GE Digital Energy. UR version 7.10 and UR Plus version 1.90 Firmware release Sales Presentation May , 2013. V1.0. By: Jose Mendez & JC Theron – Product Managers. Content. UR & UR Plus Family Preview What is UR v710 and UR Plus 1.90? Application Examples Key Market Drivers Ordering - PowerPoint PPT Presentation

TRANSCRIPT

  • GE Digital EnergyUR version 7.10 and URPlus version 1.90 Firmware release Sales Presentation May , 2013V1.0By: Jose Mendez & JC Theron Product Managers

  • UR & URPlus Family PreviewWhat is UR v710 and URPlus 1.90?Application ExamplesKey Market DriversOrderingQ & AContent

  • Proven State of the Art Protection and Control SystemsUR Family PreviewContinuing to drive the protection and control industry

    Complete Platform supporting all major protection applications Modular platform: Reduce spare part cost and handling, swap modules among different relay models, upgrade and expand hardware seamlessly, drastically reduce the impact of hardware updates, common software tools for configuration, monitoring, diagnostics. Advanced Communications as a backbone of the platform with unique integration flexibility Continued development in Ease of Use functionality IEC61850 on the entire family including Process Bus (Hardfiber) Diagnostics and Recording meeting international requirements Security providing the tools for NERC CIP compliance 15 years of experience in the market More than 140000 units sold (2012) GE Multilin Committed to market and Customers

  • Completely Packaged Cost-Effective Solution for Protection, Control & AutomationURPlus Family PreviewD90Plus: Sub-cycle protection . . . Improved network stability & power system performance C90Plus: Bay Monitoring/control, SSOD, F/V, dF/dt and Fast Load Shed. . . easy to design, expandB95Plus: Distributed Bus Protection . . . Up to 24 three-phase ccts with BF, reconfigurable bussesPowerful automation flexlogic & math engine . . .Improved substation automation capability in terms of performance, cost & redundancy Color HMI & annunciator . . . very intuitive and easy-to-use visual tool to monitor & control the bay/bus . . . Soft labels, descriptive messages - eliminate LEDs and annunciator in panels 288 AlarmsPowerful DFR capability . . . Eliminate the need for standalone DFRs and meet NERC requirementEnhanced metering functionality . . . Enhanced data logger and Synchrophasors as per IEEE C37.118Outstanding communication capability . . . IEC61850, Dual IP redundancy, PRP . . .Pre-configured to use for 12 different configurations . . . ready to useEnerVista Software Suite . . . Intuitive & simply the easiest way to manage the URPlus

  • GenerationTransmissionDistributionIndustrialNetwork & ControlG60 Generator G30 Generator & Transformer

    L90 - Line Differential L60 - Phase ComparisonL30 - Line DifferentialD90Plus Sub-Cycle DistanceD60 - Line Distance D30 - Backup DistanceB30 Low Impedance Bus B90 Low Impedance BusB95Plus Distributed Bus BarF60 Complete Feeder F35 - Multiple FeederT60 Complete TransformerT35 - Transformer C30 Controller N60 Network Stability and SynchrophasorsC60 Breaker ControllerC70 - Capacitor BankC90Plus Bay Controller and Small Signal Oscillation

    M60 MotorC90Plus Fast Load SheddingCovering All Major Protection and Control Applications

  • What is UR 7.10?What is URPlus 1.90?

  • MDS WiYZTMProduct Summary URMultilin UR FW release v7.10What is it?UR FW version 7.10 release introduces specific new communication and P&C capabilities to The UR Family of devices.

    New Communication functionalityNew network redundancy method as per the IEC 62439-3 PRP standard.Updated KEMA certification on the IEC61850 protocol

    New P&C FunctionalitiesIn-zone transformer capabilities added to the L90 Line Protection SystemCyberSentryTM UR Lvl 1 new settings for password bypass

    Value Proposition of UR FW version 7.10Increases network availability by enabling independent failure mode and reducing failover time to zero through implementation of IEC62439-3 PRPIn-zone transformer capability in the L90 enables decreasing the number of required CT banks by 1/3 and dedicated transformer relay for line differential schemes with a power transformer in betweenNew settings fields for bypassing user authentication may speed up relays commissioning and testing by 10% while keeping NERC/CIP compliance

  • MDS WiYZTMProduct Summary URPlusMultilin URPlus FW release v1.90What is it?URPlus FW version 1.90 release introduces specific new communication and enhanced P&C capabilities to The URPlus platform, excluding the B95Plus.

    New Communication functionalityNew network redundancy method as per the IEC 62439-3 PRP standard.Updated KEMA certification on the IEC61850 protocol

    Enhanced P&C Functionalities (C90Plus)Small Signal Oscillation Detection range is expanded to cover a wider range of 0.08 to 1Hz with step increments of 0.02Hz.

