government of haryana public health...

116
GOVERNMENT OF HARYANA Public Health Engineering Department. TENDER and CONTRACT DOCUMENT For Procurement of Civil/Mechanical/Electrical Works under Local Competitive Bidding Procedure. Name of Work: Estimate for Special repair of existing structures for Water Works Jakhoda & Existing Boosting Station Sankhol Tehsil Bahadurgarh Distt. Jhajjar. "Repair of Inlet Channel, Filter Beds, Clear Water Tank, Suction Well for Raw/Clear Water, Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery at Existing Water Works Jakhoda & Exist. B/Stn. Sankhol, Distribution System & all other works contingent thereto". Name of Agency : ……………………………………………………………….......... ……………………………………………………………….......... Agreement No. : ……………………………………………………………….......... -Sd- Signature of Dy. Supdt. Tender Notice No..…………… App. Cost Rs. 21.30 lacs.

Upload: dodieu

Post on 24-Mar-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

GOVERNMENT OF HARYANA

Public Health Engineering Department.

TENDERand

CONTRACT DOCUMENT

For Procurement of Civil/Mechanical/Electrical Works under Local Competitive Bidding Procedure.

Name of Work: Estimate for Special repair of existing structures for Water Works Jakhoda & Existing Boosting Station SankholTehsil Bahadurgarh Distt. Jhajjar. "Repair of Inlet Channel, Filter Beds, Clear Water Tank, Suction Well for Raw/Clear Water,Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery at Existing Water Works Jakhoda& Exist. B/Stn. Sankhol, Distribution System & all other works contingent thereto".

Name of Agency : ………………………………………………………………..........………………………………………………………………..........

Agreement No. : ………………………………………………………………..........-Sd-

Signature of Dy. Supdt. Tender Notice No..……………

App. Cost Rs. 21.30 lacs.

Page 2: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

- 11 -

-Sd-Executive EngineerContractor Witness

C:\Users\Dev\Desktop\

PRESS NOTICE

Public Health Engineering Department, Haryana Public Health Engineering Division Bahadurgarh.Notice Inviting Tender

No. Dated:

1. Online bids are hereby invited on behalf of Governor of Haryana for the works mentioned below:-

Name of Work: Estimate for Special repair of existing structures for Water Works Jakhoda &Existing Boosting Station Sankhol Tehsil Bahadurgarh Distt. Jhajjar. "Repair of InletChannel, Filter Beds, Clear Water Tank, Suction Well for Raw/Clear Water, BoundaryWall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, PumpingMachinery at Existing Water Works Jakhoda & Exist. B/Stn. Sankhol, DistributionSystem & all other works contingent thereto".

During date & TimeSr. No. of work Estimated Cost Earnest Money Tender

DocumentFee

Downloading of TenderDocument & Payment ofTender Document fees

Online Bid preparationand hash submission

1 Rs. 21.30 Lacs Rs. 42600/- Rs. 1000/- From date 09.07.2013 &

time 22.01 to date

18.07.2013 & time 22:00

From date 09.07.2013& time 22.01 todate 18.07.2013 & time22:00

1. Tender will be opened on dated 26.07.2013, from 22:01 to 27.07.2013 22:001. Possession of Digital Signature Certificate (DSC) and registration of the contractors on the portal i.e. http://haryanaphed.etenders.in is a

prerequisite for e-tendering. Kindly contact o/o Nextenders (India) Pvt. Ltd., at Basement, HSRDC Building, Bay No.13-14, Sec-2,Panchkula. Contact persons : Sh. Manmit - 09815034028

2. For any other queries, please contact Executive Engineer, PHE Div. Bahadurgarh Tel.(O)_01276 242976 Tel (M)09416951300 Address P.H. Divn. Bahadurgarh.For further details and e-tendering schedule, visit website http://haryanaphed.etenders.in

For & on behalf of Governor of HaryanaSd/

Executive EngineerPHE Division, Bahadurgarh.

Page 3: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

- 22 -

-Sd-Executive EngineerContractor Witness

PUBLIC HEALTH ENGINEERING DEPARTMENT, HARYANA PUBLIC HEALTH ENGINEERINGDIVISON, BAHADURGARH.

NOTICE INVITING TENDER

Online bids are hereby invited on behalf of Governor of Haryana for the following work as mentioned below:-

Name of Work: Estimate for Special repair of existing structures for Water Works Jakhoda & Existing Boosting Station SankholTehsil Bahadurgarh Distt. Jhajjar. "Repair of Inlet Channel, Filter Beds, Clear Water Tank, Suction Well forRaw/Clear Water, Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, PumpingMachinery at Existing Water Works Jakhoda & Exist. B/Stn. Sankhol, Distribution System & all other workscontingent thereto".

App. Cost Rs. 21.30 lacs.

During date & TimeSr. No. of

workEstimated

CostEarnestMoney

TenderDocument

Fee

Downloading of TenderDocument & Payment ofTender Document fees

Online Bid preparation andhash submission

1 Rs. 21.30 Lacs Rs. 42600/- Rs. 1000/- From date 09.07.2013 &

time 22.01 to date

18.07.2013 & time 22:00

From date 09.07.2013 &time 22.01 to date18.07.2013 & time 22:00

1. Tender documents can be downloaded online from the Portal: http://haryanaphed.etenders.in by the Firms / Individualregistered on the Portal.2. As the Bids are to be submitted online and are required to be encrypted and digitally signed, the Bidders are advised to obtain Digital Signature Certificate

(DSC) at the earliest. For obtaining Digital Certificate, the Bidders should follow point No. 3 under "Annexure-A - Conditions of e-tendering".

Page 4: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

- 33 -

-Sd-Executive EngineerContractor Witness

3. Key Dates

Sr. No. PHED State Contractor Stage Start Date and Time Expiry Date and Time1 Release of Tender document 09.07.2013 10:00 Hrs. 09.07.2013 22:00 Hrs.2

-

Downloading ofTender Documents &Payment of Tender

Documents fees

09.07.2013 22:01 Hrs. 18.07.2013 22:00 Hrs.

3-

Online BidPreparation & Hash

Submission

09.07.2013 22:01 Hrs. 18.07.2013 22:00 Hrs.

4 Technical & Financial Lock - 18.07.2013 22:01 Hrs. 19.07.2013 22:00 Hrs.5

-Submission of

Bid Online19.07.2013 22:01 Hrs. 22.07.2013 20:00 Hrs.

6 Open EMD & Technical/PQ Bid - 22.07.2013 20:01 Hrs 23.07.2013 22:00 Hrs.7 Eligibility criteria evaluation - 23.07.2013 22:01 Hrs 26.07.2013 22:00 Hrs.8 Open Financial/Price-Bid - 26.07.2013 22:01 Hrs 27.07.2013 22:00 Hrs.

4. The Bidders can download the tender documents from the Portal : http://haryanaphed.etenders.in. Tender Documents Fees has to be paid online through payment gatewayduring the "Downloading of Tender Document & Payment of Tender Document fees" stage and Earnest Money Deposit has to be submitted through RTGS

transaction/Net Banking in the name of Executive Engineer , Public Health Engineering Division Bahadurgarh bank account No. 909020041684267in Bank name AXIS BANK & Bank IFS CODE UTIB0000627 . The particulars are to be given online at the e-tendering website of the department:-

a) Name of a/c holder from whose a/c payment for earnest money has been made by the agency b)A/C No.c) Name of the Bankd) Transaction IDe) Date of time of transactionf) Mode of payment is through RTGS, Demand Draft, Net banking, Credit card etc. g)Amount of Payment

Willing Contractors shall have to pay the Tender Document Fees through payment gateway during the "Downloading of Tender Document & Payment of Tender Documentfees" stage. However, as the details of the EMD are required to be filled at the time of Bid Preparation and Hash Submission stage, the Bidders are required to keep the EMD detailsready beforehand.

Page 5: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

- 44 -

-Sd-Executive EngineerContractor Witness

5. The tender shall be submitted by the bidder in the following three separate envelops online:1. Earnest Money and all the documents

2.in support of eligibility criteriaN.I.T. and Technical Bid

- Envelope 'ED'- Envelope 'T I'

3. Price Bid - Envelope 'C I'

Note:- Online Bidders shall submit the EMD or through RTGS/Net Banking/ Credit card. Documents in support of eligibility criteria shall also be submitted inEnvelope 'ED'. Price Bids are to be submitted mandatory online and shall not be accepted in any physical form.

Reference of the EMD is to be mentioned online.

The envelopes 'ED' & 'TI' shall be kept in a big outer envelop, which shall also be sealed. In the first instance, the Envelop - 'ED' of all the Bidders containing the Earnest Money anddocuments supporting eligibility criteria shall be opened online . If the Earnest Money and eligibility of bidder is found proper, the Envelop 'TI' containing Technical Bid shall beopened in the presence of such bidders who either themselves or through their representatives choose to be present. The Technical and Financial bid shall be opened only if the biddersmeet the eligibility criteria as per the Bid document.

The bidder will submit the necessary documents as under.

Envelope 'ED' - Earnest Money Deposit and eligibility criteria Envelop

Online EMD Envelope-Reference details of the Earnest Money Deposit instrument and scanned copy of documents supporting eligibility criteria.

Envelope 'TI' - Technical Bid Envelope

Online Technical Envelope - All the information and scanned copies of the Documents / Certificates as required to be submitted as per the Tender. Also, all such documents, if any,that cannot be submitted online i.e. all the Information and Documents / Certificates as required to be submitted in physical technical envelope as per the Tender.

Envelope 'CI' - Price Bid Envelope

To be submitted mandatory online- "Information related to Price Bid of the Tender". The Envelopes "ED" & "TI" shall be placed in another envelop of bigger size clearlymarking the name of agency & name of work. In case, the Bidders have submitted all the information and documents/ certificates required as a part of Technical Bid online, physicalEnvelope "TI" shall be submitted clearly marking "Blank".

The bidder can submit their tender documents as per the dates mentioned in the schedule above.

CONDITONS:-

Page 6: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

- 55 -

-Sd-Executive EngineerContractor Witness

1) NIT, if required, can be seen on any working day during office hours in office of the undersigned.

2) Conditional tenders will not be entertained & are liable to be rejected.

3) The undersigned reserves the right to reject any tender or all the tenders without assigning any reason.

4) The societies shall upload & produce a copy of the resolution of the Co-Operative department for e-tendering.

5) The tender without earnest money will not be opened.

6) The jurisdiction of court will be at .

7) The tender of the bidder who does not satisfy the eligibility criteria in the bid documents is liable to be rejected summarily without assigning any reason and no claim

whatsoever on this account will be considered.

8) The bid for the work shall remain open for acceptance during the bid validity period to be reckoned from the date of "Online Bid preparation and Hash submission". If any

bidder withdraws his bid before the said period, any modifications in the terms and conditions of the bid, the said earnest money shall stand forfeited. Bids would require to

be valid for 3 months from the date of closing of online "Bid preparation and Hash submission stage".

For and On Behalf of Governor of Haryana

Endorsement No. DatedA copy of above is forwarded to the following for information and wide publicity:

(1) Deputy Commissioner, at(2) Engineer-in-Chief Haryana, PHED, Panchkula(3) All Superintending Engineers/Executive Engineer, PHED Haryana.

-Sd-Executive EngineerPHE Division,Bahadurgarh

For and On Behalf of Governor of Haryana

-Sd-Executive EngineerPHE Division,Bahadurgarh

Page 7: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

- 66 -

-Sd-Executive EngineerContractor Witness

ANNEXURE-A

CONDITIONS OF E-TENDERING Instructions to Contractors on Electronic Tendering

1. These conditions will over-rule the conditions stated in the tender documents, wherever relevant and applicable.

2. All the Contractors intending to participate in the tenders processed online, are required to get registered for the Electronic Tendering System on the Portalhttp://haryanaphed.etenders.in For more details, please see the information in Registration info link on the home page.

3. Obtaining a Digital Certificate:

3.1 The Bids submitted online should be encrypted and signed electronically with a Digital Certificate to establish the identity of the bidder bidding online. A digital signaturecertificate has two keys i.e. Public Key and Private Key. Public Key is used to encrypt the data and Private Key is used to decrypt the data. Encryption means conversion ofnormal text into coded language whereas decryption means conversion of coded language into normal text. These Digital Certificates are issued by an approved certifying authority, bythe controller of Certifying Authorities, Government of India.

3.2 A Digital Certificate is issued upon receipt of mandatory identity proofs and verification letters attested by the Notary Public / Charted Account / AnyGazatted Officer whose stamp bears emblem of Ashoka. Only upon the receipt of the required documents, a digital certificate can be issued.

3.3 The contractors may obtain Class II B digital certificate from any Certifying Authority or Sub-certifying Authority authorized by the Controller of Certifying Authorities onthe portal http://cca.gov.in. or may obtain information and application format and documents required for issue of digital certificate from one such certifying authority on given belowwhich is :-

1. TATA Consultancy Services Ltd.11th Floor, Air India Building, Nariman Point, Mumbai-400021 website -www.tcs-ca.tcs.co.in

2. Sify Communications Ltd.III Floor, Tidel Park, 4 Canal Bank Road, Taramani, Chennai-600113. Website - www.safescrypt.com

3. MTNL Trustline CAO/o DGM (IT-CA), 5515, 5th Floor, Core-V Mahanagar Doorsanchal Sadan, CGO Comples, MTNL, Delhi-110003. Website - www.mtnltrustline.com

4. iTrust CA (IDRBT)Castle Hills, Road No.1, Masab Tank, Hyderabad, Andhra Pardesh -500057. Website - idrbtca.org.in

5. (n)Code solutions301, GNFC Tower, Bodak Dev, Ahmedabad-380054, Gujarat. Website - www.ncodesolutions.com

6. National Informatics Centre Ministry of Communication and Information TechnologyA-Block CGO Complex, Lodhi Road,New Delhi-110003. Website https://nicca.nic.in

Page 8: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

- 77 -

-Sd-Executive EngineerContractor Witness

7. e-Mudhra CA3i Info-tech Consumer Serivces Ltd3rd Floor, Sai Arcade, Outer Ring Road, Devarabeesanahalli, Bangalore560036, Karnataka Website - http://www.e-Mudhra.com

Contractors may also obtain information and application format and documents required for issue of digital certificate from the following:-

1. Nextenders (India) Pvt. Ltd.YUCHIT, Juhu Tara Road, Mumbai-400049 [email protected]

2. Nextenders (India) Pvt. Ltd.O/o HSRDC, Bays No.13-14, Sec-2, Panchkula-134151Contact Person: Manmit - 09815034028Rishi - 09878012160

3.4 Bid for a particular tender may be submitted only using the digital certificate, which is used to encrypt the data and sign the hash during the stage of bid preparation andhash submission. In case, during the process of a particular tender, the user looses his digital certificate (i.e. due to virus attack, hardware problem, operating systemproblem), he may not be able to submit the bid online. Hence, the users are advised to have back up of certificate and keep the copies at safe place under proper security to beused in case of emergencies.

3.5 In case of online tendering, if the digital certificate issued to the authorized user of a firm is used for signing and submitting a bid, it will be considered equivalent to a no-objection certificate/power of attorney to that User. The firm has to authorize a specific individual via an authorization certificate signed by all partners to use the digitalcertificate as per Indian Information Technology Act 2000. Unless the certificates are revoked, it will be assumed to represent adequate authority of the user to bid on behalfof the firm for Public Health Engineering Department, Haryana tenders as per Information Technology Act2000. The digital signature of this authorized user will be binding on the firm. It shall be the responsibility of management / partners of the registered firms to inform thecertifying authority or Sub Certifying Authority, in case of change of authorized user and applies for a fresh digital certificate and issues an'authorization certificate' for the new user. The procedure for application of a digital certificate will remain the same for the new user.

3.6 The same procedure holds true for the authorized users in a private/Public limited company. In this case, the authorization certificate will have to be signed by the directorsof the company.

4. Set up of machine

In order to operate on the electronic tender management system, a user's machine is required to be set up. A help file on setting up of the system can be obtained fromNexTenders (India) Pvt. Ltd. or downloaded from the home page of the website - http://haryanaphed.etenders.in.>> "Information for new users".

5. Online Viewing of Notice Inviting Tenders:The contractors can view the N.I.T and the time schedule (Key Dates) for all the packages floated using the electronic tendering system on the HaryanaPHED website http://haryanaphed.etenders.in. Contractor may refer to NIT in the office of Executive Engineer.

Page 9: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

- 88 -

-Sd-Executive EngineerContractor Witness

6. Opening of an Electronic Payment Account:

6.1 For purchasing the tender documents online, contractors are required to pay the tender documents fees online using the electronic payments gateway service as mentioned atS. No.8.

6.2 For the list of payments using which the online payments can be made, please refer to the Home page of the Portal http://haryanaphed.etenders.in

7. Submission of Earnest Money Deposit:

7.1 The EMD Payment can be made by eligible contractors through Approved Traditional Financial Instruments or through RTGS/Net Banking transaction .

7.2 Contractors have to submit the EMD either physically in a sealed physical envelope which should reach the office of concerned Executive Engineer as mentioned inthe Tender Notice or make EMD payment through RTGS/Net Banking transaction.

8. Submission of Tender Document Fees:

The Payment can be made by eligible contractors online directly via Credit Card / Internet Banking Account / Cash Card / Debit card. The contractors have to pay for thetender documents online by making online payment of tender document fees using the service of the secure electronic payment gateway. The secure electronic paymentsgateway is an online interface between contractors and credit card / online payment authorization networks.

9. Purchase of Tender Documents:

Download of Tender Documents: The tender documents can only be downloaded from the Electronic Tendering System on the Portal http://haryanaphed.etenders.in

10. Submission of Bid Seal (Hash) of online Bids:

Submission of bids will be preceded by submission of the digitally signed bid seal (Hash) as stated in the tender time schedule (Key Dates) of the Tender. Bidders should takenote of any corrigendum being issued on the website on a regular basis. They should view and note down the tender Hash and ensure that it matches with their previousnoted Hash before confirming the rates.

11. Generation of Super Hash:After the time of submission of Bid Seal (Hash) by the bidders has lapsed, the bid round will be closed and a digitally signed tender Super Hash will be generated byauthorized Haryana PHED official. This is equivalent to sealing the tender box.

12. Submission (Re-encryption) of actual online bids:Bidders have to submit their encrypted bids online and upload the relevant documents for which they generated the hash at the stage of hash generation and submission afterthe generation of Super Hash within the date and time as stated in the Notice Inviting Tenders (Key Dates). The electronic bids of only those contactors who have submittedtheir bid seals (Hashes) within the stipulated time, as per the tender time schedule (Key Dates), will be accepted by the System. A bidder who does not submit his bid seal(Hash) within the stipulated time will not be allowed to submit his bid.

Page 10: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

- 99 -

-Sd-Executive EngineerContractor Witness

13. Key Dates:13.1 The bidders are strictly advised to follow dates and time as indicated in the Notice Inviting Tender. The date and time will be binding on all the bidders. The bidders are

required to complete the stage within the stipulated time as per the schedule to continue their participation in the tender. All online activities are time tracked and the systemenforces time locks that ensure that no activity or transaction can take place outside the start and end dates and time of the stage as defined in the Notice Inviting Tender. Thebidder should check the status of a particular stage by following the below mentioned procedure:-

a. Click on "Main" after login into the portal. b.Select "Tender Search" and click on "Go"c. Next screen will appear on the screen and click on "Search" button to view the list of various tenders.d. Select the tender whose status is to be viewed by clicking on the tender no. e.Click on "Action page" button. The status of all the stages

i.e. whether "Pending" or "Completed" can be viewed.

The bidder should ensure that the status of a particular stage should be shown as "Completed" before the expiry date and time of that particular stage and he should possess acopy of receipt of completion of each stage to be performed from his end. It will be the sole responsibility of the bidder if the status of a particular stage is "Pending" till theexpiry date and time of that stage and he is not able to proceed further in the e-tendering process.

Other Information:

1. The intending bidders shall fill the lumpsum rate / item rate / Percentage rate in the online templates of the online tender. The Price Bid has to be submitted mandatoryonline.

2. Technical Bid Documents except EMD that cannot be submitted online, if any should be put in separate sealed envelopes and these sealed envelopes together withthe documents listed below should be sealed in another cover and delivered to this office before the date and time mentioned in the Tender Notice.i. A list of all documents accompanying the sealed envelopes containing the tender documents.

ii. Duly accepted power of Attorney in original along with its two certified copies in the name of bidder or authorized representative to act on behalf of the agency.iii. Documents in respect of payment of earnest money.

3. Tender must strictly abide by the stipulations set forth in notice inviting tender & while tendering for the work, the bidder shall adopt only the three envelopesystem.

