UP- - - - - - - - - - - - - - - - 5600 21752 Unit 1 Unit 2 Unit 3 Co n st i tut i on Hi l l Proposed Building 1 External Stairs & Lift 1 - Fire Protected External Stairs & Lift 2 - Fire Protected Proposed Playground Proposed Park Landscape Proposed External Landscape for pedestrian use 1 12 Gradient Ramp to Carpark Below Ramp gradient 1 12 & Stairs Proposed Pathway for pedestrians Existing Buses Entrance Entrance Ramp gradient 1 12 ENTRANCE ENTRANCE E x i s t i n g P a t hway Entrance Entrance PRIVATE GARDENS PRIVATE GARDENS PRIVATE GARDENS Proposed Pedestrian Crossing Proposed Pathway Proposed Pathway Proposed Pathway - - - - 6617 10328 4552 6709 9384 ENTRANCE 008 2 - - - - 002 2 - 002 1 008 1 Private Balconies Bus Depot Broadstone Luas King's Inn Park Existing Surrounding Buildings Existing Buildings The Royal Society of the King's Inn ESB Proposed Building (to be designed at a later Stage 20270 19750 18470 011 1 Royal Society of the King's Inn Proposed Building Proposed Building Existing Surrounding Buildings King's Inn Park Existing Bus Depot Three Proposed Units North CLIENT PROJECT JOB NUMBER DATE SCALE DRAWN BY CHECKED STATUS FOR REVIEW DRAWING CHECKER CAD FILE BLOCK DRAWING NUMBER ZONE REVISION NOTE ALL DIMENSIONS TO BE CHECKED ON SITE NO DIMENSIONS TO BE SCALED FROM THIS DRAWING THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT CONSULTANTS DRAWINGS COPYRIGHT (C) Group 4 Key Site Plan 10/12/2015 14:04:30 10/12/2015 14:04:30 1 : 500 Site Plan - G.A's T6 Group 4 000 General Arrangements Dublin City Council DESIGN 1 : 500 Site Plan - G.A's 3D of the Site WatermainsSiteboundarySurfaceWaterFoulWaterElectricityESBSchedual of Balcony Units Block 1 : 37 Units Block 2 : 37 Units Block 3 : 37 Units Total Units on site in the 3 blocks : 111 Units *Notincludingnewpurposedbuildingattheendofthesite.

Upload: patrick-dunne

Post on 15-Apr-2017

74 views

Category:

Documents


0 download

TRANSCRIPT

  • UP

    -

    -

    - -

    -

    -

    - -

    -

    -

    -

    -

    -

    - -

    -

    5600

    2175

    2

    Unit 1

    Unit 2

    Unit 3

    Constitution Hill

    Proposed Building 1

    External Stairs & Lift 1 - Fire Protected

    External Stairs & Lift 2 - Fire ProtectedProposed Playground

    Proposed Park Landscape

    Proposed ExternalLandscape for pedestrianuse1 12 Gradient Ramp to Carpark

    Below

    Ramp gradient 1 12 & Stairs

    ProposedPathway forpedestrians

    Existing Buses

    Entrance

    Entrance

    Ramp gradient 1 12

    ENTRANCE

    ENTRANCE

    Existing Pathway

    Entrance

    Entrance

    PRIVATE GARDENS

    PRIVATE GARDENS

    PRIVATE GARDENS

    Proposed PedestrianCrossing

    Proposed Pathway

    Proposed Pathway

    Proposed Pathway

    -

    -

    -

    - 6617

    1032

    8

    4552

    6709

    9384

    ENTRANCE

    0082

    -

    -

    -

    -

    002 2

    -

    002

    1

    008

    1

    Private Balconies

    Bus Depot

    Broadstone Luas

    King's InnPark

    Existing Surrounding Buildings

    Existing Buildings

    The RoyalSociety of theKing's Inn

    ESB

    Proposed Building(to be designed at alater Stage

    20270

    19750

    18470

    011

    1

    Royal Society of the King's Inn

    Proposed Building

    Proposed Building

    Existing Surrounding Buildings

    King's Inn Park

    Existing Bus Depot

    Three Proposed Units

    North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    10/1

    2/20

    15 1

    4:04

    :30

    10/12/2015 14:04:30

    1 : 500

    Site Plan - G.A's

    T6

    Group 4

    000

    General Arrangements

    Dublin City Council

    DESIGN 1 : 500Site Plan - G.A's

    3D of the Site

    Water mains

    Site boundary

    Surface Water

    Foul Water

    Electricity ESB

    Schedual of Balcony UnitsBlock 1 : 37 UnitsBlock 2 : 37 UnitsBlock 3 : 37 UnitsTotal Units on site in the 3blocks : 111 Units

    *Not including new purposed building at the endof the site.

  • 987654321

    18 17 16 15 14 13 12 11 10

    7

    6

    5

    4

    3

    2

    1

    15141312111098

    22

    21

    20

    19

    18

    17

    16

    29 28 27 26 25 24 23

    41 mPlant Room

    19 mLift Lobby

    8 mLobby

    23 mStairwell B

    26 mLiving Room/ Kitchen

    8 mBathroom

    AOV

    Duct

    ExteriorStairCore 1

    10 mHall

    B2

    C2

    E2

    A2

    1A 2A 3A 4A 5A 6A 7A 8A 9A 10A 11A

    12A

    AOV

    Duct

    ExteriorStairCore 2

    External Lift 2

    ProposedResidential GreenSpace

    ProposedNewEntrance tosite

    13A

    22 mStorage

    41 mPlant Room

    Constitution Hill

    ProposedResidential paving

    Block 3

    Block 1

    Earth Infill

    ProposedResidential paving

    ProposedResidential GreenSpace

    4640

    4000

    11775

    159 mRetail Space 1

    159 mRetail space 3

    104 mRetail space 4

    Duct

    1

    2

    30 mLift Lobby

    7 mLobby

    21 mStairwell D

    6 mHall11 m

    W.C

    19 mBedroom

    39 mLiving Room/Kitchen

    4001 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000

    13257

    2003

    D2

    8164

    7125

    2370

    47 mLobby

    159 mRetail Space 2

    14 mFire lobby

    33 mStair well I

    8000

    2740

    1500

    4639

    4963

    777511788

    4640

    4000

    11775

    4000

    4639

    4702

    4639

    5703

    3925

    910

    5303

    400 1200 1045 630 427 1810 890 1810 450 630 1475 1770 718

    5810

    70101611

    6088

    5059

    3051

    7021

    8054

    2988

    1625

    1010

    1010

    1626

    7076

    5565

    1200

    619

    1200

    1717

    1770

    1023

    5940

    3487

    910

    910

    970

    900

    900

    900

    505

    3731

    5661

    4304

    2000 800 1200 1200 800 2000 18881900

    6675

    4962

    14892513

    4822

    Duc

    t

    431 1035 426

    2300

    4850

    22 23 24 25 26 27 28 29 30 32

    2586 mBasement Carpark

    1010

    1810

    3695

    1810

    1288

    5884

    Ramp Gradient1:12

    Pedestrian Walkway

    Entrance Entrance Entrance Entrance18130

    16400

    18780

    17523

    F2

    1499

    Pedestrian Walkway

    Pedestrian Walkway Pedestrian Ramp

    1093

    1200

    3855

    3631

    3467

    1888 2000 800 1200 1200 800 2000 1888 3888 7888 688 1200 1200 800 2000

    Schedule of Rooms

    Retail Unit x 4

    One Bedroom Apartment x 1

    Plant Room x 1

    Storage Unit x 1

    01

    01

    02

    02

    02

    03

    03

    0404

    05

    01

    04

    06

    06

    07

    07

    08

    08

    08

    10

    10

    1213

    16

    16

    17

    17

    17

    Retail Units

    Basement Carpark

    One Bedroom Apartment

    Plant Room Storage Room

    North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    10/1

    2/20

    15 1

    4:04

    :53

    10/12/2015 14:04:53

    1 : 100

    Ground Floor

    T6

    Group 4

    001

    General Arrangements

    Dublin City Council

    DESIGN

    1 : 10000 - Ground FFL Unit 2

    3D of Ground Floor

    Water mains

    Site boundary

    Surface Water

    Foul Water

    Electricity ESB

    01 - External Walls.Are 200mm thick reinforcedin-situ concrete,externalinsulated with 300mmextraterm with a 10mm renderfinish and has a internal finishof 12.5mm plasterboard.02 - Internal load bearing Walls.Are roughly 200mm thick block wall with doublelayered 12.5mm plasterboard finished eitherside.03 - Internal non-load bearing Walls.Are 100mm thick timber stud partition walls with aplasterboard finish.04 - Internal Sair Core.The internal stair cores are 300mm thick with apolished cocrete finish.05 - Internal Plant Room.Are 200mm thick concrete wall with a polishedconcerte finish.06 - Cutain Glazing.Triple glazed external panels.07 - Basment Wall.200mm concrete wall with a polished concrete finish.08 - One Storey Concrete Columns.Columns are sized to enginers specifications. Theyare 300mm thick. Refer to NBS spec : E20,E40 andM40.10 - Basment Floor Finish.Power coated concrete floor finish.12 - Appartment Floor Finish.150mm concrete floor with 50mm screed and apolished cooncrete finish.13 - External paving.Concrete paving slabs with a permable pavingfinish.16 - Retail Floor Finish.150mm concrete floor with 50mm screed and apolished concrete finish.17 - Stair Core Floor Finish.150mm concrete floor with 50mm polished concretescreed and a non slip finish.

