0 6 22261.32 2.6 57879.43IV. 87.5 81.5 2993.34 6 17960.04 2.6 46696.104
Total 219999.93 3699.5
17. Measure taken for air pollution, noise pollution and treatment of dust
suppression:-
(i) Air:- The quality of air is free from any pollution at this time, as there is no
major source of pollution the air with in the area or nearby the area. There is
no source of air-deterioration in this region and therefore amg'_ air quality:/~'~~
in the area as well as in the regiOnOq~~< tufll.l;'~,~~\{-'U;'fH ' ,- <1." ~,'rrr \~,.,; ~. -:_}. '. ' .» ~i ~ \ :J)i" .• iI I"~ ," . ": ," ,..• \.'~r-- , \J~.~::-." .' ..1.1 ,1' ~ .-,.' "-...' ~ ~ '<~' __. -:;'.-L~_ -'- _. " ~ ~. •... :"-----
Page 11
Air pollution caused by deployment of JCB for removal of overburden and
playing of truck/tractors, which generates dust. The air pollution in the
mining area causes respiratory diseases and eye ailment.
Controlling dust, water will be sprinkled daily on temporary unpaved roads in
the applied area and dust mask shall be provided to operator and mine
workers.
(ii) Ambient Noise & Vibration Levels
The proposed mining is semi mechanized opencast method but some amount
of noise will be there due to JCB which will be deployed on hire basis for
removal of overburden and movement of truck/tractor, which shall be within
limits of safety. Earplugs shall be provided to operator and mineworker.
(iii) Dust Suppression: The proposed mmmg is semi mechanized open cast
method and mineral is overlain by thin layer of dune sand so dust will be
generated from mining and transportation of mineral by vehicles. For control
of dust applicant will be done water sprinkling on road and mining area. And
applicant will be done plantation on boundary of applied area.
18. Programme of Afforestation
The mining of Masonary Stone is carried out for earth work, after removal of
the mineral land will be used for water reservoir. It will be helpful for
recharging ground water. Applicant will be plantation out side the applied
area taking permission from compo.nent authority. ;;%~~:~.·~~~~7~~\.r- II i, '}'«!I [9-. \'1 -"~'l':: '~'\.f' \~\i - /'f~~' -...~~~ 't-( I~... ~ {." ,.. "/ ,~ -t l-.~· - .' ;\ ~;,.,. '~jJ'l_it ..,. \~~ \ ,..~; ::"to,I ' . ...._;; ,'. , ,~.!<c\ - -e- ~,
" ; ~- ..... " ..... .. J, ' .. r",.-; -. ..f,e,g""I '"\, =r .. ,to '.- , .........,. _ 1",_ / _',__ ....- ..~ _',_?L_:__ i \ l ;.\"';":'-:~'J ':, e- " ~,•. ~( ...
-- .... ,,_--..~~.'_~ - ., .,', .•. [:<<;'
Signature of applicant ~ ~.,~ .~~ lfcT ~kfi2l·l;.w, I.;:i;~:.· .J;
~
Page 12
----------------------------- .
~~GOYT.OF.RAJASTHAN
ct>lllfclll ttBlll4> ~ ~, ~ ~ ~ Fc1$1I"i ~, ~~)Office of the Assistant Mining Enginer, Deptt. Of Mines and Geology, Near malji ka kamra, Old
Sale tax office building, kothariya ka mohalla, Churu(Rajasthan) Tel. no [email protected]
~:- x=mI3f/~/~.-eT.tfI./17-18/ I~ol ~~--'-;'ii:""'--CfJ:- '~/11'rMIS VIS INFRA SOLUTION LLP,411,4 FLOOR, SUN N MOON CHAMBER,AlMER PULIA, JAIPUR, 14RAlASTHAN- 302006 .
