geoharbour middle east construction llc prequalification ... pre-qualification.pdf · geoharbour...
TRANSCRIPT
1 / 70
GEOHARBOUR MIDDLE EAST CONSTRUCTION LLC
PREQUALIFICATION DOCUMENT
P. O. Box: 391662, Dubai – U.A.E. | Tel: +971 4 383 1577 | Fax: +971 4 383 1576 | E-mail: [email protected] | www.geoharbourme.com
P. O. Box: 5100648, Abu Dhabi – U.A.E. | Tel: +971 2 5102400 Ext.212 | Fax: +971 2 5589961
Member of Shanghai Geoharbour Group
2 / 70
CONTENTS
1. QUALITY POLICY STATEMENT……………………………………………………………..3
2. GENERAL CAPCITY………………………………………………………………………………4
3. SERVICE PROVIDED…………………………………………………………………………….6
3.1 Soft Ground Improvement
3.2 Piling & Foundation Engineering
3.3 Geotechnical Design & Consulting
3.4 Geotechnical Package Solution
3.5 Dredging & Reclamation
4. EQUIPMENT DETAIL……………………………………………………….………………..…7
5. PROJECT APPROVALS……………………………………………………………………..…10
6. STAFF CAPACITY……………………………………………………………………………..…16
7. MAJOR PROJECTS………………………………………………………………………….….17
APPENDIX 1- ORGANIZATION CHART…………………………………………………..….22
APPENDIX 2 - COMPANY LICENSE – DUBAI………………………………………….…..23
APPENDIX 3 - DUBAI CHAMBER – MEMBERSHIP CERTIFICATE……………….…24
APPENDIX 4 - DM – ENGINEER MEMBERSHIP CARD …………………………...25
APPENDIX 5 - COMPANY LICENSE – ABU DHABI…………………………………….…26
APPENDIX 6 – GEOHARBOUR MIDDLE EAST ISO CERTIFICATES……………….…27
APPENDIX 7 – GEOHARBOUR GROUP CERTIFICATES ……………………….…….….30
3 / 70
1. QUALITY POLICY
4 / 70
2. GENERAL CAPACITY
Geoharbour Middle East Construction LLC was established in the year of 2013 in the Emirate of Dubai as one of
the leading companies in the UAE and particularly for Soft Ground Improvement and Piling & Foundation works.
We are a member of Shanghai Geoharbour Group, which is a global professional entity, specializing in
geotechnical investigation, consultancy, design, research and construction. Furthermore we have recently been
appointed as the Chief Editor of China Code of Reclamation Soil Treatment and the Director member of Technical
Committee of China Soft Soil Treatment.
Geoharbour Middle East Construction main activities are but not limited to the followings:
1. Soft Ground Improvement
2. Piling & foundation Engineering
3. Geotechnical design & consulting
4. Geotechnical package solution
5. Dredging & Reclamation
As a professional entity, over the past 10 years we have completed more than 200 mega projects and concluded a
soil improvement for more than 10,000 hectares, used in preparation for the construction of infrastructure works
for the following projects:
Airport: Shanghai Pudong Int'l Airport ( 2nd & 3rd runway, total 2.22 million m2 ), Hongqiao Airport,
Ningbo Airport etc..
F1 runway: Shanghai Formula One runway.
Harbour & Ports: Shanghai Port (Phase II-IV, total 5 million m2 ), Ningbo Port, Changshu Port, Jing Tang
Gang Port etc..
Railways: Shanghai Lingang Railway, Qiancao Railway, Hanyi Railway etc..
Highway & Expressway: Qinglvbei Road in China, North-South Expressway in Vietnam etc..
Petrochemical works: Qingdao Grand Refinery, Huangdao 100,000 m3 Oil Tanks etc..
Power Plant: Shanghai Caojing Power Plant, Indonesia Teluk Naga Power Plant, Vietnam Nhon Trach 2
Power Plant etc..
Logistic Facilities: US PROLOGIS, China Tongsheng Logistics etc..
Industrial Plants: China Midea, Asia Aluminum, Tianjing Qinmeida etc..
Industrial Zone: CAOFEIDIAN industrial zone ( the Largest zone in China - 310 Sq. Km), Qingdao
Industrial Zone etc..
