GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES ANNUAL REPORT: 2017-18 OF QUALITY CONTROL DIVISION, BHADRAK MAY-2018 EXECUTIVE ENGINEER QUALITY CONTROL DIVISION BHADRAK

Upload: others

Post on 11-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

GOVERNMENT OF ODISHA

DEPATMENT OF WATER RESOURCES

ANNUAL REPORT: 2017-18 OF

QUALITY CONTROL DIVISION, BHADRAK

MAY-2018

EXECUTIVE ENGINEER

QUALITY CONTROL DIVISION

BHADRAK

Page 2: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

INTRODUCTION

The Quality Control Division, Bhadrak with Headquarter at Bhadrak was created

vide Govt. notification no. 5417 dtd. 27-02-2012 and started functioning in the year

2015 restructuring of Water Resources Department. This office is temporarily

functioning with FA/3(F type) quarter in 1st floor of block A having two rooms of size

about 10ft x 12ft in his office premises i.e. Salandi Canal Division, bypass, Bhadrak

and another two rooms near Mausima temple for function of office and QC

Laboratory of this newly created division respectively vide his office order no 6384

dtd 5.11.15. Above said allotted quarter is now functioning as office as well as store of

procured equipment. Some laboratory equipment’s have already procured for

function of QC laboratory. But till today no laboratory have functioned in allotted

rooms situated near temple due to non posting of Watchman-cum Sweeper and other

laboratory technicians by the Govt. for watch and ward point of view.

Jurisdiction of this Division

Jurisdiction of this division is as follows-

1. Aul Embankment Division, Aul

2. Drainage Division, Bhadrak

3. Markona Canal Division, Markona

4. Minor Irrigation Division, Anandapur

The work distribution of AEE(C) have been made as follows

1. Prasanna Kumar Dash, AEE(C)- i) Aul Embankment Division, Aul

ii) Markona Canal Division, Markona

2. Sumanta Kumar Madhei, AEE(C)- i) Drainage Division, Bhadrak

ii) Minor Irrigation Division, Anandapur

Inspection Vehicle

One number of inspection vehicle has been provided to this division on hiring basis for inspection of ongoing works of above four no’s Divisions.

The undersigned has been requested to the Director, Research and Quality

Control, Bhubaneswar to provide one more private vehicle on hiring basis to this Division.

Page 3: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

PRESENT STAFF POSITION OF QUALITY CONTROL DIVISION,BHADRAK as on 31-03-2018

SI

No

Name of

Sanctioned Post

No

of

Posts

Name of Staff in Position

No

of

Staff

Vacant Remarks

GRADE -A

1 Executive

Engineer 1 ........................ Nil Vacant

EE,QCD,Baripada

Additional Charge

from dt.

31.01.2018

2 Asst. Executive

Engineer 1 Sri Prasanna Kumar Dash 1

Joined on

dt.20.06.2016

3 Asst. Executive

Engineer 1

Sri Sumanta Kumar

Madhei 1

Joined on

dt.16.06.2016

4 Asst. Executive

Engineer 1 ....................... Nil Vacant

GRADE-B

5 Asst. Engineer 1 ........................ Nil Vacant

6 Asst. Engineer 1 ........................ Nil Vacant

7 Junior Engineer 2 ........................ Nil Vacant

8 Embankment

Inspector 1 ........................ Nil Vacant

GRADE-C

9 Senior Clerk 1 Sri Himanshu Sekhar

Jena 1

Joined on

dt.13.02.2018.

Deputed to the

EE, Quality

Control Division,

Cuttack, Jobra.

10 Junior Clerk 2 ........................ Nil Vacant

11 Asst. Embankment

Inspector 1 ........................ Nil Vacant

12 Laboratory

Assistant 1 ........................ Nil Vacant

GRADE -D

13 Laboratory

Attendant 1 ........................ Nil Vacant

14 Peon 5 ........................ Nil Vacant

15 Night Watchman-

cum Sweeper 1 ........................ Nil Vacant

Total 21 3

Executive Engineer

Quality Control Division

Bhadrak

Page 4: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

LIST OF WORKS VISITED BY QUALITY CONTROL INSPECTION AUTHORITIES

Name of the Division:-QUALITY CONTROL DIVISION,BHADRAK

SI

No

Date of

Visit

Name of

Inspecting

Authorities

Name of the

Division Name of the Work Agt. No.

