goldberg brothers, inc.€¦ · door premium hardware set installed on track trim board that is...

2
Using the carriage bolts, hex nuts and lock washers, aach the horseshoe hangers to the door as shown in the diagram. WALL DOOR FINISHED FLOOR Plumb the door before fastening door guide to floor. In the closed position, the door should overlap the wall a minimum of ʺ at the top and a minimum of ½on both sides. The edge of the door should align with the end of the track. Note: After the door is hung from the track, the anti- jump blocks can be installed directly behind the horseshoe hangers. At 3ʺand 9ʺ from both sides of the top half of the door, measure down 1⁄ʺ and drill ⁄ʺ pilot holes followed by ⁄ʺ holes. 6ʺ from both sides of the top half of the door, measure down 4⁄ʺ and drill ⁄ʺ pilot holes followed by ⁄ʺ holes. Door Prep and Hanger Installaon Basic Installaon Layouts GOLDBERG BROTHERS, INC. Premium Series Horseshoe Hanger - Installation Instructions Premium Hardware set installed with no casing, base, or other trim. FINISHED OPENING HEADER/BLOCK WALL DOOR Premium hardware set installed on track trim board that is equal to or thicker than casing, base, or other trim. FINISHED OPENING HEADER/BLOCK WALL DOOR Head Track Block SIDE CASING Base Board Premium hardware set + extension kit installed where casing, base, or other trim is greater than thick. Extensions FINISHED OPENING HEADER/BLOCK WALL ½ʺ Extensions DOOR Side Casing Base Board Premium hardware set + ½” extension kit installed where casing, base, or other trim is up to ½” thick. ʺ or 1⁄ʺ ⁄ʺ or 1⁄ʺ ⁄ʺ ⁄ʺ ⁄ʺ ⁄ʺ FINISHED OPENING HEADER/BLOCK WALL DOOR SIDE CASING BASE BOARD TRACK DOOR ⁄ʺ ⁄ʺ ⁄ʺ 5⁄ʺ 3⁄ʺ 1⁄ʺ ⁄ʺ Included Hardware Horseshoe hangers (2) T-guide (1) Carriage bolts (6) Washers (6) An-jump blocks (2) Spacers (6) Track stops (2) T-guide screws (2) Lock washers (6) Hex lag bolts (6) An-jump block screws (4) Hex nuts (6) 1⁄ʺ 4⁄ʺ FINISHED OPENING DOOR EDGE Goldberg Brothers barn door track and hardware sets come with a one-year manufacturer’s warranty for defective parts under normal installation and use. Warranty is subject to repair or replacement of defective components at manufacturer’s discretion and does not include installation costs. Goldberg Brothers does not warrant the loss of finish at points where roller is in contact with track. Goldberg Barn Track is sold as a rustic finished hardware and Goldberg does not warrant the imperfections seen through the finish in the steel parts. It is part of the look. With the exception of our stainless steel products, Goldberg Brothers does not warrant any products installed and used outdoors or where they are exposed to weather, running water or water condensation. Under these conditions, rust and other damage will naturally occur. This warranty does not include loss or defects caused by elements outside the control of Goldberg Brothers, Inc., such as natural disasters, weather, fire, water leakage, abuse, improper installation, or anything else deemed out of the control of Goldberg Brothers, Inc. Using the T-guide screws, aach the T-guide to the floor by aligning the edge of the guide with the edge of finished opening as shown above. T-guide Installaon Stay: At each end of the track, place one felt pad strip on top of the track, 1⁄ʺ in from the track stop as shown. Bumper: For each hanger, place one felt pad strip on the track stop or the edge of the hanger as shown. 1⁄ʺ An-jump block

Upload: others

Post on 27-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GOLDBERG BROTHERS, INC.€¦ · DOOR Premium hardware set installed on track trim board that is equal to or thicker than casing, base, or other trim. FINISHED OPENING HEADER/BLOCK

Goldberg Brothers Barn Door Hardware sets come with a one-year manufacture’s warranty for defective parts under normal installation and use. Warranty is subject to repair or replacement of defective part/s at manufacture’s discretion and does not include installation costs. Goldberg Brothers does not warrant the loss of finish at points where roller is in contact with the track. Goldberg Brothers Barn Door Hardware is sold as a rustic finished hardware and Goldberg does not warrant the imperfections seen through the finish in steel parts. It is part of the look.

