STATE TRANSPORTATION IMPROVEMENT PROGRAM

Page 2: Geometric Review of Linear Algebra

BEAUFORT

PITTGREENE

LENOIR

CARTERET

JONES

CRAVEN

PAMLICO

17

258

70

258

70

13

17

264264

70

264

13

58

903

101

24

58

903

306

33

91

99

11

55

4358

102

55

222

92

32

118

41

12

Washington

Kinston

Havelock

Greenville

New Bern

AV-5746

AV-5743

B-5614

B-4433

B-4722B

B-4863

K-3800

B-4530

B-4528

B-5612

B-4603

B-4607

B-5100

B-5129

R-5516

EB-5724

R-5702

U-5730

R-4463AA

U-5785

U-5740

EB-5727

U-3315

R-2250A

U-5860

U-5870

U-5713

R-5727 R-3307

U-2817

R-5703

R-2250C

R-2250B

R-2514C

R-2514D

EB-4411F

R-1015

DRAFT STIPFY 2015-2025STI ProjectsDIVISION 2

0 9 184.5Miles

BRIDGES FUNDED THROUGH STI

STATEWIDE AVIATION

REGIONAL AVIATION

DIVISION AVIATION

DIVISION FERRYREGIONAL RAILDIVISION RAILREGIONAL TRANSITDIVISION TRANSITSAFETYTRANSITION *TRANSITION *INTERSTATE MAINTENANCESTATEWIDE HIGHWAYREGIONAL HIGHWAYDIVISON HIGHWAYDIVISION BIKE/PEDESTRIANINTERSTATE ROUTEUS ROUTENC ROUTESECONDARY ROADMUNICIPAL BOUNDARIESMILITARY BASENCDOT DIVISION BOUNDARYCOUNTY BOUNDARYWATER FEATURES

* Note: Reflects 108 of the Major Transition ProjectsNote: FY 2015 projects represent major projects not

let as of November 2014

Page 3: Geometric Review of Linear Algebra

COUNTY

FUTURE YEARS

F

NHPB - National Highway Performance Program (Bridge)NHPIM - National Highway Performance Program (Interstate Maintenance)O - OthersRR - Rail-Highway SafetyS (M) - State MatchSRTS - Safe Routes to School

FLPI - Federal Lands Program (Indian Reservation Roads) STP - Surface Transportation ProgramHFB - Highway Fund Bridge Replacement Program STPDA - Surface Transportation Program - Direct AttributableHP - Federal-Aid High Priority STPEB - Surface Transportation Program, Enhancements (Bike)

STPON - Surface Transportation Program Bridge (On System Bridge)STPOFF -Surface Transportation Program (Off System Bridge) PE - Preliminary EngineeringT - State Highway Trust Funds

NHP - National Highway Performance Program TAP - Transportation Alternatives Program RG - Right of Way (GARVEE)

SW - StatewideTRN -Transition Project

S - StructureU - Utilities

I - ImplementationL - LandscapingM - MitigationO - OperationsP - Paving

WAKE

NUMBERLENGTH (MILES)

DIVISION 00

R-0000

IDROUTE/CITY

US or NC RoutesON NEW LOCATION. I - InterstateWITH A BYPASS OF HOMETOWN ROUTE/CITY

Project termini and a general

SW

M1500

A

NHP

4000

FUNDING CATEGORY (1)

used for each project phase.

FUNDING SOURCE (2)

U

B3000R

FY 2017

C

(3) WORK TYPE (ACTIVITY)

A - Acquisition

with proposed work type or activity beginning in the initial scheduled year. (Estimates are in thousand of

For other work types or activities see Work Type (Activity) box below.

dollars.)

of a project segment indicates (Cash-Flow Funding) COMMITMENTSFUTURE

SW CBSW

One or two letter

HIGHWAY PROGRAM

UNFUNDED

NC 3 TO SR 1003SR 1003 TO NC 96

ASW

UNFUNDED

20000CRC 5000C 5000 BC B

WIDEN TO A FOUR-LANE FACILITY

A

NC 00 R7.3 R25063,450I-40 TO NC 96 EAST OF HOMETOWN.

B

FY 2025 FY 2018

700

FY 2019

DEVELOPMENTAL PROGRAMSTATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2020FY 2015 FY 2016

M

TOTAL PROJECT

COST (THOU)

NHPNHP

FUN

DS

A

PRIOR YEARS COST

(THOU)

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

U 5000NHP

C10000

FY 2021

C

FY 2023 FY 2024

FY 2022

5000

9000

APD - Appalachian Development

NHPNHP

LOCATION / DESCRIPTION NHP

NHP

I-40 TO NC 3

Preliminary engineering, Right of Way, Mitigation, Utilities or Construction. break.

work description.

way, utility, mitigation and construction cost estimates

See Highway Funding Key

any project breaks.Category for the project andIdentifies the "STI" Funding

by funding category in current dollars. Cost may include one or more funding types. Multi-year funding

for an explanation of funding categories

Phases of implementation: ESTIMATED COST Preliminary engineering, right of

(1) FUNDING CATEGORY

PROJECT BREAKS

designation for project

LOCATION / DESCRIPTION

SR - Secondary Road

IDENTIFICATION NUMBER Assigned to each project at conception and remains with

BVarious - multiple routesNEW ROUTE or City

WORK TYPE (ACTIVITY) (3)

BOND (R) - Revenue Bond

HRRR - High Risk Rural Roads

L - LocalHSIP - Highway Safety Improvement Program

project until completion.

DIV - DivisionEX - Exempt

REG - RegionalHF - State Dollars (Non-STI)

F - Feasibility StudyCG - Construction (GARVEE)C - Construction

G - Grading and Structures

R - Right of Way

(2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES

ER - Emergency Relief Funds

CMAQ - Congestion MitigationDP - Discretionary or Demonstration

FED - Federal Rail Funds

Page 4: Geometric Review of Linear Algebra

HIGHWAY PROGRAMDIVISION 2

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

SECTION C, GARVEE BOND FUNDING $3.4 MILLION; RIGHT OF WAY - PAYBACK FY 2007 - FY 2018

R-2510* 332470 330962SOUTH OF SR 1127 (POSSUM TRACK ROAD) TO NORTH OF NC 171. FOUR LANE DIVIDED FREEWAY, SOME NEW LOCATION.

