prequalification - petro team commercial prequalification-201511.pdf · prequalification reliable...

62
DONG-O FLANGE PREQUALIFICATION Reliable Company, Dong-O Flange DONG-O FLANGE CO., LTD 1

Upload: vodan

Post on 10-Jun-2018

273 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

PREQUALIFICATION

Reliable Company, Dong-O Flange

DONG-O FLANGE CO., LTD

1

Page 2: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

GREETING

It is our great pleasure to our customers Dong-O Flange Co., Ltd. Since its

establishment in 1989, our company has furnished with modern state-of-the-art

equipment and facilities, with a lot of experience and accumulation of technology.

We provides customers with a variety of high quality flanges in the fields of heavy

industry, such as ship-building, petro-chemical plants, power plants and others.

As a result of our efforts, we achieved award in the Quality Division from Doosan

Mecatec and gained ISO9001 certification and ISO14001 certification for systematic

Quality Management and Environmental Management.

Our company does business with DOOSAN MECATEC, SEWON CELLONTEC,

DAE KYUNG MACHINERY & ENGINEERING AND S&TC which have manufactured

heat exchanger and pressure vessel for a long time. Besides we have exported

flanges around the world such as Japan and Germany and then we have received

recognition about our highest standard of quality and superb technology from our

customers.

2

Page 3: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE 3 3

Brief Introduction

Our company has achieved impression through the best quality and best delivery.

All the staff and administration will do the best in order to become top global

company about flange business area of 21C through a higher value-added business

and high-tech advances

Ok youl , Choi / President

Page 4: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Contents

1. General Information

2. Production

3. Quality Management & Control

4. Experience List

5. Subsidiaries

4

Page 5: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Customer Satisfaction

Elimination regarding

inferior goods and

wastefulness through

continuous improvements.

Quality achievement of

world best and ensuring

competitive power

Latest technical

development/creation

of higher value-added

business

Strategy for Ensuring Competitive Power

Scientific Problem Solving

21C

Re-Spring

Customer-Centered Management Philosophy

Who is my customer?

What do customers want?

Management Philosophy & Vision

Establishing restructuring strategies in order to

ensure competitive of world best

*Decision making with data and measurement

*Suggestion for fundamentally solving method

about the cause of the problem

5

Page 6: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Company History

6

Oct. 2015 : Kuwait National Petroleum Company(KNPC), registering vendor

Oct. 2015 : Malaysia Labuan Shipyard & Engineering, registering vendor

Nov. 2014 : PETRONAS, registering vendor

OCT.2011 : L&T Piping center, registering the vendor

Mar.2011 : SNC Lavalin, registering the vendor.

Aug.2010 : LURGI, SASAKURA ENG., Doosan Heavy I&C, registering the vendor.

Mar.2010 : Aba Dhabi Oil Refining Company (TAKREER), registering the Vendor

Jul.2009 : Factory moved and extended to Haman (31,750 ㎡)

Oct.2008 : Acquired environment management system ISO14001

Aug.2007 : Acquired quality management system ISO9001

Nov.2006 : Deposite & Overlay W/D system installed

Feb.2006 : Acquired certificate (Mister of the Ministry of Commerce,Industry and Energy)

Nov.2005 : Moved to the industrial base in #61-1,Woongnam-Dong,Changwon city

Mar.2004 : Established corporate( Dong-O Flange)

Apr. 2003 : Achieved award in the Quality Division from Doosan Mecatec.

Dec.2000 : Achieved a plaque of the thanks from Korea Flange (Quality Division)

Apr.1993 : The 2nd Factory of Dong-O Flange found

Nov.1989 : Opened Masan agency of Korea Flange.

Page 7: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Company Organization

P

R

E

S

I

D

E

N

T

Administration Support

No of Staff TEAM DIVISION

Flange Business Division

Administration Team

Sales Team

Quality Assuarance Team

Procurement Team

Production Management Team

Production Team

6

6

4

2

5

15

Personnel ; Administration 6, Sales 6, Technical 11 , Production 15 Total - 39

7

Page 8: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Office & Plant Area

- Factory Site Area : 31,750 ㎡

- Total Indoor Workshop Area : 10,400 ㎡

- Office Area : 2,650 ㎡

8

Page 9: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Major Clients(Korea)

DAEKYUNG MACHINERY & ENGINEERING CO., LTD

Doosan Engineering & Construction

SEWON CELLONTECH CORP.

S & T Corporation.

9

Page 10: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Major Clients(Overseas)

L&T MHI Boilers Private Limited / India

L&T Power Limited / India

National Oil & Gas Company of Malaysia

10

Abu Dhabi Oil Refining Company / UAE

MSET Eng. Corp. Sdn Bhd / Malaysia

Kuwait National Petroleum Company / Kuwait

Page 11: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Supplier for Material

Taewoong Co., Ltd.

Korea Forging Co., Ltd.,

Posco Specialty Steel Co., Ltd.,

11

Taesang Co., Ltd.

Mysco Co., Ltd.

Page 12: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Company Location

Address: 295-1 Daechi-ri Chilseo-myeon Haman-gun Gyeongsangnam-do, Korea.

TEL. : 82–55 – 589 – 2024

FAX : 82- 55 – 589 – 2049

E-mail : [email protected]

Contact : Dae Hyun Kwon (sale Assistant Manager)

12

Factory map

Page 13: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Contents

1. General Information

2. Production

3. Quality Management & Control

4. Experience List

5. Subsidiaries

13

Page 14: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Products

Applicable standard : ASME,ASTM,ANSI,API, MSS, AWWA,DIN, JIS etc.

WELDING NECK SLIPㅡON BLIND LAP JOINT

THREADED SOCKET WELDING

ORIFICE

LONG WELDING NECKS

KS & JIS

RING JOINT

NOZZLE SPECTACLE

14

Page 15: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Products

Applicable standard : ASME,ANSI, ASTM,API, MSS, AWWA, DIN,JIS etc.

TOWER TUBE SHEET FORGED RING DRIVE WHEEL

BLEED RING SHAFT REDUCER FORGED NECK

15

Page 16: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Manufacturing Process

We Dong-O flange Co., Ltd., always provide our customers with high quality products

which conform to international codes and standards.

Our 20 years experience in the flange market improve the efficiency of each process for

better quality, quicker delivery and lower costs, all to meet the requests for customers. Our

excellent quality control engineers control all processes from initial inquiry to design,

material purchase, manufacturing and testing.

Our ultra modern laboratory facilities for the Quality Assurance include universal test

machines for physical property testing, impact tester, hardness tester, emission

spectrometer, ferrite tester, surface roughness tester etc. Such latest equipment is manned

by superb engineers and well-trained technicians.

