GDOT’s complete Street Policy

Upload: others

Post on 23-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including

GDOT’s complete Street Policy

Page 2: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including
Page 3: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including

GA 400 & I-285 Interchange: A Design Build Finance Project

12’ paved surface with 2’ unobstructed shoulders (grass) on either side with a chain link fence

Connects Local and Regional multiuse path and provide connectivity thru the interchange

Includes Shared-Use Path: Funded by 400PATH , GDOT & City of Sandy Spring

Page 4: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including

Safe Routes to Schools at Various Locations

Design-Build Project: low cost solution & expedited delivery

Page 5: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including

General Scope Items

• Connect intermittent sidewalks along roadways near schools

• Upgrade wheelchair ramps and pedestrian signals

• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc.

• Widen existing bridge to accommodate a sidewalk

• Including other innovative pavement markings and devices

Solar Powered Signs

Radar Speed Signs

Rectangular Rapid Flashing Beacons

Page 6: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including

Raised Crosswalks / Speed Tables

Page 7: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including

Before Projects:

Page 8: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including

GDOT’s Proposed Solution: Semi Protected 2-Way Cycle Path

Page 9: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including

After public involvement….

Page 10: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including

Atlanta BeltLine Project

Page 11: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including

Atlanta BeltLine Project

The Atlanta BeltLine is:

A planned loop of 22 miles of modern streetcar

33 miles of multi-use trails

2,000 acres of parks

connect 45 intown neighborhoods

Public art

Historic preservation

Page 12: GDOT’s complete Street Policy...• Restripe school zones, roadways, bike lanes, crosswalks, cyclist crossings, etc. • Widen existing bridge to accommodate a sidewalk • Including

Partnerships that Provide Possibilities