    Value Proposition of URPlus FW version 1.90Increases network availability by enabling independent failure mode and reducing failover time to zero through implementation of IEC62439-3 PRPThe SSOD (Small Signal Oscillation Detection) range is expanded and refined to ensure a larger area of system oscillations can be detected

  • Application Examples

  • MDS WiYZTMApplications 1 PRP (UR & URPlus)Increased network availability that reduces failover time to zero through implementation of IEC62439-3 PRPBumpless recovery of communicationsUR / URPlus2 networks2 ports1 MAC address/IP addressUR receives frames from both networksDiscards 2nd frameTransparent to switches

  • Application Example 1b Complete Network Redundancy (UR & URPlus) Increased network availability (Independent failure mode) Chosen redundancy method for S/S automation networks based on 61850 (Ed. 2)SAN: Single access node DANP: Double access node PRPUR v6.xx or older SANUR v7.10 or higher DANPLAN A Ring modeLAN B Tree mode

  • Application Example 1c Programmable Redundancy (UR)Programmable Redundancy- Eth Ports 2 & 3: Independent, Failover or PRP redundancy- Port 2 shares IP and MAC addresses with Port 3Eth Port 1

    Eth Port 2

    Eth Port 3

  • MDS WiYZTMApplications 2 L90 With In-zone Transformer (UR)Reduces the number of required CT banks by 1/3 and dedicated transformer relay for line differential schemes with a power transformer in betweenIn-zone Power Transformer FunctionalityCompensates remote terminal side phase shiftSuitable for two and three line terminalsSeveral Inrush Inhibit modes

  • MDS WiYZTMApplications 3 CyberSentryTM (UR)Standard Exceeds NERC CIP Password requirements (6 digits, alpha-numeric and special characters; UR 20 Digits, Alpha-numeric, special, capital and small case characters)

    Access Level for Settings Access Level for Commands Dual Access control Remote Password, Local Password Security Audit Trial (6.0x)FW 7.0x CyberSentryTM UR Level 1 Exceeds NERC CIP Password requirements (6 digits, alpha-numeric and special characters; UR 20 Digits, Alpha-numeric, special, capital and small case characters)

    RBAC with Five Roles AdministratorSupervisorEngineerOperatorObserver

    Enterprise authentication - Radius

    Enhanced Security Audit Trial plus Syslog supportRequires software option

  • Relay Commissioning and Testing Takes hours and requires frequent settings change (at least once per tested element)Each setting change requires password clearanceSubmitting password may be slow depending on the interface (front panel)Disabling passwords compromises final settings Bypass requires Administrator privileges

    Applications 3b Password Bypass (UR)User Activities CommsRead and write settings filesRead record filesWrite independent settingsFW upgradeCybersSentry settingsMaster/client Comm

    User Activities FPSee and write independent settingsSee independent recordsNo access to CyberSentry settingsRemote Password BypassSpeeds up relays commissioning and testing by about 10% while keeping NERC/CIP compliance

  • MDS WiYZTMApplications 4 Small Signal Oscillation Detection (URPlus)Increases large power system stability by monitoring 6 inputs and allow system separations upon detected instabilitySSOD Settings Range Expanded in C90PlusMeasure up to 6 analog inputs either local or remote signals at a fixed measurement rate of 100 ms, and monitor for small power system oscillations (Power or Frequency) Alarm and Trip stageSettings range expanded: 0.08 to 1 Hz with 0.02 Hz frequency step

  • Multilin UR &10 Key Feature Descriptions

    Key FeatureWhat it MeansIEC62439-3 (PRP)IEC 62439-3 is a standard that re-defines traditional Ethernet LAN redundancy by introducing two redundancy methods: the Parallel Redundancy Protocol (PRP) and the High-Availability Seamless Redundancy (HSR). UR and URplus devices support both PRP. When PRP is implemented, both main and redundant Ethernet LANs become active, data packets from UR/URPlus devices are tagged and transmitted over both LANs simultaneously. The device receiving that data, will use the packet that comes in first and drop the second one. As a benefit, if one LAN fails, there is no failover time causing delays. UR and URPlus implementation is based on the latest version of the IEC62439-3 standard, which is dated Jul-2012.In-zone Transformer for line differential protectionThe In-zone transformer protection functionality refers to the capability that GEs Line Differential Protection Systems, L30 and L90, have to accommodate a power transformer between the line terminals so the current differential scheme looks over both, Line and power transformer, without compromising protection performance. Magnitude and phase compensation as well as second harmonic inhibit during transformer magnetizing inrush are provided. This reduces the current differential scheme hardware requirements.CyberSentryTMThis is a new GEs Trade Mark that refers to all cyber security products an functionality developed by GE Grid Automation. The CyberSentry TM UR is related to the