Page 1: GENERAL ARRANGEMENT DRAWINGS · 21.8 GENERAL NOTES The General Notes on the General Arrangement Drawing shall be in the format shown on the current issue of RTA Standard Bridge Drawing

SECTION 21

GENERAL ARRANGEMENT

DRAWINGS

Page 2: GENERAL ARRANGEMENT DRAWINGS · 21.8 GENERAL NOTES The General Notes on the General Arrangement Drawing shall be in the format shown on the current issue of RTA Standard Bridge Drawing

RTA Structural Drafting General Arrangement Drawings and Detailing Manual

OTB005 Issue 1 – Revision 1 (22 September 2010) Page 1 of 3

21 GENERAL ARRANGEMENT DRAWINGS

21.1 GENERAL

In all cases, Sheet No 2 of each set of bridge construction drawings prepared by the Authority, by Consultants for the Authority or for bridges that will become the property of the Authority, shall be the "General Arrangement” drawing. Where more than one sheet is necessary to show all the required details, a suite of General Arrangement drawings shall be created and the titles General Arrangement - Sheet A, General Arrangement - Sheet B etc shall be used. The “General Arrangement” gives an overall view of the bridge as it will appear once constructed and it shall include a plan, an elevation, a typical cross section, a site plan, a suitable skew diagram and/or vertical alignment diagram as appropriate and a list of "General Notes" which apply to the entire set of drawings. The General Arrangement drawing shall contain a note which describes the thickness and composition of the bituminous surfacing and waterproofing system on the structure. The General Arrangement drawing shall not contain any construction sequence information or any construction requirement information. Typical General Arrangement drawings for a variety of bridge construction types are shown in Figures 21.1.1(a), 21.1.1(b), 21.1.1(c) and 21.1.1(d).

21.2 PLAN VIEW

Plan views shall contain the following information:

- An outline of the structure - The watercourse, railway line or road under the structure - Any existing structures including the Reduced Level of the deck - The location of any public utilities - The Base centreline and Carriageway centreline as appropriate - Chainages on the Base centreline at the ends of deck and at each pier centreline

together with the reduced level at each location - The bearing or radius of the Base centreline as appropriate - For bridges over roads, the coordinates of the intersection point of the control line for

the bridge and the centreline of the underlying roadway, as well as the chainage on the control line for the bridge structure at that point

- The outline of parapets, footways and railings as appropriate - Joints in the deck surface - The position of name plates - The outlines of the structural elements ie abutments, piers, piles, footings and columns

etc where the scale of the drawing permits - Horizontal clearances as appropriate - The location of any vertical clearance referenced from the Elevation - Contours of the existing surface - Shapes and slopes of any embankments - Extent of any embankment protection required - Extent of any channel excavation required - The direction of flow of the watercourse or conventional tidal representation - The compass direction of True North indicated by a northpoint - The outline of concrete safety barrier extensions, approach slabs and steel safety

barriers in the approaches as appropriate

Page 3: GENERAL ARRANGEMENT DRAWINGS · 21.8 GENERAL NOTES The General Notes on the General Arrangement Drawing shall be in the format shown on the current issue of RTA Standard Bridge Drawing

RTA Structural Drafting General Arrangement Drawings and Detailing Manual

OTB005 Issue 1 – Revision 1 (22 September 2010) Page 2 of 3

21.3 ELEVATION

Elevations shall contain the following information as appropriate:

- The outline of the elevation face of the structure projected from the Plan view showing foundation type, abutments, piers, superstructure and railings.