4. The third envelop - Price Bid envelope has to be submitted mandatory online and shall not be accepted physically under any circumstances. In case any bidder doesnot comply with procedure given above, it will be presumed that he is not interested in the work and the work shall not be let out to him. Further he may be de-listedwithout further notice to him for failing to abide by the strictly approved terms of notice inviting tender for this work.

5. The tenders which are not accompanied by the earnest money or proof of earnest money or do not strictly follow the technical requirement, are liable to berejected summarily.

Page 11: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-1010-

-Sd-Executive EngineerContractor Witness

6. Tenders / quotations which are dependent upon the quotations of another bidder shall be summarily rejected.7. The tenders of the bidders who does not satisfy the qualification in the bid documents are liability to be rejected summarily without assigning any reason and no claim

what so ever on their account will be considered.

Note: - Bidders participating in e-tendering shall check his/her validity of Digital Signature Certificate before bidding in the specific work floated online at e- tenderingportal of Public Health Engineering Department, Haryana on the website http://haryanaphed.etenders.in. Also, the bidder will be held liable solely, in case, while bidding in

particular stage - Date & Time expired as per the key dates available on the tender document. Key dates are subject to change in case ofany amendment in schedule due to any reason stated by concerned Executive Engineer of the Department.

Page 12: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-1111-

-Sd-Executive EngineerContractor Witness

HARYANA PUBLIC HEALTH ENGINEERING DEPARTMENT PUBLIC HEALTH ENGINEERING DIVISIONBAHADURGARH.

NOTICENOTICEINVITINGTENDER

1. For and behalf of the Government of Haryana, tenders in sealed covers are hereby invited for the execution of the workgiven below from firms of repute/such contractors, who are having a valid certificate of enlistment issued by a competent officer ofHaryana Public Health Engineering Department duly renewed upto date (on which tenders are to be opened): -

Name of Work: Estimate for Special repair of existing structures for Water Works Jakhoda & Existing Boosting Station SankholTehsil Bahadurgarh Distt. Jhajjar. "Repair of Inlet Channel, Filter Beds, Clear Water Tank, Suction Well forRaw/Clear Water, Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, PumpingMachinery at Existing Water Works Jakhoda & Exist. B/Stn. Sankhol, Distribution System & all other workscontingent thereto".

App. Cost Rs. 21.30 lacs.

Executive EngineerPARTICULARS OF THE Haryana Public Health Engineering DepartmentOFFICER INVITING Public Health Engineering Division,THE TENDERS Bahadurgarh.

Page 13: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-1212-

-Sd-Executive EngineerContractor Witness

STEREO B & R 28Name of contractor :

Hereinafter referred to as"Executive Engineer"

Name of work Estimate for Special repair of existing structures for Water Works Jakhoda & ExistingBoosting Station Sankhol Tehsil Bahadurgarh Distt. Jhajjar. "Repair of Inlet Channel, Filter Beds, Clear WaterTank, Suction Well for Raw/Clear Water, Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, RoadPath, Pumping Machinery at Existing Water Works Jakhoda & Exist. B/Stn. Sankhol, Distribution System & allother works contingent thereto".

App. Cost Rs. 21.30 lacs.

HARYANA PUBLIC HEALTH ENGINEERING DEPARTMENT, PUBLIC HEALTH ENGINEERING DIVISION,BAHADURGARH.

Form : F-1

TENDER AND CONTRACT FOR WORKS

General Rules and Directions for the Guidance of Contractor

SignatureDy. Supdt.

CONTRACTORS SHOULD CAREFULLY STUDY THE RULES GIVEN BELOW WHICH ARE FOR THEIR GUIDANCE BEFORE

SUBMITTING THE TENDERS & COMPLY WITH THE SAME ANY NON COMPLIANCE OF THE SAME IS LIKELY TO

RESULT IN FORFEITURE OF EARNEST MONEY & MAY RESULT IN CANCELLATION OF HIS CERTIFICATE OF

ENLISTMENT.

Page 14: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-1313-

-Sd-Executive EngineerContractor Witness

Rule No. 1: Brief information about the works proposed for aexecution by contractor have been notified in a shape of "NOTICE" pasted onthe Notice Board hung up in the office, duly signed by the Executive Engineer.Further, the detailed document called "NOTICE INVITING TENDERS" canbe seen in the office of Executive Engineer on any working day. This formstates the work to be carried out, as well as the date & time for submitting andopening of tenders and the time allowed for carrying out, the work, the earnestmoney required to accompany the tenders, also the amount of security to bedeposited by the contractor whose tender is accepted, the conditions of contracton which contract agreement would be concluded, copies of the specifications,designs & drawings, Contract Schedule of Rates, and also a Schedule ofCeiling Premia "by which the rates of various items of the Contract Scheduleof Rates shall be increased so as to be called the "Ceiling Rates". Furtherany other documents required in connection with the works duly signed bythe Executive Engineer for purpose of identification shall also be open forinspection by the contractors in the office of the Executive Engineer asmentioned in the "NOTICE".

General

Rule No. 2: Any contractor who submits tender may sign anaffidavit to the effect that he has no connection or relation with thefirm/contractor black-listed by Haryana Government/Govt. of India from timeto time. The form of affidavit can be seen in the office of the "ExecutiveEngineer".

Rule No. 3: The tender shall not be burdened or loaded with anyconditions. Only rate shall be quoted. A conditional tender is liable to berejected outright at the discretion of the accepting authority. In the alternative,the accepting authority may treat the conditions as null and void and make acounter offer to the tenderer to do the work at the rate

ConditionalTenders

Page 15: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-1414-

-Sd-Executive EngineerContractor Witness

quoted by him without the conditions. If the contractor who submitted thetender refuses to accept the said counter offer to do the work at the rates quotedby him without the conditions within one week of the said offer having beenmade by the accepting authority, the earnest money which accompanied thetender shall stand forfeited and the contractor shall be no claim to the samewhatsoever.

Rule No. 4: The tender shall be signed by the person orpersons authorized to do so in a manner by the authority granting the certificateof enlistment. Any tender not signed in the manner so authority shall bedeemed to be an invalid tender and shall be rejected and the earnest moneyshall be forfeited without prejudice to any other rights & remedies a availableto the Executive Engineer.

Contractor'sSignature

In the event of the tender being submitted by a firm, it must besigned separately by each member thereof, or in the event of the absence of anypartner, it must be signed on his behalf by a person holding a power of attorneyauthorizing to do so.

For the purpose of identification, the contractor shall supply to theExecutive Engineer specimen signatures duly attested by a Gazetted Officerknown to the Executive Engineer. The specimen signatures must be suppliedwell before the date of submission of tenders.

The contractor(s) shall sign on all pages of tender form to besubmitted by him. In addition, he shall also sign at the places, where he is tosign which are marked 'X' on pages:

Page 16: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-1515-

-Sd-Executive EngineerContractor Witness

All corrections shall be made in a manner so that the original islegible. There shall be no over writings. The corrections shall beauthenticated by the signatures of the authorized person as described above.

Any tender not so signed may be rejected and the earnest moneyforfeited.

SingleRate

Form forspecific

Rule No. 5: (a) For Scheduled items: Any person who submits a tendershall fill up the usual printed form stating the percentage above or below the "CeilingRates" as defined in Rule 1 at which he is willing to undertake the work. Only onesingle rate of percentage above or below on all scheduled items of the contractSchedule & for all purposes shall be mentioned in the space provided in the TenderForm. For the purpose of this single rate. Explanatory Memo, below may be seen.Which explains the manner in which the admissible payment shall be worked outafter taking into consideration the sanctioned Ceiling Premia as enumerated in the"Schedule of Ceiling Premia" mentioned in Rule (I) together with the single ratequoted by the contractor. Any rate entered outside this space may render the tenderinvalid. If a contractor quotes more than one rate in that case only lower or lowest ofthe rates so quoted shall be considered and a counter offer shall be made to himaccordingly at the lowest of the rates quoted by him and in the event of his notaccepting the same, the earnest money that accompanied the tender shall standforfeited and the contractor shall have no claim to the same whatsoever.

(b) For Non-Schedule Items: A person submitting a tender shall fillup the rates against each items shown on page No. 6 no premium over therates quoted by him will be admissible over these N.S. Items.

A single tender form shall be used, for one specific work only viz.the work for which the same has been issued by the specific

Page 17: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-1616-

-Sd-Executive EngineerContractor Witness

work contractor to whom the same has been issued by the ExecutiveEngineer. The tender form preferably be put in the cover and the cover may besealed by the contractor. If the cover is not sealed by the contractor, ExecutiveEngineer shall not be responsible for any consequences thereof.

EXPLANATORY MEMO(REFER TO RULE 4 OF GENERAL RULES AND DIRECTIONS FOR

THE GUIDANCE OF CONTRACTORS)For the purpose, the basic rate for a particular items specified in the Contract Schedule of Rates shall beincreased by the sanctioned Ceiling Premium as per the "Schedule of Ceiling Premia" which is attachedand is a part of this form. The total amount shall then be subjected to the discount or Premium quoted by thecontractor.

For example, the basis rate for an item is Rs. 120 per cum, sanctioned ceiling premium is 50%, 300 cum ofthe items are executed and premium/rebate rate quoted by the contractor is 3% below. The net payment shallbe worked out as below: -

Quantity Item Unit Rate AmountRs.

300 cum Cum Rs. 120.00 Rs. 36000Add Ceiling Premium 50% Rs. 18000GROSS TOTAL Rs. 54000Less contractors rebate 3%(-) Rs. 1620NET PAYABLE Rs. 52380

If the rate quoted by the contractor was 5% above, the amount payable would be asunder: -

GROSS TOTAL Rs. 54000Add Contractor's Premium 5% RS. 2700

RS. 56700

6. (a) The Executive Engineer or any other officer duly

Page 18: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-1717-

-Sd-Executive EngineerContractor Witness

authorized by him will open tenders. Any contractor(s) (who may havesubmitted tenders) or their authorized agents may be allowed to be present atthe of opening of tenders.

(b) The officer opening the tender will first make a list of thosetenders which are on the prescribed form. All other documents purporting to betenders shall be separated and sealed separately without even announcing theidentity of the tenders.

Out of the list of tenders received on prescribed form theofficer opening the tenders will then separate out those which are notaccompanied by requisite amount of earnest money or in the required form.Infirmities shall be notified and such tenders shall be resealed withoutannouncing the rates.

(c) He will then announce the rates quoted by all other contractorswhose tenders do not suffer from any infirmities. In case where the tenders haveany or many shortcoming, the rates may not be announced and such tendersmay be put in a cover and sealed. This fact shall be announced. The tender sosealed shall be dealt with according to rules and regulations on thesubject/situation.

(d) The Executive Engineer shall have the right of rejecting all orany of the tenders without assigning any person.

In the event of a tender being accepted, an acknowledgement of the Deposit atcall receipt, forwarded there with shall thereupon be given to the contractorwho shall thereupon for the purpose of identification, sign copies ofspecifications and other documents mentioned in Rule 1. in the event of atender not being accepted, the earnest money

Page 19: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-1818-

-Sd-Executive EngineerContractor Witness

forwarded with such tender unless the same has been forfeited willthereupon be returned to the concerned tenderer.

7. The receipt of an Accountant or Clerk for any money paid bythe contractor will not be considered as acknowledgement of payment tothe Executive Engineer and the contractor shall be responsible for seeing that heprocures a receipt signed by the Executive Engineer.

8. The memorandum or work tender for and the memorandum ofmaterials to be supplied by the Public Works Department and their issue ratesshall be filled in and completed in the office of the Executive Engineer beforethe tender form is issued. If a form is issued to a contractor who intends totender without having been so filled in and complete, he shall request the officeto have the done before he completes and delivers his tender.

9. The department may refuse or suspend payments on account of awork when executed by a firm, or by contractor described in their tender as afirm, unless receipts are signed by all the partners, or one of the partners, orsome other person produces written authority enabling him to give effectualreceipts on behalf of the firm.

Page 20: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-1919-

-Sd-Executive EngineerContractor Witness

TENDERFORWORKS

In figureas well as inwords

I/we hereby tender for the execution, for the Public Health Engineering of the work specified in the memorandum ofPage No. 7 with the time specified in such memorandum.

Page 21: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-2020-

-Sd-Executive EngineerContractor Witness

D.N.I.TName of Work:- Estimate for Special repair of existing structures for Water Works Jakhoda & Existing Boosting Station Sankhol Tehsil Bahadurgarh Distt. Jhajjar. "Repair ofInlet Channel, Filter Beds, Clear Water Tank, Suction Well for Raw/Clear Water, Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, PumpingMachinery at Existing Water Works Jakhoda & Exist. B/Stn. Sankhol, Distribution System & all other works contingent thereto".

App. CostRs.

21.30 Lacs

S.No.

Sch.ItemNo.

Description Qty. Unit Rate(in Rs.)

Amount(in Rs.)

C.P. Amountinvolveddue to

CP(In Rs.)

Total(in Rs.)

1 2 3 4 5 6 7 8 9 10

SUB WORK NO 1 (CIVIL WORKS) Schedule-I Scheduleportion

Sub Head No. 1. Repair of Inlet Channel

1 6.1( a )

Earth work of silt-clearance of channel and drains, Kassi work,undressed. 23.63 cum 100 cum 415.50 98 425% 417 515

2 11.3 First class brick work laid in cement sand mortor 1:542.21 cum cum 407.60 17205 600% 103229 120434

3 15.3 +15.75

12 mm thick cement plaster 1:2 & Cement rendering onplaster 1mm thick 227.51 Sqm Sqm 20.85 4744 500% 23718 28462

4 10.41 Cement concrete 1:2:4 with stone aggregate 20mm nominalsize in foundation and plinth. 0.15 Cum Cum 615.60 92 450% 416 508

5 10.82 Cement concrete 1:2:4 with stone aggregate 20mm Nominalsize for reinforcement concrete work in slab With inclinationnot exceeding 25 degree with horizontal Excluding steelreinforcement but including centering And shuttering laid inposition, com

9.31 cum cum 997.90 9290 450% 41807 51097

6 18.22 FE-500 QMR TMT steel bars for RCC works, where not includedin the complete rate of RCC including bending binding andplacing in position complete.

7 Qtl. Qtl. 917.05 6419 500% 32097 38516

37849 201683 239532Sub Head No. 2 Repair of Existing Filter Beds. (Exist. W/W Jakhoda)

1 11.3 First class brick work laid in cement sand mortor 1:516.00 cum cum 407.60 6522 600% 39130 45651

2 8.32 Scrapping:-Cement Plaster 62.77 Sqm Sqm 1.90 119 550% 656 775

Page 22: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-2121-

-Sd-Executive EngineerContractor Witness

3 10.87 Cement concrete 1:2:4 with stone aggregate 20mm nominalsize for reinforced concrete work for walls (10 cm to 20 cmthickness) straingth and curvd excluding steel reinforcementbut including centring and shuttering laid in position completein all respect.

51.87 Cum Cum 1400.00 72618 450% 326781 399399

4 15.3 +15.75

12 mm thick cement plaster 1:2 & Cement rendering onplaster 1mm thick 138.10 Sqm Sqm 20.85 2879 500% 14397 17276

5 10.82 Cement concrete 1:2:4 with stone aggregate 20mm Nominalsize for reinforcement concrete work in slab With inclinationnot exceeding 25 degree with horizontal Excluding steelreinforcement but including centering And shuttering laid inposition, com

3.07 cum cum 997.90 3061 450% 13773 16833

6 18.22 FE-500 QMR TMT steel bars for RCC works, where not includedin the complete rate of RCC including bending binding andplacing in position complete.

39.38 Qtl. Qtl. 917.05 36110 500% 180549 216659

7 11.5 First class brick work laid in cement sand mortar 1:3 infoundation and plinth. 4 cum cum 461.40 1846 600% 11074 12919

8 28.10 Providing and fixing cast iron double flanged sluice valve PN -1.6 marked with IS: 14846 including nuts & bolts marked withIS: 1363, Rubber sheet marked with IS:638 etc. carriageloading unloading, stacking handling, Re-handling etc.complete in all respect to the satisfaction of Engineer-In-Charge (Makes AARKO, VENUS, LEADER, SI, PANJA, UPADHAY.

e) 200 mm I/d pipe line laid complete 2 Nos each 9945.00 19890 10% 1989 218799 29.94 Providing and fixing SFRC manhole covers and frames marked with IS:

12592 including setting the same to correct lines and levels in 1:2cement sand mortar over manhole including carriage loading,unloading stacking handling re-handling etc. complete in all respect.

Type: Extra Heavy Duty Set (HD-20) -560mm clear opening. 5 Nos. Each 1100.00 5500 5% 275 5775

148544 588622 737166Sub Head No. 3 Repair of Existing Clear Water Tanks. (Exist. W/W Jakhoda)

1 11.3 First class brick work laid in cement sand mortor 1:54.58 cum cum 407.60 1867 600% 11201 13068

2 15.3 +15.75

12 mm thick cement plaster 1:2 & Cement rendering onplaster 1mm thick 34.26 Sqm Sqm 20.85 714 500% 3572 4286

3 10.82 Cement concrete 1:2:4 with stone aggregate 20mm Nominal size forreinforcement concrete work in slab With inclination not exceeding 25degree with horizontal Excluding steel reinforcement but includingcentering And shuttering laid in position, com

1.27 cum cum 997.90 1267 450% 5703 6970

Page 23: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-2222-

-Sd-Executive EngineerContractor Witness

4 29.94 Providing and fixing SFRC manhole covers and frames marked with IS:12592 including setting the same to correct lines and levels in 1:2 cementsand mortar over manhole including carriage loading, unloading stackinghandling re-handling etc. complete in all respect.

Type: Extra Heavy Duty Set (HD-20) -560mm clear opening. 2 Nos. Each 1100.00 2200 5% 110 2310

6048 20586 26634Sub Head No. 4 Repair of Existing Suction Well for Raw/Clear (Exist. W/W Jakhoda)

1 11.3 First class brick work laid in cement sand mortor 1:5 1.50 cum cum 407.60 611 600% 3668 4280

2 8.32 Scrapping:-Cement Plaster 8.46 Sqm Sqm 1.90 16 550% 88 104

3 15.5 12 mm thick cement plaster 1:4 22.47 Sqm Sqm 12.70 285 500% 1427 1712

4 29.94 Providing and fixing SFRC manhole covers and frames marked with IS: 12592including setting the same to correct lines and levels in 1:2 cement sandmortar over manhole including carriage loading, unloading stacking handlingre-handling etc. complete in all respect.

Type: Extra Heavy Duty Set (HD-20) -560mm clear opening. 1 Nos. Each 1100.00 1100 5% 55 1155

2013 5238 7251Sub Head No. 5 Repair of Boundary Wall (Exist. W/W Jakhoda)

1 8.32 Scrapping:-Cement Plaster 260 Sqm Sqm 1.90 494 550% 2717 3211

2 15.6 12mm thick cement plaster 1:5 400 Sqm Sqm 11.60 4640 500% 23200 27840

3 6.6 Earth work in excavation in foundation. 25 cum 100 cum 1108.10 277 425% 1177 1454

4 11.3 First class brick work laid in cement sand mortor 1:5 inFoundation & Plinth 45 cum cum 407.60 18342 600% 110052 128394

5 10.39 Cement concrete 1:4:8 with Stone ballast 40 mm nominal sizein foundation and plinth. 5 cum cum 403.10 2016 450% 9070 11085

6 10.115 Damp prrof course 25 mm thick of cement 1:2:4 using stoneaggregate 40mm nominal size with 2 coats of bitumen 20/30penetration at 1.65 kg. Per sqm laid not and sanded.

20 Sqm Sqm 26.40 528 450% 2376 2904

7 15.60 Cement pointing 1:2 deep variety on brick and tile work. 115 Sqm Sqm 9.90 1139 500% 5693 6831

8 16.62 Finishing walls with exterior decorative cement based paints, such assnoweem Robbiacem etc. on old work, one coat to give an evenshade.

1200 cum cum 3.10 3720 230% 8556 12276

31155 162841 193996Sub Head No. 6 Repair of Existing Pump Chamber of Size (10'x10') (Exist. W/W Jakhoda)

1 8.32 Scrapping:-Cement Plaster 107.24 Sqm Sqm 1.90 204 550% 1121 1324

2 15.6 12mm thick cement plaster 1:5 107.24 Sqm Sqm 11.60 1244 500% 6220 7464

Page 24: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-2323-

-Sd-Executive EngineerContractor Witness

3 16.8 Painting one coat with ready mixed paint. 6.78 cum cum 3.10 21 230% 48 69

4 16.62 Finishing walls with exterior decorative cement based paints, such assnoweem Robbiacem etc. on old work, one coat to give an evenshade.