15 NHP 377RG C RG 377 C RG 377 C RG 377 C

A SOUTH OF SR 1127 (POSSUM TRACK ROAD) TO SOUTH OF SR 1149 (PRICE ROAD) - COMPLETEB SOUTH OF SR 1149 (PRICE ROAD) TO US 17 NORTH OF SR 1509 (SPRINGS ROAD) - COMPLETEC US 17 NORTH OF SR 1509 (SPRINGS ROAD) TO NORTH OF NC 171 - COMPLETETRND BRIDGE OVER TAR RIVER - COMPLETE

BEAUFORT US 17(WASHINGTON BYPASS)

URBAN PROJECTSU-5860 16200US 17 BUSINESS (CAROLINA AVENUE) TO

BROWN STREET. WIDEN TO MULTI-LANES.1.8

DIV

T 5885R T 706U T 9609C

BEAUFORT SR 1306(15TH STREET)

FEDERAL BRIDGE PROJECTSB-5302 6640 150REPLACE BRIDGE NO. 3 OVER NORFOLK

SOUTHERN RAILROAD.HF

HFB R 590 HFB C 5900

BEAUFORT US 17

B-5300 1397 100REPLACE BRIDGE NO. 55 OVER PANTEGO CREEK.

HF

HFB 150R HFB 47U HFB C 1100

BEAUFORT US 264

B-4414 2804 4REPLACE BRIDGE NO. 43 OVER PUNGO CREEK.

HF

HFB R 250 HFB C 2550

BEAUFORT US 264

B-5620 1321REPLACE BRIDGE NO. 30 OVER CAMPBELL CREEK.

HF

HFB 120R HFB 1M HFB 1200C

BEAUFORT NC 33

B-5413 1651REPLACE BRIDGE NO. 20 OVER SMITH CREEK.

HF

HFB R 150 HFB M 1 HFB C 1500

BEAUFORT NC 33

B-5614 6701REPLACE BRIDGE NO. 9 OVER BLOUNTS CREEK.

DIV

STPOFF R 319 STPOFF 3191C C 3191

BEAUFORT SR 1112(MOUTH OF THECREEK ROAD)

B-4425 1220 65REPLACE BRIDGE NO. 69 OVER BRANCH OF CHOCOWINITY CREEK.

HF

HFB R 105 HFB C 1050

BEAUFORT SR 1136(GRAY ROAD)

B-4427 1287 22REPLACE BRIDGE NO. 6 OVER BIG SWAMP.

HF

HFB R 115 HFB C 1150

BEAUFORT SR 1422(MARKET STREET)

B-4430 1297 32REPLACE BRIDGE NO. 135 OVER BATH CREEK.

HF

HFB R 115 HFB C 1150

BEAUFORT SR 1742(POST ROAD)

B-4433 1013 23REPLACE BRIDGE NO. 40 OVER HORSEPEN SWAMP.

DIV

STPOFF R 90 STPOFF C 300 300C300C

BEAUFORT SR 1932(DURHAM CREEKROAD)

2-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 5: Geometric Review of Linear Algebra

HIGHWAY PROGRAMDIVISION 2

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-4709 1101 1REPLACE BRIDGE NO. 14 OVER BRANCH OF DURHAM CREEK.

HF

HFB R 100 HFB C 1000

BEAUFORT SR 1932(DURHAM CREEKROAD)

B-5618 1845REPLACE BRIDGE NO. 315 OVER DURHAM CREEK.

HF

HFB 170R HFB 1675C

BEAUFORT SR 1949(LABOR CAMP ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5102 11042 9042DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4902 1106 1106ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 2 PROJECT MITIGATION.

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC)

W-5008 2585 335US 17 BUSINESS (CAROLINA AVENUE) TO PEARCE STREET IN WASHINGTON. WIDEN TO FOUR LANE DIVIDED FACILITY WITH MEDIAN.

0.64

TRN

HSIP 2250C BEAUFORT SR 1306(15TH STREET)

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5202 6368 6368DIVISION 2 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

2-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 6: Geometric Review of Linear Algebra

HIGHWAY PROGRAMDIVISION 2

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)

E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE WAYSIDE SIGNAGE FOR DESIGNATED SITES.

TRN

STPE 96C O 128C

ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE

VARIOUS

ROADSIDE ENVIRONMENTAL PROJECTS (REST AREA)

UNDER CONSTRUCTION

K-3800 6725 6725ACQUIRE RIGHT OF WAY AND RELOCATE REST AREA AT NEW LOCATION WITH MUNICIPAL WATER AND SEWER AVAILABLE. (COORDINATE WITH R-2510B).

TRNBEAUFORT US 17

RURAL PROJECTS

UNDER CONSTRUCTION

R-3307 115512 115512GALLANT'S CHANNEL BRIDGE, FOUR LANES AT RADIO ISLAND TO US 70 NORTH OF BEAUFORT NEAR SR 1429 (OLGA ROAD). MULTI-LANES, PART ON NEW LOCATION.

2.2TRN

CARTERET US 70

R-5727 44220SR 1738 (BRIDGES STREET) TO SR 1147 (MCCABE ROAD). WIDEN EXISTING ROADWAY AND CONSTRUCT PART ON NEW LOCATION.

3

DIV

T 5491R5491R T 1318U T 21280C C 10640

CARTERET SR 1176(BRIDGES STREETEXTENSION)

URBAN PROJECTSU-5740 60081MOREHEAD CITY TO BEAUFORT

CAUSEWAY. WIDEN AND IMPROVE NEWPORT RIVER BRIDGE.

0.7

REG

NHP 2242R NHP 269U NHP 19190C C 19190 C 19190

CARTERET US 70(ARENDELL STREET)

FEASIBILITY STUDIES

FEASIBILITY STUDY IN PROGRESS

FS-1002A MOREHEAD CITY TO THE BEAUFORT CAUSEWAY. WIDEN TO MULTI-LANES.

CARTERET US 70

FEDERAL BRIDGE PROJECTSB-4722 15150 2850REPLACE BRIDGE NO. 33 OVER NORTH

RIVER AND REPAIRS TO EXISTING STRUCTURE TO SERVE AS DETOUR.REG

NHPB 12300C B

A REQUIRED REPAIRS NECESSARY FOR EXISTING STRUCTURE TO SERVE AS THE DETOUR ROUTE FOR B-4722B - COMPLETEB REPLACEMENT OF BRIDGE NO. 33 OVER NORTH RIVER. - RIGHT OF WAY IN PROGRESSREG

CARTERET US 70

B-4863 26100 100REPLACE LIFT SPAN ON BRIDGE NO. 73 AND BRIDGE NO. 96 OVER THE STRAITS AT HARKERS ISLAND.DIV

T R 2200 T C 7933 7934C7933C

CARTERET SR 1335(ISLAND ROAD)

2-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 7: Geometric Review of Linear Algebra

HIGHWAY PROGRAMDIVISION 2

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5102 11042 9042DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4902 1106 1106ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 2 PROJECT MITIGATION.