- The overall length of deck - The number and length of spans - The grade on the deck (represented by an arrow and %sign) or the reduced level of

the deck as appropriate - The normal water level or stream condition ie normally dry etc - Mean High Water Springs and Mean Low Water Springs for tidal waters. - Navigational clearances above Mean High Water Springs for navigable waterways - The calculated High Flood Levels - both the 1in 100 year ARI and 1 in 2000 year ARI

values - The reported High Flood Level, including the date of occurence - Vertical and horizontal clearances for structures over roads and/or railways including the

approximate design surface level of any road or railway line under the structure at the Base centreline

- Vertical and horizontal clearances for opening span bridges both open and closed - The existing surface on the Base centreline projected from contour lines. - Proposed cross section for channel excavation - Form and extent of any embankments and any required embankment protection

whether above or below the existing natural surface, parapet extensions, approach slabs and steel safety barriers in the approaches

- Contract levels of foundation elements - Bearing articlulation in the longitudinal direction represented by the letters “F” for fixed,

“R” for restrained and “E” for expansion - Expansion joint locations, represented by the letters “EJ” - Joints in the superstructure represented by a single heavy line - Chainages, existing surface levels and design surface levels at the ends of deck and at

each pier on the Control Line or Base centreline given in a Datum block beneath the Elevation

- Structure location with respect to nearest major towns ie FROM / TO 21.4 TYPICAL CROSS SECTION

Typical cross sections shall contain the following information:

- General form of the piers or abutments including foundation elements - Outline of the superstructure elements - Overall width of the superstructure - Width between concrete safety barriers - Height of traffic barrier railings above deck level - Widths of concrete safety barriers and/or footways - Clear width of footways - Base centreline and/or Carriageway centreline and/or Control Line - Crossfall or superelevation represented by an arrow and % sign - Type of wearing surface - Indication of orientation with respect to stream flow or compass point ie UPSTREAM

or DOWNSTREAM, NORTH or SOUTH.

21.5 SKEW DIAGRAM

Page 4: GENERAL ARRANGEMENT DRAWINGS · 21.8 GENERAL NOTES The General Notes on the General Arrangement Drawing shall be in the format shown on the current issue of RTA Standard Bridge Drawing

RTA Structural Drafting General Arrangement Drawings and Detailing Manual

OTB005 Issue 1 – Revision 1 (22 September 2010) Page 3 of 3

Skew Diagrams shall be in the following format:

- A right angle triangle with the base parallel to the Control Line or Base Centreline, the hypotenuse parallel to the abutment and pier centrelines and with the skew angle designated at the apex of the triangle.

Skew Diagrams shall contain the following information:

- A dimension for the vertical side of the triangle (normally 10 000). A dimension for the base and hypotenuse of the triangle calculated from the vertical dimension and the skew angle

Conventional Skew Diagrams, for both right and left hand skews are shown in Figure 21.5. 21.6 VERTICAL ALIGNMENT DIAGRAM Vertical alignment diagrams shall contain the following information:

- The length of the curve - The grade on the road at each end of the curve - The chainage and reduced level at each end of the curve - The position of the bridge indicated by a heavy line together with a chainage and

reduced level at each end of the bridge - The chainage and reduced level of the intersection point of the approach grades on the

Base centreline.

21.7 SITE PLAN

- Base centreline, including the position of any Tangent Points etc - The position and chainage of each end of the bridge - The existing bridge (if applicable) including the RL of the existing deck - Survey Marks and Bench Marks (including RL) - Road boundaries - The location of any existing public utilities - The location and description of any nearby features that are likely to affect the

construction of the new bridge - Northpoint

21.8 GENERAL NOTES

The General Notes on the General Arrangement Drawing shall be in the format shown on the current issue of RTA Standard Bridge Drawing No RTAB029 with the blank spaces being filled in with the appropriate information. Any necessary additional information may be added as required.

Page 5: GENERAL ARRANGEMENT DRAWINGS · 21.8 GENERAL NOTES The General Notes on the General Arrangement Drawing shall be in the format shown on the current issue of RTA Standard Bridge Drawing

GENERAL NOTES

DIMENSIONS ARE IN MILLIMETRES.

CHAINAGES AND REDUCED LEVELS ARE IN METRES.