97.73 cum cum 3.10 303 230% 697 1000

5 10.41 Cement concrete 1:2:4 with stone aggregate 20mm nominalsize in foundation and plinth (Topping). 0.62 Cum Cum 615.60 382 450% 1718 2099

2154 9803 11957Sub Head No. 7 Repair of existing Pump Chamber (13'x28') (Exist. W/W Jakhoda)

1 8.32 Scrapping:-Cement Plaster 111.48 Sqm Sqm 1.90 212 550% 1165 1377

2 15.6 12mm thick cement plaster 1:5 111.48 Sqm Sqm 11.60 1293 500% 6466 7759

3 10.41 Cement concrete 1:2:4 with stone aggregate 20mm nominalsize in foundation and plinth (Topping). 14.77 Cum Cum 615.60 9092 450% 40916 50008

4 13.13 Terracing consisting of tiles 22.86 cm x 11.43 cm x 3.81 cm laid over87.50 mm mud filling on a layer of 25mm mud plaster and an othrlayer of mud mortar for laying the tiles including two coats ofbitumen laid hot at 1.65 Kg per sqm on top of RCC slab includinggrouting with cement sand morar 1:3 and top surface to be left cleanetc.

96.98 Sqm Sqm 52.95 5135 600% 30811 35946

5 16.8 Painting one coat with ready mixed paint. 20.81 cum cum 3.10 65 230% 148 213

6 16.62 Finishing walls with exterior decorative cement based paints,such as snoweem Robbiacem etc. on old work, one coat togive an even shade.

156.07 cum cum 3.10 484 230% 1113 1597

16281 80618 96899Sub Head No. 8 Repair of existing OHSR (Exist. W/W Jakhoda)

1 11.3 First class brick work laid in cement sand mortor 1:5 inFoundation & Plinth 4.895 cum cum 407.60 1995 600% 11971 13966

2 15.3 +15.75

12 mm thick cement plaster 1:2 & Cement rendering onplaster 1mm thick 34.14 Sqm Sqm 20.85 712 500% 3559 4271

3 10.41 Cement concrete 1:2:4 with stone aggregate 20mm nominalsize in foundation and plinth (Topping). 1.334 Cum Cum 615.60 821 450% 3695 4517

4 16.61 Finishing walls with exterior decorative cement based paintssuch as snowcem. 464.22 cum cum 7.25 3366 230% 7741 11106

5 16.11 Painting one coat with ready mixed paint. 9.10 cum cum 3.10 28 230% 65 93

Page 25: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-2424-

-Sd-Executive EngineerContractor Witness

6 28.10 Providing and fixing cast iron double flanged sluice valve PN - 1.6 marked withIS: 14846 including nuts & bolts marked with IS: 1363, Rubber sheet markedwith IS:638 etc. carriage loading unloading, stacking handling, Re-handling etc.complete in all respect to the satisfaction of Engineer-In-Charge (MakesAARKO, VENUS, LEADER, SI, PANJA, UPADHAY.

f) 250 mm I/d pipe line laid complete 2 Nos each 15589.00 31178 10% 3118 34296

38100 30149 68249Sub Head No. 9 Road Path at Head Works & White Wash (Exist. W/W Jakhoda)

1 14.20 Dry brick on edge paving sand grouted over 50 mm thick cementplaster 1:4 (LR.) 449.64 Sqm Sqm 38.70 17401 600% 104406 121807

2 16.62 Finishing walls with exterior decorative cement based paints,such as snoweem Robbiacem etc. on old work, one coat togive an even shade.

5000 Sqm Sqm 3.10 15500 230% 35650 51150

32901 140056 172957

Sub Head No. 10 Distribution Syste in village Jakhoda & Sankhol

1 8.6 Dismentelling concrete.

d) C.C plain 1:2:4 mix 45 cum cum 71.85 3233 550% 17783 21016

2 10.41 Cement concrete 1:2:4 with stone aggregate 20mm nominalsize in foundation and plinth (Topping). 1.334 Cum Cum 615.60 821 450% 3695 4517

4054 21478 25533Sub Head No. 11 Repair of existing Pump Chamber (10'x12') (Exist. B/Stn. Sankhol)

1 10.41 Cement concrete 1:2:4 with stone aggregate 20mm nominalsize in foundation and plinth (Topping). 1.12 Cum Cum 615.60 689 450% 3103 3792

2 16.62 Finishing walls with exterior decorative cement based paints,such as snoweem Robbiacem etc. on old work, one coat togive an even shade.

204.38 cum cum 3.10 634 230% 1457 2091

3 16.11 Painting one coat with ready mixed paint. 9.10 cum cum 3.10 28 230% 65 93

1351 4625 5976Grand Total of HSR Items. 320450 1265700 1586150

Page 26: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-2525-

-Sd-Executive EngineerContractor Witness

(In figures) (In words)

Percent ABOVE/BELOW the Ceiling Rates worked out as per Contract Schedule of Rates and the Schedule of Ceiling Premia read with Rule 1 and in accordance in all respectswith the specifications drawings and instructions in writing referred to in Rule I thereof and in Clause-II of the annexed conditions and with such materials as are provided for bythe Engineer-in-Charge in all other respects in accordance with such conditions, so far as applicable.

D.N.I.T

Name of Work:- Estimate for Special repair of existing structures for Water Works Jakhoda & Existing Boosting Station Sankhol Tehsil Bahadurgarh Distt. Jhajjar."Repair of Inlet Channel, Filter Beds, Clear Water Tank, Suction Well for Raw/Clear Water, Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, RoadPath, Pumping Machinery at Existing Water Works Jakhoda & Exist. B/Stn. Sankhol, Distribution System & all other works contingent thereto".

Schedule 2nd N.S. Item App. CostRs.

21.30 Lacs

S.No.

NSItemNo.

Description Qty. Unit Rates to be quoted by the Cont.

1 2 3 4 5 6

Distribution System in village Jakhoda & Sankhol1 N.S. Stringing out DI pipes and specials castings along Trenches and laying the

same in trenches to correct Alignment and gradients including cartagefrom Divisional stores or nearest railway station to site of works andreturn of pieces of pipes to stores

b) 100 mm i/d 500 Mtrs Mtrs2 N.S. Cutting DI pipes and specials and chipping or filling the surface to a

uniform finish.

b)100 mm I/d 33 Cut Per

Cut3 N.S. Jointing D.I. socketted pipes, valves and specials with rubber tyton joints

fitted complete including cost of labour and tools etc. and testedcomplete.

b) 100 mm I/d 125 Nos. each

4 NS Providing & Fixing C. I. Double Flanged Specials of differentSizes confirming to I.S. specifications 1538/1993 complete inall respects

Distribution System CI Plain Ended Tees, Bends, Reducers etc.

250 Kg Kg

5 N.S. Taking out all five layer of filter media and placing outside. 206 cum cum

6 N.S. Placing all layer of filter media after washing, screening and cleaning. 185 cum cum

Page 27: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-2626-

Estimate for Special repair of existing structures for Water Works Jakhoda & Existing Boosting Station Sankhol Tehsil Bahadurgarh Distt.Jhajjar. "Repair of Inlet Channel, Filter Beds, Clear Water Tank, Suction Well for Raw/Clear Water, Boundary Wall, Pump Chamber ofB/Stn. & Water Works, OHSR, Road Path, Pumping Machinery at Existing Water Works Jakhoda & Exist. B/Stn. Sankhol, DistributionSystem & all other works contingent thereto".

App. Cost Rs. 21.30 lacs.GENERAL INSTRUCTIONS TO THE TENDERER

1. Tender form will be issued to contractors who are enlisted with the Public Health Engineering Department for general civil works upto

the cost of DNIT, as on date of issue of tender form

2. Rates to be quoted in words & Figures: -

The Tenderer shall quote in English/Hindi both in figure as well as in words the rate & amount tendered by him in the schedule of price bid

(Schedule No.1). The amount for each item should be worked out, entered and requisite total given of all items, both in f igures and words.

The tendered amount for the work shall be entered in the tender and duly signed by the tenderer. In case the rate of any item is not quoted

it will be presumed that tenderer has opted to supply/fix that particular quantity of items mentioned in the DNIT, free of cost.

3. Documents/Preparation of Tenders.

The tender documents to be submitted will consist of the following:-

a) Complete Set of tender documents as sold duly filled in and signed by the tenderer as prescribed in different clauses of the tender

document. The rates of HSR items shall be quoted on %age above or below the ceiling rates and N.S. items shall be quoted on item rate basis

and signed by the tenderer.

(b) No conditional price bid will be accepted and tender shall be liable to be rejected without any intimation to contractor.

(C ) Power of Attorney in original or a true copy thereof duly attested by a Gazetted Officer shall be produced in case an authorized

representative has signed the tender, as required in general.

(d) The price bid as received above will be evaluated for all tenders except tenders rejected as per Sub Clause (b) given above and work will

be awarded to the lowest competitive offer.

Page 28: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-2727-

3. Completeness of offer:-

The contractor shall ensure that their offers are complete in all respects for proper and complete execution of work as per the scope of work

mentioned hereinafter. If any item is not included in the DNIT specifications and is required for completion of work the same shall be

included in their offer and with separate mention of the same with full justification and cost of the same shall be quoted separately.

4. Scope of work:-

Brief description of scope of work under this tender is as under.

Sr.No.

Description ofcomponent

Nos. Size of each component

Water Works Jakhoda

1. Inlet Channel 1 No. Repair

2. Filter Bed 2 Nos. Repair

3. C.W.T. 2 Nos. Repair

4. Suction Well forRaw/Clear

2 Nos. Repair

5. Boundary Wall 1 No. Repair

6. P.C. (B/Stn.) 1 No. Repair (10’x10’)

7. P.C. (W/W) 1 No. Repair (13’x28’)

8. OHSR 1 No. Repair

9. Road path atHead Works &White Wash

1 No. Repair.

10. PumpingMachinery

1 No. 2700 lpm x 40 mtrs. head at W/W Jakhoda

11. Dist. System 100mm = 500 Mtrs. D.I. Pipe.

B/Station Sankhol.

Page 29: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-2828-

12. P.C. (W/W) 1 No. (10’x12’)

13. Pumping Machinery 1 No. 1700 lpm x 40 Mtrs. head at B/Stn. Sankhol

14. Electricalequipment

As mentioned above at Serial No. 10 & 13.

15. Supply & erectionof disinfectionequipment.

As per DNIT.

(i) The pipe for use at work at Labour rates would be supplied by Deptt, at Reserve Stock of the Division free of cost. However, the

carriage loading/ unloading of pipes upto site of work from Reserve Stock and watch and ward of same will be responsibility of the

contractor.

(ii) Supply and erection of C.I. pipes and specials both to connect the suction side of the pump with the collecting tank including bell

mouth and the delivery sides of the pump with the rising main outside the foundation of the pump chamber wall shall be part of

scope of work. Supply and erection of the same shall include cost of labour and material required for fabrication for double

flanged smaller piece lengths and jointing the delivery lines with flanged joints, inclusive of cost and labour for other material like

nuts, bolts, rubber insertion etc. as per site requirements.

(iii) The work, after completion shall be commissioned to the entire satisfaction of Engineer-in-Charge.

5. Specifications

i) All the work shall be carried out as per PWD specifications and as per drawings attached.

ii) Specifications to be adopted have been mentioned in schedule II and III and work will be executed accordingly.

iii) Any item of work, required for execution of work, for which there is no PWD specification or makes have not been mentioned in

schedule III , shall be mentioned by the firm/contractor in his tender, otherwise the same will be as per decision of Engineer-in-

Charge.

Page 30: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-2929-

Schedule No. I

Price Bid

(a) Rate for items based on Haryana Schedule of Rates 1988

at *

In figures In Words

Percent above/ below the ceiling rates worked out as per contract Schedule of Rates and

the Schedule of Ceiling Premium read with rule 1 of the standard tender form (Part of

documents) and in accordance, in all respects, with the specification drawings and

instructions in writing referred to in the said rule 1 and with such material as are provided

for by the Engineer-in-Charge, in all respects and in accordance with such conditions, so far

as applicable.

Page 31: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-3030-

D.N.I.TName of Work:- Estimate for Special repair of existing structures for Water Works Jakhoda & Existing Boosting Station Sankhol Tehsil Bahadurgarh Distt.Jhajjar. "Repair of Inlet Channel, Filter Beds, Clear Water Tank, Suction Well for Raw/Clear Water, Boundary Wall, Pump Chamber of B/Stn. & Water Works,OHSR, Road Path, Pumping Machinery at Existing Water Works Jakhoda & Exist. B/Stn. Sankhol, Distribution System & all other works contingent thereto".

App. CostRs.

21.30 Lacs

b) Rate for Non Schedule Items :-Sr.No.

Name of item with brief description Qty. Unit Rate Amount

Supply, Erection, Testing & commissioning of Horizontal spindle split casing type pumping sets of followingduties directly coupled to AC squirrel cage induction type motor with accessories as described in ScheduleNo. II complete in all respect with priming arrangement with complete base frame.

(A) At Existing Water Works Jakhoda

Clear water pump set.

2700 LPM, 40 mtrs head with squirrel cage induction motor 1440 RPM, 3 phase 50 Hz of 4 star (40.00 BHP) 1 No. each

(B) At Existing B/Station Sankhol

Clear water pump set.

1

1700 LPM, 40 mtrs head with squirrel cage induction motor 1440 RPM, 3 phase 50 Hz of 4 star (25.00 BHP) 1 No. each

2 Supply and fixing following CI D/F pipe and specials/sluice valves /non return valves/ bell mouth/Reflexvalves including cost of Jointing materials, laying, jointing in position, as per specification given in scheduleNo. II.

i) 2 Nos. Pumps for clear water

A) Detail of pipe and specials

a) CI D/F bends, Reducers, tees etc. 100 Kg. Per kg.B) CI D/F pipes excluding jointing material

b) 200 mm i/d 10 Mtrs. Per mtr.C) Bell Mouth

b) 200 mm i/d 2 No. Each

3 Supply, erection, testing and commissioning of LT cables PVC insulated single core 1100 VER copperconductor confirming to BS 6004-1984 including cost of thimbles, lugs for making connection undergroundcovered with sand and bricks/In trench/in pipe on steel bridges (Detail of cable sizes and length to beprovided be clearly mentioned for making following connection.

a) Electric meter to main switch and main switch to L.T. Pannel = 6sq mm 3.5 core cables for 1 No. for WaterWorks Jakhoda & 1 No. for existing B/Stn. Sankhol 2 x 10 = 20

20 Mtrs. Per Mtr

4 From LT pannel to starter and starter to electric motor.

For 2700 LPM at W/Works Jakhoda & 1700 LPM pumping set at existing B/Stn. Sankhol 6 sq mm 3.5 corecable = 15 x 2 = 30 Mtrs. 30 Mtrs. Per Mtr

Page 32: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-3131-Schedule-II

GENERAL CONDITIONS OF CONTRACT

1. Definition

The term “work” means the complete scope of work covered in this DNIT as per the specification mentioned hereinafter which may

be let out on contract. The term Superintending Engineer means the Superintending Engineer, Public Health Engineering Circle, Jhajjar and

the terms “Engineer-in-Charge” means the Executive Engineer, Public Health Engineering Division Bahadurgarh of the Haryana Public Health

Engineering Deptt. under whose jurisdiction the work will be carried out from time to time. The term “Contractor” means the person or firm,

whose tender for the work is accepted and the term ‘Contract’ means the contract covered by the contract agreement to be entered into by

the said contractor for carrying out and completion of the said work with the Engineer-in-Charge.

2. Consideration for contract and extent of Works:

a) The contract price payable to the contractor in respect of various items of work shall be the consideration for all and every

description of work done, executed and performed in and about and incidental to the work described or mentioned in this schedule and in

the drawings or be intended so to be whether the same shall be incidental or necessary to the ultimate completion or only for the temporary

purposes of the said work or be required for carrying out of such precautions as the Engineer-in-Charge may require for the protection of the

public, workmen and the work and also existing building etc., or as set out in the conditions of the contract. It also includes other incidental

item or work, materials and things required to make the work satisfactory in all respects and complying with the contractor’s guarantee as

incorporated hereinafter.

b) Commissioning of installation and civil works will be responsibility of the contractor.c) The contractor shall be fully responsible for making good the imperfection of any item of work executed under this agreement as

per clause 17 of the contract agreement. The contractor shall repair items of work during maintenance periods.

d) All the civil works executed under this work will be tested by the contractor at his own cost. The water retaining structure shall be

tested for water tightness and hydraulic efficiency. The contractor shall be responsible for making good imperfection in water tightness and

Page 33: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-3232-

hydraulic efficiency. All the works after completion and maintenance period will be handed over to Engineer-in- Charge in good working

condition.

3 (a) Terms & conditions of payments:-

Payment will be made as per actual work executed at site @ the accepted rates.

b) Release of security:-

5% of estimated cost as performance money will be deposited by the agency before commencement of work.

5% security including earnest money will be deducted from each running bill of the contractor, in addition to performance money.

The deduction of security referred to the clause-I of contract agreement, shall be released as per clause 7(a) of the tender document

after a period of 3 months after final bill of whole work except work included in schedule.

4. Possession of the Site :-

The Engineer-in-charge shall, as soon as practicable, after the acceptance of the tender or the execution of the contract agreement as the case

may be give possession of the site to the contractor for use of the site for the work covered by his contract so as to enable him to commence and

continue the execution of the work included in his contract, but the non-delivery or use of such site or sites or any part thereof shall not effect the use of

such contract or the specification and it shall not entitle the contractor to any increased allowance in respect of money or otherwise. Time for the

completion of the work may be extended in proportion to the delay involved on the application by the contractor but this will not entitle him to any extra

payment on account any reason what so ever it may be.

5. Reinstatement and contractor to satisfy himself on all points:-

All land, property, fencing likely to be disturbed or damaged during the execution of the contract work, shall be made good by the

contractor at his own expense, to the satisfaction of the authorities and owners concerned.

The contractor shall be deemed to have satisfied himself as to the dimensions, levels, character and nature of all the works, buildings,

roads lands, safe bearing capacity, spring level and other things with regard to any connection they may have with the works of the contract,

and shall be deemed to have obtained his own information on all matters which could in any way influence his tender.

Page 34: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-3333-

No claim for extra work or otherwise shall be allowed in consequence of any misunderstanding, error or incorrect information on any

point or if any inaccuracies in reference thereto which may appear in the specification, nor shall the contract be nullified in consequence of

any such misunderstanding, error, incorrect information or inaccuracies.

6. Storage of Material:-

All materials, supplies, machinery or equipment which may be exposed to the weather shall be suitably protected to the satisfaction

of the Engineer-in-charge.

7. Local Taxes:-

All toll, octroi, terminal taxes, sale tax , VAT, excise duty, import duty or any other Municipal taxes shall be paid by the contractor on

all tools & plants and materials imported or taken delivery by him including all goods and material delivered to him free on rail and those

transported by him into the Town/Village from outside and he shall not be entitled to reimbursement for any payments made on account of

such octroi, or terminal tax charges. This applies to materials issued from stores of the Engineer-in-charge as well.

If any fresh tax of any kind is levied at any stage or any existing tax is subsequently enhanced after the date of the contractor’s tender,

the same shall be paid by the contractor and no extra allowances shall be given to him by reason of such fresh or enhanced taxes, octroi,

terminal tax or other having been levied.

8. Import license and Foreign Exchange:

Import license and foreign exchange, if required, will have to be arranged by the successful tenderer himself and this is solely his

responsibility.

9. Services and Notices on the contractor:-

Any notice, order, required or instruction which the Engineer-in-charge may wish or require to give in relation to works, shall be

deemed to be duly served on the contractor, if recorded in the order book kept on the work, or if it shall be delivered personally to the

contractor or any of his agent or sent by post to his office, and notice of such office and of the contractor’s address shall be given by the

contractor to the Engineer-in-charge.

Page 35: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-3434-

10. Work executed outside working hours:-

If the contractor shall execute any works outside ordinary working hours during the absence of the Engineer-in-charge or his

authorized representative and without having previously given him sufficient notice in writing that such work was about to be executed he

will be required to take up and reconstruct any work so executed, if ordered to do so by the Engineer-in-charge in writing under his hand. No

payment shall be payable for the work dismantled.

11. Engineer-in-charge, his Assistants or third party nominated by Engineer to have

access to work and store:-

The Engineer-in-charge with his Assistant Engineer, Junior Engineer, Inspection Work Mistries, Munshies, Inspectors and all other

persons authorized by him shall at all times have full access to the works and the contractor’s workshop and factories, stores, brick fields,

godowns and all other places where materials are collected or stored for the works and shall have full power to send workman upon the

work to execute any other works not included in the contract and for those operations the contractor shall afford every reasonable facility

during the working hours, provided that such operation shall be carried on in such manner as not to impede the progress of the work

included in the contract, but the department shall not be held responsible for any damage which may happen to be occasioned by any such

other works.

