GOVERNMENT OF ODISHA
DEPATMENT OF WATER RESOURCES
ANNUAL REPORT: 2017-18 OF
QUALITY CONTROL DIVISION, BHADRAK
MAY-2018
EXECUTIVE ENGINEER
QUALITY CONTROL DIVISION
BHADRAK
INTRODUCTION
The Quality Control Division, Bhadrak with Headquarter at Bhadrak was created
vide Govt. notification no. 5417 dtd. 27-02-2012 and started functioning in the year
2015 restructuring of Water Resources Department. This office is temporarily
functioning with FA/3(F type) quarter in 1st floor of block A having two rooms of size
about 10ft x 12ft in his office premises i.e. Salandi Canal Division, bypass, Bhadrak
and another two rooms near Mausima temple for function of office and QC
Laboratory of this newly created division respectively vide his office order no 6384
dtd 5.11.15. Above said allotted quarter is now functioning as office as well as store of
procured equipment. Some laboratory equipment’s have already procured for
function of QC laboratory. But till today no laboratory have functioned in allotted
rooms situated near temple due to non posting of Watchman-cum Sweeper and other
laboratory technicians by the Govt. for watch and ward point of view.
Jurisdiction of this Division
Jurisdiction of this division is as follows-
1. Aul Embankment Division, Aul
2. Drainage Division, Bhadrak
3. Markona Canal Division, Markona
4. Minor Irrigation Division, Anandapur
The work distribution of AEE(C) have been made as follows
1. Prasanna Kumar Dash, AEE(C)- i) Aul Embankment Division, Aul
ii) Markona Canal Division, Markona
2. Sumanta Kumar Madhei, AEE(C)- i) Drainage Division, Bhadrak
ii) Minor Irrigation Division, Anandapur
Inspection Vehicle
One number of inspection vehicle has been provided to this division on hiring basis for inspection of ongoing works of above four no’s Divisions.
The undersigned has been requested to the Director, Research and Quality
Control, Bhubaneswar to provide one more private vehicle on hiring basis to this Division.
PRESENT STAFF POSITION OF QUALITY CONTROL DIVISION,BHADRAK as on 31-03-2018
SI
No
Name of
Sanctioned Post
No
of
Posts
Name of Staff in Position
No
of
Staff
Vacant Remarks
GRADE -A
1 Executive
Engineer 1 ........................ Nil Vacant
EE,QCD,Baripada
Additional Charge
from dt.
31.01.2018
2 Asst. Executive
Engineer 1 Sri Prasanna Kumar Dash 1
Joined on
dt.20.06.2016
3 Asst. Executive
Engineer 1
Sri Sumanta Kumar
Madhei 1
Joined on
dt.16.06.2016
4 Asst. Executive
Engineer 1 ....................... Nil Vacant
GRADE-B
5 Asst. Engineer 1 ........................ Nil Vacant
6 Asst. Engineer 1 ........................ Nil Vacant
7 Junior Engineer 2 ........................ Nil Vacant
8 Embankment
Inspector 1 ........................ Nil Vacant
GRADE-C
9 Senior Clerk 1 Sri Himanshu Sekhar
Jena 1
Joined on
dt.13.02.2018.
Deputed to the
EE, Quality
Control Division,
Cuttack, Jobra.
10 Junior Clerk 2 ........................ Nil Vacant
11 Asst. Embankment
Inspector 1 ........................ Nil Vacant
12 Laboratory
Assistant 1 ........................ Nil Vacant
GRADE -D
13 Laboratory
Attendant 1 ........................ Nil Vacant
14 Peon 5 ........................ Nil Vacant
15 Night Watchman-
cum Sweeper 1 ........................ Nil Vacant
Total 21 3
Executive Engineer
Quality Control Division
Bhadrak
LIST OF WORKS VISITED BY QUALITY CONTROL INSPECTION AUTHORITIES
Name of the Division:-QUALITY CONTROL DIVISION,BHADRAK
SI
No
Date of
Visit
Name of
Inspecting
Authorities
Name of the
Division Name of the Work Agt. No.