E DENOTES EXPANSION BEARING.

F DENOTES FIXED BEARING.

REDUCED LEVELS ARE RELATED TO AUSTRALIAN HEIGHT DATUM.

SCALE: 0 105

2.55

15m

OR AS SHOWN.

QA RECORDS COMPLETED

DATE

APPROVED

DATE

THE BRIDGEWORKS DO NOT INCLUDE DEMOLITION OF EXISTING BRIDGE,

EMBANKMENT PROTECTION, STEEL SAFETY BARRIERS, SPRAYED SAM SEAL OR ANY

WORK IN THE APPROACHES EXCEPT THE APPROACH SLABS.

BASE Lc BEARING 8 56’ 39.3"

FIGURE 21.1.1(a)

EJ DENOTES EXPANSION JOINT.

PREPARED BY

BRIDGE ENGINEERING

110 GEORGE STREET

PARRAMATTA NSW 2150

PHONE (02) 8837-0802

FACSIMILE (02) 8837-0055

1500 DEEP PSC

SUPER "T" GIRDERS

HIGHWAY No 7 CITY OF DUBBO

BRIDGE OVER TALBRAGAR RIVER

AT TROY

GENERAL ARRANGEMENT

CAD No KP2F2111A.dgn

0007 381 BC 1234

2 0

B10846

PRELIMINARY

MANAGER, BRIDGE DESIGN PROJECTS

SENIOR BRIDGE ENGINEER (NEW DESIGN)

CLIENT

WESTERN REGIONAL OFFICE

51-55 CURRAJONG STREET PARKES

PO BOX 334 PARKES NSW 2870

PHONE (02) 6861-1444

FACSIMILE (02) 6861-1414

DATUM RL 240.000

CONTRACT LEVEL RL 243.000

CONTRACT LEVEL RL 241.000

CONTRACT LEVEL RL 245.000

CHAINAGE ALONG BASE Lc

APPROXIMATE EXISTING

SURFACE ON BASE Lc

LcCALCULATED HFL RL 262.5DESIGNED SURFACE

ON BASE RL 265.200

FROM DUBBOTO GILGANDRA

OVERALL LENGTH OF DECK = 101 300

33 500 33 500 33 500400

3000

APPROACH SLAB

400

3000

APPROACH SLAB

STEEL SAFETY BARRIER

THRIE BEAM

CH 182.600

NAME PLATE

ON PARAPET

APPROACH SLAB

APPROACH SLAB

NAME PLATE

ON PARAPET

CH 283.900CH 216.500

SPAN 1 SPAN 2 SPAN 3

E E EF

1

-

1

-

BEARING 8 56’ 39.3"BASE

CH 250.000

NWL RL 247.0

STEEL SAFETY BARRIER

THRIE BEAM

EMBANKMENT

PROTECTION SHALL

BE TAKEN 600mm

MINIMUM BELOW

EXISTING LEVEL (TYP)

EXISTING BRIDGE

(TO BE DEMOLISHED)

RL 265.2

RL 265.200

RL 265.200 RL 265.200 RL 265.200

FOUNDATION MATERIAL:

SAND/SANDY LOAM

EJ EJ

600 4500 4500 600

RC DRIVEN PILES

DESIGNED SURFACE

LEVEL RL 265.200

SECTION 1

-

100

DUCT

150

STORMWATER

PIPE

DOWNSTREAM UPSTREAM

150

STORMWATER

PIPE

Lc

15 SPRAYED SAM

DOUBLE DOUBLE SEAL

BASE

SITE PLAN

0 10 20 30 40 50m

510

NEW BRIDGE

FROM DUBBO TO GILGANDRA

ABUTMENT A CH 182.600 ABUTMENT B CH 283.900

Page 6: GENERAL ARRANGEMENT DRAWINGS · 21.8 GENERAL NOTES The General Notes on the General Arrangement Drawing shall be in the format shown on the current issue of RTA Standard Bridge Drawing

GENERAL NOTES0 10m8642

12

DATE

QA RECORDS COMPLETED

APPROVED

DATEFIGURE 21. 1. 1(b)

PREPARED BY

BRIDGE ENGINEERING

110 GEORGE STREET

PARRAMATTA NSW 2150

PHONE (02) 8837-0802

FACSIMILE (02) 8837-0055

EXISTING BRIDGE 1961

BRIDGE No 643SCALES OR AS SHOWN.