The Engineer-in-charge can opt for third party inspection other than Deptt. in addition to inspection by Departmental staff stated

above. The third party would inspect the work during its execution to ensure execution of work as per specifications/agreement and also

quality control i.e. drawl of samples, testing & other items etc. The report of the same would be submitted to Engineer-in-charge by the third

party. The agency/contractor shall be bound by report of third party inspection and shall take remedial measures for execution of work as

per specifications in agreement. The inspection & sample testing charges will be borne by the Department in case samples pass. In case

samples tail, the testing charges will be recovered from contractor.

12. Interference with or damage to other works:-

Page 36: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-3535-

The contractor shall not cause any interference with the work of any other contractor engaged for the construction at site of work

and shall take all due precautions to prevent his work people from causing the damage to the work of other contractor while in course of

execution of the work covered in the scope of work or otherwise.

13. Location:-

The location, where the work is to be executed is shown on the plan attached with the DNIT.

14. Inspection of material:-

Before supply of materials like R.C.C. pipes and machinery, inspection will be carried out by the Engineer-in- Charge or the authorized

representative at the factory premises. A proper inspection note will be issued any material can be ordered to be inspected by Engineer-in-

Charge at the premises of its production.

General:

The contractor shall be responsible for arranging and executing the work of centring, scaffolding, staffing, planting, timbering,

strengthening, shoring, pumping, fencing, watching at night as well as in day. The contractor shall him self provide its sheds or godowns for

storage of material and for labour etc.

The contractor shall give all necessary personal superintendence during the execution of the work and as long thereafter the

Engineer-in- Charge may consider necessary.

Additional Conditions of Contract - I

1. The work will be carried out strictly in accordance with the PWD. book of specification edition 1990 as amended from time to time,

which forms a part and parcel of this contract agreement.

2. In this contact schedule of rates only essential portion of description of item has been written but it will deem to cover the entire

items as fully described in Haryana PWD. Schedule of rates , 1988 as amended from time to time till date of receipt abstract of tenders.

Page 37: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-3636-

3. The Engineer-in-Charge shall be entitled to order work against any item of work shown in this contract schedule of rates hereinafter

called the schedule to any extent and without any limitation where-ever as may be required in his opinion for the purpose of work,

irrespective of the fact that the quantities are omitted all together in the schedule or are shown more or less than the work ordered to be

carried-out.

4. The rate for any item of work not provided in the Haryana PWD Schedule of rates 1988 but executed at site will be decided by the

competent authority and the decision will be binding upon the contractor.

5. All the items in this contract schedule of rates are subject to foot notes/notes given in this Haryana PWD. schedule of rates 1988

regarding these items.

6. Approximate quantities are given in the contract Schedule of rates and may vary at the time of execution of work. The payment will

however be made for the actual work done by the contractor. No extra claims whatsoever will be admissible to the contract on account of

variation, alteration or deletion of any item over the quantities depicted in this contract schedule of rates.

7. All amendments issued in the Haryana PWD Schedule of rates 1988 and the date of receipt of the tender will be applicable on the

contract schedule of rates.

8. The contractor will have to make his own arrangement of bricks and all other materials required for successful execution and

completion of the work.

9. Any other item not included in this contract schedule of rates and got done at site of work will be paid according to relevant item of

Haryana PWD schedule of rates @ rates accepted in the allotment letter and approval issued by the competent authority against this

contract.

10. No claim will be entertained from the contractor in case any omission in description of rates and DNIT which might have occurred in

any of these items taken in schedule while comparing this schedule or on account of typing/comparison or over writing in case of any error,

the same shall be rectifiable at any stage as per Haryana PWD Schedule of rates 1988 along with the amendments on the same received from

time to time.

Page 38: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-3737-

11. The premium should be quoted above or below the contract schedule of rates and no condition should be given. In case, any

condition is tendered, this will be considered as Null and void and only the premium or discount quoted by the tenderer shall be accepted. In

case, any tenderer refuses to accept this, his earnest money will be forfeited.

12. No tendered premium shall be payable on N.S. items. The contractor will quoted his rate for each N.S. item.

13. The contractor will dispose off the excavated surplus soil , at his own cost to a place as directed by the Engineer-in-Charge , but shall

by all means, clear the site from the extra earth. No extra lead, lift, wet earth, loading, unloading and carriage will be paid to the contractor

who will have no claim on the same at anytime later. Further, the contractor will quote his rate taking into account the effect of the surplus

earth which will be disposed off by him at his own cost.

14. All the reinforcement shall be Fe-500/TMT steel bars grade confirming to relevant BIS and of SAIL, RANL, TISCO, IISCO and shall be

procured by the contractor at his own cost. If agency is allowed to use steel Fe-500/TMT of other companies, than the above, but ISI marked,

the deduction @ Rs. 5000/- MT will be made.

15. The rates included in the contract cover the cost of filling of the water retaining structure, testing for water tightness, to the full

satisfaction of the Engineer-in-Charge and emptying the same if desired.

16. Minimum 40mm clear cover be provided on the reinforcement on the inner side of the structure. The contractor shall give

structurally safe and water proof structure.

17. Contractor shall be fully responsible for structural safety in all respect of the structures existing and under construction as per scope

of work of the DNIT.

18. The cement will be arranged by the Contractors/ Society/ Agency/ Firm at his own level. The cement shall be ordinary Portland-43

grade, duly ISI marked & confirming to ISI-8112 with latest amendments. The cement manufactured by Mini Cement Plant shall not be used.

In case contractor is allowed to use PP = cement duly ISI marked and confirming to IS-1489 with latest amendments for only non

RCC works than a recovery of Rs. 15/- per bag of 50 Kg. cement be made.

19. The cement shall be purchased from authorized Distributor of Manufacturer or Authorized Dealer.

Page 39: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-3838-

20. The cement arranged by the Contractor/Agency will be brought at site and shall be kept in the Store maintained at site, provided with

dual locking system i.e. one key of lock with representative of the Deptt. and 2nd key with authorized representative of agency.

21. The contractor/Agency will inform the Executive Engineer/ Sub Divisional Engineer for the quantity of the cement brought at site with

bill/ challan in the name of the agency before using the same and Executive Engineer incharge or his authorized representative may

check the actual receipt of cement at site.

22. The Engineer-in-charge or his authorized representative may, if need be, also send the cement for testing to any Govt. Lab./reputed

Lab. The samples of the cement will be collected as per BIS specifications in the presence of the Contractor/Agency or his authorized

representatives. In case the cement is found as per ISI specifications then the cost of testing will be borne by the Deptt., but in case the

cement sample fails to meet the BIS requirements, then appropriate action as per Contract Agreement will be taken. The cost on the

testing cement along with any loss caused to Govt. shall also be recovered from the Contractor/Agency and no claim in this respect will be

entertained.

23. The stock of cement at site shall not be more than one month consumption and only sufficient quantities shall be kept to ensure

continuity of the work.

24. The cement consumption register showing date of cement brought at site by the Contractor/Agency and its day-to-day utilization will

be maintained. The said register shall be open to inspection for representative of the Engineer-in-Charge during their visit at site. The

consumption and receipt of cement in the register shall be initialed jointly by the authorized representative of the Contractor/Agency and

representative of Engineer-in-Charge. The said register will be issued by office of concerned Sub Divisional Engineer under his dated

signature for each agreement separately. The register will also contain the columns for work executed against the cement issued.

25. Quality check register will be maintained at site and regular sampling of work executed every month shall be recorded in the same.

26. Water

Page 40: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-3939-

All water to be used on the work shall be clear fresh water to be obtained from a source to be approved by the Engineer-in-charge, It

shall be entirely free from brackish salts, alkaline, acid mineral impurities and confirm to clause 4.3 of IS-456-2000 and shall be stored and

carried in clear tank and vessels.

The contractor shall provide at his own expenses at all time arrangement for supply of water for all purpose to the full satisfaction of

the Engineer-in-charge and shall pay all charges of Govt. in case of the supply of water by Govt..

27. Cement Concrete.

All mixes shall be as per IS 456-2000 and IS 3370-1965 (Part I to IV) amended time to time. In the reinforced cement concrete for

water retaining structures the grade of cement concrete shall be as per specifications.

The concrete shall be confirm to IS 456-2000 ordinary grade and described in 5.33 and shall be subject to such test as specified in the

above standard.

All concrete used in RCC work shall be poured by mixing in a Mechanical mixer shall be compacted with mechanical operated

vibrators to be arranged by the contractor at his own cost and charges.

The Engineer-in-charge may require reasonable number of test to be made on the concrete during the progress of work. Not less than

3 standard specimens shall be made for each test. The specimen shall be cured under filled conditions. The cost of testing shall be borne by

the contractor.

If the specimen fails to comply with the requirement set out in IS 456-2000 above , Engineer-in-charge will have the right to order the

demolition of such work as he may think to have been carried out in weak concrete at the cost of contractor and no payment shall be made

for the faulty construction. The method of making work cube test shall be accordingly to be given in IS 456, 4.1 read with IS 516-1959. The

Engineer-in-charge shall have the right to order the test of any material used in RCC work to determine their suitability for the purpose. The

cost of all such test shall be borne by the contractor. All the faulty materials so found/ determined shall be removed from the site of work by

the contractor at his own cost with in period specified by the Engineer-in-charge.

28. Mode of Construction.

Page 41: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-4040-

The RCC shall be cast monolithic with supporting beams. Steel shuttering and forms must be substantial and of unyielding built to

correct dimensions and water tight to the entire satisfaction of the Engineer-in-charge so as to preserve the concrete from damage or

distortion during setting and till removal of shuttering of all visible faces must be of steel or plywood.

All reinforcement shall be as per detailed drawing and calculation duly approved by the S.E. The contractor shall be responsible for

the accurate fixing of the reinforcement and shall not place any concrete until the reinforcement has been inspected in position and

approved by the Engineer-in-charge. The contractor shall take all precaution to prevent the displacement of reinforcement during concreting.

29. Test for Water Tightness of the Structure.

The R.C.C. Structures shall be absolutely watertight. No sweating shall take place after period of 20 days of the tank being filled upto

the full supply level and kept so full during the above period. The maximum fall in the water level including that occasioned evaporation shall

not be more than 6mm after 48 hours during the winter & 12mm during the summer. All works required to fulfill the test shall be carried out

by the contractor at his own risk & cost. No back filling of earth shall be allowed till testing of Tank is done.

30. Erection of pumping machinery:-

30.1 Safeguarding & Protection

All machinery, equipment, pipes, specials accessories, name plates, gauges etc. supplied by the contractors shall be safeguarded by

him completely erected, tested and commissioned. All opening shall be rejected to prevent entry of foreign matter, by blinds/ plugs. In case

of loss or damage to any machinery or to any part thereof, the contractor shall bear the responsibility and loss.

The machinery shall be protected by the contractor against weather conditions and other chances of deterioration. If required by the

Engineer-in-Charge, these shall be covered with tarpaulins and with tin or G.I. Sheets.

The components, parts etc shall be thoroughly cleaned before assembly and assembled as per drawing and instructions contained in

the supplier’s booklets and literature for installation or as per instructions by the Engineer-in-Charge. The contractor shall be responsible for

installation of machinery as per drawings or directions of Engineer-in- Charge. In case of any variation in levels, etc. the contractor shall do

the necessary rectification at his own cost.

Page 42: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-4141-

After completion of pre-erection works to the satisfaction of the Engineer-in-Charge, the contractor shall commence the erection of

machinery or foundations.

30.2 General

The contractor shall supply the manufacturer’s recommendations and instruction for installation and operation so as to ensure

proper erection of machinery and its operation.

The contractor shall provide all tools and gauges for erection and alignment. The contractor for the purposes of erection shall employ,

at his own cost, suitable lifting shackles, cranes and skilled men, to the satisfaction of the Engineer-in-Charge. The contractor shall himself

provide huts , sheds or godown for storage of his materials and labour etc.

The contractors shall be responsible for arranging and executing the work of centering scaffolding, staffing, planting, timbering,

strengthening, shoring, pumping fencing, watching and lighting at night as well as in day.

Final alignment, as specified by the manufacturer, shall be carried out after piping connections are made. Tolerances specified by the

manufacture shall be added to ensure that no stresses are induced on the pumps by piping.

The drilling of holes in the base plate for fixing motors, fixing of couplings on shafts etc. and dowelling including provision of dowel

pins or similar arrangement for retaining the alignment shall be carried out by the contractor as part of the erection work.

The contractor shall fix up pressure gauge, lubricants grease cup and all other accessories as part of the unit.

30.3 Grouting Under Base Plates And Machine Foundation:

30.3 (1) General

The grouting material shall solidly fill the spaces to be grouted and permanently retain its original volumes so that the base plate will

be held firmly in the set position. The amount of water used in mixing shall be kept in minimum.

30.3 (2) Preparation of Surface

The top of foundation shall be cleaned and free of all levitance loose particles, oil or grease and shall wetted thoroughly leaving no

puddles prior to grouting.

Page 43: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-4242-

All tapped pockets shall be properly vented to allow penetration of grout.

The grout shall cover all shims, which are to be retained.

30.3 (3) Placement

All anchor bolt holes shall be completely filled with grout.

The finished surface shall be smooth and shall slope away from base plate (approximately at slopes of 1 in 25). After initial set is over

the grout shall be kept thoroughly wetted for a minimum of 5 days. Care is also to be taken during grouting to see that the base plate level

and alignment is not disturbed.

30.3 (4) Bolts & Nuts etc.

Holding down bolts of sufficient length shall be provided and fixed for setting the machinery to the foundation. All the necessary

supporting joists and girders, bolts, nuts, washers and plates shall also be provided together with jointing material for making the various

joints and cost shall be included in tender.

Wherever a reference to any Indian standard appearing in this schedule, it shall be taken to mean the latest version of the standard

till date of the receipt of tenders with latest amendment. The Superintending Engineer/ Engineer-in- Charge shall have the option to change

the specification of any structures. The contractor shall have no claim whatsoever for such change.

The contractor/agencies shall fill up the component-wise rates in figures and words for Non-Schedule Items in the space given on

page _ under the heading (B) Non-Schedule Items. The tender of the contractor/agency who does not fill up the component-wise rates shall

be out rightly rejected as an “irresponsive tender and earnest money of concerned contractor/agency shall be forfeited for not observing the

required procedure.”

Page 44: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-4343-

Schedule – III

Specifications & Technical conditions

1 Specification of PUMP and pumping machinery (Centrifugal type):

1.1 Pumps

The contractor will supply factory assembled Pump, Motor with base plate and coupling duly tested of factory premises. Horizontal

spindle split casing type centrifugal pump sets completed with suitable squirrel cage induction motor of specified makes as per schedule No.

III, directly coupled, conforming in all respect to IS 1520-1972 and motor conforming in all respect to IS 325-1978, as amended upto date.

The pump set shall be capable of pumping clear, cold fresh water having characteristics as specified in clause 3.1 of IS 1520-1972. Each pump

motor set shall be suitable for continuous rating and shall be supplied with suitable coupling, priming, funnel, test, cock, base plate,

foundation bolts and nuts and with accessories. The make shall be Kirloskar/Mather platt/Worthington.

Centrifugal Pumps: -

A) Specifications:Horizontal spindle split casing type centrifugal pumps of specified approved make as per schedule No. III and conforming in all respect

to IS 1520-1972 as amended upto date.B) Material & Construction:

As per clause 5.1(Table.1) of IS 1520-1972as amended upto date. The Pump is to be bronze fitted S.S. spindle as per IS-318.C) Impellers:

Double suction enclosed type hydraulically and statically balances and made of bronze.D) Nominal speed:

1440 RPM.E) Pump Assembly:

Individual casing parts and pump as a whole in assembled condition to be hydrostatically tested at 1.5 times the shut off headpressure or two time the duty point pressure whichever is higher.F) Efficiency:

Page 45: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-4444-

The duty point should be towards left side of best efficiency point (B.E.P.) but within the best efficiency zone. The efficiency shouldnot be less than 75%.G) Guarantee and performance:

As per clause 12 of IS 1520-1972 and no extra credit shall be given for higher efficiency. Further pump efficiency shall be guaranteedto deliver required discharge for a range of head between (+) 10% from the specified head. Shut off head of the pump should also bementioned and maintained.H) Information to be provided by the manufacturer:

The performance data as per clause 19.2.4, performance curves and original test certificates certified and signed by the manufacturerand tenderer for performance of pump shall be provided otherwise offer will be rejected.

I) Accessories:Each pump shall be supplied with following accessories as per clause 7.1 of IS 1520-1972.a) Ball type air relief valve.(Manufacturer’s provision)b) Tyre type coupling.c) Pressure and vacuum gauge with siphon cock as per IS 3624.d) Pressure relief valve.e) Base plate.f) Foundation bolts and nuts.

NOTE: Two pumps – I will run at a time. (Specified in Schedule-I)

1.2 Electric Motor:

The pump shall be directly coupled to A.C. three phase 415 volts 50 cycles squirrel cage induction motor on common fabricated M.S.

base plate. The motor shall be capable of operation on 415(+) 10% (-) 10% voltage having synchronous speed of not more than 1500 RPM

(full load slip not to exceed 4%) . The motor shall be totally enclosed fan cooled and of continuous rating type. The motor shal l confirm to IS

325-1978. The motor shall have class, F, insulation according to IS 12741-1974. The H.P. of electric motor shall have a safe margin of 10% at

the maximum requirement of BHP/Pump rating and (+) 10% rated of head at duty point. Rise in temperature while motor is in continuous

use at rated out put should not exceed as per Class-F, insulation (clause 12.1 of IS 325-1978).

1.2.1 Dimensions and output:

Page 46: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-4545-

The dimensions and outputs of motor shall comply with IS 1231-1974.

1.2.2 Winding and Insulation:

The stator winding consists of synthetic enamel covered copper wire with slot insulation complying with the requirements of IS 1271-

1974.

1.2.3 Balance:

All rotors are dynamically balanced to comply with the requirements of IS 4729-1968.

1.2.4 Performance Data:

The contractor shall provide the following details in a tabular form in respect of each set alongwith the tender.

1) Make of Pump.

2) Model & size of pump.

3) Duties offered LPM/M. discharge head.

4) Manufacturer.

5) Efficiency of pump at rated head.

6) Overall efficiency of pump set at rated head.

7) Shut of head (M).

8) NPSHR (M).

9) Discharge at (-) 10% Head (LPM).

10) Efficiency at (-) 10% Head.

11) Discharge at (+) 10% Head (LPM).

12) Efficiency at (+) 10% Head.

13) Input at rated head and discharge D.P. (KW).

14) Input at (-) 10% Head K.W.

15) Input at (+) 10% Head KW

16) Rated Motor output (KW).

Page 47: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-4646-

17) Guarantee.

18) Make of Motor.

19) Synchronous speed for Motor (RPM).

20) Suitability at (+) 10% (-) 10% Voltage.

21) Suitability at (+) 3% frequency.

22) Performance Curves.

23) Accessories.

24) Material and construction of pumps

a) Casing

b) Impellers

c) Shaft

d) Shafts sleeves

e) Bearing rings

(Note: All the material of rating as per the Schedule No. I and specifications & make of schedule No. II & III)

2. C.I. Pipes and Specials:

2.1 C.I. Pipes:

The specials shall be all flanged conforming to ISI 1538-1993 ISI Marked class B. The velocity in the suction & delivery pipe shall not to

exceed 2.00 m/sec and 2.5 meters/sec. respectively. The suction and delivery pipe shall be so designed that any of the pumps can be

operated at one time and delivery pipes of each pump will be as per manufacture standard.

Pipes shall be horizontally cast iron double flanged pipes class-B conforming to IS-7181-1986 as amended upto date and bearing ISI

certification marks in maximum length upto 2.75 meter each or shorter lengths/pieces as per site requirements.

28.3 Reflux Valves:

Horizontal Type Reflux Valves shall be heavy duty flanged type with gun metal sheets confirming to ISI 5312 (part I) 1969 and shall be

provided separately on the suction side of each of the pumping set and delivery side of clear water pumps with Bye Pass Arrangement. These

valves will be of same size as of suction and delivery pipe. The make of reflux valves will be as per schedule-III.

Page 48: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-4747-

28.4 Bell Mouth:

On the suction side, bell mouth of appropriate size and opening shall be provided in the collecting tank.

28.5 Casting

All casting shall be sound and inform/smooth both externally and internally be entirely free from blowholes. They shall be carefully

cleared and dressed off. All bright work shall be free from air holes and spots and shall be properly cleared and finished to remove tool

marks.