  • -01 - BasementCarpark

    15270

    1A 2A 3A 4A 5A 6A 7A 8A 9A 10A 11A 12A 13A

    00 - Ground FFL16400

    01 - First FFL19750

    02 - Second FFL22650

    03 - Third FFL25550

    04 - Fourth FFL28450

    05 - Fifth FFL31800

    06 - Sixth FFL34669

    07 - Seventh FFL37150

    08 - Roof Level40050

    5 mBathroom

    27 mLiving room/Kitchen

    5 mBathroom

    4 mHall

    28 mLiving room/Kitchen

    4 mHall

    33 mStair well C

    5 mBathroom

    4 mHall

    27 mLiving room/Kitchen

    5 mBathroom

    4 mHall

    27 mLiving room/Kitchen

    5 mBathroom

    4 mHall

    27 mLiving room/Kitchen

    29 mLobby

    21 mStair well D

    15 mBedroom

    6 mKitchen

    11 mBedroom

    6 mKitchen

    10 mBedroom

    6 mKitchen

    10 mBedroom

    6 mKitchen

    11 mBedroom

    6 mKitchen

    12 mBedroom

    29 mLiving Room/Kitchen

    11 mBedroom

    29 mLiving Room/Kitchen

    34 mStairwell C

    11 mBedroom

    29 mLiving Room/Kitchen 11 m

    Bedroom29 m

    Living Room/Kitchen 11 mBedroom

    29 mLiving Room/Kitchen

    104 mRetail space 4

    159 mRetail space 3

    159 mRetail space 3

    159 mRetail Space 2

    159 mRetail Space 2

    159 mRetail Space 1159 m

    Retail Space 147 mLobby

    17 mBike Store

    28 mFire Lobby

    7 mHall

    7 mLobby

    21 mStairwell D

    21 mStairwell D

    21 mStairwell D

    14

    14

    14

    01

    19

    08

    01

    04

    04

    04

    PV Panels Angled towards to the south for maximum solar gain

    Proposed balconies

    2481

    2869

    3350

    2900

    2900

    2900

    3350

    2365

    0

    4001 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000

    13257

    215

    2281

    200

    2661

    353

    2997

    366

    2542

    300

    2600

    310

    2545

    795

    2550

    2977

    295

    2600

    300

    2600

    346

    2504

    365

    2985

    00 - Ground FFL Unit1

    17370

    02 - Upper FFL Unit1

    23170

    03 - Third FFL Unit 126070

    04 - Fourth FFL Unit1

    28970

    05 - Fifth FFL Unit 131870

    E2B3 C3A3 A D EB C

    Retail/ Creche

    2700

    2700

    2700

    2700

    Private Garden

    Access Deck Private Balcony

    Carpark Basement

    4820

    UNIT 1

    UNIT 2

    2700

    1462

    2

    3631

    01 - First FFL19750

    06 - Sixth FFL34669

    07 - Seventh FFL37150

    F2

    Infill

    08

    09

    09

    01

    19

    1414

    01 19 mBedroom

    27 mPrivate balcony

    21 mLIVING ROOM

    8 mKITCHEN

    13 mBedroom

    11 mPrivate Balcony

    2675 1500 1559 1499 15006542

    2799

    2900

    2900

    2900

    3420

    3350

    2481

    North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    10/1

    2/20

    15 1

    4:05

    :40

    10/12/2015 14:05:40

    1 : 100

    Sections

    T6

    Author

    003

    General Arrangements

    Dublin City Council

    DESIGN

    1 : 100Long Section - G.A's - Unit 2

    1 : 100Short Section - G.A's

    06 - Cutain Glazing.Triple glazed external panels.

    09 - One Storey Steel Columns.Columns are sized to engineers specifications.They are roughly 150x150mm. Refer to NBSspec : G10.

    01 - External Walls.Are 200mm thick reinforced in-situ concrete,external insulatedwith 300mm extraterm with a10mm render finish and has ainternal finish of 12.5mmplasterboard.

    17 - Stair Core Floor Finish.150mm concrete floor with 50mm polishedconcrete screed and a non slip finish.

    19 - Fifth floor wall Finish.200mm timber stud wall with a timber oanel externalcladding and a platerboard internal finish.

    14 - Roof Finish.Rheinzink angled standing seem coveringsloped to an an angle on 1:3 to NBS spec: H7415 - Green roof Finish.Wind flower planting sedum on 100mm soillayer.

    08 - One Storey Concrete Columns.Columns are sized to enginers specifications. Theyare 300mm thick. Refer to NBS spec : E20,E40 andM40.

    04 - Internal Sair Core.The internal stair cores are300mm thick with a polishedcocrete finish.

  • 7

    6

    5

    4

    3

    2

    1

    15141312111098

    22

    21

    20

    19

    18

    17

    16

    29 28 27 26 25 24 23

    19 mLIFT LOBBY

    2 mLIFT

    2 mLIFT

    8 mLOBBY

    24 mSTAIRWELL B

    10 mHALL 8 m

    BATHROOM

    8 mKITCHEN

    18 mLIVING ROOM

    Exterior Stair Core 1

    Ramp toBelow

    Proposed Pedestrian Green Landscape

    ExternalLift 2

    Proposed Residential Green Space

    ProposedNewEntrance tosite

    Proposed ResidentialPathway

    Constitution Hill

    AOV

    DuctB2

    C2

    E2

    A2

    1A 2A 3A 4A 5A 6A 7A 8A 9A 10A 11A

    12A 13A

    Block 3

    ExteriorStairCore 2

    External Ramp 1 12 Gradient

    External Steps

    19850

    5678

    11830

    Entrance

    32 mPrivate Garden

    48 mPrivate Garden

    32 mPrivate Garden

    32 mPrivate Garden

    31 mPrivate Garden

    51 mLaundrette/Cafe

    11 mW.C

    39 mLiving Room/Kitchen

    19 mBedroom

    26 mPrivate Balcony

    Proposed Pedestrian Paving

    Block2

    Proposed Residential GreenSpace

    1583

    3710

    34 mStairwell C

    48 mEntrance Lobby

    7 mHall

    6 mHall

    21 mStairwell D

    17 mBike Store

    Duct

    1

    2

    4001 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000

    13257

    2003

    12 mBedroom

    29 mLiving Room/Kitchen

    6 mWC

    10 mBedroom

    8 mHall

    11 mBedroom

    6 mW.C

    8 mHall

    10 mBedroom

    29 mLiving Room/Kitchen

    6 mW.C

    10 mBedroom

    8 mHall

    11 mBedroom

    29 mLiving Room/Kitchen

    8 mHall

    6 mW.C

    10 mBedroom

    11 mBedroom

    6 mW.C

    8 mHall

    10 mBedroom

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    18 mLift Lobby

    35 mStair Lobby

    Duc

    t

    D2

    21 mLift Lobby

    3 mLobby

    29 mLiving Room/Kitchen

    29 mLiving Room/Kitchen

    11 mBedroom

    2740

    1500

    4639

    4963

    1500

    1035

    1500

    7901 11850

    38641207

    3100

    2770

    3006

    3864

    2223

    1440 349

    8

    3775

    425 1200 2492 910 630 1770 423

    910

    910

    3380

    910

    Duc

    t

    2774 800 1300 2988

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    9153

    4976

    6645

    2513

    4822

    425 1200 2617 910 505 1770 787 1010 2627 425 1200 2492 910 630 1770 433 416 1200 2492 910 630 1770 424 425 1200 2492 910 630 1770 433 475 1810 3379 7397 260

    5648

    4144

    690

    1810

    3438

    7141

    4428

    3731

    3579

    6093

    776

    900

    1094

    900

    510

    3051

    430 1010 705 1010

    1010

    1190

    1625

    4303

    7076

    5563

    2988

    1010

    1010

    2575

    910

    910

    3485

    5940

    1433 683 1220 1035 630 427 1810 890 1810 450 630 538

    481

    1220

    539

    1220

    565

    788 1770 1023

    1083

    1220

    3847

    3629

    6093

    803

    1770

    1261

    1770

    918

    1500

    1207

    3100

    2770

    3006

    2223

    3498

    3743

    5039

    910

    3505

    1450

    37431207

    3100

    2770

    3743

    2223

    3498

    3800

    910

    3505

    1500

    37501207

    3100

    2770

    3750

    2223

    3498

    3775

    5039

    910

    3505

    1500

    37751207

    3105

    2765

    3775

    2223

    3503

    3775

    5114

    910

    3505

    3788 3743

    20320

    19570

    18620

    7125

    8164

    F2

    1890

    FW.1 FW.2 FW.3 FW.4 FW.5 FW.6

    SW.1 SW.2 SW.3 SW.4 SW.5

    Fall Fall Fall Fall Fall

    Fall

    Fall

    Fall

    Fall

    Fall

    Schedule of Rooms

    Two Bedroom Apartment x 5

    One Bedroom Apartment x 1

    Laundrette/Cafe x 1

    Bike Store x 1

    01

    0101

    01

    02

    02

    02

    03

    03

    0303

    03

    04

    04

    04

    06

    0606 09

    0909

    11

    11

    11 12

    12

    12

    12

    13

    13

    17

    17

    17

    04

    04

    Two Bedroom Apartments

    Existing Stair Core

    Roof Gardens

    Private Balcony

    Laundrette/Cafe North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    10/1

    2/20

    15 1

    4:07

    :12

    10/12/2015 14:07:12

    1 : 100

    First Floor

    T6

    Author

    005

    General Arrangements

    Dublin City Council

    DESIGN

    1 : 10001 - First FFL Unit 2

    First Floor 3D View

    Water mains

    Site boundary

    Surface Water

    Foul Water

    Electricity ESB

    02 - Internal load bearing Walls.Are roughly 200mm thick block wallwith double layered 12.5mmplasterboard finished either side.

    03 - Internal non-load bearing Walls.Are 100mm thick timber stud partitionwalls with a plasterboard finish.04 - Internal Sair Core.The internal stair cores are300mm thick with a polishedcocrete finish.06 - Cutain Glazing.Triple glazed external panels.09 - One Storey Steel Columns.Columns are sized to engineers specifications.They are roughly 150x150mm. Refer to NBSspec : G10.11 - Terrace/Balcony Floor Finish.Is 15mm non-permamble timber panels.12 - Appartment Floor Finish.150mm concrete floor with 50mmscreed and a polished cooncretefinish.13 - External paving.Concrete paving slabs with a permablepaving finish.

    01 - External Walls.Are 200mm thick reinforced in-situ concrete,external insulatedwith 300mm extraterm with a10mm render finish and has ainternal finish of 12.5mmplasterboard.

    17 - Stair Core Floor Finish.150mm concrete floor with 50mm polished concretescreed and a non slip finish.

  • 987654321

    18 17 16 15 14 13 12 11 10

    8

    7

    6

    5

    4

    3

    2

    1

    14

    13

    12

    11

    10

    9

    18 17 16 15

    AOV

    Duct

    22 mLiving Room

    9 mKitchen

    19 mLift Lobby

    7 mKitchen

    8 mBathroom

    B2

    C2

    E2

    A2

    1A 2A 3A 4A 5A 6A 7A 8A 9A 10A 11A

    12A 13A

    Block 3

    AOV

    Duct

    6967

    5652

    1590

    15 mBedroom

    6 mWC

    14 mBedroom 23 m

    Living Room

    9 mHall

    12 mPrivate Balcony

    53 mAccess Deck

    6 mKitchen

    11 mBedroom

    6 mWC

    13 mBedroom

    23 mLiving Room

    9 mHall

    35 mStairway C

    6 mKitchen

    10 mBedroom

    6 mWC

    13 mBedroom

    13 mBedroom

    9 mHall

    6 mKitchen

    9 mPrivate Balcony

    12 mPrivate Balcony

    9 mPrivate Balcony

    9 mPrivate Balcony

    28 mFire Lobby

    10 mBedroom

    9 mHall

    23 mLiving Room

    13 mBedroom

    23 mLiving Room

    9 mHall

    6 mWC

    11 mBedroom

    6 mKitchen

    6 mKitchen

    24 mPrivate Balcony

    Block 1

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    2549

    Duc

    t

    2003

    Duct

    6 mW.C

    29 mLiving Room

    12 mBedroom

    11 mBedroom

    20 mLift Lobby

    9 mHall

    11 mBedroom

    21 mStairwell D

    11 mW.C

    6 mHall

    19 mBedroom

    39 mKitchen/Living Room

    5 mKitchen

    1

    2

    10 mBedroom

    20 mPrivate Balcony

    D2

    23 mLiving Room

    6 mWC

    4001 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000

    4963

    4639

    1500

    2725

    13257

    3738

    2773

    2223

    3806

    3864

    7950

    1000 1000

    3775

    2581 283

    8

    970

    910

    910

    1669

    1157

    4084

    2263

    3710

    9015

    1500

    1950 6025 3900 8100 1990 5985 2099 5915 4061 10761

    3775

    2599

    2773

    3775

    3393

    970

    1069

    2838

    3743

    1492

    1000 200 1000

    910

    910

    1010 1146 1220 1534 1220 1568 319 1010 1187 1220 2996 1010 1469 1220 1859 1010 1196 1220 1415 1220 1978 1010 1137 1220 1505 1220 1948 1010 497 1220 903