DIMENSIONS ARE IN MILLIMETRES.

CHAINAGES AND REDUCED LEVELS ARE IN METRES.

REDUCED LEVELS ARE RELATED TO AHD.

R DENOTES RESTRAINED BEARING.

THE BRIDGEWORKS DO NOT INCLUDE SPRAYED SAM DOUBLE DOUBLE SEAL, STEEL

SAFETY BARRIER, EMBANKMENT FILL AND PROTECTION OR ANY WORKS IN THE

APPROACHES EXCEPT APPROACH SLABS.

MAIN ROAD No 246 SHIRE OF HUME

BRIDGE OVER FRENCH’S CREEK

AT 1.9km SOUTH OF HOWLONG

GENERAL ARRANGEMENT

CAD No KP2F2111B.dgn

0246 451 BC 1234

2 0

B10589

PRELIMINARY

MANAGER, BRIDGE DESIGN PROJECTS

SENIOR BRIDGE ENGINEER (NEW DESIGN)

NAME PLATE

ON PARAPET

APPROACH SLAB

CH 882.700

RL 142.300

NAME PLATE

ON PARAPET

APPROACH SLAB

CH 943.300

RL 142.300

BASE Lc

CH 895.000CH 907.000 CH 919.000 CH 931.000

1

-

1

-

SPAN 1 SPAN 2 SPAN 3 SPAN 4 SPAN 5DATUM RL 118.000

ELEVATION

APPROXIMATE EXISTING SURFACE LEVEL

ON BASE

CHAINAGE ON BASE

Lc

Lc

EMBANKMENT PROTECTION SHALL

BE TAKEN 600mm MINIMUM BELOW

EXISTING SURFACE LEVEL (TYP)

DECK RL 142.300

ON BASE Lc

300 300

OVERALL LENGTH OF DECK = 60 600

3000

APPROACH

SLAB

3000

APPROACH

SLAB

FROM

HOWLONG

TO

CHILTERN

SURFACE

PLAN

1 IN 100 YEAR ARI

HFL RL 140.500

CONTRACT LEVEL

RL 123.500

R R R R R R

STEEL SAFETY BARRIER

(THRIE BEAM) - TYP

W BEAM TO THRIE BEAM TRANSITION

IN ACCORDANCE WITH RTA DRAWING

No WD.R132.B04.A - TYP

POSTS AND BLOCKOUT PIECES IN APPROACHES IN ACCORDANCE

WITH RTA DRAWING No MD.R132.F02.A - TYP

APPROX LEVEL OF EMBANKMENT

FILL TO UNDERSIDE OF ABUTMENT

HEADSTOCK PRIOR TO DRIVING OF PILES

5 AT 12 000 = 60 000

NWL RL 247.0

Lc

1

-

UPSTREAM DOWNSTREAM

45004500

9000

0 1000

5001000

2000 3000mm

DESIGNED SURFACE

LEVEL RL 142.300

RADIAL SECTION

10 200

600600

DIA 100

UPVC PIPES

15mm SPRAYED SAM DOUBLE

DOUBLE SEALBASE

12m SPAN PSC

PLANKS - TYP

TP CH 799.397 TP CH 961.087

CH 882.700

ABUTMENT A

CH 943.300

ABUTMENT B

RL 142.300RL 142.300

SITE PLAN0

125

75m

25

25 50

EXISTING BRIDGE

RL 141.000

Page 7: GENERAL ARRANGEMENT DRAWINGS · 21.8 GENERAL NOTES The General Notes on the General Arrangement Drawing shall be in the format shown on the current issue of RTA Standard Bridge Drawing

REDUCED LEVELS ARE TO AUSTRALIAN HEIGHT DATUM.