fcrn:r:-Development and Maintenance Sardarshahar to Lunkaransar Section SH-6A from Km 0.000 to Km 75.800 and Churu to Bhaleri Section SH-69from Km 0.000 to Km 33.200 -gg STP 6fTmf I
~'4:- 3WlQ?T m~ 1f5f ~'iiCfJ 07.07.2017 ciJ ~~ ill
•
,+"Ii5IGlI,
\34xlCfC"1 Fclt'llll·fPfij \3cYdl~ij f.i+rtuT m "YX ~ ~ ~ 4fHfl ~2,20,000c.=r ctT ~. ~ 1f5f -gg 31fq IDXT ~ m~ 1f5f ciJ x-rr~ ~ Gfdl~\i1mt{'f ~ ~ I1. m~ 1f5f I2. CfJllIT~~1 q '\Jfi' ~1~q&1 ctT >ffi11
3. '<1\i1F~ ~ ~ ~ 229 ~ STRC{) ~~ fl'<CfJlx '<1\J1'<"Cl lJFf ~ ij15ffl&1~Glfl'< ~ ~ ctT (rp:jliSlrGl q -.:rcmT I
4. \Jfi.-eT.m "YX -.:rcmT I31fq IDXT ~ G fd I~ \Jj'j ciJ WeTUT ciJ 4 ~ij Iij, ~ 11a-T il \JfRT CfJIII T~ ~I il ~
~ fll+"llUI ciJ ~ -gg ~ 1f5f umt ~ ~ 1ffiT ~ ctT ~ ~ I
3Kf: m ~ 1=JTI5" ctT ~ il ~ 3l~4ijIRCfJijl~ Tf ~ CfTf$ ~ 11a-T \34xlCfC"1~ -gg 3k'4 ICI~ ~ ~ "\i1T~ ~ \YfT ~ I1. 3ic>4IC1~ ~ 1f5f ~~~ ~ 1,10,100/-2. '<11Ic>tl ~ 50,60,000/-3. ~ ~ ~ 3,520/-
4. fl'<c1IC12ij +"I1~f.iJI ~ 3ij~G'i10 ~ CfJllIT&1l1 em ~ ~ I
5. 'Bffif '{i'<CfJI'< ciJ Cfrf ~ 4 ""1TCI'<ul +"I'"5II&1l1ctT ~~ 09.09.2013 ctT q[mT il 411TCI,<uftllfl15+"1R11
6. ~~. 15000/- cpr ~.~.3iN. (~ 3i1~ClI'{i'i ciJ ~ il)
7. ,<11I<7C"1 ~ em 10 l'lR1~lij ~ (~.~.~.-eT.) ~ f%f«CfC fl)'ixC'1 Lf)1\3)U~~I'i ~ 1l\Jfl1T Cf)'<T ~ ~ cR I
8. -eT.x=fi.~. 2 l'lR1~lij ctT ~ -ft \Jfl1T ctT ~ ~ cR I.-". '-':~:---.
~----.....t_--'-1 ;:: :~':
1\ r.~\\ I. ,
-.~~! ,i ,t ",
r =<":n~ lOf ~O("'I <~'~HS1 31~Af ~
~~ ..J\H'I~'4 ~"'£ /
•
'3,-1\:il ~.:t; It-/Of J ')_°ll ~ 31~\6<-rl.I~<~~ F == I
., I"'" f0 -:l-J , I::f,T ~ .._1'1-1, '. o\'1.or Xf I~1<"1 \ \J<cf. .f\.d\ . \ 'l .,\1-I C!I I\'2Y b' ~ <-\.1:<1 , 1\., \ '2011 a31-?.a<..t t?I"-lI R ~ of\ ....J'.
'\~' " ~~I :i{1~~Z!~'1 ~,~, cfT-, ~~\ 301\<1 _3;,~\f4({
\)(4 ' .ft, Jt, ~\~ / b\\Al1 ~ 'k~< ~~ ~\S1 ~ ~ 1
(1F. Qi~IEI<:- ~~) ~:fT Cl·13,~~ bl. ~f f,-~6,a)I qZ:""<l- ar ~ ~f;1j;.~ - 4 3>q,~~ ~. ~~
<8\ F ; I";~r ~ ll":iil \:h~"i""1 f-l,"1<or~ ''''1j)ElI <\1.'\ (\ , n ~ ....! .l\') El\f1\I;4 ~ -< :r\""L\~ <;:;~~<U\) ~ (Jq"5<~1 S p~ 12/rt- ~ c£1~1CYI') ~OJ ~~ .:t;p-,f(~o-r~ g,~ ~\\"I ~ ~"<'I
~~ ~¥\,<~~-~~~~
~~Vkt~51' 1."
•
•
PLAN SHOWING APPLIED STP AREA FOR MINERAL MASONARYSTONE NEAR VILLAGE BALERA TEHSIL BIDASAR DISTRICTCHURU.APPLIED BY:-M/S VIS INFRA SOLUTIONS LLP,
SCALE:-ICM=40MT.
C
F.R.P:-T~EWELLNEARMATAJ~~~TEMPLE IN KODASAR BIDAWATANN27°44'38.2"
{E74°19'51.2"
D
DESCRIPTION REPORTN27°44'38.2"F.R.P:-TUBE WELL NEARMATAJI {E74019'51.2"
TEMPLE IN KODASAR BIDAWATAN
LONGITUDE74°20'23.19"74°20'25.66"74°20'28.65"74°20'26.18"
LATITUDE27°44'38.72"27°44'40.65"27°44'39.43"27°44'37.49"
DISTANCE876.1170 Mts.
90.00 Mts.90.00 Mts.90.00 Mts.90.00 Mts.
BEARING89°15'43.82"
49°00'115°00'229°00'295°00'
TOABCDA
FROMF.R.PA8Co
APPLIED M.L. AREA :-0.7399 Hect.
Sig.of applicant
···e
.....
... ...,j
~--.-.-------"..-"-...~--.-..-..------.-.- ....-,~........----.---"~-.-..-~-...-..
,,/
....
///;'
..... ,...