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

HAZARD ELIMINATION PROJECTSW-5319 1926WEST OF WILLIS ROAD TO BANKS STREET.

CONSTRUCT A RAISED MEDIAN.TRN

HSIP 1926C CARTERET US 70

W-4700 1457 1457SR 1140 (ROBERTS ROAD) TO WEST OF SR 1127 (MASON TOWN ROAD). WIDEN TO 24 FEET.

3.5

A REPLACE BRIDGE NO. 76 WITH A CULVERT - UNDER CONSTRUCTIONB SR 1140 (ROBERTS ROAD) TO WEST OF SR 1127 (MASON TOWN ROAD) - COMPLETE

CARTERET SR 1124(NINE FOOT ROAD)

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5202 6368 6368DIVISION 2 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)

IN PROGRESS

S-5501 201 201IMPLEMENTATION OF WAYSHOWING AND VISITOR ORIENTATION.

EX

CARTERETDAREHYDE

NC 12/US 70

S-5502 212OUTER BANKS SCENIC BYWAY WAYSIDES AND INTERPRETIVE SIGNS.

TRN

DP 212C CARTERETDAREHYDE

NC 12/US 70

RURAL PROJECTS

SECTION A, GARVEE BOND FUNDING $33.9 MILLION; PAYBACK FY 2009-2020

R-2301* 250166 69801US 17 SOUTH OF NEW BERN TO US 17 NORTH OF NEW BERN. FOUR LANE DIVIDED FREEWAY ON NEW LOCATION.

16.1 NHP CG 3713 A CG 3713 A CG 3713 A CG 3713 A CG 3713 A T 15800R B T 146000C B

A US 17 SOUTH OF NEW BERN TO US 70 - COMPLETETRNB US 70 TO US 17 NORTH OF NEW BERN

CRAVENJONES

US 17(NEW BERN BYPASS)

2-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 8: Geometric Review of Linear Algebra

HIGHWAY PROGRAMDIVISION 2

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

R-5516 23272 350SLOCUMB ROAD AT CHERRY POINT MILITARY BASE. CONSTRUCT INTERCHANGE.

TRN

NHP 5000R NHP 17600C NHP 322U

CRAVEN US 70

PLANNING/DESIGN IN PROGRESS

R-1015* 210811 10941NORTH OF PINE GROVE TO NORTH OF CARTERET COUNTY LINE. CONSTRUCT MULTI-LANE FACILITY ON NEW LOCATION.

10.1

DIV

NHP R 11425 NHP U 845 NHP 49200CG CG 12300 CG 12300 CG 12300 12300CG12300CG12300CG CG 12300 CG 12300S(M) CG 10000 CG 10000 CG 10000 10000CG

CRAVEN US 70(HAVELOCK BYPASS)

PLANNING/DESIGN IN PROGRESS

R-4463 71768 56393NC 43/NC 55 TO US 17 IN NEW BERN. CONSTRUCT ROUTE ON NEW LOCATION WITH INTERCHANGE AT US 70.

4.2 T 1275R A T 10100C A T 4000C AA

A US 17 TO SOUTH OF US 70AA SOUTH OF US 70 TO US 70TRNB US 70 TO NC 43/NC 55 - COMPLETE

CRAVEN NC 43 CONNECTOR

URBAN PROJECTSU-5713 66000NEUSE RIVER BRIDGE TO GRANTHAM

ROAD. UPGRADE ROADWAY TO FREEWAY.2.5

SW

NHP 12500R12500R NHP 1000U NHP 13333C C 13333 C 13334

CRAVEN US 70

FEDERAL BRIDGE PROJECTSB-4483 1505 20REPLACE BRIDGE NO. 66 OVER CREEK.

HF

HFB R 135 HFB C 1350

CRAVEN SR 1232(CICERO RIGGS ROAD)

B-5617 1790REPLACE BRIDGE NO. 41 OVER SWIFT CREEK.

HF

HFB 165R HFB 1625C

CRAVEN SR 1464(PUGHTOWN ROAD)

B-4484 9200 400REPLACE BRIDGE NO. 138 OVER NEUSE RIVER, AND BRIDGE NO. 139 OVER NEUSE RIVER OVERFLOW.HF

HFB R 800 HFB C 8000

CRAVEN SR 1470(MAPLE CYPRESS ROAD)

B-4485 1018 28REPLACE BRIDGE NO. 26 OVER BEAVER DAM SWAMP.

HF

HFB R 90 HFB C 900

CRAVEN SR 1621(HILLS NECK ROAD)

B-4487 1609 14REPLACE BRIDGE NO. 2 OVER FORK CLUBFOOT CREEK.

HF

HFB R 145 HFB C 1450

CRAVEN SR 1715(BLADES ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5102 11042 9042DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

2-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 9: Geometric Review of Linear Algebra

HIGHWAY PROGRAMDIVISION 2

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025MITIGATION PROJECTS

IN PROGRESS

EE-4902 1106 1106ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 2 PROJECT MITIGATION.

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5202 6368 6368DIVISION 2 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

ENHANCEMENT (CALL PROJECTS)E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE

WAYSIDE SIGNAGE FOR DESIGNATED SITES.

TRN

STPE 96C O 128C

ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE

VARIOUS

ROADSIDE ENVIRONMENTAL PROJECTS (REST AREA)

UNDER CONSTRUCTION

K-5101 575 575REST AREA RENOVATIONS - BUILDINGS AND GROUNDS. ENCLOSE LOBBY AND ADD ADA COMPLIANT FAMILY RESTROOM.TRN

CRAVEN US 70

FEDERAL BRIDGE PROJECTSB-4527 997 6REPLACE BRIDGE NO. 26 OVER BEAR

CREEK.

HF

HFB R 90 HFB M 1 HFB C 900

GREENE SR 1140(OAKDALE ROAD)SR 1705(HOOD SWAMPROAD)

B-4528 1598 3REPLACE BRIDGE NO. 25 OVER TYSON MARSH.

DIV

STPOFF R 145 STPOFF 1450C

GREENE SR 1149(WARRENTOWNROAD)

2-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 10: Geometric Review of Linear Algebra

HIGHWAY PROGRAMDIVISION 2

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

UNDER CONSTRUCTION

B-4755 636 636REPLACE BRIDGE NO. 65 OVER APPLETREE SWAMP.