Dong-O Flange will continue total effort to supply top quality products for worldwide

clients.

16

Page 17: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Manufacturing Process

17

6 ton Air Drop Hammer

2500 ton Press

Heat Furnace

Heat Treatment Lathe Marking

Band Saw Cutting

Gas Cutting

Packing /Finished Product

Slab

Bloom

Ingot

Page 18: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Manufacturing Equipments

18

NO. Equipment Specification&Capacity Q'ty Maker

1 Turning Lathe 4000Φ 1 O-Mltd

2 Turning Lathe 3200Φ 1 O-Mltd

3 Turning Lathe 2500Φ 1 O-Mltd

4 Turning Lathe 2000Φ 1 O-Mltd

5 Turning Lathe 1500Φ 2 O-Mltd

6 CNC Lathe 1000Φ 1 O-Mltd

7 Turning Lathe 750mm X 1500mm 4 HANKOOK

8 Turning Lathe 600mm X 1500mm 7 Namsun

9 Turning Lathe 460mm X 1500mm 2 Hwacheon

10 Radial Drilling Machine 4000Φ 1 OKUMA

11 Radial Drilling Machine 2500Φ 1 TOMINAGA

12 Radial Drilling Machine 2000Φ 6 DOOSAN

13 Radial Drilling Machine 1600Φ 1 Nambuk

14 Radial Drilling Machine 720Φ 3 Korando

15 ESW Machine Φ1500~Φ6000 2 In-sung Tech

16 ESW Machine Φ300~Φ4000 2 In-sung Tech

17 SAW Machine Φ1500~Φ6000 2 In-sung Tech

18 Auto GTAW Machine Φ35~Φ900 1 In-sung Tech

19 Auto GTAW Machine Φ35~Φ250 1 In-sung Tech

20 Auto GTAW Machine Φ35~Φ1000 1 In-sung Tech

21 Auto GTAW Machine Φ300~Φ3000 1 In-sung Tech

22 Auto GTAW Machine Φ35~Φ1200 1 In-sung Tech

23 Turning Table 10Ton 1 In-sung Tech

24 Welding Positioner 5Ton 1 In-sung Tech

25 Turning Roller 10Ton 1 In-sung Tech

26 CNC Gas Cutting Machine Max 50 th'k 1 Seshin Buffalo

Page 19: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Manufacturing Equipments - Cutting

[Turning Lathe Φ3200 O-M Ltd] [Turning Lathe Φ4000 O-M Ltd]

[Turning Lathe Φ2500 O-M Ltd] [Turning Lathe Φ2000 O-M Ltd]

19

Page 20: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE 20 20

Manufacturing Equipments - Cutting

[Vertical NC Lathe Φ1000 O-M Ltd]

[Turning Lathe 750mm x 1500mm HANKOOK ]

[Turning Lathe 460mm x 1500mm NAMSUN]

[Radial Drilling M/C Φ2000 DOOSAN]

Page 21: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE 21 21

Manufacturing Equipments - Cutting

[Radial Drilling M/C Φ4000 OKUMA] [Radial Drilling M/C Φ2000 DOOSAN]

[Radial Drilling M/C Φ1600 NAMBUK] [CNC Gas Cutting M/C Max50Th’k]

21

Page 22: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE 22 22

Manufacturing Equipments – Overlay Welding

[ESW M/C Overlay Φ1500 ~ 6000] [ESW M/C. Overlay Φ1500 ~ 6000]

Page 23: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE 23 23

[ESW M/C. Overlay Φ300 ~ 4000]

Manufacturing Equipments – Overlay Welding

[SAW M/C. Φ1500 ~ 6000]

23

Page 24: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE 24 24

Manufacturing Equipments – Overlay Welding

[SAW M/C. Φ1500 ~ 6000]

[Auto GTAW M/C Overlay Φ35 ~ 900 ]

[Auto GTAW M/C Overlay Φ35 ~ 250 ]

24

Page 25: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE 25 25

[ESW M/C. Overlay Φ300 ~ 4000 ] [Auto GTAW M/C Overlay Φ35 ~ 1000 ]

[Auto GMAW M/C Overlay Φ300 ~ 3000 ] [Auto GTAW M/C Overlay Φ35 ~ 1200 ]

Manufacturing Equipments – Overlay Welding

Page 26: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Manufacturing Equipments - Forging

[6 ton Air Drop Hammer]

6 ton Air Drop Hammer Line

[2 ton Air Hammer] [1000 ton Trimming Press ] [3 ton Batch Furnace ]

3 ton Air Drop Hammer Line

[3 ton Air Drop Hammer] [1 ton Air Hammer] [500 ton Trimming Press ] [1 ton Batch Furnace ]

26

Page 27: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Manufacturing Equipments - Forging

[1.5 ton Air Drop Hammer]

1.5 ton Air Drop Hammer Line

[300 ton Trimming Press ] [700 Kw Induction Heater ]

2,500 ton Forging Press Line

[2500 ton Forging Press] [800 Kw Induction Heater ] [500 ton Trimming Press ]

27

Page 28: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Contents

1. General Information

2. Production

3. Quality Management & Control

4. Experience List

5. Subsidiaries

28

Page 29: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Quality Management & Control

Dong-O Flange Co., Ltd., is fully equipped with the most up-

to-date facilities and staffed with excellent engineers and

technicians to produce top quality products that meet the

demanding requirements of clients.

Since its establishment in 1989, Dong-O Flange has

specialized in the production of wide range of flanges using

accumulated technology and strict quality assurance system.

Our technology and products are earning an excellent

reputation from customers around the world. Dong-O Flange

has obtained quality certificates such as ISO9001,ISO14001

Our products include carbon steel, non-ferrous and lined

flanges to the specifications of ANSI,AWWA,API and MSS,

JIS as well as many other special flanges.