~-~~$r: :!lC47U~: \\_q e~)f?-D16
~-!"ffiC6T4i1~4iI,( "4>T-;m::r, fqm, ~nrrf.rcm:r~<f;..rm
~ ~ ~~"4>T~nrr~~ ~-:i. ~
Cfiff4i'(1l1<f;-;m::r
lmR~ ~
3. 4. S. 6. 7. 8. 9. 10."=<..~'-n' & »< j' ~ U ~:) g_ 56-1'3 &0~{l-.{~ -'n .~ (_<C~(l/~~~((I'''L
( '.'), .. ,)i .•. -. / .___
. .
-)/
. t~lC'\' .
,.;.
11.
"1i+lIt'1'(1l1~~.nrr 'ffI'fu§r
13.12.
SIGNATURE OF APPLICANT
PLAN SHOWING APPLIED STP AREA FOR MINERAL MASONARY STONE NEAR VILLAGEBALERA TEHSIL SUJANGARH DIST. CHURUAPPLIED BY- MIS VIS INFRA SOLUTION LLPSTP NO- 05
SCALE:- 1CM = 40 MT.
B
c
D
TOTAL APPLIED AREA - 0.7399 HECT.
KEYPLAN~--------
N
Wzis'ES?f2
500 g 5;F 1:50000 30QO
PARTOFGTSHEETNO- 45 II5, 45 II6
27°45'
..• J< , ,.•.- ,
\ ape" Kr.,e, '\
1 }~. \"
STPNO. :-05NN:-BALERA
TEH:- SUJANGARH
D1ST:- CHURU
AREA:- 0.7399 HECT
MINERAL:- MASONSTONE ARY
SCALE:- ICM-- SOOMT
MIS VIS INFRASOLUTIONLLP
...'\1/. " I /"V .
... , "'\V
.. '. ~~.~..~.t-.....~
.~ ,..
;.I;.'\V
•
'''W'IXIW''W,... 2>W :
.IXIN.ass
.
"..,."'\V
.'0/.'.: "I;'\V
SN. PARTICULARS SYMBOL
ENVIRONMENT PLANN
~E..~
1, PERMIT BOUNDARY c::::J2. ALLUVIUM ........I
o3. 60 MT. ZONE
o4. 500 MT. ZONE
5, AGRICULTURELAND
PLATE NO.06
,,-
STPNO. :·05
NN:·BALERA
TEH:· SUJANGARHDlST:· CHURU
MIS VIS INFRASOLUTIONLLP
AREA:· 0.7399 HECT
MINERAL:·
MASONARYSTONESCALE:· 1CM~ SOMT
YEAR WISE WORKING PLANN
w$Esw SE
RF 1:200010 i 20 yo150W 125W WOW 75W 50W 25W
B50N
o 2. SECTION LINE3. PIT POSITIONAFTER 1STYEAR4. MASONARYSTONE
STPNO. :-05
NN:-BALERATEH:- SUJANGARH
DIST:- CHURU
AREA:- 0.7399 HECT
MINERAL:
MASONARY STONE
SCALE:- I CM= 20 MT
100mt
SCALEVERTICAL1CM=10MT IN SECTION
PLATE NO.OS
MIS VIS INFRASOLUTION LLP
INDEX
SURFACE PLANN
W~ES+ZRF 1:2000
2,0 0 30 1(0
150W 125W lOOW75W 50W' 25W~--~--~--~--~~--~--~50N
S.N.D
DESCRIPTION SYMBOL1.2.
PERMIT BOUNDARYALLUVIUM SAND
PLATE NO.03
STPNO. :-05
NN:-BALERA
TEH:- SUJANGARH
DIST:- CHURU
AREA:- 0.7399 HECT
MINERAL:
MASONARY STONE
SCALE:- 1CM= 20 MT
MIS VIS INFRASOLUTION LLP
150W 125W WOW 75W 50W 25W
B50N
INDEX
SURFACE GEOLOGICAL PLANN
W~ES+2
2. ALLUVIUMSOIL
4. SECTIONLINE
RF 1:20002~f~50..~3~o~~~......~yo
D
S.N. DESCRIPTION1. PERMITBOUNDARY
3. MASONARYSTONE
SYMBOL
SCALEVERTICAL1CM=10MTIN SECTION
80mt
STPNO. :-05
NN:-BALERA
TEH:- SUJANGARH
DIST:- CHURU
AREA:- 0.7399 HECT
MINERAL:
MASONARY STONE
SCALE:- 1CM= 20 MT
PLATE NO.04
MIS VIS INFRASOLUTION LLP
.. ::j,-. ~,!_'~::'.i.I:.....~~
150W 125W WOW 75W 50W 25WB/~
INDEX
CONCEPTUAL PLANN
W~ES+ZRF 1:2000
2~f~~Q.. ~20~~~~ .... ..;1fo
50N
~ 25N
V ~OONV / S.N. SYMBOLDESCRIPTION1.2.
PERMIT BOUNDARYALLUVIUM SAND
3. WATER RESERVOIR
PLATE NO.O?
STPNO. :-05
NN:-BALERA
TEH:- SUJANGARH
DIST:- CHURU
AREA:- 0.7399 HECT
MINERAL:
MASONARY STONE
SCALE:- 1CM= 20 MT
IA <; / 25Sr ~~
~ /
LICENSEE