a595 grizebeck - general arrangement drawing
TRANSCRIPT
PROPOSED SITE COMPOUND/STORAGE AREA
CHAPELS VILLAGE
00
50
100
150
200
250
300
350
400
450
500
550
600
650
700
750PROPOSED UNDERPASS UNDERTHE PROPOSED A595 FORLANDOWNER USE.
FARM ACCESS TRACKJUNCTION MOVED WESTTO SUIT NEW ALIGNMENT.
FOOTWAY PROVIDED FORCONNECTION OF EXISTINGBUS STOP TO CHAPELS.
JUNCTION IMPROVEMENT WITHRIGHT TURN LANE INTO CHAPELS.
NEW JUNCTION ARRANGEMENT WITHRIGHT TURN LANE INTO BUCKHORN LANE.BIUCKHORN LANE TO BE CHANGED TOACCESS ONLYPROPOSED FIELD ACCESS
EXISTING CARRIAGEWAY ADAPTED TOPROVIDE A SHARED USE NON-MOTORISEDUSER PATH TO PROPOSED A595.
PROPOSED NON-MOTORISED SHAREDUSE PATH TO CONNECT TO EXISTINGFOOTWAY ON A595 TO SOUTH.
EXISTING A595 ADAPTED TO PROVIDE ANON-MOTORISED SHARED USE PATH ANDVEHICULAR FIELD ACCESS ROUTE.
VEHICLE TURNING HEAD PROVIDED.VEHICLE ACCESS SOUTH FROM THISPOINT LIMITED FOR FIELD ACCESSONLY.
FALSE CUTTING PROVIDED ADJACENTTO DOVE BANK COTTAGES.(APPROXIMATE HEIGHT 1.8m)
1V:2H (OR STEEPER - SUBJECT TO GROUNDINVESTIGATION DATA) EARTHWORKSCUTTING SLOPE BETWEEN CH400 AND CH700FARM ACCESS TRACK
CONNECTION BETWEENFIELDS IMPROVED
EXISTING CARRIAGEWAY CHANGED TORESIDENTAL VEHICLE ACCESS ONLYAND PROVIDES A FOOTPATH BETWEENTHE BUS STOP AND BUCKHORNLANE/EXISTING A595.
PROPOSED NON-MOTORISED SHAREDPATH TO LINK TO EXISTING A595
SURFACE WATER ATTENTUATIONBASIN A AND ACCESS TRACK.
SEE RIGHT
PROPOSED WATERCOURSEDIVERSION.
PROPOSED SITECOMPOUND/STORAGE AREA
GRIZEBECK VILLAGE
GRIZEBECK COMMUNITYCENTRE
A595 TO
WORKINGTON
A5092 TOKENDAL
700
750
800
850
900
950
1000
1050
1100
1150
1200
1250
1300
1350
1386
PROPOSED UNDERPASS UNDERTHE PROPOSED A595 FORLANDOWNER USE.
JUNCTION IMPROVEMENT TOCONNECT INTO PROPOSEDCARRIAGEWAY
PROPOSED CROSS OVER BRIDGETO MAINTAIN CONNECTIVITY OFEXISTING CARRIAGEWAY
JUNCTION IMPROVEMENT FORACCESS INTO COMMUNITYCENTRE CAR PARK.
EXISTING FOOTWAY TO COMMUNITYCENTRE EXTENDED TO IMPROVEVISIBILTY FOR PEDESTRIANSCROSSING.
PROPOSED CULVERTOVER GRIZE BECK
PROPOSED FIELD ACCESS
PROPOSED TURNING HEAD.
PROHIBITION OF VEHICULAR TRAFFICFROM EXISTING 'MOUSE TRAP'JUNCTION.ACCESS FOR NON-MOTORISED USERSMAINTAINED.
ELLERMIRE BRIDGE EXTENDEDFOR CARRIAGEWAY WIDENING.
PROPOSED FIELDACCESS
EXISTING ACCESS INTO ELLER MIRE WIDENEDWITH RIGHT TURN POCKET FROM A5092.
PROPOSED PEDESTRIAN CROSSING WITHREFUGE ISLAND TO PROVIDE CROSSING POINTTO EXISTING FOOTWAY ON NORTH SIDE OFA595/A5092.
EXISTING JUNCTION CHANGED TOBUS LEFT OUT MANOUVRES ONLY.
BUS STOP RETAINED.
