geometric review of linear algebra
TRANSCRIPT
2
Division 2BeaufortCarteretCravenGreeneJonesLenoirPamlicoPitt
STATE TRANSPORTATION IMPROVEMENT PROGRAM
BEAUFORT
PITTGREENE
LENOIR
CARTERET
JONES
CRAVEN
PAMLICO
17
258
70
258
70
13
17
264264
70
264
13
58
903
101
24
58
903
306
33
91
99
11
55
4358
102
55
222
92
32
118
41
12
Washington
Kinston
Havelock
Greenville
New Bern
AV-5746
AV-5743
B-5614
B-4433
B-4722B
B-4863
K-3800
B-4530
B-4528
B-5612
B-4603
B-4607
B-5100
B-5129
R-5516
EB-5724
R-5702
U-5730
R-4463AA
U-5785
U-5740
EB-5727
U-3315
R-2250A
U-5860
U-5870
U-5713
R-5727 R-3307
U-2817
R-5703
R-2250C
R-2250B
R-2514C
R-2514D
EB-4411F
R-1015
DRAFT STIPFY 2015-2025STI ProjectsDIVISION 2
0 9 184.5Miles
BRIDGES FUNDED THROUGH STI
STATEWIDE AVIATION
REGIONAL AVIATION
DIVISION AVIATION
DIVISION FERRYREGIONAL RAILDIVISION RAILREGIONAL TRANSITDIVISION TRANSITSAFETYTRANSITION *TRANSITION *INTERSTATE MAINTENANCESTATEWIDE HIGHWAYREGIONAL HIGHWAYDIVISON HIGHWAYDIVISION BIKE/PEDESTRIANINTERSTATE ROUTEUS ROUTENC ROUTESECONDARY ROADMUNICIPAL BOUNDARIESMILITARY BASENCDOT DIVISION BOUNDARYCOUNTY BOUNDARYWATER FEATURES
* Note: Reflects 108 of the Major Transition ProjectsNote: FY 2015 projects represent major projects not
let as of November 2014
COUNTY
FUTURE YEARS
F
NHPB - National Highway Performance Program (Bridge)NHPIM - National Highway Performance Program (Interstate Maintenance)O - OthersRR - Rail-Highway SafetyS (M) - State MatchSRTS - Safe Routes to School
FLPI - Federal Lands Program (Indian Reservation Roads) STP - Surface Transportation ProgramHFB - Highway Fund Bridge Replacement Program STPDA - Surface Transportation Program - Direct AttributableHP - Federal-Aid High Priority STPEB - Surface Transportation Program, Enhancements (Bike)
STPON - Surface Transportation Program Bridge (On System Bridge)STPOFF -Surface Transportation Program (Off System Bridge) PE - Preliminary EngineeringT - State Highway Trust Funds
NHP - National Highway Performance Program TAP - Transportation Alternatives Program RG - Right of Way (GARVEE)
SW - StatewideTRN -Transition Project
S - StructureU - Utilities
I - ImplementationL - LandscapingM - MitigationO - OperationsP - Paving
WAKE
NUMBERLENGTH (MILES)
DIVISION 00
R-0000
IDROUTE/CITY
US or NC RoutesON NEW LOCATION. I - InterstateWITH A BYPASS OF HOMETOWN ROUTE/CITY
Project termini and a general
SW
M1500
A
NHP
4000
FUNDING CATEGORY (1)
used for each project phase.
FUNDING SOURCE (2)
U
B3000R
FY 2017
C
(3) WORK TYPE (ACTIVITY)
A - Acquisition
with proposed work type or activity beginning in the initial scheduled year. (Estimates are in thousand of
For other work types or activities see Work Type (Activity) box below.
dollars.)
of a project segment indicates (Cash-Flow Funding) COMMITMENTSFUTURE
SW CBSW
One or two letter
HIGHWAY PROGRAM
UNFUNDED
NC 3 TO SR 1003SR 1003 TO NC 96
ASW
UNFUNDED
20000CRC 5000C 5000 BC B
WIDEN TO A FOUR-LANE FACILITY
A
NC 00 R7.3 R25063,450I-40 TO NC 96 EAST OF HOMETOWN.
B
FY 2025 FY 2018
700
FY 2019
DEVELOPMENTAL PROGRAMSTATE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2020FY 2015 FY 2016
M
TOTAL PROJECT
COST (THOU)
NHPNHP
FUN
DS
A
PRIOR YEARS COST
(THOU)
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
U 5000NHP
C10000
FY 2021
C
FY 2023 FY 2024
FY 2022
5000
9000
APD - Appalachian Development
NHPNHP
LOCATION / DESCRIPTION NHP
NHP
I-40 TO NC 3
Preliminary engineering, Right of Way, Mitigation, Utilities or Construction. break.
work description.
way, utility, mitigation and construction cost estimates
See Highway Funding Key
any project breaks.Category for the project andIdentifies the "STI" Funding
by funding category in current dollars. Cost may include one or more funding types. Multi-year funding
for an explanation of funding categories
Phases of implementation: ESTIMATED COST Preliminary engineering, right of
(1) FUNDING CATEGORY
PROJECT BREAKS
designation for project
LOCATION / DESCRIPTION
SR - Secondary Road
IDENTIFICATION NUMBER Assigned to each project at conception and remains with
BVarious - multiple routesNEW ROUTE or City
WORK TYPE (ACTIVITY) (3)
BOND (R) - Revenue Bond
HRRR - High Risk Rural Roads
L - LocalHSIP - Highway Safety Improvement Program
project until completion.
DIV - DivisionEX - Exempt
REG - RegionalHF - State Dollars (Non-STI)
F - Feasibility StudyCG - Construction (GARVEE)C - Construction
G - Grading and Structures
R - Right of Way
(2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES
ER - Emergency Relief Funds
CMAQ - Congestion MitigationDP - Discretionary or Demonstration
FED - Federal Rail Funds
HIGHWAY PROGRAMDIVISION 2
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS
SECTION C, GARVEE BOND FUNDING $3.4 MILLION; RIGHT OF WAY - PAYBACK FY 2007 - FY 2018
R-2510* 332470 330962SOUTH OF SR 1127 (POSSUM TRACK ROAD) TO NORTH OF NC 171. FOUR LANE DIVIDED FREEWAY, SOME NEW LOCATION.