29

Page 30: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Test Laboratory Equipments

30

NO. Equipment Specification Q'ty Maker

1 Universal Testing Machine 1 DT&t Machine

2 Charpy Impact Tester For Metals 1 DT&t Machine

3 Protable Hardness Tester(EQUOTIP3) 1 PROCE Q

4 Emission spectrometer 1 Oxford Instruments

5 Portable Surface Roughness Tester 1 Mitutoyo

6 Ferrite Tester 1 Fischer

7

Vernier Calipers 0mm~2000mm 1 Mitutoyo 8

Vernier Calipers 0mm~1000mm 4 Mitutoyo 9

Vernier Calipers 0mm~600mm 5 Mitutoyo 10

Vernier Calipers 0mm~300mm 4 Mitutoyo 11

Vernier Calipers 0mm~200mm 1 Mitutoyo 12

Vernier Calipers 0mm~150mm 1 Mitutoyo 13

Digimatic Vernier Calipers 0mm~300mm 1 Mitutoyo 14

Dial Gauge 0mm~10mm 2 Mitutoyo 15

Compact Inverted Metallurgical Microscope 1 Olympus

Page 31: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE 31 31

Test Laboratory Equipments

Emission Spectrometer

(PMI – MASTER Pro : Oxford Instruments)

Portable Hardness Tester

(EQUOTIP 3 : Proceq)

Page 32: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Test Laboratory Equipments

Universal Testing M/C

(DT & T)

Charpy Impact Tester

(DT & T)

32

Page 33: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE 33 33

Test Laboratory Equipments

Portable Surface Roughness Tester

(Mitutoyo)

Ferrite Tester (Fischer)

Page 34: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Certificates

Certificate of ISO9001 PED 97/23/EC

34

Certificate of ISO14001

Page 35: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Certificates

TAKREER’s Approved

Vendor

SAMSUNG’s Approved

Vendor

PETRONAS Approved

Vendor

Page 36: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Certificates

Labuan Shipyard &Eng.’s

Approved Vendor KNPC Approved Vendor

Page 37: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Certificates

Certificate of NTS-Designated Model Tax Payer

Certificate of the cooperation company of Doosan Mecatec

37

Page 38: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Contents

1. General Information

2. Production

3. Quality Management & Control

4. Experience List

5. Subsidiaries

38

Page 39: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

1 JORD INTERNSTIONAL

ROCK SPRINGS SA350LF2CL1 15 SEWON CELLONTECH Co., Ltd

2 CB&I

FREEPORT LNG LIQUEFACTION SA105N 15 SEWON CELLONTECH Co., Ltd

3 TECHNIP USA INC

LAKE CHARLES CHMICAL PJT SA350LF2CL1 15 SEWON CELLONTECH Co., Ltd

4 FLUOR DANIEL INTERNATIONAL

LHC-9 PJT SA105N 15 SEWON CELLONTECH Co., Ltd

5 GS E&C

CLEN FUEL PJT SA105N 15 SEWON CELLONTECH Co., Ltd

6 DAEWOO E&C

CAFC PJT SA182F316 15 IPT

7 SECL

ZUBAIR PJT SA350LF2CL1 15 IPT

8 DAELIM

SOHAR SA105N 15 IPT

9 FLUOR

FLUOR NORTH WEST REDWATER A350LF2CL1 15 L&T PIPING CENTER

10 PRVUNL

STEAM GENERATOR&AUXILIARIES PKG. SA105N 15 L&T MHPS BOILER PVT LTD

11 FLUOR CANADA LTD

STURGEON REFINERY SA350LF2 15 SEWON CELLONTECH Co., Ltd

12 UTE TSGI

AEGEAN REFINERY PJT/TURKEY SA105N 15 DAEKYUNG MACHINERY & ENG'G CO.,LTD

13 TECNICAS REUNIDAS

TALARA REFINERY MODERNIZATION PJT/PERU SA105 15 DAEKYUNG MACHINERY & ENG'G CO.,LTD

Page 40: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

14

TOYO ENGINEERING COP.

RAPID SCC PJT./MALAYSIA SA105N, SA182F11 15 DAEKYUNG MACHINERY & ENG'G CO.,LTD

15

MOROOJ S.OIL SERVICES CO.,LTD

WESTERN LIBYA GAS/LIBYA SA105N 15 DAEKYUNG MACHINERY & ENG'G CO.,LTD

16

SAIPEM

GNL-3Z ARZEW PJT/ALGERIA SA182F304L 15 DAEKYUNG MACHINERY & ENG'G CO.,LTD

17

SK E&C

KNPC CFP PJT/KUWAIT SA105N 15 DAEKYUNG MACHINERY & ENG'G CO.,LTD

18

CTCI-CHIYODA JOINT VENTURE

RAPID SCC PJT./MALAYSIA SA105N 15 DAEKYUNG MACHINERY & ENG'G CO.,LTD

19

TOYO ENGINEERING COP.