Observation

&

Remarks

1 07.04.2017 Sri Sumanta

Kumar

Madhei,AEE

Drainage

Division,

Bhadrak

Improvement to D.C Kaudia and

It's link drain Bauri

nallah,Baligan

mahara,Kaharagahari to

Jadadhari near village

Panasapada,Nuagoan to

Sukeswar,Bauri nallah tail to

Kanigadia,Baitanallah to

Ghusuriganda,Thukur

mahara,chadheikhia nallah

(Tentulidihi),Charimania nallah

(Tentulidihi),Thukur

mahara(Thukur),Patanali(Bhuinb

ruti) including F.B.

28P1/2016-17 I. Foot Bridge-1

near Kandia

nallah

II. Foot Bridge-

2 over

Kahargauri

nallah III.

Foot Bridge-3

over Gadanali

nallah

IV. Foot

Bridge-4 near

village

Mulakaina

V. Foot Bridge-

5 near village

Baulajada

2 20.04.2017 Sri Sumanta

Kumar

Madhei,AEE

Drainage

Division,

Bhadrak

Improvement of Lunijore

(Mantei River to Khatua sahi

Sluice) and its link drain (Rout

sahi nallah,Anugrahapur to

Rampur and Batitangi nuanala

D.C) in Salandi Matei Doab No-

XII.

36P1/2016-17 I. Foot Bridge-1

II. Foot Bridge-

2 III.

Foot Bridge-3

IV. Foot

Bridge-4

V. Foot Bridge-

5

3 23.05.2017 Sri Sumanta

Kumar

Madhei,AEE

Drainage

Division,

Bhadrak

Construction of Foot Bridge over

Nuanai near village Chhatrapada

Lenkasahi of Rajnagar G.P

146P1/2016-

17

I. Deck slab of

F.B was in

progess.

II.Gradation of

C.A & F.A and

Slump test

conducted at

site and found

satisfactory.

III.Curing

should be

continuous in

lieu of

intrmittent

curing.

4 27.05.2017 Sri Sumanta

Kumar

Madhei,AEE

Drainage

Division,

Bhadrak

Improvement to Kansanbansa

Drainage Channel from Dungura

to Kharasapur in Doab No-XI.

(Part-B Structural Worka only)

90P1/2016-17 I. Deck slab of

F.B was in

progess.

II.Gradation of

C.A & F.A and

Slump test

conducted at

site and found

satisfactory.

III.Curing

should be

continuous in

lieu of

intrmittent

curing.

Page 5: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

5 30.05.2017 Sri Prasanna

Ku. Dash

(AEE)

Aul

Embankment

Division, Aul

Protection to scoured bank to

Gabindapur, Madhuban RD7.580

to 7.720 Km.

72P1/2016-17 Stone dumping

work is under

progress and

needs replace of

skin surface

stone by good

one. Interstics

should be filled

up properly

Creek irrigation to Aul Block

and construction of sluice at

Arjunpur on Kani Kharasuan

right embankment

MOU/04/

2013-14

D/S floor work

is under

progress and

advise next time

test of sample to

be dene on

Govt. laboratory

6 01.06.2017 Sri Sumanta

Kumar

Madhei,AEE

M.I.Division,

Anandapur

Checkdam Paravadi (Nayaksahi)

over Sita Nallah near village

Khantaghar in Ghatagoan Block

for the year 2016-17.

101P1/2016-

17

At the time of

inspection, no

work was going

at site.

Gradation for

C.A & F.A done

and found

satisfactory

results and

instructed to

continuous

curing of

structure.

Checkdam Mudraveda-II over

Baladapada nallah near vuillage

Mudraveda in Ghatagoan Block

for the year 2016-17.

106P1/2016-

17

At the time of

inspection, Left

side Abutment

wall casting was

under progress.

Instructed to

continuous

curing of

structure.

Checkdam Sanajiali over Budhi

nallah near village Jhadapokhar

in Ghatagoan Block for the year

2016-17.

132P1/2016-

17

At the time of

inspection, Left

side Abutment

foundation

excavation was

under progress.

On Physical eye

observation

materials were

satisfactory.

Checkdam Joguiadhara over

Jaunria nallah near village

Nuagoan in Harichandanpur

Block for the year 2016-17.