15 NHP 377RG C RG 377 C RG 377 C RG 377 C
A SOUTH OF SR 1127 (POSSUM TRACK ROAD) TO SOUTH OF SR 1149 (PRICE ROAD) - COMPLETEB SOUTH OF SR 1149 (PRICE ROAD) TO US 17 NORTH OF SR 1509 (SPRINGS ROAD) - COMPLETEC US 17 NORTH OF SR 1509 (SPRINGS ROAD) TO NORTH OF NC 171 - COMPLETETRND BRIDGE OVER TAR RIVER - COMPLETE
BEAUFORT US 17(WASHINGTON BYPASS)
URBAN PROJECTSU-5860 16200US 17 BUSINESS (CAROLINA AVENUE) TO
BROWN STREET. WIDEN TO MULTI-LANES.1.8
DIV
T 5885R T 706U T 9609C
BEAUFORT SR 1306(15TH STREET)
FEDERAL BRIDGE PROJECTSB-5302 6640 150REPLACE BRIDGE NO. 3 OVER NORFOLK
SOUTHERN RAILROAD.HF
HFB R 590 HFB C 5900
BEAUFORT US 17
B-5300 1397 100REPLACE BRIDGE NO. 55 OVER PANTEGO CREEK.
HF
HFB 150R HFB 47U HFB C 1100
BEAUFORT US 264
B-4414 2804 4REPLACE BRIDGE NO. 43 OVER PUNGO CREEK.
HF
HFB R 250 HFB C 2550
BEAUFORT US 264
B-5620 1321REPLACE BRIDGE NO. 30 OVER CAMPBELL CREEK.
HF
HFB 120R HFB 1M HFB 1200C
BEAUFORT NC 33
B-5413 1651REPLACE BRIDGE NO. 20 OVER SMITH CREEK.
HF
HFB R 150 HFB M 1 HFB C 1500
BEAUFORT NC 33
B-5614 6701REPLACE BRIDGE NO. 9 OVER BLOUNTS CREEK.
DIV
STPOFF R 319 STPOFF 3191C C 3191
BEAUFORT SR 1112(MOUTH OF THECREEK ROAD)
B-4425 1220 65REPLACE BRIDGE NO. 69 OVER BRANCH OF CHOCOWINITY CREEK.
HF
HFB R 105 HFB C 1050
BEAUFORT SR 1136(GRAY ROAD)
B-4427 1287 22REPLACE BRIDGE NO. 6 OVER BIG SWAMP.
HF
HFB R 115 HFB C 1150
BEAUFORT SR 1422(MARKET STREET)
B-4430 1297 32REPLACE BRIDGE NO. 135 OVER BATH CREEK.
HF
HFB R 115 HFB C 1150
BEAUFORT SR 1742(POST ROAD)
B-4433 1013 23REPLACE BRIDGE NO. 40 OVER HORSEPEN SWAMP.
DIV
STPOFF R 90 STPOFF C 300 300C300C
BEAUFORT SR 1932(DURHAM CREEKROAD)
2-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 2
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
B-4709 1101 1REPLACE BRIDGE NO. 14 OVER BRANCH OF DURHAM CREEK.
HF
HFB R 100 HFB C 1000
BEAUFORT SR 1932(DURHAM CREEKROAD)
B-5618 1845REPLACE BRIDGE NO. 315 OVER DURHAM CREEK.
HF
HFB 170R HFB 1675C
BEAUFORT SR 1949(LABOR CAMP ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5102 11042 9042DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4902 1106 1106ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 2 PROJECT MITIGATION.
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC)
W-5008 2585 335US 17 BUSINESS (CAROLINA AVENUE) TO PEARCE STREET IN WASHINGTON. WIDEN TO FOUR LANE DIVIDED FACILITY WITH MEDIAN.
0.64
TRN
HSIP 2250C BEAUFORT SR 1306(15TH STREET)
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5202 6368 6368DIVISION 2 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
2-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 2
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)
E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE WAYSIDE SIGNAGE FOR DESIGNATED SITES.
TRN
STPE 96C O 128C
ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE
VARIOUS
ROADSIDE ENVIRONMENTAL PROJECTS (REST AREA)
UNDER CONSTRUCTION
K-3800 6725 6725ACQUIRE RIGHT OF WAY AND RELOCATE REST AREA AT NEW LOCATION WITH MUNICIPAL WATER AND SEWER AVAILABLE. (COORDINATE WITH R-2510B).
TRNBEAUFORT US 17
RURAL PROJECTS
UNDER CONSTRUCTION
R-3307 115512 115512GALLANT'S CHANNEL BRIDGE, FOUR LANES AT RADIO ISLAND TO US 70 NORTH OF BEAUFORT NEAR SR 1429 (OLGA ROAD). MULTI-LANES, PART ON NEW LOCATION.
2.2TRN
CARTERET US 70
R-5727 44220SR 1738 (BRIDGES STREET) TO SR 1147 (MCCABE ROAD). WIDEN EXISTING ROADWAY AND CONSTRUCT PART ON NEW LOCATION.
3
DIV
T 5491R5491R T 1318U T 21280C C 10640
CARTERET SR 1176(BRIDGES STREETEXTENSION)
URBAN PROJECTSU-5740 60081MOREHEAD CITY TO BEAUFORT
CAUSEWAY. WIDEN AND IMPROVE NEWPORT RIVER BRIDGE.
0.7
REG
NHP 2242R NHP 269U NHP 19190C C 19190 C 19190
CARTERET US 70(ARENDELL STREET)
FEASIBILITY STUDIES
FEASIBILITY STUDY IN PROGRESS
FS-1002A MOREHEAD CITY TO THE BEAUFORT CAUSEWAY. WIDEN TO MULTI-LANES.
CARTERET US 70
FEDERAL BRIDGE PROJECTSB-4722 15150 2850REPLACE BRIDGE NO. 33 OVER NORTH
RIVER AND REPAIRS TO EXISTING STRUCTURE TO SERVE AS DETOUR.REG
NHPB 12300C B
A REQUIRED REPAIRS NECESSARY FOR EXISTING STRUCTURE TO SERVE AS THE DETOUR ROUTE FOR B-4722B - COMPLETEB REPLACEMENT OF BRIDGE NO. 33 OVER NORTH RIVER. - RIGHT OF WAY IN PROGRESSREG
CARTERET US 70
B-4863 26100 100REPLACE LIFT SPAN ON BRIDGE NO. 73 AND BRIDGE NO. 96 OVER THE STRAITS AT HARKERS ISLAND.DIV
T R 2200 T C 7933 7934C7933C
CARTERET SR 1335(ISLAND ROAD)
2-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 2
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5102 11042 9042DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4902 1106 1106ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 2 PROJECT MITIGATION.