DIV

GREENE SR 1215(APPLE TREE ROAD)

B-4530 994 4REPLACE BRIDGE NO. 13 OVER BEAMAN RUN.

DIV

STPOFF R 90 STPOFF 900C

GREENE SR 1222(BEAMAN OLDCREEK ROAD)

UNDER CONSTRUCTION: FUNDING THROUGH B-4755

B-5112 640 640REPLACE BRIDGE NO. 72 OVER APPLETREE SWAMP.

DIV

GREENE SR 1253(LINDELL ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5102 11042 9042DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4902 1106 1106ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 2 PROJECT MITIGATION.

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

HAZARD ELIMINATION PROJECTS

UNDER CONSTRUCTION

W-5329 429 429NORTH OF SR 1117 (FRED HARRISON ROAD) TO SOUTH OF SR 1101 (BROWNTOWN ROAD). WIDEN TO PROVIDE A LEFT TURN LANE.

TRNGREENE US 258

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5202 6368 6368DIVISION 2 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

RURAL PROJECTS

SECTION A, GARVEE BOND FUNDING $33.9 MILLION; PAYBACK FY 2009-2020

R-2301* 250166 69801US 17 SOUTH OF NEW BERN TO US 17 NORTH OF NEW BERN. FOUR LANE DIVIDED FREEWAY ON NEW LOCATION.

16.1 NHP CG 3713 A CG 3713 A CG 3713 A CG 3713 A CG 3713 A T 15800R B T 146000C B

A US 17 SOUTH OF NEW BERN TO US 70 - COMPLETETRNB US 70 TO US 17 NORTH OF NEW BERN

CRAVENJONES

US 17(NEW BERN BYPASS)

2-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 11: Geometric Review of Linear Algebra

HIGHWAY PROGRAMDIVISION 2

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

PLANNING/DESIGN IN PROGRESS

R-2514* 214808 66708MULTI-LANES NORTH OF JACKSONVILLE TO NEW BERN BYPASS. WIDEN TO MULTI-LANES WITH BYPASSES OF BELGRADE, MAYSVILLE AND POLLOCKSVILLE ON NEW LOCATION.

22.1 T 10175C B C 10175 B C 10175 B C 10175 B T 16150C C C 16150 C T 25033C D C 25033 D C 25034 D

A MULTI-LANE SECTION NORTH OF JACKSONVILLE TO SOUTH OF BELGRADE - COMPLETEB SOUTH OF BELGRADE TO NORTH OF MAYSVILLE - RIGHT OF WAY IN PROGRESSTRNC NORTH OF MAYSVILLE TO SOUTH OF NC 58 - RIGHT OF WAY IN PROGRESSTRND SOUTH OF NC 58 TO THE NEW BERN BYPASS - RIGHT OF WAY IN PROGRESSTRN

JONESONSLOW

US 17

FEDERAL BRIDGE PROJECTSB-4563 1494 9REPLACE BRIDGE NO. 6 OVER BIG

CHINQUAPIN CREEK.

HF

HFB R 135 HFB 1350C

JONES SR 1301(PINE STATE ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5102 11042 9042DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4902 1106 1106ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 2 PROJECT MITIGATION.

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5202 6368 6368DIVISION 2 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

RURAL PROJECTS

UNDER CONSTRUCTION - SECTION BA - GARVEE BOND FUNDING $68.8 MILLION; PAYBACK FY 2008 - FY 2019; PLANNING/DESIGN IN PROGRESS

R-2554* 364068 332763WEST OF NC 581 IN WAYNE COUNTY TO EAST OF SR 1323 (PROMISE LAND ROAD) IN LENOIR COUNTY. FOUR LANE DIVIDED FREEWAY ON NEW LOCATION.

20.5 NHP CG 7545 BA CG 7545 BA CG 7545 BA CG 7545 BA NHP 1125C D

A WEST OF NC 581 TO EAST OF SR 1300 (SALEM CHURCH ROAD) - UNDER CONSTRUCTIONTRNBA EAST OF SR 1300 (SALEM CHURCH ROAD) TO EAST OF SR 1556 (WAYNE MEMORIAL DRIVE) - COMPLETEBB EAST OF SR 1556 (WAYNE MEMORIAL DRIVE) TO WEST OF SR 1714 (CREEK ROAD) - UNDER CONSTRUCTIONTRNC WEST OF SR 1714 (CREEK ROAD) TO EAST OF SR 1323 (PROMISE LAND ROAD) - UNDER CONSTRUCTIONTRND IMPLEMENTATION OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS)TRN

LENOIRWAYNE

US 70(GOLDSBOROBYPASS)

2-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 12: Geometric Review of Linear Algebra

HIGHWAY PROGRAMDIVISION 2

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

R-5703 62858NC 58 TO NC 11. CONSTRUCT MULTI-LANE FACILITY ON NEW LOCATION.

4.2

REG

T 5332R T 640U T C 28443 C 28443

LENOIR NC 148(HARVEY PARKWAY)

FEASIBILITY STUDIES

SCHEDULED FOR FEASIBILITY STUDY

FS-1502A US 70 AND US 258 (QUEEN STREET). CONSTRUCT OVERPASS WITH SQUARE LOOP DESIGN.

0LENOIR US 70

FEASIBILITY STUDY IN PROGRESS

FS-1202A SR 1115 (BOB STROUD ROAD) TO NC 24. WIDEN NC 241 TO MULTI-LANES WITH IMPROVEMENTS TO NC 11 AND NC 24.

DUPLINLENOIR

NC 241

FEDERAL BRIDGE PROJECTS

UNDER CONSTRUCTION

B-4565 15193 15193REPLACE BRIDGE NO. 42 AND BRIDGE NO. 43 OVER NEUSE RIVER. REPLACE BRIDGE NO. 26 AND BRIDGE NO. 28 OVER NEUSE RIVER OVERFLOW.

REG

LENOIR US 70 BUSINESS/US 258 BUSINESS(SOUTH QUEEN STREET)

B-4926 8375 100REPLACE BRIDGE NO. 20 OVER NEUSE RIVER AND BRIDGE NO. 34 OVER NEUSE RIVER OVERFLOW.HF

HFB R 1275 HFB C 7000

LENOIR NC 55

B-4566 7154 4REPLACE BRIDGE NO. 45 OVER NEUSE RIVER.

HF

HFB 650R HFB C 6500

LENOIR NC 903

B-5619 2420REPLACE BRIDGE NO. 152 OVER NEUSE RIVER OVERFLOW.