130P1/2016-

17

The CC work

and stone

pitching work

completed in

full shape

except turfing

work. Instructed

to complete

turfing work

before rainy

season.

Checkdam Bahabal-5 over

Remala nallah near village

Hyarpur in Harichandanpur

Block for the year 2016-17.

102P1/2016-

17

The CC work

completed in

full shape

except stone

pitching and

turfing work.

Instructed to

complete turfing

Page 6: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

and stone

pitching work.

before rainy

season

7 01.06.2017 Sri Prasanna

Ku. Dash

(AEE)

Aul

Embankment

Division, Aul

Protection to scoured bank to

Gabindapur Hadua TRE near

Madhubana (2 nos of spur)

92P1/2016-17

Nil

Protection to scoured bank on

OAE 9B near Hinjal Dhoba RD

6.4 to 6.5 Km.

37P1/2016-17 Site order book

& activity log

book should be

available at site.

8 02.06.2017 Sri Sumanta

Kumar

Madhei,AEE

M.I.Division,

Anandapur

Checkdam Juanga sahi over

Kusei nallah near village

Budhipada in Harichandanpur

for the year 2016-17.

126P1/2016-

17

During

inspection, no

work was going

on at site.1st,

2nd and 3rd

cut

off completed.

Materials

collection was

under progress.

Checkdam Kusei-5 over Kusei

nallah near village Budhipada in

Harichandanpur Block for the

year 2016-17.

69P1/2016-17 The CC work

and stone

pitching work

completed in

full shape

except turfing

work. Instructed

to complete

turfing work

before rainy

season.

9 02.06.2017 Sri Prasanna

Ku. Dash

(AEE)

Aul

Embankment

Division, Aul

Protection to scoured bank near

village Jamudanda on K.K of

Koldhia G.P.

59P1/2016-17 Stone Interstices

should be main

properly

Protection to scoured bank near

villageTunga RD 17.900 to

17.960 Km.

45P1/2016-17

Nil

10 07.06.2017 Sri Sumanta

Kumar

Madhei,AEE

Drainage

Division,

Bhadrak

Improvement to D.C from Bada

Haripur to Begunia via Uttukuda

and it's link, Uttukuda to

Mruganayani via Biswali,Singiti

matha to Dian nallah via Orasahi

Red Cross Chamber,Bijaynagar

to Kusuma,Improvement to

Gaibata nallah,Gihiri

nallah,Thakura nallah

(Radhakrushna nallah ),Guja

nallah link drain to Pithia

send,BamamatiGohiri,Brahmani

Pokhari tio Banamati Gohiri and

Construction of VRBs on

Bijaynagar G.P,Orasahi

G.P,Uttukuda G.P.

95P1/2016-17 I. Deck slab of

F.B was in

progess.

II.Gradation of

C.A & F.A and

Slump test

conducted at

site and found

satisfactory.

III.Curing

should be

continuous in

lieu of

intrmittent

curing.

11 22.06.2017 Sri Sumanta

Kumar

Madhei,AEE

M.I.Division,

Anandapur

Checkdam Ganda-7 over Ganda

nallah near village Nanikabahali

under Ghasipura Block for the

year 2016-17.

108P1/2016-

17

During

inspection,

Right side

protection wall

concreting was

Page 7: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

under progress.

Instructed to use

needle vibrator.

Before centring

work started

shuttering oil

should use on

plate for smooth

surface of CC

work

12 29.06.2017 Sri Prasanna

Ku. Dash

(AEE)

Aul

Embankment

Division, Aul

Bank protection work to scoured

bank at Bania RD 0 to 500 m.

91P1/2016-17 Stone dumping

work is under

progress

Improvement to Bagi

embankment RD 13 to 16 Km.

85P1/2016-17 Nil

Construction of Chhamania

sluice on Deuli- Bajarpur near

Upuli village.

108P1/2016-

17

Work is at

initial stage,

earth work is

under progress

13 04.07.2017 Sri Sumanta

Ku. Madhei

(AEE) along

with Sri B.C.

Panda(EE)

Drainage

Division,

Bhadrak

Improvement to Kandia

D.C,Kandia nallah,Balichatri

nallah and it's link drains under

Salandi-Baitarani Doab No.XIII.