GENERAL NOTES

NOT TO SCALE

SKEW DIAGRAM

10

00

0

SITE PLAN

McGRATHS HILL

FROM TO

PITT TOWN

EXISTING TIMBER

3640

10642

FROM THE HAWKESBURY RIVER. THE PROBABLE 100 YEAR HFL IS RL 16.0M INCLUDING

* CALCULATED HFL BASED ON McKENZIES CREEK CATCHMENT WITHOUT BACKWATER

BACKWATER FROM THE HAWKESBURY RIVER, BASED ON LOWER HAWKESBURY RIVER

THE CONSTRUCTION OF THE SIDE TRACK, ROAD APPROACHES, GABIONS, GUARDRAIL,

THE BRIDGEWORKS INCLUDE THE DEMOLITION OF THE EXISTING BRIDGE BUT EXCLUDE

KERB EXTENSIONS, SUBSOIL DRAINS, ASPHALTIC CONCRETE AND CHANNEL SHAPING

NOT TO SCALE

VERTICAL ALIGNMENT

75000

RL

6.4

40

RL

6.3

51

CH

23

9.3

06

CH

89.3

06

RL

9.1

81

RL 6.191

IP CH 164.306

75000

RL

6.3

55

-3.987%

0.214%

McK

EN

ZIE

S

CREEK

FLOOD PLAIN ATLAS - MAY 1982 (RICHMOND TO WILBERFORCE).

AND PROTECTION.

FOR DETAILS OF NEW CHANNEL

ALIGNMENT, PROFILE AND

BATTER PROTECTION REFER

TO SHEET No 14

NOT TO SCALE

SCALES AS SHOWN.

FIGURE 21.1.1(c)

20 00 00"

DATE

QA RECORDS COMPLETED

APPROVED

DATE

BRIDGE RL 6.000

ABUTMENT A

CH 208.045

ABUTMENT B

CH 223.685

CONTROL LINE

R 2

20

0 0

00

LENGTH OF VC

DIMENSIONS ARE IN MILLIMETRES.

CHAINAGES AND REDUCED LEVELS ARE IN METRES.

CH

223.6

85 A

BU

TM

EN

T B

CH

208.0

45 A

BU

TM

EN

T A

PREPARED BY

BRIDGE ENGINEERING

110 GEORGE STREET

PARRAMATTA NSW 2150

PHONE (02) 8837-0802

FACSIMILE (02) 8837-0055

EXISTING TIMBER BRIDGE (1947)

RL 6.000 TO BE DEMOLISHED

BRIDGE NUMBER 589

PREPARED CHECKED

DESIGN

DRAWING

MANAGER, BRIDGE DESIGN PROJECTS

ISSUE DATE REVISION PREP AUTH

ROADS AND TRAFFIC AUTHORITY OF NSW

CHECK

TH

IS D

RA

WIN

G I

S C

ON

FID

EN

TIA

L A

ND

SH

AL

L O

NL

Y B

E U

SE

D F

OR

TH

E P

UR

PO

SE

OF

TH

E N

OM

INA

TE

D P

RO

JEC

T.