HF

HFB 220R HFB 2200C

LENOIR SR 1389(HARDY BRIDGEROAD)

B-4569 1004 14REPLACE BRIDGE NO. 68 OVER GROUNDNUT CREEK.

HF

HFB R 90 HFB C 900

LENOIR SR 1515(ALDRIDGE STOREROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5102 11042 9042DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4902 1106 1106ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 2 PROJECT MITIGATION.

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

2-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 13: Geometric Review of Linear Algebra

HIGHWAY PROGRAMDIVISION 2

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5202 6368 6368DIVISION 2 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

ENHANCEMENT (CALL PROJECTS)E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE

WAYSIDE SIGNAGE FOR DESIGNATED SITES.

TRN

STPE 96C O 128C

ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE

VARIOUS

FEDERAL BRIDGE PROJECTSB-5613 3382REPLACE BRIDGE NO. 36 OVER SOUTH

PRONG BAY RIVER.

HF

HFB 305R HFB 2M HFB 3075C

PAMLICO NC 55

B-4593 3368 18REPLACE BRIDGE NO. 38 OVER TRENT CREEK.

HF

HFB R 300 HFB C 3050

PAMLICO NC 55

DIVISION PURCHASE ORDER CONTRACT

B-5616 935REPLACE BRIDGE NO. 37 OVER BRANCH OF TRENT CREEK.

HF

HFB 85R HFB C 850

PAMLICO NC 55

DIVISION PURCHASE ORDER CONTRACT (DPOC)

B-5129 6424 5024REPLACEMENT OF FIVE STRUCTURES ON NC 304 AS A PILOT PROJECT.TRN

STPON 1400C

A NORTH PRONG OF BAY RIVER. REPLACE BRIDGE NO. 24TRNB VANDERMERE CREEK. REPLACE NO. 31 - COMPLETEC LITTLE VANDERMERE CREEK. REPLACE BRIDGE NO. 35 - COMPLETED BEAR CREEK. REPLACE BRIDGE NO. 40 - COMPLETEE GALE CREEK. REPLACE BRIDGE NO. 42 - COMPLETE

PAMLICO NC 304

B-4596 1029 39REPLACE BRIDGE NO. 28 OVER FORK OF BEARD CREEK.

HF

HFB R 90 HFB C 900

PAMLICO SR 1005(NEUSE ROAD)

B-4595 1503 18REPLACE BRIDGE NO. 14 OVER BEARD CREEK.

HF

HFB R 135 HFB C 1350

PAMLICO SR 1005(NEUSE ROAD)

B-4598 1157 117REPLACE BRIDGE NO. 16 OVER FORK OF BAY RIVER.

HF

HFB R 90 HFB C 950

PAMLICO SR 1324(FLORENCE ROAD)

2-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 14: Geometric Review of Linear Algebra

HIGHWAY PROGRAMDIVISION 2

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5102 11042 9042DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4902 1106 1106ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 2 PROJECT MITIGATION.

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5202 6368 6368DIVISION 2 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

RURAL PROJECTSR-5702 1550SR 1110 (HANRAHAN ROAD). UPGRADE

INTERSECTION.REG

T R 300 T C 1250

PITT NC 11

PLANNING/DESIGN IN PROGRESS

R-2250* 242935 10865NC 11 TO US 264 (GREENVILLE BYPASS). CONSTRUCT FOUR LANE DIVIDED FACILITY ON NEW LOCATION WITH BYPASS OF WINTERVILLE.

12.4

TRN

T 27000R R 27000 T 1785U U 1785 T 43625C C 43625 C 43625 C 43625

PITT NC 11/NC 903(GREENVILLESOUTHWEST BYPASS)

URBAN PROJECTSU-5730 233NC 43 (5TH STREET). UPGRADE

INTERSECTION.

REG

NHP R 45 NHP C 188

PITT US 13(MEMORIAL DRIVE)

PLANNING/DESIGN IN PROGRESS

U-2817 35275 2135SR 1711 (WORTHINGTON ROAD) IN WINTERVILLE TO US 264A (GREENVILLE BOULEVARD) IN GREENVILLE. WIDEN TO MULTI-LANES.

3.8

DIV

STP 12840R STP 1500U STP 12533C C 6267

PITT SR 1700(EVANS STREET/OLD TAR ROAD)

U-5870 23755SR 1704 (FOURTEENTH STREET) TO NC 33. WIDEN TO MULTI-LANES.

DIV

STP 2767R R 2768STP 332U U 332STP 17556C

PITT SR 1708(FIRETOWER ROAD)

2-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 15: Geometric Review of Linear Algebra

HIGHWAY PROGRAMDIVISION 2

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS

U-5785 6233NC 43 (CHARLES BOULEVARD) TOSR 1704 (FOURTEENTH STREET). WIDENTO MULTI-LANES.

0.6

DIV

T R 1494 T U 179 T 4560C

PITT SR 1708(FIRETOWER ROAD)

PLANNING/DESIGN AND RIGHT OF WAY IN PROGRESS

U-3315 51700 28400US 13/NC 11 (MEMORIAL DRIVE) TO SR 1702 (EVANS STREET) IN GREENVILLE. CONSTRUCT MULTI-LANES, SOME NEW LOCATION WITH GRADE SEPARATION AT CSX TRANSPORTATION SYSTEM.

1.2

TRN

STP 7767C C 7767 C 7766 PITT STANTONSBURG ROAD/TENTH STREETCONNECTOR

FEASIBILITY STUDIES

FEASIBILITY STUDY IN PROGRESS

FS-1002B NC 11 TO NC 33. WIDEN AND IMPROVE INTERSECTIONS.

PITT US 264(GREENVILLE BOULEVARD)

FEDERAL BRIDGE PROJECTSB-4786 8530 230REPLACE BRIDGE NO. 38 OVER TAR RIVER.

REG

NHPB R 1000 NHPB 2434C2433C2433C

PITT US 13

B-5301 2510 100REPLACE BRIDGE NO. 87 OVER NORFOLK SOUTHERN RAILROAD.

HF

HFB R 460 HFB C 1950

PITT NC 33

BRIDGE PURCHASE ORDER CONTRACT (DPOC): UNDER CONSTRUCTION

B-5418 1146 1146REPLACE BRIDGE NO. 50 OVER JOHNSON MILL RUN.REG

PITT NC 33

B-5612 13990REPLACE BRIDGE NO. 24 OVER TAR RIVER.