Observation
&
Remarks
1 07.04.2017 Sri Sumanta
Kumar
Madhei,AEE
Drainage
Division,
Bhadrak
Improvement to D.C Kaudia and
It's link drain Bauri
nallah,Baligan
mahara,Kaharagahari to
Jadadhari near village
Panasapada,Nuagoan to
Sukeswar,Bauri nallah tail to
Kanigadia,Baitanallah to
Ghusuriganda,Thukur
mahara,chadheikhia nallah
(Tentulidihi),Charimania nallah
(Tentulidihi),Thukur
mahara(Thukur),Patanali(Bhuinb
ruti) including F.B.
28P1/2016-17 I. Foot Bridge-1
near Kandia
nallah
II. Foot Bridge-
2 over
Kahargauri
nallah III.
Foot Bridge-3
over Gadanali
nallah
IV. Foot
Bridge-4 near
village
Mulakaina
V. Foot Bridge-
5 near village
Baulajada
2 20.04.2017 Sri Sumanta
Kumar
Madhei,AEE
Drainage
Division,
Bhadrak
Improvement of Lunijore
(Mantei River to Khatua sahi
Sluice) and its link drain (Rout
sahi nallah,Anugrahapur to
Rampur and Batitangi nuanala
D.C) in Salandi Matei Doab No-
XII.
36P1/2016-17 I. Foot Bridge-1
II. Foot Bridge-
2 III.
Foot Bridge-3
IV. Foot
Bridge-4
V. Foot Bridge-
5
3 23.05.2017 Sri Sumanta
Kumar
Madhei,AEE
Drainage
Division,
Bhadrak
Construction of Foot Bridge over
Nuanai near village Chhatrapada
Lenkasahi of Rajnagar G.P
146P1/2016-
17
I. Deck slab of
F.B was in
progess.
II.Gradation of
C.A & F.A and
Slump test
conducted at
site and found
satisfactory.
III.Curing
should be
continuous in
lieu of
intrmittent
curing.
4 27.05.2017 Sri Sumanta
Kumar
Madhei,AEE
Drainage
Division,
Bhadrak
Improvement to Kansanbansa
Drainage Channel from Dungura
to Kharasapur in Doab No-XI.
(Part-B Structural Worka only)
90P1/2016-17 I. Deck slab of
F.B was in
progess.
II.Gradation of
C.A & F.A and
Slump test
conducted at
site and found
satisfactory.
III.Curing
should be
continuous in
lieu of
intrmittent
curing.
5 30.05.2017 Sri Prasanna
Ku. Dash
(AEE)
Aul
Embankment
Division, Aul
Protection to scoured bank to
Gabindapur, Madhuban RD7.580
to 7.720 Km.
72P1/2016-17 Stone dumping
work is under
progress and
needs replace of
skin surface
stone by good
one. Interstics
should be filled
up properly
Creek irrigation to Aul Block
and construction of sluice at
Arjunpur on Kani Kharasuan
right embankment
MOU/04/
2013-14
D/S floor work
is under
progress and
advise next time
test of sample to
be dene on
Govt. laboratory
6 01.06.2017 Sri Sumanta
Kumar
Madhei,AEE
M.I.Division,
Anandapur
Checkdam Paravadi (Nayaksahi)
over Sita Nallah near village
Khantaghar in Ghatagoan Block
for the year 2016-17.
101P1/2016-
17
At the time of
inspection, no
work was going
at site.
Gradation for
C.A & F.A done
and found
satisfactory
results and
instructed to
continuous
curing of
structure.
Checkdam Mudraveda-II over
Baladapada nallah near vuillage
Mudraveda in Ghatagoan Block
for the year 2016-17.
106P1/2016-
17
At the time of
inspection, Left
side Abutment
wall casting was
under progress.
Instructed to
continuous
curing of
structure.
Checkdam Sanajiali over Budhi
nallah near village Jhadapokhar
in Ghatagoan Block for the year
2016-17.
132P1/2016-
17
At the time of
inspection, Left
side Abutment
foundation
excavation was
under progress.
On Physical eye
observation
materials were
satisfactory.
Checkdam Joguiadhara over
Jaunria nallah near village
Nuagoan in Harichandanpur
Block for the year 2016-17.