84P1/2016-17 Foot Bridge

near Baharbil

(Intensive work)

14 08.12.2017 Sri Sumanta

Kumar

Madhei,AEE

M.I.Division,

Anandapur

Check Dam Ghagara -1 over

Ghagara nallah near village

Kantipal in Anandapur Block for

the Year 2016-17.

115P1/2016-

17

During

inspection, no

work was going

on.

Reinforcement

binding was

done for skin

concrete on

body wall.

Check Dam Taneipal-2 over

Dhodhoya nallah near village

Taneipal in Anandapur Block

for the Year 2016-17.

117P1/2016-

17

At the time of

inspection, PCC

casting was

going on Left

Abutment area,

Materials

stacked at site

were

satisfactory.

15 20.12.2017 Sri Prasanna

Ku. Dash

(AEE)

Aul

Embankment

Division, Aul

Creek irrigation to Aul Block

and construction of sluice at

Arjunpur on Kani Kharasuan

right embankment (RIDF-XVIII)

MOU/04/

2013-14

Nil

Raising and strengthening of

Alapua and Bidurpa on

Brahmani left.

53P1/2017-18 Road widening

work is under

progress and

advise to

maintain QC

register

16 19.01.2018 Sri Sumanta

Kumar

Madhei,AEE

M.I.Division,

Anandapur

Improvement of Gonda M.I.P

under C.L.S.R.P grant, Canal

lining in Ghasipura Block for the

year 2017-18.

80P1/2017-18

&81P1/2017-

18

At the time of

inspection,

Canal lining

work was under

progress. Slump

tested at site and

instructed to use

rigid shuttering

work

Page 8: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

17 16.02.2018 Sri Sumanta

Ku. Madhei

(AEE) along

with Sri P.K.

Pradhan (EE)

Drainage

Division,

Bhadrak

Improvement of Storm water

Drainage Channel NH-5 to

Salandi River and Neheru

Stadium to Bonth

Chhak,Apartibindha Elkha to

Satabhauni nallah,From

Dagamunda to NH-5,Kalimandir

to Rajghat,Baudpur to

Dagamunda,Sahapur to Motel

chhak in Bhadrak municipality in

Salandi-Baitarani Doab No.XIII.

91P1/2015-16 I.At the time of

inspection,no

work was going.

II.Works are at

finishing

stage,instructed

to maintainthe

record

henceforth with

detail.

II. Improvement to Drainage

Channel from Charampa I.T.I to

kadagambhir village,DC from

kadabaranga nallah to

khattagodia and construction of

Foot Bridge,D.C from

Khandakati sluice to Nimagohiri

nallah and construction of Foot

Bridge,D.C from Khandakati

nallah to SAnkhari

nallah,Renovation of matia

nallah and construction of Foot

Bridge at Haripur(in

Chandigoan,Sabaranga)

103P1/2016-

17

I. D/S protection

wall centering

was in progress.

II. U/S

protection wall

have completed

shortly which

needs curing

with gunny bags

frequently. III.

Finishing of

Bridge portion

has completed.

18 26.02.2018 Sri Prasanna

Ku. Dash

(AEE)

Aul

Embankment

Division, Aul

Construction of drainage sluice

at Bagapatia saline embankment

RD 750m.

Earth

excavation work

has already been

completed and

advise to

maintain

register

regarding

Quality Control

aspects.

Protection to scoured bank of

river Patasala left near village

Junagadi

14P1/2017-18 Stone dumping

work is under

progress

protection to scoured bank on

river Brahmani right near village

dakhinabeda RD 2025 to 2565

m.

65P1/2016-17 Stone dumping

work is under

progress and

interstics should

be minimized

by proper

packing.

19 07.03.2018 Sri Sumanta

Kumar

Madhei,AEE

M.I.Division,

Anandapur

Restoration of Lost Ayacut of

Sapua M.I.P (Main Canal) in

Harichandanpur Block for the

Year 2017-18.

50P1/2017-

18.

During

inspection,

Main canal wall

shuttering work

was under

progress.

Instructed to

maintain clear

cover and

before casting

bottom of the

bed should be

clear and clean.

Page 9: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

Check Dam Lukuna over Gobara

nallah near village MohulMunda

in Harichandanpur Block for the

year 2017-18.