... ...
5 / 70
Geoharbour has its own Design Institute and all the engineering companies which are distributing in China main
land and Southeast Asia countries, Indonesia, Malaysia, Vietnam etc. and Middle East, have recently moved to
their new set up in Dubai.
We have given a great priority and importance to R&D and we have patented our technology beyond 30 cases.
HVDM series (High Vacuum Densification Method) are the most typical patents. They are the green technology,
which already contributed to the society by saving over tens of millions tons of cement which subsequently
resulted in huge reduction CO2 emission. Based on this contribution, Geoharbour won three International awards
in 2012, The World 10th Bogsch Memory Medal, The WIPO Award for Inventors, the Green Invention Glory Medal.
6 / 70
3. SERVICE PROVIDED
Services provided by the company may be summarized as follows.
a.Soft Ground Improvement on EPC basis
High Vacuum Densification Method(HVDM)
Dynamic Compaction
Vibro Compaction (Vibro flotation)
High Energy Roller Compactor
Dynamic Replacement
Stone Column
Deep Soil Mixing
Prefabricated Vertical Drain (PVD)
Vacuum preloading
HVDM with Preloading
HVDM with Composite Foundation
Soil Nailing
Pressure Grouting
b.Piling and foundation engineering on EPC basis (Design & Build)
All types of bored and driven piling works
Micro Piling ,Anchors , Soil Nailing works
Under Pinning works, Tube-a-manchette Grout Injection and Compaction Grouting works
Reinstate of old structures foundations
Pile breaking , Guide wall constructions , Steel cage fabrications, Fencing works , site hoardings , site sign
boards , pile head repairing works , pile repairing works , excavation and cart away
Plant & equipment hire / sub-contract
All types of shoring works:
* Secant Wall
* Diaphragm Wall
* Contiguous Wall
* Soldier Piles
c. Geotechnical design & consulting
We offer the geotechnical design & consulting service for Industrial, Municipal infrastructure works, such
airport, harbor, highways, oil tank, petrochemical plants, power plants, steel plants, aluminum plants etc. .
d.Geotechnical package solution
We offer the service for projects total geotechnical solution throughout the various phases of preliminary
case study, budget plan, design stage and project implementation.
7 / 70
e. Dredging & Reclamation
We offer the best solution for our clients based on the suitable trailing suction hopper dredger or cutter
suction dredger or grab dredger based on the project requirements through the excellent project management
team professional service.
4. MAJOR EQUIPMENTS DETAILS
No.Construction
EquipmentCapacity
Name of
ManufactureModel No. Quantity
Average
Age
1Self-propelled trailing
suction dredger6000m3 China - 1 2010
2Cutter suction
dredger3500m3 China - 1 2008
3Cutter suction
dredger1250m3 China - 2 2009
4 Grab dredger 8 m3 China 1 2009
5 Hydraulic Excavator 0.8 m3 HITACHI ZX200 3 2009
6 Hydraulic Excavator 0.8 m3 Kobelco SK200 2 2009
7 Hydraulic Excavator 0.8 m3 Komatsu PC200 3 2010
8 Hydraulic Excavator 0.8 m3 Doosan DH215 2 2009
9 Hydraulic Excavator 0.9 m3 Hyundai R215 2 2010
10 Generator 100KW CUMMINS GF100 4 2010
11 Generator 200KW CUMMINS GF200 6 2010
12 Generator 250KW CUMMINS GF250 4 2009
13 Generator 300KW NISSHA NES300EH 8 2008