130P1/2016-
17
The CC work
and stone
pitching work
completed in
full shape
except turfing
work. Instructed
to complete
turfing work
before rainy
season.
Checkdam Bahabal-5 over
Remala nallah near village
Hyarpur in Harichandanpur
Block for the year 2016-17.
102P1/2016-
17
The CC work
completed in
full shape
except stone
pitching and
turfing work.
Instructed to
complete turfing
and stone
pitching work.
before rainy
season
7 01.06.2017 Sri Prasanna
Ku. Dash
(AEE)
Aul
Embankment
Division, Aul
Protection to scoured bank to
Gabindapur Hadua TRE near
Madhubana (2 nos of spur)
92P1/2016-17
Nil
Protection to scoured bank on
OAE 9B near Hinjal Dhoba RD
6.4 to 6.5 Km.
37P1/2016-17 Site order book
& activity log
book should be
available at site.
8 02.06.2017 Sri Sumanta
Kumar
Madhei,AEE
M.I.Division,
Anandapur
Checkdam Juanga sahi over
Kusei nallah near village
Budhipada in Harichandanpur
for the year 2016-17.
126P1/2016-
17
During
inspection, no
work was going
on at site.1st,
2nd and 3rd
cut
off completed.
Materials
collection was
under progress.
Checkdam Kusei-5 over Kusei
nallah near village Budhipada in
Harichandanpur Block for the
year 2016-17.
69P1/2016-17 The CC work
and stone
pitching work
completed in
full shape
except turfing
work. Instructed
to complete
turfing work
before rainy
season.
9 02.06.2017 Sri Prasanna
Ku. Dash
(AEE)
Aul
Embankment
Division, Aul
Protection to scoured bank near
village Jamudanda on K.K of
Koldhia G.P.
59P1/2016-17 Stone Interstices
should be main
properly
Protection to scoured bank near
villageTunga RD 17.900 to
17.960 Km.
45P1/2016-17
Nil
10 07.06.2017 Sri Sumanta
Kumar
Madhei,AEE
Drainage
Division,
Bhadrak
Improvement to D.C from Bada
Haripur to Begunia via Uttukuda
and it's link, Uttukuda to
Mruganayani via Biswali,Singiti
matha to Dian nallah via Orasahi
Red Cross Chamber,Bijaynagar
to Kusuma,Improvement to
Gaibata nallah,Gihiri
nallah,Thakura nallah
(Radhakrushna nallah ),Guja
nallah link drain to Pithia
send,BamamatiGohiri,Brahmani
Pokhari tio Banamati Gohiri and
Construction of VRBs on
Bijaynagar G.P,Orasahi
G.P,Uttukuda G.P.
95P1/2016-17 I. Deck slab of
F.B was in
progess.
II.Gradation of
C.A & F.A and
Slump test
conducted at
site and found
satisfactory.
III.Curing
should be
continuous in
lieu of
intrmittent
curing.
11 22.06.2017 Sri Sumanta
Kumar
Madhei,AEE
M.I.Division,
Anandapur
Checkdam Ganda-7 over Ganda
nallah near village Nanikabahali
under Ghasipura Block for the
year 2016-17.
108P1/2016-
17
During
inspection,
Right side
protection wall
concreting was
under progress.
Instructed to use
needle vibrator.
Before centring
work started
shuttering oil
should use on
plate for smooth
surface of CC
work
12 29.06.2017 Sri Prasanna
Ku. Dash
(AEE)
Aul
Embankment
Division, Aul
Bank protection work to scoured
bank at Bania RD 0 to 500 m.
91P1/2016-17 Stone dumping
work is under
progress
Improvement to Bagi
embankment RD 13 to 16 Km.
85P1/2016-17 Nil
Construction of Chhamania
sluice on Deuli- Bajarpur near
Upuli village.
108P1/2016-
17
Work is at
initial stage,
earth work is
under progress
13 04.07.2017 Sri Sumanta
Ku. Madhei
(AEE) along
with Sri B.C.
Panda(EE)
Drainage
Division,
Bhadrak
Improvement to Kandia
D.C,Kandia nallah,Balichatri
nallah and it's link drains under
Salandi-Baitarani Doab No.XIII.
