general sprinkler notes: fire protection...

5
9 6" 6" 2" MAIN DRAIN ALARM TEST VALVE 6" O.S.&Y. VALVE WITH TAMPER SWITCH 1 15 16 14 2 3 4 1 5 6 7 8 9 10 11 13 12 VIKING WATER MOTOR ALARM #F-1 WITH POTTER ROEMER NEW 6"FP MAIN SIGN # 6340, "WHEN BELL RINGS CALL FIRE DEPARTMENT" 2" DRAIN PIPED 6" ABOVE FINISHED GRADE 6" VIKING ALARM CHECK VALVE 2" MAIN DRAIN VALVE PIPE SUPPORT TEE PRESSURE SWITCH MODEL A-1 VIKING RETARDING CHAMBER #B-3 WATER GUAGE FLOW SWITCH BALL DRIP CHECK VALVE 4 2 1 5 11 8 16 12 13 14 15 FLOOR NO SCALE WET SPRINKLER RISER DIAGRAM 7 10 THIS RISER DIAGRAM IS FOR GENERAL INFORMATION ONLY. THE INSTALLATION OF THE SPRINKLER SYSTEM SHALL BE IN COMPLIANCE WITH NFPA 13 AND LOCAL AUTHORITY HAVING JURISDICTION. 17 CHROME FIRE DERAPTMENT CONNECTION WITH "AUTO SPRINKLER' LETTERING. VERIFY TYPE AND LOCATION WITH LOCAL FIRE DEPT. 6" 17 WATTS DOUBLE DETECTOR CHECK ASSEMBLY, MODEL NO. 709DCDA-OSY-GPM 6 RISER DIAGRAM NOTES GENERAL SPRINKLER NOTES: 1. PROVIDE A WET PIPE SYSTEM. THE WET SPRINKLER SYSTEM SHALL BE HYDRAULICALLY CALCULATED TO PROVIDE THE PRESCRIBED DENSITY UNIFORMLY OVER THE MOST REMOTE AREA. COPIES OF THE CALCULATIONS SHALL BE SUBMITTED WITH THE SHOP DRAWINGS. THE BUILDING IS LIGHT HAZARD OCCUPANCY. THE WET DENSITY SHALL BE 0.10 GPM/SQ. FT. OVER THE MOST REMOTE 1500 SQ. FT. FOR LIGHT HAZARD AND .15 OVER 1500 SQ. FT. FOR ORDINARY HAZARD WITH 250 GPM ALLOWANCE FOR HOSE STREAMS. 2. SPRINKLER HEAD LOCATIONS SHALL BE AS SHOWN ON THE REFLECTED CEILING PLAN DRAWINGS. SPRINKLER HEADS SHALL BE CENTERED IN CEILING TILES AND LOCATED SYMMETRICALLY WITH LIGHTING FIXTURES AND DIFFUSERS AS REQUIRED, UNLESS NOTED OTHERWISE. 3. THE SPRINKLER HEAD SPACING AND LOCATIONS IN THE ENTIRE SPRINKLER SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH NFPA-13. 4. THE FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING SHOP DRAWINGS AND HYDRAULIC CALCULATIONS TO ALL AGENCIES HAVING JURISDICTION FOR REVIEW AND APPROVAL, INCLUDING THE LOCAL BUILDING INSPECTOR. DRAWINGS AND CALCULATIONS SHALL BEAR THE SEAL OF A LICENSED FIRE PROTECTION ENGINEER. 5. THE ENTIRE BUILDING SHALL BE SPRINKLERED. THIS SHALL INCLUDE THE CONCEALED COMBUSTIBLE SPACES. AREAS SUBJECT TO FREEZING SHALL HAVE DRY PENDENT TYPE HEADS. CONCEALED COMBUSTIBLE SPACES WILL INCLUDE BUT NOT LIMITED TO: ATTIC SPACE, AND OVERHANGING ROOF SPACES. 6. SPRINKLER HEADS IN FINISHED SPACES SHALL BE CONCEALED TYPE 1/2" ORIFICE WITH WHITE COVER PLATE. THE TWO PIECE DESIGN SHALL ALLOW FOR REMOVAL OF THE CEILING TILES WITHOUT DISTURBING THE SPRINKLER SYSTEM. 7. SPRINKLER HEADS IN CONCEALED SPACES AND MECHANICAL ROOMS SHALL BE BRASS PENDENT TYPE WITH SPRINKLER GUARDS. 8. THE SPRINKLER DISTRIBUTION SYSTEM SHALL BE SCHEDULE 10 PIPE WITH ROLL GROOVED FITTINGS FOR 2 1/2" AND LARGER, AND SCHEDULE 40 THREADED PIPE FOR 2" AND SMALLER. 9. PROVIDE INSPECTOR TEST STATIONS AT THE MOST REMOTE POINT OF THE SPRINKLER RISER. 10. THE WATER SOURCE FOR THE SPRINKLER SYSTEM IS CITY WATER. PROVIDE UP-TO-DATE FLOW TEST. 11. THE SPRINKLER CONTRACTOR SHALL REVIEW ALL PROJECT DRAWINGS AND COORDINATE THE INSTALLATION OF THE PIPING WITH ALL OTHER TRADES FOR THE PROJECT. 12. ALL OS&Y VALVES TO HAVE TAMPER SWITCHES. 13. THE WET PIPE RISER SHALL BE COMPLETE WITH ALL ACCESSORIES AS REQUIRED BY NFPA 13 INCLUDING THE FOLLOWING: WET PIPE ALARM VALVE, 2" MAIN DRAIN, WATER MOTOR GONG, (2) GAGES, RETARDING CHAMBER, PRESSURE SWITCH, WATER FLOW SWITCH, ALARM TEST VALVE. 14. DO NOT INSTALL SPRINKLER PIPING OR ANY OTHER EQUIPMENT OVER ELECTRICAL PANELS AND EQUIPMENT. MAINTAIN A MINIMUM OF 36" CLEAR IN FRONT OF ELECTRICAL PANELS AND EQUIPMENT. 15. PROVIDE A FIRE DEPARTMENT CONNECTION AS SHOWN ON THE RISER DIAGRAM. COORDINATE TYPE, SIZE, AND LOCATION WITH FIRE MARSHAL. 16. PROVIDE A WATTS DETECTOR CHECK MODEL 07F WITH BY-PASS KIT AND GPM METER AT SERVICE ENTRANCE. 17. F.P.C. SHALL CUT AND PATCH EXISTING PLASTER OR DRYWALL CEILING AS REQUIRED FOR THE INSTALLATION OF HANGERS TO SUPPORT THE NEW PIPING ABOVE NEW SUSPENDED CEILING. THIS SHALL INCLUDE ALL NECESSARY STRUCTURAL MEMBERS AS REQUIRED FOR ADEQUATE SUPPORT. 18. PROVIDE 20 ADDITIONAL SPRINKLER HEADS WITH 10'-0" OF BRANCH PIPING INSTALL ABOVE CEILING PER SPRINKLER. FIRE PROTECTION SCOPE OF WORK 1. RUN UP-TO-DATE FLOW TEST. PROVIDE NEW 6" FIRE PROTECTION SERVICE TO BUILDING. 2. PROVIDE NEW 6" BACKFLOW PREVENTER FOR NEW FIRE SERVICE. 3. PROVIDE NEW FIRE PROTECTION SERVICE ENTRANCE. 4. PROVIDE SPRINKLER COVERAGE FOR ENTIRE FACILITY. 5. PROVIDE NEW RISER WITH FLOOR CONTROL ASSEMBLY ON EACH FLOOR. 6. PROVIDE NEW FIRE DEPARTMENT CONNECTION PER THE REQUIREMENTS OF THE LOCAL AUTHORITY HAVING JURISDICTION. 7. PROVIDE POST INDICATOR VALVE. FIRE PROTECTION SCOPE OF WORK INCLUDES, BUT IS NOT LIMITED TO, THE FOLLOWING: INDICATOR POST DETAIL FIRE PROTECTION ABBREVIATIONS FIRE PROTECTION SYMBOLS EFP FP BACKFLOW PREVENTER PIPE CAP PIPE RISE PIPE DROP FIRE PROTECTION EXIST FIRE PROTECTION CHECK VALVE UNION PRESSURE GAUGE DIRECTION OF FLOW OS&Y VALVE FLOW ALARM SWITCH CONCEALED PENDENT SPRINKLER HEAD RECESSED PENDENT SPRINKLER HEAD SIDEWALL SPRINKLER HEAD UPRIGHT SPRINKLER HEAD EXIST SPRINKLER HEAD TO BE REMOVED E EXTENDED COVERAGE CONCEALED SPRINKLER HEAD HOR HORIZONTAL ID INSIDE DIAMETER INT INTERIOR INV INVERT MB MOP BASIN OD OUTSIDE DIAMETER P PRESSURE GAUGE PD PRESSURE DROP PIV POST INDICATOR VALVE PRV PRESSURE REDUCING VALVE RCP REINFORCED CONCRETE PIPE SS SERVICE SINK TS TAMPER SWITCH VER VERTICAL WIV WALL INDICATOR VALVE AFG ABOVE FINISHED GRADE AFR ABOVE FINISHED