    7316

    4135

    6093

    3325

    900

    510

    7021

    3072

    54833486

    70765563

    2988

    1626

    1010

    645

    1200

    558

    1200

    1010

    910

    910

    683 1220 1035 630 427 1810 890 1810 450 630 550 925 1770 1023

    1083

    1220

    3845

    3631

    6383

    1161

    1218

    2826

    3617

    7012

    6117

    7051

    3

    440 1810 440 1770 1930 1770 1437549 1770 1731

    3788

    2599

    1010

    2123

    2838

    982

    2773

    1681

    910

    910

    910

    3791

    3383

    5100

    5648

    2809

    3787

    910

    910

    2713

    2713

    1010

    1810

    2600

    2773

    2232

    1991

    2788

    2660 1000 200 3909

    910

    910

    910

    910

    3766

    2595

    2902 970

    3766

    3383

    2912

    3775

    2581

    2838

    910

    1669

    91091

    0

    910

    3775

    3383

    910

    910

    1238 2862

    910

    3775

    2599

    2581

    2838

    1669

    3775

    2773

    2223

    F2

    1499

    Schedule of Rooms

    One Bedroom Apartment x 1

    Two Bedroom Apartment x 5

    Four Bedroom Apartment x 1

    01

    01

    01

    01

    020202

    02

    02

    03

    03

    03

    03

    0303

    03

    04

    04

    04

    04

    0606

    09

    09

    09

    11

    11 09

    1111

    12

    17

    17

    17

    12

    12

    12

    12

    12

    12

    5150

    5150

    Access Deck

    Two Bedroom Apartment

    One Bedroom Apartment

    Four Bedroom Apartment

    Existing Stair Core

    Private Balconies

    Private Balcony

    North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    10/1

    2/20

    15 1

    4:07

    :49

    10/12/2015 14:07:49

    1 : 100

    Typical Upper Floor

    T6

    Author

    006

    General Arrangements

    Dublin City Council

    DESIGN

    1 : 10002 - Upper FFL Unit 2

    3D of Upper Floor

    02 - Internal load bearing Walls.Are roughly 200mm thick block wallwith double layered 12.5mmplasterboard finished either side.

    03 - Internal non-load bearing Walls.Are 100mm thick timber stud partitionwalls with a plasterboard finish.04 - Internal Sair Core.The internal stair cores are300mm thick with a polishedcocrete finish.06 - Cutain Glazing.Triple glazed external panels.09 - One Storey Steel Columns.Columns are sized to engineers specifications.They are roughly 150x150mm. Refer to NBSspec : G10.11 - Terrace/Balcony Floor Finish.Is 15mm non-permamble timber panels.12 - Appartment Floor Finish.150mm concrete floor with 50mmscreed and a polished cooncretefinish.

    01 - External Walls.Are 200mm thick reinforced in-situ concrete,external insulatedwith 300mm extraterm with a10mm render finish and has ainternal finish of 12.5mmplasterboard.

    17 - Stair Core Floor Finish.150mm concrete floor with 50mm polished concretescreed and a non slip finish.

  • B2

    C2

    E2

    A2

    1A 2A 3A 4A 5A 6A 7A 8A 9A 10A 11A

    12A 13A

    2003

    4001 4000 4000 4000 4000 4000 4000 4000 4000 4000 3708

    9601

    1500

    2725

    AOV

    AOV

    13257

    3537

    Flat Green Roof

    FALLFALL

    FALL

    Private Balcony

    Private BalconyPrivate BalconyPrivate BalconyPrivate BalconyPrivate BalconyPrivate Balcony

    Access Deck

    44000

    32850

    3734635167

    35303

    40608

    41246

    37150

    36360PV Panels & Solar Panels Proposed on the roof

    PV Panels &Solar PanelsProposed on theroof

    7470

    107647800

    D2

    F2

    1499

    Gutter size 150mm Diameter

    89mm Diameter of outlet

    Components on Roof

    Solar PV 's on roof

    Flat Green Roof

    RWP every 8 meters

    89mm Diameter of Outlet

    0111

    1111

    1414

    14

    15

    Sloping Zinc Roof

    Access Deck

    Triple Glazed Windows

    Solar and PV Panels on roof

    Flat Green Roof

    Private Balconies

    Timber Panel Finish

    Bris Soleil

    North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    10/1

    2/20

    15 1

    4:08

    :06

    10/12/2015 14:08:06

    1 : 100

    Roof Plan

    T6

    Author

    007

    General Arrangements

    Dublin City Council

    DESIGN

    1 : 10008 - Roof Level

    3D of Roof

    06 - Cutain Glazing.Triple glazed external panels.09 - One Storey Steel Columns.Columns are sized to engineers specifications.They are roughly 150x150mm. Refer to NBSspec : G10.

    11 - Terrace/Balcony Floor Finish.Is 15mm non-permamble timber panels.14 - Roof Finish.Rheinzink angled standing seem coveringsloped to an an angle on 1:3 to NBS spec: H7415 - Green roof Finish.Wind flower planting sedum on 100mm soillayer.

    01 - External Walls.Are 200mm thick reinforced in-situ concrete,external insulatedwith 300mm extraterm with a10mm render finish and has ainternal finish of 12.5mmplasterboard.

    18 - Gutter size and outlet.Gutter and outlets comply with TGD H

  • 987654321

    18 17 16 15 14 13 12 11 10

    8

    7

    6

    5

    4

    3

    2

    14

    13

    12

    11

    10

    9

    17 16 15

    B2

    C2

    E2

    A2

    1A 2A 3A 4A 5A 6A 7A 8A 9A 10A 11A

    12A 13A

    33 mStair well C

    21 mStair well D

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    Duct

    5627

    1532

    20 mBed room

    5 mBathroom 4 m

    Hall

    27 mLiving room/Kitchen

    19 mBed room

    28 mLiving room/Kitchen

    4 mHall

    5 mBathroom

    55 mAccess Balcony

    Not EnclosedPrivate Balcony Not Enclosed

    Private BalconyNot Enclosed

    Private BalconyNot Enclosed

    Private BalconyNot Enclosed

    Private Balcony

    19 mBed room

    27 mLiving room/Kitchen

    4 mHall5 m

    Bathroom5 m

    Bathroom

    4 mHall

    27 mLiving room/Kitchen

    19 mBed room

    19 mBed room

    27 mLiving room/Kitchen

    4 mHall

    5 mBathroom

    24 mPrivate Balcony

    2003

    D2

    1500

    35 mLiving Room/Kitchen

    11 mBedroom

    10 mBedroom

    10 mBedroom

    6 mW.C

    9 mHall

    20 mLift Lobby

    29 mLobby

    11 mW.C

    6 mHall

    39 mLiving Room/Kitchen

    19 mBedroom

    AOV

    4001 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000

    13257

    4963

    4639

    1500

    2725

    20 mPrivate Balcony

    1

    2

    Duc

    t

    Duct

    F2

    1976

    2649

    1850

    4055 3673

    810

    810

    910

    7954

    900 620 900

    749 1220 4285 1220 1475 1220 521 1010 2554 1220 2996 1010 1469 1220 451 1010 2604 1220 1415 1220 484 1010 2631 1220 1505 1220 384 1010 2061 1220 903

    3710

    9001

    1500

    645

    1200

    558

    1200

    2000

    683 1220 1035 630 427 1810 890 1810 450 630 497 979 1770 1023

    5940

    3489

    7076

    5563

    2649

    1955 1850

    3902 3628

    2829 900 600 900 2526

    1955

    2649

    810

    910

    810

    810

    1850

    910

    810

    3857

    2767 900 740 900 2448

    3673

    2649

    19551888

    810 81

    0

    3889 3661

    2839 900 680 900 2456 2819 900 680 900 229626

    49

    1955 1888

    810 81

    0

    910

    3880 3670

    1010

    3788

    3383

    910

    910

    2773

    2223

    2724

    3788

    910

    1081

    1010

    910

    2268

    5100

    5648

    3787

    2713

    3787

    2809

    574 1770 1751

    441 1810 440 1770 1930 1770 1145

    559

    1770

    1261

    1770

    918

    3180

    6093

    776

    900

    1094

    900

    510

    386

    1835

    480

    1010

    7030

    3051

    5481

    4392

    2988

    1010101

    0

    910

    1626

    910

    6148

    3631

    6338

    44141

    Schedule of Rooms

    One Bedroom Apartment x 6

    Four Bedroom Apartment x 1

    01

    01

    02

    0202

    02

    03

    03

    03

    03

    0303

    04

    04

    0404

    04

    0606

    09

    11

    11

    1111

    12

    12

    12

    12

    1212

    17

    17

    17

    19

    Private Balcony

    Access Balcony

    Private Balcony

    One Bedroom ApartmentFour Bedroom Apartment

    One Bedroom Apartment

    North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    10/1

    2/20

    15 1

    4:08

    :32

    10/12/2015 14:08:32

    1 : 100

    Fifth Floor

    T6

    Author

    010

    General Arrangements

    Dublin City Council

    DESIGN

    1 : 10005 - Fifth FFL Unit 21

    3D of Fifth Floor

    02 - Internal load bearing Walls.Are roughly 200mm thick block wallwith double layered 12.5mmplasterboard finished either side.

    03 - Internal non-load bearing Walls.Are 100mm thick timber stud partitionwalls with a plasterboard finish.04 - Internal Sair Core.The internal stair cores are300mm thick with a polishedcocrete finish.06 - Cutain Glazing.Triple glazed external panels.09 - One Storey Steel Columns.Columns are sized to engineers specifications.They are roughly 150x150mm. Refer to NBSspec : G10.11 - Terrace/Balcony Floor Finish.Is 15mm non-permamble timber panels.12 - Appartment Floor Finish.150mm concrete floor with 50mmscreed and a polished cooncretefinish.

    01 - External Walls.Are 200mm thick reinforced in-situ concrete,external insulatedwith 300mm extraterm with a10mm render finish and has ainternal finish of 12.5mmplasterboard.

    17 - Stair Core Floor Finish.150mm concrete floor with 50mm polishedconcrete screed and a non slip finish.19 - Fifth floor wall Finish.200mm timber stud wall with a timber oanel externalcladding and a platerboard internal finish.

  • B2 C2A2

    Wind flower planting sedumon 100mm soil layeron root barrier/drainage membraine toNBS Spec. Q37

    50mm slab pavingon 50mm sand cementto NBS Spec. Q25

    Powder coated aluminumBrise soleil with 1 metre overhangabove to NBS Spec. L10

    Structural steel column supporting balcony aboveto NBS Spec. G10

    Drainage channel draininbeded in concrete to NBSSpec. R10

    Curtain walling to NBS Spec. H11 fixed strictlyin accordance with manufacturersspecifications.