The contractor shall reject and replace any casting, which the Engineer-In-Charge consider to be not of first class appearance and

quality No plugging, welding burning shall be resorted to.

28.6 Drip Pans

Drip pans shall be provided where any dripping of oil or water may occur and there shall be made of copper with a copper pipe edging

and be such that they fit neatly into bring arrangement will be got done separately so no provision is to be made by contracting agency.

29. LT Panel (In Pump Chamber)

Cubical type dust proof and Vermin Proof extensible type free standing, floor mounting made out of 14 gauge CRCA sheet

with C-channel frame iron

75x40x6 mm base frame painted with synthetic light gray enamel paint with suitable size of cable chamber with brass

compression type glands to receive incoming and outgoing cables in sheet steel cubical comprising of following.29.1 Bus Bar Coppers.

TPN, 415 Volt AC Bus bar Complete in all respect as per specification given below:

The Bus bar shall consists of hard drawn high conductivity, duly tinned copper strip size 80 x10 mm for phase and 40 x 10 mm for

neutral with PVC heat shrinkable sleeves of appropriate phase colour. The bus bar shall be mounted on bus bar insulator (of DMC Material)

which will permit sufficient movement for compensation of temperature stresses as well as proper bracing to with stand the electromagnetic

forces provided during short circuit and the bus bar and links shall be designed for a maximum temperature of 750 C.

All the outgoing and incoming feeder's connected with LT cables or bus bars complete in all respect.

Page 49: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-4848-

All connections with LT panel should of solid connection with copper strips.

(Note: All the material of rating as per the Schedule No. I and specifications & make of schedule No. II & III)

29.2 Star-Delta Starter:-

1. MCCB 1 no. L&T/Siemens,ABB

2. Contactor 3 Nos. L&T/Siemens,ABB

3. Over-load relay 1 no L&T

4. S.P.P. 1 no L&T/Mini Pac

5. Timer (Electronics) 1 no L&T/GIL

6. Push Button 2 Nos.

7. Indication ON/OFF LED TYPE 2 Nos.

8. Control fuse 1 no

9. Amp. Meter with C.T. 1 no AE, KAPPA, L&T

& Selector Switch

10. Voltmeter with selector switch 1 no AE, KAPPA, L&T

29.3 Switches/MCCB's /MCB's

Panel mounting switches/MCCB's/MCB's suitable for 415 Volts 50 Cycles 3 -Phase AC supply with operating mechanism handle

conforming to IS: 13947 (Part -I & III) 1993/IEC 947.

(Note: All the material of rating as per the Schedule No. I and specifications & make of schedule No. II & III)

MCCB's/MCB's

a) Fix contact

b) Terminal & Backing plate for terminal

c) Moving contact assembly.

d) Archute & bridge.

Page 50: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-4949-

e) Thermal/Electronics Trip system with adjustable of S/C, O/C.

f) The operating handle shall have suitable indication of ON - OFF -Trip.

30. Voltmeter: -

Volt meter shall be provided on incoming of each panel with 3 way and off selector switch 144 Sq mm instead for each pump as per IS

1248.

(Note: All the material of rating as per the Schedule No. I and specifications & make of schedule No. II & III)

31. Amp meter:-

Each pumping set shall be providing with amp-meter with single CTS for suitable range of motor amp and provided one No. Amp

meter on incoming of each panel with 3 way and off selector switch 144 Sq mm as per IS 1248.

(Note: All the material of rating as per the Schedule No. I and specifications & make of schedule No. II & III)

32. Indication:

The three indications with control fuse in the incomer of Main LT Panel RYB.

(Note: All the material of rating as per the Schedule No. I and specifications & make of schedule No. II & III)

33. Voltage Drops:-

In motor circuit the conductor shall be so chosen that the voltage at the terminals of motor when running under full load conditions is

not less than 90% of the voltage at the main bus bar.

34. Automatic Power Factor Correction Device.

Cubical type dust & vermin proof 125 KVAR automatic power factor correction panel face standing floor mounting made out of 14

Gauge CRCA sheet with angle size 40 x 40 x 6 mm base frame painted with 3 coats of stove synthetic light grey enamel paint including one

coat of primer with suitable size of compression type cable glands comprising of:

a. 125 KVAR oil filled capacitors in the unit of 5 KVAR each with 8 step relay and appropriate size of contractors arranged in such a way

that the power factor does not go down lower than 0.95 on no load condition and load conditions with following specifications.

Voltage : 400/440-Volt Ac

Page 51: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-5050-

Frequency : 50 HZ

No. of fuses : 3

Insulation level : 3000 Volt AC

Equipped with Internal fuse : Provided in the form of suitably rate tinned

copper wire.

Externally : Provided with discharge resisters

Operating conditions : As per Is 2834-1986 revised.

Power factor meter

Contractors : As per IS 13947(Part 1 and Part IV) 1993

revised up to date

b) Automatic power factor relay

c) 1-300 Amp MCCB

d) 1-100 Amp TPN Bus bar

e) 3 ½ core armoured aluminum cable of suitable size for connecting with LT side of transformer.

f) Contractor of suitable sizes

g) 2 core copper control cable size 1.5 sq. mm

h) Necessary control fuses.

i) 1- voltmeter with selector switch size 144 sq. mm

j) 3 Nos. phase indicating lamps.

k) Red & Green lamps for on & Off Indications.

l) Push button for manual selection.

(Note: All the material of rating as per the Schedule No. I and specifications & make of schedule No. II & III)

40. Electrical Wiring Including HT & LT Cable:

Page 52: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-5151-

The work of electrical wiring and cabling shall be carried out in accordance with the Indian Electricity Rules and IS 732-1963.

The contractor shall include cost of providing and installing complete HT Cable, LT cable and wiring work from HVPN GO switch including

earthling to user end.

1. The supply erection, testing and commissioning of XLPE HT cable from SEB GO switch to metering panel to HT panel to transformers

including cost of cable boxes as per specification given below.

2. XLPE cable makes (as per schedule no. III) 3 core galvanized steel strip armored cable HT/11 KV grade with aluminum conductor of

standard make conforming to IS 7098 Part-II-1905 including cost of thimbles, solder etc.3. In Panel room the LT cable from transformers to LT panel and LT panel to starter, starter to motor including cost of thimbles, lags, solder

etc. for ISI marked cable of suitable size, 1100 Volts 3/3½ core armored cable aluminum conductor conforming to IS 1554 (Part-I)-1993 inground covered with sand and brick/in trench/in pipe/on steel cable trays. The maximum current that will flow under normal condition ofservice in a motor circuit shall be taken of that corresponding to the full load current of the motor, when rates in accordance with therelevant current rating ad given in IS 325-1978. The size of PVC Copper cable/wiring used shall be capable of carrying the full load currentcorresponding to the rating full load of the motor. It will include the cost of thimbles solder etc.

The maximum current that flow in the motor circuit shall be taken as that marked on the specification plate of the motor. The size of the

cable for each circuit shall be suitable for the maximum current as mentioned in the Para above.

36. Earthling:All the electrical equipment such as transformers HT panel, metering panel, LT panel, switches, bus bars, starters, motors etc.

shall be providing with double loop earthling with thimble connection. All lighting equipment shall be provided with single loopearthling. All connection shall be by means of soldered thimbles of approved quality. The earthling shall be done in accordance withPara 7 of IS –732-1968 and IS 3043-1996 all connections of the earthling system shall be visible for periodical inspection and testing. Itis absolutely essential that the entire earthling system should be designed with regard to likely earth fault. Current based on therating of equipments installed.

37. Inspection and Test certificate of equipment.All the equipments and pumping machinery sluice valve, NRV and C.I. pipe / CI specials before supply shall be inspected by RITES/WAPCOarrangements. The initial test shall be made by the supplier at manufacturers works and also make, type and routine test certificate will besupplied at the time of initial test. In addition to the above contractor shall be fully responsible to show the specified duties after themachinery installation is completed at the pumping station. The testing will be done as per ISI standards. The inspection charges will beborne by the department.

Page 53: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-5252-

HARYANA PUBLIC HEALTH ENGINEERING DEPARTMENT.

Estimate for Special repair of existing structures for Water Works Jakhoda & Existing Boosting Station Sankhol Tehsil Bahadurgarh Distt.Jhajjar. "Repair of Inlet Channel, Filter Beds, Clear Water Tank, Suction Well for Raw/Clear Water, Boundary Wall, Pump Chamber ofB/Stn. & Water Works, OHSR, Road Path, Pumping Machinery at Existing Water Works Jakhoda & Exist. B/Stn. Sankhol, DistributionSystem & all other works contingent thereto".

App. Cost Rs. 21.30 lacs.

The following makes of Equipment/Material shall be acceptable for this job.1. PUMPS : Kirloskar / Mathar & Platt. /

Jyoti / Worthington2. NON RETURN VALVES : As Per HSR3. SUICE VALVES : As per HSR4. MOTORS : Kirloskar / Cromption / Jyoti / ABB

Siemens / NGEF/ Alsthom5. LT SWITCH GEAR

A. Air Circuit Breaker : L&T / GE / Siemens / Schneider Elect.

B. MCCB/SFU/MCB : L&T / GE / MDS / Merlin GerinC. Contractor/O/LRelay/Timers : L&T / GE / MDS / Merlin GerinD. MCB/ELCB/DB’s : L&T / GE / MDS / Merlin GerinE. Capacitor : L&T / GE / SiemensF. Current Transformers : AE / KAPPA / L&TG. Selector Switch : L&T / GE / HPLH. Indicating Lamps/Push Botton : L&T / GE / Vecco

I. APFC Relay : L&T / Ducati

J. Change over switch : HPL / L&T / Havells.

K. Meters (Volt Meter/Amp

Page 54: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-5353-

Meter/PF Meter/KWH

Meter/HZ Meters etc. : L&T / AE / Emerson.

L. Starter (Star Delta) : L&T / Greaves / Siemens.

6. Cables :A. Copper Wire (Flexible : Finolex / Havells / National

Multistrand)B. 1100 Volt grade, PVC : Havells / Plaza / L&T / Finolex

Insulated AL Conductor,Armored cables

C. 11 KV XLPE Cable : Havells / Plaza / L&T / Finole

D. Cable Glands : Dowells / Comet / IMI / JainsonsE. Cable Lugs : DowellsF. 11 KV Cable Joints Kit : Raychem / Mahindera & Mahindera

Densons / M. Seal

G. Cable Boxes : Densons / Raychem / Universal7. Miscellaneous

A. Pin / Disc Insulator : Jayshree / WS / IEC / PCL / BHEL

B. Lightening Arrestor : Atlas / GE / International / Lamco

C. Drop out fuses : National / Kiran / Jyoti / Jayshree

D. Fire Extinguishers : Minmax / safex / Vijay / cease fire /

Zenith / OmaxeE. Rubber Matting : ISI Marked only / JyotiF. Chain Pulley Block : Morris, Indef.

All the materials shall be conforming to relevant ISI/IEC standard.

Page 55: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-5454-

The contractor should supply materials of the suggested reputed make. They must indicate the make that he purpose to

supply and also the particular suggested reputed make to which the proposed product to be supplied bears similarity. In case it is

found that any contractor makes claims whether intentionally or unintentionally. The Engineer-In-Charge, may without, prejudices

to any other rights and remedies available to him, direct the contractor to supply any one of the suggested reputed makes, and in

the event of his failure to comply with the directions, he may also cancel the contract, without prejudice to other rights and

remedies available to him, under the contract first agreement preference will be given to ISI marked material.

38. Painting Schedule:

All parts of the transformers, electrical equipments and pumping machinery, base plate, accessories, piping and other iron or steel

work not finished bright shall be filled and painted with three coats of approved paint which shall be applied after erection.

39. Special Tools and Spanners.

The contractor shall provide a set of polished spanners, screw driver, hammers etc for installation, one to fit on every nut

or stud on the pumping machinery and all auxiliary apparatus provided, including the foundation bolts. All other specials tools or

apparatus, pipe clamps, required for erection or dismantling of the pumping machinery and equipment shall also be provided M.S.

Board shall be fixed in the control room on which all the spanners and other tools shall be neatly arranged.

40. Inter Change abilityCorresponding parts of all apparatus supplies shall be made to standard gauge and shall be interchangeable. Threads of all screws

shall in accordance with ISI and where these are not available according to British Standard.

Page 56: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-5555-

HARYANA PUBLIC HEALTH ENGINEERING DEPARTMENT.

Estimate for Special repair of existing structures for Water Works Jakhoda & Existing Boosting Station Sankhol Tehsil Bahadurgarh Distt.Jhajjar. "Repair of Inlet Channel, Filter Beds, Clear Water Tank, Suction Well for Raw/Clear Water, Boundary Wall, Pump Chamber ofB/Stn. & Water Works, OHSR, Road Path, Pumping Machinery at Existing Water Works Jakhoda & Exist. B/Stn. Sankhol, DistributionSystem & all other works contingent thereto".

App. Cost Rs. 21.30 lacs.

SCHEDULE - IV

ADDITIONAL TECHNICAL CONDITIONS:

1. Tenderer must be either he or himself be on ‘A’ Class electrical License Holder of the Chief Electrical Inspector Haryana for Executing,

11 KV, Electrical Works or he must have a partnership deed with a person who is holding an ‘A’ Class Electrical License from Chief Electrical

Inspector Haryana or allot Electrical work to a Sub-contractor who is holding an A Class electrical license from Chief Electrical Inspector of

Haryana.

2. The Electrifications system, H.T. Panel, H.T. cables, jointing of jointing-kits, LT Cables if any, metering panel shall be got inspected

from the Engineer-In-Charge or his representative before its installation. The Inspecting authority may got tested the above items at works of

manufacturer firm if desired by the Inspecting Authority.

3. The contractor shall be responsible for getting inspected passed and approved the whole electrical system, or part of it from Chief

Electrical Inspector, Haryana and he will make necessary payments of fee for this purpose to his office. The Department will however tender

necessary assistance to the contractor in this regard.

4. All testing charges of various electrical equipments required by state Electricity Board authority will be borne by the contractor.

5. The contractor shall submit the original manufacturer test certificates in respect of pumping sets, Motors, Starters, Main switches etc.

6. The Aluminum conductor cable (Heavy) should be ISI marked & PVC insulated, armored and should be confirming to relevant IS-

specifications, Codes with latest amendments.

7. Test Certificate: -

Page 57: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-5656-

A test certificate from the manufacturers shall be handed over to the department before installation of the equipment specifying that

the equipment conforms to relevant I.S.I/P.W.D. specifications.

8. Wiring Diagram: -

After completion of the work complete drawing showing connections to the various equipment is to be prepared by the tenderer and

shall submit to the deptt. Along with final bills of the work.

9. Connection: -

Inter connections from the bus bar chamber to the different main switches/Air Circuit breakers/MCCB’s should be through solid

copper bus bar's/AL bar’s (which is specified in tender) of the required capacity duly insulated for which no extra payment will be made.

10. The rates quoted should be F.O.R. at site of work including cost of installation, freight, octroi taxes and other charges, nothing extra

over and above rates will be admissible.

11. Superfluous conditions and conditional tender will be rejected.

12. Telegraphic tender and tenders without earnest money in shape of deposit at call will not be accepted.

13. The Machinery will be installed as per standard ISI/P.W.D. specifications and to the entire satisfaction of the Engineer-In-Charge.

14. The quantity of transformers, electrical equipments and pumping sets can be increase/decreased by the Deptt.

15. The tender submitted by the firms shall be valid for 90 days (3months).16. In case any mistake is found in the N.I.T. the same shall be rectifiable even after he opening of the tender and execution of contract

agreement as per requirement and site conditions.

17. The Engineer-In-Charge will opt for 3rd party inspection other than Department in addition to inspection by Departmental staff. The

3rd party would inspect the work during its execution to ensure execution of work as per specifications/agreement and also quality control

i.e. drawl of samples, testing & other items etc. The report of the same would be submitted to Engineer-In-Charge by the 3rd party. The

agency/Contractor shall be bound by the report of 3rd party inspection and shall take remedial measures for execution of work as per

specifications in agreements. The inspection and sample testing charges will be borne by the Department.

18. 1% labour Cess shall be deducted from the bill of contractor/agency; as covered under the contract labour (Regular & Abolition) Act.

1970 and implementation of the building & other construction Workers Welfare Cess Act. 1998 amended suitably by State Government from

Page 58: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-5757-

time to time; which will be deposited with secretary Haryana Building and other construction Workers Welfare Board through demand draft

payable at Chandigarh.

19. The Contactor/Agencies shall fill up the component wise rates in figures & words on N.S. items in the space given on Page-6 under

heading (B) Non Schedule items the tender of Contractor/Agencies who does not fill up the component-wise rates shall be out rightly

rejected as an “Irresponsive tender and earnest money of concerned contractor/agency shall be for feited for not observing the required

procedure.”

20. The Contractor/agencies shall full up the component wise rates in figures and words for Non-Schedule Items in the space given on

page 6 under the heading (B) Non-Schedule Items. The tender of the contractor/agency who does not fill up the component-wise rates shall

be out rightly rejected as an irresponsive tender and earnest money of concerned money of concerned contractor/agency shall be forfeited

for not observing the required procedure.

Executive Engineer

Public Health Engineering Division

Bahadurgarh

Page 59: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-5858-

HARYANA PUBLIC HEALTH ENGINEERING DEPARTMENT

SCHEDULE - V

Estimate for Special repair of existing structures for Water Works Jakhoda & Existing Boosting Station Sankhol Tehsil Bahadurgarh Distt.Jhajjar. "Repair of Inlet Channel, Filter Beds, Clear Water Tank, Suction Well for Raw/Clear Water, Boundary Wall, Pump Chamber ofB/Stn. & Water Works, OHSR, Road Path, Pumping Machinery at Existing Water Works Jakhoda & Exist. B/Stn. Sankhol, DistributionSystem & all other works contingent thereto".

App. Cost Rs. 21.30 lacs.

AFFIDAVIT

I ____________________ son of Shri ______________________ caste _______________ resident of ________________

District___________ contractor partner or share Holder (Strike out the words which is not applicable) of firm or contractor hereby declare

and solemnly affirm as under:

1. That the person/firms black listed by Haryana Govt. / Govt. of India from time to time never have any connection or interest in

any business.

2. That the said persons/firm do not have any subsisting interest in my business.

3. That the said person/firm are not the employee of my firm and are not in any way connected with my business.

Dated ______________ Deponent.

I do hereby solemnly declare and affirm that the above declaration is true and correct to the best of my knowledge and belief. No

part of it is false and it conceals nothing.

Contractor Witness Deponent.

Page 60: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-5959-

SCHEDULE NO.VI

CONTRACT DRAWING ACCOMPANYING THE TENDER

List of drawing and curves to be submitted by the contractor with the tender for electrical equipments and pumping machinery.

General arrangement of the electrical equipments and pumping machinery and other equipment offered.

Witness______________ Contractor____________

Dated ____________ Dated____________

Page 61: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-6060-

SCHEDULE NO. VII

List of drawings in duplicate to be submitted by the contractor to the Engineer-in-charge for approval during the course of construction of

work. completed and final to the scale, foundation plans.

Completed and to the scale, other detailed dimensioned and sectional working drawings to panel board and line diagrams of LT cables and

PVC copper wiring and pumping machinery with suction and delivery pipe and line diagrams. Any other working drawing required by

Engineer-in-charge from time to time.

Completion Plans:-

Three bound sets of above drawings together with the printed instructions, leaflets, characteristics curves and Operations

Hand Books of the various equipment installed at the work.

Witness ___________ Contractor___________

Dated ____________ Dated ___________

.

Page 62: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-6161-SCHEDULE NO. VIII

The following is the list of drawing attached with the DNIT.

Layout plan showing location of Water Works Jakhoda & Boosting Station Sankhol.

Line Diagram of Pipes and Specials

Flow Diagram

Under ground Clear water Tank

Pump Chamber

Village plan showing the distribution.

.

Page 63: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-6262-

SCHEDULE NO.IX

GUARANTEE:-

I, we hereby guarantee that the electric equipment, pumping machinery, switch gear, distribution board, electric cable etc. or any

other apparatus supplied are according to the latest ISI, Specifications, whichever applicable on the date of opening of tender and according

to the specification attached to the tender, wherever ISI Specifications do not exist. The performance is guaranteed for the entire work for a

period of one year after the date of final acceptance of the work by the Engineer-in-Charge. The guarantee also covers for the same one year,

efficient, reasonably free from noise and satisfactory working of the machinery and equipment. If found not to comply with the guarantee,

I/We shall at our own cost and expenses renew or replace or do whatever is necessary to remedy the fault as required by the Engineer-in-

Charge. I/WE shall during the same period of one year repair promptly at our cost and expenses, all break-downs or failures which may occur

in the opinion of the Engineer-in-Charge, due to faulty material and workshop.

