golden retriever junction improvements - bracknell forest · golden retriever junction improvements...

1
GOLDEN RETRIEVER JUNCTION IMPROVEMENTS NORTH L KEY: Alignment of existing roundabout [ /(:(/:l Area of verge / trees .__ __ _,I Footway Pedestrian crossing with signals Amendment Date Initials A Desi n u dated Nov 19 AS tJI Bracknell ...--'1 Forest Council PLACE, PLANNING & REGERATION Transport Engineering Group Project title GOLDEN RETRIEVER JUNCTION Drawing title PROPOSED JUNCTION IMPROVEMENTS Prepared Checked by AMT by NR Scale NTS Date JUNE 2019 Project Number Drawing Number Amend Print Letter Suffix A3095/001 A Traffic signal - Crown Cop~ ight and database rights 2019 Ordnance

Upload: others

Post on 03-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Golden Retriever Junction Improvements - Bracknell Forest · GOLDEN RETRIEVER JUNCTION IMPROVEMENTS SARUM WIDENING OF ENTRY AND EXIT LANES NEW SHARED FOOTPATH / CYCLE-TRACK 0001 488

GOLDEN RETRIEVER JUNCTION IMPROVEMENTS

NORTH

L

KEY:

Alignment of existing roundabout

[ /(:(/:l Area of verge / trees

.__ __ _,I Footway

������������ Pedestrian crossing with signals

Amendment Date Initials

A Desi n u dated Nov 19 AS

~~ tJI Bracknell ...--'1 Forest

Council

PLACE, PLANNING & REGERATION

Transport Engineering Group

Project title

GOLDEN RETRIEVER JUNCTION

Drawing title

PROPOSED JUNCTION IMPROVEMENTS

Prepared Checked by AMT by NR

Scale NTS Date JUNE 2019

Project Number Drawing Number Amend Print Letter Suffix

A3095/001 A

Traffic signal -

~ Crown Cop~ ight and database rights 2019 Ordnance