    200mm polished concrete floorslab 35N20 concreteA142 mesh reinformentwith 100mm suspendedceiling to NBS Spec. K10

    Concrete box beam to engineersspec with 3mm plaster skim on12.5mm plasterboard toNBSspec. K10

    Zinc standing seam parapet cappinglaid to a 3 degree fall on 18mm WBP plyboardto NBS Spec. H74

    Curtain walling to NBS Spec. H11fixed strictly in accordance withmanufacturers specifications.

    New 200mm polished concretefloor slab 35N20 concrete A142mesh reinforcement with 50mmcover laid on 300mm XPSinsulation with radonbarrier at joints it is taped andlapped.foundation to engineers spec.

    Aspalt to NBS Spec. j21ON 3 LAYERS OF 100mmfoamglass flat roof insulationJoints lapping boards stageredon vapour/airtight membraineon 150mm concrete slab to NBSSpec. E60 with 100mm suspendedceiling to NBS Spec. K45with space for MVHR supply air ductworkand MVHR return extract ductwork

    Drainage channel draininbeded in concrete to NBSSpec. R10

    150mm concrete slab on60mm sand blinding on4 layers 150mm hardcore

    Parex EWI/ silicate render system orsimimlar. Silicate 2 coat render finishon reinforcement mesh on base coatall in accordence with suppliers detailspec.

    Parapet build up300mm EPS insulation boards with renderedfinish to NBS Spec M21 adhesive fixed to pasterparge coat substrate with 150mm pre-castconcrete upstand to NBS Spec. E60 with100mm EXP insulation yo NBS Spec. M21 withrendered finish.

    Air tight barrier at joints is tappedand lapped to NBS Spec. P10

    2671

    3035

    5015

    010

    0

    199

    301

    920

    0

    E2

    00 - Ground FFL16400

    01 - First FFL19750

    200mm Polished Concrete floor slab35N20 Concrete A142 meshReinforcement with 50mm cover laidon 300mm XPS insulation withRadon barrier at joints it is taped andlapped.

    10mm Plasterboard internal finsh on200mm concrete slab on two layers of150mm XPS insulation overlapped atjoints with 10mm plaster external finish

    100x100mm Stone paving ground levelfinish on 75mm Sand blinding on Threelayers of 150mm Hardcore

    200mm Polished Concrete floor slab 35N20Concrete A142 mesh Reinforcement with50mm cover laid with 100mm SuspendedCeiling

    100mm Suspended ceiling to NBS Spec.K45 with space for MVHR suppy airductwork and MVHR return extract ductworkwith 15mm 600x600mm Ceiling tile finish

    Aluminium Clad door frame to NBSspec L20 with Aluminium thresholdon 10mm steel angle fixed back to200mm structural Concrete

    Structural steel column to NBSSpec G10

    B2 C2

    05 - Fifth FFL31800

    815

    1262

    1712

    3789

    1287

    222

    564

    100mm suspended Ceiling to NBS specK45 with space for MBHR Supply airductwork and MHVR return extractductwork with 15mm 600x600mmCeiling finish

    200mm polished concrete floor slab 35N20concrete A142 mesh reinforcment with50mm cover with on 50mm acusticinsulation on 12.5mm OSB to NBS specK21 on a water membrain layer to be tapedand sealed at joints with air tight tape withan over lap of 100mm to NBS spec J40 on100mm Suspended ceiling

    Two Layers of 12.5mm PlasterboardInternal finish on 50x50mm Vertically fixedbattons on 200m Reinforced Concrete wallon Two layers of 150mm XPS insulationoverlapped at joints with 10mm Plasterexternal finish

    40mm Non-Permeable Timber boarding to NBSSpec H21 on Structural steel Universal I beamsfixed back to structural Steel columns Both to NBSspec G10 & Sized to Engineers Spec Fixed Backto structure

    Steel Framed balcony fixed back to structure withsteel angles to NBS spec G12 and sized toEngineers Spec with 10mm thermal break

    Glass Balustrade fixed back to steel framedbalcony to engineers Spec

    Non Permeable Timber Boarding slopedtowards Drain

    Powder coated aluminumBrise soleil with 1 metre overhangabove to NBS Spec. L10

    Roof Build up from External to Internal:Rheinzink angled standing seem covering sloped to an an angle on 1:3to NBS spec : H74. On 20mm structural OSB to NBS spec : k21. On50x50mm Horizontal battons at 600mm spacings to NBS spec H21. Ona water membrain layer to be taped and sealed at joints with air tighttape with an over lap of 100mm to NBS spec J40 . On 20mm structuralOSB to NBS spec : k21. On 100mm XPS insulation overlapped at joints.On 12.5mm OSB to NBS spec : k21 On Structural BCI 90 EngineeredC24 I beams at 400mm centers, to enginers specification with 300mmrockwool insulation is placed in between the beams. On a inteligentmembrain layer to be taped and sealed at joints with air tight tape withan over lap of 100mm to NBS spec J40. On 12.5mm OSB to NBS spec :k21. On 100mm suspended Ceiling to NBS spec K45 with space forMBHR Supply air ductwork and MHVR return extract ductwork with15mm 600x600mm Ceiling finish

    Wall Build up from External to Internal:15mm timber cladding to NBS spec K20. On 50X50mm vertical timberbattons to NBS spec H21. On a water membrain layer to be taped andsealed at joints with air tight tape with an over lap of 100mm to NBSspec J40. On 12.5mm OSB to NBS spec : k21. On 100mm XPSinsulation overlapped at joints. On 12.5mm OSB to NBS spec : k21.On 200mm stimber stud wall filled with rockwool insulation is placed inbetween the studs. On a inteligent membrain layer to be taped andsealed at joints with air tight tape with an over lap of 100mm to NBSspec J40. On 12.5mm OSB to NBS spec : k21. On 50X50mm verticaltimber battons to NBS spec H21. On Two Layers of 12.5mmPlasterboard.

    Insect mesh.

    E2

    05 - Fifth FFL31800

    F2

    Drainage channel draininbeded in concrete to NBSSpec. R10

    40mm Non-Permeable Timber boarding to NBS Spec H21 on Structural steel Universal I beams fixed back to structural Steel columns Both to NBS spec G10 & Sized to Engineers Spec 100mm structural concrete screed to NBS soec m10Fixed Back to structure

    Steel Framed balcony fixed back tostructure with steel angles to NBSspec G12 and sized to EngineersSpec with 10mm thermalbreak

    Structural steel column supportingbalcony above to NBS Spec. G10

    Roof Build up from External to Internal:Rheinzink angled standing seem coveringsloped to an an angle on 1:3 to NBS spec: H74. On 20mm structural OSB to NBS spec: k21. On 50x50mm Horizontal battons at600mm spacings to NBS spec H21. On awater membrain layer to be taped and sealed at joints with air tight tape with an over lapof 100mm to NBS spec J40 . On 20mmstructural OSB to NBS spec : k21. On 100mm XPS insulation overlapped at joints. On12.5mm OSB to NBS spec : k21 On StructuralBCI 90 Engineered C24 I beams at 400mmcenters, to enginers specification with 300mm rockwool insulation is placed in between the beams. On a inteligent membrain layer to be taped and sealed at joints with air tight tape with an over lap of 100mm to NBS spec J40. On 12.5mm OSB to NBS spec : k21. On 100mm suspended Ceiling to NBS spec K45 with space for MBHR Supply air ductwork and MHVR return extractductwork with 15mm 600x600mm Ceiling finish

    Insect mesh.311

    3789

    2080

    1709

    3796

    1156

    B2 C2

    04 - Fourth FFL28450

    100mm suspended Ceiling to NBS specK45 with space for MBHR Supply airductwork and MHVR return extractductwork with 15mm 600x600mmCeiling finish

    200mm polished concrete floor slab 35N20concrete A142 mesh reinforcment with50mm cover with 100mm Suspendedceiling

    Two Layers of 12.5mm Plasterboard Internalfinish on 50x50mm Vertically fixed battons on200m Reinforced Concrete wall on Two layersof 150mm XPS insulation overlapped at jointswith 10mm Plaster external finish

    40mm Non-Permeable Timber boarding to NBSSpec H21 on Structural steel Universal I beams fixedback to structural Steel columns Both to NBS specG10 & Sized to Engineers Spec Fixed Back tostructure

    Steel Framed balcony fixed back to structurewith steel angles to NBS spec G12 and sized toEngineers Spec with 10mm thermal break

    Glass Balustrade fixed back to steel framedbalcony to engineers Spec

    Non Permeable Timber Boarding slopedtowards Drain

    North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    CHECKER

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    NOTES

    10/1

    2/20

    15 1

    4:14

    :57

    10/12/2015 14:14:57

    As indicated

    1 20 SectionT6

    Group 4

    004

    General Arrangements

    Dublin City CouncilDESIGN 1 : 20Ground Floor Detail

    1 : 20Ground Floor Basement Junction

    1 : 20Fifth Floor Roof Detail

    1 : 20Fifth Floor Balcony and Roof Detail

    1 : 20Intermediate Balcony Connection Detail

    1 : 200Key section

    1 : 500Key plan

    Detail A Detail B

    Detail C

    Detail D

    Detail E

    Detail C - Intermediate balcony connection detail.Scale 1:20

    Detail D - Fifth Floor and roof detail.Scale 1:20

    Detail C - Fifth floor balcony and roofdetail.Scale 1:20

    Insulated Aluminium frame.

  • UP

    -

    -

    - -

    -

    -

    - -

    -

    -

    -

    -

    -

    - -

    -

    5600

    2175

    2

    Unit 1

    Unit 2

    Unit 3

    Constitution Hill

    Proposed Building 1

    External Stairs & Lift 1 - Fire Protected

    External Stairs & Lift 2 - Fire ProtectedProposed Playground

    Proposed Park Landscape

    Proposed ExternalLandscape for pedestrianuse1 12 Gradient Ramp to Carpark

    Below

    Ramp gradient 1 12 & Stairs

    ProposedPathway forpedestrians

    Existing Buses

    Entrance

    Entrance

    Ramp gradient 1 12

    ENTRANCE

    ENTRANCE

    Existing Pathway

    Entrance

    Entrance

    PRIVATE GARDENS

    PRIVATE GARDENS

    PRIVATE GARDENS

    Proposed PedestrianCrossing

    Proposed Pathway

    Proposed Pathway

    Proposed Pathway

    -

    -

    -

    - 6617

    1032

    8

    4552

    6709

    9384

    ENTRANCE

    0082

    -

    -

    -

    -

    002 2

    -

    002

    1

    008

    1

    Private Balconies

    Bus Depot

    Broadstone Luas

    King's InnPark

    Existing Surrounding Buildings

    Existing Buildings

    The RoyalSociety of theKing's Inn

    ESB

    Proposed Building(to be designed at alater Stage

    20270

    19750

    18470

    011

    1

    Royal Society of the King's Inn

    Proposed Building

    Proposed Building

    Existing Surrounding Buildings

    King's Inn Park

    Existing Bus Depot

    Three Proposed Units

    North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    10/1

    2/20

    15 1

    4:04

    :30

    10/12/2015 14:04:30

    1 : 500

    Site Plan - G.A's

    T6

    Group 4

    000

    General Arrangements

    Dublin City Council

    DESIGN 1 : 500Site Plan - G.A's

    3D of the Site

    Water mains

    Site boundary

    Surface Water

    Foul Water

    Electricity ESB

    Schedual of Balcony UnitsBlock 1 : 37 UnitsBlock 2 : 37 UnitsBlock 3 : 37 UnitsTotal Units on site in the 3blocks : 111 Units

    *Not including new purposed building at the endof the site.