REG

T R 666 T 4441C C 4441 C 4442

PITT NC 222

UNDER CONSTRUCTION

B-4787 1791 1791REPLACE BRIDGE NO. 95 OVER JOHNSON MILL RUN.

DIV

PITT SR 1401(OLD RIVER ROAD)

B-4788 851 1REPLACE BRIDGE NO. 171 OVER JOHNSON MILL RUN.

HF

HFB R 75 HFB C 775

PITT SR 1418(STATON HOUSEROAD)

DIVISION PURCHASE ORDER CONTRACT (DPOC)

B-4789 1070 80REPLACE BRIDGE NO. 164 OVER GRINDLE CREEK.

HF

HFB R 90 HFB C 900

PITT SR 1424(ALPINE-TAYLOR ROAD)

B-4603 1050 60REPLACE BRIDGE NO. 29 OVER FORK SWAMP.

DIV

STPOFF R 90 STPOFF 300C300C300C

PITT SR 1715(JACK JONES ROAD)

B-5615 2125REPLACE BRIDGE NO. 6 OVER COW SWAMP.

HF

HFB 200R HFB 1925C

PITT SR 1756(J. C. GALLOWAY ROAD)

B-4605 1601 6REPLACE BRIDGE NO. 5 OVER CHICOD CREEK.

HF

HFB R 145 HFB C 1450

PITT SR 1777(BLACK JACK-GRIMESLAND ROAD)

B-4606 1633 13REPLACE BRIDGE NO. 17 OVER CHICOD CREEK.

HF

HFB R 145 HFB C 1475

PITT SR 1780(BOYDS ROAD)

2-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 16: Geometric Review of Linear Algebra

HIGHWAY PROGRAMDIVISION 2

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-4607 2863 5REPLACE BRIDGE NO. 43 OVER SWIFT CREEK.

DIV

STPOFF R 260 STPOFF 866C866C866C

PITT SR 1923(GARDENVILLEROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5102 11042 9042DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

MUNICIPAL BRIDGE PROJECTS

CITY OF GREENVILLE - MUNICIPAL BRIDGE: RIGHT OF WAY IN PROGRESS

B-5100 777 90REPLACE BRIDGE NO. 421 OVER MEETING HOUSE BRANCH.

DIV

L 137C STPOFF 550C

PITT GREENVILLE(KING GEORGEROAD)

MITIGATION PROJECTS

IN PROGRESS

EE-4902 1106 1106ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 2 PROJECT MITIGATION.

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5202 6368 6368DIVISION 2 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT

VARIOUS

2-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 17: Geometric Review of Linear Algebra

 

Page 18: Geometric Review of Linear Algebra

COUNTY ID

FUTURE YEARS

F

RR - Rail-Highway SafetyRTAP - Rural Transit Assistance ProgramS - State I - ImpementationS (M) - State Match O - OperationsSMAP - Operating Assistance and State Maintenance Oc - OPS Funded CapitalSRTS - Safe Routes to School PE - Preliminary EngineeringSTAT - State PL - Planning / DesignSTHSR - Stimulus High Speed Rail R - Right-of-WaySTPDA - Surface Transportation Program - Direct AttributableSTPE - Surface Transportation Program, EnhancementsSTPEB - Surface Transportation Program, Enhancements (Bike)T - State Highway Trust FundsT2001 - State Rail FundsTAP - Transportation Alternatives ProgramTIGER DISC - TIGER Discretionary Grants

HP - Federal-Aid High PriorityJARC - Job Assistance and Reverse Commute (3037)

(1) FUNDING CATEGORY

DURHAM AREA

SR - Secondary Road

TRANSIT PARTNERROUTE / CITY /

NUMBER

TA-4738

LOCATION / DESCRIPTION

PASSENGER AMENITIES - BUS STOP TRANSIT AUTHORITY

DIV

SHELTERS, BENCHES, SHOP EQUIPMENTSPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.

CP

BUS STOP SHELTER AND BENCHES LOCATED AT HOLLOWAY STREET

ESTIMATED COST Preliminary engineering, right of

C10000

dollars.)

of a project segment indicates (Cash-Flow Funding)Mitigation, Utilities or Construction.

way, utility, mitigation and construction cost estimates

(2) FUNDING SOURCES KEY

O - OtherL - Local

initial scheduled year. (Estimates are in thousand of

For other work types or activities see Work Type (Activity) box below.

work description. CPProject termini and a general

conception and remains with

9000

PROJECT BREAKS

CP

Various - multiple routes

A

5000

FY 2022

C

CP 3000CP

BCP 5000 B

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FY 2023 FY 2024FY 2021

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2020

TOTAL PROJECT

COST (THOU)

FUZFUZ

FUN

DS

A

PRIOR YEARS COST

(THOU)

ACP 700

FY 2015 FY 2016

4000CP

FY 2025

5000

BB

CP CP 5000B

UNFUNDED

NON HIGHWAY PROGRAM

ADIV

FY 2017 FY 2018

BSHOP EQUIPMENT, SPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.

WORK TYPE (ACTIVITY) (3)Phases of implementation:

DIV C

20000

COMMITMENTSFUTURE

by funding category in current dollars. Cost may include one or more funding types. Multi-year funding

Preliminary engineering, Right of Way, UNFUNDED

BUS STOP SHELTER AND BENCHES LOCATED AT GREGSON AVENUE

with proposed work type or activity beginning in the

break.

One or two letter

CP

A

for an explanation of funding categories

FUNDING CATEGORY (1)

DIV

DIVISION 00

DEVELOPMENTAL PROGRAM

DURHAM

FY 2019

TRANSIT PARTNERROUTE / CITY /

NEW ROUTE or CityTRANSIT PARTNER

IDENTIFICATION NUMBER Assigned to each project at

US or NC RoutesI - Interstate

project until completion.

C - City

FEPD - Elderly and Persons with Disablity (5310)

FMOD - Fixed Guideway Modifications

designation for project

any project breaks.Category for the project and

LOCATION / DESCRIPTION

used for each project phase.

