go for green energy !! solar is the energy for future!

9
SOLAR IS THE ENERGY FOR FUTURE! Innovative. Aesthetic. Efficient. We Encourage New Ideas and Fresh Approaches! Go for Green Energy!!

Upload: others

Post on 13-Feb-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

SOLAR IS THE ENERGY FOR

FUTURE! Innovative. Aesthetic.

Efficient.

We Encourage New Ideas and Fresh Approaches!

Go for Green Energy!!

Mission

Vision

consists of young entrepreneurs eager to avail the optimum solution of customer's renewable needs. The company puts constant efforts to create unique and decadent solar power plants and provide aesthetic solar solutions. In Collaborations with globally renowned technology providers, the team at Jarvis Energy is ready to serve Residential, Commercial, NGOs and Industrial clients.

To be a world/global leader in innovative solar energy provider and to show the world that humanity and nature can stay in harmony with each other.

To spread awareness about the potential of solar power. To help customers to reap maximum benefits from the sun. To provide technology solutions which

are light on customer's wallet and environment as well.

KEY FEATURES

FEASIBILITY STUDIES SITE-SPECIFIC DESIGN

STATUTORY APPROVALS ENGINEERING

EQUIPMENT PROCUREMENT PROJECT MANAGEMENT

SERVICES ROOFTOP PV PLANTS | GROUND MOUNTED PV PLANTS

TURN-KEY EPC SOLUTIONS | OPERATIONS & MAINTENANCE

Solar Farm

Solar Rooftop

Solar Pumps

Solar EV Charging

Solar Gadgets

Solar Street Lights

Solar Trees

B E N E F I T S W I T H S O L A R

S Y S T E M L I F E 2 5 Y E A R S

5 Y E A R S S Y S T E M

W A R R A N T Y

M I N I M U M 1 5 0 0 U N I T S /

Y E A R / K W G E N E R A T I O N

L O W M A I N T E N A N C E

C O S T

R E D U C E / E L I M I N A T E

Y O U R E L E C T R I C I T Y

B I L L S

R E D U C E Y O U R

C A R B O N F O O T P R I N T

N E T M E T E R I N G B E N E F I T S

A C C E L E R A T E D E P R E C I A T I O N

4 0 / 6 0 % F O R C O M M E R C I A L /

I N D U S T R I A L I N S T A L L A T I O N

R O I I N 3

Y E A R S

Solar Installation Process

Gujarat Energy Development Agency

(GEDA) 1. Free assessment 2. Customer Registration

and approval 3. Net Meter agreement

with Local DISCOM

Local Distribution Company

(DISCOM)

1. Feasibility Check 2. Principal check for

grid connectivity 3. Net Meter installation

Chief Electrical Inspector

(CEI)

1. Approval of system design

2. Issue of energizing certificate

1. Solar plant installation 2. Solar power plant

commissioning in consultation with GEDA & DISCOM

S O L A R R O O F T O P P O W E R P L A N T S

India has aimed 40 GW of Solar Rooftop Power Plants till 2022. India will have installed 16 GW of the 40 GW target until 2020. Solar Rooftop Power Plants can be Installed on Residencies, Industries, Commercial Complexes, Hospitals, Schools, Hotels, Resorts, Hostels, etc.

Industrial Policy Salient Points

Solar power plant installation with more than 50% of the sanctioned load for MSMEs. Capital subsidy of up to 25% and maximum of ₹35 Lakh on term loan amount for MSMEs. Interest Subsidy of up to 7% of term loan amount with maximum of ₹35 Lakh per annum for 7 years. 1% additional interest subsidy will be given to SC/ST Entrepreneur/ physically challenged entrepreneur/ Women entrepreneur/ Start Up in manufacturing sector. 1% additional interest subsidy will be given to young entrepreneur below the age of 35 years on the date of sanction of loan. Maximum interest subsidy to be capped at 9% for all the categories. The interest subsidy will be so given that in any case, the unit will have to bear minimum 2% of total interest levied on term loan.