14 Crane 50T FUWA QUY50A 3 2008
15 Crane 50T FUWA QUY50B 4 2009
16 Crane 50T FUWA QUY50C 2 2010
17 Crane 50T HITACHI KH180 2 2009
18 Crane 50T SANY SCC500E 6 2011
19 Crane 55T YUTONG YTQU55 1 2010
8 / 70
20 Crane 70T SANY SCC700E 3 2011
21 Crane 70T ZOOMLION ZTM300 1 2010
22Dynamic compaction
machine351T.m SANY SQH321 9 2011
23Dynamic compaction
machine300T.m FUWA QUYS013 6 2012
24Dynamic compaction
machine450T.m YUTONG YTQH450A 20 2015-2016
25Dynamic compaction
machine350T.m YUTONG YTQH350A 8 2011
26Deep cement mixing
machine45KW China STB-II 20 2010
27 Vibrofloation head 30KW China ZCQ30 20 2011
28 Vibrofloation head 55KW China ZCQ55 18 2011
29 Vibrofloation head 55KW China BJV55E-325 20 2012
30 Vibrofloation head 75KW China ZCQ75 60 2010
31 Vibrofloation head 75KW China BJV75E-325 20 2011
32 Vibrofloation head 90KW China BJV90E-377 18 2012
33 Vibrofloation head 100KW China ZCQ100 20 2012
34 Vibrofloation head 130KW China BJ377-130KW 12 2012
35 Vibrofloation head 180KW ChinaBJ402/426-180K
W200 2014-2015
36 HVDM PUMP 15KW China SK-6 5000 2010
37 HVDM PUMP 7.5KW China 7.5KW 3000 2012
38 Vacuum pipe 3m-8m China Dia.32.5mm 4000T 2012
39 Bulldozer 5m3 Xuanhua T165-2 2 2010
40 Bulldozer 5m3 PENGPU PD140-2 2 2011
41 COMPACTOR 20T XCMG XS202J 2 2009
42 COMPACTOR 10T INGERSOLL SD-100D 2 2007
43 Vibro Hammer 33T TAIWAN 250C 6 2010
44 Vibro Hammer 30T HONG KONG 2000HP 10 2010
9 / 70
45 Vibro Hammer 35T HONG KONG 2500HP 10 2011
46 Piling machine 6T
China
(PiLECO
hammer)
6T-15C 1 2011
47 Piling machine 8T
China
(PiLECO
hammer)
8T-15C 8 2012
48Hydraulic
RotaryDrilling Rig
Deep:90m(
max.)
Dia.:2m(ma
x.)
YUTONG YTR280D 6 2012
49 Reverse C Drill
Drill
Dia.:2.8m,
Depth:80m
China GPS-28 4 2011
50 Reverse C Drill
Drill
Dia.:2.8m,
Depth:150
m
China ZJD2800/180 3 2012
51 Drilling Jumbo
Hole
Dia.:27-45m
m
Hole
Depth(once
):2.1m
China DF10-BCD 12 2008
52Shotcrete spraying
pump5.5KW China FZ-5 4 2009
53 Grouting pump 14L/min China ZBQ 10 2009
54 Grouting pump 88L/min China ZBY 10 2010
55 Probing instrument - China TGP206 1 2009
10 / 70
5. PROJECT APPROVALS
11 / 70
12 / 70
13 / 70
14 / 70
15 / 70
16 / 70
6. STAFF CAPACITY
Job List Nos. Remark
Management 146 Board of Directors, Marketing, Finance, HR, etc.
Permanent
Employees
Project Manager 78
Coordinate Related Works
Take Responsibilities for Overall Cost, Schedule, Quality of
Project
Administrators 104 Project Planning, Cost Management, EPC Coordination,
Other Administrative Work
Engineers *1 92 Prepare, Review and Apply Design Datum
Field Supervisors *2 186 Field Construction Control, Craftsmen Control
QA/QC, Safety 82 Quality Assurance, Safety Directing, etc.
Craftsmen *3 488 Field Work, Equipment Operation
Others 77
Total 1153
Note: Craftsmen less than 3 years experience are not including the list.
17 / 70
7. MAJOR PROJECT LIST
Soft soil improvement projects in overseas
No. Project name Client TimeArea
(Ha.)
Site
Location
1Ground Improvement for Bawabat Al
Sharq Villas Phase 3
Baniyas
Investment &
Development
Consultant:
AECOM
2014 9.35Abu
Dhabi-UAE
2
Ground Improvement for South Tank
Forms, Jazan & Refinery & Terminal
Project
Saudi Aramco
Main
Contractor:
Petrofac
20142.2 (2
Tanks)Jazan, KSA
3Ground Improvement for Deira Island
Project
Wade Adams
Contracting
L.L.C.