RAPID SCC PJT./MALAYSIA SA105N, SA182F11 15 DAEKYUNG MACHINERY & ENG'G CO.,LTD

20

SK E&C

FORTHILL SECONDARY EXTRACTION/CANADA SA105N 15 DAEKYUNG MACHINERY & ENG'G CO.,LTD

21

DAEWOO E&C

CENTRAL AREA FIELD COMPLEX PJT/ALGERIA SA105N 15 DAEKYUNG MACHINERY & ENG'G CO.,LTD

22

CB&I

FREEPORT LNG LIQUEFACTION PJT/USA SA350LF2 15 DAEKYUNG MACHINERY & ENG'G CO.,LTD

23

HANWHA E&C

YNCC C5 SEPARATION PJT/KOREA SA105 15 DAEKYUNG MACHINERY & ENG'G CO.,LTD

24

TECNICAS REUNIDAS

TALARA REFINERY MODERNIZATION/PERU SA105 15 DAEKYUNG MACHINERY & ENG'G CO.,LTD

25

UTE TSGI

AEGEAN REFINERY PJT./TURKEY SA105, LF2 15 DAEKYUNG MACHINERY & ENG'G CO.,LTD

26

DAELIM E&C

UMM WUAL EPC PJT.AMMONIA PLANT. SA182F304L 15 DAEKYUNG MACHINERY & ENG'G CO.,LTD

Page 41: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

27 SAMSUNG E&C

SECL ARAMCO COGEN IPP PJT. SA105, SA182F316L 15 S&T CORPORATION

28 PETROFAC

KHAZZAN PJT. SA350LF2 15 S&T CORPORATION

29

KARBALA PJT SA105, SA182F11 15 DOOSAN E&C

30

FREEPORT LNG PJT. SA105N 15 DOOSAN E&C

31

NSRP PJT. SA105N 15 DOOSAN E&C

32 KOLON

BARONIA SA182F316L, F51 15 IPT

33 KHPT

LOTTE IP SA105N 15 IPT

34 TOYO KOREA

ECU&PE PP SA105N, LF2, F304 15 IPT

35 DAELIM

PB2 PJT SA105N 15 IPT

36

BARAKAH NPP 3&4 SA105N,SA182F22 15 SEDAE ENERTECH CO.,LTD

37

SOUTH HELWAN IN EGYPT_SURFACE CONDENSER SA105 15 SEDAE ENERTECH CO.,LTD

38

PUNTA CATALINA_HP FEEDWATER HEATERS SA350LF2 15 SEDAE ENERTECH CO.,LTD

39

DJELFA_IP STEAM DRUM SA105 15 SEDAE ENERTECH CO.,LTD

Page 42: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

40 UAE BRAKA BNPP

BARAKAH NPP 1&2 3&4 SA105N, SA182F11 14 SADAE ENERTECH Co., Ltd

41

RAS DJINET 1 CCPP HRSG SA105N 14 SADAE ENERTECH Co., Ltd

42 TOYO ENGINEERING COP.

PURSI-IIB PJT. SA105N 14 SEWON CELLONTECH Co., Ltd

43 FLUOR DANIEL INTERNATIONAL

LHC-9 PJT SA105N 14 SEWON CELLONTECH Co., Ltd

44 HYUNDAI E&C

SARB #4 SA350LF2CL1,SA182F316L 14

SEWON CELLONTECH Co., Ltd

45 THE DOW CHEMICAL COMPANY

GULFSTREAM POLY B TRAIN 3 SA350LF2CL1 14 SEWON CELLONTECH Co., Ltd

46 MITSUI ENG&SHIPBUILDING CO

EOS PJT SA105N 14 SEWON CELLONTECH Co., Ltd

47 DAELIM

SOHAR REFINERY IMPROVEMENT PJT. SA182F304L 14 SEWON CELLONTECH Co., Ltd

48 JGC CORP.

SRC MOGAS COGAN SA105N,SA182F321 14 SEWON CELLONTECH Co., Ltd

49 THE DOW CHEMICAL COMPANY

GULFSTREAM POLY 5 SA105N 14 SEWON CELLONTECH Co., Ltd

50 FLUOR CANADA LTD

STURGEON REFINERY SA350LF2 14 SEWON CELLONTECH Co., Ltd

51 BASF COMPANY LTD

KR1T BK SA105, 14 SEWON CELLONTECH Co., Ltd

52 MITSUI ENG&SHIPBUILDING CO

AURORA-EOS SA105 14 SEWON CELLONTECH Co., Ltd

Page 43: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

53

FOSTER WHEELER

PROPANE DEHYDROGENATION UNIT/USA SA105 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

54

TECNICAS REUNIDAS PROYECTO NUEVA UNIDAD DE REFORMACION CATALITICA SA105,F11 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

55

TECNIMONT

3740 HD+LDPE ALJUBAIL SA105 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

56

SAMSUNG ENG.

BOLIVIA YPFB AMMONIA&UREA SA105,F304 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

57

SAIPEM S.P.A RABIGH II PJT(RP2) SA105 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

58

DAELIM E&C

UMM WUAL EPC PJT. 350LF2,F304L,F11 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

59

DAELIM E&C

SOHAR PJT. SA105N 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

60 JGC CORPORATION

NGHI SON REFFINERY AND PETROCHE SA350LF2 14 SEWON CELLONTECH Co., Ltd

61 TOYO ENG

STC SM #1 MODERNIZATION PJT SA182F304H 14 SEWON CELLONTECH Co., Ltd

62 FLUOR DANIEL INTERNATIONAL

LHC-9 PJT SA350LF2 14 SEWON CELLONTECH Co., Ltd

63 LURGI GMBH

NWR CANDI 1 PJT SA350LF3 14 SEWON CELLONTECH Co., Ltd

64 TR

STUTGEON SA105N 14 S&T CORPORATION

65 PETROFAC

SOHAR PJT. SA105N 14 S&T CORPORATION

Page 44: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

66

SK E&C

FORTHILL SECONDARY EXTRACTION/ CANADA SA105 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

67

SAIPEM S.P.A.(ITALY) GNL-3Z-ARZEW PJT/ALGERIA SA105 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

68

PT REKAYASA INDUSTRY

PUSRI IIB,AMMONIA-UREA/INDONESIA SA105 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

69

BP AMOCO EXPLORATION

IN AMENAS TRAIN 3 REINSTATEMENT/ALGERIA SA105N 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

70

TECNICAS REUNIDAS

STURGEON/CANADA SA105N, LF2 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

71

SAMSUNG C&T

STC NCC RECOVERY SECTION OPTIMIZATION/ KOREA SA105, LF3 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

72

TECHNIP

MANGALORE PTA/ INDIA F316L,304L,F51 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

73

EDWARDS LTD

EGYPTIAN REFINERY COMPANY SA105N, LF2, F304 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

74

MITSUI ENG& SHIPPBUILDING CO., LTD

NAG-OF PJT/USA SA105N 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

75

DAELIM& PETROFAC SRIP JOINT

SOHAR REFINERIES EXPANSION SA105,LF2,SB381 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

76

CB&I

INGLESIDE ETHYLENE PJT./USA SA105, LF2, F304 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

77

CTCI-CORPORATION

LAFFAN REFINERY RHASE2/QATAR F304L,F316L,F321,F11 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