ROOF BFG BELOW FINISHED GRADE BFP BACKFLOW PREVENTER BLW BELOW BOTT BOTTOM BV BUTTERFLY VALVE CA COMPRESSED AIR CIP CAST IRON PIPE DIP DUCTILE IRON PIPE EXT EXTERIOR FA FIRE ALARM FDN FOUNDATION FDC FIRE DEPARTMENT CONNECTION FDV FIRE DEPARTMENT VALVE FH FIRE HYDRANT FHC FIRE HOSE CABINET FD FLOOR DRAIN FS FLOW SWITCH FTG FOOTING NO SCALE MIN. 48" GATE VALVE FIRE PROTECTION MAIN OPERATING WRENCH LOCKING STAPLE 40" 30" GRADE BODY SHUT T TAMPER SWITCH PROVIDED BY FPC, WIRED BY EC (TYPICAL) (VERIFY EXACT LOCATION WITH FIRE MARSHAL AND ARCHITECT) COMMON ABBREVIATIONS COMMON SYMBOLS CONNECT TO EXISTING EXISTING TO BE REMOVED PLAN NORTH SECTION ID A H1.1 SHEET NO. WHERE SECTION IS DIRECTIONAL VIEW OF SECTION 1 REVISION NUMBER ELEVATION 100.00' 1 KEYNOTE EQUIPMENT TAG SHOWING TYPE AND ID. SEE EQUIPMENT SCHEDULES FOR DETAILS EXISTING TO REMAIN REMOVE EXISTING PROVIDE NEW N TYPE ID REVISION CLOUD DETAIL ID 1 H1.1 SHEET NO. WHERE DETAIL IS 101 ROOM/SPACE NO. 11 H1.1 DIRECTION OF VIEW SHEET NO. WHERE EL. IS DRAWN ELEVATION ID A/E ARCHITECT/ENGINEER AC ABOVE CEILING ABV ABOVE AFF ABOVE FINISHED FLOOR AFI ARC-FAULT INTERRUPTER AFR ABOVE FINISHED ROOF ALT ALTERNATE ATS AUTOMATIC TRANSFER SWITCH ATC AUTOMATIC TEMPERATURE CONTROL - COORDINATE LOCATION C/G COUNTERTOP GFI CD CORD DROP CL CENTERLINE CLG CEILING CM CEILING MOUNT COL COLUMN CT COUNTERTOP HEIGHT-44" AFF UNO OR CURRENT TRANSFORMER CR CORD REEL DBF DOWN BELOW FLOOR DET DETAIL DIA DIAMETER DIM DIMENSION DN DOWN DW DISHWASHER DWG DRAWING EC ELECTRICAL CONTRACTOR EL ELEVATION ELEV ELEVATOR EMER EMERGENCY EO EMERGENCY ONLY (NORMALLY OFF) EWC ELECTRIC WATER COOLER (PROVIDE GFI RECEPTACLE) EQ EQUIPMENT, COORDINATE LOCATION EX EXISTING FA FIRE ALARM FBO FURNISHED BY OWNER FLR FLOOR FPC FIRE PROTECTION CONTRACTOR FSC FOOD SERVICE CONTRACTOR GC GENERAL CONTRACTOR GFI GROUND-FAULT INTERRUPTER GND GROUND HC HVAC CONTRACTOR HCP HANDICAPPED HGT HEIGHT HR HOUR IR INFRARED JB JUNCTION BOX KES KITCHEN EQUIPMENT SUPPLIER LV LOW-VOLTAGE MC MECHANICAL CONTRACTOR MCA MINIMUM CIRCUIT AMPACITY MOCP MAXIMUM OVERCURRENT PROTECTION MT MULTITECHNOLOGY MO MICROWAVE OVEN NA NOT APPLICABLE NE NORMAL/EMERGENCY (NORMALLY ON) NIC NOT IN CONTRACT NTS NOT TO SCALE OFCI OWNER FURNISHED- CONTRACTOR INSTALLED EQ FOR EQUIPMENT, COORDINATE LOCATION P PEDESTAL PC PLUMBING CONTRACTOR PIR PASSIVE INFRARED SE SERVICE ENTRANCE SECT SECTION SHT SHEET SIM SIMILAR SPD SURGE PROTECTION DEVICE SPEC SPECIFICATION SS SERVICE SINK STD STANDARD SUSP SUSPENDED SB SMARTBOARD COORDINATE LOCATION TL TASK LIGHT TR TAMPER RESISTANT TSTAT THERMOSTAT TV FOR TV, COORDINATE LOCATION TVSS TRANSIENT VOLTAGE SURGE SUPPRESSER UNO UNLESS NOTED OTHERWISE US ULTRASONIC USB 2 USB PORTS IN ADDITION TO RECEPTACLES W/ WITH W/O WITHOUT W WALL-MOUNTED WP WEATHERPROOF FULL SHEET SIZE: 30" x 42" SHEET NUMBER PROJECT NUMBER REGISTRATION CURRENT ISSUE COPYRIGHT 2016 SFA DRAWING HISTORY SITE / CIVIL ENGINEER LANDSCAPE ARCHITECT STRUCTURAL ENGINEER MECHANICAL / ELECTRICAL / PLUMBING FIRE PROTECTION ENGINEER TELECOM ENGINEER AUDIO VISUAL ENGINEER SECURITY ENGINEER ACOUSTICAL ENGINEER F0.1 LVE-14179 Cover Sheet BUCKS COUNTY COMMUNITY COLLEGE FOUNDERS HALL RENOVATIONS 275 Swamp Rd, Newtown, PA 18940 275 Swamp Rd, Newtown, PA 18940 CONFORMED CONSTRUCTION SET 12/07/2016 N/A N/A BARRY ISETT ASSOCIATES 85 PA-100, Allentown, PA 18106 LEHIGH VALLEY ENGINEERING 1 W Broad St #500, Bethlehem, PA 18018 LEHIGH VALLEY ENGINEERING N/A N/A N/A N/A DRAWING LIST F0.1 Cover Sheet F2.0 Ground Floor Plan F2.1 First Floor Plan F2.2 Second Floor Plan F2.3 Third Floor Plan P0.1 Cover Sheet P1.0 Foundation Plan - Demolition P1.0A Ground Floor Plan - Demolition P1.1 First Floor Plan - Demolition P1.2 Second Floor Plan - Demolition P1.3 Roof Plan - Demolition P2.0 Foundation Plan - Labs - Drainage P2.0A Ground Floor Plan - Labs - Drainage P2.1 First Floor Plan - Labs - Drainage P2.2 Second Floor Plan - Labs - Drainage P2.3 Roof Plan - Drainage P3.0 Foundation Plan - Labs - Supply P3.0A Ground Floor Plan - Labs - Supply P3.1 First Floor Plan - Labs - Supply P3.2 Second Floor Plan - Labs - Supply P7.1 Riser Diagrams P8.1 Details and Schedules H0.1 Cover Sheet H1.0 Ground Floor Plan - Demolition H1.1 First Floor Plan - Demolition H1.2 Second Floor Plan - Demolition H1.3 Third Floor Plan - Demolition H2.0 Ground Floor Plan - HVAC H2.1 First Floor Plan - HVAC H2.2 Second Floor Plan - HVAC H2.3 Third Floor Plan - HVAC H3.0 Ground Floor - HVAC - Piping H3.1 First Floor - HVAC - Piping H3.2 Second Floor - HVAC - Piping H3.3 Third Floor - HVAC - Piping H5.1 Enlarged Plans & Sections-HVAC H5.2 Sections H5.3 Sections H7.0 Details H7.1 Details H7.2 Details H7.3 Details H7.4 Details H7.5 Details H8.0 Schedules H8.1 Schedules H8.2 Schedules H8.3 Schedules E1.0 Ground Floor Plan - Demolition E1.1 First Floor Plan - Demolition E1.2 Second Floor Plan - Demolition E1.3 Third Floor Plan - Demolition E2.0 Ground Floor Plan - Lighting E2.1 First Floor Plan - Lighting E2.2 Second Floor Plan - Lighting E2.3 Third Floor Plan - Lighting E3.0 Ground Floor Plan - Power E3.1 First Floor Plan - Power E3.2 Second Floor Plan - Power E3.3 Third Floor Plan - Power E4.0 Ground Floor Plan - Low-Voltage E4.1 First Floor Plan - Low-Voltage E4.2 Second Floor Plan - Low-Voltage E4.3 Third Floor Plan - Low-Voltage E5.1 Enlarged Kitchen Plan E7.1 Single Line Diagrams E7.2 Details E7.3 Teledata Details E8.1 Schedules E8.2 Schedules E8.3 Schedules E8.4 Schedules E8.5 Schedules NO. ISSUE DATE: DESCRIPTION