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
HAZARD ELIMINATION PROJECTSW-5319 1926WEST OF WILLIS ROAD TO BANKS STREET.
CONSTRUCT A RAISED MEDIAN.TRN
HSIP 1926C CARTERET US 70
W-4700 1457 1457SR 1140 (ROBERTS ROAD) TO WEST OF SR 1127 (MASON TOWN ROAD). WIDEN TO 24 FEET.
3.5
A REPLACE BRIDGE NO. 76 WITH A CULVERT - UNDER CONSTRUCTIONB SR 1140 (ROBERTS ROAD) TO WEST OF SR 1127 (MASON TOWN ROAD) - COMPLETE
CARTERET SR 1124(NINE FOOT ROAD)
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5202 6368 6368DIVISION 2 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)
IN PROGRESS
S-5501 201 201IMPLEMENTATION OF WAYSHOWING AND VISITOR ORIENTATION.
EX
CARTERETDAREHYDE
NC 12/US 70
S-5502 212OUTER BANKS SCENIC BYWAY WAYSIDES AND INTERPRETIVE SIGNS.
TRN
DP 212C CARTERETDAREHYDE
NC 12/US 70
RURAL PROJECTS
SECTION A, GARVEE BOND FUNDING $33.9 MILLION; PAYBACK FY 2009-2020
R-2301* 250166 69801US 17 SOUTH OF NEW BERN TO US 17 NORTH OF NEW BERN. FOUR LANE DIVIDED FREEWAY ON NEW LOCATION.
16.1 NHP CG 3713 A CG 3713 A CG 3713 A CG 3713 A CG 3713 A T 15800R B T 146000C B
A US 17 SOUTH OF NEW BERN TO US 70 - COMPLETETRNB US 70 TO US 17 NORTH OF NEW BERN
CRAVENJONES
US 17(NEW BERN BYPASS)
2-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 2
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS
R-5516 23272 350SLOCUMB ROAD AT CHERRY POINT MILITARY BASE. CONSTRUCT INTERCHANGE.
TRN
NHP 5000R NHP 17600C NHP 322U
CRAVEN US 70
PLANNING/DESIGN IN PROGRESS
R-1015* 210811 10941NORTH OF PINE GROVE TO NORTH OF CARTERET COUNTY LINE. CONSTRUCT MULTI-LANE FACILITY ON NEW LOCATION.
10.1
DIV
NHP R 11425 NHP U 845 NHP 49200CG CG 12300 CG 12300 CG 12300 12300CG12300CG12300CG CG 12300 CG 12300S(M) CG 10000 CG 10000 CG 10000 10000CG
CRAVEN US 70(HAVELOCK BYPASS)
PLANNING/DESIGN IN PROGRESS
R-4463 71768 56393NC 43/NC 55 TO US 17 IN NEW BERN. CONSTRUCT ROUTE ON NEW LOCATION WITH INTERCHANGE AT US 70.
4.2 T 1275R A T 10100C A T 4000C AA
A US 17 TO SOUTH OF US 70AA SOUTH OF US 70 TO US 70TRNB US 70 TO NC 43/NC 55 - COMPLETE
CRAVEN NC 43 CONNECTOR
URBAN PROJECTSU-5713 66000NEUSE RIVER BRIDGE TO GRANTHAM
ROAD. UPGRADE ROADWAY TO FREEWAY.2.5
SW
NHP 12500R12500R NHP 1000U NHP 13333C C 13333 C 13334
CRAVEN US 70
FEDERAL BRIDGE PROJECTSB-4483 1505 20REPLACE BRIDGE NO. 66 OVER CREEK.
HF
HFB R 135 HFB C 1350
CRAVEN SR 1232(CICERO RIGGS ROAD)
B-5617 1790REPLACE BRIDGE NO. 41 OVER SWIFT CREEK.
HF
HFB 165R HFB 1625C
CRAVEN SR 1464(PUGHTOWN ROAD)
B-4484 9200 400REPLACE BRIDGE NO. 138 OVER NEUSE RIVER, AND BRIDGE NO. 139 OVER NEUSE RIVER OVERFLOW.HF
HFB R 800 HFB C 8000
CRAVEN SR 1470(MAPLE CYPRESS ROAD)
B-4485 1018 28REPLACE BRIDGE NO. 26 OVER BEAVER DAM SWAMP.
HF
HFB R 90 HFB C 900
CRAVEN SR 1621(HILLS NECK ROAD)
B-4487 1609 14REPLACE BRIDGE NO. 2 OVER FORK CLUBFOOT CREEK.
HF
HFB R 145 HFB C 1450
CRAVEN SR 1715(BLADES ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5102 11042 9042DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
2-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 2
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025MITIGATION PROJECTS
IN PROGRESS
EE-4902 1106 1106ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 2 PROJECT MITIGATION.
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5202 6368 6368DIVISION 2 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
ENHANCEMENT (CALL PROJECTS)E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE
WAYSIDE SIGNAGE FOR DESIGNATED SITES.
TRN
STPE 96C O 128C
ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE
VARIOUS
ROADSIDE ENVIRONMENTAL PROJECTS (REST AREA)
UNDER CONSTRUCTION
K-5101 575 575REST AREA RENOVATIONS - BUILDINGS AND GROUNDS. ENCLOSE LOBBY AND ADD ADA COMPLIANT FAMILY RESTROOM.TRN
CRAVEN US 70
FEDERAL BRIDGE PROJECTSB-4527 997 6REPLACE BRIDGE NO. 26 OVER BEAR
CREEK.
HF
HFB R 90 HFB M 1 HFB C 900
GREENE SR 1140(OAKDALE ROAD)SR 1705(HOOD SWAMPROAD)
B-4528 1598 3REPLACE BRIDGE NO. 25 OVER TYSON MARSH.
DIV
STPOFF R 145 STPOFF 1450C
GREENE SR 1149(WARRENTOWNROAD)
2-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 2
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4755 636 636REPLACE BRIDGE NO. 65 OVER APPLETREE SWAMP.