62P1/2017-

18.

During

Inspection,

Body wall

casting was

under progress

and cube taken

for testing and

instructed to use

Rigid

shuttering.

Check Dam Raidala over Gobara

nallah near village Mohul Munda

in Harichandanpur Block for the

year 2017-18.

58P1/2017-

18.

At the time of

inspection, no

work was going

on. Encasing

reinf. For

wearing coat

was laying and

binding work

completed.

Instructed to

clear the area

before casting.

20 08.03.2018 Sri Sumanta

Kumar

Madhei,AEE

M.I.Division,

Anandapur

Restoration of Lost Ayacut of

Kureijodi M.I.P (From RD.

482m to 2500m and RD. 4750m

to 5790m of Main Canal) in

Harichandanpur Block for the

year 2017-18.

53P1/2017-18 At the time of

inspection, no

work was going

on except

excavation of

canal bed and

side area.

Check Dam Nuagoan over local

nallah near village Nuagoan in

Ghatagoan Block for the year

2017-18.

65P1/2017-

18.

The CC work

completed in

full shape

except stone

pitching and

turfing work.

Instructed to

complete turfing

and stone

pitching work.

before rainy

season

21 20.03.2018 Sri Prasanna

Ku. Dash

(AEE) along

with Sri P.K.

Pradhan (EE)

Aul

Embankment

Division, Aul

Protection to scoured bank of

Jamboo Baulakani

Mahakalapada chhapali saline

gherry.

01P1/17-18 Test of stone

should be done

in Govt.

laboratory and

interstices

should be filled

up properly with

required stone.

Akhadasahi creek irrigation

project.

1417 F2/13-

14

Honey combs of

sluice needs

rectification

Page 10: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

LIST OF WORKS VISITED BY QUALITY CONTROL INSPECTION AUTHORITIES

(HIGHER AUTHORITIES/SQM)

Name of the Division:-QUALITY CONTROL DIVISION,BHADRAK

SI

No

Date of

Visit

Name of

Inspecting

Authorities

Name of the

Division Name of the Work Agt. No.

Observation

&

Remarks

1 26.04.2017 Sri N.N.

Nayak,

Director,

R &

QC,BBSR

M.I.Division,

Anandapur

Check Dam Toradia -I over

Toradia nallah near village

Gorirabani in Anadapur Block for

the Year 2016-17.

118P1/2016-

17

I.At the time of

inspection,no

work was going.

II. The CC work

of Check Dam

completed in full

shape except earth

work and

pitching.

III.Plastering over

concrete is to be

strictly avoided.

Check Dam Toradia -II over

Toradia nallah near village

Beladihi in Anadapur Block for

the Year 2016-17.

110P1/2016-

17

I.At the time of

inspection,no

work was going.

II.Plastering over

concrete is to be

strictly avoided.

III.Curing should

be continuous in

lieu of intrmittent

curing.

Check Dam Toradia -III over

Toradia nallah near village

Belabandha in Anadapur Block

for the Year 2016-17.

121P1/2016-

17

I.At the time of

inspection,no

work was going

on at site except

centering and

shuttering of left

Abutment wall at

RL 101.20mtr.

II.The old

shuttering plate

should be

replaced.

III.Plastering over

concrete is to be

strictly avoided.

2 Drainage

Division,

Bhadrak

Improvement of Genguti D.C

from village Jahagir to

Khadimahara from RD. 31.75

KM to 12.60KM in Damnagar

Block of Bhadrak District in

Baitatrani Doab No. XIII under

NABARD assistance(RIDF-XIX).

I.At the time of

inspection,no

work was going.

II. The Bridge has

already been

completed in all

respect. III.A

good no. of stones

have been used in

stone packing

work at u/s & d/s

of bridge which

should be

replaced

immediately. IV.

The excavated

earth is to be

dress properly in

design profile.

Page 11: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

3 09.05.2017 Mr. K.K.

Khandai SQM

Aul

Embankment

Division, Aul

Creek irrigation of Aul block &

construction of sluice at Arjunpur

Kani-Kharasuan embankment

MOU/04/20

13-14

Compressive

strength of

concrete has been

tested by S.G.