78

TOYO ENG JAPAN

TAIF VCC(TNV) PJT.RUSSIA SA105 14 DAEKYUNG MACHINERY & ENG'G CO.,LTD

Page 45: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

79 GS E&C

ERC REFINERY PROJECT SA105N 13 DOOSAN E&C

80 BECHTEL INTERNATIONAL

GLNG PROJECT SA182F316L, SA350LF2 13 DOOSAN E&C

81 BECHTEL INTERNATIONAL

APLNG PROJECT SA350LF2 13 DOOSAN E&C

82 TECHNIP FRANCE

ALGIERS REFINERY PROJECT SA105N, SA350LF2 13 DOOSAN E&C

83 TECHNIP FRANCE

ALGIERS REFINERY PROJECT (MR-0810-1004) SA105N 13 DOOSAN E&C

84 NINGXIA BAOFENG ENERGY GROUP

WASTE GAS RECOVERY AND INTEGRA PJT. SA105N, SA182F11 13 DOOSAN E&C

85 CHONGQING CHANGFENG CHEMICAL

400 KTPA METHANOL PLANT PROJECT SA105N 13 DOOSAN E&C

86 DAELIM

PETRON RMP-2 PROJECT SA105N 13 DOOSAN E&C

87 SANSUNG ENG

SAMSUNG TOTAL NO.2 AROMATICS COMPLEX PROJECT SA105N 13 DOOSAN E&C

88 APS

RESID PROJECT SA105N 13 DOOSAN E&C

89 TOYO ENGINEERING KOREA

KALTIM-5 PROJECT SA350LF2, SA182F304L 13 DOOSAN E&C

90 APS

RESID UPGRADING PROJECT SA105,SA182F316L 13 DOOSAN E&C

91 JKC JV(JGC/CHIYODA/KBR JV)

ICHTHYS ONSHORE LNG FACILITIES PROJECT SA350LF2, SA105 13 DOOSAN E&C

Page 46: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

92 DAELIM

SADARA MFC PROJECT SA350LF2 13 DOOSAN E&C

93 CONSORCIO UFN3

UFN3(UFN III (UNIDADE DE FERTILIZANTES NITROGENADOS III) SA182F11, F304, F316 13 DOOSAN E&C

94 TECHNIP FRANCE

PRELUDE FLNG PROJECT SA105, LF2, F316L 13 DOOSAN E&C

95 SOLVAY

HPPO3 PROJECT SA105, F304L 13 DOOSAN E&C

96 LUKOIL

LUKOIL NNOS FCC PROJECT SA350LF2 13 DOOSAN E&C

97 BECHTEL

SABINE PASS LIQUEFACTION PROJECT SA182F304L 13 DOOSAN E&C

98 JGC CORPORATION

ICHTHYS ONSHORE LNG FACILITIES PROJECT SA182F316L, LF2 13 DOOSAN E&C

99 FOSTER WHEELER

SADARA PROPYLENE OXIDE PROJECT SA182F304, SA182F321 13 DOOSAN E&C

99 ALDIS-ROSIVEFT

KOMOSOMOLSK PROJECT SA182F347, F5, LF2 13 DOOSAN E&C

100 KBR

RAS TANURA INTEGRATED PROJECT (RTIP) SA182F304/304L 13 DOOSAN E&C

101 HYUNDAI ENG

TURKMENBSSHI OIL REFINERY RECONSTRUCTION SA182F304L 13 DOOSAN E&C

102 TECNICAS

EPDM-PBR-KEMSA PROJECT SA105N 13 DOOSAN E&C

103 DAELIM

RABIGH PHASE Ⅱ PETROCHEMICAL SA105 13 DOOSAN E&C

Page 47: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

104 ALDIS

KOMSOMOSLK REFINERY PJT SA350LF2, SA182F321 13 DOOSAN E&C

105 TECNICAS REUNIDAS

SADARA CHEMICAL III PROJECT SA105 13 DOOSAN E&C

106 TECNICAS REUNIDAS

SADARA CHEMICAL III PROJECT SA105 13 DOOSAN E&C

107 RED MAUNTAIN

ACHINSK REFINERY PROJECT SA350LF2 13 DOOSAN E&C

108 TECNICAS REUNIDAS

SADARA CHEMICAL III PROJECT SA182F316L, SA105 13 DOOSAN E&C

109 JACOBS BELGIUM

HPPO3 PROJECT SA182F304L, SA105 13 DOOSAN E&C

110 ALSTOM POWER ENERGY RECOVERY GMBH

DEKYANG STEAM DRUM SA105 13 DOOSAN E&C

111 CONOCOMYILLIPS

PARWIN LNG PROJECT SA182F316L 13 DOOSAN E&C

112 TOYO ENGINEERING

TAIF VCC SA350LF2 13 DOOSAN E&C

113 RELIANCE / JACOBS

JAMNAGARA 3 PROJECT SA765GR4 13 DOOSAN E&C

114 RELIANCE / TECHNIP FRANCE

JAMNAGARA 3 PROJECT SA105 13 DOOSAN E&C

115 TECHNIMONT

MH3 WEVER (US) EPCS-IOWA SA182F304L,SA350LF2 13 DOOSAN E&C

116 SUNCOR ENERGY

MONTREAL REFINERY REVAMP SA182F22 13 DOOSAN E&C

Page 48: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

117 TECNIMONT S.P.A

TEMPA ROSSA PJT SA105 13 DAEKYUNG E&C

118 KINETICS TECHNOLOGY S.P.A

TEMPA ROSSA PJT/ ITALY SA105,LF2, F316L, F304

L 13

DAEKYUNG E&C

119 DAELIM

SADARA ISOCYANATES SA105N, LF2 13 DAEKYUNG E&C

120 TOYO ENG. JAPAN

TAIF VSS(TNV) PJT. SA182F11, LF2 13 DAEKYUNG E&C

121 KBR

DYNO F441 THE DYNO NOVEL LOUISIANA PJT. SA105, F22 13 DAEKYUNG E&C

122 JGC

SADARA PJT. SA105, LF3, 304L 13 DAEKYUNG E&C

123 BECHTEL INTERNATION INC.

APLING TRAIN 2 PJT/AUSTRALIA SA105, LF2 13 DAEKYUNG E&C

124 JGC

PETRONAS LNG TRAIN 9 FEED PJT/ MALAYSIA LF2, 304L 13 DAEKYUNG E&C

125 MODEC OFFSHORE PRODUC SYSTEM

FPSO CIDADE DE IYAGUAI MV26 PJT. SA105 13 DAEKYUNG E&C

126 HYUNDAI ENG.

TURKMENBSHI OIL REFINERY RECONSTRUCTION PJT./ HELI SA105, F5 13 DAEKYUNG E&C

127 TECNICAS

EPDM PJT. SA105N,LF2 13 DAEKYUNG E&C

128 DAELIM

RABIGH PJT. SA105N 13 DAEKYUNG E&C

129 TECNOCAS

SADARA PJT. SA182F51, SA105 13 DAEKYUNG E&C

Page 49: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

130 DAELIM

SADARA PJT. SA105N, LF2 13 DAEKYUNG E&C

131 LUMMUS TECH. HEAT TRANSFER

EEP2 PJT./ HELIX H/EX SA182F11, SA105 13 DAEKYUNG E&C

132 TECNICAS

HORIZON V.D.U PJT SA105N, LF2 13 DAEKYUNG E&C