MAIN ROAD No 123 SHIRE OF HAWKESBURY

BRIDGE OVER McKENZIES CREEK

AT 1.2km NORTH OF McGRATHS HILL

GENERAL ARRANGEMENT

CAD No KP2F2111C.dgn

REGISTRATION No OF PLANS

SHEET No

ISSUE STATUS:

RTA BRIDGE NUMBER

0123 291 BC 0256

2 0

B10256

ISSUE

PRELIMINARY

MANAGER, BRIDGE DESIGN PROJECTS

SENIOR BRIDGE ENGINEER (NEW DESIGN)

DOWNSTREAM

LEVEL

DESIGN SURFACE

RAILING

TRAFFIC BARRIER

3% 3%

CONTROL LINE

CONTRACT LEVEL

UPSTREAM

(NOT IN BRIDGEWORKS)

SECTION 1

-

(INCLUDING AFFLUX)

1/125 DIA UPVC DUCT

FOR TELSTRA

1/150 DIA UPVC DUCT

325 325

0 5m4321

1 0.5

FOR AGL

2/125 DIA UPVC DUCTS FOR

2/125 DIA UPVC DUCTS FOR

INTEGRAL ENERGY

APPROXIMATE EXISTING SURFACE

15m PSC PLANKS

* 100 YEAR HFL RL 16.0 APPROX

INTEGRAL ENERGY

* CALCULATED 100 YEAR HFL RL 7.24

75 THICK ASPHALT

11 650

5 500 5 500

ELEVATION

PLAN

APPROACH SLAB

CONCRETE PARAPET

NAME PLATE ON

CONCRETE PARAPET

NAME PLATE ON

APPROACH SLAB

1.5 TO 1

PITT TOWN

TOFROM

McGRATHS HILL

SURFACE

APPROXIMATE EXISTING

APPROACH

3000 3000

CONTROL LINE

CONTRACT LEVEL

RL -5.700

F DENOTES FIXED BEARING

F E

I.L. RL 3.50

APPROXIMATE EXISTING

CHANNEL.

E DENOTES EXPANSION BEARING

ON CONTROL LINE

ON CONTROL LINE 6.3

45

6.0

226.6

85

6.3

55

5.3

223.6

85

6.4

20

5.2

20

8.0

45

6.4

40

6.1

20

5.0

45

CHAINAGE ON CONTROL LINE

EXISTING SURFACE LEVEL

DESIGN SURFACE LEVEL

DATUM RL -5.500

END OF APPROACH SLAB

ABUTMENT A

END OF APPROACH SLAB

RL 6.440 RL 6.355

RL 6.345RL 6.420

RL -2.800

CONTRACT LEVEL

1

-

-

1

6.0

EXISTING LIGHT POST

McK

EN

ZIE

S C

RE

EK

8700

EXISTING CHANNEL SHALL BE SHAPED TO THE

BASE OF CHANNEL SHALL BE PROTECTED WITH 230 THICK

ROCK MATTRESS AND EMBANKMENTS SHALL BE STABILISED

WITH JUTE MESH AND GRASSED TO PREVENT SCOUR

(NOT IN BRIDGEWORKS)

5.0

4.0

5.0

4.0

4.0

3.0

5.0

4.0

5.0

FOR DETAILS OF GABIONS RETAINING FILL, REFER

(8200 SQUARE TO CHANNEL)

SLAB SLAB

APPROACH W BEAM TO THRIE BEAM TRANSITION

IN ACCORDANCE WITH RTA DRAWING

No MD.R132.BO4.A (TYP)

POSTS AND BLOCKOUT PIECES

IN APPROACHES IN ACCORDANCE

WITH RTA DRAWING No MD.R132.FO2.A

(TYP)

0 5m4321

1 0.5

0 5m4321

1 0.5

OVERALL LENGTH OF DECK ON CONTROL LINE 15 640

R 2

20

0 0

00

TO ROAD PLANS REG No 0181 091 BA 2500.