DIV
GREENE SR 1215(APPLE TREE ROAD)
B-4530 994 4REPLACE BRIDGE NO. 13 OVER BEAMAN RUN.
DIV
STPOFF R 90 STPOFF 900C
GREENE SR 1222(BEAMAN OLDCREEK ROAD)
UNDER CONSTRUCTION: FUNDING THROUGH B-4755
B-5112 640 640REPLACE BRIDGE NO. 72 OVER APPLETREE SWAMP.
DIV
GREENE SR 1253(LINDELL ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5102 11042 9042DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4902 1106 1106ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 2 PROJECT MITIGATION.
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
HAZARD ELIMINATION PROJECTS
UNDER CONSTRUCTION
W-5329 429 429NORTH OF SR 1117 (FRED HARRISON ROAD) TO SOUTH OF SR 1101 (BROWNTOWN ROAD). WIDEN TO PROVIDE A LEFT TURN LANE.
TRNGREENE US 258
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5202 6368 6368DIVISION 2 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
RURAL PROJECTS
SECTION A, GARVEE BOND FUNDING $33.9 MILLION; PAYBACK FY 2009-2020
R-2301* 250166 69801US 17 SOUTH OF NEW BERN TO US 17 NORTH OF NEW BERN. FOUR LANE DIVIDED FREEWAY ON NEW LOCATION.
16.1 NHP CG 3713 A CG 3713 A CG 3713 A CG 3713 A CG 3713 A T 15800R B T 146000C B
A US 17 SOUTH OF NEW BERN TO US 70 - COMPLETETRNB US 70 TO US 17 NORTH OF NEW BERN
CRAVENJONES
US 17(NEW BERN BYPASS)
2-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 2
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS
PLANNING/DESIGN IN PROGRESS
R-2514* 214808 66708MULTI-LANES NORTH OF JACKSONVILLE TO NEW BERN BYPASS. WIDEN TO MULTI-LANES WITH BYPASSES OF BELGRADE, MAYSVILLE AND POLLOCKSVILLE ON NEW LOCATION.
22.1 T 10175C B C 10175 B C 10175 B C 10175 B T 16150C C C 16150 C T 25033C D C 25033 D C 25034 D
A MULTI-LANE SECTION NORTH OF JACKSONVILLE TO SOUTH OF BELGRADE - COMPLETEB SOUTH OF BELGRADE TO NORTH OF MAYSVILLE - RIGHT OF WAY IN PROGRESSTRNC NORTH OF MAYSVILLE TO SOUTH OF NC 58 - RIGHT OF WAY IN PROGRESSTRND SOUTH OF NC 58 TO THE NEW BERN BYPASS - RIGHT OF WAY IN PROGRESSTRN
JONESONSLOW
US 17
FEDERAL BRIDGE PROJECTSB-4563 1494 9REPLACE BRIDGE NO. 6 OVER BIG
CHINQUAPIN CREEK.
HF
HFB R 135 HFB 1350C
JONES SR 1301(PINE STATE ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5102 11042 9042DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4902 1106 1106ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 2 PROJECT MITIGATION.
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5202 6368 6368DIVISION 2 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
RURAL PROJECTS
UNDER CONSTRUCTION - SECTION BA - GARVEE BOND FUNDING $68.8 MILLION; PAYBACK FY 2008 - FY 2019; PLANNING/DESIGN IN PROGRESS
R-2554* 364068 332763WEST OF NC 581 IN WAYNE COUNTY TO EAST OF SR 1323 (PROMISE LAND ROAD) IN LENOIR COUNTY. FOUR LANE DIVIDED FREEWAY ON NEW LOCATION.
20.5 NHP CG 7545 BA CG 7545 BA CG 7545 BA CG 7545 BA NHP 1125C D
A WEST OF NC 581 TO EAST OF SR 1300 (SALEM CHURCH ROAD) - UNDER CONSTRUCTIONTRNBA EAST OF SR 1300 (SALEM CHURCH ROAD) TO EAST OF SR 1556 (WAYNE MEMORIAL DRIVE) - COMPLETEBB EAST OF SR 1556 (WAYNE MEMORIAL DRIVE) TO WEST OF SR 1714 (CREEK ROAD) - UNDER CONSTRUCTIONTRNC WEST OF SR 1714 (CREEK ROAD) TO EAST OF SR 1323 (PROMISE LAND ROAD) - UNDER CONSTRUCTIONTRND IMPLEMENTATION OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS)TRN
LENOIRWAYNE
US 70(GOLDSBOROBYPASS)
2-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 2
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS
R-5703 62858NC 58 TO NC 11. CONSTRUCT MULTI-LANE FACILITY ON NEW LOCATION.
4.2
REG
T 5332R T 640U T C 28443 C 28443
LENOIR NC 148(HARVEY PARKWAY)
FEASIBILITY STUDIES
SCHEDULED FOR FEASIBILITY STUDY
FS-1502A US 70 AND US 258 (QUEEN STREET). CONSTRUCT OVERPASS WITH SQUARE LOOP DESIGN.
0LENOIR US 70
FEASIBILITY STUDY IN PROGRESS
FS-1202A SR 1115 (BOB STROUD ROAD) TO NC 24. WIDEN NC 241 TO MULTI-LANES WITH IMPROVEMENTS TO NC 11 AND NC 24.
DUPLINLENOIR
NC 241
FEDERAL BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4565 15193 15193REPLACE BRIDGE NO. 42 AND BRIDGE NO. 43 OVER NEUSE RIVER. REPLACE BRIDGE NO. 26 AND BRIDGE NO. 28 OVER NEUSE RIVER OVERFLOW.
REG
LENOIR US 70 BUSINESS/US 258 BUSINESS(SOUTH QUEEN STREET)
B-4926 8375 100REPLACE BRIDGE NO. 20 OVER NEUSE RIVER AND BRIDGE NO. 34 OVER NEUSE RIVER OVERFLOW.HF
HFB R 1275 HFB C 7000
LENOIR NC 55
B-4566 7154 4REPLACE BRIDGE NO. 45 OVER NEUSE RIVER.
HF
HFB 650R HFB C 6500
LENOIR NC 903
B-5619 2420REPLACE BRIDGE NO. 152 OVER NEUSE RIVER OVERFLOW.