Upload: truongthien

Post on 08-Mar-2018

229 views

Category:

Documents


2 download

TRANSCRIPT

9

6"

6"

2" MAIN DRAIN

ALARM TEST VALVE

6" O.S.&Y. VALVE WITH TAMPER SWITCH

1

15

16

14

2

3

4

1

5

6

7

8

9

10

11

13

12

VIKING WATER MOTOR ALARM #F-1 WITH POTTER ROEMER

NEW 6"FP MAIN

SIGN # 6340, "WHEN BELL RINGS CALL FIRE DEPARTMENT"

2" DRAIN PIPED 6" ABOVE FINISHED GRADE

6" VIKING ALARM CHECK VALVE

2" MAIN DRAIN VALVE

PIPE SUPPORT TEE

PRESSURE SWITCH MODEL A-1

VIKING RETARDING CHAMBER #B-3

WATER GUAGE

FLOW SWITCH

BALL DRIP

CHECK VALVE

4

2

1

5

11

8

16

12

13

14

15

FLOOR

NO SCALE

WET SPRINKLER RISER DIAGRAM

7

10

THIS RISER DIAGRAM IS FOR GENERAL INFORMATIONONLY. THE INSTALLATION OF THE SPRINKLER SYSTEMSHALL BE IN COMPLIANCE WITH NFPA 13 AND LOCALAUTHORITY HAVING JURISDICTION.