FUNDING SOURCE (2)

Identifies the "STI" Funding

See Highway Funding Key

FSPR - State Planning and Research

FNF - New Freedom ProgramFNS - New Starts - Capital (5309)

FMPL - Metropolitan Planning (5303)

FED - Federal Rail Funds

FLAP - Federal Lands Access Program

FUZ - Urbanized Area Formula Program (5307)

CMAQ - Congestion Mitigation

FF - Federal Ferry

FNU - Non Urbanized Area Formula Program (5311)

(3) WORK TYPE (ACTIVITY)

C - ConstructionAD - Administrative

CP - Capital

A - AcquisitionHF - State Dollars (Non-STI)REG - RegionalSW - Statewide

DIV - Division

DP - Discretionary or DemonstrationFBUS - Capital Program - Bus Earmark (5309)

Page 19: Geometric Review of Linear Algebra

NON HIGHWAY PROGRAMDIVISION 2

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025AVIATION PROJECTS

AV-5743 3276ACQUIRE LAND FOR AND CONSTRUCT RUNWAY 5-23 EXTENSION AND TAXIWAY.

0

DIV

T C 2948 O C 328

BEAUFORT WARREN FIELD(OCW)

PUBLIC TRANSPORTATION PROJECTSTK-6110 1970 562ADMINISTRATION

HF

FNU 280O O 141 O 141 O 141 O 141 O 141 141O141O141O FNU

BEAUFORT BEAUFORT COUNTYDEVELOPMENT CENTER, INC

TA-6119 605 192CAPITAL

HF

FNU 413CP BEAUFORT BEAUFORT COUNTYDEVELOPMENT CENTER,INC.

TI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY

HF

FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON

GREYHOUND LINES

AVIATION PROJECTSAV-5746 1790FULL PARALLEL TAXIWAY 8-26.

DIV

T C 1611 O C 179

CARTERET MICHAEL J. SMITH FIELD(MRH)

BICYCLE AND PEDESTRIAN PROJECTS

RIGHT OF WAY IN PROGRESS

EB-5500 215 535TH STREET TO 25TH STREET. INSTALL SIDEWALKS ON THE NORTH SIDE.

TRN

STPEB 210C CARTERET US 70(ARENDELL STREET)

FERRY PROJECTS

UNDER CONSTRUCTION

F-5301 980 980CEDAR ISLAND, SOUTHPORT AND FORT FISHER DOCKS. REPLACE DOLPHINS.

TRN

BRUNSWICKCARTERETNEW HANOVER

VARIOUS

PUBLIC TRANSPORTATION PROJECTSTA-6553 158CAPITAL

HF

FNU 126CP L 16CP S 16CP

CARTERET CARTERET COUNTY

TK-6115 1760 734ADMINISTRATION

HF

FNU 426O O 75 O 75 O 75 O 75 O 75 75O75O75O FNU

CARTERET CARTERET COUNTY

TM-6151 100OPERATING

HF

JARC 50O L 50O

CARTERET CARTERET COUNTY

TQ-6799 200OPERATING

HF

FEPD 100O L 100O

CARTERET CARTERET COUNTY

TQ-6155 20OPERATING ASSISTANCE

HF

FEPD 10O L 10O

CARTERET CARTERET COUNTY

2-23 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 20: Geometric Review of Linear Algebra

NON HIGHWAY PROGRAMDIVISION 2

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TA-6540 32ACCESSIBLE INFORMATION KIOSKS AST TERMINAL CENTER FOR INFORMATION BY VARIOUS FORMS INCLUDING BRAILLE AND MULTIPLE LANGUAGESHF

FNF 32CP CARTERETHYDE

NCDOT FERRY DIVISION

BICYCLE AND PEDESTRIAN PROJECTSEB-5727 2090NC 55 TO TRENT CREEK ROAD. CONSTRUCT

MULTI-USE PATH.4.4

DIV

TAP 1672C L 418C

CRAVEN US 17 BUS(MARTIN LUTHERKING, JR. BOULEVARD)

EB-5502 430NC 55 (1ST STREET) TO SR 1309/SR 1402 (GLENBURNIE ROAD) IN NEW BERN. CONSTRUCT SIDEWALK.TRN

STPEB 5R STPEB 425C

CRAVEN NC 55(NEUSE BOULEVARD)

EB-5501 460ELIZABETH AVENUE TO NC 55 (NEUSE BOULEVARD) IN NEW BERN. CONSTRUCT MULTI-USE PATH.TRN

STPEB 5R STPEB 455C

CRAVEN SR 1309(GLENBURNIE ROAD)

EB-5724 450LIBERTY STREET TO LAWSON PARK. CONSTRUCT TIMBER FOOTBRIDGE.

0.1

DIV

TAP 360C L 90C

CRAVEN LAWSON CREEK BRIDGE

FERRY PROJECTSF-5000 800CHERRY BRANCH VISITOR'S CENTER.

REPLACEMENT.TRN

T 800C CRAVEN NC 306

PUBLIC TRANSPORTATION PROJECTSTN-6115 86OPERATING ASSISTANCE

HF

FNF 86O CRAVENJONESPAMLICO

CRAVEN AREA RURALTRANSPORTATION SYSTEM

TO-6102 1210 350OPERATING ASSISTANCE

HF

FNU 172O O 86 O 86 O 86 O 86 O 86 86O86O86O CRAVEN CRAVEN AREA RURALTRANSPORTATION SYSTEM

TO-5204 648OPERATING ASSISTANCE

HF

FUZ O 172 O 152 L O 172 O 152

CRAVEN CRAVEN AREA RURALTRANSPORTATION SYSTEM

TP-5122 20SHORT RANGE PLANNING

HF

FUZ PL 8 PL 8 L PL 2 PL 2

CRAVEN CRAVEN AREA RURALTRANSPORTAION SYSTEM

TA-6182 553 176CAPITAL

HF

FNU 377CP CRAVEN CRAVEN AREA RURALTRANSPORTATION SYSTEM

TC-5100 60MOBILITY MANAGEMENT

HF

FUZ CP 24 CP 24 L CP 6 CP 6

CRAVEN CRAVEN AREA RURALTRANSPORTATION SYSTEM

TG-5165 390Expansion Vans

HF

FUZ CP 166 CP 166 L CP 29 CP 29

CRAVEN CRAVEN AREA RURALTRANSPORTATION SYSTEM

TG-5257 159ADA/PARATRANSIT

HF

L CP 12 CP 20 S CP 48 CP 79

CRAVEN CRAVEN AREA RURALTRANSPORTATION SYSTEM

TG-5256 93PREVENTIVE MAINTENANCE

HF

FUZ CP 36 CP 38 L CP 9 CP 10

CRAVEN CRAVEN AREA RURALTRANSPORTATION SYSTEM

2-24 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 21: Geometric Review of Linear Algebra

NON HIGHWAY PROGRAMDIVISION 2

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TK-6122 4746 1356ADMINISTRATION