84P1/2016-17 Foot Bridge
near Baharbil
(Intensive work)
14 08.12.2017 Sri Sumanta
Kumar
Madhei,AEE
M.I.Division,
Anandapur
Check Dam Ghagara -1 over
Ghagara nallah near village
Kantipal in Anandapur Block for
the Year 2016-17.
115P1/2016-
17
During
inspection, no
work was going
on.
Reinforcement
binding was
done for skin
concrete on
body wall.
Check Dam Taneipal-2 over
Dhodhoya nallah near village
Taneipal in Anandapur Block
for the Year 2016-17.
117P1/2016-
17
At the time of
inspection, PCC
casting was
going on Left
Abutment area,
Materials
stacked at site
were
satisfactory.
15 20.12.2017 Sri Prasanna
Ku. Dash
(AEE)
Aul
Embankment
Division, Aul
Creek irrigation to Aul Block
and construction of sluice at
Arjunpur on Kani Kharasuan
right embankment (RIDF-XVIII)
MOU/04/
2013-14
Nil
Raising and strengthening of
Alapua and Bidurpa on
Brahmani left.
53P1/2017-18 Road widening
work is under
progress and
advise to
maintain QC
register
16 19.01.2018 Sri Sumanta
Kumar
Madhei,AEE
M.I.Division,
Anandapur
Improvement of Gonda M.I.P
under C.L.S.R.P grant, Canal
lining in Ghasipura Block for the
year 2017-18.
80P1/2017-18
&81P1/2017-
18
At the time of
inspection,
Canal lining
work was under
progress. Slump
tested at site and
instructed to use
rigid shuttering
work
17 16.02.2018 Sri Sumanta
Ku. Madhei
(AEE) along
with Sri P.K.
Pradhan (EE)
Drainage
Division,
Bhadrak
Improvement of Storm water
Drainage Channel NH-5 to
Salandi River and Neheru
Stadium to Bonth
Chhak,Apartibindha Elkha to
Satabhauni nallah,From
Dagamunda to NH-5,Kalimandir
to Rajghat,Baudpur to
Dagamunda,Sahapur to Motel
chhak in Bhadrak municipality in
Salandi-Baitarani Doab No.XIII.
91P1/2015-16 I.At the time of
inspection,no
work was going.
II.Works are at
finishing
stage,instructed
to maintainthe
record
henceforth with
detail.
II. Improvement to Drainage
Channel from Charampa I.T.I to
kadagambhir village,DC from
kadabaranga nallah to
khattagodia and construction of
Foot Bridge,D.C from
Khandakati sluice to Nimagohiri
nallah and construction of Foot
Bridge,D.C from Khandakati
nallah to SAnkhari
nallah,Renovation of matia
nallah and construction of Foot
Bridge at Haripur(in
Chandigoan,Sabaranga)
103P1/2016-
17
I. D/S protection
wall centering
was in progress.
II. U/S
protection wall
have completed
shortly which
needs curing
with gunny bags
frequently. III.
Finishing of
Bridge portion
has completed.
18 26.02.2018 Sri Prasanna
Ku. Dash
(AEE)
Aul
Embankment
Division, Aul
Construction of drainage sluice
at Bagapatia saline embankment
RD 750m.
Earth
excavation work
has already been
completed and
advise to
maintain
register
regarding
Quality Control
aspects.
Protection to scoured bank of
river Patasala left near village
Junagadi
14P1/2017-18 Stone dumping
work is under
progress
protection to scoured bank on
river Brahmani right near village
dakhinabeda RD 2025 to 2565
m.
65P1/2016-17 Stone dumping
work is under
progress and
interstics should
be minimized
by proper
packing.
19 07.03.2018 Sri Sumanta
Kumar
Madhei,AEE
M.I.Division,
Anandapur
Restoration of Lost Ayacut of
Sapua M.I.P (Main Canal) in
Harichandanpur Block for the
Year 2017-18.
50P1/2017-
18.
During
inspection,
Main canal wall
shuttering work
was under
progress.
Instructed to
maintain clear
cover and
before casting
bottom of the
bed should be
clear and clean.
