gip monthly meeting may 2014
TRANSCRIPT
![Page 1: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/1.jpg)
GIP Monthly Meeting May 2014
![Page 2: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/2.jpg)
How are you doing??
![Page 3: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/3.jpg)
Agenda
Performance Updates
Consultancy Output
Matching Updates!
Operations & Transition
Quality for GIP Fruit
Peak
Myaiesec.net changes
![Page 4: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/4.jpg)
![Page 5: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/5.jpg)
![Page 6: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/6.jpg)
Indicator Last 90 days (completed)NPS 44 (38)RR 42% (30%)
% Promoters 59% (58%)Cases Open/Total Cases 51/83
Promoters Detractors
Communication by the Host LC (4%) Support by the host entity during the experience (8%)
Objectives of the Program (4%) Integration into the local chapter (5%)
The Selection Interview (4%) Accommodation (5%)
Net Promoter Score
![Page 7: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/7.jpg)
TopoGIP Ma Q2
TopiGIP
Ma Q2
![Page 8: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/8.jpg)
Global Realisation Forecast
![Page 9: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/9.jpg)
iGIP Consultancy Output
How can we stop iGIP members
from dropping out so quickly? How can we
get our LCPs more
committed to growing iGIP in their LCs?
How can we increase the
sales intensity of our LCs?
How can we increase the
sales intensity of our LCs?
How do we know if we
need to improve our
talent capacity to
grow in iGIP?
![Page 10: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/10.jpg)
What do the following images have in common?GIP Golden FormsGuaranteed responses. Faster Matching.
![Page 11: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/11.jpg)
GIP Golden Forms A google spreadsheet with top forms in marketing and teaching
from the top 8 TN suppliers for Summer 2014
Brazil, MoC, Colombia, Czech Republic, Germany, India, Mexico, Turkey
All EPs and EP Managers are welcome
How will this be faster? Everything is in one place, and we have rules to speed up communication and matching!!
![Page 12: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/12.jpg)
GIP Golden FormsRules for EPs and EP Managers
1. CC the MC of the iGIP entity on every email and the EP application
2. Apply only to TNs for which you meet the requirements3. Respond to all TN Manager emails within 48 hours4. Attend all interviews for TNs you apply to, unless you have
been matched5. You can have a maximum of 10 ongoing applications
If an EP breaks a rule, their EP form will be put on hold
![Page 13: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/13.jpg)
GIP Golden FormsRules for TN Managers
1. Respond to all EP emails and EP applications within 48 hours
2. When an EP applies for a TN, they must be given an interview with time and date or a rejection within 7 days
If a TN Manager doesn’t follow these rules, their TN will be kicked out of the Golden Forms
![Page 14: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/14.jpg)
GIP Golden FormsIf everyone is qualified for the TNs they are applying for . . .
And everyone is communicating with each other quickly . . .
And the interviews happen as soon as possible . . .
There’s no reason we can’t match our Marketing and Teaching forms for Summer Peak!!
![Page 15: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/15.jpg)
GIP Golden Forms Start using the Golden Forms today to match your
EPs!
If you have any questions or suggestions email [email protected]
If anyone breaks a rule email [email protected]
Even if you don’t have TNs on Golden Forms, you should start enforcing these rules in your entity
![Page 16: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/16.jpg)
Brazil TN Managers have to respond to EPs within 48 hours (tracked by
NST)
If TN Managers don’t respond to EPs within 48 hours or if the company or EPs complain about the TN Manager, then . . .
First time they get a warning
Second time their LC loses points in Brazil’s challenge
Third time the TN gets rejected and the LC can’t raise TNs until they solve the issues
![Page 17: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/17.jpg)
Matching Updates!
Golden Forms!
Matching Mania
Teaching
S&D Knowledge
GCP: Greece & Ukraine
GCP: Brazil
![Page 18: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/18.jpg)
Matching Mania
Teaching
![Page 19: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/19.jpg)
• Bring TN and EP forms with start date of July or August
• Ensure ALL LCs that are doing the Teaching sub product (Specifically 3 month and 6 month English teaching) are at the MATCHING MANIA
• iGIP Entities can bring promotion booklet for their teaching TNs and upload them here - Promotion Booklets for Teaching TNs
• iGIP MCs and LCs can upload their reception information/toolkits here - Reception information
• oGIP LCs can have EP Managers and EPs on the chat space as well
• Be aware of Product, duration, start and end date and language requirements while bringing TN forms, EP forms/EPs
Preparation for Matching Mania!
![Page 20: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/20.jpg)
How will the space run?
We will showcase top
TN forms across each
teaching product
Email LCs clear
action steps on
how to match faster
Track matches of LCs
attending matching
mania
![Page 21: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/21.jpg)
What will be the follow up by AI?
Email MCs a list
of LCs that attended
Email LCs clear
action steps on
how to match faster
Track matches of LCs
attending matching
mania
![Page 22: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/22.jpg)
S&D Knowledge
S&D for Global Product is updated!
Fill out your search tool and find others!
AFT Updated! (Live and Offline ones)
Match Wiki for continuous updates
![Page 23: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/23.jpg)
Matching in PartnershipsClassify your
current supply in products. Use AFT
Classify the products in your LC’s
Classify your partners supply in products
Connect your & your
partner entity’s LC’s
Track the matches in
LC’s
Communicate with your partner (MC VP or NST)
![Page 24: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/24.jpg)
Greece raised a large marketing contract with a hotel chain for Ukrainian EPs—there was no partnership before, so they had to make one fast!