2015 74.4Dubai,
UAE
4Ground Improvement for Ramada
Kuwait Hotel in Palm Jumeirah
Dubai Civil
Engineering
L.L.C.
2015 3.4Dubai,
UAE
5Soil Improvement Works at Al Barsha
1st, Dubai-UAE.
Universal Piling
Foundation2016
Stone
Column
Dubai,
UAE
6
Ground Improvement Works for
Proposed Sorting Post Office at Hidd
Industrial Area in Bahrain.
Public Works
Ministry2016
Stone
Column
Kingdom
of Bahrain
7Soil Improvement Works at The World
Islands Dubai, UAE
The Heart Of
Europe2016
Vibro
Compac
tion
Dubai,
UAE
8
Ground Improvement Works for P148
Lagoons District Phase-1 CO3 Enabling
Works Located in Sadiyat Island, Abu
Dhabi- U.A.E.
Western
Bainoonah
Group
Ongoing
Dynamic
Compact
ion
Abu Dhabi,
UAE
9
Carryout Installation of Stone Columns
for Multistory Car Park in Adliya
Kingdom of Bahrain. , till Maximum of
6.50m deep as per approved design
and drawings with specifications in
Bahrain.
Public Works
Ministry2016
Stone
Colum
Kindom of
Bahrain
10Land Preparation Works For Changi
Airport Terminal 5,Singapore
Ministry of
Transport,
Singapore
2014.12.Ongoing 64 Singapore
18 / 70
11Soil Improvement of PLTU 3 BANTEN
3×315MW Power PlantPLN 2008-2009 45
Indonesia
12Soft Soil Improvement of Dinh Vu
Polyester Plant ProjectPVTEX 2009 42
Vietnam
13Soft Soil Improvement of Nhon Trach II
Combined Cycle Power PlantPVN 2009 32
Vietnam
14Soft Soil Improvement of LPG
Refrigerated Storage Tank ProjectPV GAS 2009-2010 35
Vietnam
15Soft Soil Improvement of Duyen Hain 1
thermal Power PlantEVN 2011-2012 52
Vietnam
16Soft Soil Improvement of Long Phu 1
thermal Power PlantPVN 2011-2012 69
Vietnam
17Soft Soil Improvement of THAI BINH 2
THERMAL POWER PLANT 2 x 600MWPVN 2011-2012 30 Vietnam
18Soft Soil Imporvement of Tapin Coal
Yard Terminal Project
PT. Tapin Coal
Terminal2011-2012 42
Indonesia
19
North-South Expressway Construction
Project HCMC-Dau Giay Section,
Package No.3
Vietnam
Expressway
Company
2012-2013 11Vietnam
20Soil Improvement of Formosa Ha Tinh
Steel Plant
Formasa Ha
Tinh Steel
Co.,Ltd
2012-2015 500Vietnam
21Soft Soil Improvement of PLTU1
KAILIMANTAN TENGAH(2×60 MW)PLN 2011-2013 35 Indonesia
22 Tarahan Coal Yard BUKIT ASAM 2012 30 Indonesia
Soft soil improvement projects in China
NO. PROJECT NAME DATEArea
(Ha.)Remark
1Shanghai Port
WaigaoqiaoⅡRoads &Stack yards
98.05~98.10 100 HVDM
2Shanghai Port Waigaoqiao
Ⅲ Roads & Stack yards02.02~02.05 80 HVDM
3Shanghai Waigaoqiao
welding platform02.07~02.10
1#~4#Platform
HVDMfk>210kPa
4Changsu PortⅡRoads,
Stack yards & wareshouse02.4~02.10 20 HVDM
19 / 70
5Shanghai Port Waigaoqiao
Ⅳ Roads & Stack yards03.02~03.10 160
HVDMShanghai Science Committee appraised
this case reaching International advancedlevel
6Shanghai Port Waigaoqiao
Ⅴ Roads & Stack yards04.01~04.12 80 HVDM
7Shanghai Pudong Int’l
Runway No.203.06~03.12 111
HVDM
Awarded “ No.1 in China”,“ Much betterthan design
requirement ”,Post-settlement<10cm,differential settlement<1/1000
8Changsu Port Ⅲ Roads,
Stack yards & wareshouse03.12~04.03 30 HVDM
9Shanghai Dongfang Oil
tank base03.07~03.10 12 Tanks HVDM
10Ningbo Beilun port Ⅲ
Roads, Stack yards03.08~04.01 46
HVDMAwarded Science No.1 Medal