133 Ammonia Casaie S.A

REVAMPING OF THE TEC AMMONIA PLANT SA182F11 13 SEWON CELLONTECH Co., Ltd

134 SAMSUNG ENGINEERING CO.,LTD

TAKREER CBDC SA105N ,SA182F304H 13 SEWON CELLONTECH Co., Ltd

135 TECNICAS REUNIDAS S.A

SADARA CHEMICAL III A105 13 SEWON CELLONTECH Co., Ltd

136 UHDE GMBH

C F I DONALDSONVILLE EXPANSION SA182F11 13 SEWON CELLONTECH Co., Ltd

137 BAGFAS GMBH

BAGFAS PJT SA182F321 13 SEWON CELLONTECH Co., Ltd

138 SK E&C

IRPC UHV SA182F11 13 SEWON CELLONTECH Co., Ltd

139 FLUOR DANIEL INTERNATIONAL

USGC P D H -1 PROPANE DE -HYDROGENATION SA182F51 13 SEWON CELLONTECH Co., Ltd

140 TECNICAS REUNIDAS S.A

SADARA CHEMICAL NIII SA182F51 13 SEWON CELLONTECH Co., Ltd

141 HYUNDAI E&C

RPLC DEEP CONVERSION PJT SA182F11 13 SEWON CELLONTECH Co., Ltd

Page 50: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

142 JKC_ICHTHYS

ICHTHYS ONSHORE LNG FACILITIES GE INPEX HRSG S UNITS 15 MODULES SA105, F91 13 S&TC

143 HYUNDAI OILBANK

T/A BUNDLE SA350LF2 13 IPT

144 MES

PVA 1ST LINE PJT. SA105, F304 13 IPT

145 DAELIM

BUTANOL&SYNGAS SA105 13 IPT

146 SECL

BADRA OIL FIFLD SA105 13 IPT

147 SECL

UGCC GSP&POLYMER PJT. SA105 13 IPT

148 HYUNDAI E&G

TURKMENBASHI SA105 13 IPT

149 SECL

BOLIVIA, YPFB AMMONIA/ UREA SA105 13 IPT

150 HITACHI

SSP2 PJT. A105 13 HITACHI KOREA

151

LOS AZUFRES III PHASE I SA105, F304 13 NAMIN

Page 51: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

152 SABIC

YANPET PJT SA182F316L

12 (DAEKYUNG MACHINERY & ENG'G CO.,LTD) SA105N

153 PIPEX

SABALAN PJT. SA182 F304L, SA105,

12 (DAEKYUNG MACHINERY & ENG'G CO.,LTD) SA182 F11CL.2

154 BECH TEL

APLNG PJT SA182 F304L 12 (DAEKYUNG MACHINERY & ENG'G CO.,LTD)

155 DAELIM

SADARA PJT SA105,SA182F304L

12 (DAEKYUNG MACHINERY & ENG'G CO.,LTD) SA182F316L,SA350LF2CL.2

156 TECHNIP

BOURGAS SA350LF2CL.1

12 (DAEKYUNG MACHINERY & ENG'G CO.,LTD) SA336 F22

157 OCI

OCI PJT SA182 F316L 12 (DAEKYUNG MACHINERY & ENG'G CO.,LTD)

158 DAELIM

RTIP/SAUDI ARABIA SA350 LF2CL.1 12 (DAEKYUNG MACHINERY & ENG'G CO.,LTD)

159 DOOSANHEAVY I&C

태안화력 IGCC PROJECT SA105N, SA182F11 12 (DOOSAN E&C)

160 SNAMPROGETTI CANADA

ALGIERS REFINERY SA105N 12 (DOOSAN E&C)

161 TECHNIP FRANCE

ALGIERS REFINERY SA105N, SA350LF2 12 (DOOSAN E&C)

162 JGC CORPORATION

BIR SEBA PROJECT SA105N, SA350LF2, F316L 12 (DOOSAN E&C)

163 BP PRODUCTS N.A INC. BP RHU 200 BUNDLES AT TEXAS CITY R

EFINERY SA105 12

(DOOSAN E&C)

164 JGC CORPORATION

DONNGI SENORO LNG PROJECT SA182F316L 12 (DOOSAN E&C)

165 BECHTEL INTERNATIONAL

GLNG PROJECT SA105N, SA350LF2 12 (DOOSAN E&C)

Page 52: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

166 SOLVAY

HPPO3 PROJECT SA105, SA182F304L 12 (DOOSAN E&C)

167 SNAMPROGETTI CANADA

HUSKY SUNRISE-CPF LP PV PROJECT SA105, SA350LF2 12 (DOOSAN E&C)

168 JKC JV(JGC/CHIYODA/KBR JV) ICHTHYS ONSHORE LNG FACILITIES PR

OJECT SA350LF2 12

(DOOSAN E&C)

169 JGC CORPORATION ICHTHYS ONSHORE LNG FACILITIES PR

OJECT SA350LF2, F316L 12

(DOOSAN E&C)

170 PETROFAC IN SALAH GAS-SOUTHERN FIELDS DEVE

LOPMENT PROJECT SA182F316L 12

(DOOSAN E&C)

171 GS E&C

IPC EVA PROJECT SA105,F304 12 (DOOSAN E&C)

172 SK E&C

JURONG AROMATICS COMPLEX SA105N 12 (DOOSAN E&C)

173 TOYO ENG.

KALTIM-5 SA105 12 (DOOSAN E&C)

174 PETROFAC

LAGGAN-TORMORE PROJECT LF2, F316, SA105 12 (DOOSAN E&C)

175 LUKOIL

LUKOIL NNOS FCC PROJECT SA182F11, LF2, F316L 12 (DOOSAN E&C)

176 DELTA MONTAGEM INDUSTRIAL

PETROBRAS COMPERJ PROJECT SA105N 12 (DOOSAN E&C)

177 DAELIM

PETRON RMP-2 PROJECT SA105N 12 (DOOSAN E&C)

178 DAELIM PHILIPPINE PETRON BATAAN RMP-2 PR

OJECT SA182F304L, F316L 12

(DOOSAN E&C)

179 TECHNIP FRANCE

PRELUDE FLNG PROJECT SA182F321, F316L, SA105 12 (DOOSAN E&C)

180 PTT GLOBAL CHEMICAL

PTTPE LLDPE PJT SA350LF2, F316L 12 (DOOSAN E&C)

Page 53: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

181 SAMSUNG E&G

QATAR LAFFAN PROJECT SA182F22 12 (DOOSAN E&C)

182 APS

RESID PROJCT SA105, F11, F304 12 (DOOSAN E&C)

183 APS

RESID UPGRADING PROJCT SA105,F316L 12 (DOOSAN E&C)

184 SASOL NORTH AMERICA INC

S&B/SASOL ECHO-1 PROJECT SA182F316L 12 (DOOSAN E&C)

185 BECHTEL

SABINE PASS LNG PROJECT F304L, F316L, SA105 12 (DOOSAN E&C)

186 DAELIM

SADARA MFC PROJECT SA105, LF2 12 (DOOSAN E&C)

187 FOSTER WHEELER

SADARA PROPYLENE OXIDE SA182F304/304L, F321 12 (DOOSAN E&C)

188 SAMSUNG E&G SAMSUNG TOTAL NO.2 AROMATICS COMPLEX PR

OJECT SA105 12

(DOOSAN E&C)