Check Dam Lukuna over Gobara
nallah near village MohulMunda
in Harichandanpur Block for the
year 2017-18.
62P1/2017-
18.
During
Inspection,
Body wall
casting was
under progress
and cube taken
for testing and
instructed to use
Rigid
shuttering.
Check Dam Raidala over Gobara
nallah near village Mohul Munda
in Harichandanpur Block for the
year 2017-18.
58P1/2017-
18.
At the time of
inspection, no
work was going
on. Encasing
reinf. For
wearing coat
was laying and
binding work
completed.
Instructed to
clear the area
before casting.
20 08.03.2018 Sri Sumanta
Kumar
Madhei,AEE
M.I.Division,
Anandapur
Restoration of Lost Ayacut of
Kureijodi M.I.P (From RD.
482m to 2500m and RD. 4750m
to 5790m of Main Canal) in
Harichandanpur Block for the
year 2017-18.
53P1/2017-18 At the time of
inspection, no
work was going
on except
excavation of
canal bed and
side area.
Check Dam Nuagoan over local
nallah near village Nuagoan in
Ghatagoan Block for the year
2017-18.
65P1/2017-
18.
The CC work
completed in
full shape
except stone
pitching and
turfing work.
Instructed to
complete turfing
and stone
pitching work.
before rainy
season
21 20.03.2018 Sri Prasanna
Ku. Dash
(AEE) along
with Sri P.K.
Pradhan (EE)
Aul
Embankment
Division, Aul
Protection to scoured bank of
Jamboo Baulakani
Mahakalapada chhapali saline
gherry.
01P1/17-18 Test of stone
should be done
in Govt.
laboratory and
interstices
should be filled
up properly with
required stone.
Akhadasahi creek irrigation
project.
1417 F2/13-
14
Honey combs of
sluice needs
rectification
LIST OF WORKS VISITED BY QUALITY CONTROL INSPECTION AUTHORITIES
(HIGHER AUTHORITIES/SQM)
Name of the Division:-QUALITY CONTROL DIVISION,BHADRAK
SI
No
Date of
Visit
Name of
Inspecting
Authorities
Name of the
Division Name of the Work Agt. No.
Observation
&
Remarks
1 26.04.2017 Sri N.N.
Nayak,
Director,
R &
QC,BBSR
M.I.Division,
Anandapur
Check Dam Toradia -I over
Toradia nallah near village
Gorirabani in Anadapur Block for
the Year 2016-17.
118P1/2016-
17
I.At the time of
inspection,no
work was going.
II. The CC work
of Check Dam
completed in full
shape except earth
work and
pitching.
III.Plastering over
concrete is to be
strictly avoided.
Check Dam Toradia -II over
Toradia nallah near village
Beladihi in Anadapur Block for
the Year 2016-17.
110P1/2016-
17
I.At the time of
inspection,no
work was going.
II.Plastering over
concrete is to be
strictly avoided.
III.Curing should
be continuous in
lieu of intrmittent
curing.
Check Dam Toradia -III over
Toradia nallah near village
Belabandha in Anadapur Block
for the Year 2016-17.
121P1/2016-
17
I.At the time of
inspection,no
work was going
on at site except
centering and
shuttering of left
Abutment wall at
RL 101.20mtr.
II.The old
shuttering plate
should be
replaced.
III.Plastering over
concrete is to be
strictly avoided.
2 Drainage
Division,
Bhadrak
Improvement of Genguti D.C
from village Jahagir to
Khadimahara from RD. 31.75
KM to 12.60KM in Damnagar
Block of Bhadrak District in
Baitatrani Doab No. XIII under
NABARD assistance(RIDF-XIX).
I.At the time of
inspection,no
work was going.
II. The Bridge has
already been
completed in all
respect. III.A
good no. of stones
have been used in
stone packing
work at u/s & d/s
of bridge which
should be
replaced
immediately. IV.
The excavated
earth is to be
dress properly in
design profile.
3 09.05.2017 Mr. K.K.