TRAPEZOIDAL PROFILE AS SHOWN ON SHEET No 14

CH 205.045

CH 208.045

CH 223.685

CH 226.685

ABUTMENT B

320 15000 320

END OF DECK END OF DECK

FOUNDATION MATERIAL:

SAND / SANDY CLAY

EJ

EJ DENOTES EXPANSION JOINT

Page 8: GENERAL ARRANGEMENT DRAWINGS · 21.8 GENERAL NOTES The General Notes on the General Arrangement Drawing shall be in the format shown on the current issue of RTA Standard Bridge Drawing

LENGTH OF CURVE = 250 000

VERTICAL CURVE DIAGRAM

NOT TO SCALE

GENERAL NOTES0 10m8642

12

AB

UT

ME

NT

A

CH

64

1.2

10

AB

UT

ME

NT

B

CH

70

5.9

10

BRIDGE

LOCATION EN

D O

F C

UR

VE

CH

82

5.0

00

ST

AR

T O

F C

UR

VE

CH

57

5.0

00

IP C

H 7

00

.00

0

RL

27

1.5

00

5.9422%

1.7236%

2

CLIENT

SOUTH WEST REGIONAL OFFICE

1 SIMMONS STREET WAGGA WAGGA

PO BOX 484 WAGGA WAGGA NSW 2650

PHONE (02) 6938-1111

FACSIMILE (02) 6938-1183

PREPARED BY

BRIDGE ENGINEERING

110 GEORGE STREET

PARRAMATTA NSW 2150

PHONE (02) 8837-0810

FACSIMILE (02) 8837-0055

FIGURE 21.1.1(d)

SCALE OR AS SHOWN.

DIMENSIONS ARE IN MILLIMETRES.

CHAINAGES AND REDUCED LEVELS ARE IN METRES.

REDUCED LEVELS ARE RELATED TO AHD .

E DENOTES EXPANSION BEARING. F DENOTES FIXED BEARING.

EJ DENOTES EXPANSION JOINT.

BRIDGEWORKS DO NOT INCLUDE EXCAVATION TO EXCAVATED ROCK SURFACE

AND HW2 FINISHED DESIGN LEVELS, TREATMENT OF EXCAVATED ROCK SURFACE,

ASPHALT, STEEL SAFETY BARRIER OR ANY WORK IN THE APPROACHES EXCEPT

FOR APPROACH SLABS.

PREPARED CHECKED

DESIGN

DRAWING

ISSUE DATE REVISION PREP AUTH

ROADS AND TRAFFIC AUTHORITY OF NSW

CHECK

TH

IS D

RA

WIN

G I

S C

ON

FID

EN

TIA

L A

ND

SH

AL

L O

NL

Y B

E U

SE

D F

OR

TH

E P

UR

PO

SE

OF

TH

E N

OM

INA

TE

D P

RO

JEC

T.

HIGHWAY No 2 SHIRE OF GUNDAGAI

BRIDGE OVER HIGHWAY No 2

AT 82.4km SOUTH OF YASS

GENERAL ARRANGEMENT

REGISTRATION No OF PLANS

SHEET No

ISSUE STATUS:

RTA BRIDGE NUMBER

0002 246 BC 2140

AISSUE

FOR CONSTRUCTION

CAD No D246GA.dgn

MANAGER, BRIDGE DESIGN PROJECTS

DATE

MANAGER, BRIDGE DESIGN PROJECTS

QA RECORDS COMPLETED

AND DRAWINGS RECOMMENDED

FOR APPROVAL

APPROVED

DATE

SENIOR BRIDGE ENGINEER (NEW DESIGN)

