Page 1: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

Imagination at work

GE Oil & Gas

Cost Optimization for Subsea Utilities

Subsea Asia 2015 – 23rd November, Jakarta

Wendi Guo – Applications Engineer

Subsea Controls Systems

GE Proprietary Information — Confidential

Page 2: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

Offshore & Subsea…

Long term subsea production from oil & gas reserves remains out of sight

GE © 2015 – All Rights Reserved Unauthorised Reproduction Prohibited

Page 3: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

Electrical Power

GE © 2015 – All Rights Reserved Unauthorised Reproduction Prohibited

What are Utility Services?

Command & Control Communications

Fluids Services

Page 4: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

System Performance Envelope

The condition of the supplies to the utility services

received subsea is a function of a number of variables.

Electrical supply, Comms modems,

Hydraulic & chemical power units

GE © 2015 – All Rights Reserved Unauthorised Reproduction Prohibited

Seabed Umbilical & Distribution Network

SOURCE

Actuators, Control Modules, Instrumentation, Injection Valves

END USER

Validated Interfaces

Complex design and optimisation required to deliver matched interfaces for power and comms

Page 5: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

The condition of the supplies to the utility services

received subsea is a function of a number of variables.

Seabed Umbilical & Distribution Network

Electrical supply, Comms modems,

Hydraulic & chemical power units

GE © 2015 – All Rights Reserved Unauthorised Reproduction Prohibited

Actuators, Control Modules, Instrumentation, Injection Valves

Validated Interfaces

Complex design and optimisation required to deliver matched interfaces for power and comms

SOURCE END USER

System Performance Envelope

Page 6: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

Basic cable for electric power & comms – twisted shielded quad

Composite umbilical with stainless steel lines and external armour

Impact of Layout on Characteristics

Page 7: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

Umbilical Losses

A customer provided the umbilical data late on in a project.

This turned out to be significantly worse than standard models.

1 10 10080-

60-

40-

20-

07.5 75

Signal

Level

(dB) GE Default

Vendor's

Proposal

-37.5 dB

-73.0 dB

Frequency (kHz)

Increasing loss Lesson learnt, new ‘worst case’, but

early umbilical definition gives;

• Opportunity for umbilical optimisation

• Reduction in cross section

0.8 1 1.2 1.46-

4-

2-

0

2

4

6Signal

Level

(V)

Time (ms)

The signal, as transmitted

0.8 1 1.2 1.46-

4-

2-

0

2

4

6Signal

Level

(V)

Time (ms)

The signal at the far end of the GE default cable

0.8 1 1.2 1.46-

4-

2-

0

2

4

6Signal

Level

(V)

Time (ms)

The signal at the end of the vendor’s cable

Case Study: Lessons from STFLs

Page 8: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

Connectors as a potential source of unreliability

Page 9: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

Distribution hardware in an ‘integration & test’ environment

Product Reliability

Page 10: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

Vulnerability to functional failure throughout the field life;

- Probe / bayonet failure or deformation

- Screw thread damage or seizure

- Unplanned shear pin failure

- Marine growth and calcification

Industry Observations

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

Break

Page 11: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

FACTOR NEED

Number of Ways

Quantity of hydraulic connections

MQCs per field installation

Cost and handling time

Make-up time

Make-up time

Installation costs and diver/ROV time

Risk in difficult conditions (such as high water

current or deep fields)

Offsets and Misalignments

Misalignment offset range

Diver/ROV installation time

Risk of an incorrect mating

Design Criteria

Page 12: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

Remove screw threads

- Metal-to-metal, high torque risk

- Avoided in other parts of subsea

Improve reliability

- Leave as few components subsea as possible

Innovation

Page 13: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

Extended qualification tests verified reliability of concept

Full FMECA

Carrier Frame shock & vibration tests

Underwater ROV tests by experienced operator

Deliberate misalignment

Concept verified under all conditions identified during design Removed the need for secondary release mechanism

Single moving part

Verified Reliability

Page 14: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

Integrate all moving parts into

topside-recoverable tool

This serviceable tool removes the complexity from subsea

Performs all required

actions with two levers

Can exercise plates without the

need to disconnect

© 2015 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Tooling Design

Page 15: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

Where marine growth and calcification are prevalent;

Shallow North Sea Warm Australian waters

Connectors and Reliability

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

… how do we support through life reliability?

Page 16: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

Injects slow stream of weak acid to reach hydraulic couplers through dedicated channels.

Acid Injection for Uptime

Page 17: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

Product Structuring as a contributor to Cost Optimization

Page 18: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

Objectives Reduced Engineering Reduced Cycle Time

Reduced Execution Risk

Manifolds Product Structuring

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

Page 19: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

0 – 100m

Diver Assist N/A N/A

100 – 750m

Guideline

750 – 3000m

Guidelineless

+ = Standardization Modularity Structured Product

Cluster Manifold –

Vertical Connections

Cluster Manifold – Horizontal Connections Template Manifold

DVCM

A pre-engineered, Strutured Manifold Portfolio delivers...

Page 20: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

Standard structure and design

… with 5 Manifold options

DVCM 2 4 Slot Manifold with Gas Lift

DVCM 1 Basic 4 slot Manifold

DVCM 4 Basic 6 slot

Manifold

DVCM 5 6 slot Manifold with

Gas Lift

DVCM 3 4 slot Manifold with

Test Header

One Structure Multiple Manifolds

Page 21: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

The Indonesia Deepwater Development Subsea Umbilical Termination Assembly

One Structure Multiple UTAs

• Terminates the umbilical • Distributes hydraulics, chemicals,

power and communications • Modular design expandable,

re-useable, simplified and optimised

Page 22: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

Product Structuring for Topside Control Stations

Page 23: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

Virtual Machine

EWS

3rd Party Servers (SIIS 3)

Network Monitor

Power Control

DCS

ROWS

KVM

Data Server

User Interface

Historian

Gateway

PLC

One System Modular Design

Page 24: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

cost

time

quality

One System Modular Design

Modular Hardware and Software Reduced Engineering with off the shelf code Reduced Cycle Time using lower hours in configuration Reduced Execution Risk from repeatability and constant review

Page 25: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

Subsea Electric Actuation for manifold cost reduction

Page 26: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

Electric cables replacing hydraulic lines for manifolds

All Electric Optimisation

Page 27: GE Oil & Gas Cost Optimization for Subsea Utilities ge oil and gas.pdf · Imagination at work GE Oil & Gas Cost Optimization for Subsea Utilities Subsea Asia 2015 – 23rd November,

© 2015 GE Oil & Gas. All Rights Reserved. Unauthorized Reproduction Prohibited

- The importance of Integration of the Subsea Utilities distribution with the key Controls components; to deliver an ‘end-to-end’ performance envelope

- We have stressed component reliability as key contributor to reducing the cost-of-ownership

- Illustrated capital cost reduction through a process of Product Structuring – standard designs, custom solutions

We conclude that optimisation – in terms of Cost, Installability, and guaranteed performance envelope – are more easily achieved if the Distribution scope is integral with the whole Control System scope.

Summary