189 SAIPEM S.P.A

SHAH GAS DEVELOPMENT PROJECT SA105 12 (DOOSAN E&C)

190 SAMSUNG H&I

SHELL F-LNG PROJECT SA105 12 (DOOSAN E&C)

191 SAIPEM S.P.A

STAATSOILE REFINERY SA105N, LF2 12 (DOOSAN E&C)

192 SAIPEM S.P.A

STAATSOLIE REFINERY PROJECT SA105 12 (DOOSAN E&C)

193 CHIYODA CORPORATION

TMP-2 PROJECT SA105 12 (DOOSAN E&C)

194 TECNICAS

TOTAL RAFFINAGE MARKETING PROJECT SA105 12 (DOOSAN E&C)

195 CONSORCIO UFN3

UFN3 PROJECT SA182F11 12 (DOOSAN E&C)

Page 54: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

196 CONSORCIO UFN3 UFN3(UFN III (UNIDADE DE FERTILIZANTES NIT

ROGENADOS III) SA105, LF2, F304L, F11 12

(DOOSAN E&C)

197 NINGXIA BAOFENG ENERGY GROUP

WASTE GAS RECOVERY AND INTEGRA SA182F22, SA105 12 (DOOSAN E&C)

198 DAELIM

YANBU EXPORT REFINERY PROJECT SA105 12 (DOOSAN E&C)

199 SAMSUNG F&C

ECH NO.2 PLANT H/EX 40/46 SA105, SA266, F304L, F316L 12 (IPT)

200 TOYO ENG'G KOREA

Russia NKGPS Project LF2, F304 12 (IPT)

201 TASET INC.

Rehab. & Expansion of SWTP PJT SA105 12 (IPT)

202 SAMSUNG E&G

West Qurna Ph-2 SA105 12 (IPT)

203 HYUNDOILBANK

#1 Lube Base Oil Project SA105, F304 12 (IPT)

204 TOYO ENG'G KOREA

Russia NKGPS Project LF2, F304 12 (IPT)

205 TECHNIP FRANCE

REHABILTATION AND ADAPTATION SA105N, SA182 F321

12 (SEWON CELLONTECH CO.,LTD) SA182 F11CL.2

206 GT ADVANCED TECHINOLOGIES

TOKUYAMA PJT SA182 F316L 12 (SEWON CELLONTECH CO.,LTD)

207 JGC CORPORATION

BARZAN ONSHORE PJT SA182 F304/304L 12 (SEWON CELLONTECH CO.,LTD)

208 HITACHI

HITACHI PLANT TECHNOLOGIES SA182 F304/304L 12 (SEWON CELLONTECH CO.,LTD)

Page 55: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

209 UPI

PARNABIA SA182 F91 , SA182 F22 CL.3 12 (S&TC)

210 TR

TUPRAS SA350 LF2 CL.1 , SA182 F11 CL.2

12 (S&TC) SA182 F91 , SA105

211 JKC

ICHTHYS SA182 F316 , SA105N ,

SA350 LF2CL.1 12

(S&TC)

212 POSCO

POSCO FINEX VALVE SKID SA105N 12 (NAMIN)

213 POSCO

POSCO FUEL CELL SUPPORT&PIPE SA105N,SA182 F304 12 (NAMIN)

214 KCC ENGINEERING&CONSTRUCTION JUBAIL POLYSILICON PJT SA105N,SA182 F11CL.2

SA182 F304 , SA350LF2CL.1 12

215 KEPCO

UAE BRAKA BNPP A105,SA182 F316L 12 (SEDAE ENERTECH)

216 PIDEC

KAVE METHANOL PLANT PJT. SA182F304L,SA182F316L

11 (DAEKYUNG MACHINERY & ENG'G CO.,LTD) SA105N

217 BECHTEL

CHEVRON PASCAGOULA PJT. SA105

11 (DAEKYUNG MACHINERY & ENG'G CO.,LTD) SA182 F6A

218 BANTREL

SURMONT 2 PJT. SA350LF2CL.1 11 (DAEKYUNG MACHINERY & ENG'G CO.,LTD)

219 TECHNIP

MACEDON GAS PJT. SA182F51,SA182F316L,SA105N 11 (DAEKYUNG MACHINERY & ENG'G CO.,LTD)

220 SECL

DOW FA LCON PROJECT. SA105,SA182F304L

11 (DAEKYUNG MACHINERY & ENG'G CO.,LTD) SA182F316L,SA182F51

221 HEC

LUBE OIL PJT. SA105N 11 (DAEKYUNG MACHINERY & ENG'G CO.,LTD)

222 CTCI IBN RUSHD Ⅱ(ARO) PJR/SAUDI ARA

BIA SA105N 11

(DAEKYUNG MACHINERY & ENG'G CO.,LTD)

223 CTCI

IR-Ⅱ AROMATICS/SAUDI ARABIA SA105N 11 (DAEKYUNG MACHINERY & ENG'G CO.,LTD)

Page 56: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

224

JGC SINGAPORE PTE.,LTD.

MLNG ROSE PJT. SA350 LF2 CL.1 11 (DAEKYUNG MACHINERY & ENG'G CO.,LTD)

225 JGC

DONGGI SENORO LNG PJT. SA350LF2,SA182F304L 11 (DOOSAN E&C.)

226 SNAMPROGETTI CANADA

SUNRISE PHASE 1 CPF PJT. SA105N 11 (DOOSAN E&C.)

227 SAIPEM S.P.A

STAATSOLIE RENFINERY PJT. SA105N 11 (DOOSAN E&C.)

228 TECNICAS

YANBU EXPORT REFINERY PJT. SA105N,SA182F304L 11 (DOOSAN E&C.)

229 DAELIM

JG SUMMIT NCC PJT SA350LF2CL.1, SA182F304L 11 (DOOSAN E&C.)

230 DAELIM

YANBU EXPORT REFINERY PROJECT SA105N

11 (DOOSAN E&C.) SA350LF2

231 BECHTEL INTERNATIONAL

GLNG PROJECT(MVA0-00004) SA105N

11 (DOOSAN E&C.) SA182F316L

232 BECHTEL INTERNATIONAL

GLNG PROJECT(MVWC-00001) SA105N , SA350LF2 11 (DOOSAN E&C.)

233 BECHTEL INTERNATIONAL

GLNG PROJECT(MES0-00001) SA350LF2,SA182F304L 11 (DOOSAN E&C.)

234 PETROFAC

IN SALAH GAS PROJECT SA350LF2 11 (DOOSAN E&C.)