  • 987654321

    18 17 16 15 14 13 12 11 10

    7

    6

    5

    4

    3

    2

    1

    15141312111098

    22

    21

    20

    19

    18

    17

    16

    29 28 27 26 25 24 23

    41 mPlant Room

    19 mLift Lobby

    8 mLobby

    23 mStairwell B

    26 mLiving Room/ Kitchen

    8 mBathroom

    AOV

    Duct

    ExteriorStairCore 1

    10 mHall

    B2

    C2

    E2

    A2

    1A 2A 3A 4A 5A 6A 7A 8A 9A 10A 11A

    12A

    AOV

    Duct

    ExteriorStairCore 2

    External Lift 2

    ProposedResidential GreenSpace

    ProposedNewEntrance tosite

    13A

    22 mStorage

    41 mPlant Room

    Constitution Hill

    ProposedResidential paving

    Block 3

    Block 1

    Earth Infill

    ProposedResidential paving

    ProposedResidential GreenSpace

    4640

    4000

    11775

    159 mRetail Space 1

    159 mRetail space 3

    104 mRetail space 4

    Duct

    1

    2

    30 mLift Lobby

    7 mLobby

    21 mStairwell D

    6 mHall11 m

    W.C

    19 mBedroom

    39 mLiving Room/Kitchen

    4001 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000

    13257

    2003

    D2

    8164

    7125

    2370

    47 mLobby

    159 mRetail Space 2

    14 mFire lobby

    33 mStair well I

    8000

    2740

    1500

    4639

    4963

    777511788

    4640

    4000

    11775

    4000

    4639

    4702

    4639

    5703

    3925

    910

    5303

    400 1200 1045 630 427 1810 890 1810 450 630 1475 1770 718

    5810

    70101611

    6088

    5059

    3051

    7021

    8054

    2988

    1625

    1010

    1010

    1626

    7076

    5565

    1200

    619

    1200

    1717

    1770

    1023

    5940

    3487

    910

    910

    970

    900

    900

    900

    505

    3731

    5661

    4304

    2000 800 1200 1200 800 2000 18881900

    6675

    4962

    14892513

    4822

    Duc

    t

    431 1035 426

    2300

    4850

    22 23 24 25 26 27 28 29 30 32

    2586 mBasement Carpark

    1010

    1810

    3695

    1810

    1288

    5884

    Ramp Gradient1:12

    Pedestrian Walkway

    Entrance Entrance Entrance Entrance18130

    16400

    18780

    17523

    F2

    1499

    Pedestrian Walkway

    Pedestrian Walkway Pedestrian Ramp

    1093

    1200

    3855

    3631

    3467

    1888 2000 800 1200 1200 800 2000 1888 3888 7888 688 1200 1200 800 2000

    Schedule of Rooms

    Retail Unit x 4

    One Bedroom Apartment x 1

    Plant Room x 1

    Storage Unit x 1

    01

    01

    02

    02

    02

    03

    03

    0404

    05

    01

    04

    06

    06

    07

    07

    08

    08

    08

    10

    10

    1213

    16

    16

    17

    17

    17

    Retail Units

    Basement Carpark

    One Bedroom Apartment

    Plant Room Storage Room

    North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    10/1

    2/20

    15 1

    4:04

    :53

    10/12/2015 14:04:53

    1 : 100

    Ground Floor

    T6

    Group 4

    001

    General Arrangements

    Dublin City Council

    DESIGN

    1 : 10000 - Ground FFL Unit 2

    3D of Ground Floor

    Water mains

    Site boundary

    Surface Water

    Foul Water

    Electricity ESB

    01 - External Walls.Are 200mm thick reinforcedin-situ concrete,externalinsulated with 300mmextraterm with a 10mm renderfinish and has a internal finishof 12.5mm plasterboard.02 - Internal load bearing Walls.Are roughly 200mm thick block wall with doublelayered 12.5mm plasterboard finished eitherside.03 - Internal non-load bearing Walls.Are 100mm thick timber stud partition walls with aplasterboard finish.04 - Internal Sair Core.The internal stair cores are 300mm thick with apolished cocrete finish.05 - Internal Plant Room.Are 200mm thick concrete wall with a polishedconcerte finish.06 - Cutain Glazing.Triple glazed external panels.07 - Basment Wall.200mm concrete wall with a polished concrete finish.08 - One Storey Concrete Columns.Columns are sized to enginers specifications. Theyare 300mm thick. Refer to NBS spec : E20,E40 andM40.10 - Basment Floor Finish.Power coated concrete floor finish.12 - Appartment Floor Finish.150mm concrete floor with 50mm screed and apolished cooncrete finish.13 - External paving.Concrete paving slabs with a permable pavingfinish.16 - Retail Floor Finish.150mm concrete floor with 50mm screed and apolished concrete finish.17 - Stair Core Floor Finish.150mm concrete floor with 50mm polished concretescreed and a non slip finish.

  • 7

    6

    5

    4

    3

    2

    1

    15141312111098

    22

    21

    20

    19

    18

    17

    16

    29 28 27 26 25 24 23

    19 mLIFT LOBBY

    2 mLIFT

    2 mLIFT

    8 mLOBBY

    24 mSTAIRWELL B

    10 mHALL 8 m

    BATHROOM

    8 mKITCHEN

    18 mLIVING ROOM

    Exterior Stair Core 1

    Ramp toBelow

    Proposed Pedestrian Green Landscape

    ExternalLift 2

    Proposed Residential Green Space

    ProposedNewEntrance tosite

    Proposed ResidentialPathway

    Constitution Hill

    AOV

    DuctB2

    C2

    E2

    A2

    1A 2A 3A 4A 5A 6A 7A 8A 9A 10A 11A

    12A 13A

    Block 3

    ExteriorStairCore 2

    External Ramp 1 12 Gradient

    External Steps

    19850

    5678

    11830

    Entrance

    32 mPrivate Garden

    48 mPrivate Garden

    32 mPrivate Garden

    32 mPrivate Garden

    31 mPrivate Garden

    51 mLaundrette/Cafe

    11 mW.C

    39 mLiving Room/Kitchen

    19 mBedroom

    26 mPrivate Balcony

    Proposed Pedestrian Paving

    Block2

    Proposed Residential GreenSpace

    1583

    3710

    34 mStairwell C

    48 mEntrance Lobby

    7 mHall

    6 mHall

    21 mStairwell D

    17 mBike Store

    Duct

    1

    2

    4001 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000

    13257

    2003

    12 mBedroom

    29 mLiving Room/Kitchen

    6 mWC

    10 mBedroom

    8 mHall

    11 mBedroom

    6 mW.C

    8 mHall

    10 mBedroom

    29 mLiving Room/Kitchen

    6 mW.C

    10 mBedroom

    8 mHall

    11 mBedroom

    29 mLiving Room/Kitchen

    8 mHall

    6 mW.C

    10 mBedroom

    11 mBedroom

    6 mW.C

    8 mHall

    10 mBedroom

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    18 mLift Lobby

    35 mStair Lobby

    Duc

    t

    D2

    21 mLift Lobby

    3 mLobby

    29 mLiving Room/Kitchen

    29 mLiving Room/Kitchen

    11 mBedroom

    2740

    1500

    4639

    4963

    1500

    1035

    1500

    7901 11850

    38641207

    3100

    2770

    3006

    3864

    2223

    1440 349

    8

    3775

    425 1200 2492 910 630 1770 423

    910

    910

    3380

    910

    Duc

    t

    2774 800 1300 2988

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    9153

    4976

    6645

    2513

    4822

    425 1200 2617 910 505 1770 787 1010 2627 425 1200 2492 910 630 1770 433 416 1200 2492 910 630 1770 424 425 1200 2492 910 630 1770 433 475 1810 3379 7397 260

    5648

    4144

    690

    1810

    3438

    7141

    4428

    3731

    3579

    6093

    776

    900

    1094

    900

    510

    3051

    430 1010 705 1010

    1010

    1190

    1625

    4303

    7076

    5563

    2988

    1010

    1010

    2575

    910

    910

    3485

    5940

    1433 683 1220 1035 630 427 1810 890 1810 450 630 538

    481

    1220

    539

    1220

    565

    788 1770 1023

    1083

    1220

    3847

    3629

    6093

    803

    1770

    1261

    1770

    918

    1500

    1207

    3100

    2770

    3006

    2223

    3498

    3743

    5039

    910

    3505

    1450

    37431207

    3100

    2770

    3743

    2223

    3498

    3800

    910

    3505

    1500

    37501207

    3100

    2770

    3750

    2223

    3498

    3775

    5039

    910

    3505

    1500

    37751207

    3105

    2765

    3775

    2223

    3503

    3775

    5114

    910

    3505

    3788 3743

    20320

    19570

    18620

    7125

    8164

    F2

    1890

    FW.1 FW.2 FW.3 FW.4 FW.5 FW.6

    SW.1 SW.2 SW.3 SW.4 SW.5

    Fall Fall Fall Fall Fall

    Fall

    Fall

    Fall

    Fall

    Fall

    Schedule of Rooms

    Two Bedroom Apartment x 5

    One Bedroom Apartment x 1

    Laundrette/Cafe x 1

    Bike Store x 1

    01

    0101

    01

    02

    02

    02

    03

    03

    0303

    03

    04

    04

    04

    06

    0606 09

    0909

    11

    11

    11 12

    12

    12

    12

    13

    13

    17

    17

    17

    04

    04

    Two Bedroom Apartments

    Existing Stair Core

    Roof Gardens

    Private Balcony

    Laundrette/Cafe North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    10/1

    2/20

    15 1

    4:07

    :12

    10/12/2015 14:07:12

    1 : 100

    First Floor

    T6

    Author

    005

    General Arrangements

    Dublin City Council

    DESIGN

    1 : 10001 - First FFL Unit 2

    First Floor 3D View

    Water mains

    Site boundary

    Surface Water

    Foul Water

    Electricity ESB

    02 - Internal load bearing Walls.Are roughly 200mm thick block wallwith double layered 12.5mmplasterboard finished either side.

    03 - Internal non-load bearing Walls.Are 100mm thick timber stud partitionwalls with a plasterboard finish.04 - Internal Sair Core.The internal stair cores are300mm thick with a polishedcocrete finish.06 - Cutain Glazing.Triple glazed external panels.09 - One Storey Steel Columns.Columns are sized to engineers specifications.They are roughly 150x150mm. Refer to NBSspec : G10.11 - Terrace/Balcony Floor Finish.Is 15mm non-permamble timber panels.12 - Appartment Floor Finish.150mm concrete floor with 50mmscreed and a polished cooncretefinish.13 - External paving.Concrete paving slabs with a permablepaving finish.