Greece contacted LCs in Ukraine and gave very specific EP profiles for them to raise
Communication between the LCs was daily, with Skype meetings and emails
The LCs in Ukraine started visa paperwork in advance so that delivery would be easy
Three Tips for Matching from Greece:
1) Clear product – TN requirements and EP profiles
2) Daily communication
3) Clarify visa processes and requirements at the very beginning
Greece – Ukraine Partnership: 40 GIP Matches in 2014
![Page 25: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/25.jpg)
Quality for GIP
![Page 26: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/26.jpg)
What Are We Trying to Achieve?
NPS = 48
![Page 27: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/27.jpg)
Integration
What’s Keeping Us from NPS of 48?
Our NPS for GIP is 38
16% of our passive and detractors
recommend we improve integration
JD ClarityAccommodati
on
15% of our passive and detractors
recommend we improve JD clarity
12% of our passive and detractors
recommend we improve
accommodation
![Page 28: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/28.jpg)
If we eliminate these three
issues, our NPS will be 48
2015 NPS Goal
Achieved!!
![Page 29: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/29.jpg)
How Can We Improve Integration?
Understand the EP’s integration expectations between match and realization
Make an integration plan with each EP upon reception of what activities they’d like to do and be involved with
On the EP’s first day, run a 1-day integration agenda with the TN-taker, the EP Manager, and the EP
EP buddies with clear JD, training, and tracking
![Page 30: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/30.jpg)
How Can We Improve JD Clarity?
Ensure a professional working environment for the EP with a clear MoS for the EP
Ensure the company provides training and support for the EP to do their JD
Give a suggested working agenda to the TN-taker for the first two weeks
Make sure the salary payment process is clear and always followed
![Page 31: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/31.jpg)
How Can We Improve Accommodation?
Before realization, clarify with every EP the plan for their accommodation
Set accommodation standards with your LCs
Only have EPs housed in safe neighborhoods
![Page 32: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/32.jpg)
Quality for GIP
If you have more suggestions or materials for these detractor issues, email [email protected]
Stay tuned for the Quality Wiki to have more content on these issues in the next week!
Address these issues with your VPs now!
![Page 33: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/33.jpg)
Operations management & transition
![Page 34: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/34.jpg)
Who has already started MC transition?
![Page 35: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/35.jpg)
Which of you has your elects running most operations?
![Page 36: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/36.jpg)
Add your MC VPs 1415 to the Global MC VP Contact List!!
![Page 37: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/37.jpg)
Have working time to make it happen!
Be clear when your
successor is taking over and make
sure he/she is directly
driving it!
Plan key activities to
support from MC level until
end of your term
Have a clear direction and mandate for
LC level, starting with knowing your
RE for Q3!
What to do to keep running operations?
![Page 38: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/38.jpg)
Aiesec.net Changes
![Page 39: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/39.jpg)
What is happening during making a match?
Match! Upload TN
and EP ILs & ANs
Adjust Field of Work to 1
primary and 1 secondary in for TN and 2&2 for EP
forms
![Page 40: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/40.jpg)
![Page 41: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/41.jpg)
What information can I access?
![Page 42: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/42.jpg)
How does it work? Capacity indicators
![Page 43: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/43.jpg)
How does it work?
Capacity indicators
• You can check % of people in functions – Both exchange and exchange support
• You can check % of people by process – In Raise, Match, Delivery, Re-integration, Re-raising
• You can check % of people by process for ALL teams or for teams in SPECIFIC FUNCTION
![Page 44: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/44.jpg)
How does it work?
Productivity
![Page 45: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/45.jpg)
How does it work?
• You can check the formula used everywhere by clicking on the i (for information) tab
• To be able to have accurate information around productivity and capacity indicators ALL TEAMS being created starting TODAY will have to assign exchange process and exchange function
• There is also a small modification while doing role assignment so that for every member in a team we can assign specific exchange processes
![Page 46: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/46.jpg)
Work with the MCVP TM to ensure ALL GIP teams are on myAIESEC.net
You can choose to modify roles of existing teams if you want the data to be more accurate
Start tracking your focus LCs in GIPs productivity, number of members and % supporting exchange process through myAIESEC.net
Educate LCs on how to use these changes
Track your talent planning and manage talent pipeline using capacity indicators
![Page 47: GIP Monthly Meeting May 2014](https://reader036.vdocuments.site/reader036/viewer/2022081518/554ae000b4c9056a798b4ec6/html5/thumbnails/47.jpg)
Golden Forms:https://docs.google.com/a/ai.aiesec.org/spreadsheets/d/13ueLxM6V_cAifVMIe7aFnSoF_AJYYIA_cBuDKdzil1Q/editS&D: https://docs.google.com/a/ai.aiesec.org/spreadsheet/ccc?key=0Ap6bTNYUAcwbdEg0cmZQTTRGSmJON0phRS05a3NWeVE&usp=drive_web#gid=9Live AFT:http://live.myaiesec.net/aft/aft.phpOffline AFT:http://www.myaiesec.net/content/viewfile.do?contentid=10304189Match GIP Wiki:http://www.myaiesec.net/content/viewwiki.do?contentid=10303308Global 1415 Contact List:https://docs.google.com/a/ai.aiesec.org/spreadsheet/ccc?key=0AooK2vHYB3emdG5lMHg4c0lHMlg3c1dUQkNkWC1FX1E&usp=docslist_api#gid=1Global Realization Forecast:https://docs.google.com/a/ai.aiesec.org/spreadsheets/d/1l3T6GO9S3AasRKFE1xeS6Tr7y_1Iauv05GzzDYk3hUI/edit#gid=0
Links