11Guangdong Ao-Li-oil
power plant03.08~03.11 32
HVDM
12Shanghai FTZ container
park04.01~04.06 103
HVDM
13Qigong Binghai Industry
Park road05.05~05.08 20
HVDMfak≥135kPa
14Sinopec Qingdao Refining
factory06.01~06.04 70
HVDM
15Shanghai Chemical Park Ⅱ
roads04~06 600
HVDM
16Shanghai Lingang New city
roads03~05 400 HVDM
17Guangdong Nansha power
plant05.12~06.05 16 Surcharge Preloading with HVDM
18Shanghai Gas company
West part reclaimed land05.08~05.10 57.5
HVDM
fak120kPa
19Huangdao Oil Tank (old
area)06.01~06.05 130
HVDM
fak120kPa
20Huangdao Oil Tank
(100,000m3)06.01~06.05 150 HVDM
21Shanghai Lingang Dianqi
road & warehouse06.01~06.05 100 Surcharge Preloading with HVDM
22Qingdao Refining park
roads & factory area06.01~06.04 52
HVDM
fak160kPa
23 Qingdao West EPZ road 06.10~07.02 70 HVDM
24Zhongtie Baoqiao
Yangzhou06.07~06.10 120 HVDM
25
Qingdao Kaifaqu
HongshiyaNo.6,No11
projects
07.05~07.07 110
HVDM
26 Zhuhai Qinglv N. Road 06.11~07.08 32 Surcharge Preloading with HVDM
20 / 70
27Ningbo Port Zhenhai
project No.406.12~07.06 30
HVDM
28Ningbo Port Zhenhai Coal
stock project07.01~07.08 61 HVDM
29Ningbo Beilun Port Ⅳ
project07.02~07.07 78
HVDM
30Ningbo Konggang
LogisticⅠproject07.01~07.07 80 Surcharge Preloading with HVDM
31Jiangxing Liangshi
warehouse & port project07.08~07.10 80 HVDM
32Qiancao trainway 2
sections07.12~08.10 40
HVDM
33Qingdao Hi-tech area
Avenues08.08`09.02 123
HVDM
34Shanghai
BaosteelⅠproject08.08~09.03 100 Surcharge Preloading with HVDM
35Shanghai Caojing Power
Plant07.03~07.09 50 HVDM
36Caifeiding industry park
roads07.12~ Till now 300 HVDM
37Guangxi Qinzhou Baoshui
port09.02~ Till now 484
HVDM
38Ningbo Beilunshan Port
and Meishan Gang project08.9~ 09.04 30 HVDM
39Hebei Changzhou Material
field project08.10~08.05 48.2 HVDM
40Qingdao Hi-tech Park 8
Roads09.03~ Till now 48
HVDM
41Wujiang Development
Zone
09.07 ~ Tillnow
200 HVDM series
42Liaoning SAIGE Industry
Park09.08~09.11 10 HVDM
43 JIANGYIN Port 09.09~10.01 47 HVDM
44 WUHAN Port 09.11~09.12 10 HVDM
45 Qingdao Oil Refining 10.01~10.4 15 HVDM SERIES
46 ZHANGJIAGANG PORT 10.04~10.07 20 HVDM
21 / 70
47JIANGYIN LINJIANG
STORAGE BASE10.05~10.07 15 HVDM
48 JINTANG GANG PORT 10.06~till now 100 HVDM
49 SHANGYU Industrial Zone 10.06-till now 200 HVDM
50Qidong Lvsi Binhai
Municipal roads10.9-till now 70 HVDM
……
Major projects of dredging & piling
No. Project name Location Size Main Contractor/Owner
1Dredging work of Laizhou Port in
Shandong ProvinceLaizhou, China 5,270,000m3 Shandong Government
2
First phase of Huaneng Haimen Power
Plant, Unit 1& Unit 2 (2×1000MW) port
basin and channel dredging work
Haimen,China 3,800,000m3 Huaneng Group
3Desilting and dredging work of Lake
Dian of KunmingKunming,China 8,000,000m3 Yunnan Government
4 Formosa Ha Tinh Steel millHa Tinh,
Vietnam1,000,000m
Formosa
(PHC pile)
5 C360 Package for Macau Light Metro Macau 43,000m
Continental Engineering
Company
(Bored pile)
6Banten 3X335MW Power Plant,
Indonesia
Telu
Naga,Indonesia3,6000m
PLN
(PHC pile)
7 Shanghai Lingang New City Shanghai, China 12,500mShanghai Government
(Bored pile)
……
22 / 70
General Manager
Contracts & Estimation Depart.