Khandai SQM
Aul
Embankment
Division, Aul
Creek irrigation of Aul block &
construction of sluice at Arjunpur
Kani-Kharasuan embankment
MOU/04/20
13-14
Compressive
strength of
concrete has been
tested by S.G.
Engg and some
cubes has been
sent to QC Div,
Cuttack
Protection to Brahmani left at
Khudipatna & Koladiha near
Ekamania and construction of 4
nos of sluice over Bankeswar
Atlao under NABARD assitance
133p1/2015-
16
Hard granite stone
boulder tested by
EE, QC Division,
Cuttack & Quality
of work seems to
be good.
4 10.05.2017 Mr. K.K.
Khandai SQM
Aul
Embankment
Division, Aul
Improvement to aul ring bundha
under IRC & IC
72P1/2015-
16
The road
materials have
been tested by Sai
consultants,
BBSR. Further
testing of road
materials sent to
EE, QC
Division,Cuttack.
Bank protection to old Marahata
bundh near Gokha sahi & jena
sahi.
2016/17 The stone boulder
have been tested
by SG
Engg,BBSR &
Quality of works
seems to be good
Restoration to Bagi embankment
near Chhadesh school & Olavara
sluice
62P1/2016-
17
The stone
materials and
borrow earth have
been tested by SG
Engg,BBSR & all
QC staffs
supervise the
work regulraly.
5 11.05.2017 Mr. K.K.
Khandai SQM
Aul
Embankment
Division, Aul
Protection to scoured bank on
Brahmani right near Dakhinbeda
under NABARD Assitance.
65P1/2016-
17
Dumping work is
in progress and
sample has been
sent to QC
Division, Cuttack.
Quality of work
seems good
Improvement to road on
Dangamal dalkhai with cons. Of 2
nos of sluiceunder IRC & IS.
04P1/16-17 Top of toe wall
should be kept at
one level and
protection
measure should
be taken for
protecting the
earth on the
Bhitarakanika
National park side
which has scoured
at places.
Construction of protection
measure on sea bed in front of
geo-textile tube embankment near
Pentha.
25P1/2016-
17
Stone has been
tested by SG
Engg & Sova
Consultant, BBSR
& sample has also
been sent to QC
division,Cuttack
Protection to scoured bank on
river Hansua right near village
Badakote under NABARD
Assitance.
54P1/2016-
17
Dumping work is
in progress and
sample has been
sent to QC
Division, Cuttack
6 16.05.2017 Mr.
K.K.Mahanty
SQM
M.I.Division
Anandapur
Check DamNuamalia over local
nallah near village Nuamalia in
Ghasipura Block for the year
2016-17.
98P1/2016-
17
I.Advised to be
careful during
shuttering
work,so that wall
surface will be
smooth without
bulging and
honeycombs.
II.O.K card to be
maintained.
Check Dam Ganda-6 overGonda
nallah near village Gudiadiha in
Ghasipura Block for the year
2016-17.
100P1/2016-
17
I.Advised to be
careful during
shuttering
work,so that wall
surface will be
smooth without
bulging and
honeycombs.
II.O.K card to be
maintained.
Check Dam Kanpur-3 over
Kundi nallah near village Kanpur
in Ghasipura Block for the year
2016-17.
61P1/2016-
17
I.Advised to be
careful during
shuttering
work,so that wall
surface will be
smooth without
bulging and
honeycombs.
II.O.K card to be
maintained.
7 13.12.2017 Mr. T.B.Das
SQM
M.I.Division
Anandapur
Check Dam Charikiari over local
nallah near villageMakasakila in
Harichandanpur Block for the
year 2017-18.
64P1/2017-
18
Quality of
Concrete was
good. Gradation
of C.A & F.A
conducted at site
and found
satisfactory.
Improvement to Sapua M.I.P
(Branch Canal) under Critical
Grant in Harichandanpur Block
for the Year 2017-18.
52P1/2017-
18
Nil
8 21.03.2018 Mr.
K.KMohanty
SQM
M.I.Division
Anandapur
Check Dam Santiahudi over local
nallah near village Bhuka(Line
sahi) in Harichandanpur Block
for the year 2017-18.
47P1/2017-
18
At the time of
Inspection, no
work was going
on. The CC work
was completed.