17

CHROME FIRE DERAPTMENT CONNECTIONWITH "AUTO SPRINKLER' LETTERING. VERIFYTYPE AND LOCATION WITH LOCAL FIRE DEPT.

6"

17 WATTS DOUBLE DETECTOR CHECKASSEMBLY, MODEL NO. 709DCDA-OSY-GPM

6

RISER DIAGRAM NOTES

GENERAL SPRINKLER NOTES:

1. PROVIDE A WET PIPE SYSTEM. THE WET SPRINKLER SYSTEM SHALL BE HYDRAULICALLY CALCULATED TO

PROVIDE THE PRESCRIBED DENSITY UNIFORMLY OVER THE MOST REMOTE AREA. COPIES OF THE

CALCULATIONS SHALL BE SUBMITTED WITH THE SHOP DRAWINGS. THE BUILDING IS LIGHT HAZARD

OCCUPANCY. THE WET DENSITY SHALL BE 0.10 GPM/SQ. FT. OVER THE MOST REMOTE 1500 SQ. FT. FOR

LIGHT HAZARD AND .15 OVER 1500 SQ. FT. FOR ORDINARY HAZARD WITH 250 GPM ALLOWANCE FOR HOSE

STREAMS.

2. SPRINKLER HEAD LOCATIONS SHALL BE AS SHOWN ON THE REFLECTED CEILING PLAN DRAWINGS.

SPRINKLER HEADS SHALL BE CENTERED IN CEILING TILES AND LOCATED SYMMETRICALLY WITH LIGHTING

FIXTURES AND DIFFUSERS AS REQUIRED, UNLESS NOTED OTHERWISE.

3. THE SPRINKLER HEAD SPACING AND LOCATIONS IN THE ENTIRE SPRINKLER SYSTEM SHALL BE

INSTALLED IN ACCORDANCE WITH NFPA-13.

4. THE FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING SHOP DRAWINGS AND

HYDRAULIC CALCULATIONS TO ALL AGENCIES HAVING JURISDICTION FOR REVIEW AND APPROVAL,

INCLUDING THE LOCAL BUILDING INSPECTOR. DRAWINGS AND CALCULATIONS SHALL BEAR THE SEAL OF

A LICENSED FIRE PROTECTION ENGINEER.

5. THE ENTIRE BUILDING SHALL BE SPRINKLERED. THIS SHALL INCLUDE THE CONCEALED COMBUSTIBLE

SPACES. AREAS SUBJECT TO FREEZING SHALL HAVE DRY PENDENT TYPE HEADS. CONCEALED

COMBUSTIBLE SPACES WILL INCLUDE BUT NOT LIMITED TO: ATTIC SPACE, AND OVERHANGING ROOF

SPACES.

6. SPRINKLER HEADS IN FINISHED SPACES SHALL BE CONCEALED TYPE 1/2" ORIFICE WITH WHITE COVER

PLATE. THE TWO PIECE DESIGN SHALL ALLOW FOR REMOVAL OF THE CEILING TILES WITHOUT

DISTURBING THE SPRINKLER SYSTEM.

7. SPRINKLER HEADS IN CONCEALED SPACES AND MECHANICAL ROOMS SHALL BE BRASS PENDENT TYPE

WITH SPRINKLER GUARDS.

8. THE SPRINKLER DISTRIBUTION SYSTEM SHALL BE SCHEDULE 10 PIPE WITH ROLL GROOVED FITTINGS FOR

2 1/2" AND LARGER, AND SCHEDULE 40 THREADED PIPE FOR 2" AND SMALLER.

9. PROVIDE INSPECTOR TEST STATIONS AT THE MOST REMOTE POINT OF THE SPRINKLER RISER.

10. THE WATER SOURCE FOR THE SPRINKLER SYSTEM IS CITY WATER. PROVIDE UP-TO-DATE FLOW TEST.

11. THE SPRINKLER CONTRACTOR SHALL REVIEW ALL PROJECT DRAWINGS AND COORDINATE THE

INSTALLATION OF THE PIPING WITH ALL OTHER TRADES FOR THE PROJECT.

12. ALL OS&Y VALVES TO HAVE TAMPER SWITCHES.

13. THE WET PIPE RISER SHALL BE COMPLETE WITH ALL ACCESSORIES AS REQUIRED BY NFPA 13 INCLUDING

THE FOLLOWING: WET PIPE ALARM VALVE, 2" MAIN DRAIN, WATER MOTOR GONG, (2) GAGES, RETARDING

CHAMBER, PRESSURE SWITCH, WATER FLOW SWITCH, ALARM TEST VALVE.

14. DO NOT INSTALL SPRINKLER PIPING OR ANY OTHER EQUIPMENT OVER ELECTRICAL PANELS AND

EQUIPMENT. MAINTAIN A MINIMUM OF 36" CLEAR IN FRONT OF ELECTRICAL PANELS AND EQUIPMENT.

15. PROVIDE A FIRE DEPARTMENT CONNECTION AS SHOWN ON THE RISER DIAGRAM. COORDINATE TYPE,

SIZE, AND LOCATION WITH FIRE MARSHAL.

16. PROVIDE A WATTS DETECTOR CHECK MODEL 07F WITH BY-PASS KIT AND GPM METER AT SERVICE

ENTRANCE.

17. F.P.C. SHALL CUT AND PATCH EXISTING PLASTER OR DRYWALL CEILING AS REQUIRED FOR THE

INSTALLATION OF HANGERS TO SUPPORT THE NEW PIPING ABOVE NEW SUSPENDED CEILING. THIS

SHALL INCLUDE ALL NECESSARY STRUCTURAL MEMBERS AS REQUIRED FOR ADEQUATE SUPPORT.

18. PROVIDE 20 ADDITIONAL SPRINKLER HEADS WITH 10'-0" OF BRANCH PIPING INSTALL ABOVE CEILING PER

SPRINKLER.

FIRE PROTECTION SCOPE OF WORK

1. RUN UP-TO-DATE FLOW TEST. PROVIDE NEW 6" FIRE PROTECTION SERVICE

TO BUILDING.