HF
HFB 220R HFB 2200C
LENOIR SR 1389(HARDY BRIDGEROAD)
B-4569 1004 14REPLACE BRIDGE NO. 68 OVER GROUNDNUT CREEK.
HF
HFB R 90 HFB C 900
LENOIR SR 1515(ALDRIDGE STOREROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5102 11042 9042DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4902 1106 1106ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 2 PROJECT MITIGATION.
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
2-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 2
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5202 6368 6368DIVISION 2 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
ENHANCEMENT (CALL PROJECTS)E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE
WAYSIDE SIGNAGE FOR DESIGNATED SITES.
TRN
STPE 96C O 128C
ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE
VARIOUS
FEDERAL BRIDGE PROJECTSB-5613 3382REPLACE BRIDGE NO. 36 OVER SOUTH
PRONG BAY RIVER.
HF
HFB 305R HFB 2M HFB 3075C
PAMLICO NC 55
B-4593 3368 18REPLACE BRIDGE NO. 38 OVER TRENT CREEK.
HF
HFB R 300 HFB C 3050
PAMLICO NC 55
DIVISION PURCHASE ORDER CONTRACT
B-5616 935REPLACE BRIDGE NO. 37 OVER BRANCH OF TRENT CREEK.
HF
HFB 85R HFB C 850
PAMLICO NC 55
DIVISION PURCHASE ORDER CONTRACT (DPOC)
B-5129 6424 5024REPLACEMENT OF FIVE STRUCTURES ON NC 304 AS A PILOT PROJECT.TRN
STPON 1400C
A NORTH PRONG OF BAY RIVER. REPLACE BRIDGE NO. 24TRNB VANDERMERE CREEK. REPLACE NO. 31 - COMPLETEC LITTLE VANDERMERE CREEK. REPLACE BRIDGE NO. 35 - COMPLETED BEAR CREEK. REPLACE BRIDGE NO. 40 - COMPLETEE GALE CREEK. REPLACE BRIDGE NO. 42 - COMPLETE
PAMLICO NC 304
B-4596 1029 39REPLACE BRIDGE NO. 28 OVER FORK OF BEARD CREEK.
HF
HFB R 90 HFB C 900
PAMLICO SR 1005(NEUSE ROAD)
B-4595 1503 18REPLACE BRIDGE NO. 14 OVER BEARD CREEK.
HF
HFB R 135 HFB C 1350
PAMLICO SR 1005(NEUSE ROAD)
B-4598 1157 117REPLACE BRIDGE NO. 16 OVER FORK OF BAY RIVER.
HF
HFB R 90 HFB C 950
PAMLICO SR 1324(FLORENCE ROAD)
2-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 2
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5102 11042 9042DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4902 1106 1106ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 2 PROJECT MITIGATION.
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5202 6368 6368DIVISION 2 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
RURAL PROJECTSR-5702 1550SR 1110 (HANRAHAN ROAD). UPGRADE
INTERSECTION.REG
T R 300 T C 1250
PITT NC 11
PLANNING/DESIGN IN PROGRESS
R-2250* 242935 10865NC 11 TO US 264 (GREENVILLE BYPASS). CONSTRUCT FOUR LANE DIVIDED FACILITY ON NEW LOCATION WITH BYPASS OF WINTERVILLE.
12.4
TRN
T 27000R R 27000 T 1785U U 1785 T 43625C C 43625 C 43625 C 43625
PITT NC 11/NC 903(GREENVILLESOUTHWEST BYPASS)
URBAN PROJECTSU-5730 233NC 43 (5TH STREET). UPGRADE
INTERSECTION.
REG
NHP R 45 NHP C 188
PITT US 13(MEMORIAL DRIVE)
PLANNING/DESIGN IN PROGRESS
U-2817 35275 2135SR 1711 (WORTHINGTON ROAD) IN WINTERVILLE TO US 264A (GREENVILLE BOULEVARD) IN GREENVILLE. WIDEN TO MULTI-LANES.
3.8
DIV
STP 12840R STP 1500U STP 12533C C 6267
PITT SR 1700(EVANS STREET/OLD TAR ROAD)
U-5870 23755SR 1704 (FOURTEENTH STREET) TO NC 33. WIDEN TO MULTI-LANES.
DIV
STP 2767R R 2768STP 332U U 332STP 17556C
PITT SR 1708(FIRETOWER ROAD)
2-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 2
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS
U-5785 6233NC 43 (CHARLES BOULEVARD) TOSR 1704 (FOURTEENTH STREET). WIDENTO MULTI-LANES.
0.6
DIV
T R 1494 T U 179 T 4560C
PITT SR 1708(FIRETOWER ROAD)
PLANNING/DESIGN AND RIGHT OF WAY IN PROGRESS
U-3315 51700 28400US 13/NC 11 (MEMORIAL DRIVE) TO SR 1702 (EVANS STREET) IN GREENVILLE. CONSTRUCT MULTI-LANES, SOME NEW LOCATION WITH GRADE SEPARATION AT CSX TRANSPORTATION SYSTEM.
1.2
TRN
STP 7767C C 7767 C 7766 PITT STANTONSBURG ROAD/TENTH STREETCONNECTOR
FEASIBILITY STUDIES
FEASIBILITY STUDY IN PROGRESS
FS-1002B NC 11 TO NC 33. WIDEN AND IMPROVE INTERSECTIONS.
PITT US 264(GREENVILLE BOULEVARD)
FEDERAL BRIDGE PROJECTSB-4786 8530 230REPLACE BRIDGE NO. 38 OVER TAR RIVER.
REG
NHPB R 1000 NHPB 2434C2433C2433C
PITT US 13
B-5301 2510 100REPLACE BRIDGE NO. 87 OVER NORFOLK SOUTHERN RAILROAD.
HF
HFB R 460 HFB C 1950
PITT NC 33
BRIDGE PURCHASE ORDER CONTRACT (DPOC): UNDER CONSTRUCTION
B-5418 1146 1146REPLACE BRIDGE NO. 50 OVER JOHNSON MILL RUN.REG
PITT NC 33
B-5612 13990REPLACE BRIDGE NO. 24 OVER TAR RIVER.
REG
T R 666 T 4441C C 4441 C 4442
PITT NC 222
UNDER CONSTRUCTION
B-4787 1791 1791REPLACE BRIDGE NO. 95 OVER JOHNSON MILL RUN.