Witness ___________ Contractor___________

Dated ____________ Dated ___________

Page 64: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-6363-

D.N.I.T

Name of Work:- Estimate for Special repair of existing structures for Water Works Jakhoda & Existing Boosting Station Sankhol Tehsil BahadurgarhDistt. Jhajjar. "Repair of Inlet Channel, Filter Beds, Clear Water Tank, Suction Well for Raw/Clear Water, Boundary Wall, Pump Chamber of B/Stn. &Water Works, OHSR, Road Path, Pumping Machinery at Existing Water Works Jakhoda & Exist. B/Stn. Sankhol, Distribution System & all other workscontingent thereto".

App. CostRs.

21.30 Lacs

ABSTRACT OF COST OF SUB WORK No. 1

1 Sub Head No. 1 Schedule Portion Rs. 1586150 /-

2 Sub Head No. 2 N.S. Items. Rs. 129459 /-

3 Sub Head No. 3 Pumping Machinery Rs. 411400 /-

Grand Total Rs. 2127009 /-

Say Rs. 21.30 Lacs

DNIT approved for Rs. 21.30 Lacs (Rs. Twenty One Lacs & Thirty Thousand only) Subject tothe condition given in the forwarding letter

Sd/-Executive Engineer (Plg),O/o the Engineer-in-Chief, Hr.,Public Health Engineering Deptt.Panchkula

Page 65: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-6464-Notes

1. The work will be carried out strictly in accordance with the PWD Book of specification (latest edition) which will form a part and parcel of this contract agreement.

2. In the contract schedule of Rates only essential portion of description of item has been written But will deem to cover the entire item as fully described in Haryana PWD Schedule of Rates1988.

3. All the items in the contract schedule of rates are subject to the foot notes and notes given in the Haryana PWD Schedule of Rates. 1988 regarding these items.

4. Approximate quantities are given in the contract schedule of rates and may vary at the time of execution of work. The payment will however be made for the actual work done by thecontractor. No extra claims, whatsoever will be admissible to the contractor on account of variation alteration or deletion of any item over the quantities depicted in the contract scheduleof rates.

5. All amendments issued in the Haryana PWD schedule of rates 1988 upto the date of opening of the tender will be applicable on the contract schedule of rates.

6. No claim will be entertained from the contractor in case of any omission in description rates and unit which may have occurred in any of the items taken in the contract schedule of rateson account of typing or comparison or overwriting in case of any error the same shall be rectified at any stage as per Haryana PWD Schedule of Rates1988 along with the amendments received from time to time.

7. Reinforcement of Fe 415 grade duly ISI marked conforming to relevant BIS shall be procured by the contractor at his own cost. The contractor shall submit the test certificate of the steelbrought by him to the site of work. The sample of steel may also be got tested by the Engineer-in-Charge.

8. The contractor will offer ISI marked RCC pipe NP-2 for inspection within a period of one month from the date of allotment and the inspection will be carried out by an officer to benominated by the department.

9. Rubber rings shall be duly ISI marked conforming in all respect to ISS 5283/1983 (as amended upto date) The rubber rings shall be type-2 butdience styrene rubber(SPR) termite proof and oil/solvent resistant as suitable for use in RCC pipe class NP-2.

10. That no extra lead and lift will be payable for spreading of excavated earth from S/S tank & other structures inside the water works so as to achieve the formation level as per the drawingsand also nothing extra on account of lead lift loading unloading carriage etc will be paid for proper disposal of surplus soil at proper place outside the water works.

11. The rates included in the contract schedule of Rates cover the cost of filling the water retaining structures and their testing for water tightness to the full satisfaction of the Engineer-in-Charge and emptying the same after testing.

12. Contractor shall be fully responsible for structural safety in all respect of the structures existing /under construction in the vicinity of the structures under construction.

13. Non-schedule item rates should be quoted by the contractor and no ceiling premium will be allowed.

14. The work of providing and fixing of NS items given in the DNIT be executed only if material is not available in Reserve stock Bahadurgarh otherwise the same may be got executed onlabour rates as per H.S.R.

15. The contractor/agencies shall fill up the component-wise rates in figures and words for Non-Schedule Items in the space given on page _ under the heading (B) Non- Schedule Items. Thetender of the contractor/agency who does not fill up the component-wise rates shall be out rightly rejected as an “irresponsive tender and earnest money of concerned contractor/agencyshall be forfeited for not observing the required procedure.”

Sd/- Sd/- Sd/-Sub Divisional Engineer Executive Engineer Superintending Engineer,P.H. Engg. Sub Divn. No.1, Public Health Engineering Public Health Engg. Circle,Bahadurgarh Division Bahadurgarh Jhajjar

Page 66: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-6565-

Additional Conditions ofContract

1. The cement will be arranged by the contractor/Agency/Firm at his own level. The Contractor/Agency/Firm may quote his rates accordingly.2. The cement will be arranged by the Contractor/Society/Agency/Firm at his own level. The cement shall be OPC-43 grade, duly ISI marked & confirming to IS-8112 with latest

amendments. The cement manufactured by Mini Cement plant shall not be used. In case contractor is allowed by the department to use PPC cement duly ISI marked &confirming to IS-1489 with latest amendments for non RCC works then the recovery of Rs. 25/- per bag of 50 kg cement be made as per notification on revision of ceilingpremium date 10.11.2011.

3. The cement and Steel shall be purchased from authorized Distributor or Manufacturer or Authorized Dealer.

4. The cement arranged by the Contractor/Agency will be brought at site and shall be kept in the Store maintained at site, provided with dual locking system i.e. 1st key of lock withrepresentative of the Deptt. And 2nd key of lock with authorized representative of agency.

5. The Contractor/Agency will inform the Executive Engineer/Sub Divisional Engineer for the quantity of the cement brought at site with bill/challan in the name of that agencybefore using the same and Executive Engineer In-charge or his authorized representative may check the actual receipt of cement at site.

6. The Engineer-In-Charge or his authorized representative may, if need be, also sent the cement for testing to any Govt. Lab/reputed Lab. The sample of the cement will be collectedas per IS specifications in the presence of the Contractor/Agency or his authorized representatives. Incase the cement is found as per ISI specifications then the cost of testing will beborne by the Deptt., but in case the cement sample fails to meet the BIS requirement, then appropriate action as per Contractor Agreement will be taken. The cost on the testing ofcement alongwith any loss caused to Govt. shall also be recovered from the Contractor/Agency and no claim in this respect will be entertained.

7. The stock of cement at site shall not be more than one-month consumption and only sufficient quantities shall be kept to ensure continuity of the work.8. The cement consumption register showing date of cement brought at site by the Contractor /Agency and its day-to-day utilization will be maintained. The said register shall be

open to inspection by representatives of the Engineer-In-Charge during his visit at site. The consumption and receipt of cement in the register shall be initialed jointly by theauthorized representative of the Contractor/Agency and representative of Engineer-In-Charge. The said register will be issued by office of concerned Sub Divisional Engineerunder his dated signature for each agreement separately. The register will also contain the columns for work executive against the cement issued.

9. Quality check register will be maintained at site and regular sampling of work executive every month shall be recorded in the same.10. The PWD (PHED), Haryana reserves the right of negotiations as per policy approved by the State Government with the tenderers in case the process quoted are felt to be on higher

side or otherwise. The negotiations will be carried out with 1st, 2nd & 3rd lowest contractors. The highest amongst them will be called first and lowest tenderer in the last. If duringnegotiation tenderer other than lowest reduces his prices/amount below then those of lowest then lowest tenders will be counter offered this price/amount and in eventuality of himnot accepting the counter offered the same shall be offer to second lowest and so forth. Tenderer who refuses the counter offer will not have any right to the bid later on.

11. The Engineer-In-Charge will opt for 3rd party inspection other than Department. In addition to inspection by Departmental Staff. The 3rd party would inspect the work during itsexecution to ensure execution of works as per specifications/agreement and also quality control i.e. drawl of samples, testing & other items etc. The report the same would besubmitted to Engineer-In-Charge by the 3rd party. The agency/contractor shall be bound by the report of 3rd party inspection and shall take remedial measures for execution of workas per specifications in agreement. The inspection and sample testing charges will be borne by the Department.

12. The labour cess @ 1% of the cost of work done by contractor shall be deducted from each bill.13. Steel will be arranged by the agency/contractor/society/firm at his own level. The steel shall be Fe-500 EQR TMT of TISCO, SAIL, RINL, IISCO,. If the agency is allowed to use

steel Fe 500 EQR TMT of other companies, than the above, but ISI marked the deduction @ Rs. 6000/- per MT will be made, for the quantity consumed in the work.The quantity of items from which contractor will quotes rate either free of cost of abnormally low rates i.e. the rate which are below 25% of schedule rate/market rate, will beexecuted 100% at site. If any such item is not required or partially required, then the difference in schedule rate/market rate and contractor rate will be recovered, for the nonexecuted/under executed components of work.

Page 67: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-6666-

-Sd-Executive EngineerContractor Witness

Page 68: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-6767-

-Sd-Executive EngineerContractor Witness

Page 69: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-6868-

-Sd-Executive EngineerContractor Witness

Page 70: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-6969-

-Sd-Executive EngineerContractor Witness

Page 71: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-7070-

-Sd-Executive EngineerContractor Witness

Page 72: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-7171-

-Sd-Executive EngineerContractor Witness

Page 73: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-7272-

-Sd-Executive EngineerContractor Witness

Page 74: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-8080-

Page 75: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-8181-

Page 76: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-8282-

Page 77: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-8383-

Memorandum

(a) General Description : As per Name of Work(b) Estimated Cost Rs. 21.30 Lacs.(c) Earnest Money Rs. 42600/-(d) Security deposit (Including earnest money) Rs. 10%(e) Percentage, if any, to be deducted from bills(f) Time allowed for the work from date of written order to commence4 (Four)months.

In case this tender is accepted I/we hereby agree to abide by and fulfillall terms and provisions of the said conditions of contract annexedhereto so far as applicable, or in default there of forfeit to and pay to theHaryana, Public Health Engineering Department or its successor inoffice the sums of money mentioned in the said conditions.

(a),(b) if several Sub-works are includedthey should be detailed in a separate list

(c) this deposit will very from 1% to 2% ofthe estimated cost of the work accordingto the requirement of the case.

The sum of Rs. 42600/- "Deposited vide Deposit at call in the name ofExecutive Engineer Bahadurgarh

datedas earnest money, the full value

of which is to be absolutely forfeited to the Haryana Public HealthEngineering Department or its successor in office without prejudice toany other rights or remedies of the said Haryana Public HealthEngineering Department or its successor in office. Should I/We fail tocommence the work specified in the above memorandum the said

(e) This percentage will be 5% of the totalamount of running bills. sew note toClause-I of conditions of contract.

"Give particular and number

Strike out (a) if no cash security deposit tobe taken

sum of Rs. shall be retained by the HaryanaPublic Health Engineering Department on account of the security

Page 78: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-8484-

-Sd-Executive EngineerContractor Witness

deposit specified in clause-I of the said conditions of contract. ShouldI/we withdraw or modify the tender within three calendar monthsfrom the date of opening of tender, my/our earnest money will standforfeited to Haryana Public Health Engineering Department and inboth the cases any expenses which may be incurred in excess of the sumwhich could have been paid to the original contractor if the whole workhad been executed by him (of amount of which excess the certificate inwriting the Executive Engineer shall be final and conclusive) shall beborne and paid by the original contractor and may be deducted fromany money due to him by Government under the contractor orotherwise or from the proceeds of sale of his property or a sufficientpart thereof.

The above tender is hereby accepted by me for and on behalf of theGovernor of Haryana.

Dated the Day of 20

Executive EngineerPublic Health Engineering DivisionBahadurgarh

*Strike out (b) if any cash security depositis taken

*Signature of contractor beforesubmission of tender .

*Signature of witness contractor'ssignature

*Signature of officer by whom accepted.

Page 79: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-8585-

-Sd-Executive EngineerContractor Witness

CONDITIONSOFCONTRACT

This will be thesamepercentage as

Clause-1: The person/persons whose tender may beaccepted (here-in-after called the contractor). shall permit theExecutive Engineer Water Supply

that in the (c) & Sanitation Division. Haryana hereinaftercalled the Engineer-in-Charge at the time of making anypayment to him for work done under the contract to deductsuch sum as 5% of all money so payable in addition to 5% ofthe estimated cost of work already deposited as security beforecommencement of the work including earnest money. Suchdeductions to be held by Government by way of securitydeposits.

Compensationof delay

Clause 2: The time allowed for carrying out of work asentered in the tender shall be strictly observed by thecontractor, and shall be reckoned from the date on which theorder to commence work is given to the contractor, The workshall throughout the stipulated period of the contract on thepart of the contractor) and the contractor shall pay ascompensation an amount equal to one percent which theExecutive Engineer may levy on the amount of the estimatedcost of the whole work as shown by the tender for every daythat the work remains uncommenced, work the contractorshall be bound, in all cases in which the time allowed for anywork exceeds one month to complete one-fourth of the wholeof the work before one fourth of the whole time allowed underthe contract has elapsed, one half of the work before one half ofsuch time has elapsed and three fourth of the work beforethree fourth of such time has elapsed. In the event of the

Page 80: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-8686-

-Sd-Executive EngineerContractor Witness

Action whenwhole securitydeposit isforfeited.

contractor failing to comply with this condition he shall beliable to pay as compensation an amount equal to one percentwhich the Executive Engineer, may levy on the aid estimatedcost of the whole work for every day that due quantity of workremains incomplete provided always that the amount ofcompensation to be paid under the provisions of this clauseshall not exceed ten percent of the estimated cost of the workas shown in the tender. The Superintending Engineer onrepresentation in writing from the contractor, may reduce theamount of compensation and his decision in writing shall befinal.

Clause 3: In any case in which under any clause orclauses of this contract the contractor shall have renderedhimself liable to pay compensation amounting to the whole ofhis security deposit (whether paid in one sum or deducted byinstallments) the Executive Engineer on behalf of theGovernment shall have power to adopt any of the followingcourses, as he may deem best suited to the interests ofGovernment:

(a) To rescind the contract (of which rescission notice inwritten to the contractor under the hand of theExecutive Engineer shall be conclusive evidence) andin which case the security of the contractor shall standforfeited, and be absolutely at the disposal ofGovernment and any expenses which may be incurredin excess of the sum which would have been paid tothe original contractor if the whole work had beenexecuted by him (of amount of which excess thecertificate in writing the Executive Engineer shall be

Page 81: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-8787-

-Sd-Executive EngineerContractor Witness

final and conclusive) shall be borne and paid by theoriginal contractor and may be deducted from anymoney due to him by Government under the contractor otherwise or from the proceeds of sale of hisproperty or a sufficient part thereof.

(b) To employ labour paid by the Public WorksDepartment and to supply materials to carry out thework, or any part of the work debiting the contractorwith the cost of the labour and the price of thematerials (of the amount of which cost and price acertificate of the Executive Engineer shall be final andconclusive against the contractor) and crediting himwith the value of the work done, in all respects in thesame manner and at the same rates as if it had beencarried out by the contractor under the terms of hiscontract: the certificate of the Executive Engineer as tothe value of the work done shall be final.

(c) To measure up the work of the contractor and to takesuch part thereof as shall be unexecuted out of hishands, and to give it to another contractor to complete,in which case any expenses which may be incurred inexcess of the sum which would have been paid to theoriginal contractor if the whole work had beenexecuted by him (of amount of which excess thecertificate in writing the Executive Engineer shall befinal and conclusive) shall be borne and paid by theoriginal contractor and may be deducted from anymoney due to him by Government under the contractor otherwise or from the proceeds of sale of his

Page 82: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-8888-

-Sd-Executive EngineerContractor Witness

property or a sufficient part thereof.

In the event of any of the 'above courses being adoptedby Executive Engineer. The contractor shall have no claim tocompensation for any loss sustained by him by reason of hishaving purchased or procured any materials, or entered intoany engagement or made any advances on account of or with aview to the execution of the work or the performance of thecontract. And in case the contract shall be rescinded under theprovision aforesaid the contractor shall not be entitled torecover or be paid any sum for any work therefore actuallyperformed under this contact, unless and until the ExecutiveEngineer will have certified in writing the performance of suchwork and the value payable in respect thereof, and he shallonly be entitled to be paid the value so certified.

Clause 4: In any case in which any of the powersconferred upon the Executive Engineer by clause-3 hereof,shall become exercisable and the same are not exercised, thenon-exercise thereof shall not constitute a waiver of any of theconditions hereof and such powers shall not withstanding beexercisable in the event of any future case of default by thecontractor for which by any clause of clauses hereof he isdeclared liable to pay compensation amounting to the whole ofhis security deposit and the liability of the contractor of pastand future case of compensation shall remain unaffected. Inthe event of the Executive Engineer putting in force either ofthe powers(a) or (c) vested in him under the proceeding clausehe may, if he so desires take possession of all or any tools,plant material and stores in or upon the work or the site there

Page 83: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-8989-

-Sd-Executive EngineerContractor Witness

of or belonging to the contractor, or procured by him andintended to be used for the execution of the work on any partthereof paying or allowing for the same in account at thecontract rates, or in case of these not being applicable at currentmarket rates to be certified by the Executive Engineer whosecertificate hereof shall be final otherwise the ExecutiveEngineer may by notice in writing to the contractor or his clerkof the works, foreman or other authorized agent require him toremove such tools plant materials, or stores from the premises(within a time to be specified in such notice) and in the event ofthe contractor failing to comply with any such requisition, theExecutive Engineer may remove them at the contractor'sexpenses or sell them by auction or private sale on account ofthe contractor and at his risk in all respect and the certificate ofthe Executive Engineer as to the expense of any such removal,and the amount of the proceeds and expense of any such saleshall be final and conclusive against the contractor.

Clause 5: If the contractor shall desire an extension ofthe time for completion of the work on the grounds of hishaving been unavoidably hindered in its execution or anyother ground, he shall apply in writing to the SuperintendingEngineer Public Health Engineering Circle, Jhajjar through theExecutive Engineer Public Health Engineering DivisionBahadurgarh with in 30 days of the date of the hindrance onaccount or which he desires such extension as aforesaid butbefore the expiry of contract period and the ExecutiveEngineer/Superintending Engineer shall, if in his opinion(which shall be final) reasonable grounds have been shown,thereof authorize, such extension of time. If any, as may in his

Page 84: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-9090-

opinion be necessary or proper.

Clause 5-A: The contractor shall deliver in the office ofthe Executive Engineer on or before the 10th day of everymonth during the continuance of the work covered by thiscontract, a return showing details of any work claimed for asextra, and such return shall also contain the value of such workas claimed by contractor value of which shall be based uponthe rates and prices mentioned in the contract or in theschedule of rates in force at that time. The contractor shallinclude in such monthly return particulars of all claims ofwhatever kind and however arising which at the date thereforehe has or may claim to have against the Executive Engineerunder or in respect. of in any manner arising out of theexecution of work and the contractor shall be deemed to havewaived all claims not included in such return and will have noright to enforce any such claims not so included, whatsoeverbe the circumstances.

Contractor tosubmitreturns everymonth forany workclaimed asextra.District ratesmeans theHaryanaPWDBuilding andRoad Branchrates for thatDistrict.

Clause 6-A: Without prejudice to the rights ofGovernment under any clause hereinafter contained oncompletion of the work, the contractor shall be furnished witha certificate by the Executive Engineer (hereinafter called theEngineer-in-Charge) of such completion: but no such certificateshall be given. not shall the work be considered to be completeuntil the contractor shall have removed from the premises onwhich the work shall be executed all scaffolding, surplusmaterials and rubbish and cleaned off the dirt from all woodworks, doors window, wall floors or other parts of anybuilding in upon or about which the work is to be executed of

Finalcertificate

Page 85: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-9191-

which he may have had possession for the purpose of theexecution thereof and the measurements in the said certificateshall be binding and conclusive against the contractor, if thecontractor shall fail to comply with the requirements of thisclause as to removal of scaffolding, surplus materials andrubbish, and cleaning off dirt on or before the date fixed for thecompletion of the work, the Engineer-in-Charge may at theexpense of the contractor, remove such scaffolding or surplusmaterials and rubbish and dispose off the same as he thinks fitand clean off such dirt aforesaid; and the contractor shallforthwith pay the amount of all expenses so incurred and shallhave no claim in respect of any such scaffolding or surplusmaterials as aforesaid except for any sum actually realized bythe sale thereof less any expense incurred by the Engineer-in-Charge in connection therewith.