    01 - External Walls.Are 200mm thick reinforced in-situ concrete,external insulatedwith 300mm extraterm with a10mm render finish and has ainternal finish of 12.5mmplasterboard.

    17 - Stair Core Floor Finish.150mm concrete floor with 50mm polished concretescreed and a non slip finish.

  • 987654321

    18 17 16 15 14 13 12 11 10

    8

    7

    6

    5

    4

    3

    2

    1

    14

    13

    12

    11

    10

    9

    18 17 16 15

    AOV

    Duct

    22 mLiving Room

    9 mKitchen

    19 mLift Lobby

    7 mKitchen

    8 mBathroom

    B2

    C2

    E2

    A2

    1A 2A 3A 4A 5A 6A 7A 8A 9A 10A 11A

    12A 13A

    Block 3

    AOV

    Duct

    6967

    5652

    1590

    15 mBedroom

    6 mWC

    14 mBedroom 23 m

    Living Room

    9 mHall

    12 mPrivate Balcony

    53 mAccess Deck

    6 mKitchen

    11 mBedroom

    6 mWC

    13 mBedroom

    23 mLiving Room

    9 mHall

    35 mStairway C

    6 mKitchen

    10 mBedroom

    6 mWC

    13 mBedroom

    13 mBedroom

    9 mHall

    6 mKitchen

    9 mPrivate Balcony

    12 mPrivate Balcony

    9 mPrivate Balcony

    9 mPrivate Balcony

    28 mFire Lobby

    10 mBedroom

    9 mHall

    23 mLiving Room

    13 mBedroom

    23 mLiving Room

    9 mHall

    6 mWC

    11 mBedroom

    6 mKitchen

    6 mKitchen

    24 mPrivate Balcony

    Block 1

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    2549

    Duc

    t

    2003

    Duct

    6 mW.C

    29 mLiving Room

    12 mBedroom

    11 mBedroom

    20 mLift Lobby

    9 mHall

    11 mBedroom

    21 mStairwell D

    11 mW.C

    6 mHall

    19 mBedroom

    39 mKitchen/Living Room

    5 mKitchen

    1

    2

    10 mBedroom

    20 mPrivate Balcony

    D2

    23 mLiving Room

    6 mWC

    4001 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000

    4963

    4639

    1500

    2725

    13257

    3738

    2773

    2223

    3806

    3864

    7950

    1000 1000

    3775

    2581 283

    8

    970

    910

    910

    1669

    1157

    4084

    2263

    3710

    9015

    1500

    1950 6025 3900 8100 1990 5985 2099 5915 4061 10761

    3775

    2599

    2773

    3775

    3393

    970

    1069

    2838

    3743

    1492

    1000 200 1000

    910

    910

    1010 1146 1220 1534 1220 1568 319 1010 1187 1220 2996 1010 1469 1220 1859 1010 1196 1220 1415 1220 1978 1010 1137 1220 1505 1220 1948 1010 497 1220 903

    7316

    4135

    6093

    3325

    900

    510

    7021

    3072

    54833486

    70765563

    2988

    1626

    1010

    645

    1200

    558

    1200

    1010

    910

    910

    683 1220 1035 630 427 1810 890 1810 450 630 550 925 1770 1023

    1083

    1220

    3845

    3631

    6383

    1161

    1218

    2826

    3617

    7012

    6117

    7051

    3

    440 1810 440 1770 1930 1770 1437549 1770 1731

    3788

    2599

    1010

    2123

    2838

    982

    2773

    1681

    910

    910

    910

    3791

    3383

    5100

    5648

    2809

    3787

    910

    910

    2713

    2713

    1010

    1810

    2600

    2773

    2232

    1991

    2788

    2660 1000 200 3909

    910

    910

    910

    910

    3766

    2595

    2902 970

    3766

    3383

    2912

    3775

    2581

    2838

    910

    1669

    91091

    0

    910

    3775

    3383

    910

    910

    1238 2862

    910

    3775

    2599

    2581

    2838

    1669

    3775

    2773

    2223

    F2

    1499

    Schedule of Rooms

    One Bedroom Apartment x 1

    Two Bedroom Apartment x 5

    Four Bedroom Apartment x 1

    01

    01

    01

    01

    020202

    02

    02

    03

    03

    03

    03

    0303

    03

    04

    04

    04

    04

    0606

    09

    09

    09

    11

    11 09

    1111

    12

    17

    17

    17

    12

    12

    12

    12

    12

    12

    5150

    5150

    Access Deck

    Two Bedroom Apartment

    One Bedroom Apartment

    Four Bedroom Apartment

    Existing Stair Core

    Private Balconies

    Private Balcony

    North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    10/1

    2/20

    15 1

    4:07

    :49

    10/12/2015 14:07:49

    1 : 100

    Typical Upper Floor

    T6

    Author

    006

    General Arrangements

    Dublin City Council

    DESIGN

    1 : 10002 - Upper FFL Unit 2

    3D of Upper Floor

    02 - Internal load bearing Walls.Are roughly 200mm thick block wallwith double layered 12.5mmplasterboard finished either side.

    03 - Internal non-load bearing Walls.Are 100mm thick timber stud partitionwalls with a plasterboard finish.04 - Internal Sair Core.The internal stair cores are300mm thick with a polishedcocrete finish.06 - Cutain Glazing.Triple glazed external panels.09 - One Storey Steel Columns.Columns are sized to engineers specifications.They are roughly 150x150mm. Refer to NBSspec : G10.11 - Terrace/Balcony Floor Finish.Is 15mm non-permamble timber panels.12 - Appartment Floor Finish.150mm concrete floor with 50mmscreed and a polished cooncretefinish.

    01 - External Walls.Are 200mm thick reinforced in-situ concrete,external insulatedwith 300mm extraterm with a10mm render finish and has ainternal finish of 12.5mmplasterboard.

    17 - Stair Core Floor Finish.150mm concrete floor with 50mm polished concretescreed and a non slip finish.

  • 987654321

    18 17 16 15 14 13 12 11 10

    8

    7

    6

    5

    4

    3

    2

    14

    13

    12

    11

    10

    9

    17 16 15

    B2

    C2

    E2

    A2

    1A 2A 3A 4A 5A 6A 7A 8A 9A 10A 11A

    12A 13A

    33 mStair well C

    21 mStair well D

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    Duc

    t

    Duct

    5627

    1532

    20 mBed room

    5 mBathroom 4 m

    Hall

    27 mLiving room/Kitchen

    19 mBed room

    28 mLiving room/Kitchen

    4 mHall

    5 mBathroom

    55 mAccess Balcony

    Not EnclosedPrivate Balcony Not Enclosed

    Private BalconyNot Enclosed

    Private BalconyNot Enclosed

    Private BalconyNot Enclosed

    Private Balcony

    19 mBed room

    27 mLiving room/Kitchen

    4 mHall5 m

    Bathroom5 m

    Bathroom

    4 mHall

    27 mLiving room/Kitchen

    19 mBed room

    19 mBed room

    27 mLiving room/Kitchen

    4 mHall

    5 mBathroom

    24 mPrivate Balcony

    2003

    D2

    1500

    35 mLiving Room/Kitchen

    11 mBedroom

    10 mBedroom

    10 mBedroom

    6 mW.C

    9 mHall

    20 mLift Lobby

    29 mLobby

    11 mW.C

    6 mHall

    39 mLiving Room/Kitchen

    19 mBedroom

    AOV

    4001 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000

    13257

    4963

    4639

    1500

    2725

    20 mPrivate Balcony

    1

    2

    Duc

    t

    Duct

    F2

    1976

    2649

    1850

    4055 3673

    810

    810

    910

    7954

    900 620 900

    749 1220 4285 1220 1475 1220 521 1010 2554 1220 2996 1010 1469 1220 451 1010 2604 1220 1415 1220 484 1010 2631 1220 1505 1220 384 1010 2061 1220 903

    3710

    9001

    1500

    645

    1200

    558

    1200

    2000

    683 1220 1035 630 427 1810 890 1810 450 630 497 979 1770 1023

    5940

    3489

    7076

    5563

    2649

    1955 1850

    3902 3628

    2829 900 600 900 2526

    1955

    2649

    810

    910

    810

    810

    1850

    910

    810

    3857

    2767 900 740 900 2448

    3673

    2649

    19551888

    810 81

    0

    3889 3661

    2839 900 680 900 2456 2819 900 680 900 229626

    49

    1955 1888

    810 81

    0

    910

    3880 3670

    1010

    3788

    3383

    910

    910

    2773

    2223

    2724

    3788

    910

    1081

    1010

    910

    2268

    5100

    5648

    3787

    2713

    3787

    2809

    574 1770 1751

    441 1810 440 1770 1930 1770 1145

    559

    1770

    1261

    1770

    918

    3180

    6093

    776

    900

    1094

    900

    510

    386

    1835

    480

    1010

    7030

    3051

    5481

    4392

    2988

    1010101

    0

    910

    1626

    910

    6148

    3631

    6338

    44141

    Schedule of Rooms

    One Bedroom Apartment x 6

    Four Bedroom Apartment x 1

    01

    01

    02

    0202

    02

    03

    03

    03

    03

    0303

    04

    04

    0404

    04

    0606

    09

    11

    11

    1111

    12

    12

    12

    12

    1212

    17

    17

    17

    19

    Private Balcony

    Access Balcony

    Private Balcony

    One Bedroom ApartmentFour Bedroom Apartment

    One Bedroom Apartment

    North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    10/1

    2/20

    15 1

    4:08

    :32

    10/12/2015 14:08:32

    1 : 100

    Fifth Floor

    T6

    Author

    010

    General Arrangements

    Dublin City Council

    DESIGN

    1 : 10005 - Fifth FFL Unit 21

    3D of Fifth Floor

    02 - Internal load bearing Walls.Are roughly 200mm thick block wallwith double layered 12.5mmplasterboard finished either side.

    03 - Internal non-load bearing Walls.Are 100mm thick timber stud partitionwalls with a plasterboard finish.04 - Internal Sair Core.The internal stair cores are300mm thick with a polishedcocrete finish.06 - Cutain Glazing.Triple glazed external panels.09 - One Storey Steel Columns.Columns are sized to engineers specifications.They are roughly 150x150mm. Refer to NBSspec : G10.11 - Terrace/Balcony Floor Finish.Is 15mm non-permamble timber panels.12 - Appartment Floor Finish.150mm concrete floor with 50mmscreed and a polished cooncretefinish.

    01 - External Walls.Are 200mm thick reinforced in-situ concrete,external insulatedwith 300mm extraterm with a10mm render finish and has ainternal finish of 12.5mmplasterboard.

    17 - Stair Core Floor Finish.150mm concrete floor with 50mm polishedconcrete screed and a non slip finish.19 - Fifth floor wall Finish.200mm timber stud wall with a timber oanel externalcladding and a platerboard internal finish.

