Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

Upload: ashley-schmitt

Post on 01-Apr-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

Global Futures Advisory Committee and Technical Working Group Meeting

Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

Page 2: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

Outline 1

• Global Futures Tasks– Current state– Issues

• What is next

• Questions

Page 3: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

Outline 2

1. High performance cluster2. IFPRI CC monograph comments3. Report on crop/system productivity

potential4. Crop modeling5. Crop spatial data (SPAM data)6. IMPACT enhancement

Page 4: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

High Performance Cluster 1

• Installed as of January 2011• Using Amazon cloud sources• The infrastructure can be turned on when needed• Nodes can be optimized depending on needs• Can be accessed from many different locations

(CGIAR CRP-GRiSP) for software installation• The speed is much faster than a connection to a

system within the IRRI infrastructure• Not intended to run graphics-intensive (e.g. GIS)

operations but unattended heavy processing

Page 5: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

High Performance Cluster 2

• Issues:– Installation of the regional to global scale crop prediction

IFPRI routine– Activate computational resources – Real computer to keep the GIS portion of the exercise– This process may be complemented by the routine already

developed at IRRI in the GIS group

• Question:– Can we use the regional to global scale crop prediction IRRI

routine?

Page 6: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

IFPRI CC Monograph Comments 1

• Feedback was provided on the recently published IFPRI CC Monograph– Comments on the biophysical base of climate change

(Reiner Wassman)– A preliminary factual assessment on rice supply (Axel

Tonini)– http://www.ifpri.org/climatechange/casemaps.html

Page 7: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

IFPRI CC Monograph Comments 2

• Biophysical base of CC. Issues:– Sea level rise– Extreme events– Irrigated rice assumed to be unaffected by precipitation

changes– Cap on modeled yields (20% at pixel level)

Page 8: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

IFPRI CC Monograph Comments 3

• Factual assessment on baseline. Issues:– The international price development for rice seems too

conservative– Area appears to decline too fast in several countries

(India, Indonesia, Myanmar, South Korea)– Yield grows too fast for China, Japan and extremely fast

for Kenya and Mozambique – The net trade positions of Bangladesh, China and India

are unrealistic– Expected new Baseline for comments on May 15

Page 9: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

IFPRI CC Monograph Comments 4

• Questions:– Was this information useful?– How could we merge and make available the baseline

validation information from the different CGIARs?– Will the next baseline be available by May 15, 2011?

Page 10: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

Report on Rice Productivity Potential

• The report was submitted on 16/03/2011• Issues:

– Helpful in starting the interaction process with breeders– Difficult to obtain and compile information from the

breeders

• Question– What will be the dissemination format of these technical

reports? IFPRI monograph on productivity potentials?

Page 11: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

Crop Modeling 1

• Coupling Oryza 2000 with DSSAT by December 2011 (IRRI, U of Florida)

• Issue:– Time and capacity– Collect information on cropping calendars and fertilizer

application schemes (when?, why?)• Question:

– Follow the GIS-GRASS routine or the IRRI routine in ArcGIS for the global predictions?

Page 12: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

Crop Modeling 2

• Preliminary workplan:– Coupling of Oryza2000 with DSSAT (by December

2011)– Translation of the defined VCs into Oryza 2000 (May-

June 2011)– GIS-GRASS/IRRI ArcGIS global predictions (September

2011?)– Translation of potential yields into IMPACT (October-

November 2011?)

Page 13: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

Crop Spatial Data 1

• Data on rice production, area and yields were submitted for most Asian countries

• The process is ongoing and needs to be improved

• Comments were received for India and Myanmar

• Issues: – very intensive, – administrative units may change over time

Page 14: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

Crop Spatial Data 2

• Data on rice production, area and yields were submitted for most Asian countries

• The process is ongoing and needs to be improved

• Comments were received for India and Myanmar

• Issues: – very intensive, – administrative units may change over time

Page 15: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

Crop Spatial Data 3

• Question:– How to share the different CGIAR experiences in

providing SPAM data?– Timeframe for delivery?

Page 16: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

IMPACT Enhancement 1

• Tasks:– Provide feedback on baseline projections for rice– Contribute to the modeling improvement of the effect of

border measures and domestic measures of support

• A concept note was provided during the latest meeting in Washington DC

• A report on the latest Washington DC meeting is available

Page 17: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

IMPACT Enhancement 2

• Issues:– Options modeling trade policies:

1. Net trade structure2. Spatial net trade structure (Takayama-Judge)3. Bilateral trade base on CES Armington assumption

– Domestic policies for rice are sparsely available and not always reliable as compared to border measures. Need to review and check data availability

Page 18: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

IMPACT Enhancement 3

Preliminary IMPACT workplan:1. Write a methodological paper (April 1-June1, 2011)

2. Collect data (t.b.a.)

3. Modify price transmission equations for rice (t.b.a.)

4. Construct and calibrate baseline for rice (t.b.a.)

5. Perform scenario analysis on trade (t.b.a.)

6. Write a paper on results (t.b.a.)

Page 19: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

General Questions

• Template/Content/Structure for the Report to be handed in by June 15

• Need to establish a vertical and horizontal coordination for the IMPACT enhancement– Vertical: indentify a key reference person at IFPRI for

the different methodological developments– Horizontal: establish some rule of conduct for GAMS

code modifications and define how the different improvements will be incorporated

Page 20: Global Futures Advisory Committee and Technical Working Group Meeting Saturday, April 16, 2011 Mt. Kenya Safari Club, Nanyuki, Kenya

General Questions

• Technical questions on IMPACT:– How the yield growth rates have been generated for

IMPACT? How expert information enters in this process?

– How the PSE/CSE indicators for non-OECD countries have been constructed?

– …