Payment onintermediatecertificate to beregarded asadvances

Clause 7: No payment shall be made for work estimatedto cost less than rupees one thousand till after the whole of theworks shall have been completed and a certificate ofcompletion given. But in case of works estimate to cost morethan rupees one thousand, the contractor shall be submittingthe bill thereof, be entitled to receive a monthly paymentproportionate to the part thereof then approved and passed bythe Engineer-in-Charge whose certificate of such approval andpassing of the sum so payable shall be final and conclusiveways of advance against the final payments only and not aspayments for work actually done and completed and shall notpreclude the requiring of bad. Unsounded and imperfect orunskillful work to be removed and taken away andreconstructed or re-erected, or be considered as an admission

Page 86: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-9292-

of the due performance of the contract or any part thereof inany respect or the accruing of any claim, nor shall it conclude,determine or affecting any way the powers of the Engineer-in-Charge, under these conditions or any of them as to the finalsettlement and adjustment of the accounts or otherwise, or inany other way vary or affect the contract. The final bill shall besubmitted by the contractor within one month of the date fixedfor completion of the work otherwise the Engineer-in-Charge'scertificate of the measurement and of the total amount payablefor the work accordingly shall be final and binding on allparties.

Security to bereleased 3months afterthe payment offinal bill.Bill to besubmitted inmonthly.

Clause 7(a): The deductions referred to in clause 1hereinbefore or such part thereof as may be due to thecontractor under this contract shall be payable to the contractorafter a period of three months has lapsed after payment of finalbill.

Clause 8: A bill shall be submitted by the contractoreach month on or before the date fixed by the Engineer-in-Charge for all work executed in the previous month and theEngineer-in-Charge shall take or cause to be taken the requisitemeasurement for the purpose of having the same verified, andthe claim, as far as admissible, adjusted if possible, before theexpiry of ten days from the presentation of the bill. If thecontractor does not submit the bill within the time fixed asaforesaid, the Engineer-in-Charge may depute as subordinateto measure up the said work in the presence of the contractorwhose counter signature to the measurement list will besufficient warrant and Engineer-in-Charge may prepare a billfrom such list which shall be binding on the contractor in all

Page 87: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-9393-

Bill to be onprinted format

respects.Clause 9: The contractor shall submit all bills in

triplicate on the printed forms to be has from the office of theEngineer-in-Charge and the charges in the bills shall always beentered at the rates specified in tender on in the case of anyextra work ordered in pursuance of these conditions and notmentioned or provided for in the tender at the rates hereinafterprovided for such work.

Stores suppliedbyGovernment

Clause 10: If the specification of estimate of the workprovides for the use of any special description of materials tobe supplied from the Engineer-in-Charge's store or if it isrequired that the contractor shall use certain stores to beprovided by the Engineer-in-Charge (such materials and storesand the price of be charged therefore as hereinafter mentionedbeing so far as practicable for the convenience of thecontractor. But not so as in any way to control the meaning ofeffect of this contract, specified in the schedule, ormemorandum here to annexed), the contractor shall besupplied with such materials and stores as required from timeto time to be used by him for the purposes of the contract onlyand the value of the full quantity of materials and stores sosupplied at the rates specified in the said schedule ormemorandum may be set off or deducted form any sums thendue, or thereafter to become due to the contractor under thecontract or otherwise, against or from the security deposit, orthe proceeds of sale thereof, if the same is held in Governmentsecurities, the same or a sufficient portion thereof being in thiscase sold for the purpose. All materials supplied to the

Page 88: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-9494-

contractor, shall remain the property of the contractor, butshall not on any account be removed from the site of the workwithout the written permission of the Engineer-in-Charge andshall at the time of completion or determination of the contractshall be returned to the Engineer-in-Charge's store and shallhave no claims for compensation on account of any suchmaterials so supplied to him as aforesaid being unused by himor for any wastage in or damage to any such materials.

Clause 11: The contractor shall execute the whole andevery part of the work in the most substantial and workmanlike manner, and both as regards materials and otherwise inevery respect in strict accordance with the specification. Thecontractor shall also conform exactly, fully to the designs,contract drawings and instructions in writing relating to thework signed by the Engineer-in-Charge and lodged in hisoffice, and to which the contractor shall be entitled to haveaccess at such office, or at the site of the work for the purposeof inspection during office hours, and the contractor shall if heso requires be entitled at his own expense to make or cause tobe made copies of the specifications, and of all such designs,drawings and instructions as aforesaid.

Works to beexecuted inaccordancewithspecificationdrawingorders etc.

Clause 11(a): The Engineer-in-Charge shall have fullpowers at all times to object to the employment of anyworkman, foreman or other employees on the works by thecontractor and if the contractor shall receive notice in writingfrom the Engineer-in-Charge requesting the removal of anysuch man or men from the work, the contractor shall complywith the request forthwith.

Removal ofemployer'sworkman.

Page 89: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-9595-

No such workman, foreman or other employee after hisremoval from the works by request of the Engineer-in-Chargeshall be re-employed or re-instated on the work by thecontractor at any time except with the prior approval inwriting of the Engineer-in-Charge.

The contractor shall not be entitled to demand thereason from the Engineer-in-Charge for requiring the removalof any such workman, or foreman or other employees.

Clause 12: The Engineer-in-Charge shall have power tomake any alterations in or omissions from or additions to orsubstitutions for the original specifications, drawings, designsand instructions that may appear to him to be necessary oradvisable during the progress of the work and the contractorshall be bound to carry out the work in accordance with anyinstructions which may be given to him in writing signed bythe Engineer-in-Charge and such alterations, omissions,additions or substitutions shall not invalidate the contract andany altered, additional or substituted work which thecontractor may be directed to do in the manner above specifiedas part of the work shall be carried out by the contractor on thesame conditions in all respects on which he agreed to do themain work and at the same rates as are specified in the tenderfor the main work. The time for the completion of the workshall be extended in the proportion that the altered, additionalor substituted work bears to the original contract work, and thecertificate of the Engineer-in-Charge shall be conclusive as tosuch proportion. And if the altered, additional or substituted

Alteration inspecificationsand designs

Do notinvalidatecontracts.

Extension of

Page 90: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-9696-

work includes any class of work, for which no rate is specifiedin this contract, then such class of work shall be carried out atthe rates entered in the Haryana schedule of rates subject to thesame percentage above or below as for the items included inthe contract, and if such class of work is not entered in theHaryana schedule of rates. The contractor shall within sevendays of the date of his receipt of the order to carry out of work,inform the Engineer-in-Charge of the rate he intends to chargefor such a class of work, and if the Engineer-in-Charge doesnot agree to this rate he shall by notice in writing, be at libertyto cancel his order to carry out such class of work, and arrangeto carry it out in such manner as he may consider advisable,provided always that if the contractor shall commence work orincur any expenditure in regard thereto before the rates shallhave been determined as lastly hereinbefore mentioned thenand in such case he shall only be entitled to be paid in respectof the work carried out or expenditure incurred by him prior tothe date of determination of the rates as aforesaid according tosuch rates as shall be communicated by the Engineer-in-Charge, after getting the same decided by the competentauthority.

time ofconsequenceof alteration

Rates of worknot inestimate orschedule ofrates of theDistrict .

Nocompensationfor alteration inor restriction ofwork to becarried out

Clause 13: If at any time after the commencement of thework, if the Government shall for any reason, whatsoever, notrequires the whole work thereof as specified in the tender to becarried out, the Engineer-in-Charge shall give notice in writingof the fact to the contractor who shall have no claim to haveany payment of compensation, whatsoever on account of anyprofit or advantage, which he might have derived from theexecution of the work in full, but which he did not derive in

Page 91: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-9797-

consequence of the full amount of the work not having beencarried out, neither shall be have any claim compensation byreason of any alteration having been made in the originalspecification, drawings, designs and instructions which shallinvolve any curtailment of the works as originallycontemplated,

Action andcompensationpayable in caseof bad work

Clause 14: If at shall appear to the Engineer-in-Chargeor his subordinate incharge of the work, that any work hasbeen executed with unsounded, imperfect or unskillfulworkmanship, or with materials of any inferior description, orthat any materials or articles provided by him for the executionof the work are unsound, or of a quality inferior to thatcontracted for, or otherwise not in accordance with thecontract, the contractor shall on demand in writing form theEngineer-in-charge specifying the work materials or articlescomplained of not with standing that the same may have beeninadvertently passed, certified and for, forthwith rectify orremove and reconstruct the work so specified in whole or inpart, as the case may require or as the case maybe, remove thematerial or articles so specified and provide other proper andsuitable materials or articles at this own charge and cost and inthe event of his failing to do so within a period to be specifiedby the Engineer-in-Charge in his demand aforesaid, thecontractor shall be liable to pay compensation at the' rate ofone percent on the amount of the estimated cost of the workcovered by this contract for everyday not exceeding ten days,while his failure to do so shall continue and in the case of anysuch failure, the Engineer-in-Charge may certify or removeand re-execute the work or remove and replace with other

Page 92: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-9898-

materials, or articles complained of, as the case may be, a therisk and expense in all respects of the contractor.

Works to beopen toinspectionContractor orresponsibleAgent to bepresent

Clause 15: All work under or in course of execution orexecuted in pursuance of the contract shall at all times be opento the inspection and supervision of the Engineer-in-Chargeand his subordinates and the contractors shall at the all times,during the usual working hours, and at all other times atwhich reasonable notice of the intention of the Engineer-in-Charge or his subordinate to visit the works shall have beengiven to the contractor, either himself be present to receiveorders and instructions, or have a responsible agent dulyaccredited in writing, present for that purpose, orders given tothe contractor's agent shall be considered to have the sameforce as if they had been given to the contractor himself.

Notice to begiven beforeworks coveredup

Clause 16: The contractor shall give not less than fivedays 'notice in writing to the Engineer-in-Charge or hissubordinate-in-charge of the work before covering up orotherwise placing beyond the reach of the measurement any workthat the same may be measured and correct dimensions thereof betaken before the same is so covered up or placed beyond thereach of measurement and shall not cover up or place beyond thereach of measurement 'any work, without the consent in writingof the Engineer-in-Charge or his subordinate-in-charge of thework, if any work shall be covered up or placed beyond the reachor the measurement without such notice having been given orconsent obtained the same shall be uncovered at the contractor'sexpense, or in default thereof, no payment shall be made for suchwork/materials with which the same was executed.

Page 93: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-9999-

Contractorliable fordamage doneand forimperfectionsfor 3 monthsafter certificate

Clause 17: If the contractor and his work people, or hisservant shall break, deface injury or destroy any part ofbuilding, in which they may be working or any building, roadfence, enclosure or grass and or cultivated ground contiguousto premises on which the work or any part of it is beingexecuted or if any damage shall happen to the work, while inprogress from any cause whatever or any imperfectionsbecome apparent in it within three months after a certificatefinal or other of its completion shall have been given by theEngineer-in-Charge as aforesaid, the contractor shall make thesame good at his own expense, or in default, the Engineer-in-Charge may cause the same to be made good by otherworkmen, and deduct the expense, of which the certificate ofthe Engineer-in-Charge shall be final, from any sums that maybe then or any time thereafter may become due to thecontractor or from his security deposit or the proceeds or salethereof or of a sufficient portion thereof.

Contractor tosupply plantladders.Scaffolding etc.

Clause 18: the contractor shall supply at his own cost allmaterials (except such special materials if any, as may inaccordance with the contract b supplied from the Engineer-in-Charge's store), plants, tools, appliances, implements, laddersetc. scaffolding and temporary works requisite or proper forthe execution of the work, whether original, altered orsubstituted and whether included in the Specification or otherdocuments forming part of the contract or referred to in theseconditions or not, which may be necessary fro the purpose ofsatisfying or complying with the requirements of the Engineer-in-Charge as to matter as to which under these condition he is

Page 94: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-100100100 -

entitled to be satisfied, or which he is entitled to requiretogether with carriage thereof to and from the work. Thecontractor shall also supply without, charge the requisitenumber of persons with the means and materials necessary forthe purpose of setting out works, and counting, weighing andassigning in the measurement or examination at any time andfrom time to time of the work or materials. Failing his so doingthe same may be provided by the Engineer-in-Charge at theexpense of the contractor and the expenses may be deductedfrom any money due to the contractor under the contractor orfrom his security deposit or the proceeds of sale of his propertyor a sufficient portion thereof.

The contractor shall also provide all necessary fencingand lights, required to protect the public form accident andshall be bound to bear the expenses of defence of every suit,action or other proceedings at law that may be brought by anyperson for injury sustained owing to neglect to the aboveprecaution, and to pay any damage, and costs which may beawarded in any such suit, action, or proceedings to any suchpersons or which may with the consent of the contractor bepaid to compromise any claim by any such person.

And be liablefor damagesestimatingfrom non-provision oflight, fencingetc.

Clause 18(a): The final bill of the contractor shall not bepaid unless or until he furnishes to the satisfaction of theEngineer-in-Charge a proof of the price of the earth used forthe works having been fully paid to the owners of the landfrom which the earth was removed or of the matter havingbeen amicably settled with them, the contractor shall also beliable to indemnify the Government against all claims made,

Page 95: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-101101101 -

proceedings and actions taken by any persons in respect of theprice of the earth removed by the contractor from his land forthe work against all losses, damages, cost and expenses whichthe Government may suffer or incur as a result of such claims.

Clause 19(a): No labourer below the age of 12 years shallbe employed on the work.

Labour

Clause 19(b): The contractor shall pay his labourers notless than the wages paid for similar work in neighborhood.

Clause 20: No work shall be done on Sunday withoutthe sanction in writing of the Engineer-in-Charge.

Works onSundays

Clause 20(a): In every case in which by virtue of theprovisions of section 12, sub-section (1) of Workman'sCompensation Act, 1923, Government is obliged to paycompensation to a workman employed by the contractor, inexecution of the work, Government will recover from thecontractor, the amount of the compensation so paid andwithout the prejudice to the rights of Government Undersection 12, Sub-section (2) of the act, Government shall be atliberty to recover such amount or any part thereof bydeducting it from the security deposit or from any sum due byGovernment to contractor whether under this contract orotherwise.

Contractorliable forpayment ofcompensationto injuredworkman orin case ofdeath hisrelations.

Government shall no be bound to contest any claimmade against it under section 12, subsection (1) of the said Act-except on the written request of the contractor and Upon his

Page 96: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-102102102 -

giving to Government full security for all costs for whichGovernment might become liable in consequence of contestingsuch claim.

Clause 21: The contract shall no be assigned or subletwithout the written approval of Engineer-in-Charge. And if thecontractor shall assign or sublet his contract or attempt to do soor become insolvent or commence any insolvency proceedingsor make any composition with his creditors or attempt to do soor if any bribe, gratuity, gift, loan, requisite reward ofadvantage, pecuniary or otherwise: shall either directly orindirectly by given promised or offered by the contractor orany of his servant or agents to any public officer or person inthe employment of Government in any relating to his office oremployment or any such officer or person shall become in anyway directly or indirectly interested in the contract, theEngineer-in-Charge may thereupon by notice in writingrescind the contract and the security deposit of the contractorshall there upon stand forfeited and be absolutely at thedisposal of Government and the same consequence shallensure, as if the contract had been rescinded under clause-3hereof, and in addition the contractor shall not be entitled torecover or be paid for any work therefore actually performedunder the contract.

Work not tobe sublet.

Contract maybe rescindand securitydepositforfeited forsub-lettingbribing or ifcontractbecomesinsolvent.

Sum payableby way ofcompensationto beconsidered as

Clause 22: all sums payable by way of compensationunder any of these conditions shall be considered as reasonablecompensation to be applied to the use of Government withoutreference to the actual loss or damage sustained, and whetheror no any damage shall have been sustained.

Page 97: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-103103103 -

reasonable ascompensationwith ourreference toactual loss.Deduction ofamounts dueto Governmenton any accountwhatsoever tobe permissiblefor sumspayable to acontractor

Clause 22(a): Any excess payment made to thecontractor inadvertently or otherwise under this contract onany account whatever and any other sum bond to be due toGovernment by the contractor in respect of this contract or anyother contract or work order or on any account whatever, maybe deducted from sum whatever, payable by Government tothe contractor either in respect of this contract or any workorder or contract or any other account by any other departmentof the Government.

Changes inconstitution offirm

Clause 23: In the case of tender by partners, any changein the constitution of the firm shall be forthwith notified by thecontractor to the Engineer-in-Charge for his information.

Works to beunderdirections ofSuperintendingEngineer

Clause 24: All works to be executed under the contractshall be executed under the direction and directions of subjectto the approval in all respects of the Superintending Engineerof he circle for the being, Superintending who shall be entitledto direct at what point or points and in what manner they areto be commenced and from time to time carried on.

Claims forpayment of anextra ordinarynature to be

Clause 25: No claims for payment of an extraordinarynature, such as claims for a bonus for extra employed incompleting the work before the expiry of the contractualperiod at the request of the Engineer-in-Charge or claims for

Page 98: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-104104104 -

referred toGovernmentfor decision

compensation where work has been temporarily brought to astand-still though no fault of the contractor, shall be allowedunless and to the extent that the same shall have beenexpressly sanctioned by the Haryana Government under thesignature of its Secretaries.

Arbitration Clause 25(a): If any dispute of difference of any kindwhatsoever shall arise between the Governor of Haryana hisauthorized agent and the contractor in connection with orarising out of the contract or the execution of the work that is(i) whether before it s commencement or during the progress ofthe work or after its completion (ii) and whether before or afterthe termination, abandonment or breach of the contract, it shallin the first instance be referred to for being settled by theExecutive Engineer-in-charge or the work at the time and heshall within a period of sixty days after being requested inwriting by the contractor to do so, convey his decision to thecontractor, and subject to arbitration as hereinafter provided,such decision in respect of every matter so referred, shall befinal and binding upon the contractor. In case the work isalready in progress, the contractor will proceed with theexecution of the work on receipt of the decision by theExecutive Engineer-in-Charge as aforesaid, with all duediligence whether he or the Governor of Haryana/hisauthorized agent requires arbitration as hereinafter providedor not., If the Executive Engineer-in-Charge of the work hasconveyed his decision to the contractor and no claim toarbitration has been filed with him by the contractor within aperiod of sixty days form the receipt of letter communicatingthe decision, the said decision shall be final and binding upon

Page 99: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-105105105 -

the contractor and will not be a subject matter or arbitration atall. If the Executive Engineer-in-Charge of ht work files toconvey his decision within a period of sixty days after beingrequested, as aforesaid, the contractor may, within furthersixty days of the expiry of first sixty days from the date onwhich request has been made to the Executive Engineer-in-Charge request the Engineer-in-Chief, that the matters indispute be relevant to arbitration, as hereinafter provided.

2. All disputes or differences in respect of which thedecision is not final and conclusive shall at the request inwriting of either party made in a communication sent throughRegistered A. D. Post, be referred to the sole arbitration of anyserving Superintending Engineer of Chief Engineer of HaryanaPublic Health Engineering Department to be nominated by theEngineer-in-Chief. Haryana Public Health EngineeringDepartment at the relevant time. It will be no objection to anysuch appointment that the arbitrator so appointed is aGovernment servant or that he had to deal with the matters towhich the contract relates and that in the course of his duties asa Government servant, he had expressed in his visit on all orany of the matters in dispute. The arbitrator to whom thematter is originally referred being transferred or vacating hisoffice, his successor-in-office, as such shall be entitled toproceed with the reference from the stage at which it was leftby his predecessor.

In case the arbitrator nominated by the Engineer-in-Chief, is unable or unwilling to act as such for any reasons,whatsoever, the Engineer-in-Chief shall be competent to

Page 100: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-106106106 -

appoint and nominate any other Superintending Engineer orChief Engineer, as the case may be, as arbitrator in his placeand the arbitrator so appointed shall be entitled to process withthe reference.

3. It is also a term of this arbitration agreement that noperson other than a person appointed by the Engineer-in-Chief, Haryana Public Health Engineering Department. Shallact as arbitrator and if for any reason that is not possible, thematter shall not be referred to arbitration at all. In all caseswhere the aggregate amount awarded exceeds Rs. 25,000/-(Rupees Twenty Five Thousand Only) the arbitrator mustinvariably give reasons for his award in respect of each claimand counter-claim separately.

4. The arbitrator shall award separately giving hisaward against each claim and dispute raised by either partyincluding any counter-claims individually and that any lump-sum award shall not be legally enforceable.

5. The following matters shall not lie with in thepurview of arbitration:

(a) Any dispute relating to the levy of compensation asliquidated damages which has already been referred to theSuperintending Engineer and is being heard or/and has beenfinally decided by the Superintending Engineer-in-charge ofthe work.