This document contains proprietary information of Goldberg Brothers, Inc. and its receipt of possession does not convey any rights to reproduce or disclose its contents, or to manufacture, use or sell anything it may describe. Reproduction, disclosure, or use without prior written authorization from Goldberg Brothers, Inc. is strictly forbidden.

Included Hardware Straight strap hangers (2) T-guide (1) Carriage bolts (4) Washers (6) An�-jump blocks (2) Spacers (6) Track stops (2) T-guide screws (2) Lock washers (4) Hex lag bolts (6) An�-jump block screws (4) Hex nuts (4)

Using the carriage bolts, hex nuts and

lock washers, a�ach the horseshoe

hangers to the door as shown in the

diagram.

Bumper:Place 1 pad on stop

or edge of roller per side.

Stay:Place 1 pad on top of track ateach end directly under roller when roller is touching stop.

Bumper

Stay

DOOR

TRACK

Finished Opening

DO

OR

EDG

E

½ʺ

ʺ

11

1

�⁄�ʺ

�⁄�ʺ

�⁄�ʺ�⁄�ʺ

�⁄�ʺ

�⁄�ʺ

�⁄�ʺ

Using the T-guide screws, a ach the T-guide to the floor by aligning the edge of the guide with the edge of

finished opening as shown above.

finished floor

WALL

DOOR

FINISHED FLOOR

Plumb the door before fastening door guide to floor.

Goldberg Brothers, Inc.10488 W Cenntenial Rd, Suite 100Li�leton, CO 80127(303) 321-1099

In the closed position, the door should overlap the wall a minimum of ⅜ʺ at the top

and a minimum of ½” on both sides.

The edge of the door should align with the end of the

track.

Note: After the door is hung from the track, the anti-

jump blocks can be installed directly behind the horseshoe hangers.

At 3ʺand 9ʺ from both sides of the top half of the door, measure down 1�⁄�ʺ and drill �⁄�ʺ pilot holes followed by �⁄�ʺ holes. 6ʺ from both sides of the top half of the door, measure down 4�⁄�ʺ and drill �⁄�ʺ pilot holes followed by �⁄�ʺ holes.

1�⁄�ʺ

Door Prep and Hanger Installa�on

T-guide Installa�on

Basic Installa�on Layouts

GOLDBERG BROTHERS, INC.Premium Series Horseshoe Hanger - Installation Instructions

Premium Hardware set installed with no casing,

base, or other trim.

FINISHED OPENING

HEADER/BLOCK

WALL

DOOR

Premium hardware set installed on track trim board that is equal to or

thicker than casing, base, or other trim.

FINISHED OPENING

HEADER/BLOCK

WALL

DOOR

Head

Trac

k Bloc

kSI

DE C

ASIN

G

Base

Boa

rd

Premium hardware set + extension kit installed where casing, base, or other trim is greater than thick.

Extensions

FINISHED OPENING

HEADER/BLOCK

WALL

½ʺ Extensions

DOOR

Sid

e C

asin

gBa

se B

oard

Premium hardware set + ½” extension kit installed where casing, base, or other trim is up to ½” thick.

�⁄�ʺ or 1�⁄�ʺ

1

3

3

�⁄�ʺ or 1�⁄�ʺ

�⁄�ʺ�⁄�ʺ

�⁄�ʺ

�⁄�ʺ

FINISHED OPENING

HEADER/BLOCK

WALLDOOR

SID

E CA

SIN

GB

AS

E B

OA

RD

STAY PAD

TRACK

BUMPER

DOOR

�⁄�ʺ

�⁄�ʺ �⁄�ʺ

�⁄�ʺ

5�⁄�ʺ

3�⁄�ʺ6ʺ 3ʺ

1�⁄�ʺ

�⁄�ʺ

Included Hardware Horseshoe hangers (2) T-guide (1) Carriage bolts (6) Washers (6) An�-jump blocks (2) Spacers (6) Track stops (2) T-guide screws (2) Lock washers (6) Hex lag bolts (6) An�-jump block screws (4) Hex nuts (6)

1�⁄�ʺ

4�⁄�ʺ

FINISHED OPENING

DO

OR

ED

GE

Goldberg Brothers barn door track and hardware sets come with a one-year manufacturer’s warranty for defective parts under normal installation and use. Warranty is subject to repair or replacement of defective components at manufacturer’s discretion and does not include installation costs.