  • B2

    C2

    E2

    A2

    1A 2A 3A 4A 5A 6A 7A 8A 9A 10A 11A

    12A 13A

    2003

    4001 4000 4000 4000 4000 4000 4000 4000 4000 4000 3708

    9601

    1500

    2725

    AOV

    AOV

    13257

    3537

    Flat Green Roof

    FALLFALL

    FALL

    Private Balcony

    Private BalconyPrivate BalconyPrivate BalconyPrivate BalconyPrivate BalconyPrivate Balcony

    Access Deck

    44000

    32850

    3734635167

    35303

    40608

    41246

    37150

    36360PV Panels & Solar Panels Proposed on the roof

    PV Panels &Solar PanelsProposed on theroof

    7470

    107647800

    D2

    F2

    1499

    Gutter size 150mm Diameter

    89mm Diameter of outlet

    Components on Roof

    Solar PV 's on roof

    Flat Green Roof

    RWP every 8 meters

    89mm Diameter of Outlet

    0111

    1111

    1414

    14

    15

    Sloping Zinc Roof

    Access Deck

    Triple Glazed Windows

    Solar and PV Panels on roof

    Flat Green Roof

    Private Balconies

    Timber Panel Finish

    Bris Soleil

    North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    10/1

    2/20

    15 1

    4:08

    :06

    10/12/2015 14:08:06

    1 : 100

    Roof Plan

    T6

    Author

    007

    General Arrangements

    Dublin City Council

    DESIGN

    1 : 10008 - Roof Level

    3D of Roof

    06 - Cutain Glazing.Triple glazed external panels.09 - One Storey Steel Columns.Columns are sized to engineers specifications.They are roughly 150x150mm. Refer to NBSspec : G10.

    11 - Terrace/Balcony Floor Finish.Is 15mm non-permamble timber panels.14 - Roof Finish.Rheinzink angled standing seem coveringsloped to an an angle on 1:3 to NBS spec: H7415 - Green roof Finish.Wind flower planting sedum on 100mm soillayer.

    01 - External Walls.Are 200mm thick reinforced in-situ concrete,external insulatedwith 300mm extraterm with a10mm render finish and has ainternal finish of 12.5mmplasterboard.

    18 - Gutter size and outlet.Gutter and outlets comply with TGD H

  • B2 C2 E2A2

    Proposed Commercial Building

    Carpark Entrance

    1 12 Gradient Ramp

    21406Unit 1Unit 2

    Private Balconies

    Access Balconies

    2697

    200

    2703

    2700

    1700

    1200

    1938

    7

    00 - Ground FFL16400

    01 - First FFL19750

    02 - Second FFL22650

    03 - Third FFL25550

    04 - Fourth FFL28450

    05 - Fifth FFL31800

    06 - Sixth FFL34669

    07 - Seventh FFL37150

    08 - Roof Level40050

    D2

    2900

    2481

    2869

    3350

    2900

    2900

    2900

    3350

    F2

    01

    01

    19

    14 14

    09

    09

    09

    1A2A3A4A5A6A7A8A9A10A11A12A13A

    Stair Core

    Glass Balcony

    Glass Balcony

    Retail/Cafe

    Proposed Zinc Roof with 3 degree slope

    Unit 2

    TESCO DEALZ

    00 - Ground FFL16400

    01 - First FFL19750

    02 - Second FFL22650

    03 - Third FFL25550

    04 - Fourth FFL28450

    05 - Fifth FFL31800

    06 - Sixth FFL34669

    07 - Seventh FFL37150

    08 - Roof Level40050

    3350

    2900

    2900

    2900

    3350

    2869

    2481

    2900

    Unit 1

    01

    01

    01

    06

    06

    06

    09

    09

    09

    09

    14

    14

    14

    1919

    North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    10/1

    2/20

    15 1

    4:05

    :20

    10/12/2015 14:05:20

    1 : 100

    North & West Elevations

    T6

    Author

    002

    General Arrangements

    Dublin City Council

    DESIGN

    1 : 100West Elevation - G.A's

    1 : 100North Elevation - G.A's - Unit 2

    06 - Cutain Glazing.Triple glazed external panels.

    09 - One Storey Steel Columns.Columns are sized to engineers specifications.They are roughly 150x150mm. Refer to NBSspec : G10.

    01 - External Walls.Are 200mm thick reinforced in-situ concrete,external insulatedwith 300mm extraterm with a10mm render finish and has ainternal finish of 12.5mmplasterboard.

    17 - Stair Core Floor Finish.150mm concrete floor with 50mm polishedconcrete screed and a non slip finish.

    19 - Fifth floor wall Finish.200mm timber stud wall with a timber oanel externalcladding and a platerboard internal finish.

    14 - Roof Finish.Rheinzink angled standing seem coveringsloped to an an angle on 1:3 to NBS spec: H7415 - Green roof Finish.Wind flower planting sedum on 100mm soillayer.

  • ADE BC

    Constitution Hill

    Flat Roof

    Sloped roof of core

    Access Balcony

    Unit 1

    2700

    1700

    1200

    1700

    1200

    1700

    1200

    Basement Carpark

    Private Balcony

    00 - Ground FFL16400

    01 - First FFL19750

    02 - Second FFL22650

    03 - Third FFL25550

    04 - Fourth FFL28450

    05 - Fifth FFL31800

    06 - Sixth FFL34669

    07 - Seventh FFL37150

    08 - Roof Level40050

    01

    1414

    01

    06

    2900

    2481

    2869

    3350

    2900

    2900

    2900

    3350

    1550

    1350

    1550

    1028

    2198

    4

    840

    1340

    1500 9600 1500 2675

    1A 2A 3A 4A 5A 6A 7A 8A 9A 10A 11A 12A 13A

    01 - First FFL19750

    02 - Second FFL22650

    03 - Third FFL25550

    04 - Fourth FFL28450

    05 - Fifth FFL31800

    Stair Core

    Stair Core

    Basement Carpark

    Glass Balcony

    Proposed Green Area

    Unit 2

    Entrance

    AOV

    06 - Sixth FFL34669

    07 - Seventh FFL37150

    08 - Roof Level40050

    2900

    2481

    2869

    3350

    2900

    2900

    2900

    AOV

    4001 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 13257

    14

    1401

    14

    01

    01

    01

    17

    09

    090909

    150606

    North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    10/1

    2/20

    15 1

    4:13

    :06

    10/12/2015 14:13:06

    1 : 100

    South & East Elevations

    T6

    Author

    008

    General Arrangements

    Dublin City Council

    DESIGN

    1 : 100East Elevation - G.A's

    1 : 100South Elevation - G.A's - Unit 2

    06 - Cutain Glazing.Triple glazed external panels.

    09 - One Storey Steel Columns.Columns are sized to engineers specifications.They are roughly 150x150mm. Refer to NBSspec : G10.

    01 - External Walls.Are 200mm thick reinforced in-situ concrete,external insulatedwith 300mm extraterm with a10mm render finish and has ainternal finish of 12.5mmplasterboard.

    17 - Stair Core Floor Finish.150mm concrete floor with 50mm polishedconcrete screed and a non slip finish.

    19 - Fifth floor wall Finish.200mm timber stud wall with a timber oanel externalcladding and a platerboard internal finish.

    14 - Roof Finish.Rheinzink angled standing seem coveringsloped to an an angle on 1:3 to NBS spec: H7415 - Green roof Finish.Wind flower planting sedum on 100mm soillayer.

  • -01 - BasementCarpark

    15270

    1A 2A 3A 4A 5A 6A 7A 8A 9A 10A 11A 12A 13A

    00 - Ground FFL16400

    01 - First FFL19750

    02 - Second FFL22650

    03 - Third FFL25550

    04 - Fourth FFL28450

    05 - Fifth FFL31800

    06 - Sixth FFL34669

    07 - Seventh FFL37150

    08 - Roof Level40050

    5 mBathroom

    27 mLiving room/Kitchen

    5 mBathroom

    4 mHall

    28 mLiving room/Kitchen

    4 mHall

    33 mStair well C

    5 mBathroom

    4 mHall

    27 mLiving room/Kitchen

    5 mBathroom

    4 mHall

    27 mLiving room/Kitchen

    5 mBathroom

    4 mHall

    27 mLiving room/Kitchen

    29 mLobby

    21 mStair well D

    15 mBedroom

    6 mKitchen

    11 mBedroom

    6 mKitchen

    10 mBedroom

    6 mKitchen

    10 mBedroom

    6 mKitchen

    11 mBedroom

    6 mKitchen

    12 mBedroom

    29 mLiving Room/Kitchen

    11 mBedroom

    29 mLiving Room/Kitchen

    34 mStairwell C

    11 mBedroom

    29 mLiving Room/Kitchen 11 m

    Bedroom29 m

    Living Room/Kitchen 11 mBedroom

    29 mLiving Room/Kitchen

    104 mRetail space 4

    159 mRetail space 3

    159 mRetail space 3

    159 mRetail Space 2

    159 mRetail Space 2

    159 mRetail Space 1159 m

    Retail Space 147 mLobby

    17 mBike Store

    28 mFire Lobby

    7 mHall

    7 mLobby

    21 mStairwell D

    21 mStairwell D

    21 mStairwell D

    14

    14

    14

    01

    19

    08

    01

    04

    04

    04

    PV Panels Angled towards to the south for maximum solar gain

    Proposed balconies

    2481

    2869

    3350

    2900

    2900

    2900

    3350

    2365

    0

    4001 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000

    13257

    215

    2281

    200

    2661

    353

    2997

    366

    2542

    300

    2600

    310

    2545

    795

    2550

    2977

    295

    2600

    300

    2600

    346

    2504

    365

    2985

    00 - Ground FFL Unit1

    17370

    02 - Upper FFL Unit1

    23170

    03 - Third FFL Unit 126070

    04 - Fourth FFL Unit1

    28970

    05 - Fifth FFL Unit 131870

    E2B3 C3A3 A D EB C

    Retail/ Creche

    2700

    2700

    2700

    2700

    Private Garden

    Access Deck Private Balcony

    Carpark Basement

    4820

    UNIT 1

    UNIT 2

    2700

    1462

    2

    3631

    01 - First FFL19750

    06 - Sixth FFL34669

    07 - Seventh FFL37150

    F2

    Infill

    08

    09

    09

    01

    19

    1414

    01 19 mBedroom

    27 mPrivate balcony

    21 mLIVING ROOM

    8 mKITCHEN

    13 mBedroom

    11 mPrivate Balcony

    2675 1500 1559 1499 15006542

    2799

    2900

    2900

    2900

    3420

    3350

    2481

    North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    DRAWING

    CHECKER

    CAD FILE BLOCK DRAWING NUMBER ZONE REVISION

    NOTE

    ALL DIMENSIONS TO BE CHECKED ON SITENO DIMENSIONS TO BE SCALED FROM THIS DRAWINGTHIS DRAWING IS TO BE READ IN CONJUNCTION WITHRELEVANT CONSULTANTS DRAWINGS

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    10/1

    2/20

    15 1

    4:05

    :40

    10/12/2015 14:05:40

    1 : 100

    Sections

    T6

    Author

    003

    General Arrangements

    Dublin City Council

    DESIGN

    1 : 100Long Section - G.A's - Unit 2

    1 : 100Short Section - G.A's

    06 - Cutain Glazing.Triple glazed external panels.