Engg and some

cubes has been

sent to QC Div,

Cuttack

Protection to Brahmani left at

Khudipatna & Koladiha near

Ekamania and construction of 4

nos of sluice over Bankeswar

Atlao under NABARD assitance

133p1/2015-

16

Hard granite stone

boulder tested by

EE, QC Division,

Cuttack & Quality

of work seems to

be good.

4 10.05.2017 Mr. K.K.

Khandai SQM

Aul

Embankment

Division, Aul

Improvement to aul ring bundha

under IRC & IC

72P1/2015-

16

The road

materials have

been tested by Sai

consultants,

BBSR. Further

testing of road

materials sent to

EE, QC

Division,Cuttack.

Bank protection to old Marahata

bundh near Gokha sahi & jena

sahi.

2016/17 The stone boulder

have been tested

by SG

Engg,BBSR &

Quality of works

seems to be good

Restoration to Bagi embankment

near Chhadesh school & Olavara

sluice

62P1/2016-

17

The stone

materials and

borrow earth have

been tested by SG

Engg,BBSR & all

QC staffs

supervise the

work regulraly.

5 11.05.2017 Mr. K.K.

Khandai SQM

Aul

Embankment

Division, Aul

Protection to scoured bank on

Brahmani right near Dakhinbeda

under NABARD Assitance.

65P1/2016-

17

Dumping work is

in progress and

sample has been

sent to QC

Division, Cuttack.

Quality of work

seems good

Improvement to road on

Dangamal dalkhai with cons. Of 2

nos of sluiceunder IRC & IS.

04P1/16-17 Top of toe wall

should be kept at

one level and

protection

measure should

be taken for

protecting the

earth on the

Bhitarakanika

National park side

which has scoured

at places.

Construction of protection

measure on sea bed in front of

geo-textile tube embankment near

Pentha.

25P1/2016-

17

Stone has been

tested by SG

Engg & Sova

Consultant, BBSR

& sample has also

been sent to QC

division,Cuttack

Page 12: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

Protection to scoured bank on

river Hansua right near village

Badakote under NABARD

Assitance.

54P1/2016-

17

Dumping work is

in progress and

sample has been

sent to QC

Division, Cuttack

6 16.05.2017 Mr.

K.K.Mahanty

SQM

M.I.Division

Anandapur

Check DamNuamalia over local

nallah near village Nuamalia in

Ghasipura Block for the year

2016-17.

98P1/2016-

17

I.Advised to be

careful during

shuttering

work,so that wall

surface will be

smooth without

bulging and

honeycombs.

II.O.K card to be

maintained.

Check Dam Ganda-6 overGonda

nallah near village Gudiadiha in

Ghasipura Block for the year

2016-17.

100P1/2016-

17

I.Advised to be

careful during

shuttering

work,so that wall

surface will be

smooth without

bulging and

honeycombs.

II.O.K card to be

maintained.

Check Dam Kanpur-3 over

Kundi nallah near village Kanpur

in Ghasipura Block for the year

2016-17.

61P1/2016-

17

I.Advised to be

careful during

shuttering

work,so that wall

surface will be

smooth without

bulging and

honeycombs.

II.O.K card to be

maintained.

7 13.12.2017 Mr. T.B.Das

SQM

M.I.Division

Anandapur

Check Dam Charikiari over local

nallah near villageMakasakila in

Harichandanpur Block for the

year 2017-18.

64P1/2017-

18

Quality of

Concrete was

good. Gradation

of C.A & F.A

conducted at site

and found

satisfactory.

Improvement to Sapua M.I.P

(Branch Canal) under Critical

Grant in Harichandanpur Block

for the Year 2017-18.

52P1/2017-

18

Nil

8 21.03.2018 Mr.

K.KMohanty

SQM

M.I.Division

Anandapur

Check Dam Santiahudi over local

nallah near village Bhuka(Line

sahi) in Harichandanpur Block

for the year 2017-18.

47P1/2017-

18

At the time of

Inspection, no

work was going

on. The CC work

was completed.

Check Dam Jhuliani over local

nallah near village Bhuka in

Harichandanpur Block for the

year 2017-18.

48P1/2017-

18

Nil

Check Dam Gelhamunda over

Gobara nallah in Harichandanpur

Block for the year 2017-18.

45P1/2017-

18

At the time of

Inspection, no

work was going

on. The CC work

was completed

Page 13: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

Check Dam Baldia over Gobara

nallah near village Bailobeda in

Harichandanpur Block for the

year 2017-18.