Goldberg Brothers does not warrant the loss of finish at points where roller is in contact with track. Goldberg Barn Track is sold as a rustic finished hardware and Goldberg does not warrant the imperfections seen through the finish in the steel parts. It is part of the look.

With the exception of our stainless steel products, Goldberg Brothers does not warrant any products installed and used outdoors or where they are exposed to weather, running water or water condensation. Under these conditions, rust and other damage will naturally occur.

This warranty does not include loss or defects caused by elements outside the control of Goldberg Brothers, Inc., such as natural disasters, weather, fire, water leakage, abuse, improper installation, or anything else deemed out of the control of Goldberg Brothers, Inc.

Using the T-guide screws, a�ach the T-guide to the floor by aligning the edge of the guide with the edge of

finished opening as shown above.

T-guide Installa�on

Stay:At each end of the track, place one felt pad strip on

top of the track, 1�⁄�ʺ in from the track stop as shown.

Bumper:For each hanger, place one felt

pad strip on the track stop or the edge of the hanger as shown.

1�⁄�ʺ

An�-jump block

Page 2: GOLDBERG BROTHERS, INC.€¦ · DOOR Premium hardware set installed on track trim board that is equal to or thicker than casing, base, or other trim. FINISHED OPENING HEADER/BLOCK

Op�onal Accessories

Sidewall Guide Bracket1 eachIncludes 1 bracket, 4 machine screws, 4 nuts and 1 felt pad Part #6001SW-*

NOTE: Use the provided T-guide wood screws for sidewall guide installa�on.

Door Guide “U” 1 setIncludes 2 “U” guides, 2 wood screws and 1 felt padPart #6001U-*

NOTE: Use the providedT-guide wood screws for U-guide installa�on.

Track Connec�ng Plate 1 eachPart #6001C-*

Wall Extension Bolts SetIncludes 6 lag bolts and 6 wall spacers

So� Stop 1 setIncludes 2 So� Stop mechanisms, 2 triggers and 4 wood screws Part #6001SOFT11 (4’-7’ track)Part #6001SOFT17 (8’+ track)

* Indicates that the related part is available in various colors.

Li� the door and hang it from the track.

Using the remaining hex lag bolts, spacers and washers, finish a�aching the track at the remaining connec�ng points.

Using a hex lag bolt, track stop, spacer and washer, connect one end of the track to the wall using the pre-drilled hole closest to the opening as shown in the diagram.

NOTE: The end of the track

should extend a minimum of �⁄�” past the door

opening as noted above.

�⁄�ʺ

Mark the centerline* of the track on the wall using a level.

*The centerline of the track is represented as the door height (DH) + 1�⁄�ʺ above

finished floor.

At each of the track connec�ng points, drill �⁄�”

pilot holes followed by �⁄�ʺ pilot holes.

DH

+ 1

�⁄�”

= Tr

ack

cent

erlin

e

FINISHED FLOOR

Track Installa�on

Goldberg Brothers, Inc.10488 W Centennial Rd, Suite 100Li�leton, CO 80127(303) 321-1099

Track Centerline

1�⁄�ʺ Door 1�⁄�ʺ Door 2�⁄�ʺ Door

�⁄�ʺ Extension Part #60013E-* Part #60013EX-* Part #60013EXX-*

�⁄�ʺ Extension Part #60014E-* Part #60014EX-* Part #60014EXX-*

1�⁄�ʺ Extension Part #60015E-* Part #60015EX-* Part #60015EXX-*

�⁄�ʺ Extension �⁄�ʺ Extension 1�⁄�ʺ Extension

1�⁄�ʺ Door Part #60013E-* Part #60013EX-* Part #60013EXX-*

1�⁄�ʺ Door Part #60014E-* Part #60014EX-* Part #60014EXX-*

2�⁄�ʺ Door Part #60015E-* Part #60015EX-* Part #60015EXX-*

Swing the track to the opposite end of the wall

as shown.

Using the same method as before, connect the opposite end of the track to the wall.