2. PROVIDE NEW 6" BACKFLOW PREVENTER FOR NEW FIRE SERVICE.

3. PROVIDE NEW FIRE PROTECTION SERVICE ENTRANCE.

4. PROVIDE SPRINKLER COVERAGE FOR ENTIRE FACILITY.

5. PROVIDE NEW RISER WITH FLOOR CONTROL ASSEMBLY ON EACH FLOOR.

6. PROVIDE NEW FIRE DEPARTMENT CONNECTION PER THE REQUIREMENTS

OF THE LOCAL AUTHORITY HAVING JURISDICTION.

7. PROVIDE POST INDICATOR VALVE.

FIRE PROTECTION SCOPE OF WORK INCLUDES, BUTIS NOT LIMITED TO, THE FOLLOWING:

INDICATOR POST DETAIL

FIRE PROTECTION ABBREVIATIONS

FIRE PROTECTION SYMBOLS

EFP

FP

BACKFLOW PREVENTER

PIPE CAP

PIPE RISE

PIPE DROP

FIRE PROTECTION

EXIST FIRE PROTECTION

CHECK VALVE

UNION

PRESSURE GAUGE

DIRECTION OF FLOW

OS&Y VALVE

FLOW ALARM SWITCH

CONCEALED PENDENTSPRINKLER HEAD

RECESSED PENDENTSPRINKLER HEAD

SIDEWALL SPRINKLER HEAD

UPRIGHT SPRINKLER HEAD

EXIST SPRINKLER HEADTO BE REMOVED

EEXTENDED COVERAGECONCEALED SPRINKLER HEAD

HOR HORIZONTAL

ID INSIDE DIAMETER

INT INTERIOR

INV INVERT

MB MOP BASIN

OD OUTSIDE DIAMETER

P PRESSURE GAUGE

PD PRESSURE DROP

PIV POST INDICATOR VALVE

PRV PRESSURE REDUCING VALVE

RCP REINFORCED CONCRETE PIPE

SS SERVICE SINK

TS TAMPER SWITCH

VER VERTICAL

WIV WALL INDICATOR VALVE

AFG ABOVE FINISHED GRADE

AFR ABOVE FINISHED ROOF

BFG BELOW FINISHED GRADE

BFP BACKFLOW PREVENTER

BLW BELOW

BOTT BOTTOM

BV BUTTERFLY VALVE

CA COMPRESSED AIR

CIP CAST IRON PIPE

DIP DUCTILE IRON PIPE

EXT EXTERIOR

FA FIRE ALARM

FDN FOUNDATION

FDC FIRE DEPARTMENT CONNECTION

FDV FIRE DEPARTMENT VALVE

FH FIRE HYDRANT

FHC FIRE HOSE CABINET

FD FLOOR DRAIN

FS FLOW SWITCH

FTG FOOTING

NO SCALE

MIN.48"

GATE VALVE

FIRE PROTECTION MAIN

OPERATING WRENCH

LOCKING STAPLE

40"

30"

GRADE

BODY

SHUT

T TAMPER SWITCH PROVIDED BYFPC, WIRED BY EC (TYPICAL)

(VERIFY EXACT LOCATION WITH FIRE MARSHAL AND ARCHITECT)

COMMON ABBREVIATIONS

COMMON SYMBOLS

CONNECT TO EXISTING

EXISTING TO BE REMOVED

PLAN NORTH

SECTION IDA

H1.1 SHEET NO. WHERE SECTION IS

DIRECTIONAL VIEW OF SECTION

1 REVISION NUMBER

ELEVATION100.00'

1 KEYNOTE

EQUIPMENT TAG SHOWINGTYPE AND ID. SEE EQUIPMENTSCHEDULES FOR DETAILS

EXISTING TO REMAIN

REMOVE EXISTING

PROVIDE NEW

N

TYPEID

REVISION CLOUD

DETAIL ID1

H1.1 SHEET NO. WHERE DETAIL IS

101 ROOM/SPACE NO.

11 H1.1

DIRECTION OF VIEW

SHEET NO. WHERE EL. IS DRAWN

ELEVATION ID

A/E ARCHITECT/ENGINEER

AC ABOVE CEILING

ABV ABOVE

AFF ABOVE FINISHED FLOOR

AFI ARC-FAULT INTERRUPTER

AFR ABOVE FINISHED ROOF

ALT ALTERNATE

ATS AUTOMATIC TRANSFER SWITCH

ATC AUTOMATIC TEMPERATURECONTROL - COORDINATE LOCATION

C/G COUNTERTOP GFI

CD CORD DROP

CL CENTERLINE

CLG CEILING

CM CEILING MOUNT

COL COLUMN

CT COUNTERTOP HEIGHT-44" AFF UNOOR CURRENT TRANSFORMER

CR CORD REEL

DBF DOWN BELOW FLOOR

DET DETAIL

DIA DIAMETER

DIM DIMENSION

DN DOWN

DW DISHWASHER

DWG DRAWING

EC ELECTRICAL CONTRACTOR

EL ELEVATION

ELEV ELEVATOR

EMER EMERGENCY

EO EMERGENCY ONLY (NORMALLYOFF)

EWC ELECTRIC WATER COOLER(PROVIDE GFI RECEPTACLE)

EQ EQUIPMENT, COORDINATELOCATION

EX EXISTING

FA FIRE ALARM

FBO FURNISHED BY OWNER

FLR FLOOR

FPC FIRE PROTECTION CONTRACTOR

FSC FOOD SERVICE CONTRACTOR

GC GENERAL CONTRACTOR

GFI GROUND-FAULT INTERRUPTER

GND GROUND

HC HVAC CONTRACTOR

HCP HANDICAPPED

HGT HEIGHT

HR HOUR

IR INFRARED

JB JUNCTION BOX

KES KITCHEN EQUIPMENT SUPPLIER

LV LOW-VOLTAGE

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPACITY

MOCP MAXIMUM OVERCURRENTPROTECTION

MT MULTITECHNOLOGY

MO MICROWAVE OVEN

NA NOT APPLICABLE

NE NORMAL/EMERGENCY(NORMALLY ON)