Project Implement Depart.
Admin. & HR Depart.
Chief Engineer
Financial Depart.
Business Deve. Depart.
QHSE Depart.
Business Deve. Manager
Contracts & Estimation Manager
Accounts Manager
Accountants
Contracts Engineer
QA&QC Manager Safety Manager
Admin. & HR Manager
Operations Depart.
Operational Manager Technical Manager
Procurement Manager Project (Site)
Snr. Project Manager
Project Mangers
Site Engineers
Foreman
Skilled Labors
Helpers
Procurement Assistant
Estimation Engineer
Quantity Surveyor
APPENDIX 1- ORGANIZATION CHART
23 / 70
APPENDIX 2 - COMPANY LICENSE – DUBAI
24 / 70
APPENDIX 3 – DUBAI CHAMBER-MEMBERSHIP CERTIFICATE
25 / 70
APPENDIX 4 DUBAI MUNICIPALITY – ENGINEER MEMBERSHIP CARD
26 / 70
APPENDIX 5 COMPANY LICENSE – ABU DHABI
27 / 70
APPENDIX 6 – GEOHARBOUR MIDDLE EAST ISO CERTIFICATES
ISO 14001:2004 ENVIRONMENTAL MANAGEMENT SYSTEM
28 / 70
BS OHSAS 18001:2001 OCCUPATIONAL HEALTH AND SAFETY
29 / 70
ISO 9001:2008 QUALITY MANAGEMENT SYSTEM
30 / 70
APPENDIX 7 – GEOHARBOUR GROUP CERTIFICATES & MEMBERSHIP CARDS
TRAKHEES IN UAE – MEMBERSHIP CARD
31 / 70
LICENSE OF GEOHARBOUR INDONESIA
32 / 70
33 / 70
LICENSE OF GEOHARBOUR VIETNAM
34 / 70
LICENSE OF GEOHARBOUR MALAYSIA
35 / 70
LICENSE OF SHANGHAI GEOHARBOUR CONSTRUCTION (GROUP) CO., LTD.
36 / 70
37 / 70
38 / 70
39 / 70
40 / 70
41 / 70
SHANGHAI SCIENCE & TECHNOLOGY AWARD FOR HVDM INVENTION
42 / 70
43 / 70
Excellent Award for the Invention of HVDM
44 / 70
45 / 70
GEOHARBOUR PATENTS in China
46 / 70
GEOHARBOUR PATENTS in China
47 / 70
GEOHARBOUR PATENTS in USA
48 / 70
GEOHARBOUR PATENTS in Japan
49 / 70
GEOHARBOUR PATENTS in Australia
50 / 70
GEOHARBOUR PATENTS in Indonesia
51 / 70
GEOHARBOUR PATENTS in Indonesia
52 / 70
GEOHARBOUR PATENTS in Malaysia
53 / 70
GEOHARBOUR PATENTS in Malaysia
54 / 70
GEOHARBOUR PATENTS in Vietnam
55 / 70
GEOHARBOUR PATENTS in Vietnam
56 / 70
GEOHARBOUR PATENTS in India
57 / 70
GEOHARBOUR PATENTS in Egypt
58 / 70
GEOHARBOUR PATENTS in UAE
59 / 70
GEOHARBOUR PATENTS in South Africa
60 / 70
61 / 70
62 / 70
63 / 70
64 / 70
65 / 70
66 / 70
67 / 70
68 / 70
69 / 70
MUSANADA REGISTRATION
70 / 70
DEPARTMENT OF MUNICIPAL AFFAIRS AND TRANSPORT REGISTRATION