HF

FNU 678O O 339 O 339 O 339 O 339 O 339 339O339O339O FNU

CRAVEN CRAVEN AREA RURALTRANSPORTATION SYSTEM

PUBLIC TRANSPORTATION PROJECTSTA-6283 218 172CAPITALHF

FNU 46CP GREENE GREENE COUNTY

TK-6131 1613 463ADMINISTRATION

HF

FNU 230O O 115 O 115 O 115 O 115 O 115 115O115O115O FNU

GREENE GREENE COUNTY

PUBLIC TRANSPORTATION PROJECTSTN-6115 86OPERATING ASSISTANCE

HF

FNF 86O CRAVENJONESPAMLICO

CRAVEN AREA RURALTRANSPORTATION SYSTEM

TA-6204 675 384CAPITAL

HF

FNU 291CP JONESONSLOWPAMLICO

ONSLOW UNITED TRANSIT

TK-6150 3034 866ADMINISTRATION

HF

FNU 432O O 217 O 217 O 217 O 217 O 217 217O217O217O FNU

JONESONSLOWPAMLICO

ONSLOW UNITED TRANSIT

TA-6248 EXPANSION - LIGHT TRANSIT VEHICLE

HF

JONESONSLOWPAMLICO

TRANSPORTATION ADMIN.

PUBLIC TRANSPORTATION PROJECTSTA-6130 859 249CAPITALHF

FNU 610CP LENOIR LENOIR COUNTY

TK-6178 3694 1048ADMINISTRATION

HF

FNU 550O O 262 O 262 O 262 O 262 O 262 262O262O262O FNU

LENOIR LENOIR COUNTY

TM-6154 110SECTION 5316 OPERATING

HF

JARC 55O L 55O

LENOIR LENOIR COUNTY

PUBLIC TRANSPORTATION PROJECTSTN-6115 86OPERATING ASSISTANCE

HF

FNF 86O CRAVENJONESPAMLICO

CRAVEN AREA RURALTRANSPORTATION SYSTEM

TA-6204 675 384CAPITAL

HF

FNU 291CP JONESONSLOWPAMLICO

ONSLOW UNITED TRANSIT

TK-6150 3034 866ADMINISTRATION

HF

FNU 432O O 217 O 217 O 217 O 217 O 217 217O217O217O FNU

JONESONSLOWPAMLICO

ONSLOW UNITED TRANSIT

2-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 22: Geometric Review of Linear Algebra

NON HIGHWAY PROGRAMDIVISION 2

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TA-6248 EXPANSION - LIGHT TRANSIT VEHICLE

HF

JONESONSLOWPAMLICO

TRANSPORTATION ADMIN.

BICYCLE AND PEDESTRIAN PROJECTS

RIGHT OF WAY IN PROGRESS

EB-5539 2116 313SOUTH TAR RIVER GREENWAY. PHASE 3: PITT STREET TOWARD MOYE BOULEVARD IN VICINITY OF PITT MEMORIAL HOSPITAL. CONSTRUCT GREENWAY USING EXISTING SIDEWALKS, ROADS AND ON NEW LOCATION ALONG THE RIVER.TRN

DP 60R L 15R DP 660C L 165C STPEB 903C

PITT GREENVILLE

PLANNING, DESIGN, RIGHT OF WAY, AND CONSTRUCTION BY CITY OF GREENVILLE

EB-5618 750PROVIDE PEDESTRIAN CROSSWALK IMPROVEMENTS AT MULTIPLE INTERSECTIONS.

1TRN

STPEB 750C PITT GREENVILLE

RIGHT OF WAY IN PROGRESS

EB-4996 1718 1718GREEN MILL RUN GREENWAY, CHARLES BOULEVARD TO EVANS PARK. CONSTRUCT GREENWAY.TRN

PITT GREENVILLE

PUBLIC TRANSPORTATION PROJECTSTA-4965 4330 950REPLACEMENT BUS

HF

FBUS FUZ 560CP CP 2144 L 140CP CP 268 S CP CP 268

PITT GREENVILLE AREA TRANSIT

TD-4716 8100 2869FACILITY - INTERMODAL CENTER - LAND, PLANNING, DESIGN, CONSTRUCTION

HF

FBUS FUZ 4185CP L 523CP S 523CP

PITT GREENVILLE AREA TRANSIT

TG-4767 7738 1980ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC

HF

FUZ 1064CP CP 551 CP 565 CP 580 CP 594 CP 601 601CP601CP601CP PITT GREENVILLE AREA TRANSIT

see amendment #1 to 2012-2018 STIP

TG-5107B 8717 2025PREVENTIVE MAINTENANCEHF

FUZ 1266Oc Oc 656 Oc 673 Oc 690 Oc 707 Oc 675 675Oc675Oc675Oc PITT GREENVILLE AREA TRANSIT

TG-5107C 2334 439OPERATING ASSISTANCE - ADA PARATRANSIT SERVICEHF

FUZ 411Oc Oc 213 Oc 218 Oc 224 Oc 229 Oc 150 150Oc150Oc150Oc PITT GREENVILLE AREA TRANSIT

see amendment #1 to 2012-2018 STIP

TO-4726 18975 5542OPERATING ASSISTANCE

HF

FUZ 1733O O 1298 O 980 O 1057 O 1080 O 1080 1080O1080O1080O SMAP 577O O 341 O 350 O 322 O 275 O 275 275O275O275O

PITT GREENVILLE AREA TRANSIT

TP-5107 443 131PLANNING ASSISTANCE - 5303HF

FMPL 66CP CP 33 CP 33 CP 33 CP 33 CP 33 27CP27CP27CP PITT GREENVILLE AREA TRANSIT

TP-5107A 200 100PLANNING ASSISTANCE - 5 YEAR PLANHF

FUZ CP 100 PITT GREENVILLE AREA TRANSIT

TS-5112 177 72SAFETY & SECURITYHF

FUZ 30CP CP 15 CP 15 CP 15 CP 15 CP 15 PITT GREENVILLE AREA TRANSIT

2-26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 23: Geometric Review of Linear Algebra

NON HIGHWAY PROGRAMDIVISION 2

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY

HF

FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON

GREYHOUND LINES

TA-6134 717 546CAPITALHF

FNU 171CP PITT PITT COUNTY

TA-9002 97CAPITAL - PURCHASE OF SERVICE

HF

FEPD 77CP L 10CP S 10CP

PITT PITT COUNTY

TK-6154 2524 718ADMINISTRATION

HF

FNU 366O O 180 O 180 O 180 O 180 O 180 180O180O180O FNU

PITT PITT COUNTY

2-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project