general laboratory design review 16 february, 2013 king saud university hospitals (ksuhs) wajahat...
TRANSCRIPT
General Laboratory Design Review
16 February, 2013
King Saud University Hospitals (KSUHs)
Wajahat HalimSolution Architect
Bilal MazehDelivery Consultant
© 2011 Cerner Corporation. All rights reserved. This document contains Cerner confidential and/or proprietary information which may not be reproduced or transmitted without the express written consent of Cerner. 2
Agenda
Objectives Project ProgressData Collection ProcessDesign DecisionsReference Data Manager (RDM)Next StepsQuestions
© 2011 Cerner Corporation. All rights reserved. This document contains Cerner confidential and/or proprietary information which may not be reproduced or transmitted without the express written consent of Cerner. 3
Objectives
Discuss the project current state and listen to updates from KSUH and CernerReview Data Collection Workbooks progress and do updates as requiredReview already taken Design Decisions and finalize the rest of themIntroduce Cerner’s new Data Collection tool, Reference Data Manager (RDM)Discuss the coming steps and new assignmentsAnswer any Questions or Concerns that either KSUH or Cerner has
© 2011 Cerner Corporation. All rights reserved. This document contains Cerner confidential and/or proprietary information which may not be reproduced or transmitted without the express written consent of Cerner. 4
Project Progress
KSUH, KKUH and KAUHGeneral Feedback, Problems and ChallengesWhat went well?What needs improvement?
CernerFeedbackBuild Progress
© 2011 Cerner Corporation. All rights reserved. This document contains Cerner confidential and/or proprietary information which may not be reproduced or transmitted without the express written consent of Cerner. 5
Data Collection
Answer any Questions or Concerns
Review the existing DCWs:KSUH Specimen Management DCWKSUH General Laboratory DCW
Introduce the following new DCWs:KSUH Miscellaneous DCWKSUH QC DCW
© 2011 Cerner Corporation. All rights reserved. This document contains Cerner confidential and/or proprietary information which may not be reproduced or transmitted without the express written consent of Cerner. 6
Design Decisions
Answer any Questions or Concerns
Complete Unfinalized Decisions General Laboratory DDM
© 2011 Cerner Corporation. All rights reserved. This document contains Cerner confidential and/or proprietary information which may not be reproduced or transmitted without the express written consent of Cerner. 7
Reference Data Manager (RDM)
New Data Collection MethodologyRDM Advantages
Multiple editors at the same timeNo need to check out or check inData ValidationData Completion and Accuracy Reports
RDM Demohttps://cme.cernerrdm.com/passportcontrol/login.aspx
© 2011 Cerner Corporation. All rights reserved. This document contains Cerner confidential and/or proprietary information which may not be reproduced or transmitted without the express written consent of Cerner. 8
Assignment and Next Steps
AssignmentKSUH to Complete Data Collection Process with Cerner’s supportKSUH to Review and Confirm Design Decisions as RequiredCerner to Continue Building and Configuring eSIHI system
Next Step, System Validation SessionReview System Validation Guide on MethodMAttend and Participate in System Validation Workshop Identify Super UsersBegin to identify testing and training timelines
How Do You Feel Now?How Do You Feel Now?