B10256

SECTION 1

-

0 1000

5001000

2000 3000mm

9 400

600

3.0% 3.0%

STEEL TRAFFIC

BARRIER RAILING

SAFETY SCREEN

PSC VOIDED SLAB

BRIDGE ¶

600

CONTRACT LEVEL

RL 258.000

4 700 4 700

NORTHERN SIDE SOUTHERN SIDE

APPROX FINISHED SURFACE LEVEL

DIA 100

DUCTS - TYP

75mm THICK ASPHALT

AND WATERPROOF

MEMBRANE

1300 T

YP

1.5 TO 1

1.5 TO 1

ELEVATION

PLAN

MAIN ROAD

No 87

APPROXIMATEEXISTING

SURFACELEVEL

1

-

1

-

10 00010 000

DATUM RL 250.000

5450 M

IN

CL

EA

RA

NC

E

267.6

37

EXISTING SURFACE

LEVEL ON BRIDGE ¶

CHAINAGE ON

BRIDGE ¶

33 00031 000350 350

OVERALL LENGTH OF DECK ON BRIDGE ¶ = 64 700

3 000

APPROACH SLAB

3 000

APPROACH SLAB

269.0

66

27

0.4

05

705.9

10

672.5

60

641.2

10

CONTRACT LEVEL

RL 258.000

PIE

R ¶

AB

UT

ME

NT

A

EN

D O

F D

EC

K

AB

UT

ME

NT

B

EN

D O

F D

EC

K

SPAN 1SPAN 2

NO

RT

HB

OU

ND

CO

NT

RO

L L

INE

SOU

TH

BO

UN

D

CO

NT

RO

L L

INE

NO

RT

HB

OU

ND

CA

RR

IAG

EW

AY

SO

UT

HB

OU

ND

CA

RR

IAG

EW

AY

TO

YA

SS

FR

OM

YA

SS

FR

OM

GU

ND

AG

AI T

O G

UN

DA

GA

I

APPROACH SLAB

APPROACH SLAB

2 T

O 1

2 T

O 1

2 T

O 1

2 T

O 1

1.5 TO 1

1.5 TO 11.5 TO 1

1.5 TO 1

CONTRACT LEVEL

RL 264.095

CONTRACT LEVEL

RL 266.765

2 T

O 1

2 T

O 1

FROM

COOTAMUNDRA

DESIGN SURFACE

LEVEL ON BRIDGE ¶

BRIDGE ¶

271.3

273.8

276.5

CH 705.910

RL 270.405

CH 672.560

RL 269.066

CH 641.210

RL 267.637

BEARING 68%%d 42’ 35.2" ON BRIDGE ¶

STEEL SAFETY

BARRIER

F

E

E

26

9.4

88

682.5

60

27

4.8

STEEL SAFETY

BARRIER

SAFETY SCREEN

POSTS INSTALLED

TRULY VERTICAL

NO

RT

HB

OU

ND

CO

NT

RO

L L

INE

SOU

TH

BO

UN

D

CO

NT

RO

L L

INE

1 000

MIN EXCAVATED

ROCK SURFACE

EXCAVATED

ROCK SURFACE

1 000

MIN

FINISHED

DESIGN LEVEL

ON HIGHWAY No 2

TO HIGHWAY No 2

LOADING/UNLOADING

RAMPS

HIG

HW

AY

No

2

HIG

HW

AY

No

2

NAME PLATE

ON WINGWALL

NAME PLATE

ON WINGWALL

CH 662.582

E 241024.378

N 3145246.891

STEEL SAFETY BARRIERS IN

BRIDGE APPROACHES SHALL

BE IN ACCORDANCE WITH

RTA DRAWING No MD.R132.HO1.B

*

*

*

DENOTES PLAN LOCATION

POINT OF MINIMUM CLEARANCE

ON

EJ

EJ

Page 9: GENERAL ARRANGEMENT DRAWINGS · 21.8 GENERAL NOTES The General Notes on the General Arrangement Drawing shall be in the format shown on the current issue of RTA Standard Bridge Drawing

’L2’

’L1’

10

00

0

SKEW ANGLE

RIGHT HAND SKEW

DIRECTION OF INCREASING CHAINAGE

’L2’

’L1’

10

00

0

SKEW ANGLE

DIRECTION OF INCREASING CHAINAGE

SKEW DIAGRAMS

IN BOTH CASES, ’L1’ AND ’L2’ ARE CALCULATED BY

THE USE OF THE GIVEN DIMENSIONS AND THE SKEW ANGLE

FIGURE 21.5

LEFT HAND SKEW