DIV
PITT SR 1401(OLD RIVER ROAD)
B-4788 851 1REPLACE BRIDGE NO. 171 OVER JOHNSON MILL RUN.
HF
HFB R 75 HFB C 775
PITT SR 1418(STATON HOUSEROAD)
DIVISION PURCHASE ORDER CONTRACT (DPOC)
B-4789 1070 80REPLACE BRIDGE NO. 164 OVER GRINDLE CREEK.
HF
HFB R 90 HFB C 900
PITT SR 1424(ALPINE-TAYLOR ROAD)
B-4603 1050 60REPLACE BRIDGE NO. 29 OVER FORK SWAMP.
DIV
STPOFF R 90 STPOFF 300C300C300C
PITT SR 1715(JACK JONES ROAD)
B-5615 2125REPLACE BRIDGE NO. 6 OVER COW SWAMP.
HF
HFB 200R HFB 1925C
PITT SR 1756(J. C. GALLOWAY ROAD)
B-4605 1601 6REPLACE BRIDGE NO. 5 OVER CHICOD CREEK.
HF
HFB R 145 HFB C 1450
PITT SR 1777(BLACK JACK-GRIMESLAND ROAD)
B-4606 1633 13REPLACE BRIDGE NO. 17 OVER CHICOD CREEK.
HF
HFB R 145 HFB C 1475
PITT SR 1780(BOYDS ROAD)
2-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 2
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
B-4607 2863 5REPLACE BRIDGE NO. 43 OVER SWIFT CREEK.
DIV
STPOFF R 260 STPOFF 866C866C866C
PITT SR 1923(GARDENVILLEROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5102 11042 9042DIVISION 2 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
MUNICIPAL BRIDGE PROJECTS
CITY OF GREENVILLE - MUNICIPAL BRIDGE: RIGHT OF WAY IN PROGRESS
B-5100 777 90REPLACE BRIDGE NO. 421 OVER MEETING HOUSE BRANCH.
DIV
L 137C STPOFF 550C
PITT GREENVILLE(KING GEORGEROAD)
MITIGATION PROJECTS
IN PROGRESS
EE-4902 1106 1106ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 2 PROJECT MITIGATION.
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5202 6368 6368DIVISION 2 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BEAUFORTCARTERETCRAVENGREENEJONESLENOIRPAMLICOPITT
VARIOUS
2-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
COUNTY ID
FUTURE YEARS
F
RR - Rail-Highway SafetyRTAP - Rural Transit Assistance ProgramS - State I - ImpementationS (M) - State Match O - OperationsSMAP - Operating Assistance and State Maintenance Oc - OPS Funded CapitalSRTS - Safe Routes to School PE - Preliminary EngineeringSTAT - State PL - Planning / DesignSTHSR - Stimulus High Speed Rail R - Right-of-WaySTPDA - Surface Transportation Program - Direct AttributableSTPE - Surface Transportation Program, EnhancementsSTPEB - Surface Transportation Program, Enhancements (Bike)T - State Highway Trust FundsT2001 - State Rail FundsTAP - Transportation Alternatives ProgramTIGER DISC - TIGER Discretionary Grants
HP - Federal-Aid High PriorityJARC - Job Assistance and Reverse Commute (3037)
(1) FUNDING CATEGORY
DURHAM AREA
SR - Secondary Road
TRANSIT PARTNERROUTE / CITY /
NUMBER
TA-4738
LOCATION / DESCRIPTION
PASSENGER AMENITIES - BUS STOP TRANSIT AUTHORITY
DIV
SHELTERS, BENCHES, SHOP EQUIPMENTSPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.
CP
BUS STOP SHELTER AND BENCHES LOCATED AT HOLLOWAY STREET
ESTIMATED COST Preliminary engineering, right of
C10000
dollars.)
of a project segment indicates (Cash-Flow Funding)Mitigation, Utilities or Construction.
way, utility, mitigation and construction cost estimates
(2) FUNDING SOURCES KEY
O - OtherL - Local
initial scheduled year. (Estimates are in thousand of
For other work types or activities see Work Type (Activity) box below.
work description. CPProject termini and a general
conception and remains with
9000
PROJECT BREAKS
CP
Various - multiple routes
A
5000
FY 2022
C
CP 3000CP
BCP 5000 B
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FY 2023 FY 2024FY 2021
STATE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2020
TOTAL PROJECT
COST (THOU)
FUZFUZ
FUN
DS
A
PRIOR YEARS COST
(THOU)
ACP 700
FY 2015 FY 2016
4000CP
FY 2025
5000
BB
CP CP 5000B
UNFUNDED
NON HIGHWAY PROGRAM
ADIV
FY 2017 FY 2018
BSHOP EQUIPMENT, SPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.
WORK TYPE (ACTIVITY) (3)Phases of implementation:
DIV C
20000
COMMITMENTSFUTURE
by funding category in current dollars. Cost may include one or more funding types. Multi-year funding
Preliminary engineering, Right of Way, UNFUNDED
BUS STOP SHELTER AND BENCHES LOCATED AT GREGSON AVENUE
with proposed work type or activity beginning in the
break.
One or two letter
CP
A
for an explanation of funding categories
FUNDING CATEGORY (1)
DIV
DIVISION 00
DEVELOPMENTAL PROGRAM
DURHAM
FY 2019
TRANSIT PARTNERROUTE / CITY /
NEW ROUTE or CityTRANSIT PARTNER
IDENTIFICATION NUMBER Assigned to each project at
US or NC RoutesI - Interstate
project until completion.
C - City
FEPD - Elderly and Persons with Disablity (5310)
FMOD - Fixed Guideway Modifications
designation for project
any project breaks.Category for the project and
LOCATION / DESCRIPTION
used for each project phase.