NIC NOT IN CONTRACT

NTS NOT TO SCALE

OFCI OWNER FURNISHED-CONTRACTOR INSTALLED

EQ FOR EQUIPMENT, COORDINATE LOCATION

P PEDESTAL

PC PLUMBING CONTRACTOR

PIR PASSIVE INFRARED

SE SERVICE ENTRANCE

SECT SECTION

SHT SHEET

SIM SIMILAR

SPD SURGE PROTECTION DEVICE

SPEC SPECIFICATION

SS SERVICE SINK

STD STANDARD

SUSP SUSPENDED

SB SMARTBOARD COORDINATE LOCATION

TL TASK LIGHT

TR TAMPER RESISTANT

TSTAT THERMOSTAT

TV FOR TV, COORDINATE LOCATION

TVSS TRANSIENT VOLTAGESURGE SUPPRESSER

UNO UNLESS NOTED OTHERWISE

US ULTRASONIC

USB 2 USB PORTS IN ADDITION TO RECEPTACLES

W/ WITH

W/O WITHOUT

W WALL-MOUNTED

WP WEATHERPROOF

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

F0.1LVE-14179

Cover Sheet

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

275 Swamp Rd, Newtown, PA 18940

275 Swamp Rd, Newtown, PA 18940

CONFORMEDCONSTRUCTION SET

12/07/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

DRAWING LIST

F0.1 Cover Sheet

F2.0 Ground Floor Plan

F2.1 First Floor Plan

F2.2 Second Floor Plan

F2.3 Third Floor Plan

P0.1 Cover Sheet

P1.0 Foundation Plan - Demolition

P1.0A Ground Floor Plan - Demolition

P1.1 First Floor Plan - Demolition

P1.2 Second Floor Plan - Demolition

P1.3 Roof Plan - Demolition

P2.0 Foundation Plan - Labs - Drainage

P2.0A Ground Floor Plan - Labs - Drainage

P2.1 First Floor Plan - Labs - Drainage

P2.2 Second Floor Plan - Labs - Drainage

P2.3 Roof Plan - Drainage

P3.0 Foundation Plan - Labs - Supply

P3.0A Ground Floor Plan - Labs - Supply

P3.1 First Floor Plan - Labs - Supply

P3.2 Second Floor Plan - Labs - Supply

P7.1 Riser Diagrams

P8.1 Details and Schedules

H0.1 Cover Sheet

H1.0 Ground Floor Plan - Demolition

H1.1 First Floor Plan - Demolition

H1.2 Second Floor Plan - Demolition

H1.3 Third Floor Plan - Demolition

H2.0 Ground Floor Plan - HVAC

H2.1 First Floor Plan - HVAC

H2.2 Second Floor Plan - HVAC

H2.3 Third Floor Plan - HVAC

H3.0 Ground Floor - HVAC - Piping

H3.1 First Floor - HVAC - Piping

H3.2 Second Floor - HVAC - Piping

H3.3 Third Floor - HVAC - Piping

H5.1 Enlarged Plans & Sections-HVAC

H5.2 Sections

H5.3 Sections

H7.0 Details

H7.1 Details

H7.2 Details

H7.3 Details

H7.4 Details

H7.5 Details

H8.0 Schedules

H8.1 Schedules

H8.2 Schedules

H8.3 Schedules

E1.0 Ground Floor Plan - Demolition

E1.1 First Floor Plan - Demolition

E1.2 Second Floor Plan - Demolition

E1.3 Third Floor Plan - Demolition

E2.0 Ground Floor Plan - Lighting

E2.1 First Floor Plan - Lighting

E2.2 Second Floor Plan - Lighting

E2.3 Third Floor Plan - Lighting

E3.0 Ground Floor Plan - Power

E3.1 First Floor Plan - Power

E3.2 Second Floor Plan - Power

E3.3 Third Floor Plan - Power

E4.0 Ground Floor Plan - Low-Voltage

E4.1 First Floor Plan - Low-Voltage

E4.2 Second Floor Plan - Low-Voltage

E4.3 Third Floor Plan - Low-Voltage

E5.1 Enlarged Kitchen Plan

E7.1 Single Line Diagrams

E7.2 Details

E7.3 Teledata Details

E8.1 Schedules

E8.2 Schedules

E8.3 Schedules

E8.4 Schedules

E8.5 Schedules

NO. ISSUE DATE: DESCRIPTION

S

FCM

S

S

FCM

S

H

S

S

S

S

S

S

S

SSS

H

S

SSSSSF

F

F

FF F

FF

F

IMIMIM

OM

S

H

F

S

S

S

S

S

H

S

H

S

S

F

3 4 5 6 7 8 9 10 11

L

K

H

G

F

E

D1

DC

B

A1

A

5.1

8.1

2.1 2.2

C1C2

C3

C4 C5

E

E

E E

E

E

EE

E

E

EE

EE

E E

EE

E

E

EE

E

E

PATIENT CARE

LAB

F015

MEDICAL

ASSISTANCE LAB

09

PHLEBOTOMY

LAB

06

STAIR #3

S3-0

CORRIDOR #1

C1-0

M. TOIL

19

JC

18STAIR #4

S4-0

STORAGE

10

STORAGE

17

PATIENT CARE

LAB

16

STORAGE

12W. TOIL

03

LOWER LECTURE

HALL

140

STORAGE

04

MECH

21

E. LOBBY

22

TYPICAL EXTENDEDCOVERAGE CONCEALEDSPRINKLER HEAD

TYPICAL CONCEALEDSPRINKLER HEAD

TYPICAL BRASS UPRIGHTSPRINKLER WITHSPRINKLER GUARD

PROVIDE 180 DEGREE FACTORY BRASSSIDEWALL HEAD 18"ABOVE FLOOR OFELEVATOR PIT AND WITHIN 2'-0" OF HEATDETECTOR. COORDINATE EXACTLOCATION WITH EC.

REFER TO WETSPRINKLER RISERDIAGRAM ON DWG. F0.1

2.1 3 4 5 5.1 6 7 8 8.1 9 10 11 2.2

A

A1

B

CD

D1

E

F

G

H

K

L

MAINTAIN MINIMUM OF 3'-6" AWAYFROM SOFFIT PER NFPA-13.(TYPICAL FOR 12" DEEP SOFFITS"

MAINTAIN MINIMUM OF 3'-6" AWAYFROM SOFFIT PER NFPA-13.(TYPICAL FOR 12" DEEP SOFFITS"

MAINTAIN MINIMUM OF 3'-6" AWAYFROM SOFFIT PER NFPA-13.(TYPICAL FOR 12" DEEP SOFFITS"

MAINTAIN MINIMUM OF 3'-6" AWAYFROM SOFFIT PER NFPA-13.(TYPICAL FOR 12" DEEP SOFFITS"

PROVIDE 60' OF NEW 6" SERVICE MAIN. CONNECT NEW6"FP MAIN TO EXISTING WATER MAIN. PROVIDE ALLEXCAVATION, INSTALLATION OF PIPE, BACKFILL,COMPACTION AND RESTORATION OF FINISHED SURFACE TOMATCH EXISTING.