Check Dam Jhuliani over local
nallah near village Bhuka in
Harichandanpur Block for the
year 2017-18.
48P1/2017-
18
Nil
Check Dam Gelhamunda over
Gobara nallah in Harichandanpur
Block for the year 2017-18.
45P1/2017-
18
At the time of
Inspection, no
work was going
on. The CC work
was completed
Check Dam Baldia over Gobara
nallah near village Bailobeda in
Harichandanpur Block for the
year 2017-18.
31P1/2017-
18
Nil
Check Dam Beganabahal over
Gobara nallah near village
Bailobeda in Harichandanpur
Block for the year 2017-18.
54P1/2017-
18.
Nil
9 22.03.2018 Mr.K.K.Moha
nty SQM
M.I.Division
Anandapur
Check Dam Nuagoan over local
nallah near village Nuagoan in
Ghatagoan Block for the year
2017-18.
65P1/2017-
18.
At the time of
Inspection, no
work was going
on. The CC work
was completed
Check Dam Marsapal -II over
Muhan nallah near village
Marsapal in Anandapur Block for
the year 2017-18.
107P1/2017-
18.
Nil
Check Dam Kendudiha over
Muhan nallah in Anandapur
Block for the year 2017-18.
42P1/2017-
18.
Nil
Improvement of Gonda M.I.P
under C.L.S.R.P grant, Canal
lining in Ghasipura Block for the
year 2017-18.
80P1/2017-
18
&81P1/2017
-18
Provide weep
hole on regular
interval. Curing
should be
continuous.
PHOTO GALLERY
I) State Quality Monitor (SQM) and Higher Authority inspection report.
ii) Attached photos were taken during inspection with SQM, Higher Authority
and Individually.
Name of work: “Check dam Taradia III in Golabandha under Anandapur block for
2016-17” on dtd 26.04.2017 inspected by Director, R&QC, BBSR.
Name of work: “Renovation of Genguti Drainage channel Jahangir to Khadimahara in Dhamnagar block
Bhadrak 2015-16” on dtd 26.04.2017 inspected by Director, R&QC, BBSR.
Name of work: “Creek irrigation of Aul block & construction of sluice at Arjunpurm Kani-Kharasuan
embankment” on dtd 09.05.2017 inspected by K.K.Khandai, SQM.
Name of work:” Check Dam Kanpur-3 over Kundi nallah near village Kanpur in Ghasipura
Block for the year 2016-17” on dtd 16.05.17 inspected by K.K.Mohanty, SQM
Name of work: “Protection to scoured bank to Gabindapur Hadua TRE near Madhubana (2 nos of spur) for
2016-17” on dtd 01.06.2017 inspected by P.K.Dash, AEE, QCD, Bhadrak.
Name of work: “Check dam Juanga sahi over Kusei nallah near village Budhipada in Harichandanpur for the
year 2016-17” on dtd 02.06.2017 inspected by S.K.Madhei, AEE,QCD, Bhadrak
Name of work: “Improvement to Kandia D.C,Kandia nallah,Balichatri nallah and its link drains under
Salandi-Baitarani Doab No.XIII” on dtd 4.07.17 inspected by B.C.Panda, EE,QCD, Bhadrak
Name of work: “Check Dam Charikiari over local nallah near villageMakasakila in Harichandanpur Block
for the year 2017-18.” On dtd 13.12.2017 inspected by T.B.Das, SQM.
Name of work: “Improvement to Drainage Channel from Charampa I.T.I to kadagambhir village,DC from
kadabaranga nallah to khattagodia and construction of Foot Bridge,D.C from Khandakati sluice to
Nimagohiri nallah and construction of Foot Bridge,D.C from Khandakati nallah to SAnkhari
nallah,Renovation of matia nallah and construction of Foot Bridge at Haripur(in Chandigoan,Sabaranga) for
year 2016-17” on dtd 16.02.18 inspected by P.K.Pradhan, EE, QCD, Bhadrak.
Name of work: “Improvement of Gonda M.I.P under C.L.S.R.P grant, Canal lining in Ghasipura Block for
the year 2017-18” on dtd inspected by K.K.Mohanty, SQM