Important Documents

Last Electricity Bill Municipal corporation tax bill Copy of Aadhar card Copy of PAN Card Copy of PAN Card of the company Passport size Photograph Cancelled cheque Deposit cheque GST registration certificate Authorization Letter Trust deed/ registration Letter Board of resolution

S O L A R F A R M P O W E R P L A N T S

Solar Farm Policy Salient Points

Solar Ground mounted Power Plant can be installed on Non-Agricultural (NA) land. Solar power plant installation with more than 50% of the sanctioned load for MSMEs. Capital subsidy of up to 25% and maximum of ₹35 Lakh on term loan amount for MSMEs. Interest Subsidy of up to 7% of term loan amount with maximum of ₹35 Lakh per annum for 7 years. 1% additional interest subsidy will be given to SC/ST Entrepreneur/ physically challenged entrepreneur/ Women entrepreneur/ Start Up in manufacturing sector. 1% additional interest subsidy will be given to young entrepreneur below the age of 35 years on the date of sanction of loan. Maximum interest subsidy to be capped at 9% for all the categories. The interest subsidy will be so given that in any case, the unit will have to bear minimum 2% of total interest levied on term loan.

Important Documents

Last Electricity Bill Municipal corporation tax bill Copy of Aadhar card Copy of PAN Card Copy of PAN Card of the company Passport size Photograph Cancelled cheque Deposit cheque GST registration certificate Authorization Letter Trust deed/ registration Letter Board of resolution 7/12 Document NA Conversion Document

MATERIAL DESCRIPTION MAKE SPECIFICATION

Solar PV Modules

VIKRAM / RAYZON / GREENBRILLIANCE / TRINA /

ADANI / WAAREE / RENEWSYS

Mono PERC / Mono PERC

Half Cut

Inverter Abb / Delta / Growatt / Utl / Ksolar / Kstar / Sofar /

Evvo / Solis

As Required

Module Mounting Structure Hot Dip Galvanized Iron or Aluminum Rail

HDGI : 2.5 mm - 80 microns

Anchor Fastner & Base Plate Standard SS 304 grade

Mid Clamps-End Clamps / J-Bolt Standard Standard Al Make

MC4 cable connectors Stäubli / Almex Solar Grade

DC Cable Polycab / RR Kabel / LAPP XLPE Grade, As Required

AC cable Polycab / RR Kabel / LAPP XLPE Grade, As Required

DC Distribution Box (Includes MCB, SPD, etc.)

Schneider, C&S, Havells As Required

DC Distribution Box (Includes MCCB, NVR, SPD, etc.)

Schneider, C&S, Havells As Required

Earthing Cable Polycab / RR Kabel / LAPP As Required

Earthing Rod/ Plate Standard As Required

Lightening Arrestor Standard As Required

Cable Pipes / Trays Polycab / Standard UV Protected PVC / HDP, As Required

Mounting Accessories (includes nut- bolt washer, ring/pin type nuts, MS

clamps, Jasti Khilla)

Standard

As Required

Pipe Accessories (includes elbows, coupler, Tee, bends, etc.)

Standard As Required

Cable Ties Standard UV Protected PVC

Feruls Standard As Required

RCC Foundation Material / Earthing Block Material

Standard As Required

S O L A R M O D U L E S C O M P A R I S O N

VALUE ENGINEERING Preliminary Design Energy Yield Estimation Detailed Engineering Optimized Design

INSTALLATION & COMMISSIONING Installation Safety Measures Performance Testing Regulatory Compliance

MATERIAL PROCUREMENT

Technical Specif ications High Quality Standards

Reputed Vendors Logistics Co- Ordination

OPERATIONS

& MAINTENANCE

Technical Support O& M Manual

Remote Plant Monitoring Warranty Management

Technology Resources

Industrial | Commercial | Residential

Solar Power Plants

G/2, Ratnmani Complex, NH-8, Thakkarbapa Nagar,Ahmedabad, Gujarat,382350

Phone No: +91-6351334885, +91-9724272728 Email: - [email protected]

Website: - www.jarvisgroup.in

MAKE IN INDIA