PROPOSED GHOST ISLAND JUNCTION WITHRIGHT TURN LANE ONTO PROPOSED A595.WITH ADDITIONAL BUFFER LANE FOR RIGHTTURN MANOUVRES INTO RESIDENTIALPROPERTIES ON NORTH SIDE OF A5092/A595.
PROPOSED TRAFFICISLAND
EXISTING JUNCTION INTOGRIZEBECK RETAINED.
EXISTING FOOTPATH ON NORTHSIDE OF A595/A5092 RETAINED.
PROPOSED FIELD ACCESS.
SURFACE WATER ATTENTUATIONBASIN B WITH ACCESS TRACK ANDTURNING HEAD.
PROPOSED DRAINAGEDITCH
SURFACE WATER ATTENTUATIONBASIN C WITH ACCESS TRACKAND TURNING HEAD.
1V:2H (OR STEEPER - SUBJECT TO GROUNDINVESTIGATION DATA) EARTHWORKSCUTTING SLOPE BETWEEN CH400 AND CH700FARM ACCESS TRACK
SEE LEFT
KEY:
EXISTING PUBLIC RIGHT OF WAY
PROPOSED FIELD BOUNDARY
EXISTING RESIDENTIAL BUILDING
NOTES:
1. LAND EXTENTS SHOWN ARE APPROXIMATE AND WILL NEED TO BEREVISED FOLLOWING TOPOGRAPHICAL SURVEY AND DETAILEDDESIGN.
2. THE PROPOSED DRAINAGE DESIGN WILL CONSIST OF THEFOLLOWING WHERE POSSIBLE: CATCH-PITS, GULLIES, CARRIERDRAINS, FILTER DRAINS, SWALES, BALANCING PONDS, BIFURCATIONOF DRAINAGE RUNS FOR ATTENUATION AND BYPASS INTERCEPTOR/ SEPARATORS. NOT SHOWN FOR CLARITY.
3. THE ROAD MARKINGS SHOWN ARE INDICATIVE.ROAD IMPROVEMENT
TOP SOILING AND LANDSCAPING
INDICATIVE DRAINAGE OUTFALL
PROPOSED POST AND RAIL FENCE
FIELD ACCESS TRACK /ATTENUATION BASIN ACCESS TRACK
650
700
750
800
850
1V:2H (OR STEEPER - SUBJECT TO GROUNDINVESTIGATION DATA) EARTHWORKSCUTTING SLOPE BETWEEN CH400 AND CH700FARM ACCESS TRACK
SEE RIGHT
SEE LEFT
650
700
750 THE PROPOSED A595 FORLANDOWNER USE.
SEE RIGHT
SEE LEFT
15
20
25
30
35
40
45
50
15
20
25
30
35
40
45
50
15
20
25
30
35
40
45
50
15
20
25
30
35
40
45
50
TYPICAL SECTION THROUGH FALSE CUTTING ADJACENT TO DOVE BANK COTTAGES(CH500 - CH700)
SCALE 1:500
PROPOSED GROUND LEVEL.1V:2H EARTHWORKS SLOPESHOWN.
EXISTING GROUND LEVEL
DOVE BANK COTTAGES
T:\C
S098
850 A
595 G
RIZE
BECK
IMPR
OVEM
ENT
PREL
IM D
ESIG
N\03
DEL
IVER
Y\HG
N HW
AYGE
NERA
L\03 D
RAW
INGS
\GRZ
B-CA
P-HG
N-00
-DR-
C-11
00.D
WG
ed by
: Matt
hew
Stee
l On:
26 M
ay 20
21 at
12:31
www.capitaproperty.co.uk
Project
Client
Drawing
Scale at A1 Drawn Checked Approved
Project No. Date
Purpose of Issue
© Capita Property and Infrastructure Ltd © Crown Copyright 2015 Ordnance Survey
Drawing IdentifierRevision
Capita Property and Infrastructure Ltd.
Classification
Project - Originator - Zone - Level - File Type - Role - Number
Englishgate Plaza, Botchergate, Carlisle, CA1 1RP01228 673000
A595 Grizebeck Improvement
CS098850
Property and Infrastructure
Rev Description DateDrwn
Chk'd
App'd
N
General Arrangement
GRZB-CAP-HGN-00-DR-C-1100 P03
2021-05-26
IRIR1:2000 MGS
Commercial in Confidence
S2 - Issued for Information
P01 MGS IR IRP02 MGS IR IRP03 MGS IR IR
2021-05-212021-05-242021-05-26
Draft Design Freeze LayoutDraft Design Freeze Layout for ReviewDesign Freeze Layout DRAFT