31P1/2017-

18

Nil

Check Dam Beganabahal over

Gobara nallah near village

Bailobeda in Harichandanpur

Block for the year 2017-18.

54P1/2017-

18.

Nil

9 22.03.2018 Mr.K.K.Moha

nty SQM

M.I.Division

Anandapur

Check Dam Nuagoan over local

nallah near village Nuagoan in

Ghatagoan Block for the year

2017-18.

65P1/2017-

18.

At the time of

Inspection, no

work was going

on. The CC work

was completed

Check Dam Marsapal -II over

Muhan nallah near village

Marsapal in Anandapur Block for

the year 2017-18.

107P1/2017-

18.

Nil

Check Dam Kendudiha over

Muhan nallah in Anandapur

Block for the year 2017-18.

42P1/2017-

18.

Nil

Improvement of Gonda M.I.P

under C.L.S.R.P grant, Canal

lining in Ghasipura Block for the

year 2017-18.

80P1/2017-

18

&81P1/2017

-18

Provide weep

hole on regular

interval. Curing

should be

continuous.

Page 14: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

PHOTO GALLERY

I) State Quality Monitor (SQM) and Higher Authority inspection report.

Page 15: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah
Page 16: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah
Page 17: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah
Page 18: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah
Page 19: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah
Page 20: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah
Page 21: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah
Page 22: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah
Page 23: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah
Page 24: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

ii) Attached photos were taken during inspection with SQM, Higher Authority

and Individually.

Name of work: “Check dam Taradia III in Golabandha under Anandapur block for

2016-17” on dtd 26.04.2017 inspected by Director, R&QC, BBSR.

Name of work: “Renovation of Genguti Drainage channel Jahangir to Khadimahara in Dhamnagar block

Bhadrak 2015-16” on dtd 26.04.2017 inspected by Director, R&QC, BBSR.

Page 25: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

Name of work: “Creek irrigation of Aul block & construction of sluice at Arjunpurm Kani-Kharasuan

embankment” on dtd 09.05.2017 inspected by K.K.Khandai, SQM.

Name of work:” Check Dam Kanpur-3 over Kundi nallah near village Kanpur in Ghasipura

Block for the year 2016-17” on dtd 16.05.17 inspected by K.K.Mohanty, SQM

Page 26: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

Name of work: “Protection to scoured bank to Gabindapur Hadua TRE near Madhubana (2 nos of spur) for

2016-17” on dtd 01.06.2017 inspected by P.K.Dash, AEE, QCD, Bhadrak.

Name of work: “Check dam Juanga sahi over Kusei nallah near village Budhipada in Harichandanpur for the

year 2016-17” on dtd 02.06.2017 inspected by S.K.Madhei, AEE,QCD, Bhadrak

Page 27: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

Name of work: “Improvement to Kandia D.C,Kandia nallah,Balichatri nallah and its link drains under

Salandi-Baitarani Doab No.XIII” on dtd 4.07.17 inspected by B.C.Panda, EE,QCD, Bhadrak

Name of work: “Check Dam Charikiari over local nallah near villageMakasakila in Harichandanpur Block

for the year 2017-18.” On dtd 13.12.2017 inspected by T.B.Das, SQM.

Page 28: GOVERNMENT OF ODISHA DEPATMENT OF WATER RESOURCES Bhadrak.pdf · and stone pitching work completed in full shape except turfing work. Instructed to complete turfing work ... nallah

Name of work: “Improvement to Drainage Channel from Charampa I.T.I to kadagambhir village,DC from

kadabaranga nallah to khattagodia and construction of Foot Bridge,D.C from Khandakati sluice to

Nimagohiri nallah and construction of Foot Bridge,D.C from Khandakati nallah to SAnkhari

nallah,Renovation of matia nallah and construction of Foot Bridge at Haripur(in Chandigoan,Sabaranga) for

year 2016-17” on dtd 16.02.18 inspected by P.K.Pradhan, EE, QCD, Bhadrak.

Name of work: “Improvement of Gonda M.I.P under C.L.S.R.P grant, Canal lining in Ghasipura Block for

the year 2017-18” on dtd inspected by K.K.Mohanty, SQM