    09 - One Storey Steel Columns.Columns are sized to engineers specifications.They are roughly 150x150mm. Refer to NBSspec : G10.

    01 - External Walls.Are 200mm thick reinforced in-situ concrete,external insulatedwith 300mm extraterm with a10mm render finish and has ainternal finish of 12.5mmplasterboard.

    17 - Stair Core Floor Finish.150mm concrete floor with 50mm polishedconcrete screed and a non slip finish.

    19 - Fifth floor wall Finish.200mm timber stud wall with a timber oanel externalcladding and a platerboard internal finish.

    14 - Roof Finish.Rheinzink angled standing seem coveringsloped to an an angle on 1:3 to NBS spec: H7415 - Green roof Finish.Wind flower planting sedum on 100mm soillayer.

    08 - One Storey Concrete Columns.Columns are sized to enginers specifications. Theyare 300mm thick. Refer to NBS spec : E20,E40 andM40.

    04 - Internal Sair Core.The internal stair cores are300mm thick with a polishedcocrete finish.

  • 7A8A

    00 - Ground FFL16400

    01 - First FFL19750

    05 - Fifth FFL31800

    06 - Sixth FFL34669

    Parapet build up300mm EPS insulation boards with renderedfinish to NBS Spec M21 adhesive fixed to pasterparge coat substrate with 150mm pre-castconcrete upstand to NBS Spec. E60 with100mm EXP insulation yo NBS Spec. M21 withrendered finish.

    Curtain walling to NBS Spec. H11fixed strictly in accordance withmanufacturers specifications.

    Zinc standing seam parapet cappinglaid to a 3 degree fall on 18mm WBP plyboardto NBS Spec. H74

    Curtain walling to NBS Spec. H11 fixed strictlyin accordance with manufacturersspecifications.

    Powder coated aluminumBrise soleil with 1 metre overhangabove to NBS Spec. L10

    Glass Balustrade fixed back to steel framedbalcony to engineers Spec

    Steel Framed balcony fixed back to structure withsteel angles to NBS spec G12 and sized toEngineers Spec with 10mm thermal break

    Wall Build up from External to Internal:15mm timber cladding to NBS spec K20. On 50X50mm vertical timberbattons to NBS spec H21. On a water membrain layer to be taped andsealed at joints with air tight tape with an over lap of 100mm to NBSspec J40. On 12.5mm OSB to NBS spec : k21. On 100mm XPSinsulation overlapped at joints. On 12.5mm OSB to NBS spec : k21.On 200mm stimber stud wall filled with rockwool insulation is placed inbetween the studs. On a inteligent membrain layer to be taped andsealed at joints with air tight tape with an over lap of 100mm to NBSspec J40. On 12.5mm OSB to NBS spec : k21. On 50X50mm verticaltimber battons to NBS spec H21. On Two Layers of 12.5mmPlasterboard.

    Roof Build up from External to Internal:Rheinzink angled standing seem covering sloped to an an angleon 1:3 to NBS spec : H74. On 20mm structural OSB to NBS spec: k21. On 50x50mm Horizontal battons at 600mm spacings toNBS spec H21. On a water membrain layer to be taped andsealed at joints with air tight tape with an over lap of 100mm toNBS spec J40 . On 20mm structural OSB to NBS spec : k21. On100mm XPS insulation overlapped at joints. On 12.5mm OSB toNBS spec : k21 On Structural BCI 90 Engineered C24 I beams at400mm centers, to enginers specification with 300mm rockwoolinsulation is placed in between the beams. On a inteligentmembrain layer to be taped and sealed at joints with air tighttape with an over lap of 100mm to NBS spec J40. On 12.5mmOSB to NBS spec : k21. On 100mm suspended Ceiling to NBSspec K45 with space for MBHR Supply air ductwork and MHVRreturn extract ductwork with 15mm 600x600mm Ceiling finish

    PV Panels & Solar PanelsProposed on the roof

    2165

    4628

    7

    20008001200

    Parex EWI/ silicate render system orsimimlar. Silicate 2 coat render finishon reinforcement mesh on base coatall in accordence with suppliers detailspec.

    Steel Framed horizontal beam fixed back tovertical steel columns and fixed with steel anglesto NBS spec G12 and sized to Engineers Specwith 10mm thermal break

    1095

    2155

    1760

    Glass Balustrade fixed back to steel framedbalcony to engineers Spec

    Retail/ Cafe

    Fifth Floor Bedroom

    7A8A

    New 200mm polished concretefloor slab 35N20 concrete A142mesh reinforcement with 50mmcover laid on 300mm XPSinsulation with radonbarrier at joints it is taped andlapped.foundation to engineers spec.

    Curtain walling to NBS Spec. H11fixed strictly in accordance withmanufacturers specifications.

    Drainage channel draininbeded in concrete to NBSSpec. R10

    Powder coated aluminumcill to NBS Spec. H72

    Two Layers of 12.5mm Plasterboard Internalfinish on 50x50mm Vertically fixed battons oneither side of 200m Blockwork wall NBS Spec.F10

    External paving is concrete paving slabs with apermable paving finish.

    Aluminum mullions fixed back tointernal walls to manufactures spec

    North

    CLIENT

    PROJECT

    JOB NUMBER

    DATE

    SCALE

    DRAWN BY

    CHECKED

    STATUS FOR REVIEW

    CHECKER

    COPYRIGHT (C)

    Group 4

    Key Site Plan

    NOTES

    10/1

    2/20

    15 1

    4:14

    :16

    10/12/2015 14:14:16

    1 : 20

    Part Elevation & PlanT6

    Author

    011

    General Arrangements

    Dublin City CouncilDESIGN

    1 : 20Part Elevation - G.A's - Unit 2

    1 : 2000 - Ground FFL Unit 2 Part Plan

  • B2 C2A2

    Wind flower planting sedumon 100mm soil layeron root barrier/drainage membraine toNBS Spec. Q37

    50mm slab pavingon 50mm sand cementto NBS Spec. Q25

    Powder coated aluminumBrise soleil with 1 metre overhangabove to NBS Spec. L10

    Structural steel column supporting balcony aboveto NBS Spec. G10

    Drainage channel draininbeded in concrete to NBSSpec. R10

    Curtain walling to NBS Spec. H11 fixed strictlyin accordance with manufacturersspecifications.

    200mm polished concrete floorslab 35N20 concreteA142 mesh reinformentwith 100mm suspendedceiling to NBS Spec. K10

    Concrete box beam to engineersspec with 3mm plaster skim on12.5mm plasterboard toNBSspec. K10

    Zinc standing seam parapet cappinglaid to a 3 degree fall on 18mm WBP plyboardto NBS Spec. H74

    Curtain walling to NBS Spec. H11fixed strictly in accordance withmanufacturers specifications.

    New 200mm polished concretefloor slab 35N20 concrete A142mesh reinforcement with 50mmcover laid on 300mm XPSinsulation with radonbarrier at joints it is taped andlapped.foundation to engineers spec.

    Aspalt to NBS Spec. j21ON 3 LAYERS OF 100mmfoamglass flat roof insulationJoints lapping boards stageredon vapour/airtight membraineon 150mm concrete slab to NBSSpec. E60 with 100mm suspendedceiling to NBS Spec. K45with space for MVHR supply air ductworkand MVHR return extract ductwork

    Drainage channel draininbeded in concrete to NBSSpec. R10

    150mm concrete slab on60mm sand blinding on4 layers 150mm hardcore

    Parex EWI/ silicate render system orsimimlar. Silicate 2 coat render finishon reinforcement mesh on base coatall in accordence with suppliers detailspec.

    Parapet build up300mm EPS insulation boards with renderedfinish to NBS Spec M21 adhesive fixed to pasterparge coat substrate with 150mm pre-castconcrete upstand to NBS Spec. E60 with100mm EXP insulation yo NBS Spec. M21 withrendered finish.

    Air tight barrier at joints is tappedand lapped to NBS Spec. P10

    2671

    3035

    5015

    010

    0

    199

    301

    920

    0

    E2

    00 - Ground FFL16400

    01 - First FFL19750

    200mm Polished Concrete floor slab35N20 Concrete A142 meshReinforcement with 50mm cover laidon 300mm XPS insulation withRadon barrier at joints it is taped andlapped.

    10mm Plasterboard internal finsh on200mm concrete slab on two layers of150mm XPS insulation overlapped atjoints with 10mm plaster external finish

    100x100mm Stone paving ground levelfinish on 75mm Sand blinding on Threelayers of 150mm Hardcore

    200mm Polished Concrete floor slab 35N20Concrete A142 mesh Reinforcement with50mm cover laid with 100mm SuspendedCeiling

    100mm Suspended ceiling to NBS Spec.K45 with space for MVHR suppy airductwork and MVHR return extract ductworkwith 15mm 600x600mm Ceiling tile finish

    Aluminium Clad door frame to NBSspec L20 with Aluminium thresholdon 10mm steel angle fixed back to200mm structural Concrete

    Structural steel column to NBSSpec G10

    B2 C2

    05 - Fifth FFL31800

    815

    1262

    1712

    3789

    1287

    222

    564

    100mm suspended Ceiling to NBS specK45 with space for MBHR Supply airductwork and MHVR return extractductwork with 15mm 600x600mmCeiling finish

    200mm polished concrete floor slab 35N20concrete A142 mesh reinforcment with50mm cover with on 50mm acusticinsulation on 12.5mm OSB to NBS specK21 on a water membrain layer to be tapedand sealed at joints with air tight tape withan over lap of 100mm to NBS spec J40 on100mm Suspended ceiling

    Two Layers of 12.5mm PlasterboardInternal finish on 50x50mm Vertically fixedbattons on 200m Reinforced Concrete wallon Two layers of 150mm XPS insulationoverlapped at joints with 10mm Plasterexternal finish

    40mm Non-Permeable Timber boarding to NBSSpec H21 on Structural steel Universal I beamsfixed back to structural Steel columns Both to NBSspec G10 & Sized to Engineers Spec Fixed Backto structure

    Steel Framed balcony fixed back to structure withsteel angles to NBS spec G12 and sized toEngineers Spec with 10mm thermal break

    Glass Balustrade fixed back to steel framedbalcony to engineers Spec

    Non Permeable Timber Boarding slopedtowards Drain

    Powder coated aluminumBrise soleil with 1 metre overhangabove to NBS Spec. L10

    Roof Build up from External to Internal:Rheinzink angled standing seem covering sloped to an an angle on 1:3to NBS spec : H74. On 20mm structural OSB to NBS spec : k21. On50x50mm Horizontal battons at 600mm spacings to NBS spec H21. Ona water membrain layer to be taped and sealed at joints with air tighttape with an over lap of 100mm to NBS spec J40 . On 20mm structuralOSB to NBS spec : k21. On 100mm XPS insulation overlapped at joints.On 12.5mm OSB to NBS spec : k21 On Structural BCI 90 EngineeredC24 I