FUNDING SOURCE (2)
Identifies the "STI" Funding
See Highway Funding Key
FSPR - State Planning and Research
FNF - New Freedom ProgramFNS - New Starts - Capital (5309)
FMPL - Metropolitan Planning (5303)
FED - Federal Rail Funds
FLAP - Federal Lands Access Program
FUZ - Urbanized Area Formula Program (5307)
CMAQ - Congestion Mitigation
FF - Federal Ferry
FNU - Non Urbanized Area Formula Program (5311)
(3) WORK TYPE (ACTIVITY)
C - ConstructionAD - Administrative
CP - Capital
A - AcquisitionHF - State Dollars (Non-STI)REG - RegionalSW - Statewide
DIV - Division
DP - Discretionary or DemonstrationFBUS - Capital Program - Bus Earmark (5309)
NON HIGHWAY PROGRAMDIVISION 2
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025AVIATION PROJECTS
AV-5743 3276ACQUIRE LAND FOR AND CONSTRUCT RUNWAY 5-23 EXTENSION AND TAXIWAY.
0
DIV
T C 2948 O C 328
BEAUFORT WARREN FIELD(OCW)
PUBLIC TRANSPORTATION PROJECTSTK-6110 1970 562ADMINISTRATION
HF
FNU 280O O 141 O 141 O 141 O 141 O 141 141O141O141O FNU
BEAUFORT BEAUFORT COUNTYDEVELOPMENT CENTER, INC
TA-6119 605 192CAPITAL
HF
FNU 413CP BEAUFORT BEAUFORT COUNTYDEVELOPMENT CENTER,INC.
TI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY
HF
FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON
GREYHOUND LINES
AVIATION PROJECTSAV-5746 1790FULL PARALLEL TAXIWAY 8-26.
DIV
T C 1611 O C 179
CARTERET MICHAEL J. SMITH FIELD(MRH)
BICYCLE AND PEDESTRIAN PROJECTS
RIGHT OF WAY IN PROGRESS
EB-5500 215 535TH STREET TO 25TH STREET. INSTALL SIDEWALKS ON THE NORTH SIDE.
TRN
STPEB 210C CARTERET US 70(ARENDELL STREET)
FERRY PROJECTS
UNDER CONSTRUCTION
F-5301 980 980CEDAR ISLAND, SOUTHPORT AND FORT FISHER DOCKS. REPLACE DOLPHINS.
TRN
BRUNSWICKCARTERETNEW HANOVER
VARIOUS
PUBLIC TRANSPORTATION PROJECTSTA-6553 158CAPITAL
HF
FNU 126CP L 16CP S 16CP
CARTERET CARTERET COUNTY
TK-6115 1760 734ADMINISTRATION
HF
FNU 426O O 75 O 75 O 75 O 75 O 75 75O75O75O FNU
CARTERET CARTERET COUNTY
TM-6151 100OPERATING
HF
JARC 50O L 50O
CARTERET CARTERET COUNTY
TQ-6799 200OPERATING
HF
FEPD 100O L 100O
CARTERET CARTERET COUNTY
TQ-6155 20OPERATING ASSISTANCE
HF
FEPD 10O L 10O
CARTERET CARTERET COUNTY
2-23 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 2
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS
TA-6540 32ACCESSIBLE INFORMATION KIOSKS AST TERMINAL CENTER FOR INFORMATION BY VARIOUS FORMS INCLUDING BRAILLE AND MULTIPLE LANGUAGESHF
FNF 32CP CARTERETHYDE
NCDOT FERRY DIVISION
BICYCLE AND PEDESTRIAN PROJECTSEB-5727 2090NC 55 TO TRENT CREEK ROAD. CONSTRUCT
MULTI-USE PATH.4.4
DIV
TAP 1672C L 418C
CRAVEN US 17 BUS(MARTIN LUTHERKING, JR. BOULEVARD)
EB-5502 430NC 55 (1ST STREET) TO SR 1309/SR 1402 (GLENBURNIE ROAD) IN NEW BERN. CONSTRUCT SIDEWALK.TRN
STPEB 5R STPEB 425C
CRAVEN NC 55(NEUSE BOULEVARD)
EB-5501 460ELIZABETH AVENUE TO NC 55 (NEUSE BOULEVARD) IN NEW BERN. CONSTRUCT MULTI-USE PATH.TRN
STPEB 5R STPEB 455C
CRAVEN SR 1309(GLENBURNIE ROAD)
EB-5724 450LIBERTY STREET TO LAWSON PARK. CONSTRUCT TIMBER FOOTBRIDGE.
0.1
DIV
TAP 360C L 90C
CRAVEN LAWSON CREEK BRIDGE
FERRY PROJECTSF-5000 800CHERRY BRANCH VISITOR'S CENTER.
REPLACEMENT.TRN
T 800C CRAVEN NC 306
PUBLIC TRANSPORTATION PROJECTSTN-6115 86OPERATING ASSISTANCE
HF
FNF 86O CRAVENJONESPAMLICO
CRAVEN AREA RURALTRANSPORTATION SYSTEM
TO-6102 1210 350OPERATING ASSISTANCE
HF
FNU 172O O 86 O 86 O 86 O 86 O 86 86O86O86O CRAVEN CRAVEN AREA RURALTRANSPORTATION SYSTEM
TO-5204 648OPERATING ASSISTANCE
HF
FUZ O 172 O 152 L O 172 O 152
CRAVEN CRAVEN AREA RURALTRANSPORTATION SYSTEM
TP-5122 20SHORT RANGE PLANNING
HF
FUZ PL 8 PL 8 L PL 2 PL 2
CRAVEN CRAVEN AREA RURALTRANSPORTAION SYSTEM
TA-6182 553 176CAPITAL
HF
FNU 377CP CRAVEN CRAVEN AREA RURALTRANSPORTATION SYSTEM
TC-5100 60MOBILITY MANAGEMENT
HF
FUZ CP 24 CP 24 L CP 6 CP 6
CRAVEN CRAVEN AREA RURALTRANSPORTATION SYSTEM
TG-5165 390Expansion Vans
HF
FUZ CP 166 CP 166 L CP 29 CP 29
CRAVEN CRAVEN AREA RURALTRANSPORTATION SYSTEM
TG-5257 159ADA/PARATRANSIT
HF
L CP 12 CP 20 S CP 48 CP 79
CRAVEN CRAVEN AREA RURALTRANSPORTATION SYSTEM
TG-5256 93PREVENTIVE MAINTENANCE
HF
FUZ CP 36 CP 38 L CP 9 CP 10
CRAVEN CRAVEN AREA RURALTRANSPORTATION SYSTEM
2-24 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 2
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS
TK-6122 4746 1356ADMINISTRATION
HF
FNU 678O O 339 O 339 O 339 O 339 O 339 339O339O339O FNU
CRAVEN CRAVEN AREA RURALTRANSPORTATION SYSTEM
PUBLIC TRANSPORTATION PROJECTSTA-6283 218 172CAPITALHF
FNU 46CP GREENE GREENE COUNTY
TK-6131 1613 463ADMINISTRATION
HF
FNU 230O O 115 O 115 O 115 O 115 O 115 115O115O115O FNU
GREENE GREENE COUNTY
PUBLIC TRANSPORTATION PROJECTSTN-6115 86OPERATING ASSISTANCE
HF
FNF 86O CRAVENJONESPAMLICO
CRAVEN AREA RURALTRANSPORTATION SYSTEM
TA-6204 675 384CAPITAL
HF
FNU 291CP JONESONSLOWPAMLICO
ONSLOW UNITED TRANSIT
TK-6150 3034 866ADMINISTRATION
HF
FNU 432O O 217 O 217 O 217 O 217 O 217 217O217O217O FNU
JONESONSLOWPAMLICO
ONSLOW UNITED TRANSIT
TA-6248 EXPANSION - LIGHT TRANSIT VEHICLE
HF
JONESONSLOWPAMLICO
TRANSPORTATION ADMIN.