235 PETROFAC

SOUTH YOLOTEN GAS PROJECT SA105N 11 (DOOSAN E&C.)

236 PEERLESS MFG CO

G LNG PJT SA105 11 (DOOSAN E&C.)

237 DAELIM

PHILIPPINE PETRON BATAAN RMP-2 PROJECT SA105,SA182F11,SA182F321 11 (DOOSAN E&C.)

238 GS E&C

IPC EVA PROJECT SA105

11 (DOOSAN E&C.) SA182F304

Page 57: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

239 SNAMPROGETTI CANADA

SUNRISE PHASE 1 CPF PJT SA105N,SA350LF2 11 (DOOSAN E&C.)

240 TECHNIP FRANCE

ALGIERS REFINERY PJT SA105N 11 (DOOSAN E&C.)

241 LOTTE E&C HONAM PETROCHEMICAL CORP NC

C FURNACE

SA105,SA182F11 11

(SEENTEC CO.,LTD) SA350LF2

242 IHI

HRSG-TNP PJT THAILAND SA105N 11 (SEENTEC CO.,LTD)

243 SAMSUNG ENG SHAH GAS DEVELOPMENT PACKAG

E PJT SA105N 11

(SEENTEC CO.,LTD)

244 PETROFAC INTERNATIONAL LTD SOUTH YOLOTEN GAS FIELD DEVEL

OPMENT SA182F316/316L 11

(SEWON CELLONTECH CO.,LTD)

245 JGC CORPORTATION

BARZAN ONSHORE PROJECT SA182F304/304L 11 (SEWON CELLONTECH CO.,LTD)

246 TECNIMONT

NEW AGRP PEVAMP PROJECT SA105 11 (SEWON CELLONTECH CO.,LTD)

247 DAERIM INDUSTRIAL CO.,LTD JG SUMMIT NAPHTHA CRACKER PR

OJECT SA105,SA105N,SA350LF2 11

(SEDAE ENERTECH CO.,LTD)

248 LURGI EMBH

AL UER HYDROGENT PLANT SA182 F304L 11 (KHE)

249 SAMSUNG ENG.G

PERTIL-2 EXPANSION SA182F11CL2, F304L

11 (DAEKYUNG MACHINERY & ENG'G CO.,LTD) SA105,SA350LF2

250 LINDE

SAMCO SAAC PJT SA105,LF2,F304/304L

11 (DAEKYUNG MACHINERY & ENG'G CO.,LTD) SA182F316/316L

251 TECHNIP

PLATEAN MAINTENANCE SA105N 11 (DAEKYUNG MACHINERY & ENG'G CO.,LTD)

252 LIMMUS

WASTLAKE CHEM PJT. SA182F1,SA105 11 (DAEKYUNG MACHINERY & ENG'G CO.,LTD)

253 TECHNIP

JUBAIL EXPORT PJT. SA105,SA182F304

11 (DAEKYUNG MACHINERY & ENG'G CO.,LTD) SA182F316L

Page 58: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Experience List

NO. CLIENT(ENGINEER) PROJECT NAME MATERIAL YEAR

254

TECHNIP

UPRADING TRACHE 2PJT.

SA105N ,

11 (DAEKYUNG MACHINERY & ENG'G CO.,LTD) SA182F6A

255

CB&I

CATAGENA PJT. SA105N 11 (DAEKYUNG MACHINERY & ENG'G CO.,LTD)

256

S&B

EAST PROPERTY PJT. SA105N 11 (DAEKYUNG MACHINERY & ENG'G CO.,LTD)

257 CHIYODA

PNG LNG PJT. SA105N,LF2

11 (DAEKYUNG MACHINERY & ENG'G CO.,LTD) SA182F304L

258 KCC E&C U1 PJT. SA105 11

259 OCI

N-0, P1 RECTOR PLATFORM SS400 11 (IPT CO.,LTD)

260 TECNICAS

YANBU EXPORT REFINERY PJT. F11,SA105,LF2 11 (DOOSAN E&C.)

261 DAELIM

JG Summit NCC PJT. SA105,F304L

11 (DOOSAN E&C.) SA350LF2

262 LINDE AG

SASOLBURG 02 SA350LF2 11 (DOOSAN E&C.)

263 TECNIMONT

HABSHAN-5 SA105,LF2 11 (DOOSAN E&C.)

264 CHIYODA

PNG LNG PJT SA105N,LF2 11 (DOOSAN E&C.)

265 TECNIMONT KT

JUBAIL REFINERY PJT SA105N,LF2 11 (DOOSAN E&C.)

266 Sakhalin Energy Investment Company Ltd

Sakhalin Energy ETP PJT. SA350LF2 11

(DOOSAN E&C.)

267 SHELL EASTERN PTE

BUGIS PJT. SA105,F22,F316L 11 (DOOSAN E&C.)

268 HANWHA E&C

EVA PJT. SA105 11 (DOOSAN E&C.)

Page 59: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Contents

1. General Information

2. Production

3. Quality Management & Control

4. Experience List

5. Subsidiaries

59

Page 60: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Subsidiaries

*Establishment Date : Sep.20. 2007.

*Business : Chemical and Petrochemical / Oil /

Gas Process Equipment

*Product : Heat Exchanger, Tower & Column,

Pressure Vessel, Reactor, Drum & Tank etc.

*Address : 295-1, Daechi-Ri, Chilseo-Myeon, Haman-Gun

Gyeongsangnam -do

*Establishment Date : Aug.10,1990

*Business : Automobile Parts

*Product : Synchronize sleeves,Tripod Housing, Outer

Races, Drive shafts, Spiders

*Address : 960-17, Hwacheon-ri, Chilbuk-myeon,Haman-gun

Gyeongsangnam-do

* IPT

* IMT

60

Page 61: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE

Subsidiaries

*Establishment Date : Dec. 23. 2004

*Business : Die Forging

*Product : Forging Item (Flange,Cam shaft,Valve,

Elbow,Tee)

*Address : 308-4, Sunam-dong, Nam-ku,Ulsan city

Kyunsangnam-do

* Hankook Forging

61

*Establishment Date : Mar. 1,1994

*Business : Flanges

*Product : Girth Flange, Tube sheet etc.

*Address : 219-1, Mohwa-ri Oedong-eup Gyeongju-si

Gyeongsangbuk-do

* Dongguk Industry

Page 62: PREQUALIFICATION - Petro Team Commercial Prequalification-201511.pdf · PREQUALIFICATION Reliable Company, ... Oct. 2015 : Kuwait National Petroleum Company ... Approved Vendor KNPC

DONG-O FLANGE 62