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

F2.0LVE-14179

Ground Floor Plan

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

275 Swamp Rd, Newtown, PA 18940

275 Swamp Rd, Newtown, PA 18940

CONFORMEDCONSTRUCTION SET

12/07/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

N

2'

Scale: 1/8" = 1'-0"

0 4' 8' 16'

GROUND FLOOR PLAN

NO. ISSUE DATE: DESCRIPTION

E8

E1

E1

E4

E1

E1

E1

E1

E23

E4

E1

E8

E12

E1

E27

E15

E10

E11

E9

E28

E20

E13

23

18B

8

1

2

1

4

1

3

3

3

2

1

3

1

2

1

16

23

17

31

31

30

6 6

18A

4

1

3

3

3

24

23

7

8

6

14

12

19

21

2

1

3

27

22

22

15

5

26

2910

11

13

9

28

25

20

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

24X60 24X60

24X60

SS

S

S S S S S S S S

SSSS

S

SSSS

SS

S

S

SS

H

S

S

SS

SSSSS S

S

S

S

S SS

S

SS

S

S

S

S S

S

S

S

S

S

S

S

S

S

SSS

S

S

S S S S S S

S S

S S

S

S S

F

F

F

F

S

S

FF

FCMF

CM

F

F FFF

F

FF

F

F

F

FF

F

S

F F SSS

S

FF

F

S

FCM

S

F

F

F F

F F

F

S

S

S

S

S

F

S

SS

F

S

S

S

MM

S

S

F F

S

S

S

S

S

SS

S

S

H

H

S

F

F

F

F

F

S

S

2 3 4 5 6 7 8 9 10 11 12 13 14 15

L

K

H

G

F

E

D1

DC

B

A1

A

5.1

8.1

2.1 2.2

C1C2

C3

C4 C5

ELECTRICAL LAB

148

COMPUTER LAB

152

PROJECT ROOM

157

STEM LEARNING

CENTER

156

CLASSROOM

106

OFFICE

110A

CLASSROOM

115

CLASSROOM

117

CLASSROOM

120

OFFICE

121

IDF

122

OFFICE

123

OFFICE

124

OFFICE

125

CONF. RM.

127

OFFICE

128

OFFICE

130

OFFICE

133

OFFICE

134

CLASSROOM

135

MECHANICAL

111

MECHANICAL

153

STAIR #3

S3-1

M. TOIL

159

STOR

160

STAIR #4

S4-1

CORRIDOR

C5-1

CORRIDOR

C4-1

UPPER LECTURE

HALL

140

LECTURE HALL

141

LOBBY

142

STAIR #5

S5-1

CORRIDOR

C2-1

ELEV VEST

001

ELEV LOBBY

003

STAIR #1

S1-1

MECH ROOM

104W. TOIL

102

MECH ROOM

101

W. TOIL

146

MECH PREP

155

MECHANICAL LAB

154

MECH STOR

151

OFFICE

110B

KITCHENETTE

110C

OFFICE

110F

OFFICE

110G

OFFICE

110H

OFFICE

110D

OFFICE

110E

STEM/PS OFFICES

110

OFFICE

122A

OFFICE

126

OFFICE

131

OFFICE

132A

OFFICE

132

OFFICE

129OFFICE

136

MEETING RM 4

161

MEETING RM 2

116

MEETING RM 3

118

ELEC.

138

?

?

J. CL.

105

VESTIBULE

142A

STAIR #3

S3-1

TLT

S3-6

MECH

002

CORRIDOR

C1-1

CORRIDOR

C1-4

STAIR

S6-1

STAIR

S7-1

CORRIDOR

C1-7

E

EE

E

E

E

EE

E

EEE

E

EE

E

E

E

E

E

E

EE

E

E

E

PROVIDE CONCEALEDSPRINKLER HEAD,COLOR AS SELECTEDBY ARCHITECT(TYPICAL)

TYPICAL BRASS UPRIGHTSPRINKLER WITHSPRINKLER GUARD

TYPICAL EXTENDEDCOVERAGE CONCEALEDSPRINKLER HEAD

2.1 3 4 5 5.1 6 7 8 8.1 9 10 11 2.2 12 13 14 15

A

A1

B

CD

D1

E

F

G

H

K

L

PROVIDE 183° FACTORY BRASSSIDEWALL HEAD 18" ABOVE FLOOR OFELEVATOR PIT. LOCATE WITHIN 2'-0" OFHEAT DETECTOR. COORDINATE EXACTLOCATION WITH EC.

MAINTAIN MINIMUM OF 3'-6" AWAYFROM SOFFIT PER NFPA-13.(TYPICAL FOR 12" DEEP SOFFITS"

MAINTAIN MINIMUM OF 3'-6" AWAYFROM SOFFIT PER NFPA-13.(TYPICAL FOR 12" DEEP SOFFITS"

MAINTAIN MINIMUM OF 3'-6" AWAYFROM SOFFIT PER NFPA-13.(TYPICAL FOR 12" DEEP SOFFITS"

MAINTAIN MINIMUM OF 3'-6" AWAYFROM SOFFIT PER NFPA-13.(TYPICAL FOR 12" DEEP SOFFITS"

REFER TO DETAIL ON DWG. F0.1 FORPOST HYDRANT DETAIL

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

F2.1LVE-14179

First Floor Plan

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

275 Swamp Rd, Newtown, PA 18940

275 Swamp Rd, Newtown, PA 18940

CONFORMEDCONSTRUCTION SET

12/07/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

N

2'

Scale: 1/8" = 1'-0"

0 4' 8' 16'