PUBLIC TRANSPORTATION PROJECTSTA-6130 859 249CAPITALHF
FNU 610CP LENOIR LENOIR COUNTY
TK-6178 3694 1048ADMINISTRATION
HF
FNU 550O O 262 O 262 O 262 O 262 O 262 262O262O262O FNU
LENOIR LENOIR COUNTY
TM-6154 110SECTION 5316 OPERATING
HF
JARC 55O L 55O
LENOIR LENOIR COUNTY
PUBLIC TRANSPORTATION PROJECTSTN-6115 86OPERATING ASSISTANCE
HF
FNF 86O CRAVENJONESPAMLICO
CRAVEN AREA RURALTRANSPORTATION SYSTEM
TA-6204 675 384CAPITAL
HF
FNU 291CP JONESONSLOWPAMLICO
ONSLOW UNITED TRANSIT
TK-6150 3034 866ADMINISTRATION
HF
FNU 432O O 217 O 217 O 217 O 217 O 217 217O217O217O FNU
JONESONSLOWPAMLICO
ONSLOW UNITED TRANSIT
2-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 2
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS
TA-6248 EXPANSION - LIGHT TRANSIT VEHICLE
HF
JONESONSLOWPAMLICO
TRANSPORTATION ADMIN.
BICYCLE AND PEDESTRIAN PROJECTS
RIGHT OF WAY IN PROGRESS
EB-5539 2116 313SOUTH TAR RIVER GREENWAY. PHASE 3: PITT STREET TOWARD MOYE BOULEVARD IN VICINITY OF PITT MEMORIAL HOSPITAL. CONSTRUCT GREENWAY USING EXISTING SIDEWALKS, ROADS AND ON NEW LOCATION ALONG THE RIVER.TRN
DP 60R L 15R DP 660C L 165C STPEB 903C
PITT GREENVILLE
PLANNING, DESIGN, RIGHT OF WAY, AND CONSTRUCTION BY CITY OF GREENVILLE
EB-5618 750PROVIDE PEDESTRIAN CROSSWALK IMPROVEMENTS AT MULTIPLE INTERSECTIONS.
1TRN
STPEB 750C PITT GREENVILLE
RIGHT OF WAY IN PROGRESS
EB-4996 1718 1718GREEN MILL RUN GREENWAY, CHARLES BOULEVARD TO EVANS PARK. CONSTRUCT GREENWAY.TRN
PITT GREENVILLE
PUBLIC TRANSPORTATION PROJECTSTA-4965 4330 950REPLACEMENT BUS
HF
FBUS FUZ 560CP CP 2144 L 140CP CP 268 S CP CP 268
PITT GREENVILLE AREA TRANSIT
TD-4716 8100 2869FACILITY - INTERMODAL CENTER - LAND, PLANNING, DESIGN, CONSTRUCTION
HF
FBUS FUZ 4185CP L 523CP S 523CP
PITT GREENVILLE AREA TRANSIT
TG-4767 7738 1980ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC
HF
FUZ 1064CP CP 551 CP 565 CP 580 CP 594 CP 601 601CP601CP601CP PITT GREENVILLE AREA TRANSIT
see amendment #1 to 2012-2018 STIP
TG-5107B 8717 2025PREVENTIVE MAINTENANCEHF
FUZ 1266Oc Oc 656 Oc 673 Oc 690 Oc 707 Oc 675 675Oc675Oc675Oc PITT GREENVILLE AREA TRANSIT
TG-5107C 2334 439OPERATING ASSISTANCE - ADA PARATRANSIT SERVICEHF
FUZ 411Oc Oc 213 Oc 218 Oc 224 Oc 229 Oc 150 150Oc150Oc150Oc PITT GREENVILLE AREA TRANSIT
see amendment #1 to 2012-2018 STIP
TO-4726 18975 5542OPERATING ASSISTANCE
HF
FUZ 1733O O 1298 O 980 O 1057 O 1080 O 1080 1080O1080O1080O SMAP 577O O 341 O 350 O 322 O 275 O 275 275O275O275O
PITT GREENVILLE AREA TRANSIT
TP-5107 443 131PLANNING ASSISTANCE - 5303HF
FMPL 66CP CP 33 CP 33 CP 33 CP 33 CP 33 27CP27CP27CP PITT GREENVILLE AREA TRANSIT
TP-5107A 200 100PLANNING ASSISTANCE - 5 YEAR PLANHF
FUZ CP 100 PITT GREENVILLE AREA TRANSIT
TS-5112 177 72SAFETY & SECURITYHF
FUZ 30CP CP 15 CP 15 CP 15 CP 15 CP 15 PITT GREENVILLE AREA TRANSIT
2-26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 2
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS
TI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY
HF
FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON
GREYHOUND LINES
TA-6134 717 546CAPITALHF
FNU 171CP PITT PITT COUNTY
TA-9002 97CAPITAL - PURCHASE OF SERVICE
HF
FEPD 77CP L 10CP S 10CP
PITT PITT COUNTY
TK-6154 2524 718ADMINISTRATION
HF
FNU 366O O 180 O 180 O 180 O 180 O 180 180O180O180O FNU
PITT PITT COUNTY
2-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project