(b) Any dispute in respect of substituted, altered,

Page 101: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-107107107 -

additionaAlmwoournkt/ocfoCmlmaiimttsed work/deRfeactteivoefwSeocrukrirteyfeDrerepdosbity(tih)e FCoorntCralacitmors fobreltohwe deRciss.ion of the Supe2ri%ntoefnadminogunEtncglainimeeed1In0c,0h0a0rge of the Work if it is being heard 5o%r hoafsamaloruenatdcylabimeeend(diie)ciFdoerdCblyaitmhes soafid SuperRisn.tending Engineer.10,000 10% of amount claimedand abo(cv)eAannyddibepluowte rRegs.arding the scope of the work or its1ex,0e0c,u00ti0on or suspension or abandonment that has been(rieifi)errFeodr bcylaitmhse coofntractoRrsf.or the decision of the Government1o,f00H,0a0r0yana and has been so decided finally by the HaryanaaGnodvaebronvme ent.

The stamp-fee due on the award shall be payable by theparty a6s. dTehseireinddebpyenthdeenatrbclitariamtosroaf ntdheinpatrhtye oetvheenrt thofansuthcheopnaretyg’esttdinegfatuhlet tahrebitsrtautmorp-afpepe oisnhteadll, baes arelscoovceoruanbtleer-fcrloamimsanoyfaonthyepr asrutmy wduilel btoe seunctehrtpaainrteydubnydtehrethairsboitrr atnoyr ontohtewricthosnttarnacdti.ngthat the8.aTrbhietrvaetonruehaodf abrebeitnraatpiopnosinhtaeldl baetstuhceh ipnlsatcaencoer poflatchees

oasthmerapyarbtey.fixed by the arbitration in his sole discretion. Thework under the contract shall continue during the discretionproceed7i.ngIts.is also a term of this arbitration agreement thatwhere 9th. eNepiathrteyr pinavrotykisnhgallarbbeitreanttiiotnledistothberincognatracclatoimr, fnoorraerfbeirtreantcioenfiofrthaerbaiptrpaotiionntmsehnatllofbseuchmairnbtiatrinataobrlehausnnleostsbethenecaopnptlrieadctowrithfuinrn6ismhoensthtso. the satisfaction of the ExecutiveEnginee(ra)IOncfhtahregedaotef othfecowmoprkle,tiaonseocfuhrittywodrekpaosicteortfifaiedsubmyEdxeteecrumtiivneedEnagcicnoeredri-ning-cthoardgeetaoirl.s given below and the sum sdeposited shall on the termination of the arbitrationproceed(ibn)go,fbtheeaddajutestoefdabaagnaidnosntmtheentcofstt,hiefwanoryk, ,aowr arded bythe arbitrator against the claimant party and the balanceremaini(ncg) oafftitesr nsounc-hcoamdmjusetnmcemntenint wthiethianbs6emncoenothfsafnroymsuthchedcoastte boefianbganawdoanrdmeednt,hoerwwhroitlteenofotrhdeerssutmo cwomillmbeenrceefuthnedwedortkoahsimapwpiltichainbloen, oermonth from the date of award:

Page 102: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-108108108 -

(d) of the completion of the work through anyalternative agency or means after withdrawal of the work fromthe contractor in whole or in part and/or its rescission, or

(e) of receiving an intimation from the ExecutiveEngineer Incharge or the work that final payment due to orrecovery from the contractor had been determined which hemay acknowledge and/or receive.

Whichever of (a) to (e) above is the latest.

If the matter is not referred to arbitration within theperiod prescribed above all the rights and claims of any partyunder the contract shall be deemed to have been forfeited andabsolutely barred by time even for civil litigationnotwithstanding.

10. It is also a terms of this arbitration agreement thatno question relating to this contract shall be brought before anyCivil Court without first involving and completing thearbitration proceedings as above if the scope of the arbitrationspecified herein coves issues that can be brought before thearbitration i.e. any matter that can be referred to arbitrationshall not be brought before a Civil Court. The pendency ofarbitration proceedings shall not disentitle the Government toterminate the contractor and make alternative arrangement forthe completion of the work.

11. The arbitrator shall be deemed to have entered onthe reference on the day he issues notices to the parties fixing

Page 103: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-109109109 -

the first date of hearing. The arbitrator may from time to timewith the consent of the parties enlarge the initial time formaking and publishing the awards.

12. It is also a terms of this arbitration agreement thatsubject to the stipulation herein mentioned, the arbitrationproceedings shall be conducted in accordance with theprovisions of the arbitration Act or any other latest law in forcefor the time being, Indian arbitration and Reconciliation Act of1996 shall be applicable on this contract.

State ofEuropeanAmericanmanufacture tobe obtainedfrom Govt.

Clause 26: The contractor shall obtain from the stores ofthe Engineer-in-Charge all stores and articles of European orAmerican manufacture which may be required there of or inconnection therewith unless he has obtained permission inwriting from the Engineer-in-Charge to obtain such stores andarticles else where. The value of such stores and articles as maybe supplied to the contractor by the Engineer-in-Charge will bedebited to the contractor in his account at the rate shown in theschedule attached to the contract, and if they are not entered inthe schedule they win be debited at cost price which for thepurposes of this contract shall include the cost of carriage andall other expenses whatsoever which shall have been incurredin obtaining delivery of the same at the stores aforesaid.

Fluctuations inRailwayfreight.

Clause 26(a): Any fluctuations in Railway rates whichmay occur during the subsistence of and affecting freights ofany material to be supplied under this contract shall bebrought to the notice of the Engineer-in-Charge by thecontractor within fifteen days from such date withoutprejudice to the rights of Government, should the contractor

Page 104: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-110110110 -

fail to comply with the above requirement any excess or shortcharge on account of such increase or decrease shall be inconsequence of fluctuation in railway freight when suchrailway freight is on account of material which is required by acontractor in the manufacture of an article to be suppliedunder this contract e.g. fluctuation of railway freight on coalrequired for burning bricks will not be taken into considerationor for an article which forms part of a finished work forpurpose of this clause. Similarly no alteration in rates will beallowed when a manufacture article is transported by rail fromplace A to place B to form part of a finished work.

Clause 27: The contractor shall be responsible formaking his own arrangements for securing priorities andlicence for material and transportation required for the worksand Engineer-in-Charge shall not be held responsible in anyway for making such arrangements for any of them.

Clause 28: In the case of any clause of work for whichthere is no such specification as is mentioned in rule 1, suchwork shall be carried out in accordance with the P.W.D.specifications, and in the event of there being no P.W.D.specification, then in such case the work shall be carried out inall respects in accordance with the instructions andrequirements of the Engineer-in-Charge.

Action wherenospecification

Clause 29: The Expression “work” or “works” whereused in these conditions shall unless there be something eitherin the subject or context repugnant such constructions beconstructed and taken to mean the work by or by virtue of the

Definition ofwork.

Page 105: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-111111111 -

contract contracted to be executed whether temporary orpermanent and whether original, altered, substituted oradditional.

Clause 30: The percentage referred to at page (3) of thetender will be calculated on the gross amount (value offinished work including cost of materials whether purchasedform Government or direct of (1) the items of works to whichthe rates in the tender apply and also (2) the items of work towhich rates exist in the Schedule of rates of the district.

Clause 31: The terms and conditions of the agreementhave been explained to me/us and I/we clearly understandthem.

Page 106: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-112112112 -

ADDITIONAL CLAUSEClause 32: The contractor states that he is not related to any of

the officers employed by the Haryana P.W.D.Clause 33: No pit shall be dug by the contractor near the site of

the work for taking out earth for use on the work. In case of default,the pit so dug will be filled in by the Department at the cost of thecontractor.

Clause 34: Fair wage clause attached.Clause 35: The contractor shall have to pay sales tax to Excise

and Taxation Department in accordance with the rules in force formtime to time.

Clause 36: All payments for work done under this contractshall be made by cheque to the contractor. The work covered by thiscontract as shown on plans which have been signed by the contractorare annexed herewith.

Clause 37: Should the tenderer withdraw or modify his tenderwithin three months from the date of opening of tender he is liable toblack listed and earnest money forfeited.

Clause 38: All royalty and compensation for building stone,bajri and stone metal etc. should be included in the rates to be quotedand is payable by the contactor.

Clause 39: The rates given are for the finished work inclusive ofExcise duty, Octroi charges, sales taxes, service tax etc.

Clause 40: It will be the responsibility of the contractor toensure that the trees at the site of work and in the vicinity or their fruitetc., are not damaged by his labour or agent. The cost of such damage,if any, will be at the discretion of the Engineer-in-Charge and shall bededucted from the bill of the contractor.

Clause 41: The contractor shall provide at his own cost separate

Page 107: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-113113113 -

latrine, bathing enclosures and platform for use of the man andwomen labour and keep them clean to the satisfaction of the Engineer-in-Charge. He should also arrange at his own expenses for cleandrinking water, housing, medical facilities necessary for the welfare ofthe labour employed at his work, in case of his failure the same shallbe provided by Government at contractor’s cost. At dispute regardingthis will be settled by the Engineer-in-Charge whose decision will bebinding.

Clause 42: Any material left on the site of work after one monthform the date of completion of the work shall become the property ofthe Government and no payment shall be made for it.

Clause 43: The amount of the work can be increased ordecreased according to the requirement of the department and noclam whatsoever on this account will be entertained.

Clause 44: The department reserve option to take away anyitems of the work or part thereof any time during the currency of thecontract and re-allot it to another agency with due notice to thecontractor without liability or compensation.

Clause 45: It is not obligatory on the contractor to employlabour through Employment Exchange but he may avail of thefacilities offered by the Employment Exchange in case he wishes to doso.

Clause 46: No claim on account of fluctuation in prices due towar or any other cause will be entertained.

Clause 47: The contractor shall be liable to make good alldamages caused by breakage from the moment the stores, pipes andfittings etc. are handed over to his charge.

Clause 48: No compensation whatever will be payable onaccount of any delay or default in the supply of material mentioned inthe “List of material to be issued to the contractor” by the department

Page 108: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-114114114 -

and consequent delay in the execution of work.Clause 49: The contractor will inform the C.M.O. about the

employment of labourer on the work for carrying out Malariasurveillance.

Clause 50: No premium shall be payable on Non-scheduleitems. Whether depicted in enclosed schedule of rates or not.Contractor will quote his separate rates as depicted on page No. 6 ofthe tender form.

Clause 51: Sales Tax/Income Tax will be deducted from grosspayment as per Government Instructions.

Clause 52: Labour cess Charge @ 1% will be deducted fromgross payment.

FAIR WAGES CLAUSES(a) The contractor shall pay not less than fair wage to labour

engaged by him on the work. Explanation: Fair Wage means wagewhether for time or piece work notified at the time or inviting tendersof the work and where such wages have not been so notified, thewages prescribed by the Public Works Department, Building andRoads Branch, Haryana for the district in which the work is done.

(b) The contractor shall notwithstanding the provisions of anyagreement to the contrary, caused to be paid fair wages to labourers,indirectly engaged on the work including any labour engaged by hissub-contractors in connection with the said work, as if the labourershad been directly employed by him.

(c) In respect of labour directly employed on the works for theperformances of the contractor’s part of this agreement the contractshall comply with or cause to be complied with the Haryana PublicWorks Department Contractor’s Labour’s Regulations made by

Page 109: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-115115115 -

Government from time to time in regard to payment of wages perioddeductions from wages recovery of wages not paid and deductionsunauthorizedly made maintenance of wage book, wage slip,publication of wages and other terms of employment inspection andsubmission of periodical returns and all other matters of alike nature.

(d) The Executive Engineer or Sub Divisional Engineerconcerned shall have the right to deduct, form the moneys due to thecontractor’s any sum required or estimated to be required for makinggood the loss suffered by a worker or workers by reason of non-fulfillment of the conditions of the contract for benefit of the workers,non payment of wages or deductions made from his or their wages,which are not justified by the terms of the contract for non observanceof the regulations referred to in clause (‘c’ above)

(e) Vis-à-vis the Haryana Government, the contractor, shall beprimarily liable for all payments to be made under and for theobservance of the regulations aforesaid without prejudice to his rightto claim indemnity from his sub-contractors.

(f) The regulations aforesaid shall be deemed to be a part ofthis contract.

(g) Attendance card should invariably be issued by thecontractors to their workers which should be returned to thecontractors concerned at the time of receiving payment of their wages.

(h) Before making payment to the contractors the authoritiesconcerned should obtain a certificate from the contractors that he hasmade payment to all the workers connected with the execution of thework for which the payment is being made.

(i) Contractors employing 50 or more workers on the site of aparticular work, should provide facilities of housing, latrines, waterand light to their workers at their own expense.

(j) The normal working house of workers employed by

Page 110: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-116116116 -

contractors for the execution of work allotted to them should be 8hours per day with a break of 2 hours during summer, one hourduring winter after continuous work of 4 hours at the elates. Thespread over should in no case exceed 10 hours, workers workingbeyond these hours should be paid over time wages at the double theordinary rate or their wages calculated by the hour.

HARYANA PUBLICWORKS DEPARTMENT

1. Short Title.Contractor’s Labour Regulation

These regulations may be called Haryana (1) Public WorksDepartment Contractor’s labour Regulations.2. Definition.

In these regulations, unless otherwise expressed or indicatedthe following words and expressions shall have the meaning herebyassigned to them respectively, that is to say.

(1) Labour means workers employed by a Public WorksDepartment Contractor’s directly or indirectly a sub-contractor otherpersons or by an agent on his behalf.

(2) Fair wages means whether for items or piece work, notifiedat the time of inviting tenders for the work and where such wageshave not been so notified the wages prescribed by the Public WorksDepartment for the district in which the work is done.

(3) Contractor shall include every person whether a sub-contractor or headman or agent employing labour on the work, takenon contract.

(4) “Wages” shall have the same meaning as defined in thepayment of Wages Act and includes time and piece rate wages.

Page 111: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-117117117 -

3. Display of notice regarded wages etc.The contractor shall before he commences his work on

contract, display and correctly maintain and continue to display andcorrectly maintain a clean and legible condition at conspicuous placeson the work notice in English and in the Local Language spoken bythe majority of the workers giving the rate of wages which have beencertified by the Executive Engineer, the Superintending Engineer, theChief Engineer or Regional Labour Commissioner as fair wages andthe hours of work for which such wages are earned and a copy of suchnotices to the District Labour Welfare Officer.4. Payment of Wages.

(I) Wages due to every worker be paid to him direct.(ii) All wages shall be paid in current coin or currency or in

both.5. Fixation of Wage Periods.

(I) The contractor shall fix the wage periods in respect ofwhich the wages shall be payable.

(II) No wage period shall exceed one moth(III) Wages of every workman employed on the contract shall

be paid before the expiry of ten days after the last of thewage period in respect of which the wages are payable.

(IV) When the employment of any worker is terminated by oron behalf of the contractor. The wages earned by himshall be paid before the expiry of succeeding the one onwhich his employment is terminated.

(V) All payment of wages shall be made on a working dayexcept the work is completed before the expiry of thewages period in which case final payment shall be madewithin 48 hours of the last working day.

Notes: - The terms working day mean a day, on which the work

Page 112: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-118118118 -

on which the labour is employed is in progress.6. Wages Books and Wages Slip etc.

A) The contractor shall maintain a wage book of eachworker in such a form as may be convenient but the sameshall include the following particulars.

I) Rate of daily or monthly wages.II) Nature of work for which employed.III) Total number of days worked during each wage period.IV) Total amount payable for the work during each wage

period.V) All deductions made from the wages with an indication

in each case of the ground for which the deductions ismade from the wage.

VI) Wages actually paid for each wage period.B) The contractor shall also maintain a wage slip for each

worker employed on the work. The wage slip shallcontain all the particulars given in the wage book.

C) The Executive Engineer, may grant exemption from themaintenance of Wage Book and Wage Slips to acontractor who in his opinion, may not directly orindirectly employ more than 50 persons on the work.

7. Fine and deductions which may be made from wages.1. The wages of workers shall be paid to him without any

deduction of any kind except the following.(a) Fines.(b) Deductions for absence from duty viz., from the place or

places where by the terms of his employment is requiredto work.The amount of deduction shall be in proportion to theperiod for which he was absent.

Page 113: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-119119119 -

(c) Deductions for damage to or loss of goods, expressly,entrusted to the employed person for custody, or for lossof money for which he is required to account, where suchdamage or loss is directly attributable to his neglect ordefault.

(d) Any other deductions which the Government may fromtime to time allow.

2. No fine shall be imposed on a worker and no deductionfor damage or loss be made until the worker has beengiven an opportunity of showing cause against such finesor deductions.

3. The total amount of fine which may be imposed in anyone wage period on a worker shall not exceed an amountequal to half an anna in a rupee of the wage payable tohim in respect of that wage period.

4. No fine imposed on any worker shall be recovered fromhim by installments, or after the expiry of 60 days fromthe date in which it was imposed.

8. Register of Fine etc.1. The contractor shall maintain a Register of fine and of all

deductions for damage or loss. Such Register shallmaintain the reason for which fine was imposed ordeduction for damage or loss was made.

2. The contractor shall maintain, both in English and LocalLanguage, a list approved by the Chief LabourCommissioner clearly stating the acts and commissionsfor which penalty of fine may be imposed on workmenand display it is a good conditions at a conspicuous placeon the work.

9. Preservation of Registers.

Page 114: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-120120120 -

The wage book, the wage slips and the Register of fines,deductions required to be maintained under these regulations shall bepreserved for 12 months after the date of last entry made in them.10. Power of Labour Welfare Officer to make Investigation Enquiry.

The Labour Welfare Officer or any person authorized by theGovernment on their behalf shall have to make enquiries with a viewto ascertaining and enforcing due and proper observance of the fairwage clause and provisions of these Regulations. He shall beinvestigation into any complaint regarding the default made by thecontractor or sub-contractor in regard to such provision.11. Report of Labour Welfare Officer.

The Labour Welfare Officer or any other persons authorized asaforesaid shall submit a report of the result of his investigation orenquiry to the Executive Engineer concerned, indicating the extent ifany to which the default has been committed and the amount of finerecoverable in respect of the acts of omission and commission of thelabourer with a note that necessary deduction form the contractor’sbill be made and the wages and other dues be paid to the labourersconcerned.

Page 115: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-121121121 -

12. Appeal against the decision of Labour Welfare Officer.

Any person aggrieved to the decision and recommendation ofLabour Welfare Officer or other person so authorized may appealagainst such decision to the Regional Labour Commissioner within 30days from the date of decision forwarding simultaneously a copy ofhis appeal to Executive Engineer concerned but subject to such appeal,the decision of the Labour Welfare Officer shall be final and bindingupon the contractor.

13. Representation of Parties.(1) A workman shall be entitled to be represented in any

investigation or inquiry under these regulations by:(i) An officer of a registered Trade Union to which he is a

member.(ii) An officer of Federation of Trade Unions to which the trade

union referred it in clause (a) is affiliated.(iii) Where the worker is not a member of any registered union,

an officer or registered trade union connected with, or byany other workman employed in the industry in which theworker is employed.

(2) An employer shall be entitled to be represented in anyinvestigation or inquiry under these regulations by:

(a) An officer of an association of employers of which he is amember.

(b) An officer of an association of employees to which theassociation referred to in clause (a) is affiliated.

(c) Where the employer is not a member of any association ofemployees by an officer of an association of employers

Page 116: GOVERNMENT OF HARYANA Public Health …haryanaphed.etenders.in/tpoimages/haryanaphed/tender/...Boundary Wall, Pump Chamber of B/Stn. & Water Works, OHSR, Road Path, Pumping Machinery

-Sd-Executive EngineerContractor Witness

-122122122 -

connected with or by any other employer is engaged.14. Inspection of Books

The contractor shall allow inspection of Wage Book, the WageSlip and Register of Fines and deduction to any of his workersor his agent at a convenient time and place after notice isreceived or to the Labour Welfare Officer or any other personauthorized by the Government on his behalf.

15. Submission of returnsThe contractor will follow the contract labour (Regulation andAbolition Act 1970) and the contract labour (Regulations andAbolition Central Rule 1971) enforced by Haryana Labour andEmployment Department Memo No. 12 (26-78-4-labour dated10-06-1979).The contractor shall submit periodical returns as specifiedfrom time to time.

16. Licencing of ContractorEvery contractor who employs or who employed on any dayof the proceeding 12 calendar months 20 or more workmen iscovered by the Act and is required to obtain a licence. Thecontractor should obtain the necessary licence as requiredunder section 12 of contract labour (Regulation and AbolitionAct 1970) before commencing the work.

17. AmendmentsThe Haryana Government may from time to time amend theseregulations on any questions as to application, interpretationor effect of these regulations. The decision of the LabourCommissioner to Haryana Government in that behalf shall befinal.