FIRST FLOOR PLAN

NO. ISSUE DATE: DESCRIPTION

E8

E1

E1

E4

E1

E1

E1

E1

E23

E4

E1

E8

E12

E1

E27

E15

E10

E11

E9

E28

E20

E13

23

18B

8

1

2

1

4

1

3

3

3

2

1

3

1

2

1

16

23

17

31

31

30

6 6

18A

4

1

3

3

3

24

23 23

7

8

6

14

12

19

21

2

1

3

27

22

22

15

5

26

2910

11

13

9

28

25

20

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

24X60 24X60

24X60

S

S

S

S

S

S S

S

SS

S

S

S S

S

S S S S

S

S S

S S

S

S S

S

S

S

S

SSSSSSSS

S

S

SSSS

S

SSSSSS

S

S

S

S

S

S S S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

H

H

S

FCM

FCM

F

F

FFF

F

F

F

F

F

F F F F F

F

F

F

FF

F

F F F

F

F

FF

S

S

S

S

S

FF

F

F

S

S

SS

FCM

H

H

F

F

FF

S

S

S S

S

S

S

IM

IM

IM

M

S

S

S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

L

K

H

G

F

E

D1

DC

B

A1

A

5.1

8.1

2.1 2.2

C1C2

C3

C4 C5

COOKING AND

BAKING

CULINARY

INSTRUCTIONAL

LAB

244

VOCATIONAL

CLASSROOM

247

COMPUTER LAB

250

ELEC.

221A

OFFICE

220

OFFICE

221

OFFICE

222

OFFICE

223

OFFICE

224

OFFICE

225

OFFICE

226

OFFICE

227

OFFICE

229

OFFICE

230

OFFICE

231

OFFICE

232

OFFICE

233

CLASSROOM

234

OFFICE

231A

CLASSROOM

212

CLASSROOM

214

CLASSROOM

216

CLASSROOM

218

OFFICE

205A

OFFICE

206

OFFICE

207

OFFICE

208

OFFICE

209

OFFICE

210

OFFICE

211

OFFICE

210A

OFFICE

205

CLASSROOM

204

ELEV VEST

203

STAIR #1

S1-2

MECH ROOM

200

W. TOIL

202

MECH ROOM

201

UPPER LECTURE

HALL

239

CORRIDOR

C4-2

CORRIDOR

C5-2

CORRIDOR

C3-2 STAIR #4

S4-2

M. TOIL

255

STOR

256

CORRIDOR

C1-2

STAIR #5

S5-2

CORRIDOR #2

C2-2

UPPER LECTURE

HALL

140

STAIR #1

S1-1

MECH ROOM

104

W. TOIL

243

OBSERVATION /

CONTROL ROOM

253C

OFFICE

228

STAIR #3

S3-2

SIM. LOBBY

253

ICU

253B

SIMULATION

253D

STORAGE

253F

SIMULATION

253E

SIMULATION

253A

OFFICE

235

BALCONY

257

CLST.

236

STAIR #3

S6-2

STAIR #3

S7-2

CORRIDOR

C1-10

E E

EE

E E

EE

E E

EE

E E

EE E E

EE

E E

EE

E

E

E

E

E

TYPICAL BRASS UPRIGHTSPRINKLER WITHSPRINKLER GUARD

TYPICAL EXTENDEDCOVERAGE CONCEALEDSPRINKLER HEAD

TYPICAL CONCEALEDSPRINKLER HEAD

A

A1

B

CD

D1

E

F

G

H

K

LMAINTAIN MINIMUM OF 3'-6" AWAYFROM SOFFIT PER NFPA-13.(TYPICAL FOR 12" DEEP SOFFITS"

MAINTAIN MINIMUM OF 3'-6" AWAYFROM SOFFIT PER NFPA-13.(TYPICAL FOR 12" DEEP SOFFITS"

MAINTAIN MINIMUM OF 3'-6" AWAY FROMSOFFIT PER NFPA-13. (TYPICAL FOR 12"DEEP SOFFITS"

MAINTAIN MINIMUM OF 3'-6" AWAYFROM SOFFIT PER NFPA-13.(TYPICAL FOR 12" DEEP SOFFITS"

MAINTAIN MINIMUM OF 3'-6" AWAYFROM SOFFIT PER NFPA-13.(TYPICAL FOR 12" DEEP SOFFITS"

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

F2.2LVE-14179

Second Floor Plan

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

275 Swamp Rd, Newtown, PA 18940

275 Swamp Rd, Newtown, PA 18940

CONFORMEDCONSTRUCTION SET

12/07/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

N

2'

Scale: 1/8" = 1'-0"

0 4' 8' 16'

SECOND FLOOR PLAN

NO. ISSUE DATE: DESCRIPTION

FF

F

S

S

S

S

S

S

S S S S S S S S S S S

S

SSSSSSSSSSSS

F F F F F F F F F F F

F

F

F

F

S

S

S

S

F

F F

F

F F

F

H

S

S

H

IM IM IM

OM

S

H

H

S S S S S S S S S S S S S S S S S SSSSSSS

H

S

S

S S

F

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

L

K

H

G

F

E

D1

DC

B

A1

A

5.1

8.1

2.1 2.2

C1C2

C3

C4 C5

PROVIDE UPRIGHTSPRINKLER HEAD ATLANDING ABV. INSTALLTIGHT TO ROOF DECK.

CLASSROOM

306

CLASSROOM

307

CLASSROOM

308

CLASSROOM

309

CLASSROOM

310

CLASSROOM

311

CLASSROOM

312

CLASSROOM

313

CLASSROOM

314

CLASSROOM

315

CLASSROOM

316

CLASSROOM

317

CORRIDOR

C1-3

STAIR #5

S5-3

ELEV VEST

301

JC

304

STAIR #1

S1-3

STORAGE

302

MECH ROOM

305

MECH ROOM

320BALCONY

321

CL.

318CORRIDOR

C1-11

A

A1

B

CD

D1

E

F

G

H

K

L

PROVIDE ADDITIONAL SPRINKLERHEADS AS REQUIRED TO SERVE AREASUNDER ANY MECHANICAL ORELECTRICAL OBSTRUCTIONS. TYPICALFOR ALL MECHANICAL/ELECTRICALEQUIPMENT ROOMS.

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

F2.3LVE-14179

Third Floor Plan

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

275 Swamp Rd, Newtown, PA 18940

275 Swamp Rd, Newtown, PA 18940

CONFORMEDCONSTRUCTION SET

12/07/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

N

2'

Scale: 1/8" = 1'-0"

0 4' 8' 16'

THIRD FLOOR PLAN

NO. ISSUE DATE: DESCRIPTION